JP3122850B2 - Construction method of building with basement floor with steel pipe pile foundation - Google Patents
Construction method of building with basement floor with steel pipe pile foundationInfo
- Publication number
- JP3122850B2 JP3122850B2 JP03126861A JP12686191A JP3122850B2 JP 3122850 B2 JP3122850 B2 JP 3122850B2 JP 03126861 A JP03126861 A JP 03126861A JP 12686191 A JP12686191 A JP 12686191A JP 3122850 B2 JP3122850 B2 JP 3122850B2
- Authority
- JP
- Japan
- Prior art keywords
- steel pipe
- pipe pile
- building
- floor
- concrete
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Foundations (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Description
【0001】[0001]
【産業上の利用分野】本発明は、鋼管杭基礎を備えた地
下階付き建物の施工方法に関する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for constructing a building with a basement floor provided with a steel pipe pile foundation.
【0002】[0002]
【従来の技術】従来、SRC(鉄骨鉄筋コンクリート)
構造における地下階を有する建物は、建物を構成する地
下部分の架構の構築を先行して行なうとともに、この架
構の上で地上部分の施工を開始し、以下、地上部分と地
下部分の双方の施工を進めることにより構築されてい
る。2. Description of the Related Art Conventionally, SRC (steel reinforced concrete)
For buildings with underground floors in the structure, construction of the underground part of the building will be performed first, and construction of the above ground part will start on this frame. It is built by advancing.
【0003】[0003]
【発明が解決しようとする課題】しかしながら、前記従
来のような建物の施工方法の場合、地下部分の少なくと
も架構の構築を先行して行なわないと地上部分の建て方
を行なうことが出来ないといった問題がある。すなわ
ち、地上部分の重量は、施工地上部分の下部の梁鉄骨が
地下部分の上部の梁鉄骨の上にラップするように載置し
て設置されることにより地下部分の架構に支持されてい
る。したがって、地下部分の架構の構築が遅れていれば
地上部分の重量を支持することが困難であり、その建て
方を進めることが出来ない。However, in the case of the above-described conventional construction method of a building, there is a problem that the construction of the above-ground portion cannot be performed unless at least the construction of the underground portion is first performed. There is. In other words, the weight of the above-ground portion is supported by the underground frame by placing and installing the lower beam steel frame of the construction above-ground portion so as to wrap over the upper portion of the underground beam beam. Therefore, if the construction of the underground frame is delayed, it is difficult to support the weight of the aboveground part, and it is not possible to proceed with the construction.
【0004】本発明は、前述の課題に鑑みてなされたも
ので、建物の地上部分と地下部分の施工を並行に進行し
て建物の施工の作業能率が向上する鋼管杭基礎を備えた
地下階付き建物の施工方法を提供することを目的とする
ものである。[0004] The present invention has been made in view of the above-with a steel pipe pile foundation for progressing the construction of above-ground parts and underground part of the building to the concurrent increase work efficiency of the construction of the building basement It is an object of the present invention to provide a construction method for a building with floors.
