CN110359612A - A kind of novel two-way ribs profiled steel sheet combination floor of assembled - Google Patents
A kind of novel two-way ribs profiled steel sheet combination floor of assembled Download PDFInfo
- Publication number
- CN110359612A CN110359612A CN201910506525.5A CN201910506525A CN110359612A CN 110359612 A CN110359612 A CN 110359612A CN 201910506525 A CN201910506525 A CN 201910506525A CN 110359612 A CN110359612 A CN 110359612A
- Authority
- CN
- China
- Prior art keywords
- rib
- prefabricated
- profiled steel
- steel plate
- way
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 59
- 239000010959 steel Substances 0.000 title claims abstract description 59
- 239000004567 concrete Substances 0.000 claims abstract description 39
- 239000002131 composite material Substances 0.000 claims abstract description 21
- 230000002457 bidirectional effect Effects 0.000 claims abstract description 5
- 230000002787 reinforcement Effects 0.000 claims description 11
- 238000009415 formwork Methods 0.000 claims description 8
- 230000003014 reinforcing effect Effects 0.000 claims description 5
- 238000010276 construction Methods 0.000 abstract description 15
- 229910001294 Reinforcing steel Inorganic materials 0.000 abstract 3
- 239000000758 substrate Substances 0.000 abstract 1
- 238000010586 diagram Methods 0.000 description 6
- 229910052602 gypsum Inorganic materials 0.000 description 3
- 239000010440 gypsum Substances 0.000 description 3
- 238000004519 manufacturing process Methods 0.000 description 3
- 238000013461 design Methods 0.000 description 2
- 241001391944 Commicarpus scandens Species 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 230000010354 integration Effects 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 239000011178 precast concrete Substances 0.000 description 1
- 238000011160 research Methods 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B5/00—Floors; Floor construction with regard to insulation; Connections specially adapted therefor
- E04B5/16—Load-carrying floor structures wholly or partly cast or similarly formed in situ
- E04B5/17—Floor structures partly formed in situ
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
Description
技术领域technical field
本发明涉及一种楼板,具体是一种采用双向密肋压型钢板、无需梁板模具施工的装配式密肋组合楼板。The invention relates to a floor slab, in particular to a prefabricated dense rib composite floor slab which adopts two-way dense rib profiled steel plates and does not require beam-plate mould construction.
背景技术Background technique
近几年我国大力推进建筑工业化,推广装配式建筑以合理利用和节约建筑资源。钢结构具有的自重轻、易实现标准化设计、构件工业化生产等优点,使其在发展装配式建筑上具有天然的优势。楼板作为装配式钢结构建筑中重要组成部分和指标之一,装配式楼板的应用和研究对装配钢结构建筑的推广和应用有着重要的意义和作用。目前在装配式钢结构住宅中广泛应用的楼板主要有三类:压型钢板混凝土组合楼板、钢筋桁架混凝土叠合楼板和钢筋桁架楼承板。其中压型钢板组合楼板具有结构层厚度大,影响建筑物净高;垂直于板肋的管线敷设在板肋上部影响上部钢筋施工空间,导致施工复杂等诸多问题;钢筋桁架混凝土叠合楼板存在着自重较大、运输过程中易折断等缺点;钢筋桁架楼承板具有自重较大、混凝土用量多等缺陷。三种预制楼板在实际运用中都存在现场混凝土湿作业工程量大、管线集成化程度低等问题。In recent years, my country has vigorously promoted the industrialization of construction, and promoted prefabricated buildings to rationally utilize and save construction resources. The advantages of steel structure, such as light weight, easy realization of standardized design, and industrialized production of components, make it a natural advantage in the development of prefabricated buildings. As one of the important components and indicators of prefabricated steel structure buildings, the application and research of prefabricated floor slabs have important significance and effects on the promotion and application of prefabricated steel structure buildings. At present, there are three types of floor slabs widely used in prefabricated steel structure houses: profiled steel plate concrete composite floor, reinforced truss concrete composite floor and reinforced truss floor deck. Among them, the profiled steel plate composite floor has a large thickness of the structural layer, which affects the clear height of the building; the pipelines perpendicular to the slab rib are laid on the upper part of the slab rib, which affects the construction space of the upper reinforcement, resulting in complex construction and many other problems; the reinforced truss concrete composite floor has many problems. The disadvantages of large self-weight and easy to break during transportation; steel truss floor deck has the disadvantages of large self-weight and large amount of concrete. The three types of prefabricated floor slabs all have problems such as large amount of concrete wet work on site and low degree of pipeline integration in practical application.
