EP1118737A2 - Burial crypt - Google Patents

Burial crypt Download PDF

Info

Publication number
EP1118737A2
EP1118737A2 EP01107209A EP01107209A EP1118737A2 EP 1118737 A2 EP1118737 A2 EP 1118737A2 EP 01107209 A EP01107209 A EP 01107209A EP 01107209 A EP01107209 A EP 01107209A EP 1118737 A2 EP1118737 A2 EP 1118737A2
Authority
EP
European Patent Office
Prior art keywords
chamber
burial
support walls
floor
walls
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
EP01107209A
Other languages
German (de)
French (fr)
Other versions
EP1118737A3 (en
Inventor
Günter Ackermann
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=27202561&utm_source=google_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=EP1118737(A2) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Priority claimed from DE19914118408 external-priority patent/DE4118408A1/en
Priority claimed from DE9109652U external-priority patent/DE9109652U1/en
Priority claimed from DE9109653U external-priority patent/DE9109653U1/en
Application filed by Individual filed Critical Individual
Publication of EP1118737A2 publication Critical patent/EP1118737A2/en
Publication of EP1118737A3 publication Critical patent/EP1118737A3/en
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H13/00Monuments; Tombs; Burial vaults; Columbaria

Definitions

  • gas passages which are designed so that leachate not in the gas lock and through this into the Burial chamber can penetrate.
  • this burial chamber narrow ceiling tile that always remains in this place. It serves as a support plate for a foundation block for the Shot of a gravestone.
  • This well-known burial chamber has some disadvantages.
  • One of Disadvantages is that their chamber rings are loosely placed on top of each other and the bottom chamber ring are loose on the base plate lies on. There is also a in the base plate Opening above a bone pit, which is only loose by means of a plate is covered. The ceiling tiles also lie loosely on the top chamber ring. This can cause leachate penetrate into the burial chamber from the surrounding area, from high groundwater or stratified water remain silent. This can cause the process of decay in the burial chamber be significantly affected. In practice also very often omitted the base plate, so that the Burial chamber also from below for the penetration of water, in particular of groundwater and backwater, is open.
  • Another major disadvantage of this burial chamber is in that at each subsequent opening of the grave for subsequent burial or the earth cover for burial again cleared away with the planting on it and set aside must be created and that after burial the Earth cover can be applied again on the burial chamber got to.
  • the planting must also be cleared first and are practically completely renewed. That causes at each subsequent burial a significant one Workload with corresponding costs. This creates often also additional costs for an at least partial Replacement of the planting if it is removed suffered.
  • the earth cover must be outside the Ground plan area of the burial chamber are removed. Moreover must in this area, i.e. from the top of the burial chamber to the earth level, a hem formwork to be installed, the the collapse of the earth around the burial chamber prevented. This hem formwork must again afterwards be removed, both when installing and removing corresponding work required and accordingly Costs.
  • this burial chamber is use as a recessed burial chamber in which two superimposed chamber areas are available for Place the second coffin above the one already in the Lower coffin located in the burial chamber Support rods required to place the upper coffin on it can be.
  • This has the further disadvantage that at the second burial the burial chamber into the lower chamber area is open and that the lower coffin is fully visible, regardless of the Condition of the coffin and its contents. The same applies to the exhalations that may emanate from the lower coffin the decomposition process. This is particularly uncomfortable if this process of decay is due to the temporal Distance from the previous burial is in full swing. This allows for the participants in the second burial just unreasonable conditions occur.
  • This burial chamber Another disadvantage of this burial chamber is that after the refilling of the earth cover a setting of the soil is inevitable. Therefore, this earth cover must a certain time either from what was left at first Excavation or supplemented with otherwise obtained soil become. This fact also has the disadvantage that the planting was only reintroduced after this setting time can be. Otherwise one must be used immediately Planting removed in between and after Complement the earth cover to be reintroduced.
  • the invention has for its object a burial chamber to create prefabricated parts that are relatively simple is to be built in, the trouble-free decomposition process enables and easier at subsequent burials and easier and with less labor and cost possible are.
  • the longitudinal support walls have a greater length, can hold a whole group of burial chambers within the retaining walls be accommodated.
  • the longitudinal support walls are equal to the length of the chamber parts, are the longitudinal support walls in this height range on the Parts of the chamber.
  • the retaining walls are built in and then in place and Position, make sure that if one of the Burial chambers for burial, especially for subsequent burial, is opened, no soil from the area in fall into the burial chamber or even in large quantities can break in. This is after installing the retaining walls and the burial chambers in the outside area no earthworks more needed.
  • the lid of the burial chamber is designed as a trough is housed in the earth cover for the gas lock is both as a gas filter and as a planting soil for planting can be used for any subsequent Burial of the trough serving as a lid with all of it Content lifted and apart for the time of burial be stored.
  • the planting remains completely undisturbed, since they are neither removed nor stored separately must become.
  • Trough properly maintained. Neither are they other earthworks required, such as that with the known Burial chamber is necessary. It goes without saying the area around the gas lock is also untouched. The gas lock is therefore not at risk of damage. It the subsequent refilling of the Earth cover with the corresponding personnel expenditure and Expense. There is no need to replant the grave as well.
  • the Any number of available burial chambers enlarge.
  • the support walls set up at the same level as the chamber rings become.
  • the retaining walls are not only made up of the filling material supported from the outside but at the same time also complaining what their stability is greatly increased.
  • the support walls by the weight of the Burial chambers weighed down, so that also their stability is increased.
  • Spacer ensures that the chamber rings or Floor trays are not accidentally too close together are set up and therefore their troughs too dense stand side by side, which makes lifting and sitting down of a single trough could be difficult.
  • the spacers not be used separately.
  • the Kemmerrings or Floor trays hold the right mutual ones by themselves Distance, while also supporting each other, so that unevenness of the surface on which it is placed not to an inclination of adjacent chamber rings or floor trays.
  • an embodiment according to claim 11 can local irregularities of the bottom of the pit for the Burial chambers, in particular locally different load capacities of the ground, through which the foot thresholds balance, because the thresholds are much longer than the width of the individual chamber rings or floor trays can. Especially with an overlapping arrangement of the Thresholds practically result in one Leveling of the contact surface of the chamber rings or floor trays.
  • the burial chamber 160 shown in FIG. 1 has one Chamber part in the form of a floor pan 161 and a trough 162 on.
  • the trough 162 serves as a cover for the floor pan 161.
  • the floor pan 161 has an annularly closed peripheral wall 163, which has a rectangular plan area. At the a bottom 164 connects to the lower end of the peripheral wall 163, which is made in one piece with the peripheral wall 163 is.
  • the floor pan 161 is made of reinforced concrete.
  • the upper edge of the floor pan 161 is encircling Edge profile 165 provided. It is through a gutter 166 formed, which has a V-shaped cross section. she is arranged symmetrically to the center plane of the peripheral wall 163.
