CN103669706B - Tee T assembled integral shear wall side fascia and construction method - Google Patents

Tee T assembled integral shear wall side fascia and construction method Download PDF

Info

Publication number
CN103669706B
CN103669706B CN201310679652.8A CN201310679652A CN103669706B CN 103669706 B CN103669706 B CN 103669706B CN 201310679652 A CN201310679652 A CN 201310679652A CN 103669706 B CN103669706 B CN 103669706B
Authority
CN
China
Prior art keywords
shear wall
side fascia
outstanding
slab
wall side
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310679652.8A
Other languages
Chinese (zh)
Other versions
CN103669706A (en
Inventor
王睿敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Lijiu Construction Robot Co., Ltd.
Original Assignee
王睿敏
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 王睿敏 filed Critical 王睿敏
Priority to CN201310679652.8A priority Critical patent/CN103669706B/en
Publication of CN103669706A publication Critical patent/CN103669706A/en
Application granted granted Critical
Publication of CN103669706B publication Critical patent/CN103669706B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention provides a kind of tee T assembled integral shear wall side fascia and construction method, lightweight, can standardization, large-scale industrial production, cost is low, quality better.A kind of tee T assembled integral shear wall side fascia, for the connection of exterior wall and interior wall, comprises the appearance panel, warming plate and the shear wall slab that set gradually; Appearance panel, to connect as one through multiple hot bridge cut-off connecting rod between warming plate and shear wall slab; Shear wall slab is provided with the outstanding dowel of right quantity from top to bottom, outstanding dowel protrudes from the surface of shear wall slab; Movable pulley is provided with bottom shear wall slab.A construction method for shear wall side fascia, comprises the following steps: lifting shear wall side fascia installation in position; Outstanding muscle is stretched out bar splicing with basis or floor, welds or mechanical connection; Lift other shear wall side fascia and floor; Solid bottom template, concrete perfusion in cavity.