发明内容SUMMARY OF THE INVENTION
技术问题:针对上述现有装配式楼板存在的问题,本发明提供一种装配式新型双向密肋压型钢板组合楼板及施工方法,安全可靠,可实现装配化施工且容易标准化生产。Technical problem: In view of the problems existing in the above-mentioned existing prefabricated floor slabs, the present invention provides a new prefabricated two-way dense rib profiled steel plate composite floor slab and a construction method, which is safe and reliable, can realize prefabricated construction and is easy to standardize production.
技术方案:本发明的装配式新型双向密肋压型钢板组合楼板包括预制密肋底板和现浇混凝土层,所述的预制密肋底板包括双向密肋压型钢板和底层钢筋网片,双向密肋压型钢板作为预制密肋底板混凝土浇筑的模板,其上设有压型钢板预留孔和螺栓套筒,底层钢筋网片铺设于双向密肋压型钢板肋槽内;所述的现浇混凝土层位于预制密肋底板上面,现浇混凝土层内铺设有上层钢筋网片。Technical scheme: The prefabricated new double-rib profiled steel plate composite floor of the present invention includes a prefabricated dense-rib bottom plate and a cast-in-place concrete layer. The rib profiled steel plate is used as the template for concrete pouring of the prefabricated dense rib bottom plate, and there are reserved holes for the profiled steel plate and bolt sleeves on it, and the bottom reinforcement mesh is laid in the rib groove of the two-way dense rib profiled steel plate; The concrete layer is located on the prefabricated dense rib bottom plate, and the upper layer of steel mesh is laid in the cast-in-place concrete layer.
所述的预制密肋底板采用在工厂预制,在现场施工安装,采用现浇混凝土将预制密肋底板与上层钢筋网片组装、形成密肋楼板。The prefabricated dense rib bottom plate is prefabricated in the factory, constructed and installed on site, and the prefabricated dense rib floor plate and the upper reinforced mesh sheet are assembled with cast-in-place concrete to form a dense rib floor plate.
现浇混凝土层以预制密肋底板作为模板浇筑混凝土。The cast-in-place concrete layer is poured with prefabricated dense rib floor as a formwork.
所述双向密肋压型钢板分单元连接形成预制密肋底板的混凝土浇筑模板,并在纵横肋相交处预留压型钢板预留孔,预埋螺栓套筒,作为后期吊顶龙骨的支承点。The two-way rib profiled steel plates are connected in units to form a concrete pouring formwork for a prefabricated ribbed bottom plate, and a reserved hole for the profiled steel plate is reserved at the intersection of the longitudinal and transverse ribs, and the bolt sleeves are pre-buried as the support point of the ceiling keel in the later stage.
所述底层钢筋网片受力筋按双向受力成井字形布置,铺设于双向密肋压型钢板肋槽内。The reinforcing bars of the bottom reinforced mesh are arranged in a well-shaped shape according to two-way stress, and are laid in the rib grooves of the two-way dense rib pressed steel plate.
有益效果:与现有装配式楼板相比,本发明创新双向密肋压型钢板组合楼板,具有安全可靠,现浇混凝土用量低,可实现装配化施工且容易标准化生产的特点。Beneficial effects: Compared with the existing prefabricated floor slabs, the invention has the characteristics of safety and reliability, low consumption of cast-in-place concrete, assembly construction and easy standardized production.