  • the trough 162 is designed similar to the floor pan 161. He has an annular closed peripheral wall 167 and one Bottom 168 produced in one piece therewith. His top Edge 169 is flat. At the bottom of the bottom 168 is in the continuation of the peripheral wall 167 a peripheral edge profile 171 available, as a counter profile to the upper edge profile 165 of the floor pan 161 is formed. It is through a circumferential roof-shaped rib 172 is formed, the fits exactly into the groove 166.
  • the trough 162 has a certain clear height, which in general is about 60 cm. At a certain height above that Bottom 168, trough 162 has a series of drainage openings 173 on. The trough 162 takes an earth cover 174 on.
  • Gas locks are arranged in the trough 162, which is a gas and air exchange between the interior of the Allow burial chamber 160 and the surrounding area.
  • the floor trays 161 a spacer on each of its long sides 175 on. It is designed as a rib 176 and with the Circumferential wall 163 made in one piece.
  • the ribs 176 start a certain distance above the bottom of the Bottom 164 and also end a certain distance below the upper edge of the peripheral wall 163 (Fig. 2).
  • the Ribs 176 are aligned vertically.
  • the Bottom tray 161 is designed to be symmetrical on the envelope. This supports two adjacent burial chambers 160 on their long sides alternately against each other from (Fig. 4).
  • Fig. 4 is the group of burial chambers 160 surrounded by two pairs of retaining walls, each in pairs are aligned parallel to each other and with each other are aligned at right angles to each other.
  • longitudinal support walls 181 Support walls referred to as transverse support walls 182. From the latter only one is shown in FIG. The other is as to be seen standing outside the drawing sheet.
  • the longitudinal support walls 181 a mutual distance in the height range the floor pan 161 is equal to the length of the floor pan 161.
  • the wall section 181.1 located in this height range lies with its wall surface facing the burial chamber 160 183 on the outside of the floor pan 161, namely their narrow side, immediately.
  • the wall section 181.2 of the trough 162 is the wall surface 184 against the wall surface 183 by a certain one Measure about 2 to 3 cm, so that between the Wall section 181.2 and the outside of the trough 162 corresponding gap 165 remains open. This will make it Lifting and lifting the trough 162 and reinserting it and depositing the trough 162 on the floor pan 161 facilitated.
  • the gap between the trough and the retaining walls can also be created in that the Outside of the peripheral wall 167 by a corresponding amount is reset and the support walls 181 and 182 continuously have flat wall surfaces.
  • the transverse support walls 182 are between the two longitudinal support walls 181 arranged.
  • the width of the transverse support walls 182 is therefore equal to the clear distance of the longitudinal support walls 181. Da this distance for the wall sections 181.1 and 181.2 is of different sizes, the transverse support wall 182 also has a different width (Fig. 5).
  • the one below Wall section 182.1 has a width that is equal to the distance of the wall surfaces is 183.
  • the wall section 182.2 has one Width, which is equal to the distance between the wall surfaces 184.
  • the transverse support wall 182 In view of that adjacent to the transverse support wall 182 Grave chamber 160 (Fig. 4) only one spacer in The shape of the rib 176 is present, the transverse support wall 182 also provided with a spacer 187, which as in the bottom tubs 161 is formed as a rib 188 and in generally the same shape as the ribs 176, in each But the same height as this one.
  • the transverse support wall 182 without executing their spacer 187 and remove it if necessary.
  • it is the wall surface 191 of the wall section facing the burial chambers 160 182.2 by a certain amount of about 2 to 3 cm opposite the wall surface 192 of the wall section 182.2 reset like that regarding the wall surfaces of the inside of the longitudinal support walls 181 has been explained. If this If this does not occur, the transverse support wall 182 can pass over it entire height have a constant wall thickness.
  • Fig. 1 and Fig. 5 is a modification of the longitudinal support walls 181 and the transverse support walls 182 indicated by dash-dotted lines.
  • This modification relates to a baseboard 193 the longitudinal support walls 181 and a skirting 194 in the Cross support walls 182.
  • These baseboards are general on the outside of the Retaining walls arranged. If necessary, they are with the relevant support wall made in one piece, it also It is appropriate that the steel reinforcement of the retaining wall at least a certain distance up to the baseboard continued into it. Meet these baseboards two tasks. Firstly, they increase the footprint or bottom surface of the associated retaining wall, whereby is caused by the weight of the retaining wall Surface pressure in the floor below the retaining wall decreased. On the other hand, they increase the stability of the assigned retaining wall by acting on it Weight force of the above the baseboard Padding material.
  • cover plates 201 are provided for this are similar to the cover plates 196 and with a Web part are provided, which is matched to the gap 185 is. These cover plates 201 also expediently extend on the one hand up to the inner edge 202 of the transverse wall 203 of the trough 162 and on the other hand to the outer edge 204 of the longitudinal support wall 181.
  • the burial chambers 160 rest on thresholds 205. These are arranged in two rows parallel to the longitudinal support walls the group of burial chambers 160 are aligned.
  • the Bumps 205 have a length that is a multiple of that Width of the burial chambers 160.
  • the thresholds 205 can be arranged one behind the other in their longitudinal direction be cursed with each other. It is more convenient arrange them laterally offset and at the same time in to arrange their longitudinal direction so that they partially each other overlap (Fig. 9). It is appropriate that the Overlap area in the area of the long side of a burial chamber 160 is located (Fig. 9).
  • the support walls 207 used here the height of the thresholds 205 higher than the burial chambers 160 executed so that its upper edge 208 again same height with the upper edge 169 of the troughs 162. Otherwise, the support walls 207 are largely the same Support walls 181 and 182 formed.
  • the individual burial chambers 160 have due to the spacers 175 sufficient in the area of their long sides large mutual distance. Through this space this can be done from troughs 162 through the drainage openings 173 (Fig. 1) leaking water, for example Rain water or excess water, without further ado flow away. Since on the narrow sides of the floor troughs 161 Wall section 181.1 of the longitudinal support walls 181 is tight it is expedient in this wall section 181.1 or several continuous drainage grooves from top to bottom 209 to be provided. Then this can also be done in the area of Narrow sides of the troughs 162 leaking water more easily flow away.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Revetment (AREA)
  • Catching Or Destruction (AREA)
  • Feeding And Watering For Cattle Raising And Animal Husbandry (AREA)
  • Pens And Brushes (AREA)
  • Physical Deposition Of Substances That Are Components Of Semiconductor Devices (AREA)
  • Pusher Or Impeller Conveyors (AREA)
  • Sewage (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
  • Filling Or Discharging Of Gas Storage Vessels (AREA)

Abstract

The lid of the grave chamber is formed as a trough (162) to be covered with earth. The trough is surrounded by pairs of support walls (181, 182) either directly or with spacing to form several chamber parts. One pair forms the longitudinal support walls (181) and one pair form the transverse support walls. The vertical spacing from the lower edge to the top edge of the chamber rings equals the length of one chamber ring and the spacing in the vertical above same is greater than the length of one chamber ring. Inside the support walls a group of chamber parts (161) makes up the chamber rings and spacers are provided at certain mutual spacing between the rings. The support walls have a height which is roughly equal to the sum of the height of the existing chamber rings or height of the trough.

