JPH05287901A JP4121164A JP12116492A JPH05287901A JP H05287901 A JPH05287901 A JP H05287901A JP 4121164 A JP4121164 A JP 4121164A JP 12116492 A JP12116492 A JP 12116492A JP H05287901 A JPH05287901 A JP H05287901A
Authority
JP
Japan
Prior art keywords
formwork
concrete
truss
iron plate
stepped
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP4121164A
Other languages
Japanese (ja)
Inventor
Ryoji Morita
良治 盛田
Yasushi Nakanishi
康 仲西
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Takenaka Komuten Co Ltd
Original Assignee
Takenaka Komuten Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Takenaka Komuten Co Ltd filed Critical Takenaka Komuten Co Ltd
Priority to JP4121164A priority Critical patent/JPH05287901A/en
Publication of JPH05287901A publication Critical patent/JPH05287901A/en
Pending legal-status Critical Current

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
  • Steps, Ramps, And Handrails (AREA)

Abstract

PURPOSE:To raise the efficiency of construction work by a method in which a steel formwork is fixed to the downside of truss like fabricated reinforcing bars set between the upper and lower landings, a stepped steel formwork is fixed to the upside of the fabricated reinforcing bars, and concrete is placed through the hole of the step face of the upside formwork to form stairs. CONSTITUTION:A truss like fabricated reinforcing bars 1 consisting of an upper chord member 1a, a lower chord member 1b, and a lattice bar 1c is set between upper and lower landings. A steel formwork 2 is fixed by welding to the downside of the bars 1, a stepped steel formwork 3 is likewise fixed to the upside of the bars 1 by cast-in or split method. A concrete-placing hole 6 is formed in the step face of the formwork 3, sheathing boards are welded to both sides of the formwork 3, and concrete C is placed through the hole 6. The construction work of stairs can thus be attained with high efficiency with saved power without the needs for timbering for the formwork.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、コンクリートの現場打
ちによる階段の構築方法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for constructing stairs by casting concrete in situ.

【0002】[0002]

【従来の技術】従来、RC造(鉄筋コンクリート造)や
SRC造(鉄筋鉄骨コンクリート造)の建物において、
コンクリートを現場打ちして階段を構築する場合、支保
工として、多数のパイプサポートを階段室に林立させ
て、これらのパイサポートで鋼管製の大曳き及び根太を
支持させると共に、根太上に踊り場用型枠及び段床用型
枠を設置し、それらの上に段筋の配筋及びコンクリート
打設を行うといった方法により施工されていたため、次
のような欠点があった。
2. Description of the Related Art Conventionally, in RC (reinforced concrete) and SRC (reinforced concrete) buildings,
When constructing stairs by casting concrete on site, as a support work, a large number of pipe supports are erected in the staircase, and these pie supports are used to support steel pipe large hauls and joists, and for landing on joists. Since the formwork and the formwork for the raised floor were installed, and the construction was carried out by the method of arranging the raised bar and placing concrete on them, there were the following drawbacks.

【0003】狭い空間の中で、段床の傾斜に合わせた
複雑な型枠工事、配筋工事、支保工を行わなければなら
ず、これが工程進渉のネックとなっていた。 段床部分に支保工としてのパイプサポートが林立して
いるため、作業員の通行が困難であり、コンクリートが
硬化し、型枠及び支保工を撤去するまで階段室を作業用
の通路として利用できなかった。
In a narrow space, complex formwork, bar arrangement work, and support work must be carried out according to the inclination of the raised floor, which has been a bottleneck in the progress of the process. Since the pipe supports for supporting work are forested on the step floor, it is difficult for workers to pass through, and the staircase can be used as a work passage until the concrete hardens and the formwork and supporting work are removed. There wasn't.