Description

Tee T assembled integral shear wall side fascia and construction method
Technical field
The present invention relates to technical field of buildings, particularly a kind of tee T assembled integral shear wall side fascia and construction method.
Background technology
Current precast shear wall side fascia weight is large, and transporting and hoisting difficulty is large.Reinforcing bar many employings sleeve connection, cost is high, and installation difficulty is large.
Summary of the invention
The object of the invention there is provided a kind of lightweight, can standardization, large-scale industrial production, cost is low, the tee T assembled integral shear wall side fascia of quality better and construction method.
In order to above-mentioned purpose, the present invention is realized by following measures:
A kind of tee T assembled integral shear wall side fascia, for the connection of exterior wall and interior wall, comprises the appearance panel, warming plate and the shear wall slab that set gradually; Appearance panel, to connect as one through multiple hot bridge cut-off connecting rod between warming plate and shear wall slab; Shear wall slab is provided with the outstanding dowel of right quantity from top to bottom, outstanding dowel protrudes from the surface of shear wall slab; Movable pulley is provided with bottom shear wall slab.
In above-mentioned tee T assembled integral shear wall side fascia, shear wall slab comprises the concrete slab that two pieces have reinforced mesh; By multiple bar connecting between two concrete slabs, and be formed with cavity therebetween; The circumferential periphery limit of two concrete slabs is provided with outstanding muscle, and outstanding muscle protrudes from the face, limit of concrete slab; Two concrete slab upper surfaces and appearance panel and warming plate upper end surface are in same plane, and two concrete slabs or a block concrete plate lower surface are shorter than appearance panel and warming plate lower surface, and outstanding muscle lower end flushes with appearance panel and warming plate lower end.
In above-mentioned tee T assembled integral shear wall side fascia, reinforced mesh comprises vertical muscle and horizontal bar, and horizontal bar protrudes from concrete slab both sides, and outstanding muscle position is established for the groove overlapped with another side fascia, be mechanically connected or weld; Vertical muscle protrudes from concrete slab top and bottom, and outstanding muscle position is established groove or do not establish groove, and longitudinal outstanding muscle overlaps with the outstanding muscle of another side fascia longitudinal direction, is mechanically connected or welds.
In above-mentioned tee T assembled integral shear wall side fascia, groove is penetrating groove or not penetrating groove.
In above-mentioned tee T assembled integral shear wall side fascia, outstanding dowel comprises the first dowel and the second dowel, first dowel and the second dowel include protuberance and connecting portion, two connecting portions are cross-shaped to be arranged in shear wall slab, and two protuberances are that parallel shape extends to outside shear wall slab external surface.
In above-mentioned tee T assembled integral shear wall side fascia, each movable pulley is all connected with reinforced mesh through height adjuster.
In above-mentioned tee T assembled integral shear wall side fascia, height adjuster comprises connector, link and lower connector, link two ends are respectively by upper connector and the lower connector of being threaded, and movable pulley installing rack is arranged on lower connector, and upper connector welds with reinforced mesh.
In above-mentioned tee T assembled integral shear wall side fascia, link is quadrilateral structure.
In above-mentioned tee T assembled integral shear wall side fascia, the block concrete plate near interior wall comprises two plate bodys, and be provided with between plate body for the outstanding gap of outstanding dowel, two plate bodys are connected as one by connecting reinforcement
In above-mentioned tee T assembled integral shear wall side fascia, shear wall slab upper and lower side is provided with triangle mast-up.
A construction method for tee T assembled integral shear wall side fascia, comprises the following steps:
(1) by basis or the cleaning of floor end face;
(2) unwrapping wire check size on basis or on floor;
(3) ballistic support is set;
(4) lift shear wall side fascia and adjust its upright position and level pushes away and receives position, then adjust height adjuster and make shear wall side fascia vertical and installation in position;
(5) outstanding muscle is stretched out bar splicing with basis or floor, welds or mechanical connection;
(6) other shear wall side fascia and floor is lifted;
(7) solid bottom template, concrete perfusion in cavity.
Beneficial effect of the present invention: its inner band cavity, lightweight, bar connecting is simple, with rear pouring concrete perfusion cavity, by between wallboard and wallboard, between wallboard and floor, couples together between wallboard and beam column, reaches the requirement of assembled integral building; This wallboard can standardization, large-scale industrial production, reduce costs, improve quality; Overall structure is simple, establishes the position of movable pulley convenient adjustment wallboard bottom wallboard; Construction method is simple, and short construction period.
Accompanying drawing explanation
Fig. 1 is the elevational schematic view that the present invention selectes embodiment.
Fig. 2 is the schematic front view that the present invention selectes embodiment.
Fig. 3 is the schematic side view that the present invention selectes embodiment.
Fig. 4 is the elevational schematic view that the present invention selectes embodiment.