Description

Die herkömmliche Erdbestattung kann unter ungünstigen Umständen erhebliche Probleme mit sich bringen. Bei ungünstiger mineralogischer Zusammensetzung des Erdbodens, z.B. bei hohem Schluff- oder Tonanteil, und auch bei ungünstiger Wasserführung, z.B. bei häufigem Stauwasser, bei Schichtwasser, bei Haftwasser oder bei hochstehendem Grundwasser, ist eine vollständige Verwesung innerhalb einer bestimmten Ruhezeit nicht gewährleistet. Die für die Verwesung wichtigen aeroben Bakterien können nicht wirksam werden und die notwendigen Oxidationsvorgänge können nicht stattfinden. Das erfordert oft teuere Meliorationsmaßnahmen, z.B. Entwässerungsmaßnahmen oder künstliche Belüftung des Bodens. Manchmal hilft nur das Auffüllen des Bodens, was praktisch auf eine Neuanlage des betreffenden Gräberfeldes hinausläuft. Trotz der zuerst genannten Maßnahmen kann die Wiederbelegung eines Gräberfeldes nach Ablauf der üblichen Ruhezeit mit unangenehmen und für das Friedhofspersonal manchmal unzumutbaren Begleiterscheinungen belastet sein.Conventional burial can be unfavorable May cause significant problems. With less favorable mineralogical composition of the soil, e.g. with high silt or clay content, and also with unfavorable Water supply, e.g. with frequent backwater, with layer water, with sticky water or with high groundwater, is a complete decay within a certain one Rest period not guaranteed. The important ones for decay aerobic bacteria cannot take effect and that necessary oxidation processes cannot take place. The often requires expensive remediation measures, e.g. Drainage measures or artificial ventilation of the floor. Sometimes only helps filling the floor, which is practical on a new creation of the relevant burial ground results. Despite the measures mentioned first, the reoccupation of a burial ground after the usual rest period unpleasant and sometimes unacceptable for the cemetery staff Side effects may be burdened.

Eine Abhilfe wurde mit einer wiederverwertbaren Grabkammer versucht (DE-OS 35 37 367.9), die größtenteils aus Betonfertigteilen besteht. Sie weist mehrere Kammerringe auf, die in einer Grube aufeinandergestellt werden, wobei sie durch umlaufende Absätze sowohl am oberen wie auch am unteren Rand der Kammerringe untereinander geführt werden. An der untersten Stelle befindet sich eine Basisplatte, auf die die Kammerringe lose aufgesetzt sind. Auf dem obersten Kammerring sind Deckenplatten aufgelegt, die den Innenraum der Grabkammer nach oben abschließen. Diese Deckenplatten befinden sich etwa 60 cm unter dem Erdniveau. Der Zwischenraum wird mit Erde, insbesondere mit Mutterboden, bis zum Erdniveau aufgefüllt. Diese Erdabdeckung der Grabkammer umschließt eine Gasschleuse, die auf eine Durchlaßöffnung in einer der Deckenplatten aufgesetzt ist. Sie hat Gasdurchtrittsöffnungen, die so gestaltet sind, daß Sickerwasser nicht in die Gasschleuse und durch diese hindurch in die Grabkammer eindringen kann. Bei einem in der Grabkammer entstehenden Überdruck der dortigen Gasathmosphäre, z.B. beim Absinken des athmosphärischen Luftdruckes, vermag ein Teil des Gasinhaltes der Grabkammer durch die Gasschleuse und ihre Gasdurchtrittsöffnungen hindurch auszutreten. Deshalb müssen die Gasdurchtrittsöffnungen der Gasschleuse um ein bestimmtes Maß unterhalb des Erdniveaus liegen, oder, anders ausgedrückt, es muß oberhalb der Gasaustrittsöffnungen noch eine gewisse Schichtdicke der Erdabdeckung verbleiben, damit diese Erdschicht als Filter wirken kann, in dem die Bodenfauna und Flora die aus der Grabkammer austretenden Gase von denjenigen Bestandteilen befreien, die Geruchsbelästigungen auslösen könnten.A remedy was with a reusable burial chamber tried (DE-OS 35 37 367.9), mostly made of precast concrete consists. It has several chamber rings that be stacked on top of each other in a pit, passing through circulating paragraphs both at the top and at the bottom the chamber rings are guided among themselves. At the The lowest point is a base plate on which the Chamber rings are loosely placed. On the top chamber ring are ceiling tiles that cover the interior of the Complete the burial chamber at the top. These ceiling tiles are about 60 cm below ground level. The gap is with soil, especially with topsoil, until Earth level filled up. This earth cover of the burial chamber encloses a gas lock that opens into a passage one of the ceiling panels is attached. It has gas passages, which are designed so that leachate not in the gas lock and through this into the Burial chamber can penetrate. One in the burial chamber resulting overpressure of the gas atmosphere there, e.g. when the atmospheric pressure drops, is able to Part of the gas content of the burial chamber through the gas lock and exit through their gas passages. Therefore the gas passage openings of the gas lock must a certain amount below earth level, or, in other words, it must be above the gas outlet a certain layer thickness of the earth cover remains, so that this layer of earth can act as a filter, in where the soil fauna and flora emerge from the burial chamber Free gases from those components that Could cause unpleasant smells.

An einer Stirnseite dieser Grabkammer befindet sich eine schmale Deckenplatte, die stets an dieser Stelle verbleibt. Sie dient als Tragplatte für einen Fundamentblock für die Aufnahme eines Grabsteins.There is one on one end of this burial chamber narrow ceiling tile that always remains in this place. It serves as a support plate for a foundation block for the Shot of a gravestone.

Diese bekannte Grabkammer hat einige Nachteile. Einer der Nachteile ist, daß ihre Kammerringe lose aufeinandergesetzt sind und der unterste Kammerring lose auf der Basisplatte aufliegt. In der Basisplatte befindet sich zudem eine Öffnung über einer Knochengrube, die nur lose mittels einer Platte abgedeckt wird. Auch die Deckenplatten liegen lose auf dem obersten Kammerring auf. Dadurch kann Sickerwasser aus der Umgebung in die Grabkammer eindringen, von hochstehendem Grundwasser oder Schichtwasser ganz zu schweigen. Dadurch kann der Verwesungsprozeß in der Grabkammer erheblich beeinträchtigt werden. In der Praxis wird zudem sehr häufig die Basisplatte weggelassen, so daß die Grabkammer auch von unten her für das Eindringen von Wasser, insbesondere von Grundwasser und Stauwasser, offen ist. Dieser Aufbau und diese Einbauweise der bekannten Grabkammer erfordert es, jede Grabkammer an ein Drainagesystem anzuschließen, damit das eindringende Wasser so bald wie möglich abgeführt und zu einer Kläranlage geleitet werden kann. Diese zusätzliche Drainage verursacht erhebliche Kosten beim Einbau und bei der Unterhaltung der Drainage. Außerdem entstehen für die Klärung der abgeleiteten Wassermengen weitere Kosten.This well-known burial chamber has some disadvantages. One of Disadvantages is that their chamber rings are loosely placed on top of each other and the bottom chamber ring are loose on the base plate lies on. There is also a in the base plate Opening above a bone pit, which is only loose by means of a plate is covered. The ceiling tiles also lie loosely on the top chamber ring. This can cause leachate penetrate into the burial chamber from the surrounding area, from high groundwater or stratified water remain silent. This can cause the process of decay in the burial chamber be significantly affected. In practice also very often omitted the base plate, so that the Burial chamber also from below for the penetration of water, in particular of groundwater and backwater, is open. This structure and this way of installing the well-known burial chamber it is necessary to connect each burial chamber to a drainage system, so that the penetrating water as soon as possible can be discharged and sent to a sewage treatment plant. This additional drainage causes significant costs in the Installation and maintenance of the drainage. Moreover arise for the clarification of the discharged water quantities additional costs.