【0004】[0004]

【発明が解決しようとする課題】本発明は、上記の点に
留意してなされたものであって、その目的とするところ
は、コンクリートの現場打ちによって階段を構築するに
あたり、段床部分のための複雑な型枠工事、配筋工事、
支保工をなくして、階段がRC造建物やSRC造建物の
工程進渉のネックとならないようにすると共に、階段室
をコンクリート打設前の時点から作業用の通路(資材等
の運搬が可能な広さを有する通路)として利用できるよ
うにすることにある。
SUMMARY OF THE INVENTION The present invention has been made with the above points in mind, and its purpose is to construct a staircase by cast-in-place concrete, because of the stepped floor portion. Complicated formwork construction, bar arrangement work,
By eliminating the support work, the stairs will not become a bottleneck in the process progress of RC and SRC buildings, and the staircase can be used for work passages (transportation of materials etc.) from before the concrete is placed. It is intended to be used as a passage having a large width).

【0005】[0005]

【課題を解決するための手段】上記の目的を達成するた
めに、本発明では、トラス状組立鉄筋と、該トラス状組
立鉄筋の下部に固定された鉄板製下面型枠と、前記トラ
ス状組立鉄筋の上部に固定された階段状の鉄板製上面型
枠とを備えた段床用打込み型枠を、上下の踊り場間に架
設した状態で、前記段床用打込み型枠の内部にコンクリ
ートを打設して階段を構築している。
In order to achieve the above object, in the present invention, a truss-shaped assembly rebar, an iron plate lower surface form fixed to a lower portion of the truss-shaped assembly rebar, and the truss-shaped assembly. While placing the stepped-bed driving form having a stepped steel plate top form fixed to the upper part of the reinforcing bar between the upper and lower landings, concrete is poured into the stepped-bed driving form. We are constructing stairs.

【0006】尚、上下の踊り場間に段床用打込み型枠を
架設する具体的な手順としては、例えば、トラス状組立
鉄筋が先付けされた鉄板製下面型枠を上下の踊り場間に
架設し、しかる後、階段状の鉄板製上面型枠を前記トラ
ス状組立鉄筋の上部に固定して段床用打込み型枠を組み
立てる場合と、鉄板製下面型枠に先付けされたトラス状
組立鉄筋の上部に鉄板製上面型枠を固定して予め段床用
打込み型枠を組み立てておき、これを揚重機等で現場に
吊り込んで上下の踊り場間に架設する場合とが考えられ
る。本発明は、これらの手順のいずれを採用してもよ
い。
As a concrete procedure for erection of the stepped-bed driving form between the upper and lower landings, for example, an iron plate lower surface formwork having a truss-shaped rebar in front is installed between the upper and lower landings, After that, when assembling a stepped floor driving form by fixing a stair-shaped steel plate upper formwork to the upper part of the truss-shaped assembly rebar, and on the upper part of the truss-shaped assembly rebar preliminarily attached to the iron plate lower formwork It is conceivable that an iron plate upper surface formwork is fixed and a stepped floor driving formwork is assembled in advance, and this is suspended on the site by a lifting machine or the like and installed between the upper and lower landings. The present invention may employ any of these procedures.

【0007】いずれの場合も、鉄板製上面型枠の踏面に
相当する位置にコンクリート打設用孔を形成しておくこ
とは、後述する理由により望ましいものである。鉄板製
上面型枠としては、表面の平滑な鋼板の他、縞鋼板、パ
ンチングメタル、エキスパンドメタル等を使用できる。
In either case, it is desirable to form a concrete pouring hole at a position corresponding to the tread surface of the iron plate upper surface form for the reason described later. As the steel plate upper surface form, a striped steel plate, punching metal, expanded metal or the like can be used in addition to a steel plate having a smooth surface.

【0008】上下の踊り場については、水平で作業しや
すいため、在来工法と同じく、合板製床型枠を根太およ
び大曳きを介してパイプサポートで支持し、配筋、コン
クリート打設を行い、コンクリートの硬化後、脱型して
構築するようにしてもよく、トラス状組立鉄筋とその下
部に固定された鉄板製下面型枠とから成る踊り場用打込
み型枠を階段室周囲の鉄骨柱等に架設し、当該型枠上に
コンクリートを打設して踊り場を構築するようにしても
よい。
As for the upper and lower landings, since it is easy to work horizontally, the plywood floor formwork is supported by pipe supports through joists and large tows, as in the conventional construction method. After hardening of concrete, it may be demolded and constructed, and a landing driving form consisting of truss-shaped rebar and an iron plate bottom form fixed to the lower part of it is used for steel columns around the staircase. It is also possible to construct the landing by erection and placing concrete on the formwork.

