CN107178185A - The permanent template system and manufacture method of concrete staircase - Google Patents

The permanent template system and manufacture method of concrete staircase Download PDF

Info

Publication number
CN107178185A
CN107178185A CN201710610277.XA CN201710610277A CN107178185A CN 107178185 A CN107178185 A CN 107178185A CN 201710610277 A CN201710610277 A CN 201710610277A CN 107178185 A CN107178185 A CN 107178185A
Authority
CN
China
Prior art keywords
baffle plate
unit
stair
marking time
side beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710610277.XA
Other languages
Chinese (zh)
Inventor
杨国伟
杨国才
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Foshan Zhengyi Light Steel Housing Co Ltd
Original Assignee
Foshan Zhengyi Light Steel Housing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Foshan Zhengyi Light Steel Housing Co Ltd filed Critical Foshan Zhengyi Light Steel Housing Co Ltd
Priority to CN201710610277.XA priority Critical patent/CN107178185A/en
Publication of CN107178185A publication Critical patent/CN107178185A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F11/00Stairways, ramps, or like structures; Balustrades; Handrails
    • E04F11/02Stairways; Layouts thereof
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F11/00Stairways, ramps, or like structures; Balustrades; Handrails
    • E04F11/02Stairways; Layouts thereof
    • E04F11/022Stairways; Layouts thereof characterised by the supporting structure
    • E04F11/025Stairways having stringers

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Steps, Ramps, And Handrails (AREA)

Abstract

The invention provides a kind of permanent template system of concrete staircase, including:Two side beam elements, bottom board unit, multiple baffle plate units of marking time, stair bottom reinforcement elements and one or more baffle plate reinforcement unit of marking time, after wherein two side beam elements, multiple baffle plate units of marking time, bottom board unit, stair bottom reinforcement elements and one or more baffle plate reinforcement unit of marking time are completed, the cavity for accommodating concrete is formed.Present invention also offers a kind of manufacture method of the permanent template system of concrete staircase.The permanent template system for the concrete staircase for having the advantages that precision is high, be easy to transport can be provided according to the present invention.

