CN103015565B - Prefabricated and assembled type integrated reinforced concrete load bearing wall and building construction method - Google Patents

Prefabricated and assembled type integrated reinforced concrete load bearing wall and building construction method Download PDF

Info

Publication number
CN103015565B
CN103015565B CN201210561926.9A CN201210561926A CN103015565B CN 103015565 B CN103015565 B CN 103015565B CN 201210561926 A CN201210561926 A CN 201210561926A CN 103015565 B CN103015565 B CN 103015565B
Authority
CN
China
Prior art keywords
load bearing
bearing wall
concrete load
precast concrete
prefabricated
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210561926.9A
Other languages
Chinese (zh)
Other versions
CN103015565A (en
Inventor
刘文清
闫红缨
张新全
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Heilongjiang Yuhui New Building Materials Co Ltd
Original Assignee
Heilongjiang Yuhui New Building Materials Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=47964622&utm_source=google_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=CN103015565(B) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by Heilongjiang Yuhui New Building Materials Co Ltd filed Critical Heilongjiang Yuhui New Building Materials Co Ltd
Priority to CN201210561926.9A priority Critical patent/CN103015565B/en
Publication of CN103015565A publication Critical patent/CN103015565A/en
Application granted granted Critical
Publication of CN103015565B publication Critical patent/CN103015565B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Load-Bearing And Curtain Walls (AREA)

Abstract

The invention provides a prefabricated and assembled type integrated reinforced concrete load bearing wall and a building construction method. A prefabricated and assembled type integrated building concrete shear wall structure system is widely applied to a high-rise building. The prefabricated and assembled type integrated reinforced concrete load bearing wall consists of a prefabricated concrete load bearing wall component (1) with a connection rebar (12), a beam stirrup and an overlapping beam (11); the connection rebar is inserted into a longitudinal bar post-poured constructional column (3); the longitudinal bar post-poured constructional column is connected with a stirrup (4); the stirrup is connected with a beam upper part main bar (5); the beam upper part main bar is connected with a board upper part bar (6); the upper part and the lower part of the prefabricated concrete load bearing wall component are respectively connected with a prefabricated composite floor slab (2) through ring beams (8); and the lateral face of the prefabricated concrete load bearing wall component is connected with a post-poured constructional column (7). The prefabricated and assembled type integrated reinforced concrete load bearing wall provided by the invention is used for a prefabricated component of the building.