1, second vertical muscle in figure, 2, mast-up, the 3, second concrete slab, 3-1, plate body, 4, gap, the 5, second horizontal bar, 6, upper connector, 7, lower connector, 8, link, 9, movable pulley installing rack, the 10, first vertical muscle, the 11, first concrete slab, 12, warming plate, 13, reinforcing bar stratum reticulare, 14, appearance panel, 15, the first horizontal bar, 16, groove, the 17, first reinforcing bar, the 18, second reinforcing bar, 19, movable pulley, 20, the first dowel, the 21, second dowel, 22, connecting reinforcement, a, protuberance, b, connecting portion.
Detailed description of the invention
Illustrate selected embodiment of the present invention referring now to Figure of description, those skilled in the art illustrate it is only exemplary according to the subordinate of embodiments of the invention of the present disclosure, the scheme be not meant to limit the present invention.
A kind of tee T assembled integral shear wall side fascia, for the connection of exterior wall and interior wall, comprises the appearance panel 14, warming plate 12 and the shear wall slab that set gradually; Appearance panel 14, to connect as one through multiple hot bridge cut-off connecting rod 23 between warming plate 12 and shear wall slab; Reinforcing bar stratum reticulare 13 is provided with in appearance panel 14; Shear wall slab is provided with the outstanding dowel of right quantity from top to bottom, outstanding dowel protrudes from the surface of shear wall slab; Shear wall slab comprises the first concrete slab 11 and the second concrete slab 3, by organizing bar connecting between first concrete slab 11 and the second concrete slab 3 more, and be formed with cavity therebetween, first concrete slab 11 and the second concrete slab upper surface and appearance panel 14 and warming plate 12 upper end surface are in same plane, and two concrete slabs or a block concrete plate lower surface are shorter than appearance panel 14 and warming plate 12 lower surface.Outstanding muscle lower end flushes with appearance panel and warming plate lower end
The first reinforced mesh is provided with in first concrete slab 11, first reinforced mesh comprises the first horizontal bar 15 of the first vertical muscle 10 and lateral arrangement of longitudinally arranging, first vertical muscle 10 protrudes from the top and bottom of the first concrete slab 11, and the first horizontal bar 15 all protrudes from the side of the first concrete slab 11; The second reinforced mesh is provided with in second concrete slab 3, second reinforced mesh comprises the second horizontal bar 5 of the second vertical muscle 1 and lateral arrangement of longitudinally arranging, second vertical muscle 1 protrudes from the top and bottom of the second concrete slab 3, and the second horizontal bar 5 all protrudes from the side of the second concrete slab 3; The groove 16 for overlapping with another side fascia, being mechanically connected or weld is established in the outstanding muscle position of the first horizontal bar 15 and the second horizontal bar 5; First vertical muscle 10 and the second vertical muscle 1 position are established groove or do not establish groove, and the first vertical muscle 10 and the second vertical outstanding muscle of muscle 1 overlap with the outstanding muscle of another side fascia longitudinal direction, be mechanically connected or weld.Groove 16 is penetrating groove or not penetrating groove.
Adjust side fascia position when considering construction convenient, the first reinforced mesh and the second reinforced mesh lower end are equipped with two or more movable pulley 19.
Outstanding dowel comprises the first dowel 20 and the second dowel 21, first dowel 20 and the second dowel 21 and includes protuberance a and connecting portion b, and two connecting portion b are cross-shaped to be arranged between the first concrete slab 11 and the second concrete slab 3; Two protuberance a are that parallel shape extends to outside the second concrete slab 3 external surface.
Many groups reinforcing bar between first concrete slab 11 and the second concrete slab 3, often group comprises the first reinforcing bar 17 of V-shaped layout and the second reinforcing bar 18, first reinforcing bar 17 is connected the first reinforced mesh and the second reinforced mesh respectively with the two ends of the second reinforcing bar 18.
Second concrete slab 3 comprises two plate body 3-1, and gap 4, the two plate body 3-1 be provided with between plate body 3-1 for outstanding dowel is outstanding is connected as one by connecting reinforcement 22.
Each movable pulley 19 is all connected with the first reinforced mesh or the second reinforced mesh through height adjuster.Height adjuster comprises connector 6, link 8 and lower connector 7, link 8 is quadrilateral structure, link 8 two ends are respectively by upper connector 6 and the lower connector 7 of being threaded, movable pulley installing rack 9 is arranged on lower connector 7, and upper connector 6 welds with the first reinforced mesh or the second reinforced mesh.
Consider easy construction, between the first concrete slab 11 and the second concrete slab 3, upper and lower side is provided with triangle mast-up 2.
A construction method for tee T assembled integral shear wall side fascia, comprises the following steps:
(1) by basis or the cleaning of floor end face;
(2) unwrapping wire check size on basis or on floor;
(3) ballistic support is set;
(4) lift shear wall side fascia and adjust its upright position and level pushes away and receives position, then adjust height adjuster and make shear wall side fascia vertical and installation in position;
(5) by outstanding muscle with basis or floor stretch out bar splicing, weld or mechanical connection;
(6) other shear wall side fascia and floor is lifted;
(7) solid bottom template, concrete perfusion in cavity.
The present invention does not have disclosed technical characteristic, is the known technology of the art.
The foregoing describe general principle of the present invention and advantage.The present invention is not restricted to the described embodiments, and is not departing from the prerequisite of the scope of the invention, and those skilled in the art can do many changes and improvements as required.Scope should be defined by appending claims and equivalent thereof.