Description

The permanent template system and manufacture method of concrete staircase
Technical field
The present invention relates to the permanent template system and manufacture method of a kind of concrete staircase, more particularly to a kind of concrete building The prefabricated assembled permanent template system and manufacture method of ladder.
Background technology
The live formwork of existing reinforced concrete stairs and molding generally use wooden template at present.
Combination type mould for producing concrete building stairs for example disclosed in CN2379280Y Chinese utility model patents.But It is that this construction method has before and after site operation supporting process is various, waste timber resources, labor intensity is big, efficiency is low to ask Topic.And template erection low precision, often there is leakage phenomenon in seam crossing, have apparent at form joint after concrete setting Concavo-convex vestige, it is necessary to which subsequent handling carries out plaster, finally brush emulsion paint.
In addition it is dangerous in formwork construction, it is necessary to set up complementary interim in current stair work progress Passage, then further according to laying, the connection or fixed for requiring progress reinforcing bar.
The content of the invention
In order to solve the above-mentioned technical problem, the invention provides a kind of permanent template system of concrete staircase and manufacturer Method.
According to one aspect of the invention, the permanent template system of concrete staircase, including:
Two side beam elements, side girders of the two side beam elements respectively as the both sides of the stair;
Bottom board unit, the two ends of the bottom board unit are respectively fixedly connected with to the lower end of two side beam elements, are made For the bottom shrouding of the stair;
Multiple baffle plate units of marking time, the multiple two ends for marking time baffle plate unit are respectively fixedly connected with to two sides The inner side of beam element, is used as the vertical portion of every layer of step of the stair;
Stair bottom reinforcement elements, stair bottom reinforcement elements are arranged at mark time baffle plate unit and the bottom plate Between unit, stair bottom reinforcement elements are by supporting member, and the bottom board unit is spaced a predetermined distance from is attached to The bottom board unit;And
One or more baffle plate reinforcement unit of marking time, one or more than one baffle plate reinforcement unit of marking time One end be fixedly attached to the multiple baffle plate unit of marking time, one or more than one the another of baffle plate reinforcement unit of marking time One end is fixedly attached to the bottom board unit,
Wherein, two side beam elements, the multiple baffle plate unit of marking time, the bottom board unit, the stair bottom After portion's reinforcement elements and one or more than one baffle plate reinforcement unit of marking time are completed, are formed and accommodate concrete Cavity.
According to another embodiment of the present invention, the permanent template system also includes:Two stop components, it is described two Stop component is respectively fixedly connected with to the downside of the upper end of described two side beam elements.
According to a further embodiment of the present invention, the side beam element, the multiple baffle plate unit of marking time, the bottom plate Unit, stair bottom reinforcement elements and one or more than one baffle plate reinforcement unit of marking time are by metal material system Into.
According to a further embodiment of the present invention, the lower end of the side beam element includes bending to the direction of the cavity Bending part, the bending part of the side beam element is fixedly connected with the downside of the bottom board unit;And institute State thickness of the thickness more than the center section of the side beam element of the upper end of side beam element.
According to a further embodiment of the present invention, the center section of the side beam element has irregular shape.
According to a further embodiment of the present invention, the upper end of the multiple baffle plate unit of marking time include along the stair to The ledge that upper direct of travel level is protruded, and the lower end of the multiple baffle plate unit of marking time include edge and the stair Travel upwardly the ledge that direction level in opposite direction is protruded.
According to a further embodiment of the present invention, one or more than one baffle plate reinforcement unit of marking time is Λ shape knot The reinforcing rib structure of structure, the upper end of the Λ shapes structure is fixedly attached to the multiple baffle plate unit of marking time, the Λ shapes structure Lower end be fixedly attached to the bottom board unit.
According to a further embodiment of the present invention, welding is fixedly connected as described in above-mentioned embodiment.
According to another aspect of the present invention, the manufacture method of the permanent template system of reinforced concrete stairs, including:
Manufacture two side beam elements, side girders of the two side beam elements respectively as the both sides of the stair;
Bottom board unit is manufactured, the two ends of the bottom board unit are respectively fixedly connected with to two side beam elements End, is used as the bottom shrouding of the stair;
The multiple baffle plate units of marking time of manufacture, the multiple two ends for marking time baffle plate unit are respectively fixedly connected with to described two The inner side of root side beam element, is used as the vertical portion of every layer of step of the stair;