Description

Fabricated assembly overall reinforced concrete load bearing wall and construction techniques
technical field:
the present invention relates to a kind of fabricated assembly overall reinforced concrete load bearing wall and construction techniques.
background technology:
architecture construction is developed so far a variety of structural system.Fabricated assembly overall house concrete shear wall structure system is widely used in highrise building.But it expends steel and fund is more, be not suitable for small building and use.Existing small building mostly is building block load-carrying members, and speed of application is slow, and relatively long in time limit, globality is poor, and insulation difference is the disadvantage of building block load-carrying members.
summary of the invention:
the object of this invention is to provide a kind of lightweight, globality and intensity good, speed of application is fabricated assembly overall reinforced concrete load bearing wall architectural structure system and construction techniques fast and easily.
above-mentioned object is realized by following technical scheme:
a kind of fabricated assembly overall reinforced concrete load bearing wall, its composition comprises: with the precast concrete load bearing wall component of superposed beam, and described precast concrete load bearing wall component both sides have the connecting reinforcement stretched out inside, between described precast concrete load bearing wall component by described connecting reinforcement anchoring or be connected to after-pouring constructional column in form body of wall entirety, the described superposed beam of described precast concrete load bearing wall top has beam stirrup, the main muscle in beam top is installed with in described beam stirrup, the main muscle in beam top described in superimposed sheet top negative bending moment rib connects, described superimposed sheet top negative bending moment rib connects prefabricated superimposed sheet component by concrete, Prefabricated stacking floor is by described prefabricated superimposed sheet component, described superimposed sheet top negative bending moment rib and concrete build up, single layer structure entirety is formed by described Prefabricated stacking floor and described body of wall entirety, fabricated assembly overall reinforced concrete rated load-bearing building construction is formed overall by the single layer structure entirety described in one group.
described fabricated assembly overall reinforced concrete load bearing wall, described precast concrete load bearing wall component inside has single-layer bidirectional reinforcing bar or double-layer double-direction reinforcing bar; Described precast concrete load bearing wall component is that solid concrete or inside have emptying aperture or inside has light filling thing.
described fabricated assembly overall reinforced concrete load bearing wall, described connecting reinforcement is straight reinforcing bar or bending reinforcing steel bar or semi-circular reinforcing bar or steel hoop, and described connecting reinforcement is anchoring or connection in the constructional column of cast-in-place after-pouring.
described fabricated assembly overall reinforced concrete load bearing wall, described precast concrete load bearing wall top is described superposed beam, the main muscle in beam bottom of described superposed beam and beam stirrup are embedded in component, described Zhu Jin both sides, beam bottom are stretched out and are anchored in the constructional column of described after-pouring, described beam stirrup extension is opening or remains silent, described precast concrete load bearing wall top and surperficial embedded nut.
described fabricated assembly overall reinforced concrete load bearing wall, when described precast concrete load bearing wall component inside has described single-layer bidirectional reinforcing bar, described precast concrete load bearing wall component both sides arrange the alkali proof fiber grid cloth of crack resistence or staple glass fibre mesh sheet or mesh sheet; When described precast concrete load bearing wall component has solid concrete, described collar tie beam uses with lower part or does not use regeneration aggregate or building waste; Described precast concrete load bearing wall component inside has emptying aperture or inside when having light filling thing, and described precast concrete load bearing wall component its excess-three mask than its top has the constructing apparatus of reinforcement globality; Described precast concrete load bearing wall component side is matsurface or has groove.
described fabricated assembly overall reinforced concrete load bearing wall, has concrete rib at described precast concrete load bearing wall component inside, and described concrete rib laterally or is longitudinally evenly arranged in described precast concrete load bearing wall component; Described concrete rib is i-shape component, and described i-shape component has upper cross rib and lower cross rib, is connected between described upper cross rib and described lower cross rib by perpendicular rib.
described fabricated assembly overall reinforced concrete load bearing wall, has concrete rib at described precast concrete load bearing wall component inside, and described concrete rib laterally or is longitudinally evenly arranged in described precast concrete load bearing wall component; Described concrete rib is i-shape component, and described i-shape component has upper cross rib and lower cross rib, is connected between described upper cross rib and described lower cross rib by perpendicular rib.
described fabricated assembly overall reinforced concrete load bearing wall, has insulation layer or has insulation layer and architectural surface when described precast concrete load bearing wall component is the external walls of building, described insulation layer and architectural surface prefabricated to top plate top; The described each layer of precast concrete load bearing wall component is connected by section thermal attach; Described precast concrete load bearing wall component does not have described superposed beam when being non-bearing wall.
utilize a construction techniques for above-mentioned fabricated assembly overall reinforced concrete load bearing wall, this method comprises the following steps:
first, fabricated assembly overall reinforced concrete load bearing wall