Ein weiterer großer Nachteil dieser Grabkammer besteht darin, daß bei jeder folgenden Graböffnung zwecks Nachbestattung oder zwecks erneuter Bestattung die Erdabdeckung mit der darauf befindlichen Bepflanzung abgeräumt und beiseite geschafft werden muß und daß nach der Bestattung die Erdabdeckung wieder auf der Grabkammer aufgebracht werden muß. Dabei muß zuvor auch die Bepflanzung zunächst abgeräumt werden und praktisch vollständig erneuert werden. Das verursacht bei jeder folgenden Bestattung einen erheblichen Arbeitsaufwand mit entsprechenden Kosten. Dabei entstehen häufig auch zusätzliche Kosten für einen zumindest teilweisen Ersatz der Bepflanzung wenn diese beim Herausnehmen gelitten hat.Another major disadvantage of this burial chamber is in that at each subsequent opening of the grave for subsequent burial or the earth cover for burial again cleared away with the planting on it and set aside must be created and that after burial the Earth cover can be applied again on the burial chamber got to. The planting must also be cleared first and are practically completely renewed. That causes at each subsequent burial a significant one Workload with corresponding costs. This creates often also additional costs for an at least partial Replacement of the planting if it is removed suffered.

Bei diesen Arbeiten muß die Erdabdeckung bis außerhalb des Grundrißbereiches der Grabkammer abgetragen werden. Außerdem muß in diesem Bereich, d.h. vom oberen Rand der Grabkammer bis zum Erdniveau, eine Saumschalung eingebaut werden, die das Einbrechen des Erdbereiches in der Umgebung der Grabkammer verhindert. Diese Saumschalung muß nachher wieder entfernt werden, was sowohl beim Einbau wie auch beim Ausbau entsprechende Arbeitsleistungen erfordert und dementsprechend Kosten verursacht. During this work, the earth cover must be outside the Ground plan area of the burial chamber are removed. Moreover must in this area, i.e. from the top of the burial chamber to the earth level, a hem formwork to be installed, the the collapse of the earth around the burial chamber prevented. This hem formwork must again afterwards be removed, both when installing and removing corresponding work required and accordingly Costs.

Ein weiterer Nachteil dieser Grabkammer ist der, daß sie bei einer Verwendung als vertiefte Grabkammer, bei der zwei übereinanderliegende Kammerbereiche vorhanden sind, für das Unterbringen des zweiten Sarges oberhalb des bereits in der Grabkammer befindlichen unteren Sarges das Einbringen von Stützstäben erfordert, damit darauf der obere Sarg abgestellt werden kann. Das hat den weiteren Nachteil zur Folge, daß bei der zweiten Bestattung die Grabkammer bis in den unteren Kammerbereich hinein offen ist und daß dadurch der untere Sarg voll sichtbar ist, ohne Rücksicht auf den Zustand des Sarges und seines Inhaltes. Des gleiche gilt für die vom unteren Sarg möglicherweise ausgehenden Ausdünstungen des Verwesungsprozesses. Das ist besonders unangenehm, wenn dieser Verwesungsprozeß aufgrund des zeitlichen Abstandes der vorangehenden Bestattung in vollem Gange ist. Dadurch können für die Teilnehmer an der zweiten Bestattung nachgerade unzumutbare Verhältnisse auftreten.Another disadvantage of this burial chamber is that it is use as a recessed burial chamber in which two superimposed chamber areas are available for Place the second coffin above the one already in the Lower coffin located in the burial chamber Support rods required to place the upper coffin on it can be. This has the further disadvantage that at the second burial the burial chamber into the lower chamber area is open and that the lower coffin is fully visible, regardless of the Condition of the coffin and its contents. The same applies to the exhalations that may emanate from the lower coffin the decomposition process. This is particularly uncomfortable if this process of decay is due to the temporal Distance from the previous burial is in full swing. This allows for the participants in the second burial just unreasonable conditions occur.

Ein weiterer Nachteil dieser Grabkammer ist der, daß nach dem erneuten Einfüllen der Erdabdeckung ein Setzen des Erdreiches unvermeidlich ist. Daher muß diese Erdabdeckung nach einer gewissen Zeit entweder aus zunächst übriggebliebenem Erdaushub oder mit anderweitig beschafftem Erdreich ergänzt werden. Dieser Umstand hat auch den Nachteil zur Folge, daß die Bepflanzung erst nach dieser Setzzeit wieder eingebracht werden kann. Andernfalls muß eine sofort eingesetzte Bepflanzung zwischendurch wieder entfernt und nach dem Ergänzen der Erdabdeckung wieder eingebracht werden.Another disadvantage of this burial chamber is that after the refilling of the earth cover a setting of the soil is inevitable. Therefore, this earth cover must a certain time either from what was left at first Excavation or supplemented with otherwise obtained soil become. This fact also has the disadvantage that the planting was only reintroduced after this setting time can be. Otherwise one must be used immediately Planting removed in between and after Complement the earth cover to be reintroduced.

Der Erfindung liegt die Aufgabe zugrunde, eine Grabkammer aus Fertigbauteilen zu schaffen, die verhältnismäßig einfach einzubauen ist, die einen störungsfreien Verwesungsprozeß ermöglicht und bei der nachfolgende Bestattungen einfacher und leichter und mit geringerem Arbeits- und Kostenaufwand möglich sind. The invention has for its object a burial chamber to create prefabricated parts that are relatively simple is to be built in, the trouble-free decomposition process enables and easier at subsequent burials and easier and with less labor and cost possible are.

Dadurch, daß die Längsstützwände eine größere Länge haben, kann innerhalb der Stützwände eine ganze Gruppe von Grabkammern untergebracht werden.Because the longitudinal support walls have a greater length, can hold a whole group of burial chambers within the retaining walls be accommodated.