Stair bottom reinforcement elements are manufactured, stair bottom reinforcement elements are arranged at mark time baffle plate unit and the institute State between bottom board unit, it is spaced a predetermined distance from the bottom board unit by stair bottom reinforcement elements by supporting member To be attached to the bottom board unit;
The one or more baffle plate reinforcement unit of marking time of manufacture, one or more than one baffle plate of marking time is added One end of strong unit is fixedly attached to the multiple baffle plate unit of marking time, and one or more than one baffle plate of marking time is strengthened The other end of unit is fixedly attached to the bottom board unit;And
Assemble two side beam elements, the multiple baffle plate unit of marking time, the bottom board unit, the stair bottom Reinforcement elements and one or more than one baffle plate reinforcement unit of marking time, form the cavity for accommodating concrete.
Manufacture method is further comprising the steps of according to another embodiment of the present invention:Two stop components are manufactured, Described two stop components are respectively fixedly connected with to the downside of the upper end of described two side beam elements.
According to the permanent template system and manufacture method of the concrete staircase of the present invention, with following beneficial effect:Work The prefabricated precision of factory is high, handsome in appearance, sound construction;Flexible part handling ease meets different staircase design requirements;Globality journey Degree is high, lightweight, and easily transport, lifting and scene are built;Environmental protection, greatly reduces the use of timber, and reduction and saving are existing Field is artificial, time cost;And improve the assembly rate of building.
Brief description of the drawings
Fig. 1 is the scheme of installation of the permanent template system of the concrete staircase of embodiment of the present invention.
Fig. 2 is the schematic diagram of the cross sectional shape of the side beam element of embodiment of the present invention.
Fig. 3 is the schematic diagram of the cross sectional shape of the baffle plate unit of marking time of embodiment of the present invention.
Fig. 4 is the structural representation of the permanent template system of concrete staircase.
Fig. 5 is the diagrammatic top view of the structure of the permanent template system of concrete staircase.
Fig. 6 is the schematic sectional view of the structure of the permanent template system of concrete staircase.
Embodiment
The present invention is specifically described below in conjunction with the accompanying drawings.
In following embodiment, term " top " refers to upward direction perpendicular to the ground.Term " lower section " Refer to it is perpendicular to the ground in downward direction, term " direct of travel " refers to along the upward direct of travel of stair.
Fig. 1 schematically shows the permanent template system of concrete staircase after the installation of embodiment of the present invention.This is mixed The permanent template system of solidifying Tulou ladder can include:Side beam element 1, baffle plate unit 2 of marking time, bottom board unit 3, baffle plate of marking time add Strong unit 4 and stair bottom reinforcement elements 5.
The quantity of side beam element 1 can be two, and material can be the metal materials such as general steel plate, galvanized steel plain sheet, aluminium sheet The nonmetallic materials such as material or structure PVC board.Two side beam elements 1 can be processed according to design requirement by numerical control clod wash. Length, height and the end size of beam can be calculated according to actual requirement and obtained, and accurately be processed by Digit Control Machine Tool.Side girders Unit 1 install after, can as stair permanent side girders, and without remove.
As shown in figure 1, the center section 11 of side beam element 1 can be strip.In the preferred embodiment of the present invention In, the upside of the upper part 12 of side beam element 1 can be made into, and the lower end of side beam element 1 parallel with ground Part 13 is outstanding part, and the ledge can be arranged on lower floor's floor 7, to play stable effect.But It will be understood by those of skill in the art that the shape of the side beam element 1 shown in Fig. 1 is only one embodiment of the present of invention.Side The shape of side bar unit 1 can correspondingly be changed according to design requirement.
Fig. 2 schematically shows the cross sectional shape of the side beam element 1 of embodiment of the present invention.As shown in Fig. 2 side Such as in the cross sectional shape of beam element 1, its lower end includes the ledge prominent to direction on the inside of stair, in the form of an " L ".This is dashed forward Go out part and be used to improving the tensile capacity of stair and can realize with the seamless connection of bottom board unit 3 etc..
In the cross sectional shape of side beam element 1, its upper end can be various shapes.As shown in Fig. 2 (a)-(i), in Fig. 2 (a) and in Fig. 2 (i) shape of the upper end of side beam element 1 is identical with middle part shape, the side girders list in Fig. 2 (b)-Fig. 2 (h) The thickness of the upper end of member 1 is more than the thickness at middle part to better ensure that out-of-plane stability.For example, in Fig. 2 (b) and Fig. 2 (h) upper end of side beam element 1 is shaped as the bending shape that the direction to outside stair is once bent in, in Fig. 2 (c)-Fig. 2 (g) upper end of side beam element 1 is shaped as the direction to outside stair and carries out first time bending and direction progress downwards second in The shape of secondary bending, in Fig. 2 (d) upper end of side beam element 1 be shaped as into stair direction carry out first time bending and Direction carries out the shape of second of bending downwards, and the upper end of side beam element 1 is shaped as toroidal in Fig. 2 (e), in figure The upper end side of the being shaped as ring-shaped of side beam element 1 in 2 (f).