the first step is after plate condensation, and surveyor puts precast concrete load bearing wall member position dimension line;
second step wall member position on precast concrete load bearing wall component makes " ash cake ";
3rd step lays cement mortar at precast concrete load bearing wall member position place, and mortar is a little more than " ash cake " upper surface;
4th step before mortar initial set by precast concrete load bearing wall lifting component to relevant position;
then building body construction is carried out:
the first step, after precast concrete load bearing wall Components installation completes, uses bearing diagonal to be fixed by component; The constructional column reinforcing bar of second step colligation after-pouring;
3rd step installs the constructional column template of after-pouring;
4th step builds the constructional column concrete of after-pouring;
5th step arranges plate and supports;
6th step lays Prefabricated stacking floor;
the 7th main muscle in step colligation superposed beam top and superimposed sheet top muscle;
8th step builds the above concrete of Prefabricated stacking floor superposed surfaces;
repeat the step of above-mentioned the first ~ eight step, until top layer.
utilize the construction techniques of above-mentioned fabricated assembly overall reinforced concrete load bearing wall, in described second step, described " ash cake " essence is concrete pad, at precast concrete load bearing wall component installation location place, protrude from plate upper surface, build with lower floor Prefabricated stacking floor concrete, " ash cake " upper surface and plate rise difference for bed course height simultaneously; In the 3rd described step, described cement mortar is a little more than " ash cake " upper surface, and when being to make precast concrete load bearing wall Components installation, bottom bedding mortar is full; In the 4th described step, after body of wall installation in position, bearing diagonal is installed, then regulates precast concrete load bearing wall component verticality, finally fix bearing diagonal; Described bearing diagonal is the support bar of band regulatory function.
beneficial effect:
1. the present invention instead of building block load-carrying members, under the prerequisite not reducing bearing capacity and intensity, replaces blockwork with integrated member, makes structure have more globality; The collar tie beam of normal setting and structure are built and are made structural seismic performance better.
insulation layer and the architectural surface of exterior wall of the present invention are prefabricated, along with the construction of agent structure, insulation layer and finish coat have also been constructed simultaneously, other complicated procedures of forming that when therefore eliminating original form of construction work, agent structure is a large amount of after completing, site operation environment and condition are improved greatly, and speed of application is accelerated greatly.
both sides of the present invention arrange reinforcing bar or other mesh sheet, ensure that the intensity of body of wall, make precast wall body good integrity, and mechanical property is good, and crack resistance is good.
the body of wall of building precast plate of the present invention, surfacing, process of need not plastering, this product is incubated, heat insulation, soundproof effect good.
construction technology of the present invention is simple, construction quality is easy to ensure, improves the labor productivity of precast unit production and transport, improves the total quality of house, reduce costs, reduce energy consumption.
the scene of instant invention overcomes by the drawback of the combination of regeneration aggregate and cast-in-situ concrete, effectively cannot apply regeneration aggregate, saves a large amount of raw material, the saving of material is served to the effect of propelling.
accompanying drawing illustrates:
accompanying drawing 1 is the structural representation of this product.
accompanying drawing 2 is structural representations when light weight wall component is solid in accompanying drawing 1.
accompanying drawing 3 is horizontal sectional drawings of accompanying drawing 2.
accompanying drawing 4 is structural representations of side fascia when light weight wall component is solid in accompanying drawing 1.
accompanying drawing 5 is horizontal sectional drawings of accompanying drawing 4.
accompanying drawing 6 is that in accompanying drawing 1, light weight wall component inside has structural representation when emptying aperture or inside have a light filling thing.
accompanying drawing 7 is accompanying drawing 6 inside horizontal sectional drawings when having an emptying aperture.
accompanying drawing 8 is accompanying drawing 6 inside horizontal sectional drawings when having a light filling thing.
accompanying drawing 9 is that in accompanying drawing 1, light weight wall component inside has external wall panel structure schematic diagram when emptying aperture or inside have a light filling thing.
accompanying drawing 10 is accompanying drawing 9 inside horizontal sectional drawings when having an emptying aperture.
accompanying drawing 11 is accompanying drawing 9 inside horizontal sectional drawings when having a light filling thing.
accompanying drawing 12 is structural representations that accompanying drawing 1 connecting reinforcement stretches out for individual layer reinforcing bar.
accompanying drawing 13 is structural representations that accompanying drawing 1 end face beam stirrup stretches out.
accompanying drawing 14 is that accompanying drawing 1 bolt arranges schematic diagram.
accompanying drawing 15 is that the A of accompanying drawing 1 is to partial enlarged drawing.
accompanying drawing 16 is structural representations that the connecting reinforcement of accompanying drawing 12 stretches out for double steel bar.
accompanying drawing 17 is structural representations that the connecting reinforcement of accompanying drawing 12 stretches out for two outer hook reinforcing bar.
accompanying drawing 18 is structural representations that the connecting reinforcement of accompanying drawing 12 stretches out for two interior hook reinforcing bar.
accompanying drawing 19 is structural representations that the connecting reinforcement of accompanying drawing 12 stretches out for two outer straight hook reinforcing bar.