【0009】[0009]

【作用】上記の構成によれば、トラス状組立鉄筋によっ
て必要な型枠強度が得られるため、上下の踊り場間に段
床用打込み型枠を架設した状態において、段床用打込み
型枠のための支保工は不要で、段床部分にパイプサポー
トが林立せず、しかも、段床用打込み型枠が階段状の鉄
板製上面型枠を備えているため、コンクリート打設前か
ら段床用打込み型枠の鉄板製上面型枠を仮設階段として
使用でき、階段室を作業用の通路として利用することが
可能である。また、トラス状組立鉄筋を鉄板製下面型枠
に先付けしておき、鉄板製上面型枠も予め階段状に折曲
加工しておくことが可能であるため、現場での配筋工事
や型枠工事を省力化し、階段を能率良く構築できる。
According to the above construction, the required strength of the formwork can be obtained by the truss-shaped assembly rebar, so that when the formwork for the raised floor is installed between the upper and lower landings, the formwork for the raised floor is used. Since no support work is required, pipe supports do not stand upright on the terraced floor, and the terraced formwork is equipped with a stair-shaped steel plate upper surface formwork. The steel plate top formwork of the formwork can be used as a temporary staircase, and the staircase can be used as a working passage. In addition, since it is possible to attach the truss-shaped assembled rebar to the iron plate lower surface formwork in advance, and to bend the iron plate upper surface formwork in advance in a staircase shape, it is possible to perform bar arrangement work and formwork on site. Labor can be saved and stairs can be constructed efficiently.

【0010】[0010]

【実施例】以下、本発明の一実施例を図1〜図4に基づ
いて説明する。図4に示すAはRC造の階段であり、図
1〜図3に示すように、互いに平行に配置された複数の
トラス状組立鉄筋1と、該トラス状組立鉄筋1の下部に
固定された鉄板製下面型枠2と、前記トラス状組立鉄筋
1の上部に固定された階段状の鉄板製上面型枠3とを備
えた段床用打込み型枠Bを、上下の踊り場4の梁鉄骨5
間に架設した状態で、前記段床用打込み型枠Bの内部
に、前記鉄板製上面型枠3の踏面に相当する位置に形成
されたコンクリート打設用孔6からコンクリートCを打
設して構築されたものである。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of the present invention will be described below with reference to FIGS. A shown in FIG. 4 is an RC staircase, and as shown in FIGS. 1 to 3, a plurality of truss-shaped assembled reinforcing bars 1 arranged in parallel with each other and fixed to the lower part of the truss-shaped assembled reinforcing bars 1. A stepped floor driving form B having an iron plate lower surface form 2 and a stepped iron plate upper surface form 3 fixed to the upper part of the truss-shaped assembly rebar 1, and a beam steel frame 5 of the upper and lower landings 4
In the state of being installed between, the concrete C is poured into the inside of the stepped floor casting form B from the concrete placing hole 6 formed at a position corresponding to the tread surface of the iron plate upper face form 3. It was built.