The height at the middle part of side beam element 1 can be configured according to design requirement and mechanical requirements, it is ensured that side girders Mechanic properties.For example in Fig. 2 (a)-Fig. 2 (f), the middle part of side beam element 1 can be tabular, Fig. 2 (g)- In Fig. 2 (i), the middle part of side beam element 1 can include irregular shape, so as to when pouring into a mould concrete resistance concrete to Outer side force.As shown in Fig. 2 (g)-Fig. 2 (h), the center section at middle part can be curved surface and face spaced shape directly, Shown in Fig. 2 (i), the center section at middle part can be triangular facet and face spaced shape directly.But the technology of this area As long as personnel, which should be appreciated that, can resist the power laterally outwardly of concrete, it would however also be possible to employ other suitable shapes.Moreover, needing It should be noted that, although figure 2 illustrates the center section that irregular shape is located at middle part, but according to actual design requirement And/or mechanical requirements, can also be by middle part whole installation into irregular shape.
In addition, in the stair work progress of prior art, for security reasons, it is necessary to set up occasional passage.But Using the side girder construction of the present invention, workmen can be supplied to provide by the way that the thickness of the upper end of side beam element 1 is become into big Use it is enough trample area, so as to as occasional passage.
Below, baffle plate unit 2 of marking time is specifically described.
The quantity of baffle plate unit 2 of marking time can be to be multiple, and material can be the metals such as general steel plate, galvanized steel plain sheet, aluminium sheet The nonmetallic materials such as material or structure PVC board.Marking time baffle plate unit 2 can be according to design requirement by cold roll forming processing Cross sectional shape into, physical length, height, quantity and needs can pass through to calculate and obtain., can after baffle plate unit 2 of marking time is installed Using the permanent baffle plate of marking time as stair, and without removing.
Mark time baffle plate unit 2 shape can be long plate shape, be arranged between two side beam elements 1.Mark time baffle plate list The two ends of member 2 are fixedly attached to the inner sides of two side beam elements 1, this be fixedly connected mode can weld, cementing, grafting, riveting Connect, the suitable connected mode such as bolt is fixed.For example, in baffle plate unit 2 of marking time by the case that metal material is made, gear of marking time The two ends of Slab element 2 can be soldered to the inner side of two side beam elements 1, and marking time, baffle plate unit 2 is made up of nonmetallic materials In the case of, the two ends for baffle plate unit 2 of marking time can be bonded to the inner side of two side beam elements 1.
Fig. 3 diagrammatically illustrates the cross sectional shape of the baffle plate unit 2 of marking time of embodiment of the present invention, baffle plate unit 2 of marking time Can be various shapes.As shown in Fig. 3 (a)-Fig. 3 (f), the upper end for baffle plate unit 2 of marking time is included along the side of travelling upwardly of stair The ledge prominent to level.The ledge can be parallel with ground.The protuberance as shown in Fig. 3 (d) and Fig. 3 (f) The end divided can also have the kink bent downwards, to provide more preferable stability.The ledge can ensure to put down Stability outside face, and due to the presence of the ledge, provides enough areas of trampling for workmen, therefore can be with It regard the baffle plate unit 2 of marking time after installation as occasional passage.
Mark time baffle plate unit 2 middle part can be tabular, flat middle part can be arranged to it is perpendicular to the ground or Predetermined angle of inclination is formed with ground.When being arranged to form predetermined angle of inclination with ground, personnel upstairs can be prevented Shoes touch baffle plate unit 2 of marking time.
The mark time lower end of baffle plate unit 2 can have identical thickness and shape with middle part, can also be arranged to include edge With the ledge that horizontal direction in opposite direction is protruded that travels upwardly of the stair., can be with by setting the ledge Increase the compressive resistance for baffle plate unit of marking time.Moreover, by by the upper of the lower end protruding portion of upper strata step and adjacent lower step End ledge is arranged on a horizontal plane, so after concrete has been poured into a mould, when workmen's progress stair are floating, The lower end protruding portion and the residing horizontal plane of the upper end tab point of adjacent lower step for being referred to upper strata step are carried out, this Sample can ensure the flatness of stair.
As shown in Fig. 1 and 4-6, the permanent template system of concrete staircase of the invention further comprises bottom board unit 3.Bottom Slab element 3 can be tabular, and its two ends is respectively fixedly connected with to the lower end of two side beam elements 1, is used as stair forever Long bottom shrouding, and without removing.The length and width of bottom board unit 3 can be configured according to design requirement.