附图说明Description of drawings
图1是本发明涉及的双向密肋压型钢板的构造示意图;Fig. 1 is the structural schematic diagram of the bidirectional dense rib profiled steel plate involved in the present invention;
图2是本发明涉及的预制密肋底板的构造示意图;Fig. 2 is the structural schematic diagram of the prefabricated dense rib bottom plate involved in the present invention;
图3是本发明涉及的双向密肋压型钢板组合楼板的构造示意图;Fig. 3 is the structural schematic diagram of the two-way dense rib profiled steel plate composite floor involved in the present invention;
图4是图3中A-A剖视图;Fig. 4 is A-A sectional view in Fig. 3;
图5是图3中B-B剖视图;Fig. 5 is B-B sectional view in Fig. 3;
图6是图3中C-C剖视图;Fig. 6 is C-C sectional view in Fig. 3;
图7是图3中D-D剖视图;Fig. 7 is D-D sectional view in Fig. 3;
图8是本发明涉及的双向密肋压型钢板组合楼板吊顶构造示意图;8 is a schematic diagram of the structure of the double-way dense rib profiled steel plate composite floor ceiling structure involved in the present invention;
图9是本发明涉及的双向密肋压型钢板组合楼板吊顶构造示意图;Figure 9 is a schematic diagram of the structure of the double-sided dense rib profiled steel plate composite floor ceiling structure involved in the present invention;
图10是本发明涉及的双向密肋压型钢板组合楼板的连接节点示意图。FIG. 10 is a schematic diagram of the connection nodes of the bidirectional dense rib profiled steel plate composite floor according to the present invention.
图中有:双向密肋压型钢板1、底层钢筋网片2、上层钢筋网片3、螺栓套筒4、现浇混凝土层5、预制混凝土肋6、压型钢板预留孔7、栓钉8、T型螺栓9、石膏板吊顶材料10、主梁11。In the picture: two-way dense rib profiled steel plate 1, bottom reinforcement mesh sheet 2, upper reinforcement mesh sheet 3, bolt sleeve 4, cast-in-place concrete layer 5, precast concrete rib 6, profiled steel plate reserved hole 7, stud 8. T-bolt 9, gypsum board ceiling material 10, main beam 11.
具体实施方式Detailed ways
下面结合附图对本发明作进一步说明。The present invention will be further described below in conjunction with the accompanying drawings.
如图1至图3所示,本发明包括预制密肋底板和现浇混凝土层,包括预制密肋底板和现浇混凝土层,所述的预制密肋底板包括双向密肋压型钢板1和底层钢筋网片2,双向密肋压型钢板1作为预制密肋底板混凝土浇筑的模板,其上设有压型钢板预留孔7和螺栓套筒4,底层钢筋网片2铺设于双向密肋压型钢板1肋槽内;所述的现浇混凝土层内铺设有上层钢筋网片3。As shown in FIGS. 1 to 3 , the present invention includes a prefabricated rib base plate and a cast-in-place concrete layer, including a prefabricated rib base plate and a cast-in-place concrete layer, and the prefabricated rib base plate includes a two-way rib profiled steel plate 1 and a bottom layer. Reinforced mesh 2, two-way dense rib profiled steel plate 1 is used as a template for concrete pouring of the prefabricated dense rib bottom plate, and there are reserved holes 7 for profiled steel plates and bolt sleeves 4, and the bottom reinforcement mesh 2 is laid on the two-way dense rib. In the rib groove of the profiled steel plate 1; the upper-layer steel mesh sheet 3 is laid in the cast-in-place concrete layer.
进一步,所述预制密肋底板,包括双向密肋压型钢板1、螺栓套筒4和底层钢筋网片(2) 全部在工厂预制,在现场施工安装采用现浇混凝土将预制密肋底板与上层钢筋网片3组装、形成密肋楼板。Further, the prefabricated rib bottom plate, including the two-way rib profiled steel plate 1, the bolt sleeve 4 and the bottom reinforcing mesh sheet (2), are all prefabricated in the factory, and the prefabricated rib bottom plate and the upper layer are made of cast-in-place concrete during on-site construction and installation. The steel mesh 3 is assembled to form a dense ribbed floor.
进一步,所述现浇混凝土层以预制密肋底板作为模板浇筑混凝土。Further, the cast-in-place concrete layer is poured concrete with a prefabricated ribbed bottom plate as a formwork.
进一步,所述双向密肋压型钢板1分单元连接形成预制密肋底板的混凝土浇筑模板,并在纵横肋相交处预留压型钢板预留孔7,预埋螺栓套筒4,作为后期吊顶龙骨的支承点。Further, the two-way dense rib profiled steel plate is connected in units of 1 to form a concrete pouring formwork of a prefabricated dense rib bottom plate, and a reserved hole 7 for the profiled steel plate is reserved at the intersection of the longitudinal and transverse ribs, and the embedded bolt sleeve 4 is used as a later suspended ceiling. Bearing points for the keel.