Claims (7)

1. a tee T assembled integral shear wall side fascia, for the connection of exterior wall and interior wall, is characterized in that: comprise the appearance panel, warming plate and the shear wall slab that set gradually; Appearance panel, to connect as one through multiple hot bridge cut-off connecting rod between warming plate and shear wall slab; Shear wall slab is provided with the outstanding dowel of right quantity from top to bottom, outstanding dowel protrudes from the surface of shear wall slab; Movable pulley is provided with bottom shear wall slab; Shear wall slab comprises the concrete slab that two pieces have reinforced mesh; By multiple bar connecting between two concrete slabs, and be formed with cavity therebetween; The circumferential periphery limit of two concrete slabs is provided with outstanding muscle, and outstanding muscle protrudes from the face, limit of concrete slab; Two concrete slab upper surfaces and appearance panel and warming plate upper end surface are in same plane, and two concrete slabs or a block concrete plate lower surface are shorter than appearance panel and warming plate lower surface, and outstanding muscle lower end flushes with appearance panel and warming plate lower end; Outstanding dowel comprises the first dowel and the second dowel, first dowel and the second dowel include protuberance and connecting portion, two connecting portions are cross-shaped to be arranged between two concrete slabs, and two protuberances are that parallel shape extends to outside the concrete slab external surface of interior wall; A block concrete plate near interior wall comprises two plate bodys, and be provided with between plate body for the outstanding gap of outstanding dowel, two plate bodys are connected as one by connecting reinforcement.
2. tee T assembled integral shear wall side fascia according to claim 1, it is characterized in that: reinforced mesh comprises vertical muscle and horizontal bar, horizontal bar protrudes from concrete slab both sides, and outstanding muscle position is established for the groove overlapped with another side fascia, be mechanically connected or weld; Vertical muscle protrudes from concrete slab top and bottom, and outstanding muscle position is established groove or do not establish groove, and longitudinal outstanding muscle overlaps with the outstanding muscle of another side fascia longitudinal direction, is mechanically connected or welds.
3. tee T assembled integral shear wall side fascia according to claim 2, is characterized in that: groove is penetrating groove or not penetrating groove.
4. tee T assembled integral shear wall side fascia according to claim 1, is characterized in that: each movable pulley is all connected with reinforced mesh through height adjuster; Height adjuster comprises connector, link and lower connector, and link two ends are respectively by upper connector and the lower connector of being threaded, and movable pulley installing rack is arranged on lower connector, and upper connector welds with reinforced mesh.
5. tee T assembled integral shear wall side fascia according to claim 4, is characterized in that: link is quadrilateral structure.
6. tee T assembled integral shear wall side fascia according to claim 1 to 5 any one, is characterized in that: shear wall slab upper and lower side is provided with triangle mast-up.
7. a construction method for tee T assembled integral shear wall side fascia according to claim 4, comprises the following steps:
(1) by basis or the cleaning of floor end face;
(2) unwrapping wire check size on basis or on floor;
(3) ballistic support is set;
(4) lift shear wall side fascia and adjust its upright position and level pushes away and receives position, then adjust height adjuster and make shear wall side fascia vertical and installation in position;
(5) outstanding muscle is stretched out bar splicing with basis or floor, welds or mechanical connection;
(6) other shear wall side fascia and floor is lifted;
(7) solid bottom template, concrete perfusion in cavity.
CN201310679652.8A 2013-12-15 2013-12-15 Tee T assembled integral shear wall side fascia and construction method Active CN103669706B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310679652.8A CN103669706B (en) 2013-12-15 2013-12-15 Tee T assembled integral shear wall side fascia and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310679652.8A CN103669706B (en) 2013-12-15 2013-12-15 Tee T assembled integral shear wall side fascia and construction method