Bottom board unit 3 can be arranged on the above-mentioned ledge of the lower end of two side beam elements 1, and with the protrusion Part is fixedly connected, when the two is made up of metal material, and this, which is fixedly connected, to be welding, by other such as structure PCV plates When being made, this, which is fixedly connected, to be bonding.By the way that bottom board unit 3 is fixedly connected with the protuberance split-phase of side beam element 1, It can be used for improving the tensile capacity of stair and seamless connection of the two etc. can be realized.
Below, above-mentioned baffle plate reinforcement unit 4 of marking time is illustrated.
The one end for baffle plate reinforcement unit 4 of marking time is fixedly attached to the back side for baffle plate unit 2 of marking time, and the other end is fixedly attached to Bottom board unit 3.When these units are made up of metal material, this, which is fixedly connected, preferably welds.Added by installing baffle plate of marking time Strong unit 4, to increase the installation strength for baffle plate unit 2 of marking time, and when baffle plate unit 2 of marking time is as temporary stairways, marks time Baffle plate reinforcement unit 4 can increase the intensity of temporary stairways.In addition can also be by baffle plate reinforcement unit 4 of marking time for bottom board unit 3 provide extra support, and so after filling concrete, bottom board unit 3 will not produce buckling phenomenon under gravity.
The shape for baffle plate reinforcement unit 4 of marking time can be configured according to design requirement.Baffle plate reinforcement unit 4 of marking time can be with For triangle flat plate shape, it can also be constructed into the reinforcement of the shapes such as " Λ " shape.When being shaped as baffle plate reinforcement unit 4 of marking time During " Λ " shape, being somebody's turn to do " Λ " shape can be by the way that reinforcing bar bending be formed, and the upper end of " Λ " shape is soldered to the back of the body for baffle plate unit 2 of marking time Face, lower end is soldered in bottom board unit 3.
Baffle plate reinforcement unit 4 of marking time quantity can correspond to one and mark time baffle plate unit 2 to set one, but according to reality The force request on border or the width of stair etc., baffle plate reinforcement unit 4 of marking time can also set two or more.
Referring to Fig. 1, the permanent template system of concrete staircase of the invention also includes stair bottom reinforcement elements 5, stair Bottom reinforcement elements, which are arranged at, marks time between baffle plate unit 2 and bottom board unit 3, and after cast concrete, the stair bottom reinforces single Member 5 is located between concrete, plays a part of reinforcing stair.Fig. 4-6 also show further showing for stair bottom reinforcement elements 5 Meaning property structure.In the drawings, stair bottom reinforcement elements 5 are shown as bar construction, traveling of a plurality of reinforcing bar along stair Direction is be arranged in parallel.But according to actual design requirement, stair bottom reinforcement elements 5 can using caged reinforcement constitution or Person's steel mesh reinforcement is constructed.The intensity of stair bottom reinforcement elements 5 can be set according to actual design requirement.
Although not shown in above-mentioned accompanying drawing, stair bottom reinforcement elements 5 can be fixedly connected by supporting member To bottom board unit 3.For supporting member, it will be understood by those of skill in the art that according to actual design requirement, can use and appoint Anticipate suitable form.One end of the supporting member is connected with stair bottom reinforcement elements 5, and the other end is connected to bottom board unit 3. By setting the supporting member, stair bottom reinforcement elements 5 will be separated by a distance with bottom board unit 3, so mixed in cast After solidifying soil, compared with situation not spaced apart, the compression strength of stair can be preferably improved.The supporting member can To be made of arbitrary suitable material.
The bottom of stair bottom reinforcement elements 5 can be fixedly attached to lower floor's floor 7, stair bottom reinforcement elements 5 Upper end can be fixedly attached to upper strata floor 8, and it can be welding that this, which is fixedly connected,.For example, when stair bottom reinforcement elements 5 by When reinforcing bar or caged or steel mesh reinforcement structure, the bottom of the reinforcing bar of stair bottom reinforcement elements 5 can be soldered to lower floor's floor 7 Before on reserved steel bar, the upper end of the reinforcing bar of stair bottom reinforcement elements 5 can be soldered to upper strata floor 8 before it is reserved On reinforcing bar.
In a preferred embodiment of the invention, the permanent template system of concrete staircase further comprises stop component 6.
The shape of stop component 6 can be required according to actual design requirement, in figs. 4-6, two shapes of stop component 6 Shape is strip, is fixedly connected on the upper end of side beam element 1 and is extended out from side beam element 1.As illustrated, stop Part 6 is arranged on the inner side of side beam element 1, and is fixedly connected with or is soldered to the downside of the upper end of two side beam elements.
As shown in figure 1, the part extended out of stop component 6 rests in the top of upper strata floor, and can be with building The reserved reinforcing bar of the upper strata floor of ladder is engaged or fixed, and so may insure that whole template system will not occur to glide and left Move right.