Dadurch, daß im Höhenbereich von der Unterkante bis höchstens zur Oberkante der Kammerteile der gegenseitige Abstand der Längsstützwände gleich der Länge der Kammerteile ist, liegen die Längsstützwände in diesem Höhenberich an den Kammerteilen an. Dadurch, daß in dem darüberliegenden Höhenbereich die Längsstützwände einen gegenseitigen Abstand haben, der größer als die Länge der Kammerteile und damit größer als die Länge der mit den Kammerteilen fluchtenden Trögen ist, ist in diesem Höhenbereich ein ausreichender Abstand zwischen den Trögen und den sie umgebenden Stützwänden vorhanden. Entsprechendes gilt für die Querstützwände.Because in the height range from the lower edge to at most the mutual distance to the upper edge of the chamber parts the longitudinal support walls are equal to the length of the chamber parts, are the longitudinal support walls in this height range on the Parts of the chamber. The fact that in the height range above the longitudinal support walls a mutual distance have the greater than the length of the chamber parts and thus greater than the length of those aligned with the chamber parts Is trough, is sufficient at this altitude Distance between the troughs and the supporting walls surrounding them available. The same applies to the transverse support walls.

Da die Stützwände fest eingebaut werden und dann an Ort und Stelle verbleiben, sorgen sie dafür, daß dann, wenn eine der Grabkammern für eine Bestattung, insbesondere für eine Nachbestattung, geöffnet wird, kein Erdreich aus der Umgebung in die Grabkammer hineinfallen oder gar in größerer Menge hineinbrechen kann. Dadurch sind nach dem Einbau der Stützwände und der Grabkammern in deren Außenbereich keine Erdarbeiten mehr erforderlich.Since the retaining walls are built in and then in place and Position, make sure that if one of the Burial chambers for burial, especially for subsequent burial, is opened, no soil from the area in fall into the burial chamber or even in large quantities can break in. This is after installing the retaining walls and the burial chambers in the outside area no earthworks more needed.

Dadurch, daß der Deckel der Grabkammer als Trog ausgebildet ist, in dem die Erdabdeckung für die Gasschleuse untergebracht ist, die sowohl als Gasfilter wie auch als Pflanzboden für die Befplanzung dient, kann bei jeder folgenden Bestattung der als Deckel dienende Trog mit seinem gesamten Inhalt abgehoben und für die Zeit der Bestattung abseits gelagert werden. Dabei bleibt die Bepflanzung völlig ungestört, da sie weder herausgenommen noch gesondert gelagert werden muß. Sie kann im Gegenteil in der Zwischenzeit im Trog sachgerecht gepflegt werden. Es sind auch keinerlei sonstige Erdarbeiten erforderlich, wie das bei der bekannten Grabkammer notwenig ist. Dabei bleibt selbstverständlich auch die Umgebung der Gasschleuse unberührt. Die Gasschleuse ist daher keiner Gefahr einer Beschädigung ausgesetzt. Es entfällt damit auch das nachträgliche Wiedereinfüllen der Erdabdeckung mit dem entsprechenden Personalaufwand und Kostenaufwand. Das erneute Bepflanzen des Grabes entfällt ebenso.Because the lid of the burial chamber is designed as a trough is housed in the earth cover for the gas lock is both as a gas filter and as a planting soil for planting can be used for any subsequent Burial of the trough serving as a lid with all of it Content lifted and apart for the time of burial be stored. The planting remains completely undisturbed, since they are neither removed nor stored separately must become. On the contrary, in the meantime, Trough properly maintained. Neither are they other earthworks required, such as that with the known Burial chamber is necessary. It goes without saying the area around the gas lock is also untouched. The gas lock is therefore not at risk of damage. It the subsequent refilling of the Earth cover with the corresponding personnel expenditure and Expense. There is no need to replant the grave as well.

Durch eine Ausgestaltung nach Anspruch 2 läßt sich die Anzahl der verfügbaren Grabkammern praktisch beliebig vergrößern.By an embodiment according to claim 2, the Any number of available burial chambers enlarge.

Durch eine Ausgestaltung nach Anspruch 3 wird eine besonders enge Trennfuge zwischen den Längsstützwänden und den Querstützwänden erreicht, so daß besondere Abdichtungsmaßnahmen entfallen können.By an embodiment according to claim 3 particularly narrow joint between the longitudinal support walls and reached the transverse support walls, so that special sealing measures can be omitted.

Bei einer Ausgestaltung nach Anspruch 4 können die Stützwände auf dem gleichen Erdniveau wie die Kammerringe aufgestellt werden. Durch eine Ausgestaltung nach Anspruch 5 werden die Stützwände durch das Auffüllmaterial nicht nur von außen abgestützt sondern zugleich auch beschwert, was ihre Standfestigkeit stark erhöht. Bei einer Ausgestaltung nach Anspruch 6 werden die Stützwände durch das Gewicht der Grabkammern beschwert, so daß auch dadurch ihre Standfestigkeit erhöht wird.In an embodiment according to claim 4, the support walls set up at the same level as the chamber rings become. By an embodiment according to claim 5 the retaining walls are not only made up of the filling material supported from the outside but at the same time also complaining what their stability is greatly increased. In one configuration according to claim 6, the support walls by the weight of the Burial chambers weighed down, so that also their stability is increased.

Mit einer Ausgestaltung nach Anspruch 7 wird durch die Abstandshalter gewährleistet, daß die Kammerringe oder Bodenwannen nicht versehentlich zu dicht nebeneinander aufgestellt werden und dadurch auch ihre Tröge zu dicht nebeneinander stehen, wodurch das Herausheben und Hineinsetzen eines einzelnen Troges erschwert werden könnte. Bei der Weiterbildung nach Anspruch 8 müssen die Abstandshalter nicht gesondert eingesetzt werden. Die Kemmerringe oder Bodenwannen halten von selbst den richtigen gegenseitigen Abstand ein, wobei sie sich außerdem gegenseitig abstützen, so daß Unebenheiten des Untergrundes, auf dem sie aufgesetzt werden, nicht zu einer Schrägstellung benachbarter Kammerringe oder Bodenwannen führen kann.With an embodiment according to claim 7 Spacer ensures that the chamber rings or Floor trays are not accidentally too close together are set up and therefore their troughs too dense stand side by side, which makes lifting and sitting down of a single trough could be difficult. At the training according to claim 8, the spacers not be used separately. The Kemmerrings or Floor trays hold the right mutual ones by themselves Distance, while also supporting each other, so that unevenness of the surface on which it is placed not to an inclination of adjacent chamber rings or floor trays.