accompanying drawing 20 is structural representations that the connecting reinforcement of accompanying drawing 12 stretches out for two outer bail reinforcing bar.
accompanying drawing 21 is structural representations that the connecting reinforcement of accompanying drawing 12 stretches out for two outer ring opening hook reinforcing bar.
accompanying drawing 22 is that accompanying drawing 1 bolt arranges schematic diagram.
accompanying drawing 23 is that accompanying drawing 1 side grooves arranges schematic diagram.
accompanying drawing 24 is that the B of accompanying drawing 1 is to partial enlarged drawing.
detailed description of the invention:
embodiment 1:
a kind of fabricated assembly overall reinforced concrete load bearing wall, its composition comprises: with connecting reinforcement 12, the precast concrete load bearing wall component 1 of beam stirrup and superposed beam 11, described connecting reinforcement inserts in the constructional column 3 of vertical muscle after-pouring, the constructional column of described vertical muscle after-pouring connects stirrup 4, the described main muscle 5 in beam stirrup tie-beam top, described main muscle junction plate top, beam top muscle 6, described precast concrete load bearing wall member upper is connected Prefabricated stacking floor 2 with bottom respectively by collar tie beam 8, described precast concrete load bearing wall component side connects the constructional column 7 of the after-pouring of after-pouring.
embodiment 2:
fabricated assembly overall reinforced concrete load bearing wall described in embodiment 1, described fabricated assembly overall reinforced concrete solid-walled structure building, described precast concrete load bearing wall component is that solid concrete or inside have emptying aperture 9 or inside has light filling thing 10, described emptying aperture inside arranges single-layer bidirectional connecting reinforcement or double-layer double-direction connecting reinforcement, and described single-layer bidirectional connecting reinforcement or double-layer double-direction connecting reinforcement stretch out outside described precast concrete load bearing wall component by component both sides; Described light filling thing inside arranges single-layer bidirectional connecting reinforcement or double-layer double-direction connecting reinforcement, and described single-layer bidirectional connecting reinforcement or double-layer double-direction connecting reinforcement are stretched out outside described precast concrete load bearing wall component by component both sides.
embodiment 3:
fabricated assembly overall reinforced concrete load bearing wall described in embodiment 1 or 2, described connecting reinforcement is straight reinforcing bar or bending reinforcing steel bar or semi-circular reinforcing bar or steel hoop, and described connecting reinforcement is anchoring or connection in the constructional column of cast-in-place after-pouring.
embodiment 4:
fabricated assembly overall reinforced concrete load bearing wall described in embodiment 1, described precast concrete load bearing wall top is described superposed beam, the main muscle in beam bottom of described superposed beam and beam stirrup are embedded in component, described Zhu Jin both sides, beam bottom are stretched out and are anchored in the constructional column of described after-pouring, described beam stirrup extension is opening or remains silent, described precast concrete load bearing wall top and surperficial embedded nut.
embodiment 5:
fabricated assembly overall reinforced concrete load bearing wall described in embodiment 1, when described precast concrete load bearing wall component inside has described single-layer bidirectional reinforcing bar, described precast concrete load bearing wall component both sides arrange the alkali proof fiber grid cloth of crack resistence or staple glass fibre mesh sheet or mesh sheet; When described precast concrete load bearing wall component has solid concrete, described collar tie beam uses regeneration aggregate with lower part; Described precast concrete load bearing wall component inside has emptying aperture or inside when having light filling thing, and described precast concrete load bearing wall component its excess-three mask than its top has the constructing apparatus of reinforcement globality; Described precast concrete load bearing wall component side is matsurface or has groove.
embodiment 6:
fabricated assembly overall reinforced concrete load bearing wall described in above-described embodiment, has concrete rib at described precast concrete load bearing wall component inside, and described concrete rib laterally or is longitudinally evenly arranged in described precast concrete load bearing wall component; Described concrete rib is i-shape component, and described i-shape component has upper cross rib and lower cross rib, is connected between described upper cross rib and described lower cross rib by perpendicular rib.
embodiment 7:
fabricated assembly overall reinforced concrete load bearing wall described above, has concrete rib at described precast concrete load bearing wall component inside, and described concrete rib laterally or is longitudinally evenly arranged in described precast concrete load bearing wall component; Described concrete rib is i-shape component, and described i-shape component has upper cross rib and lower cross rib, is connected between described upper cross rib and described lower cross rib by perpendicular rib.
embodiment 8:
fabricated assembly overall reinforced concrete load bearing wall described above, described precast concrete load bearing wall component is external walls or the non-bearing wall of building, has insulation layer or has insulation layer and architectural surface when described precast concrete load bearing wall component is the external walls of building; The described each layer of precast concrete load bearing wall component is connected by section thermal attach; Described precast concrete load bearing wall component does not have described superposed beam when being non-bearing wall; Described insulation layer and architectural surface prefabricated to top plate top.
embodiment 9:
utilize a construction techniques for above-mentioned fabricated assembly overall reinforced concrete load bearing wall, this method comprises the following steps:
first, fabricated assembly overall reinforced concrete load bearing wall