According to the permanent template system of the concrete staircase of the present invention, two side beam elements 1, multiple baffle plate units of marking time 2nd, the bottom board unit 3, stair bottom reinforcement elements 5 and one or more baffle plate reinforcement unit 4 of marking time have been assembled Cheng Hou, forms the cavity for accommodating concrete.
The permanent template system of the concrete staircase of the present invention is the permanent template system of integration, without dismantlement work, , can be for good and all as a part for stair after concrete casting.Because the precision of template is higher, in concrete setting Afterwards, in the absence of obvious concavo-convex vestige, it is not necessary to which follow-up process carries out the processing such as plaster, therefore can reduce process, accelerates Progress and reduce cost etc..
, can also be according to design requirement in the factory with high accuracy according to the permanent template system of the concrete staircase of the present invention Industrialization means quickly manufactured, do not change any size and technical indicator of concrete staircase, complete whole stair mould The manufacture of plate, then transports to job site and carries out Integral quick hoisting.
Side beam element 1 and baffle plate unit 2 of marking time in the present invention can be using the manufactures of high-accuracy mechanical cold roll forming, tool There are excellent resistance to compression, stable mechanical property, may be used as temporary stairways, workmen is without separately setting up other occasional passages Deng.Workmen after this template system is in place need to only keep up with the upper and lower ends of the inside bar-mat reinforcement as requested, lower floor Reinforcing bar on plate is attached, fixed, you can enter the cast stage of concrete.
Reinforced concrete stairs after being poured into a mould using permanent template system of the present invention is more preferable with main building structural integrity, industry The metal form for changing manufacture is not only firm, and lines are succinctly attractive in appearance, without dismounting, smooth dry without the secondary process such as plaster Net outer surface can be delivered for use by emulsion paint application.
Under the conditions of identical size and technical requirements, the weight of permanent template system of the invention (containing reinforcing bar) is less than current city The 10% of the prefabricated reinforced concrete stair weight used on field, and stack convenient, convenient transportation, on-site hoisting is convenient, frame And if adjusting very light.Monolithic architecture speed is improved, site operation labor intensity is reduced, lowers cost of transportation and construction progress In time cost.
According to another embodiment of the present invention, a kind of permanent template system for manufacturing reinforced concrete stairs is additionally provided Method, it comprises the following steps.
Manufacture two side beam elements, side girders of two side beam elements respectively as the both sides of stair.
Bottom board unit is manufactured, the two ends of bottom board unit are respectively fixedly connected with to the lower end of two side beam elements, as The bottom shrouding of stair.
The multiple baffle plate units of marking time of manufacture, multiple two ends for marking time baffle plate unit are respectively fixedly connected with to two side girders The inner side of unit, is used as the vertical portion of every layer of step of stair.
Manufacture stair bottoms reinforcement elements, stair bottom reinforcement elements are arranged at mark time baffle plate unit and bottom board unit it Between, by stair bottom reinforcement elements by supporting member, and bottom board unit is spaced a predetermined distance from is attached to bottom board unit.
The one or more baffle plate reinforcement unit of marking time of manufacture, strengthens single by one or more baffle plate of marking time One end of member is fixedly attached to multiple baffle plate units of marking time, by the other end of one or more baffle plate reinforcement unit of marking time It is fixedly attached to bottom board unit.
Two side beam elements of assembling, multiple baffle plate units of marking time, bottom board unit, stair bottom reinforcement elements and one Or more than one baffle plate reinforcement unit of marking time, form the cavity for accommodating concrete.
Two stop components are manufactured, two stop components are respectively fixedly connected with to the upper end of two side beam elements Side.
It should be noted that above-mentioned steps can not be performed by said sequence.Those skilled in the art can be according to reality Border is adjusted.
Obviously, above-mentioned embodiment is only intended to clearly illustrate example of the present invention, and is not to the present invention Embodiment restriction.For those of ordinary skill in the field, it can also make on the basis of the above description Other various forms of changes or variation.There is no necessity and possibility to exhaust all the enbodiments.And these belong to this Among the obvious changes or variations that the spirit of invention is extended out is still in protection scope of the present invention.
Symbol description
1 side beam element
2 mark time baffle plate unit
3 bottom board units
4 mark time baffle plate reinforcement unit
5 stair bottom reinforcement elements
6 stop components
7 lower floor's floors
8 upper strata floors
11 center sections
12 upper parts
13 end portions