进一步,所述底层钢筋网片2受力筋按双向成井字形受力布置,铺设于双向密肋压型钢板1肋槽内。Further, the reinforcing bars of the bottom reinforcing mesh sheet 2 are arranged in a two-way shape in a well-shaped force, and are laid in the rib grooves of the two-way dense rib profiled steel plate 1 .
进一步,所述预留压型钢板预留孔为圆形。Further, the reserved hole for the reserved profiled steel plate is circular.
如图4至图7所示,装配式新型双向密肋压型钢板组合楼板的施工步骤为:(一)将螺栓套筒4、双向密肋压型钢板1、底层钢筋网片2和上层钢筋网片3等零部件在工厂内分体或整体进行预制;(二)在工厂内预埋螺栓套筒4,并将底层钢筋网片2铺设于双向密肋压型钢板1肋槽内,以双向密肋压型钢板1为模板浇筑混凝土,形成预制密肋底板;(三) 成型并养护好的零部件运抵施工现场,并布置临时支撑;(四)将预制密肋底板按设计的要求安装在主梁或柱子上;(四)在预制密肋底板上铺设上层钢筋网片3后浇筑混凝土将预制密肋底板连接为整体密肋楼板;(五)待混凝土养护达到强度后拆除底部临时支撑后整体楼板支承于主梁11或柱子上。As shown in Figure 4 to Figure 7, the construction steps of the new prefabricated two-way dense rib profiled steel plate composite floor are: (1) the bolt sleeve 4, the two-way dense rib profiled steel plate 1, the bottom reinforcement mesh 2 and the upper reinforcement Parts such as mesh 3 are prefabricated separately or as a whole in the factory; (2) The bolt sleeve 4 is pre-embedded in the factory, and the bottom reinforcement mesh 2 is laid in the rib groove of the two-way dense rib profiled steel plate 1 to prevent Two-way dense rib profiled steel plate 1 is poured with concrete as a formwork to form a prefabricated dense rib floor; (3) the formed and maintained parts are delivered to the construction site, and temporary supports are arranged; (4) the prefabricated dense rib floor is designed according to the requirements. Install it on the main beam or column; (4) Lay the upper layer of steel mesh 3 on the prefabricated dense rib floor and pour concrete to connect the prefabricated dense rib floor to an integral dense rib floor; (5) After the concrete is cured to the strength, remove the bottom temporary After the support, the whole floor slab is supported on the main beam 11 or the column.
如图8所示,装配式新型双向密肋压型钢板组合楼板的施工方法步骤三中将预制密肋底板按设计的要求安装在主梁11时,在相邻楼板梁上搭接位置施焊栓钉8。As shown in Figure 8, when the prefabricated rib bottom plate is installed on the main beam 11 according to the design requirements in the construction method of the new type of two-way dense rib profiled steel plate composite floor construction method, welding is performed at the lap joint position on the adjacent floor beam pegs 8.
如图9和图10所示,装配式新型双向密肋压型钢板组合楼板安装后期结合预埋螺栓套筒4与T型螺栓9安装吊顶石膏板10进行吊顶施工,双向密肋压型钢板1与吊顶石膏板10中间铺设管线。As shown in Figure 9 and Figure 10, the prefabricated new two-way rib profiled steel plate composite floor is installed with embedded bolt sleeves 4 and T-bolts 9 to install the ceiling gypsum board 10 for ceiling construction, and the two-way rib profiled steel plate 1 A pipeline is laid between the ceiling gypsum board 10 .
以上所述仅为本发明的较佳实施例而已,并不用以限制本发明,凡在本发明的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本发明的保护范围之内。The above descriptions are only preferred embodiments of the present invention, and are not intended to limit the present invention. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the scope of the present invention. within the scope of protection.