【0005】[0005]
【課題を解決するための手段】本発明の鋼管杭基礎を備
えた地下階付き建物の施工方法では、(イ)地盤の建物
の柱の位置に鋼管杭を1本以上打ち込み、これら鋼管杭
の内一本を、柱芯に位置させてかつ杭頭が1階床部分の
梁下以上となるように設置する工程と、(ロ)前記柱芯
に位置する鋼管杭の杭頭の周囲で1階部分の根切りを行
なった上根切り底に捨てコンクリートを打設し、前記杭
頭の突出した鋼管杭の内部に柱脚部を挿入するとともに
この柱脚部に梁鉄骨を連結する工程と、(ハ)柱脚部を
挿入した鋼管杭内部にコンクリートを打設し、鋼管杭と
柱脚部とを一体化する工程と、(ニ)前記(ハ)の工程
の完了後、1階の梁用、スラブと、柱用の各配筋をして
1階のコンクリートを打設して、1階の梁、スラブと、
鋼管杭と柱脚部とを内蔵する鉄筋コンクリート柱を施工
する工程と、このコンクリートが強度を発現後、地上部
分の鉄骨の建て方と地下部分の根切りを開始する工程と
からなることを前記課題の解決手段とした。According to the method for constructing a building with an underground floor provided with a steel pipe pile foundation according to the present invention, (a) one or more steel pipe piles are driven into pillar positions of a building on the ground, and (B) placing one of the steel pipes at the pillar core so that the pile head is located below the beam of the first floor, and (b) one around the pile head of the steel pipe pile located at the pillar core. Casting a discarded concrete into the upper root bottom where the floor portion was rooted, inserting a column base into the steel pipe pile protruding from the pile head, and connecting a beam steel frame to the column base. (C) casting concrete into the steel pipe pile into which the column base has been inserted, and integrating the steel pipe pile with the column base; (d) after completion of the step (c), the first floor For the beams, slabs, and columns, the first-floor concrete is cast and the first-floor beams, slabs,
It consists of a process of constructing a reinforced concrete column incorporating a steel pipe pile and a column base, and a process of starting construction of a steel frame on the ground portion and root cutting of the underground portion after the concrete has developed strength. This is the solution to the above problem.
【0006】[0006]
【作用】本発明の鋼管杭基礎を備えた地下階付き建物の
施工方法によれば、前記柱芯に位置する鋼管杭の杭頭に
建物の一階部分の梁鉄骨と、スラブと、柱とを施工して
地上部分の鉄骨の建て方と地上部分の根切りを行なうこ
とにより、建物の地上部分と地下部分の施工を並行して
行なうことが出来る。According to the construction method of a building with a basement floor provided with a steel pipe pile foundation according to the present invention, a beam steel frame of the first floor of the building, a slab, and a column are provided at the pile head of the steel pipe pile located at the pillar core. The construction of the above-ground part and the root-cutting of the above-ground part allow the construction of the above-ground part and the underground part of the building to be performed in parallel.
【0007】[0007]
【実施例】以下本発明の一実施例を、図1ないし図12
を参照して説明する。DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS One embodiment of the present invention will now be described with reference to FIGS.
This will be described with reference to FIG.
【0008】図中符号1は、本実施例の鋼管杭基礎を備
えた地下階付き建物の施工方法(以下、単に「建物の施
工方法」と称する)により構築された建物である。建物
1は、地盤T上に構築された上部構造物2と、この上部
構造物2の位置する地盤T内に上部構造物2の下に構築
された下部構造物3(地下階)とで構成され、全体がS
RC構造となっている。図1に示すように、建物1の内
部には、下部構造物3の内部で上下に貫設されている第
1の柱4と、この第1の柱4の上部に接続されて上方に
延びる第2の柱5が設けられている。Reference numeral 1 in the drawing denotes a building constructed by a method of constructing a building with a basement floor provided with a steel pipe pile foundation according to the present embodiment (hereinafter, simply referred to as “constructing method of building”). The building 1 includes an upper structure 2 constructed on the ground T and a lower structure 3 (basement floor) constructed below the upper structure 2 in the ground T where the upper structure 2 is located. And the whole is S
It has an RC structure. As shown in FIG. 1, inside a building 1, a first column 4 vertically penetrating inside a lower structure 3, and is connected to an upper portion of the first column 4 and extends upward. A second column 5 is provided.
【0009】図2に示すように、第1の柱4の柱芯に
は、第1の鋼管杭4aが内蔵されている。第1の鋼管杭
4aは、下部構造物3下方の地盤Tに打ち込まれて固定
されている。また、この第1の鋼管杭4aの周囲には第
2の鋼管杭6がその上面を下部構造物3の下面の高さと
して複数本打ち込まれている。下部構造物3は、これら
第2の鋼管杭6の上部に地下階床部3aを形成すること
により構成されている。As shown in FIG. 2, a first steel pipe pile 4a is built in the pillar core of the first pillar 4. The first steel pipe pile 4a is driven into and fixed to the ground T below the lower structure 3. A plurality of second steel pipe piles 6 are driven around the first steel pipe pile 4a with the upper surface of the second steel pipe pile 6 being the height of the lower surface of the lower structure 3. The lower structure 3 is formed by forming an underground floor portion 3 a above the second steel pipe pile 6.
【0010】第1の鋼管杭4aは、長尺な円柱状に形成
され、杭頭4bが上部構造物2の1階部分の梁7の下と
なるように設置されている。図3に示すように、梁7
は、地盤T上に杭頭4bを連結するように配設されて、
平面視格子状に構成されている。The first steel pipe pile 4a is formed in an elongated column shape, and is installed such that the pile head 4b is located below the beam 7 on the first floor of the upper structure 2. As shown in FIG.
Is disposed so as to connect the pile head 4b on the ground T,
It is configured in a lattice shape in plan view.
【0011】以下、本発明の建物の施工方法により前記
建物1の施工方法を説明する。本実施例の建物の施工方
法は、以下の(イ)ないし(ニ)の工程により構成され
ている。 (イ)まず、図4に示すように、地盤Tの施工位置に予
め山留壁を施工し、第1の鋼管杭4aを第2の柱5の柱
芯の位置で地盤Tに打ち込む。Hereinafter, the construction method of the building 1 will be described with reference to the construction method of the present invention. The construction method for a building according to the present embodiment includes the following steps (a) to (d). (A) First, as shown in FIG. 4, a retaining wall is previously constructed at the construction position of the ground T, and the first steel pipe pile 4 a is driven into the ground T at the position of the column core of the second column 5.
【0012】(ロ)次いで、図4に示すように、第1の
鋼管杭4aの打ち込み位置を連結するように梁7を設置
するための根切りを行なって梁設置部Ta(根切り穴)
を形成する。根切りの完了後は、図5に示すように、梁
設置部Taの表面に第1の捨てコンクリート8aを打設
するとともに、杭頭4bの周囲にも第1の捨てコンクリ
ート8aと略平行に第2の捨てコンクリート8bを打設
する。そして杭頭4bの内部に第2の柱5の柱脚部5a
を挿入するとともに、図6に示すように、梁設置部Ta
に梁鉄骨7aを設置してこの柱脚部5aに連結する。(B) Next, as shown in FIG. 4, a root is cut to install the beam 7 so as to connect the driving positions of the first steel pipe piles 4a, and a beam installation portion Ta (root cutting hole).
To form After the completion of the root cutting, as shown in FIG. 5, the first dumped concrete 8a is cast on the surface of the beam installation portion Ta, and the piled-up head 4b is also substantially parallel to the first dumped concrete 8a. The second waste concrete 8b is cast. And the pillar base 5a of the second pillar 5 is provided inside the pile head 4b.
And, as shown in FIG.
A beam steel frame 7a is installed in the column and connected to the column base 5a.
【0013】(ハ)前記(ロ)の工程の完了後、図7に
示すように、柱脚部5aを挿入した第1の鋼管杭4aの
内部に柱芯コンクリート8dを打設し、第1の鋼管杭4
aと柱脚部5aとを一体化する。(C) After the completion of the step (b), as shown in FIG. 7, a column core concrete 8d is poured into the inside of the first steel pipe pile 4a into which the column base 5a is inserted. Steel pipe pile 4
a and the column base 5a.
【0014】(ニ)前記(ハ)の工程の完了後、図8に
示すように、第2の柱5と、梁7と、スラブ9にそれぞ
れ配筋して1階の本設コンクリート8eを打設する。(D) After the completion of the step (c), as shown in FIG. 8, the second floor 5, the beam 7 and the slab 9 are respectively reinforced and the first floor permanent concrete 8e is provided. Cast in.
【0015】図8及び図9に示すように、第2の柱5の
配筋は、柱主筋5bを第2の柱5の上部から柱主筋5b
にわたって末広がりに配筋し、この柱主筋5bを中心と
して行なう。柱主筋5bは、第2の捨てコンクリート8
bの上に固定コンクリート8cを打設し、この固定コン
クリート8cの硬化後に削り出した部分に、柱主筋5b
を圧接することにより固定する。第1、第2の捨てコン
クリート8a、8bの上に予めシートを設置しておけ
ば、地下根伐を行なった時、シートの下から捨てコンク
リート8a、8bが楽に除去出来、躯体表面がきれいに
仕上がる。また、図10及び図11に示すように、第2
の柱5の構築は、杭頭4b内に口型鋼管4cを挿入して
地上から第1の鋼管杭4a内に柱芯コンクリート8dを
先行打設するとともに、第1の鋼管杭4aの周囲に柱主
筋5bを配筋して本設コンクリート8eを打設する。As shown in FIGS. 8 and 9, the reinforcement of the second column 5 is such that the column main bar 5 b is arranged from above the second column 5.
The main reinforcement 5b is arranged at the center of the pillar main reinforcement 5b. The column main bar 5b is made of the second discarded concrete 8
b, a fixed concrete 8c is cast on the fixed concrete 8c.
Is fixed by pressing. If a sheet is previously set on the first and second discarded concretes 8a and 8b, when underground root cutting is performed, the discarded concretes 8a and 8b can be easily removed from beneath the sheet, and the surface of the frame is finished neatly. . Further, as shown in FIGS. 10 and 11, the second
The pillar 5 is constructed by inserting a mouth-shaped steel pipe 4c into the pile head 4b, pre-casting the column core concrete 8d into the first steel pipe pile 4a from the ground, and surrounding the first steel pipe pile 4a. The main reinforcement 8b is arranged, and the concrete 8e is poured.
【0016】スラブ9は、S.F.F.G.(ソイル・フォ
ーム・フラット・ガーター)構法により構成する。図1
2に示すように、スラブ9の第2の捨てコンクリート8
aと接する部分は、無筋で成り行きの勾配として本設コ
ンクリート8eを打設する。The slab 9 is formed by an SFFG (Soil Form Flat Garter) construction method. FIG.
As shown in FIG. 2, the second discarded concrete 8 of the slab 9
The part in contact with a is laid with the main concrete 8e as a straight slope with no line.
【0017】そして、1階の本設コンクリート8eが強
度を発現後、下部構造物3の根切りと上部構造物2の鉄
骨の建て方を開始する。After the main concrete 8e on the first floor has developed the strength, the root cutting of the lower structure 3 and the construction of the steel frame of the upper structure 2 are started.
【0018】前記本実施例の建物の施工方法によれば、
第1の鋼管杭4aの杭頭4bに第2の柱5と梁鉄骨7と
スラブ9とを施工した後に上部構造物2の鉄骨の建て方
と下部構造物3の根切りとを行なうから、上部構造物2
と下部構造物3の施工を並行して行なうことが出来、建
物1の施工の作業能率を向上して工期の短縮と人件費な
どのコストの低減が可能となる。According to the building construction method of this embodiment,
After the second column 5, the beam steel structure 7, and the slab 9 are constructed on the pile head 4b of the first steel pipe pile 4a, the method of building the upper structure 2 and the root cutting of the lower structure 3 are performed. Superstructure 2
And the construction of the lower structure 3 can be performed in parallel, and the work efficiency of the construction of the building 1 can be improved, thereby shortening the construction period and reducing costs such as labor costs.
【0019】[0019]
【発明の効果】以上説明したように、本発明の鋼管杭基
礎を備えた地下階付き建物の施工方法によれば、(イ)
地盤の建物の柱の位置に鋼管杭を1本以上打ち込み、こ
れら鋼管杭の内一本を、柱芯に位置させてかつ杭頭が1
階床部分の梁下以上となるように設置する工程と、
(ロ)前記柱芯に位置する鋼管杭の杭頭の周囲で1階部
分の根切りを行なった上根切り底に捨てコンクリートを
打設し、前記杭頭の突出した鋼管杭の内部に柱脚部を挿
入するとともにこの柱脚部に梁鉄骨を連結する工程と、
(ハ)柱脚部を挿入した鋼管杭内部にコンクリートを打
設し、鋼管杭と柱脚部とを一体化する工程と、(ニ)前
記(ハ)の工程の完了後、1階の梁用、スラブと、柱用
の各配筋をして1階のコンクリートを打設して、1階の
梁、スラブと、鋼管杭と柱脚部とを内蔵する鉄筋コンク
リート柱を施工する工程と、このコンクリートが強度を
発現後、地上部分の鉄骨の建て方と地下部分の根切りを
開始する工程とからなることを特徴とするから、前記柱
芯に位置する鋼管杭の杭頭に建物の一階部分の梁鉄骨
と、スラブと、柱とを施工した後、地上部分の鉄骨の建
て方と地上部分の根切りを行なうことにより、建物の地
上部分と地下部分の施工を並行して行なうことが出来、
建物の施工の作業能率を向上して工期の短縮と人件費な
どのコストの低減が可能となるといった効果を奏する。As described above, according to the method for constructing a building with a basement floor provided with a steel pipe pile foundation according to the present invention, (a)
At least one steel pipe pile is driven into the position of the pillar of the building on the ground, and one of these steel pipe piles is positioned at the pillar core and the pile head is 1
A step of installing the floor section below the beam,
(B) Concrete is poured into the steel pipe pile at the top of the steel pipe pile located at the core of the column where the first floor is cut off around the pile head, and the pillar is placed inside the steel pipe pile with the pile head protruding. A step of inserting a leg and connecting a beam steel to the column base,
(C) Casting concrete into the inside of the steel pipe pile into which the column base has been inserted, and integrating the steel pipe pile and the column base, and (d) the beam on the first floor after completion of the step (c). , Slabs, and reinforcements for pillars, placing concrete on the first floor,
Reinforced concrete with built-in beams, slabs, steel pipe piles and column bases
A steel pipe located at the core of the column, which comprises a step of constructing a reed column and a step of starting the erecting of an underground part and a method of building a steel frame above the ground after the concrete has developed strength. After constructing the beam steel frame, slab, and column on the first floor of the building at the pile head, the method of building the steel frame on the ground and cutting off the ground are used to build the ground and basement of the building. Construction can be performed in parallel,
This has the effect of improving the work efficiency of building construction, shortening the construction period and reducing costs such as labor costs.
【図1】本発明の鋼管杭基礎を備えた地下階付き建物の
施工方法により施工された本実施例の建物の柱を示す正
面図である。FIG. 1 is a front view showing pillars of a building of this embodiment constructed by a construction method for a building with a basement floor provided with a steel pipe pile foundation according to the present invention.
【図2】前記建物の上部構造物の1階部分と地下構造物
を示す略図である。FIG. 2 is a schematic diagram showing a first floor portion of an upper structure of the building and an underground structure.
【図3】前記上部構造物の1階部分に梁が施工された状
態示す平面図である。FIG. 3 is a plan view showing a state in which a beam is constructed on a first floor portion of the upper structure.
【図4】(イ)の工程を示す正面図である。FIG. 4 is a front view showing a step (A).
【図5】(ロ)の工程の捨てコンクリートの打設を示す
正面図である。FIG. 5 is a front view showing the casting of waste concrete in the step (b).
【図6】(ロ)の工程の梁鉄骨の連結を示す正面図であ
る。FIG. 6 is a front view showing the connection of beam steel frames in the step (b).
【図7】(ハ)の工程を示す正面図である。FIG. 7 is a front view showing a step (c).
【図8】(ニ)の工程を示す正面図である。FIG. 8 is a front view showing a step (d).
【図9】第2の柱を示す断面図である。FIG. 9 is a sectional view showing a second column.
【図10】第1の柱の上部を示す断面図である。FIG. 10 is a cross-sectional view showing an upper part of the first column.
【図11】第1の柱の下部を示す断面図である。FIG. 11 is a sectional view showing a lower portion of the first column.
【図12】1階部分のスラブを示す断面図である。FIG. 12 is a sectional view showing a slab of a first floor portion.
1 建物 2 上部構造物(1階部分) 3 下部構造物(地下階) 4 第1の鋼管杭 4b 杭頭 5 柱 6 第2の鋼管杭 7 梁 7a 梁鉄骨 8a 第1の捨てコンクリート 8d 柱芯コンクリート 8e 本設コンクリート 9 スラブ T 地盤 Ta 梁設置部(根切り穴) DESCRIPTION OF SYMBOLS 1 Building 2 Upper structure (1st floor part) 3 Lower structure (basement floor) 4 First steel pipe pile 4b Pile head 5 Column 6 Second steel pipe pile 7 Beam 7a Beam steel frame 8a First discarded concrete 8d Column core Concrete 8e Permanent concrete 9 Slab T Ground Ta Beam installation part (root cutting hole)
───────────────────────────────────────────────────── フロントページの続き (58)調査した分野(Int.Cl.7,DB名) E04G 21/14 E02D 27/00 E02D 27/14 ──────────────────────────────────────────────────続 き Continued on the front page (58) Field surveyed (Int. Cl. 7 , DB name) E04G 21/14 E02D 27/00 E02D 27/14
Claims (1)
工方法であって、 (イ)地盤の建物の柱の位置に鋼管杭を1本以上打ち込
み、これら鋼管杭の内一本を、柱芯に位置させてかつ杭
頭が1階床部分の梁下以上となるように設置する工程
と、 (ロ)前記柱芯に位置する鋼管杭の杭頭の周囲で1階部
分の根切りを行なった上根切り底に捨てコンクリートを
打設し、前記杭頭の突出した鋼管杭の内部に柱脚部を挿
入するとともにこの柱脚部に梁鉄骨を連結する工程と、 (ハ)柱脚部を挿入した鋼管杭内部にコンクリートを打
設し、鋼管杭と柱脚部とを一体化する工程と、 (ニ)前記(ハ)の工程の完了後、1階の梁用、スラブ
と、柱用の各配筋をして1階のコンクリートを打設し
て、1階の梁、スラブと、鋼管杭と柱脚部とを内蔵する
鉄筋コンクリート柱を施工する工程と、このコンクリー
トが強度を発現後、地上部分の鉄骨の建て方と地下部分
の根切りを開始する工程とからなることを特徴とする鋼
管杭基礎を備えた地下階付き建物の施工方法。1. A method for constructing a building with a basement floor having a steel pipe pile foundation, comprising: (a) driving one or more steel pipe piles into pillar positions of a building on the ground, A step of placing the pillar core so that the pile head is located below the beam of the first floor, and (b) rooting of the first floor part around the pile head of the steel pipe pile located at the pillar core. (C) inserting concrete into the upper root cut bottom, inserting concrete into the steel pipe pile projecting from the pile head, and connecting a beam steel frame to the column base. Casting concrete into the steel pipe pile with the legs inserted, and integrating the steel pipe pile with the column pedestal; and (d) after the completion of the step (c), the beam, slab and , and Da設the first floor of concrete to each reinforcement for the pillar
With built-in first floor beams, slabs, steel pipe piles and column bases
With a basement floor with a steel pipe pile foundation, which consists of a step of constructing a reinforced concrete column and a step of starting construction of a steel frame above the ground and root cutting of an underground part after this concrete develops strength Building construction method.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP03126861A JP3122850B2 (en) | 1991-04-30 | 1991-04-30 | Construction method of building with basement floor with steel pipe pile foundation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP03126861A JP3122850B2 (en) | 1991-04-30 | 1991-04-30 | Construction method of building with basement floor with steel pipe pile foundation |
Publications (2)
Publication Number | Publication Date |
---|---|
JPH04330168A JPH04330168A (en) | 1992-11-18 |
JP3122850B2 true JP3122850B2 (en) | 2001-01-09 |
Family
ID=14945658
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP03126861A Expired - Fee Related JP3122850B2 (en) | 1991-04-30 | 1991-04-30 | Construction method of building with basement floor with steel pipe pile foundation |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP3122850B2 (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US8551021B2 (en) | 2010-03-31 | 2013-10-08 | Boston Scientific Scimed, Inc. | Guidewire with an improved flexural rigidity profile |