【0011】前記トラス状組立鉄筋1は、コンクリート
打設前において型枠強度を確保する役目と、階段のコン
クリートCを補強する鉄筋としての役目とを果たすもの
であって、上弦材1aと下弦材1bとこれらに溶接され
たラチス筋1cとから構成され、上弦材1aに溶接した
略逆V字状の鉄筋7を鉄板製下面型枠2の上面に溶接す
る等の手段により、鉄板製下面型枠2に先付けされ、鉄
板製下面型枠2と一体化してある。前記鉄板製上面型枠
3は、一枚物の鋼板によって全段数分を折曲加工したも
のであってもよいが、図示の実施例では、図1や図3に
示すように、予め、工場で数段の階段状に折曲加工され
た所要個数の分割型枠3aを連結して鉄板製上面型枠3
を構成してある。
The truss-shaped assembled rebar 1 serves to secure formwork strength before placing concrete, and as a rebar to reinforce the concrete C of stairs. The upper chord member 1a and the lower chord member 1a. 1b and a lattice reinforcement 1c welded thereto, and a substantially inverted V-shaped rebar 7 welded to the upper chord member 1a is welded to the upper surface of the lower steel form 2 made of an iron plate. It is attached in advance to the frame 2 and is integrated with the lower plate mold 2 made of an iron plate. The upper plate form 3 made of iron plate may be formed by bending a single plate of steel plate for all stages, but in the illustrated embodiment, as shown in FIG. 1 and FIG. The upper plate form 3 made of an iron plate is formed by connecting a required number of split forms 3a bent in a stepwise manner with
Is configured.

【0012】上下の踊り場4の梁鉄骨5間に段床用打込
み型枠Bを架設するにあたっては、予め、他の場所で上
記の構成より成る段床用打込み型枠Bを組み立ててお
き、これを現場に搬入して上下の踊り場4の梁鉄骨5間
に架設してもよいが、この実施例では、次の手順を採用
している。
In order to construct the stepped floor driving form B between the beam steel frames 5 of the upper and lower landings 4, the stepped floor driving form B having the above-described structure is assembled in advance at another place. May be carried to the site and installed between the beam steel frames 5 of the upper and lower landings 4, but in this embodiment, the following procedure is adopted.

【0013】即ち、トラス状組立鉄筋1が先付けされた
鉄板製下面型枠2の両端部を上下の踊り場4の梁鉄骨5
に溶接すると共に、トラス状組立鉄筋1の両端を梁鉄骨
5に溶接した鋼棒8に溶接する。しかる後、図1に示す
ように、分割型枠3aを下段のものから順次、トラス状
組立鉄筋1の上部に固定して鉄板製上面型枠3を構成
し、前記段床用打込み型枠Bを組み立てている。図1、
図2に示す9は側面のコンクリート止めを行う鉄板製せ
き板であり、その下端部を上下の踊り場4の梁鉄骨5間
に架設したアングル材10に固定してある。
That is, the beam steel frame 5 of the upper and lower landings 4 is formed by connecting both ends of the bottom plate form 2 made of iron plate to which the truss-shaped assembly rebar 1 is attached in advance.
At the same time, the both ends of the truss-shaped assembly rebar 1 are welded to the steel rod 8 welded to the beam steel frame 5. Thereafter, as shown in FIG. 1, the divided formwork 3a is sequentially fixed to the upper part of the truss-shaped assembly rebar 1 from the lower stage to form the upper plate formwork 3 made of iron plate. Is being assembled. Figure 1,
Reference numeral 9 shown in FIG. 2 is an iron plate dam for fixing concrete on the side surface, and the lower end portion thereof is fixed to an angle member 10 installed between the beam steel frames 5 of the upper and lower landings 4.