Publications (2)

Publication Number Publication Date
CN103669706A CN103669706A (en) 2014-03-26
CN103669706B true CN103669706B (en) 2015-10-28

Family

ID=50308415

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310679652.8A Active CN103669706B (en) 2013-12-15 2013-12-15 Tee T assembled integral shear wall side fascia and construction method

Country Status (1)

Country Link
CN (1) CN103669706B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105275145B (en) * 2015-11-19 2018-04-20 王硕干 A kind of assembled multifunction composite wall panel
CN105569355B (en) * 2016-01-14 2017-09-19 中国建筑设计院有限公司 It is a kind of to include the assembly method of prefabricated components modularization house
CN107246105B (en) * 2017-04-21 2018-06-12 清华大学 Cancel the construction and construction method of beard muscle in a kind of concrete prefabricated board plate end
CN108560926A (en) * 2018-01-31 2018-09-21 中国二十二冶集团有限公司 Interior wall method of plate installation of the assembling type steel structure house with girder steel, bracing members

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20100000053A (en) * 2008-06-24 2010-01-06 대한주택공사 Structure of doorwall can be movable
CN102312481A (en) * 2010-06-29 2012-01-11 湖南华廷筑邦建材有限公司 Reinforced concrete prefabricated member
CN102561585A (en) * 2012-03-06 2012-07-11 程松林 External wall slab of prefabricated cast-in-place composite concrete shear wall and manufacture and installation methods
CN103015565A (en) * 2012-09-09 2013-04-03 黑龙江宇辉新型建筑材料有限公司 Prefabricated and assembled type integrated reinforced concrete load bearing wall and building construction method
CN103132633A (en) * 2013-01-29 2013-06-05 盐城工学院 Permanent shuttering cast-in-place extra light concrete self-insulation composite wall body and construction technology
CN203716395U (en) * 2013-12-15 2014-07-16 王睿敏 T-shaped outer wallboard for assembling integrated shear wall

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20100000053A (en) * 2008-06-24 2010-01-06 대한주택공사 Structure of doorwall can be movable
CN102312481A (en) * 2010-06-29 2012-01-11 湖南华廷筑邦建材有限公司 Reinforced concrete prefabricated member
CN102561585A (en) * 2012-03-06 2012-07-11 程松林 External wall slab of prefabricated cast-in-place composite concrete shear wall and manufacture and installation methods
CN103015565A (en) * 2012-09-09 2013-04-03 黑龙江宇辉新型建筑材料有限公司 Prefabricated and assembled type integrated reinforced concrete load bearing wall and building construction method
CN103132633A (en) * 2013-01-29 2013-06-05 盐城工学院 Permanent shuttering cast-in-place extra light concrete self-insulation composite wall body and construction technology
CN203716395U (en) * 2013-12-15 2014-07-16 王睿敏 T-shaped outer wallboard for assembling integrated shear wall