Mit einer Ausgestaltung nach Anspruch 9 werden einerseits offene Spalten zwischen den einzelnen Grabkammern vermieden und außerdem die Möglichkeit geschaffen, die Grabkammern mit einem so großen gegenseitigen Abstand anzuordnen und dafür die Abdeckplatten so breit zu machen, daß man darauf auch quer zur Grabkammer gut stehen kann, ohne auf die Erdabdeckung der benachbarten Grabkammer zu treten. Ähnliches gilt auch bei einer Ausgestaltung nach Anspruch 10 für den Spalt zwischen den Schmalseiten der Grabkammern und den benachbarten Längsstützwänden, wenngleich dort die Breite der Abdeckplatten geringer gehalten werden kann, weil entlang der Längsstützwände ohnehin wenigstens auf einer Seite ein Fußweg oder gar ein Fahrweg vorgesehen wird, über den die einzelnen Grabkammern zu erreichen sind.With an embodiment according to claim 9 on the one hand Avoid open gaps between the individual burial chambers and also created the opportunity to use the burial chambers such a large mutual distance and for that to make the cover plates so wide that you can put them on can stand well across the burial chamber without having to cover the earth to enter the neighboring burial chamber. Similar thing also applies to an embodiment according to claim 10 Gap between the narrow sides of the burial chambers and the adjacent longitudinal support walls, although there the width the cover plates can be kept lower because anyway along the longitudinal support walls at least on one Side a footpath or even a driveway is provided over which the individual burial chambers can be reached.

Mit einer Ausgestaltung nach Anspruch 11 lassen sich örtliche Unregelmäßigkeiten des Bodens der Grube für die Grabkammern, insbesondere örtlich unterschiedliche Tragfähigkeiten des Bodens, durch die Fußschwellen ausgleichen, weil die Bodenschwellen wesentlich länger als die Breite der einzelnen Kammerringe oder Bodenwannen ausgeführt werden können. Vor allem bei einer überlappenden Anordnung der Bodenschwellen ergibt sie praktisch von selbst eine Nivelierung der Auflagefläche der Kammerringe oder Bodenwannen.With an embodiment according to claim 11 can local irregularities of the bottom of the pit for the Burial chambers, in particular locally different load capacities of the ground, through which the foot thresholds balance, because the thresholds are much longer than the width of the individual chamber rings or floor trays can. Especially with an overlapping arrangement of the Thresholds practically result in one Leveling of the contact surface of the chamber rings or floor trays.

Durch eine Ausgestaltung nach Anspruch 12 wird dafür gesorgt, daß das beispielsweise aus den Trögen austretende Wasser sich nicht zwischen dem Trog und der benachbarten Stützwand stauen kann, sondern sofort bis unterhalb der Kammerringe ablaufen kann. Through an embodiment according to claim 12 worried that the exiting from the troughs, for example Water does not get between the trough and the neighboring one Retaining wall can jam, but immediately to below the Chamber rings can expire.

Im folgenden wird die Erfindung anhand mehrerer in der Zeichnung dargestellter Ausführungsbeispiele näher erläutert. Es zeigen:

Fig. 1
einen Längsschnitt einer Grabkammer und einen Querschnitt zweier Längsstützwände;
Fig. 2
einen Querschnitt der Grabkammer nach Fig. 1;
Fig. 3
eine Draufsicht einer einzelnen Grabkammer nach Fig. 1;
Fig. 4
eine ausschnittweise dargestellte Draufsicht einer Gruppe von Grabkammern, zum Teil bei abgenommener Abdeckung;
Fig. 5
eine Ansicht einer Querstützwand;
Fig. 6
eine Seitenansicht der Querstützwand nach Fig. 5;
Fig. 7
einen ausschnittweise und vergrößert dargestellten Querschnitt zweier benachbarter Grabkammern;
Fig. 8
einen ausschnittweise dargestellten Querschnitt einer Grabkammer mit abgewandelter Längsstützwand und mit einer Bodenschwelle;
Fig. 9
eine Draufsicht auf zwei Grabkammern mit Bodenschwellen nach Fig. 8.
The invention is explained in more detail below with reference to several exemplary embodiments shown in the drawing. Show it:
Fig. 1
a longitudinal section of a burial chamber and a cross section of two longitudinal support walls;
Fig. 2
a cross section of the burial chamber of FIG. 1;
Fig. 3
a plan view of a single burial chamber of FIG. 1;
Fig. 4
a fragmentary plan view of a group of burial chambers, partly with the cover removed;
Fig. 5
a view of a transverse support wall;
Fig. 6
a side view of the transverse support wall of FIG. 5;
Fig. 7
a detail and enlarged cross-section of two adjacent burial chambers;
Fig. 8
a section of a cross-section of a burial chamber with modified longitudinal support wall and with a threshold;
Fig. 9
a plan view of two burial chambers with thresholds according to FIG. 8.

Die aus Fig. 1 ersichtliche Grabkammer 160 weist einen Kammerteil in Form einer Bodenwanne 161 und einen Trog 162 auf. Der Trog 162 dient als Deckel für die Bodenwanne 161.The burial chamber 160 shown in FIG. 1 has one Chamber part in the form of a floor pan 161 and a trough 162 on. The trough 162 serves as a cover for the floor pan 161.

Die Bodenwanne 161 hat eine ringförmig geschlossene Umfangswand 163, die eine rechteckförmige Grundrißfläche hat. Am unteren Ende der Umfangswand 163 schließt ein Boden 164 an, der zusammen mit der Umfangswand 163 einstückig hergestellt ist. Die Bodenwanne 161 ist aus Stahlbeton hergestellt.The floor pan 161 has an annularly closed peripheral wall 163, which has a rectangular plan area. At the a bottom 164 connects to the lower end of the peripheral wall 163, which is made in one piece with the peripheral wall 163 is. The floor pan 161 is made of reinforced concrete.

Der obere Rand der Bodenwanne 161 ist mit einem umlaufenden Randprofil 165 versehen. Es wird durch eine Rinne 166 gebildet, die einen V-förmigen Querschnitt hat. Sie ist symmetrisch zur Mittenebene der Umfangswand 163 angeordnet. The upper edge of the floor pan 161 is encircling Edge profile 165 provided. It is through a gutter 166 formed, which has a V-shaped cross section. she is arranged symmetrically to the center plane of the peripheral wall 163.

Der Trog 162 ist ähnlich der Bodenwanne 161 gestaltet. Er weist eine ringförmig geschlossene Umfangswand 167 und einen einstückig damit hergestellten Boden 168 auf. Sein oberer Rand 169 ist eben. An der Unterseite des Bodens 168 ist in der Fortsetzung der Umfangswand 167 ein umlaufendes Randprofil 171 vorhanden, das als Gegenprofil zum oberen Randprofil 165 der Bodenwanne 161 ausgebildet ist. Es wird durch eine umlaufende dachkantförmige Rippe 172 gebildet, die genau in die Rinne 166 hineinpaßt.The trough 162 is designed similar to the floor pan 161. He has an annular closed peripheral wall 167 and one Bottom 168 produced in one piece therewith. His top Edge 169 is flat. At the bottom of the bottom 168 is in the continuation of the peripheral wall 167 a peripheral edge profile 171 available, as a counter profile to the upper edge profile 165 of the floor pan 161 is formed. It is through a circumferential roof-shaped rib 172 is formed, the fits exactly into the groove 166.

Der Trog 162 hat eine bestimmte lichte Höhe, die im allgemeinen etwa 60 cm beträgt. In einer bestimmten Höhe über dem Boden 168 weist der Trog 162 eine Reihe von Entwässerungsöffnungen 173 auf. Der Trog 162 nimmt eine Erdabdeckung 174 auf.The trough 162 has a certain clear height, which in general is about 60 cm. At a certain height above that Bottom 168, trough 162 has a series of drainage openings 173 on. The trough 162 takes an earth cover 174 on.

Im Trog 162 sind nicht dargestellte Gasschleusen angeordnet, die einen Gas- und Luftaustausch zwischen dem Innenraum der Grabkammer 160 und der Umgebung ermöglichen.Gas locks, not shown, are arranged in the trough 162, which is a gas and air exchange between the interior of the Allow burial chamber 160 and the surrounding area.

Wie aus Fig. 4 zu ersehen ist, ist eine weitgehend beliebige Anzahl Grabkammern 160 in einem bestimmten gegenseitigen Abstand nebeneinander angeordnet, wobei ihre Längsseiten parallel zueinander ausgerichtet sind. Damit dieser Abstand beim Einbau der Grabkammern 160 ohne großen Meß- und Richtaufwand eingehalten werden kann, weisen die Bodenwannen 161 an jeder ihrer Längsseite einen Abstandshalter 175 auf. Er ist als Rippe 176 ausgebildet und mit der Umfangswand 163 einstückig hergestellt. Die Rippen 176 beginnen eine gewisse Strecke oberhalb der Unterseite des Bodens 164 und enden ebenfalls eine gewisse Strecke unterhalb des oberen Randes der Umfangswand 163 (Fig. 2). Die Rippen 176 sind lotrecht ausgerichtet. Wie aus Fig. 3 zu ersehen ist, haben die Rippen 176 in Umfangsrichtung im selben Umlaufsinn von der Mitte der betreffenden Längsseite der Umfangswand 163 einen bestimmten Abstand, der auf beiden Seiten gleich ist. In Bezug auf die Rippen 176 ist die Bodenwanne 161 gewissermaßen auf Umschlag symmetrisch ausgebildet. Dadurch stützen sich zwei einander benachbarte Grabkammern 160 an ihren Längsseiten wechselseitig gegeneinander ab (Fig. 4).As can be seen from Fig. 4, one is largely any number of burial chambers 160 in a given mutual Spacing arranged side by side, with their long sides are aligned parallel to each other. So this Distance when installing the burial chambers 160 without large measuring and Alignment effort can be observed, the floor trays 161 a spacer on each of its long sides 175 on. It is designed as a rib 176 and with the Circumferential wall 163 made in one piece. The ribs 176 start a certain distance above the bottom of the Bottom 164 and also end a certain distance below the upper edge of the peripheral wall 163 (Fig. 2). The Ribs 176 are aligned vertically. As from Fig. 3 too can be seen, the ribs 176 in the circumferential direction in same sense of rotation from the center of the long side concerned the peripheral wall 163 a certain distance, the two Sides is the same. With respect to the ribs 176, the Bottom tray 161 is designed to be symmetrical on the envelope. This supports two adjacent burial chambers 160 on their long sides alternately against each other from (Fig. 4).

Wie aus Fig. 4 ersichtlich ist, ist die Gruppe der Grabkammern 160 von zwei Paar Stützwänden umgeben, die je paarweise parallel zueinander ausgerichtet sind und untereinander rechtwinklig zueinander ausgerichtet sind. Zur besseren Unterscheidung werden die in der Längsrichtung der Gruppe der Grabkammern 160 verlaufenden beiden Stützwände als Längsstützwände 181 und die quer dazu verlaufenden Stützwände als Querstützwände 182 bezeichnet. Von letzteren ist in Fig. 4 nur eine dargestellt. Die andere ist als außerhalb des Zeichnungsblattes stehend zu betrachten.As can be seen from Fig. 4, is the group of burial chambers 160 surrounded by two pairs of retaining walls, each in pairs are aligned parallel to each other and with each other are aligned at right angles to each other. For better distinction will be made in the longitudinal direction of the Group of burial chambers 160 extending two retaining walls as longitudinal support walls 181 and the transverse to them Support walls referred to as transverse support walls 182. From the latter only one is shown in FIG. The other is as to be seen standing outside the drawing sheet.

Wie aus Fig. 1 ersichtlich ist, haben die Längsstützwände 181 einen gegenseitigen Abstand, der im Höhenbereich der Bodenwanne 161 gleich der Länge der Bodenwanne 161 ist. Der in diesem Höhenbereich gelegene Wandabschnitt 181.1 liegt mit seiner der Grabkammer 160 zugekehrten Wandfläche 183 an der Außenseite der Bodenwanne 161, und zwar an deren Schmalseite, unmittelbar an. Bei dem im Höhenbereich des Troges 162 gelegenen Wandabschnitt 181.2 ist die Wandfläche 184 gegenüber der Wandfläche 183 um ein bestimmtes Maß von etwa 2 bis 3 cm zurückgesetzt, so daß zwischen dem Wandabschnitt 181.2 und der Außenseite des Troges 162 ein entsprechender Spalt 165 offenbleibt. Dadurch wird das Anheben und Herausheben des Troges 162 und das Wiedereinsetzen und Absetzen des Troges 162 auf die Bodenwanne 161 erleichtert. Der Spalt zwischen dem Trog und den Stützwänden kann aber auch dadurch geschaffen werden, daß die Außenseite der Umfangswand 167 um ein entsprechendes Maß zurückgesetzt ist und die Stützwände 181 und 182 durchgehend ebene Wandflächen haben. As can be seen from Fig. 1, the longitudinal support walls 181 a mutual distance in the height range the floor pan 161 is equal to the length of the floor pan 161. The wall section 181.1 located in this height range lies with its wall surface facing the burial chamber 160 183 on the outside of the floor pan 161, namely their narrow side, immediately. In the high range the wall section 181.2 of the trough 162 is the wall surface 184 against the wall surface 183 by a certain one Measure about 2 to 3 cm, so that between the Wall section 181.2 and the outside of the trough 162 corresponding gap 165 remains open. This will make it Lifting and lifting the trough 162 and reinserting it and depositing the trough 162 on the floor pan 161 facilitated. The gap between the trough and the retaining walls can also be created in that the Outside of the peripheral wall 167 by a corresponding amount is reset and the support walls 181 and 182 continuously have flat wall surfaces.

Die Querstützwände 182 sind zwischen den beiden Längsstützwänden 181 angeordnet. Die Breite der Querstützwände 182 ist daher gleich dem lichten Abstand der Längsstützwände 181. Da dieser Abstand bei den Wandabschnitten 181.1 und 181.2 unterschiedlich groß ist, hat auch die Querstützwand 182 eine unterschiedliche Breite (Fig. 5). Der unten gelegene Wandabschnitt 182.1 hat eine Breite, die gleich dem Abstand der Wandflächen 183 ist. Der Wandabschnitt 182.2 hat eine Breite, die gleich dem Abstand der Wandflächen 184 ist. An der Übergangsstelle vom Wandabschnitt 182.1 zum Wandabschnitt 182.2 ist eine Übergangsfläche 186 vorhanden, die auf die Übergangsfläche zwischen den beiden Wandabschnitten 181.1 und 181.2 der Längsstützwände 181 abgestimmt ist. Diese ist im allgemeinen eine abwärts geneigte ebene Fläche.The transverse support walls 182 are between the two longitudinal support walls 181 arranged. The width of the transverse support walls 182 is therefore equal to the clear distance of the longitudinal support walls 181. Da this distance for the wall sections 181.1 and 181.2 is of different sizes, the transverse support wall 182 also has a different width (Fig. 5). The one below Wall section 182.1 has a width that is equal to the distance of the wall surfaces is 183. The wall section 182.2 has one Width, which is equal to the distance between the wall surfaces 184. On the transition point from wall section 182.1 to wall section 182.2 there is a transition surface 186 which on the transition surface between the two wall sections 181.1 and 181.2 of the longitudinal support walls 181 matched is. This is generally a downward sloping plane Area.