【0014】前記分割型枠3aは、次のようにしてトラ
ス状組立鉄筋1の上部に固定されている。即ち、予め、
各分割型枠3aには、上縁の立上がり部分の一部に切れ
目を入れて、切れ目間の板部を下方へ折り曲げたり、あ
るいは、裏面の適当箇所(例えば、踏面の裏面)に別の
板材を溶接する等して取付け片11を設けておく。一方、
並列する複数のトラス状組立鉄筋1の上弦材1aにわた
って複数本の横筋12を溶接し、当該横筋12にわたって複
数本(図示の実施例では3本)の縦筋13を溶接してお
く。これらの横筋12および縦筋13は、前記取付け片11の
取付け箇所を形成すると役目と、上弦材1aのコンクリ
ート被り厚を確保する鉄筋スペーサーとしての役目とを
果たすものである。横筋12および縦筋13の溶接は、鉄板
製下面型枠2の架設後に行ってもよいが、この実施例で
は、現場での溶接作業をできるだけ少なくするために、
予め、鉄板製下面型枠2の架設に先立って行っている。
そして、図1に示すように、分割型枠3aを下段のもの
から縦筋13の上に置き、前記取付け片11と縦筋13との接
触部を点溶接等の手段により固定している。
The split mold 3a is fixed to the upper portion of the truss-shaped assembled rebar 1 as follows. That is, in advance
In each split form 3a, a cut is made in a part of the rising portion of the upper edge, the plate portion between the cuts is bent downward, or another plate material is provided at an appropriate position on the back surface (for example, the back surface of the tread). The attachment piece 11 is provided by welding or the like. on the other hand,
A plurality of horizontal bars 12 are welded over the upper chord members 1a of a plurality of truss-shaped assembled reinforcing bars 1 arranged in parallel, and a plurality of vertical bars 13 (three in the illustrated embodiment) are welded over the horizontal bars 12. The horizontal bar 12 and the vertical bar 13 serve as a reinforcing bar spacer for securing the concrete covering thickness of the upper chord member 1a when forming the mounting portion of the mounting piece 11. The welding of the horizontal bars 12 and the vertical bars 13 may be carried out after the iron plate lower surface formwork 2 is erected, but in this embodiment, in order to minimize the welding work on site,
This is done prior to the installation of the iron plate lower surface formwork 2 in advance.
Then, as shown in FIG. 1, the split mold 3a is placed on the vertical bar 13 from the lower one, and the contact portion between the attachment piece 11 and the vertical bar 13 is fixed by means such as spot welding.

【0015】上記の実施例によれば、トラス状組立鉄筋
1によって必要な型枠強度が得られるため、段床用打込
み型枠Bのための支保工が不要で、段床部分にパイプサ
ポートが林立せず、しかも、段床用打込み型枠Bが階段
状の鉄板製上面型枠3を備えているため、コンクリート
C打設前から段床用打込み型枠Bの階段状の鉄板製上面
型枠3を仮設階段として使用でき、階段室を作業用の通
路として利用することが可能である。
According to the above-mentioned embodiment, since the required formwork strength is obtained by the truss-shaped assembly rebar 1, the supporting work for the stepped-bed driving form B is unnecessary, and the pipe support is provided on the stepped-bed portion. Since it is not forested and the stepped-bed driving form B is provided with the stepped iron plate upper surface form 3, the stepped-up iron plate upper surface type of the stepped-bed driving form B before the concrete C is placed. The frame 3 can be used as a temporary staircase, and the staircase can be used as a work passage.

【0016】また、トラス状組立鉄筋1を鉄板製下面型
枠2に先付けしておき、鉄板製上面型枠3も予め階段状
に折曲加工しておくため、現場での配筋工事が不要であ
り、型枠工事も容易である。しかも、鉄板製上面型枠3
の踏面に相当する位置にコンクリート打設用孔6が形成
されているため、段床用打込み型枠Bの内部の隅々まで
容易にコンクリートを充填することができる。
Further, since the truss-shaped assembled rebar 1 is preliminarily attached to the bottom plate form 2 made of iron plate and the top form frame 3 made of iron plate is also bent in a stepwise manner in advance, there is no need for rebar work on site. Therefore, the formwork construction is easy. Moreover, the iron plate upper surface form 3
Since the concrete pouring holes 6 are formed at the positions corresponding to the tread surface, it is possible to easily fill all the inside of the stepped floor driving form B with concrete.

【0017】この実施例では、コンクリートCの打設
後、階段の表面仕上げとして、鉄板製下面型枠2の下面
にペンキ等の塗料を塗り、図4に示すように、鉄板製上
面型枠3の踏面部分に直接プラスチックタイル14を貼っ
ているが、一旦、モルタルを塗布してプラスチックタイ
ル14を貼ってもよい。15は踏面前縁と蹴込み上縁との角
部に貼着した滑り止めである。図示しないが、鉄板製上
面型枠3を鉄板製下面型枠2と同じように塗装仕上げと
してもよく、鉄板製上面型枠3として縞鋼板を用い、表
面仕上げを省略してもよい。
In this embodiment, after the concrete C has been cast, as the surface finish of the stairs, paint such as paint is applied to the lower surface of the iron plate lower surface mold 2 and, as shown in FIG. Although the plastic tile 14 is directly adhered to the tread surface portion of, the mortar may be applied once and the plastic tile 14 may be adhered. Reference numeral 15 is a slip stopper attached to the corner between the front edge of the tread and the upper edge of the riser. Although not shown, the upper surface mold 3 made of iron plate may be painted like the lower surface mold 2 made of iron plate, or a striped steel plate may be used as the upper mold 3 made of iron plate and the surface finish may be omitted.