the first step is after plate condensation, and surveyor puts precast concrete load bearing wall member position dimension line;
second step wall member position on precast concrete load bearing wall component makes " ash cake ";
3rd step lays cement mortar at precast concrete load bearing wall member position place, and mortar is a little more than " ash cake " upper surface;
4th step before mortar initial set by precast concrete load bearing wall lifting component to relevant position;
then building body construction is carried out:
the first step, after precast concrete load bearing wall Components installation completes, uses bearing diagonal to be fixed by component; The constructional column reinforcing bar of second step colligation after-pouring;
3rd step installs the constructional column template of after-pouring;
4th step builds the constructional column concrete of after-pouring;
5th step arranges plate and supports;
6th step lays Prefabricated stacking floor;
the 7th main muscle in step colligation superposed beam top and superimposed sheet top muscle;
8th step builds the above concrete of Prefabricated stacking floor superposed surfaces;
repeat the step of above-mentioned the first ~ eight step, until top layer.
embodiment 10:
the construction techniques utilizing above-mentioned fabricated assembly overall reinforced concrete load bearing wall described in embodiment 9, in described second step, described " ash cake " essence is concrete pad, at precast concrete load bearing wall component installation location place, protrude from plate upper surface, build with lower floor Prefabricated stacking floor concrete, " ash cake " upper surface and plate rise difference for bed course height simultaneously; In the 3rd described step, described cement mortar is a little more than " ash cake " upper surface, and when being to make precast concrete load bearing wall Components installation, bottom bedding mortar is full; After body of wall installation in position, bearing diagonal is installed, then regulates precast concrete load bearing wall component verticality, finally fix bearing diagonal; Described bearing diagonal is the support bar of band regulatory function.
embodiment 11:
fabricated assembly overall reinforced concrete load bearing wall described above, its composition comprises: precast concrete load bearing wall component 1; Prefabricated stacking floor 2; The concrete that the constructional column of the after-pouring of on-the-spot colligation is indulged muscle 3 and stirrup 4, the main muscle 5 in beam top, plate top muscle 6 and built, constructional column 7 and the collar tie beam 8 of the after-pouring of after-pouring make structure finally form entirety; Described precast concrete load bearing wall component is solid or inside has emptying aperture 9 or inside has light filling thing 10; Top has superposed beam 11; Component both sides have connecting reinforcement 12.
embodiment 12:
fabricated assembly overall reinforced concrete load bearing wall described above, described precast concrete load bearing wall component is solid or inside has emptying aperture 9 or inside has light filling thing 10, inside arranges single-layer bidirectional reinforcing bar 13 or double-layer double-direction reinforcing bar 14, and reinforcing bar is stretched out by component both sides.The reinforcing bar form of stretching out is straight reinforcing bar 15 or bending reinforcing steel bar 16 or semi-circular reinforcing bar 17 or steel hoop 18, and reinforcing bar is anchoring or connection in the constructional column of cast-in-place after-pouring.
embodiment 13:
fabricated assembly overall reinforced concrete load bearing wall described above, described precast concrete load bearing wall top is superposed beam 11, the main muscle 19 in superposed beam bottom and stirrup 20 are embedded in component, Zhu Jin both sides, beam bottom are stretched out and are anchored in the constructional column of after-pouring, and beam stirrup stretches out with opening 21 or 22 forms of remaining silent.
embodiment 14:
fabricated assembly overall reinforced concrete load bearing wall described above, described precast concrete load bearing wall component solid concrete constantly, inside arranges single-layer bidirectional reinforcing bar, and both sides arrange the alkali proof fiber grid cloth of crack resistence, staple glass fibre mesh sheet or other mesh sheet 27.
described precast concrete load bearing wall component inside has emptying aperture or inside when having light filling thing, and inside arranges double-layer double-direction reinforcing bar, and side is the structure configuration 23 of the vertical muscle 24 of configuration and stirrup 25.
when described precast concrete load bearing wall component inside has emptying aperture, arrange concrete rib 26 at component inside, concrete rib laterally or is longitudinally evenly arranged in component; Described rib essence is I shape internals.
the connecting reinforcement of accompanying drawing 16 stretches out for double steel bar 36;
the connecting reinforcement of accompanying drawing 17 stretches out for two outer hook reinforcing bar 16;
the connecting reinforcement of accompanying drawing 18 stretches out for two interior hook reinforcing bar 37;
the connecting reinforcement of accompanying drawing 19 stretches out for two outer straight hook reinforcing bar 17;
the connecting reinforcement of accompanying drawing 20 stretches out for two outer bail reinforcing bar 18;
the connecting reinforcement of accompanying drawing 21 stretches out for two outer ring opening hook reinforcing bar 38.
embodiment 15:
fabricated assembly overall reinforced concrete load bearing wall described above, described precast concrete load bearing wall top and surperficial embedded nut 28, nut is mainly used in lifting and supports.
described precast concrete load bearing wall component side is matsurface or has groove 29.
embodiment 16:
fabricated assembly overall reinforced concrete load bearing wall described above, during the external walls of described precast concrete load bearing wall component as building, during the external walls of precast concrete load bearing wall component as building, there is deck and insulation layer, or there is deck 30, insulation layer 31 and architectural surface 32; The each layer of precast concrete load bearing wall component is connected by section thermal attach.Described precast concrete load bearing wall component heat insulation facing layer is prefabricated to top plate top.