Claims (5)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910506525.5A CN110359612A (en) | 2019-06-12 | 2019-06-12 | A kind of novel two-way ribs profiled steel sheet combination floor of assembled |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910506525.5A CN110359612A (en) | 2019-06-12 | 2019-06-12 | A kind of novel two-way ribs profiled steel sheet combination floor of assembled |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110359612A true CN110359612A (en) | 2019-10-22 |
Family
ID=68216186
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910506525.5A Pending CN110359612A (en) | 2019-06-12 | 2019-06-12 | A kind of novel two-way ribs profiled steel sheet combination floor of assembled |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110359612A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114482267A (en) * | 2022-02-25 | 2022-05-13 | 东南大学 | A prefabricated hollow corrugated sandwich concrete-filled steel tubular composite frame structure system |
CN115341700A (en) * | 2022-08-25 | 2022-11-15 | 昭弗建筑科技(上海)有限公司 | Composite floor slab and construction method thereof |
CN117513622A (en) * | 2023-10-26 | 2024-02-06 | 中国矿业大学(北京) | A prefabricated straw concrete composite floor slab |
Citations (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1584242A (en) * | 2004-05-27 | 2005-02-23 | 吴方伯 | Steel reinforced concrete hollow floorslab |
US20070267583A1 (en) * | 2004-07-14 | 2007-11-22 | Mycoal Products Corporation | Heat Generating Body and Process for Producing the Same |
CN201137228Y (en) * | 2007-12-17 | 2008-10-22 | 张厚 | Cast-in-situ bidirectional profiled steel sheet concrete composite floor |
CN101858119A (en) * | 2010-06-23 | 2010-10-13 | 吴方伯 | Reinforced concrete hollow floor slab and construction method |
JP2014095256A (en) * | 2012-11-12 | 2014-05-22 | Haseko Corp | Ribbed precast concrete plate, and method for separately placing concrete in composite floor slab and beam using the ribbed precast concrete plate |
CN105625619A (en) * | 2015-12-31 | 2016-06-01 | 扬州大学 | Profiled steel sheet concrete bilateral composite floor embedded with hollow square steel tubes |
CN205475931U (en) * | 2016-03-17 | 2016-08-17 | 盐城工学院 | Profiled steel sheet composite floor |
CN106894557A (en) * | 2017-04-26 | 2017-06-27 | 上海核工程研究设计院 | A kind of two-way steel plate concrete composite floor of built-in module truss |
CN206346369U (en) * | 2016-09-30 | 2017-07-21 | 长沙远大住宅工业集团股份有限公司 | Overlap assembly concrete rib floor |
CN207110167U (en) * | 2017-06-02 | 2018-03-16 | 北京中清恒业科技开发有限公司 | One kind assembling flat close rib building roof of superposed type two dimension prestressing |
CN109281432A (en) * | 2018-11-09 | 2019-01-29 | 沈阳建筑大学 | Tic-tac-toe prefabricated bottom plate and airbag formwork structure and using method |
CN109667367A (en) * | 2019-02-02 | 2019-04-23 | 福建工程学院 | A kind of hollow shear wall structure and its construction method of built-in profiled sheet |
CN208934219U (en) * | 2018-08-30 | 2019-06-04 | 河北建筑工程学院 | A cold-formed thin-walled steel well-shaped floor structure |
CN210685110U (en) * | 2019-06-12 | 2020-06-05 | 东南大学 | Assembled novel bidirectional ribbed profiled steel sheet composite floor |
-
2019
- 2019-06-12 CN CN201910506525.5A patent/CN110359612A/en active Pending
Patent Citations (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1584242A (en) * | 2004-05-27 | 2005-02-23 | 吴方伯 | Steel reinforced concrete hollow floorslab |
US20070267583A1 (en) * | 2004-07-14 | 2007-11-22 | Mycoal Products Corporation | Heat Generating Body and Process for Producing the Same |
CN201137228Y (en) * | 2007-12-17 | 2008-10-22 | 张厚 | Cast-in-situ bidirectional profiled steel sheet concrete composite floor |
CN101858119A (en) * | 2010-06-23 | 2010-10-13 | 吴方伯 | Reinforced concrete hollow floor slab and construction method |
JP2014095256A (en) * | 2012-11-12 | 2014-05-22 | Haseko Corp | Ribbed precast concrete plate, and method for separately placing concrete in composite floor slab and beam using the ribbed precast concrete plate |
CN105625619A (en) * | 2015-12-31 | 2016-06-01 | 扬州大学 | Profiled steel sheet concrete bilateral composite floor embedded with hollow square steel tubes |
CN205475931U (en) * | 2016-03-17 | 2016-08-17 | 盐城工学院 | Profiled steel sheet composite floor |