【0018】尚、段床用打込み型枠Bの上段側にコンク
リートCを打設する際、先行して打設したコンクリート
Cが未だ流動性に富み、下段側のコンクリート打設用孔
6から流れ出す虞れがある場合には、当該コンクリート
Cがある程度固まるまで、適当な板材で当該コンクリー
ト打設用孔6に蓋をしておくものとする。図示しない
が、取付け片11を各分割型枠3aの下縁に設けておき、
分割型枠3aを上段のものから順次、縦筋13に固定する
ようにしてもよい。
When the concrete C is placed on the upper side of the stepped-bed driving form B, the previously placed concrete C is still fluid and flows out from the concrete placing hole 6 on the lower side. If there is a risk, the concrete pouring hole 6 should be covered with an appropriate plate material until the concrete C is hardened to some extent. Although not shown, a mounting piece 11 is provided on the lower edge of each split mold 3a,
The split mold 3a may be fixed to the vertical streaks 13 sequentially from the upper one.

【0019】図5は本発明の他の実施例を示す。この実
施例は、鉄板製上面型枠3として、パンチングメタル又
はエキスパンドメタルを使用し、踏面後縁と蹴込み下縁
との角部を番線16で縦筋13に結束して、当該鉄板製上面
型枠3をトラス状組立鉄筋1の上部に固定するようにし
た点に特徴がある。その他の構成は先の実施例と同じで
あるため、説明を省略する。
FIG. 5 shows another embodiment of the present invention. In this embodiment, punching metal or expanded metal is used as the iron plate upper surface form 3, and the corners of the trailing edge of the tread and the lower edge of the riser are tied to the vertical stripes 13 with the number lines 16 to form the upper surface of the iron plate. It is characterized in that the form 3 is fixed to the upper part of the truss-shaped rebar 1. The other structure is the same as that of the above-mentioned embodiment, and the description thereof will be omitted.

【0020】[0020]

【発明の効果】以上の通り、本発明によれば、トラス状
組立鉄筋によって必要な型枠強度が得られるため、段床
用打込み型枠のための支保工は不要で、段床部分にパイ
プサポートが林立せず、しかも、段床用打込み型枠が階
段状の鉄板製上面型枠を備えているため、コンクリート
打設前から鉄板製上面型枠を仮設階段として使用でき、
階段室を作業用の通路として利用することが可能であ
る。また、トラス状組立鉄筋を鉄板製下面型枠に先付け
しておき、鉄板製上面型枠も予め階段状に折曲加工して
おくことが可能であるため、現場での配筋工事や型枠工
事を省力化し、階段を能率良く構築できる。殊に、請求
項2によれば、鉄板製上面型枠の踏面に相当する位置に
コンクリート打設用孔が形成されているため、段床用打
込み型枠の内部の隅々まで容易にコンクリートを充填す
ることができる。
As described above, according to the present invention, the truss-shaped assembled rebar can provide the required formwork strength, so that no support work is required for the driving formwork for the raised floor, and the pipe is attached to the raised floor portion. Since the support does not stand upright, and the stepped floor driving formwork has a staircase-shaped top plate formwork, the steel plate topside formwork can be used as a temporary staircase before concrete placement,
It is possible to use the staircase as a passage for work. In addition, since it is possible to attach the truss-shaped assembled rebar to the iron plate lower surface formwork in advance, and to bend the iron plate upper surface formwork in advance in a staircase shape, it is possible to perform bar arrangement work and formwork on site. Labor can be saved and stairs can be constructed efficiently. Particularly, according to the second aspect, since the concrete placing holes are formed at the positions corresponding to the tread surface of the steel plate upper surface formwork, concrete can be easily applied to every corner inside the step floor driving formwork. Can be filled.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明に係る階段の構築方法を説明するための
段床用打込み型枠の分解斜視図である。
FIG. 1 is an exploded perspective view of a stepped floor driving form for explaining a method of constructing stairs according to the present invention.