Claims (1)

1. a construction techniques for fabricated assembly overall reinforced concrete load bearing wall, is characterized in that: this method comprises the following steps:
first, fabricated assembly overall reinforced concrete load bearing wall
the first step is after plate condensation, and surveyor puts precast concrete load bearing wall member position dimension line;
second step wall member position on precast concrete load bearing wall component makes " ash cake ";
3rd step lays cement mortar at precast concrete load bearing wall member position place, and mortar is a little more than " ash cake " upper surface;
4th step before mortar initial set by precast concrete load bearing wall lifting component to relevant position;
then building body construction is carried out:
the first step, after precast concrete load bearing wall Components installation completes, uses bearing diagonal to be fixed by component; The constructional column reinforcing bar of second step colligation after-pouring;
3rd step installs the constructional column template of after-pouring;
4th step builds the constructional column concrete of after-pouring;
5th step arranges plate and supports;
6th step lays Prefabricated stacking floor;
the 7th main muscle in step colligation superposed beam top and superimposed sheet top muscle;
8th step builds the above concrete of Prefabricated stacking floor superposed surfaces;
repeat the step of above-mentioned the first ~ eight step, until top layer.
2. the construction techniques of fabricated assembly overall reinforced concrete load bearing wall according to claim 1, it is characterized in that: in described second step, described " ash cake " essence is concrete pad, at precast concrete load bearing wall component installation location place, protrude from plate upper surface, build with lower floor Prefabricated stacking floor concrete, " ash cake " upper surface and plate rise difference for bed course height simultaneously; In the 3rd described step, described cement mortar is a little more than " ash cake " upper surface, and when being to make precast concrete load bearing wall Components installation, bottom bedding mortar is full; After body of wall installation in position, bearing diagonal is installed, then regulates precast concrete load bearing wall component verticality, finally fix bearing diagonal; Described bearing diagonal is the support bar of band regulatory function.
CN201210561926.9A 2012-09-09 2012-12-22 Prefabricated and assembled type integrated reinforced concrete load bearing wall and building construction method Active CN103015565B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210561926.9A CN103015565B (en) 2012-09-09 2012-12-22 Prefabricated and assembled type integrated reinforced concrete load bearing wall and building construction method