Claims (10)

1. the permanent template system of a kind of concrete staircase, it is characterised in that the permanent template system includes:
Two side beam elements, side girders of the two side beam elements respectively as the both sides of the stair;
Bottom board unit, the two ends of the bottom board unit are respectively fixedly connected with to the lower end of two side beam elements, are used as institute State the bottom shrouding of stair;
Multiple baffle plate units of marking time, the multiple two ends for marking time baffle plate unit are respectively fixedly connected with to two side girders lists The inner side of member, is used as the vertical portion of every layer of step of the stair;
Stair bottom reinforcement elements, stair bottom reinforcement elements are arranged at mark time baffle plate unit and the bottom board unit Between, stair bottom reinforcement elements are spaced a predetermined distance from described to be attached to the bottom board unit by supporting member Bottom board unit;And
One or more baffle plate reinforcement unit of marking time, it is one or more than one mark time the one of baffle plate reinforcement unit End is fixedly attached to the multiple baffle plate unit of marking time, the other end of one or more than one baffle plate reinforcement unit of marking time The bottom board unit is fixedly attached to,
Wherein, two side beam elements, the multiple baffle plate unit of marking time, the bottom board unit, the stair bottom add Gu after unit and one or more than one baffle plate reinforcement unit of marking time are completed, form the sky for accommodating concrete Chamber.
2. the permanent template system of concrete staircase as claimed in claim 1, it is characterised in that the permanent template system is also Including:
Two stop components, described two stop components are respectively fixedly connected with to the upper end of described two side beam elements Side.
3. the permanent template system of concrete staircase as claimed in claim 1, it is characterised in that the side beam element, institute State multiple baffle plate units of marking time, the bottom board unit, stair bottom reinforcement elements and one or more than one Baffle plate reinforcement unit of marking time is made up of metal material.
4. the permanent template system of concrete staircase as claimed in claim 3, it is characterised in that
The lower end of the side beam element includes the bending part bent to the direction of the cavity, the institute of the side beam element The downside that bending part is stated with the bottom board unit is fixedly connected;And
The thickness of the upper end of the side beam element is more than the thickness of the center section of the side beam element.
5. the permanent template system of concrete staircase as claimed in claim 4, it is characterised in that
The center section of the side beam element has irregular shape.
6. the permanent template system of concrete staircase as claimed in claim 3, it is characterised in that
The upper end of the multiple baffle plate unit of marking time includes the ledge that direction level is protruded that travels upwardly along the stair, And
The lower end of the multiple baffle plate unit of marking time includes dashing forward along the direction level in opposite direction that travels upwardly with the stair The ledge gone out.
7. the permanent template system of concrete staircase as claimed in claim 1, it is characterised in that it is one or more than one The reinforcing rib structure that baffle plate reinforcement unit is Λ shape structures of marking time, the upper end of the Λ shapes structure is fixedly attached to the multiple Mark time baffle plate unit, the lower end of the Λ shapes structure is fixedly attached to the bottom board unit.
8. the permanent template system of the concrete staircase as described in any one of claim 1 to 7, it is characterised in that the fixation It is connected as welding.
9. a kind of manufacture method of the permanent template system of concrete staircase, it is characterised in that including:
Manufacture two side beam elements, side girders of the two side beam elements respectively as the both sides of the stair;
Bottom board unit is manufactured, the two ends of the bottom board unit are respectively fixedly connected with to the lower end of two side beam elements, It is used as the bottom shrouding of the stair;
The multiple baffle plate units of marking time of manufacture, the multiple two ends for marking time baffle plate unit are respectively fixedly connected with to two sides The inner side of side bar unit, is used as the vertical portion of every layer of step of the stair;
Stair bottom reinforcement elements are manufactured, stair bottom reinforcement elements are arranged at mark time baffle plate unit and the bottom Between Slab element, by stair bottom reinforcement elements by supporting member, and the bottom board unit is spaced a predetermined distance from pacifies It is filled to the bottom board unit;
The one or more baffle plate reinforcement unit of marking time of manufacture, strengthens single by one or more than one baffle plate of marking time One end of member is fixedly attached to the multiple baffle plate unit of marking time, by one or more than one baffle plate reinforcement unit of marking time The other end be fixedly attached to the bottom board unit;And
Assemble two side beam elements, the multiple baffle plate unit of marking time, the bottom board unit, stair bottom reinforcing Unit and one or more than one baffle plate reinforcement unit of marking time, form the cavity for accommodating concrete.
10. the manufacture method of the permanent template system of concrete staircase as claimed in claim 9, it is characterised in that the system Make method further comprising the steps of:
Two stop components are manufactured, described two stop components are respectively fixedly connected with to the upper end of described two side beam elements Downside.
CN201710610277.XA 2017-07-25 2017-07-25 The permanent template system and manufacture method of concrete staircase Pending CN107178185A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710610277.XA CN107178185A (en) 2017-07-25 2017-07-25 The permanent template system and manufacture method of concrete staircase