【図2】コンクリート打設前における要部の縦断正面図
である。
FIG. 2 is a vertical sectional front view of a main part before concrete is poured.

【図3】コンクリートの打設途中における要部の縦断側
面図である。
FIG. 3 is a vertical cross-sectional side view of a main part in the middle of pouring concrete.

【図4】上記の方法により構築されたRC造階段の縦断
側面図である。
FIG. 4 is a vertical sectional side view of an RC staircase constructed by the above method.

【図5】本発明の他の実施例を示す段床用打込み型枠の
分解斜視図である。
FIG. 5 is an exploded perspective view of a flooring driving form according to another embodiment of the present invention.

【符号の説明】[Explanation of symbols]

B…段床用打込み型枠 C…コンクリート 1…トラス状組立鉄筋 2…鉄板製下面型枠 3…鉄板製上面型枠 6…コンクリート打設用孔 B ... Driving form for terraced floor C ... Concrete 1 ... Truss-shaped rebar 2 ... Iron plate bottom form 3 ... Iron plate top form 6 ... Concrete placement hole

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】 トラス状組立鉄筋と、該トラス状組立鉄
筋の下部に固定された鉄板製下面型枠と、前記トラス状
組立鉄筋の上部に固定された階段状の鉄板製上面型枠と
を備えた段床用打込み型枠を、上下の踊り場間に架設し
た状態で、前記段床用打込み型枠の内部にコンクリート
を打設して階段を構築することを特徴とする階段の構築
方法。
1. A truss-shaped assembled reinforcing bar, an iron plate lower surface formwork fixed to a lower portion of the truss-shaped assembled reinforcing bar, and a step-like iron plate upper surface formwork fixed to an upper portion of the truss-shaped assembled reinforcing bar. A method for constructing a staircase, comprising constructing a staircase by placing concrete provided inside the stepped-bed driving formwork between the upper and lower landings, and placing concrete inside the stepped-bed driving formwork.
【請求項2】 前記鉄板製上面型枠の踏面に相当する位
置にコンクリート打設用孔が形成されていることを特徴
とする請求項1に記載の階段の構築方法。
2. The method for constructing stairs according to claim 1, wherein a concrete pouring hole is formed at a position corresponding to the tread surface of the iron plate upper surface formwork.
JP4121164A 1992-04-14 1992-04-14 Construction of stairs Pending JPH05287901A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP4121164A JPH05287901A (en) 1992-04-14 1992-04-14 Construction of stairs

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP4121164A JPH05287901A (en) 1992-04-14 1992-04-14 Construction of stairs

Publications (1)

Publication Number Publication Date
JPH05287901A true JPH05287901A (en) 1993-11-02

Family

ID=14804432

Family Applications (1)

Application Number Title Priority Date Filing Date
JP4121164A Pending JPH05287901A (en) 1992-04-14 1992-04-14 Construction of stairs

Country Status (1)