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
CN201210329628 2012-09-09
CN2012103296287 2012-09-09
CN201210329628.7 2012-09-09
CN201210561926.9A CN103015565B (en) 2012-09-09 2012-12-22 Prefabricated and assembled type integrated reinforced concrete load bearing wall and building construction method

Publications (2)

Publication Number Publication Date
CN103015565A CN103015565A (en) 2013-04-03
CN103015565B true CN103015565B (en) 2015-04-01

Family

ID=47964622

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210561926.9A Active CN103015565B (en) 2012-09-09 2012-12-22 Prefabricated and assembled type integrated reinforced concrete load bearing wall and building construction method

Country Status (1)

Country Link
CN (1) CN103015565B (en)

Families Citing this family (28)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103422672B (en) * 2013-08-29 2016-01-20 杜新智 A kind of reinforced concrete precast assembling housing construction construction method
CN103669705A (en) * 2013-12-15 2014-03-26 王睿敏 External wall panel of shear wall for assembling integral buildings, and construction method thereof
CN103628621B (en) * 2013-12-15 2015-10-28 王睿敏 Assembled integral shear wall corner for building side fascia and construction method
CN103669706B (en) * 2013-12-15 2015-10-28 王睿敏 Tee T assembled integral shear wall side fascia and construction method
CN103628567B (en) * 2013-12-17 2015-12-30 王睿敏 Assembled integral shear wall, floor construction system and construction method
CN103711238B (en) * 2013-12-28 2016-05-04 中国建筑第七工程局有限公司 Assembled ring muscle fastens and is anchored concrete shear wall structure system
CN103850352B (en) * 2014-03-17 2016-03-09 初明进 A kind of method of attachment of precast plate
CN103924711B (en) * 2014-05-01 2015-12-09 西安科技大学 The construction technology of assembling grillage shear wall structural system
CN104328847B (en) * 2014-10-24 2017-08-11 沈阳建筑大学 A kind of construction method of interior bearing diagonal assembly concrete shear wall prefabricated components
CN105464244A (en) * 2015-10-30 2016-04-06 江苏中南建筑产业集团有限责任公司 Prefabricated integrated shear wall construction method
CN105926766B (en) * 2016-04-20 2018-01-23 天津大学建筑设计研究院 Fabricated shear wall Alveolus type attachment structure assembly engineering method
CN105804284A (en) * 2016-05-06 2016-07-27 湖南标迪夫节能科技有限公司 Cast-in-place combined outer wall body of prefabricated assembling type wallboard component
CN105804238A (en) * 2016-05-06 2016-07-27 湖南标迪夫节能科技有限公司 Self-heat-insulation wall body system of prefabricated assembling type wallboard component
CN106121085B (en) * 2016-08-18 2018-05-18 戴欣旸 Assembled integral concrete shear force wall splicing structure and its assembling method
CN107419801B (en) * 2017-04-17 2019-11-12 浙江普天集成房屋有限公司 A kind of assembled single layer ALC wood connecting building and its construction method and ALC board manufacturing method
CN107143065A (en) * 2017-07-14 2017-09-08 湖北宇辉中工建筑产业化有限公司 Prefabricated load bearing concrete wall panel combining structure and construction method
CN107663951A (en) * 2017-11-24 2018-02-06 浙江新邦远大绿色建筑产业有限公司 The support system and construction technology of superimposed sheet and wallboard formed by integrally casting
CN108118798A (en) * 2017-12-01 2018-06-05 北京建筑大学 A kind of assembled air entrained concrete building systems
CN108005387B (en) * 2017-12-04 2021-02-02 天津市东鑫新材料科技有限公司 Synchronous construction method for cast-in-place main body of assembled wallboard and short-limb shear wall
CN108222324A (en) * 2018-01-15 2018-06-29 河南郑大建筑材料有限公司 A kind of assembled integral single side overlapped shear wall structure and its construction technology
CN108797791B (en) * 2018-10-08 2019-02-19 湖南晨熙绿色建筑产业有限公司 A kind of assembly method of upper and lower self-heat conserving external wall and floor
CN109183983B (en) * 2018-10-08 2021-10-12 绿建科技集团新型建材高技术有限公司 Method for assembling upper and lower inner walls and floor slab
CN109208785B (en) * 2018-10-15 2023-12-19 中国建筑第七工程局有限公司 Assembled superposed structure system
CN110593449B (en) * 2019-06-28 2024-05-28 中清大科技股份有限公司 Assembled light vertical slat type load-bearing wall structure and construction method thereof
CN111075173B (en) * 2019-12-04 2021-10-29 佛山建装建筑科技有限公司 Assembled concrete supporting system and construction method thereof
CN110952712A (en) * 2019-12-26 2020-04-03 山东科技大学 Prefabricated mixed bearing wall and construction method
CN113006321B (en) * 2021-03-12 2021-09-28 昆山市建设工程质量检测中心 Construction method for connecting joints between combined precast concrete wall bodies
CN114960961B (en) * 2022-07-18 2023-08-25 山东大学 Single-layer assembled concrete slab type structure house and installation method thereof