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710610277.XA CN107178185A (en) 2017-07-25 2017-07-25 The permanent template system and manufacture method of concrete staircase

Publications (1)

Publication Number Publication Date
CN107178185A true CN107178185A (en) 2017-09-19

Family

ID=59838454

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710610277.XA Pending CN107178185A (en) 2017-07-25 2017-07-25 The permanent template system and manufacture method of concrete staircase

Country Status (1)

Country Link
CN (1) CN107178185A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112746713A (en) * 2020-12-30 2021-05-04 江苏沪宁钢机股份有限公司 Triangular step stair and construction process thereof

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2038394A (en) * 1978-12-11 1980-07-23 American Stair Corp Stressed-skin Reinforced Concrete Stairway Structures
JPH05287901A (en) * 1992-04-14 1993-11-02 Takenaka Komuten Co Ltd Construction of stairs
CN1912305A (en) * 2005-07-19 2007-02-14 丁玟先 Precast stairway system, unit structure thereof, and method of constructing stairway system using the same
CN203878991U (en) * 2014-03-18 2014-10-15 中天建设集团有限公司 Staircase steel mold device for multi-storied shaped staircase construction
US20140325920A1 (en) * 2010-12-23 2014-11-06 Icun Nuovi Stadi S.R.L. Element for performing sports facility stands and sports faility stand performed by means of said element
CN104878924A (en) * 2015-05-29 2015-09-02 成都市第二建筑工程公司 Stair step concrete pouring-molded template and stair cast-in-situ construction method
CN207177118U (en) * 2017-07-25 2018-04-03 佛山市正一轻钢房屋有限公司 The permanent template system of concrete staircase

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2038394A (en) * 1978-12-11 1980-07-23 American Stair Corp Stressed-skin Reinforced Concrete Stairway Structures
JPH05287901A (en) * 1992-04-14 1993-11-02 Takenaka Komuten Co Ltd Construction of stairs
CN1912305A (en) * 2005-07-19 2007-02-14 丁玟先 Precast stairway system, unit structure thereof, and method of constructing stairway system using the same
US20140325920A1 (en) * 2010-12-23 2014-11-06 Icun Nuovi Stadi S.R.L. Element for performing sports facility stands and sports faility stand performed by means of said element
CN203878991U (en) * 2014-03-18 2014-10-15 中天建设集团有限公司 Staircase steel mold device for multi-storied shaped staircase construction
CN104878924A (en) * 2015-05-29 2015-09-02 成都市第二建筑工程公司 Stair step concrete pouring-molded template and stair cast-in-situ construction method
CN207177118U (en) * 2017-07-25 2018-04-03 佛山市正一轻钢房屋有限公司 The permanent template system of concrete staircase

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112746713A (en) * 2020-12-30 2021-05-04 江苏沪宁钢机股份有限公司 Triangular step stair and construction process thereof
CN112746713B (en) * 2020-12-30 2021-11-23 江苏沪宁钢机股份有限公司 Triangular step stair and construction process thereof

Similar Documents

Publication Publication Date Title
CN201661021U (en) Prefabricated reinforced concrete stair
CN205777185U (en) A kind of full assembling concrete beam-type stair
CN109518858A (en) Fabricated Beam-Slab connection structure and its construction method
CN105971276A (en) Integral aluminum formwork stair one-step continuous pouring forming structure and construction method
CN206396966U (en) A kind of assembled laminated floor slab plate seam node component
CN108678445A (en) A kind of structure of workshop
CN207177118U (en) The permanent template system of concrete staircase
CN107178185A (en) The permanent template system and manufacture method of concrete staircase
CN206800837U (en) Assembled steel skeleton lightweight concrete composition stair
CN210105158U (en) Light-duty precast concrete rib formula stair
CN108691380B (en) Damping assembly type concrete floor structure and construction method thereof
CN207160217U (en) Building frame construction provided with side bar
CN110359612A (en) A kind of novel two-way ribs profiled steel sheet combination floor of assembled
WO2012000030A1 (en) Pre- fabricated module for forming a staircase
CN212866534U (en) Assembled coincide floor
CN109441031B (en) Structure Liang Yincang type overhanging type open rotary stair structure and construction method thereof
CN113323215A (en) Concrete groove type composite floor slab free of truss steel bars and construction method thereof
CN107268852A (en) Floor construction and construction method that a kind of prefabricated frid is constituted
CN110512728B (en) Assembly type building superposed lotus root beam column node structure and construction method thereof
CN205387761U (en) Assembly type shear wall
CN111851804A (en) Assembly type formwork-dismantling-free structural body formwork and cast-in-place formwork-dismantling-free structural body
CN210685226U (en) Assembled UHPC stair
CN217759486U (en) Prefabricated plate structure and coincide floor
CN211817282U (en) Close piece together unidirectional superimposed sheet of notch cuttype PC prestressing force
CN113356489B (en) Prefabricated beam type scissor stair and construction method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
AD01 Patent right deemed abandoned
AD01 Patent right deemed abandoned

Effective date of abandoning: 20230818