Also Published As

Publication number Publication date
CN103669706A (en) 2014-03-26

Similar Documents

Publication Publication Date Title
CN103628567B (en) Assembled integral shear wall, floor construction system and construction method
CN103628621B (en) Assembled integral shear wall corner for building side fascia and construction method
CN103669706B (en) Tee T assembled integral shear wall side fascia and construction method
CN106088573A (en) A kind of assembled stretches mould bases
CN203716298U (en) Integrated assembling type shear wall and floor plate building system
CN103981998B (en) The construction method of precast shear wall plate and shear wall and shear wall
CN105220792A (en) A kind of prefabricated concealed bracings energy-consuming shear wall and assemble method thereof
CN103669697B (en) The wallboard of assembled integral reserved door and window mouth for building and construction method
CN203334680U (en) Upper reversed beam lifting mold for concrete pouring
CN204530421U (en) For the prefabricated case beam that the bent cap of falling T bridge floor continuous structure construction pedestal beam body is closely connected
CN103696607A (en) Prestressed assembled board column structure with steel supports and construction method thereof
CN204626235U (en) A kind of concatenation unit of frame bridge
CN203716396U (en) Shear wall outer wallboard for assembled integrated building
CN104674946A (en) Connecting adjusting member for concrete prefabricated members and application thereof
CN205276073U (en) Two line track roof beams of rail formula track traffic are embraced in magnetic suspension
CN203716395U (en) T-shaped outer wallboard for assembling integrated shear wall
CN204662717U (en) A kind of staircase prefabricated reinforced concrete fire barrier structure
CN204645318U (en) A kind of overlaid plate type shear wall
CN104727469B (en) A kind of staircase prefabricated reinforced concrete fire barrier structure and construction thereof
CN203429847U (en) Square hole ribbed support prestressed concrete composite slab
CN103669705A (en) External wall panel of shear wall for assembling integral buildings, and construction method thereof
CN103255903B (en) Workshop indoor steel plate concrete composite floor structure and manufacturing method thereof
CN203626237U (en) Steel-wood square column for supporting and forming reinforced concrete member in building construction
CN203716393U (en) Wallboard for assembling reserved door window of integrated building
CN204804131U (en) Reinforced concrete honeycomb core

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: SHANDONG LIJIU BUILDING TECHNOLOGY CO., LTD.

Free format text: FORMER OWNER: WANG RUIMIN

Effective date: 20150122

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 250001 JINAN, SHANDONG PROVINCE TO: 250101 JINAN, SHANDONG PROVINCE

TA01 Transfer of patent application right

Effective date of registration: 20150122

Address after: High tech Zone of Ji'nan City Industrial Road, No. 59 in Shandong province 250101 Expo International Building 1 unit 1301 room 6

Applicant after: Shandong Lijiu Building Technology Co., Ltd.

Address before: 250001 Jianshe Road century home 15-2-1103, Shizhong District, Shandong, Ji'nan

Applicant before: Wang Ruimin

ASS Succession or assignment of patent right

Owner name: WANG RUIMIN

Free format text: FORMER OWNER: SHANDONG LIJIU BUILDING TECHNOLOGY CO., LTD.

Effective date: 20150618

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20150618

Address after: 250001 Jianshe Road Century Park, Ji'nan City, Shandong province 15-2-1103

Applicant after: Wang Ruimin

Address before: High tech Zone of Ji'nan City Industrial Road, No. 59 in Shandong province 250101 Expo International Building 1 unit 1301 room 6

Applicant before: Shandong Lijiu Building Technology Co., Ltd.

C14 Grant of patent or utility model
GR01 Patent grant
CB03 Change of inventor or designer information

Inventor after: Wang Quanliang

Inventor after: Wang Ruimin

Inventor before: Wang Ruimin

CB03 Change of inventor or designer information
TR01 Transfer of patent right

Effective date of registration: 20170421

Address after: 100089 Beijing city Haidian District Qinghe Street No. 72 No. 23 floor 2 room 2345

Patentee after: Beijing Lian Fang Network Information Co., Ltd.

Address before: 250001 Jianshe Road Century Park, Ji'nan City, Shandong province 15-2-1103

Patentee before: Wang Ruimin

TR01 Transfer of patent right
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20191205

Address after: Room 601, block B, Olympic Tiantai Plaza, 5777 jingshidong Road, high tech Zone, Jinan City, Shandong Province, 250000

Patentee after: Shandong Lijiu Construction Robot Co., Ltd.