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2093874U (en) * 1991-04-18 1992-01-22 王文生 Cavity wall made of reinforced concrete
NZ267562A (en) * 1993-07-08 1998-05-27 Leftminster Pty Ltd Prefabricated building system comprises spaced apart wall frames rigidly fastened to each other and interconnected to roof and/or floor frames by a joining member
CN2466264Y (en) * 2000-10-20 2001-12-19 邹光洪 Combined prefabricated component for fabricated structure building
CN1147652C (en) * 2002-03-06 2004-04-28 赵仲星 Technology for building house with slab-type structure
JP3638590B2 (en) * 2003-06-16 2005-04-13 株式会社沖創建設 Multi-storey building construction method
CN2780873Y (en) * 2005-02-16 2006-05-17 张良纯 Cement polyppenyl module casing structure type concrete energy-saving bearing wall
CN101831970A (en) * 2010-02-10 2010-09-15 黄靓 Integrally assembled wallboard wall and construction method thereof
CN102251699B (en) * 2011-05-13 2013-10-23 北京华美科博科技发展有限公司 Residential building system with cast-in-situ beam columns and prefabricated sandwich concrete wall panels and construction method
CN202787570U (en) * 2012-09-09 2013-03-13 黑龙江宇辉新型建筑材料有限公司 Prefabricated integral reinforced concrete load bearing wall

Also Published As

Publication number Publication date
CN103015565A (en) 2013-04-03

Similar Documents

Publication Publication Date Title
CN103015565B (en) Prefabricated and assembled type integrated reinforced concrete load bearing wall and building construction method
CN202559569U (en) Assembled monolithic self-insulation hidden dense rib light superposed floor slab
CN104005502B (en) A kind of precast light building cover board and industrialized building house floor slab structure
CN202787570U (en) Prefabricated integral reinforced concrete load bearing wall
CN204531076U (en) Light steel latticework cast-in-place foamed concrete combined wall
WO2014094458A1 (en) Fully assembled, fully cast-in-place, composite-type house and construction method thereof
CN105484354A (en) Assembled steel structure building system and construction method thereof
CN102248577B (en) Superlight-foamed-cement-based manufacturing process for thermal-insulation bearing wall panel
CN104499566A (en) Assembled type special-shaped hollow column frame-shear wall housing construction system and assembling method
CN110439291A (en) A kind of assembled production and construction method suitable for low-rise building
CN105019598B (en) A kind of cutting armored concrete surface layer strengthens light weight board
CN103774777A (en) Assembly type skeleton multi-ribbed beam-plate composite structure big plate
CN207376945U (en) A kind of concrete prefabricated wallboard of steel bar girder and structural system
CN208803586U (en) A kind of steam-pressing aero-concrete integral assembling Side fascia and hoisting structure
CN203961115U (en) A kind of decoration integrated Multi-function light concrete composite plates of self-heat conserving and curtain wall
CN110670758B (en) Fabricated steel structure building based on fiber reinforced clad wood substrate and construction method
CN107313551A (en) A kind of concrete prefabricated wallboard of steel bar girder and structural system and its construction method
CN204804129U (en) Prefabricated concrete floor entirely for building
CN203412312U (en) Thermal-insulating integrated template wallboard construction building
CN203361332U (en) Prefabricated assembly type frame structure
CN110359612A (en) A kind of novel two-way ribs profiled steel sheet combination floor of assembled
CN102127942A (en) Energy-saving earthquake-resistant cored beam-free building floor slab
CN212772881U (en) Light-duty building structure of rapid Assembly formula
CN205502377U (en) Hanging wallboard is partly inlayed to unit -installment light
CN205444514U (en) Bearing light insulation intergral template

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant