EP1346754B1 - Attaching structure in particular for safety purposes - Google Patents

Attaching structure in particular for safety purposes Download PDF

Info

Publication number
EP1346754B1
EP1346754B1 EP03370010A EP03370010A EP1346754B1 EP 1346754 B1 EP1346754 B1 EP 1346754B1 EP 03370010 A EP03370010 A EP 03370010A EP 03370010 A EP03370010 A EP 03370010A EP 1346754 B1 EP1346754 B1 EP 1346754B1
Authority
EP
European Patent Office
Prior art keywords
support
structure according
securing structure
shuttle
section
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
EP03370010A
Other languages
German (de)
French (fr)
Other versions
EP1346754A1 (en
Inventor
André Fournier
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
DAFORIB SARL
Original Assignee
DAFORIB SARL
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by DAFORIB SARL filed Critical DAFORIB SARL
Publication of EP1346754A1 publication Critical patent/EP1346754A1/en
Application granted granted Critical
Publication of EP1346754B1 publication Critical patent/EP1346754B1/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • AHUMAN NECESSITIES
    • A62LIFE-SAVING; FIRE-FIGHTING
    • A62BDEVICES, APPARATUS OR METHODS FOR LIFE-SAVING
    • A62B35/00Safety belts or body harnesses; Similar equipment for limiting displacement of the human body, especially in case of sudden changes of motion
    • A62B35/0081Equipment which can travel along the length of a lifeline, e.g. travelers
    • A62B35/0087Arrangements for bypassing lifeline supports without lanyard disconnection
    • AHUMAN NECESSITIES
    • A62LIFE-SAVING; FIRE-FIGHTING
    • A62BDEVICES, APPARATUS OR METHODS FOR LIFE-SAVING
    • A62B35/00Safety belts or body harnesses; Similar equipment for limiting displacement of the human body, especially in case of sudden changes of motion
    • A62B35/0043Lifelines, lanyards, and anchors therefore
    • A62B35/0056Horizontal lifelines
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/32Safety or protective measures for persons during the construction of buildings
    • E04G21/3261Safety-nets; Safety mattresses; Arrangements on buildings for connecting safety-lines
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/32Safety or protective measures for persons during the construction of buildings
    • E04G21/3261Safety-nets; Safety mattresses; Arrangements on buildings for connecting safety-lines
    • E04G21/3276Arrangements on buildings for connecting safety-lines
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/32Safety or protective measures for persons during the construction of buildings
    • E04G21/3261Safety-nets; Safety mattresses; Arrangements on buildings for connecting safety-lines
    • E04G21/3295Guide tracks for safety lines

Definitions

  • the invention relates to a known securing structure still under the name line of life.
  • anchor points are made up of pieces anchored in the building and wearing a ring or by life lines installed on the terraces of buildings for cleaning or other services.
  • the work area of the anchor points being limited by the length of the cable connecting the harness to the said anchor, we use more frequently a lifeline.
  • a lifeline consists of two anchor points between which is stretched a cable.
  • a tensioner makes it possible to adjust the tension of the cable.
  • Rings carried by intermediate supports sometimes avoid that the cable has an arrow but generally one avoids their use because they do not allow more to move freely along the cable.
  • the cable then comprises a dissipating device of the stress exerted on the cable when stopping the fall, so that the energy transmitted to the cable and acting on the anchor points is no longer instantaneous.
  • This monitoring requires tests, periodic checks of the cables and accessories or even before use.
  • the safety rules require that a resistance test be carried out periodically, especially before use, but when it undergoes a test of resistance, the cable then sees its resistance capacity decreased.
  • This structure is placed on a terrace.
  • a stakeholder can hang on a stretch but can not move from one section to another.
  • the invention therefore proposes to provide a solution to the problems especially mentioned above.
  • the subject of the invention is a stowage structure still called a lifeline this structure being characterized in that it consists of a part by assembling sections of rigid tubular section fitted together at each end on a finger that has the head of a support intended to be anchored on a supporting structure so as to form a continuous rail without extra thickness and other the head of this support is, in its connection zone with the support, thick lower than the section of the tubular section so as to allow a free flow of shuttle clutching the rail.
  • This carabiner then surrounds the stowage structure still called lifeline.
  • This stowage structure is located, for example, on a wall or on a roof of preferably at a short distance from the surface of the wall or roof.
  • a distance of thirty to forty centimeters is still considered a short distance.
  • the invention consists on the one hand by assembling sections 1A of rigid tubular profiles fitted at each end on a finger 5A that the head 20 of a support intended to be anchored on a supporting structure in kind of forming a continuous rail without extra thickness and secondly the head 20 of this support is, in its zone 21 of connection with the support thickness, less than the section of the tubular section in order to allow a shuttling shuttle to circulate freely the rail.
  • the fixing of the ends is done by interlocking the ends and possibly by locking in translation.
  • the tube can thus be cut on the spot to the desired length according to the implantation of the supports which must take into account the resistance of the structure carrier and therefore areas where potentially these supports can be fixed.
  • the locking in translation is done, for example, by a weld or by a bolt passing through but not increasing the thickness of the rail.
  • Nesting 5 will be longer than necessary and which can be determined according to the elastic bending capacity of the profile between the two points of support and load to bear. It will be of the order of at least 150 mm.
  • Tubular sections for example made of stainless steel, are used. the end comes to cap a finger 5A carried by a support.
  • the tubular section has a continuous and unopened outer surface as would be a profile in Ce.
  • each profile is generally established in dimensions at maximum of two to three meters.
  • the attachment device 2 consists of a shuttle 2A which is in the form of a cylinder presenting along a generatrix an opening 10 wide enough to cross the heads of the supports carrying the fingers 5A, which fingers 5A are at the upper end of the head of support 3.
  • This shuttle crosses the supports without falling off the rail.
  • the envelope is not of constant section.
  • the entry 12 of the shuttle extends over approximately a semicircle while its central portion 11 extends over three quarters of the circle.
  • FIG. 18 there is shown a shuttle used when the structure lashing is attached to a ceiling.
  • the shuttle of FIG. 19 is intended for a lashing structure fixed on a vertical wall.
  • the support 3 may be of circular section, it will preferably be of section ovoid so that by slimming the part connecting the fingers to the vertical part this will facilitate, with the shape of the opening of the shuttle, the orientation of the shuttle to cross the supports.
  • This ovoid shape of the binding zone is determined to distribute the efforts.
  • an open reinforcement ring 13 on which there will be provided at least an anchor point for a carabiner and, preferably, two anchors.
  • This ring helps strengthen the shuttle and prevents it from opening.
  • the anchor points for the attachment of the rope connecting the harness and the shuttle can be directly carried by the cylindrical shape.
  • the supports 3 will carry at their ends the fingers 5A oriented in opposite directions.
  • a chamfer 15 allows, for example, to weld the tubes on the fingers without leave extra thickness.
  • brackets 3 bent to be fixed, for example, on vertical walls.
  • this line of life is first and foremost that it can be controlled with a period, between each control, much more important because the profile is not subject to corrosion in the same proportions as a cable and this tube does not deform dimensionally.
  • lifelines can be integrated in the building's architecture and, for example, constitute snowstops and, ladder stowage points during maintenance or help.
  • These rigid structures make it possible to ensure different materials, such as scaffolding or other suspended product.
  • the support will include a head 20 support having one or two fingers and a connection zone with a base.
  • connection zone comprises at its base means of association with a support adapted to the chosen configuration.
  • FIGS. 6 to 12 show different supports adapted to regularly encountered non-limiting configurations of the possibilities.
  • Figure 6 shows a solution for the flat roof
  • Figure 7 a solution for the terrace.
  • Figure 8 is for the ridge, Figure 9 for the steel tray, Figure 10 for a acroterium and in figure 11 a pose in facade.
  • FIG. 12 is intended, for example, to be placed inside premises at level of ceilings, especially industrial halls.
  • the advantage is to have a part 20, the support head 20, whose resistance is known or calculated previously and which can, through a support 3 adapted, be integrated in a construction without interfering with aesthetics. All the components of this structure will have its resistance well known mechanics which will facilitate the work of architects.

Landscapes

  • Architecture (AREA)
  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Emergency Management (AREA)
  • Health & Medical Sciences (AREA)
  • Business, Economics & Management (AREA)
  • General Health & Medical Sciences (AREA)
  • Emergency Lowering Means (AREA)
  • Electrical Discharge Machining, Electrochemical Machining, And Combined Machining (AREA)
  • Diaphragms For Electromechanical Transducers (AREA)
  • Tents Or Canopies (AREA)
  • Hardware Redundancy (AREA)

Abstract

The safety rail (1), fixed to the roof or upper wall of a building, consists of rigid tubular sections (1A) joined end-to-end by fingers projecting from the upper ends of posts (3), giving a continuous rail with no variations in thickness so that a shuttle fastening for a harness line can pass along it. The post fingers are made long enough, e.g. at least 150 mm, to accommodate any flexibility in the tubular sections without separating from them, and the posts are anchored to a supporting structure of the building. The posts' upper ends are made slim enough for a shuttle fastening to pass.

Description

L'invention se rapporte Ă  une structure d'arrimage connue encore sous l'appellation ligne de vie.The invention relates to a known securing structure still under the name line of life.

La protection des individus travaillant en hauteur, tels les couvreurs ou autres impose depuis déjà de longues années la mise en place d'équipement de protection permettant lors du déplacement d'un individu de se prémunir des conséquences graves d'une chute en stoppant l'individu notamment à la perte d'équilibre.Protection of individuals working at height, such as roofers or others has for many years imposed the installation of protective equipment allowing when moving an individual to guard against the consequences serious of a fall by stopping the individual including loss of balance.

Il existe les protections collectives et, à cet effet, on connaít l'usage de filets de protection ou de barrières placées momentanément mais ces éléments de protection ne sont installés que provisoirement.There are collective protections and for this purpose we know the use of nets protection or barriers placed momentarily but these elements of protection are installed only temporarily.

Ils ne conviennent pas pour des installations Ă  demeure.They are not suitable for permanent installations.

On connaĂ­t Ă©galement les protections individuelles permettant Ă  des intervenants de s'accrocher au moyen d'un cĂ¢ble et d'un harnais de sĂ©curitĂ© mais l'usage en est limitĂ© dans le temps.We also know the individual protections allowing stakeholders to hang on with a cable and a safety harness but use is limited in time.

Ces points d'ancrage sont constituĂ©s par des pièces ancrĂ©es dans le bĂ¢timent et portant un anneau ou par des lignes de vie installĂ©es sur les terrasses des immeubles pour les services de nettoyage ou autres.These anchor points are made up of pieces anchored in the building and wearing a ring or by life lines installed on the terraces of buildings for cleaning or other services.

Pour la protection individuelle des individus, les sociétés ont été inspirées par les techniques de montagne et on a donc proposé d'équiper chaque individu d'un harnais de sécurité et de l'attacher soit à un point d'ancrage soit à une ligne de vie fixée à demeure sur la structure porteuse.For the personal protection of individuals, companies have been inspired by mountain techniques and it was therefore proposed to equip each individual with a safety harness and attach it to either an anchor point or a lifeline permanently attached to the supporting structure.

La zone de travail des points d'ancrage Ă©tant limitĂ©e par la longueur du cĂ¢ble reliant l'harnais au dit point d'ancrage, on utilise plus frĂ©quemment une ligne de vie.The work area of the anchor points being limited by the length of the cable connecting the harness to the said anchor, we use more frequently a lifeline.

Classiquement, une ligne de vie se compose de deux points d'ancrage entre lesquels est tendu un cĂ¢ble.Classically, a lifeline consists of two anchor points between which is stretched a cable.

Un tendeur permet d'ajuster la tension du cĂ¢ble.A tensioner makes it possible to adjust the tension of the cable.

Des anneaux portĂ©s par des supports intermĂ©diaires Ă©vitent parfois que le cĂ¢ble prĂ©sente une flèche mais gĂ©nĂ©ralement on Ă©vite leur utilisation car ils ne permettent plus de se dĂ©placer librement au long du cĂ¢ble. Rings carried by intermediate supports sometimes avoid that the cable has an arrow but generally one avoids their use because they do not allow more to move freely along the cable.

L'intervenant accroche son mousqueton sur la ligne de vie et peut donc se déplacer tout au long de cette ligne de vie.The worker hangs his carabiner on the lifeline and can therefore move throughout this lifeline.

Lors de la chute accidentelle d'un individu, les forces engendrĂ©es lors de l'arrĂªt brutal de l'individu sont alors transmises aux deux points d'ancrage et s'exercent essentiellement parallèlement au cĂ¢ble.During the accidental fall of an individual, the forces generated during the shutdown brutal of the individual are then transmitted to the two anchor points and are exercised essentially parallel to the cable.

Ces forces s'ajoutent aux forces nĂ©cessaires pour tendre le cĂ¢ble, ce qui entraĂ­ne des efforts localisĂ©s particulièrement importants au niveau des points d'ancrage et sur la structure du bĂ¢timent.These forces are in addition to the forces required to tension the cable, which leads to localized efforts that are particularly important at the level of the points anchorage and on the structure of the building.

On comprend bien que, lorsque le cĂ¢ble est tendu entre les deux pignons d'un bĂ¢timent, la prĂ©sence d'un renfort de la charpente est nĂ©cessaire pour Ă©viter que les pignons ne se renversent.It is understandable that when the cable is stretched between the two gears of a building, the presence of a reinforcement of the frame is necessary to prevent the gables do not spill.

Il en va de mĂªme si les points d'arrimage se trouvent sur la charpente.The same is true if the tie-down points are on the frame.

Lors de l'arrĂªt de la chute, l'Ă©nergie produite doit se dissiper dans un temps extrĂªmement court.When stopping the fall, the energy produced must dissipate in a time extremely short.

Pour attĂ©nuer ce problème, le cĂ¢ble comporte alors un dispositif dissipateur de l'effort qui s'exerce sur le cĂ¢ble lors de l'arrĂªt de la chute, de sorte que l'Ă©nergie transmise au cĂ¢ble et s'exerçant sur les points d'ancrage ne soit plus instantanĂ©e.To mitigate this problem, the cable then comprises a dissipating device of the stress exerted on the cable when stopping the fall, so that the energy transmitted to the cable and acting on the anchor points is no longer instantaneous.

On constate toutefois que les efforts restent importants.However, we note that the efforts remain important.

Cette ligne de vie permet Ă  chaque individu de se dĂ©placer sur de longues distances sans devoir se dĂ©crocher et Ăªtre toujours en protection mais en thĂ©orie il est interdit de travailler Ă  poste fixe et il doit s'accrocher sur un point d'arrimage fixe.This line of life allows each individual to move on long distances without having to unhook and still be in protection but in theory there is forbidden to work at a fixed post and he must hang on a fixed stowage point.

Lorsque des anneaux sont nĂ©cessaires pour Ă©viter le flĂ©chissement du cĂ¢ble, ces anneaux ou mousquetons d'ancrage du harnais sur le cĂ¢ble sont parfois Ă©tudiĂ©s pour permettre un passage sans devoir se dĂ©crocher mais nĂ©cessite une manoeuvre particulière par l'individu accrochĂ© qui doit Ăªtre proche de l'anneau pour sa manoeuvre et donc doit quitter sa position de travail.When rings are needed to prevent flexing of the cable, these rings or carabiners anchoring the harness on the cable are sometimes studied to allow a passage without having to go off but requires a maneuver particular by the hooked individual who must be close to the ring for his maneuver and therefore must leave his working position.

Ces lignes de vie sont donc largement utilisées de nos jours.These lifelines are widely used nowadays.

Hormis ce problème de l'amplitude des forces induites sur les points d'ancrage, il est constamment nécessaire de surveiller cette ligne de vie.Apart from this problem of the amplitude of the forces induced on the points anchoring, it is constantly necessary to monitor this line of life.

Cette surveillance exige des essais, des vĂ©rifications pĂ©riodiques des cĂ¢bles et accessoires voire mĂªme avant utilisation. This monitoring requires tests, periodic checks of the cables and accessories or even before use.

En effet, les règles de sĂ©curitĂ© exigent qu'un test de rĂ©sistance soit pratiquĂ© pĂ©riodiquement notamment avant l'utilisation mais, lorsqu'il subit un test de rĂ©sistance, le cĂ¢ble voit alors sa capacitĂ© de rĂ©sistance diminuĂ©e.In fact, the safety rules require that a resistance test be carried out periodically, especially before use, but when it undergoes a test of resistance, the cable then sees its resistance capacity decreased.

On note Ă©galement qu'il est impossible d'y suspendre une Ă©chelle de pompier car l'appui n'est pas stable et Ă©galement toute protection collective.We also note that it is impossible to suspend a firefighter ladder because the support is not stable and also any collective protection.

On connaít également une ligne de vie (DE-A-2343233) consistant à utiliser des tubes rigides dont l'extrémité est vissée dans un potelet.Also known is a lifeline (DE-A-2343233) of using rigid tubes whose end is screwed into a post.

Cette structure est posée sur une terrasse.This structure is placed on a terrace.

Une telle solution n'est pas simple Ă  mettre en oeuvre car les tubes doivent Ăªtre coupĂ©s Ă  la bonne longueur puis filetĂ©s ainsi que les potelets.Such a solution is not simple to implement because the tubes must be cut to the right length and then threaded as well as the posts.

Un intervenant peut s'accrocher sur un tronçon mais ne peut pas se déplacer d'un tronçon vers un autre.A stakeholder can hang on a stretch but can not move from one section to another.

L'invention se propose donc d'apporter une solution aux problèmes notamment évoqués ci-dessus.The invention therefore proposes to provide a solution to the problems especially mentioned above.

A cet effet, l'invention a pour objet une structure d'arrimage encore appelĂ©e une ligne de vie cette structure Ă©tant caractĂ©risĂ©e en ce qu'elle est constituĂ©e d'une part par assemblage de tronçons de profilĂ© tubulaire rigide emboĂ­tĂ©s Ă  chaque extrĂ©mitĂ© sur un doigt que prĂ©sente la tĂªte d'un support destinĂ© Ă  Ăªtre ancrĂ© sur une structure porteuse en sorte de former un rail continu sans surĂ©paisseur et d'autre part la tĂªte de ce support est, dans sa zone de liaison avec le support, d'Ă©paisseur infĂ©rieure Ă  la section du profilĂ© tubulaire en vue de laisser circuler librement une navette enserrant le rail.For this purpose, the subject of the invention is a stowage structure still called a lifeline this structure being characterized in that it consists of a part by assembling sections of rigid tubular section fitted together at each end on a finger that has the head of a support intended to be anchored on a supporting structure so as to form a continuous rail without extra thickness and other the head of this support is, in its connection zone with the support, thick lower than the section of the tubular section so as to allow a free flow of shuttle clutching the rail.

L'invention sera bien comprise à l'aide de la description ci-après faite à titre d'exemple non limitatif en regard du dessin ci-annexé qui représente schématiquement :

  • figure 1 : une coupe verticale d'une structure d'arrimage,
  • figure 2 : un exemple de structure
  • figure 3 : un support vu de face
  • figure 4 : un support vue de profil,
  • figure 5 : un support vu de dessus,
  • figures 6 Ă  12 : diffĂ©rents montage d'une tĂªte de support avec un support diffĂ©rent.
  • figure 13 : une navette vue en perspective,
  • figure 14 : une navette vue de dessus,
  • figure 15 : une autre variante d'un support.
  • figures 16 et 17 : deux exemples d'habitations Ă©quipĂ©es de la structure d'arrimage.
  • figures 18,19 : deux variantes de navette.
The invention will be better understood using the following description given by way of non-limiting example with reference to the attached drawing which schematically shows:
  • FIG. 1: a vertical section of a lashing structure,
  • figure 2: an example of structure
  • figure 3: a support seen from the front
  • figure 4: a support seen in profile,
  • FIG. 5: a support viewed from above,
  • Figures 6 to 12: different mounting of a support head with a different support.
  • figure 13: a shuttle seen in perspective,
  • figure 14: a shuttle seen from above,
  • Figure 15: another variant of a support.
  • Figures 16 and 17: two examples of dwellings equipped with the stowage structure.
  • Figures 18,19: two shuttle variants.

En se reportant au dessin, on voit une ligne 1 de vie ou structure d'arrimage sur laquelle on peut accrocher un dispositif d'accrochage tel un mousqueton.Referring to the drawing, we see a line 1 of life or stowage structure on which one can hang a hooking device such as a carabiner.

Ce mousqueton vient alors entourer la structure d'arrimage encore appelée ligne de vie.This carabiner then surrounds the stowage structure still called lifeline.

Cette structure d'arrimage se situe, par exemple, sur un mur ou sur un toit de préférence à faible distance de la surface du mur ou du toit.This stowage structure is located, for example, on a wall or on a roof of preferably at a short distance from the surface of the wall or roof.

Elle pourrait Ăªtre accrochĂ©e Ă  un plafond en aĂ©rien.It could be hooked to an overhead ceiling.

Une distance de trente à quarante centimètres est encore considérée comme une faible distance.A distance of thirty to forty centimeters is still considered a short distance.

Selon l'invention, elle est constituĂ©e d'une part par assemblage de tronçons 1A de profilĂ©s tubulaires rigides emboĂ­tĂ©s Ă  chaque extrĂ©mitĂ© sur un doigt 5A que prĂ©sente la tĂªte 20 d'un support destinĂ© Ă  Ăªtre ancrĂ© sur une structure porteuse en sorte de former un rail continu sans surĂ©paisseur et d'autre part la tĂªte 20 de ce support est, dans sa zone 21 de liaison avec le support d'Ă©paisseur, infĂ©rieure Ă  la section du profilĂ© tubulaire en vue de laisser circuler librement une navette enserrant le rail.According to the invention, it consists on the one hand by assembling sections 1A of rigid tubular profiles fitted at each end on a finger 5A that the head 20 of a support intended to be anchored on a supporting structure in kind of forming a continuous rail without extra thickness and secondly the head 20 of this support is, in its zone 21 of connection with the support thickness, less than the section of the tubular section in order to allow a shuttling shuttle to circulate freely the rail.

En utilisant un profilé rigide 1A entre deux supports 3, lors d'une chute et donc d'une traction qui s'exerce perpendiculairement au profilé, les forces induites aux points de fixation des extrémités du profilé sont à la fois induites selon l'axe du profilé et perpendiculaires à l'axe du profilé, donc l'axe du support qui le soutient.By using a rigid profile 1A between two supports 3, during a fall and therefore a traction that is exerted perpendicularly to the profile, the induced forces at the points of attachment of the ends of the profile are both induced along the axis of the profile and perpendicular to the axis of the profile, so the axis of the support that supports it.

Par ailleurs, ces tronçons assemblés les uns aux autres avec une portée réduite A entre les supports 3 agissent comme les barrières de sécurité sur les autoroutes, c'est à dire répartissent les efforts sur les différents points d'ancrage desdits supports.Moreover, these sections assembled to each other with a range reduced A between the supports 3 act as the safety barriers on the highways, ie spread out the various anchor points said supports.

La fixation des extrémités se fait par emboítement des extrémités et éventuellement par verrouillage en translation. The fixing of the ends is done by interlocking the ends and possibly by locking in translation.

Le tube peut ainsi Ăªtre coupĂ© sur place Ă  la longueur souhaitĂ©e en fonction de l'implantation des supports qui doit tenir compte de la rĂ©sistance de la structure porteuse et donc des zones oĂ¹ potentiellement ces supports peuvent Ăªtre fixĂ©s.The tube can thus be cut on the spot to the desired length according to the implantation of the supports which must take into account the resistance of the structure carrier and therefore areas where potentially these supports can be fixed.

Le verrouillage en translation se fait, par exemple, par une soudure ou par un boulon traversant mais n'augmentant pas l'Ă©paisseur du rail.The locking in translation is done, for example, by a weld or by a bolt passing through but not increasing the thickness of the rail.

L'emboĂ­tement 5 sera plus long que celui nĂ©cessaire et qui peut Ăªtre dĂ©terminĂ© en fonction de la capacitĂ© de flexion Ă©lastique du profilĂ© entre les deux points d'appui et de la charge Ă  supporter. Il sera de l'ordre d'au moins 150 mm.Nesting 5 will be longer than necessary and which can be determined according to the elastic bending capacity of the profile between the two points of support and load to bear. It will be of the order of at least 150 mm.

Il ne sera alors pas nécessaire de verrouiller en translation les tubes sur les doigts.It will not be necessary to lock in translation the tubes on the fingers.

On utilise des profilés tubulaires par exemple en acier inoxydable dont l'extrémité vient coiffer un doigt 5A porté par un support.Tubular sections, for example made of stainless steel, are used. the end comes to cap a finger 5A carried by a support.

Le profilé tubulaire présente une surface extérieure continue et non ouverte comme le serait un profilé en Cé.The tubular section has a continuous and unopened outer surface as would be a profile in Ce.

La longueur de chaque profilé s'établit généralement dans des dimensions au maximum de deux à trois mètres.The length of each profile is generally established in dimensions at maximum of two to three meters.

Avec ce système, on peut toujours utiliser un mousqueton classique mais on préférera une navette.With this system, you can always use a carabiner classic but will prefer a shuttle.

Comme indiquĂ© ci-avant, le dispositif 2 d'accrochage est constituĂ© par une navette 2A qui se prĂ©sente sous la forme d'un cylindre prĂ©sentant au long d'une gĂ©nĂ©ratrice une ouverture 10 suffisamment large pour franchir les tĂªtes des supports portant les doigts 5A, lesquels doigts 5A se situent Ă  l'extrĂ©mitĂ© supĂ©rieure de la tĂªte du support 3.As indicated above, the attachment device 2 consists of a shuttle 2A which is in the form of a cylinder presenting along a generatrix an opening 10 wide enough to cross the heads of the supports carrying the fingers 5A, which fingers 5A are at the upper end of the head of support 3.

Cette navette franchit les supports sans toutefois se décrocher du rail.This shuttle crosses the supports without falling off the rail.

Comme on peut le voir, pour faciliter le passage de cette navette, quel que soit l'ancrage de l'individu sur cette navette et sa position, en contrebas ou au dessus, l'ouverture de cette navette est, depuis une zone centrale 11, croissante.As can be seen, to facilitate the passage of this shuttle, whatever the anchoring of the individual on this shuttle and its position, below or at above, the opening of this shuttle is, from a central zone 11, increasing.

L'enveloppe n'est pas Ă  section constante.The envelope is not of constant section.

On voit ainsi que l'entrée 12 de la navette s'étend sur environ un demi-cercle alors que sa partie centrale 11 s'étend sur les trois quarts du cercle. It can be seen that the entry 12 of the shuttle extends over approximately a semicircle while its central portion 11 extends over three quarters of the circle.

Ainsi lorsque la navette prend contact avec le support, elle va s'orienter automatiquement pour franchir le support du fait de l'orientation des bords libres de l'enveloppe de cette navette.So when the shuttle makes contact with the support, she will orient herself automatically to cross the support due to the orientation of the free edges of the envelope of this shuttle.

En figure 18, on a représenté une navette utilisée lorsque la structure d'arrimage est fixée à un plafond.In FIG. 18, there is shown a shuttle used when the structure lashing is attached to a ceiling.

La navette de la figure 19 est destinée à une structure d'arrimage fixée sur un mur vertical.The shuttle of FIG. 19 is intended for a lashing structure fixed on a vertical wall.

Si le support 3 peut Ăªtre de section circulaire, il sera, de prĂ©fĂ©rence, de section ovoĂ¯de de sorte qu'en amincissant la partie reliant les doigts Ă  la partie verticale cela facilitera, avec la forme de l'ouverture de la navette, Ă  l'orientation de la navette pour franchir les supports.If the support 3 may be of circular section, it will preferably be of section ovoid so that by slimming the part connecting the fingers to the vertical part this will facilitate, with the shape of the opening of the shuttle, the orientation of the shuttle to cross the supports.

Cette forme ovoĂ¯de de la zone de liaison est dĂ©terminĂ©e pour rĂ©partir les efforts.This ovoid shape of the binding zone is determined to distribute the efforts.

Comme on peut le voir, éventuellement, cerclant la forme cylindrique de la navette, est prévu un anneau 13 ouvert de renfort sur lequel on aura prévu au moins un point d'ancrage pour un mousqueton et, de préférence, deux ancrages.As can be seen, possibly, circling the cylindrical shape of the shuttle is provided an open reinforcement ring 13 on which there will be provided at least an anchor point for a carabiner and, preferably, two anchors.

Cet anneau contribue Ă  renforcer la navette et Ă©vite qu'elle ne s'ouvre.This ring helps strengthen the shuttle and prevents it from opening.

Les points d'ancrage pour l'accrochage du filin reliant le harnais et la navette peuvent Ăªtre directement portĂ©s par la forme cylindrique.The anchor points for the attachment of the rope connecting the harness and the shuttle can be directly carried by the cylindrical shape.

Etant donné cette ligne de vie tubulaire et la répartition des efforts en cas de chute, il est tout à fait possible de s'ancrer à deux personnes sur cette ligne de vie.Given this tubular lifeline and the distribution of efforts in case of fall, it is quite possible to anchor to two people on this line of life.

L'avantage d'une telle structure c'est qu'elle permet aussi de s'intĂ©grer lors de la construction des immeubles et notamment Ăªtre construite en mĂªme temps que le bĂ¢timent et donc s'intĂ©grer Ă  l'esthĂ©tique du bĂ¢timent.The advantage of such a structure is that it also makes it possible to integrate during the construction of the buildings and in particular to be built at the same time as the building and therefore integrate with the aesthetics of the building.

Les supports 3 porteront à leurs extrémités les doigts 5A orientés dans des directions opposées.The supports 3 will carry at their ends the fingers 5A oriented in opposite directions.

Un chanfrein 15 permet, par exemple, de souder les tubes sur les doigts sans laisser de surépaisseur.A chamfer 15 allows, for example, to weld the tubes on the fingers without leave extra thickness.

Sont Ă©galement prĂ©vus des supports 3 coudĂ©s pour Ăªtre fixĂ©s, par exemple, sur des parois verticales. Also provided are brackets 3 bent to be fixed, for example, on vertical walls.

L'avantage de cette ligne de vie, c'est en premier lieu qu'elle peut Ăªtre contrĂ´lĂ©e avec une pĂ©riode, entre chaque contrĂ´le, beaucoup plus importante car le profilĂ© n'est pas sujet Ă  la corrosion dans les mĂªmes proportions qu'un cĂ¢ble et ce tube ne se dĂ©forme pas dimensionnellement.The advantage of this line of life is first and foremost that it can be controlled with a period, between each control, much more important because the profile is not subject to corrosion in the same proportions as a cable and this tube does not deform dimensionally.

En second lieu, on comprend bien que les efforts :

  • d'une part, ne sont plus essentiellement des efforts de traction dans le sens de l'axe du profilĂ© et,
  • d'autre part, ne sont pas induits par la tension de l'Ă©lĂ©ment longiligne.
Second, we understand that the efforts:
  • on the one hand, are no longer essentially tensile forces in the direction of the axis of the profile and,
  • on the other hand, are not induced by the tension of the elongated element.

Un autre avantage, c'est par exemple que ces lignes de vie peuvent s'intĂ©grer dans l'architecture du bĂ¢timent et, par exemple, constituer des arrĂªts de neige et, Ă©galement, des points d'arrimage des Ă©chelles lors d'intervention d'entretien ou de secours. Ces structures rigides permettent d'assurer diffĂ©rents matĂ©riels, tels les Ă©chafaudages ou autre produit suspendu.Another advantage, for example, is that these lifelines can be integrated in the building's architecture and, for example, constitute snowstops and, ladder stowage points during maintenance or help. These rigid structures make it possible to ensure different materials, such as scaffolding or other suspended product.

Pour rĂ©pondre aux besoins des architectes le support comprendra une tĂªte 20 de support prĂ©sentant un ou deux doigts et d'une zone de liaison avec une embase.To meet the needs of architects the support will include a head 20 support having one or two fingers and a connection zone with a base.

Cette zone de liaison comprend à sa base des moyens d'association avec un support adapté à la configuration choisie.This connection zone comprises at its base means of association with a support adapted to the chosen configuration.

On a représenté en figure 6 à 12 différents supports adaptés aux configurations régulièrement rencontrées non limitatifs des possibilités.FIGS. 6 to 12 show different supports adapted to regularly encountered non-limiting configurations of the possibilities.

La figure 6 représente une solution pour la toiture plate, la figure 7 une solution pour la terrasse.Figure 6 shows a solution for the flat roof, Figure 7 a solution for the terrace.

La figure 8 est destinée au faítage, la figure 9 au bac acier, la figure 10 à un acrotère et en figure 11 une pose en façade.Figure 8 is for the ridge, Figure 9 for the steel tray, Figure 10 for a acroterium and in figure 11 a pose in facade.

La figure 12 est destinĂ©e par exemple Ă  Ăªtre posĂ©e Ă  l'intĂ©rieur de locaux au niveau des plafonds, halls notamment industriels.FIG. 12 is intended, for example, to be placed inside premises at level of ceilings, especially industrial halls.

L'avantage c'est de disposer d'une pièce 20, la tĂªte 20 de support, dont la rĂ©sistance est connue ou calculĂ©e prĂ©alablement et qui peut, par l'intermĂ©diaire d'un support 3 adaptĂ©, Ăªtre intĂ©grĂ©e dans une construction sans notamment nuire Ă  l'esthĂ©tique. L'ensemble des composants de cette structure aura sa rĂ©sistance mĂ©canique bien connue ce qui facilitera le travail des architectes.The advantage is to have a part 20, the support head 20, whose resistance is known or calculated previously and which can, through a support 3 adapted, be integrated in a construction without interfering with aesthetics. All the components of this structure will have its resistance well known mechanics which will facilitate the work of architects.

Claims (10)

  1. Securing structure designed to take a snap-hook going round the said line characterised in that it is made up on the one hand by assembling pieces (1A) of sections of piping fitted at each end onto a finger (5A) at the head (20) of a support designed to be anchored to a bearing structure so as to form a continuous rail without any oversize and, on the other hand, the head (20) of this support is, in its area (21) for conunecting with the support, thinner than the section of the tubular section with a view to letting a shuttle encircling the rail circulate freely.
  2. Securing structure according to Claim 1, characterised in that the pieces are locked in linear movement by welding.
  3. Securing structure according to Claim 1, characterised in that the pieces are locked in linear movement by a through bolt.
  4. Securing structure according to Claim 1, characterised in that the fitting-in (5) is longer than that required and it is detamined as a function of the elastic sagging capacity of the section, and of the load to be borne.
  5. Securing structure according to Claim 1, characterised in that it includes a hooking device (2) consisting of a shuttle (2A) which is cylinder-shaped with, along a generating line, an opening (10) wide enough to clear the supports carrying the dogs (5A), these dogs (5A) being located at the top end of the support (3).
  6. Securing structure according to Claim 5, characterised in that the opening of the shuttle (2A) is increasing from a centre area (11).
  7. Securing structure according to Claim 5, characterised in that, circling the cylindrical shape, there is an open strengthening ring (13) on which there is at least one anchoring point (14) for a snap-hook.
  8. Securing structure according to Claim 5, characterised in that the shuale (2A) has two anchoring points.
  9. Securing structure according to Claim 1, characterised in that the section of the support (3) is ovoid.
  10. Sectuing structure according to Claim 1, characterised in that the support will include a supporting head (20) with one or two dogs and an area for connecting with a support, this connection area having at its base means of working in conjunction with a support suited to the configuration selected.
EP03370010A 2002-03-19 2003-03-17 Attaching structure in particular for safety purposes Expired - Lifetime EP1346754B1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
FR0203403 2002-03-19
FR0203403A FR2837395B1 (en) 2002-03-19 2002-03-19 LIFELINE

Publications (2)

Publication Number Publication Date
EP1346754A1 EP1346754A1 (en) 2003-09-24
EP1346754B1 true EP1346754B1 (en) 2005-09-07

Family

ID=27772239

Family Applications (1)

Application Number Title Priority Date Filing Date
EP03370010A Expired - Lifetime EP1346754B1 (en) 2002-03-19 2003-03-17 Attaching structure in particular for safety purposes

Country Status (5)

Country Link
EP (1) EP1346754B1 (en)
AT (1) ATE303849T1 (en)
DE (1) DE60301511T2 (en)
ES (1) ES2249700T3 (en)
FR (1) FR2837395B1 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
ES2297984B1 (en) * 2005-07-29 2009-07-20 Juan Carlos Gonzalez Camara ANTI-SKID SAFETY SYSTEM WITH ANCHORAGE RAIL FOR CONCRETE STRUCTURES.
DE202008013783U1 (en) * 2008-11-17 2010-01-07 Jet Tageslicht & Rwa Gmbh Device for personal security against falling

Family Cites Families (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR735223A (en) * 1932-04-11 1932-11-04 Device used to fix firmly on roofs, timber or planks intended to hold flying scaffolding in suspension
US2150651A (en) * 1935-05-18 1939-03-14 Vulcan Rail And Construction C Railing and manufacture thereof
GB1287186A (en) * 1970-03-11 1972-08-31 E St John Holt And Associates Guard rail support
DE2343233A1 (en) * 1973-08-28 1975-03-13 Ertl Kg Baustoffwerk Safety device for flat-roof workers - incorporating posts holding continuous rail for running flexible harness attachment
WO1992006259A1 (en) * 1990-10-09 1992-04-16 John Clement Preston Locking joint for tubing and shadecloth clip
DE9015002U1 (en) * 1990-10-31 1991-01-10 Eisen- Und Drahtwerk Erlau Ag, 7080 Aalen Kit for making handles, handrails, barriers, small furniture, etc.
DE4204861C1 (en) * 1992-02-18 1993-03-18 Brueder Siegel Gmbh & Co Kg Draht- Und Metallwarenfabrik, 8874 Leipheim, De Guide rail fastened to floor - has special curved fittings to go round corners in corridors or factory premises
EP0731239B1 (en) * 1992-07-02 2000-05-10 David S. Gleave Roof eave safety device
DE9311347U1 (en) * 1992-09-15 1993-09-23 Wanzl Gmbh & Co. Entwicklungs-Kg, 89340 Leipheim FURNITURE PROTECTION DEVICE
EP0669436A1 (en) * 1994-02-23 1995-08-30 Ferdinand Steffen Arrangement for attaching a security scaffold to a roof
GB9704662D0 (en) * 1997-03-06 1997-04-23 Gleave David Safety rail traveller

Also Published As

Publication number Publication date
DE60301511D1 (en) 2005-10-13
ATE303849T1 (en) 2005-09-15
FR2837395B1 (en) 2004-07-09
EP1346754A1 (en) 2003-09-24
ES2249700T3 (en) 2006-04-01
FR2837395A1 (en) 2003-09-26
DE60301511T2 (en) 2006-07-13

Similar Documents

Publication Publication Date Title
EP2097599B1 (en) Mobile anchoring and fall prevention device
AU744587B1 (en) Improvements in roof anchors
US7757439B1 (en) Fabric structures with tensioner and tensioner device
EP1883457B1 (en) Device for supporting a safety line
US20150204104A1 (en) Railing system
EP1346754B1 (en) Attaching structure in particular for safety purposes
KR200400993Y1 (en) Safe support means of parapet for construction's work
FR3019202A1 (en) SAFETY BODY GUARD POTELET WITH ANTI-LIFTING MEANS AND SECURITY GUARD COMPRISING A PLURALITY OF SUCH POLELETS
EP1632271B1 (en) Intermediate anchor for a lifeline
FR2665473A1 (en) Barrier for scaffolding, and modular scaffolding comprising such a barrier
US9677333B1 (en) Unfurlable rescue ladder
FR2975419A1 (en) Mobile guardrail for fall protection of people on e.g. moving platform in industrial site, has cables/wires, pulleys and baseboard arranged on sides of passageway, where cables and pulleys are installed on fall zone
AU746393B2 (en) An anchoring device
JP4001876B2 (en) Lifeline attachment device for roof work
EP3855901B1 (en) Safety device for domestic animals
EP1433501B1 (en) Device for the fastening of an anchoring post to a supporting structure
FR2756027A1 (en) SECURITY HOOK
FR2964996A1 (en) Balustrade for use on structure of e.g. industrial building, to protect intervenor in height on inclined or flat roof, has adhesion point adhered to link to maintain balustrade in suspended state in support configuration on structure
BE1019733A4 (en) AN IMPROVED MULTIPLE FALL SECURITY THROUGH IMPROVED CURRENT FIXED ANCHOR POINT, A STAR FIXED ANCHOR POINT AND A MOVING ANCHOR POINT FOR SAFETY LINE
FR2467942A1 (en) Tensioned safety net for building construction - spans between wall hooks and guyed masts which incline outward from wall base
EP1985734A3 (en) Device for attaching a support line on webbing(s), in particular such as a fishing net
JP4762952B2 (en) Lifeline attachment device for roof work
BE1022448B1 (en) PROTECTIVE DEVICE FOR ROOF WITH JOINTS STANDING
EP1358912A1 (en) Anti-fall safety device
AU2005101079A4 (en) A mount for a luminaire

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IT LI LU MC NL PT RO SE SI SK TR

AX Request for extension of the european patent

Extension state: AL LT LV MK

17P Request for examination filed

Effective date: 20040225

AKX Designation fees paid

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IT LI LU MC NL PT RO SE SI SK TR

17Q First examination report despatched

Effective date: 20040701

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IT LI LU MC NL PT RO SE SI SK TR

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20050907

Ref country code: IE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20050907

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20050907

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20050907

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20050907

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20050907

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20050907

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

Free format text: NOT ENGLISH

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

Free format text: LANGUAGE OF EP DOCUMENT: FRENCH

REF Corresponds to:

Ref document number: 60301511

Country of ref document: DE

Date of ref document: 20051013

Kind code of ref document: P

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20051207

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20051207

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20051207

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20051207

GBT Gb: translation of ep patent filed (gb section 77(6)(a)/1977)

Effective date: 20060104

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20060207

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: HU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20060308

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20060331

REG Reference to a national code

Ref country code: ES

Ref legal event code: FG2A

Ref document number: 2249700

Country of ref document: ES

Kind code of ref document: T3

REG Reference to a national code

Ref country code: IE

Ref legal event code: FD4D

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed

Effective date: 20060608

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20070331

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20070331

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20050907

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20050907

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20050907

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: LU

Payment date: 20100312

Year of fee payment: 8

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20090317

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 20110413

Year of fee payment: 9

Ref country code: ES

Payment date: 20110426

Year of fee payment: 9

PGRI Patent reinstated in contracting state [announced from national office to epo]

Ref country code: IT

Effective date: 20110616

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: BE

Payment date: 20110414

Year of fee payment: 9

Ref country code: GB

Payment date: 20110421

Year of fee payment: 9

Ref country code: NL

Payment date: 20110404

Year of fee payment: 9

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: IT

Payment date: 20110331

Year of fee payment: 9

BERE Be: lapsed

Owner name: *DAFORIB S.A.R.L.

Effective date: 20120331

REG Reference to a national code

Ref country code: NL

Ref legal event code: V1

Effective date: 20121001

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20120317

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: FR

Payment date: 20120823

Year of fee payment: 10

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20120317

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20120331

REG Reference to a national code

Ref country code: DE

Ref legal event code: R119

Ref document number: 60301511

Country of ref document: DE

Effective date: 20121002

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20120317

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NL

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20121001

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20110317

REG Reference to a national code

Ref country code: ES

Ref legal event code: FD2A

Effective date: 20130710

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: ES

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20120318

REG Reference to a national code

Ref country code: FR

Ref legal event code: ST

Effective date: 20131129

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20130402

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20121002