US9901706B2 (en) | 2014-04-11 | 2018-02-27 | Boston Scientific Scimed, Inc. | Catheters and catheter shafts |
JP7260408B2 (en) | 2019-06-14 | 2023-04-18 | 株式会社パイオラックスメディカルデバイス | Slit pipe and guide wire using it |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH05140953A (en) * | 1991-11-15 | 1993-06-08 | Kajima Corp | Building with steel skeleton |
CN105714852A (en) * | 2015-03-03 | 2016-06-29 | 朱奎 | Basement supporting construction method performed through profile steel stand columns |
CN112853855A (en) * | 2020-12-31 | 2021-05-28 | 中建港航局集团有限公司 | Portable conversion device for steel structure storage yard and assembled field overhead |
-
1991
- 1991-04-30 JP JP03126861A patent/JP3122850B2/en not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US8551021B2 (en) | 2010-03-31 | 2013-10-08 | Boston Scientific Scimed, Inc. | Guidewire with an improved flexural rigidity profile |
US8784337B2 (en) | 2010-03-31 | 2014-07-22 | Boston Scientific Scimed, Inc. | Catheter with an improved flexural rigidity profile |
US9901706B2 (en) | 2014-04-11 | 2018-02-27 | Boston Scientific Scimed, Inc. | Catheters and catheter shafts |
JP7260408B2 (en) | 2019-06-14 | 2023-04-18 | 株式会社パイオラックスメディカルデバイス | Slit pipe and guide wire using it |
Also Published As
Publication number | Publication date |
---|---|
JPH04330168A (en) | 1992-11-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP6855296B2 (en) | Building foundation structure and its construction method | |
JP3122850B2 (en) | Construction method of building with basement floor with steel pipe pile foundation | |
JP7386095B2 (en) | Underground structure construction method | |
JP2700811B2 (en) | Construction method of structure including super frame | |
JPH0684690B2 (en) | Building basement extension method | |
JP3057466B2 (en) | How to build underground structures | |
JPH10311041A (en) | Column base foundation of precast concrete column | |
JP3109038B2 (en) | Underground skeleton structure and construction method | |
JPH04330119A (en) | Building foundation constructing method | |
JP3700119B2 (en) | Pillar construction method | |
JP6534026B2 (en) | Seismic isolation building and its construction method | |
JP3567387B2 (en) | How to build an underground skeleton | |
JPH0598653A (en) | Steel pipe concrete pillar in underground inverter construction method | |
JPH101957A (en) | Underground construction method for building | |
JPH08291526A (en) | Construction method for underground structure | |
JP4045623B2 (en) | Construction method of reinforced concrete underground floor and underground structure constructed by this method | |
JPH07103583B2 (en) | Construction method for large span underground structure | |
JP2772397B2 (en) | Underground building construction method | |
JPS6350491B2 (en) | ||
JP3740607B2 (en) | Building provisional receiving method and structure | |
AU2021221428A1 (en) | A Slab, Formwork and a Method of Constructing a Slab | |
JP3289163B2 (en) | How to build underground structures | |
NZ779330A (en) | A Slab, Formwork and a Method of Constructing a Slab | |
KR20050122763A (en) | A deck supportframe and a construction methed | |
JPH0337603B2 (en) |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20000829 |
|
LAPS | Cancellation because of no payment of annual fees |