Country Link
JP (1) JPH05287901A (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102733600A (en) * 2012-07-04 2012-10-17 江苏省华建建设股份有限公司 Totally-enclosed stair template components
CN102864925A (en) * 2012-09-29 2013-01-09 朱宏宇 Stair mould base, stair and method for building stair mould base and stair
CN103132691A (en) * 2013-02-25 2013-06-05 江苏省苏中建设集团股份有限公司 Large steel formwork corner reinforcing device
CN105040919A (en) * 2015-08-13 2015-11-11 刘文海 Precast stair and production method thereof
CN107178185A (en) * 2017-07-25 2017-09-19 佛山市正轻钢房屋有限公司 The permanent template system and manufacture method of concrete staircase
CN109025103A (en) * 2018-08-30 2018-12-18 天津大学建筑设计研究院 Light steel grating concrete folding stair
FR3081896A1 (en) * 2018-06-04 2019-12-06 Pbm Groupe PROCESS FOR THE PRODUCTION OF CONCRETE STAIRS AND STAIRS OBTAINED BY THIS PROCESS
CN110605780A (en) * 2019-10-11 2019-12-24 唐山融汇工程技术有限公司 Integral type assembly stair prefabricated template
CN113404322A (en) * 2021-06-15 2021-09-17 中国电建集团贵阳勘测设计研究院有限公司 Method for transforming steel ladder into concrete ladder in high-rise concrete structure

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102733600A (en) * 2012-07-04 2012-10-17 江苏省华建建设股份有限公司 Totally-enclosed stair template components
CN102864925A (en) * 2012-09-29 2013-01-09 朱宏宇 Stair mould base, stair and method for building stair mould base and stair
CN103132691A (en) * 2013-02-25 2013-06-05 江苏省苏中建设集团股份有限公司 Large steel formwork corner reinforcing device
CN103132691B (en) * 2013-02-25 2015-12-09 江苏省苏中建设集团股份有限公司 Steel gang form bight bracing means
CN105040919A (en) * 2015-08-13 2015-11-11 刘文海 Precast stair and production method thereof
CN107178185A (en) * 2017-07-25 2017-09-19 佛山市正轻钢房屋有限公司 The permanent template system and manufacture method of concrete staircase
FR3081896A1 (en) * 2018-06-04 2019-12-06 Pbm Groupe PROCESS FOR THE PRODUCTION OF CONCRETE STAIRS AND STAIRS OBTAINED BY THIS PROCESS
EP3578730A1 (en) * 2018-06-04 2019-12-11 PBM Groupe Method for producing concrete staircases and staircase obtained by said method
CN109025103A (en) * 2018-08-30 2018-12-18 天津大学建筑设计研究院 Light steel grating concrete folding stair
CN110605780A (en) * 2019-10-11 2019-12-24 唐山融汇工程技术有限公司 Integral type assembly stair prefabricated template
CN113404322A (en) * 2021-06-15 2021-09-17 中国电建集团贵阳勘测设计研究院有限公司 Method for transforming steel ladder into concrete ladder in high-rise concrete structure
CN113404322B (en) * 2021-06-15 2023-05-09 中国电建集团贵阳勘测设计研究院有限公司 Method for reforming steel ladder into concrete stair in high-rise concrete structure

Similar Documents

Publication Publication Date Title
US3918222A (en) Prefabricated modular flooring and roofing system
KR100694493B1 (en) Downward construction method capable of using bracket support type temporary structure as working table
JPH05287901A (en) Construction of stairs
US2014087A (en) Construction of buildings and the like
JP2747678B2 (en) Composite beam
JPH0657710A (en) Construction of concrete main tower
JPH11158813A (en) Concrete pier constructing method
JP3338240B2 (en) Construction method for reinforced concrete structures
JP3008051B2 (en) Reinforced preassembly with formwork and reinforced preassembly method with formwork
JPH084196A (en) Panel for building
JPH06299718A (en) Construction of wall, floor in atomic power plant and wall slab thereof
JPH0881918A (en) Pipe and construction method thereof
JPH06341167A (en) Working method for concrete structure
JP2811211B2 (en) Flat slab construction method
JPS6286270A (en) Slab construction method
JP3289163B2 (en) How to build underground structures
JP2761526B2 (en) How to build structures
JP2759229B2 (en) Construction method of RC construction stairs
JPH0542547B2 (en)
JPH02292428A (en) Cast-in-place-concrete-filled type pc girder
JPH0715177B2 (en) How to build a reinforced concrete structure
JPH07197510A (en) Construction of regulating pondage
JPH01223248A (en) Folded plate unit slab construction
JPH08100463A (en) Work execution method for concrete structure
JP2000017727A (en) Skelton constructing method of steel frame and reinforced concrete