CN206346369U (en) * | 2016-09-30 | 2017-07-21 | 长沙远大住宅工业集团股份有限公司 | Overlap assembly concrete rib floor |
CN106894557A (en) * | 2017-04-26 | 2017-06-27 | 上海核工程研究设计院 | A kind of two-way steel plate concrete composite floor of built-in module truss |
CN207110167U (en) * | 2017-06-02 | 2018-03-16 | 北京中清恒业科技开发有限公司 | One kind assembling flat close rib building roof of superposed type two dimension prestressing |
CN208934219U (en) * | 2018-08-30 | 2019-06-04 | 河北建筑工程学院 | A cold-formed thin-walled steel well-shaped floor structure |
CN109281432A (en) * | 2018-11-09 | 2019-01-29 | 沈阳建筑大学 | Tic-tac-toe prefabricated bottom plate and airbag formwork structure and using method |
CN109667367A (en) * | 2019-02-02 | 2019-04-23 | 福建工程学院 | A kind of hollow shear wall structure and its construction method of built-in profiled sheet |
CN210685110U (en) * | 2019-06-12 | 2020-06-05 | 东南大学 | Assembled novel bidirectional ribbed profiled steel sheet composite floor |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114482267A (en) * | 2022-02-25 | 2022-05-13 | 东南大学 | A prefabricated hollow corrugated sandwich concrete-filled steel tubular composite frame structure system |
CN114482267B (en) * | 2022-02-25 | 2024-04-09 | 东南大学 | Assembled hollow corrugated sandwich steel pipe concrete combined frame structure system |
CN115341700A (en) * | 2022-08-25 | 2022-11-15 | 昭弗建筑科技(上海)有限公司 | Composite floor slab and construction method thereof |
CN117513622A (en) * | 2023-10-26 | 2024-02-06 | 中国矿业大学(北京) | A prefabricated straw concrete composite floor slab |
CN117513622B (en) * | 2023-10-26 | 2024-04-30 | 中国矿业大学(北京) | Prefabricated straw concrete composite floor |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201087480Y (en) | Prestressed concrete composite beam | |
US9340975B2 (en) | Method of casting in-situ ferrocement ribbed slab with spliced rack and suspended formwork | |
CN104453093B (en) | Prefabricated steel reinforced concrete beam with transversal high-strength concrete clapboard, and construction method | |
CN107542196A (en) | Prestressed concrete bidirectional laminated slab and preparation method | |
CN108360712A (en) | A kind of assembled steel reinforced concrete shear force wall and its construction method | |
CN108589986A (en) | One kind being based on bolted assembled composite wall structure and its construction method | |
CN104594556A (en) | Prefabricated type steel reinforced concrete beam with transverse steel partition boards and construction method | |
CN110670770A (en) | Combined structure and construction method of solid shear wall and laminated plate edge member | |
CN212534738U (en) | Truss Floor Slab | |
CN107476470A (en) | Steel pipe built in assembled and GFRP pipe regeneration concrete compound shear walls and its construction method | |
CN104594557A (en) | Prefabricated reinforced concrete beam with transverse steel partition boards and construction method | |
CN208251372U (en) | A kind of assembled steel reinforced concrete shear force wall | |
CN110359612A (en) | A kind of novel two-way ribs profiled steel sheet combination floor of assembled | |
CN110656716B (en) | A building structure with dense rib connections of prefabricated wall panels and its construction method | |
CN113585578B (en) | Prefabricated assembly type prestress combined floor system and construction method | |
CN110644662A (en) | Prefabricated flat slab composite slab based on stress and splitting method thereof | |
CN110805144A (en) | Fully assembled high-rise/super high-rise concrete frame-supported structure system and its construction method | |
CN210685110U (en) | Assembled novel bidirectional ribbed profiled steel sheet composite floor | |
CN212670968U (en) | Composite floor and building | |
CN115928874B (en) | Full-prefabricated assembly type structural system based on prefabricated hollow slab and construction method thereof | |
CN104047381B (en) | Assembled integral rare-reinforcement concrete shear wall structure | |
CN217300054U (en) | Top cover structure of assembled rectangular pool | |
CN217580713U (en) | A prefabricated combined shear wall | |
CN111139955A (en) | Shear wall with transverse rib laminated wallboard and construction method thereof | |
CN110080455A (en) | A kind of precast shear wall, connecting node and its construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20191022 |