Im Hinblick darauf, daß an der der Querstützwand 182 benachbarten Grabkammer 160 (Fig. 4) nur ein Abstandshalter in Form der Rippe 176 vorhanden ist, ist die Querstützwand 182 ebenfalls mit einem Abstandshalter 187 versehen, der wie bei den Bodenwannen 161 als Rippe 188 ausgebildet ist und im allgemeinen die gleiche Form wie die Rippen 176, in jedem Falle aber die gleiche Höhe wie diese hat.In view of that adjacent to the transverse support wall 182 Grave chamber 160 (Fig. 4) only one spacer in The shape of the rib 176 is present, the transverse support wall 182 also provided with a spacer 187, which as in the bottom tubs 161 is formed as a rib 188 and in generally the same shape as the ribs 176, in each But the same height as this one.

Falls die Bodenwannen ganz allgemein oder die der Querstützwand 182 benachbarte Bodenwanne insbesondere auf der der Querstützwand 182 zugekehrten Längsseite ohne den Abstandshalter 175 ausgeführt ist oder dieser aus irgend einem Grunde entfernt worden ist, dann ist auch die Querstützwand 182 ohne ihren Abstandshalter 187 auszuführen und dieser erforderlichenfalls zu entfernen. In diesem Falle ist die den Grabkammern 160 zugekehrte Wandfläche 191 des Wandabschnittes 182.2 um ein bestimmtes Maß von etwa 2 bis 3 cm gegenüber der Wandfläche 192 des Wandabschnittes 182.2 zurückgesetzt, wie das bezüglich der Wandflächen der Innenseite der Längsstützwände 181 erläutert wurde. Wenn dieser Fall nicht eintritt, kann die Querstützwand 182 über ihre gesamte Höhe eine gleichbleibende Wanddicke haben. If the floor trays in general or that of the transverse support wall 182 adjacent floor pan in particular on the Transverse support wall 182 facing the long side without the spacer 175 is executed or this from any Has basically been removed, then the transverse support wall 182 without executing their spacer 187 and remove it if necessary. In this case it is the wall surface 191 of the wall section facing the burial chambers 160 182.2 by a certain amount of about 2 to 3 cm opposite the wall surface 192 of the wall section 182.2 reset like that regarding the wall surfaces of the inside of the longitudinal support walls 181 has been explained. If this If this does not occur, the transverse support wall 182 can pass over it entire height have a constant wall thickness.

In Fig. 1 und Fig. 5 ist eine Abwandlung der Längsstützwände 181 und der Querstützwände 182 strichpunktiet angedeutet. Diese Abwandlung betrifft eine Sockelleiste 193 bei den Längsstützwänden 181 bzw. eine Sockelleiste 194 bei den Querstützwänden 182. Diese Sockelleisten sind im allgemeinen auf der von den Grabkammern abgekehrten Außenseite der Stützwände angeordnet. Gegebenenfalls sind sie mit der betreffenden Stützwand einstückig hergestellt, wobei es auch zweckmäßig ist, daß die Stahlbewehrung der Stützwand zumindest eine gewisse Strecke bis in die Sockelleiste hinein weitergeführt ist. Diese Sockelleisten erfüllen zweierlei Aufgaben. Zum einen vergrößern sie die Aufstandsfläche oder Bodenfläche der zugehörigen Stützwand, wodurch sich die durch die Gewichtskraft der Stützwand hervorgerufene Flächenpressung im Boden unterhalb der Stützwand verringert. Zum anderen erhöhen sie die Standfestigkeit der zugeordneten Stützwand durch die darauf einwirkende Gewichtskraft des oberhalb der Sockelleiste eingebrachten Auffüllmaterials.In Fig. 1 and Fig. 5 is a modification of the longitudinal support walls 181 and the transverse support walls 182 indicated by dash-dotted lines. This modification relates to a baseboard 193 the longitudinal support walls 181 and a skirting 194 in the Cross support walls 182. These baseboards are general on the outside of the Retaining walls arranged. If necessary, they are with the relevant support wall made in one piece, it also It is appropriate that the steel reinforcement of the retaining wall at least a certain distance up to the baseboard continued into it. Meet these baseboards two tasks. Firstly, they increase the footprint or bottom surface of the associated retaining wall, whereby is caused by the weight of the retaining wall Surface pressure in the floor below the retaining wall decreased. On the other hand, they increase the stability of the assigned retaining wall by acting on it Weight force of the above the baseboard Padding material.

Bedingt durch die Abstandshalter 175 ist der gegenseitige Abstand zweier Grabkammern 160 verhältnismäßig groß (Fig. 4). Entsprechend weit ist der zwischen ihnen bestehende Spalt 195 (Fig. 6). Dieser wird durch eine Anzahl Abdeckplatten 196 überbrückt. Sie haben ein näherungsweise T-förmiges Profil, dessen Stegteil 197 auf den Spalt 195 zwischen den Grabkammern 160 abgestimmt ist, so daß er ein Führungselement für die Abdeckplatte 196 bildet. Die Abdeckplatten 196 erstrecken sich zweckmäßigerweise bis zum Innenrand 198 der Längswand 199 der Tröge 162 hin.Due to the spacers 175, the mutual The distance between two burial chambers 160 is relatively large (Fig. 4). The distance between them is correspondingly wide existing gap 195 (Fig. 6). This is replaced by a Number of cover plates 196 bridged. You have a approximately T-shaped profile, the web part 197 on the gap 195 between the burial chambers 160 is coordinated, so that it is a guide element for the cover plate 196 forms. The cover plates 196 expediently extend to the inner edge 198 of the longitudinal wall 199 of the troughs 162 there.

In entsprechender Weise wird der Spalt 185 zwischen der Längsstützwand 181 und den Grabkammern 160 überbrückt (Fig. 4). Dafür sind Abdeckplatten 201 vorhanden, die ähnlich den Abdeckplatten 196 ausgebildet sind und mit einem Stegteil versehen sind, der auf den Spalt 185 abgestimmt ist. Auch diese Abdeckplatten 201 erstrecken sich zweckmäßigerweise einerseits bis zum Innenrand 202 der Querwand 203 des Troges 162 und andererseits bis zum Außenrand 204 der Längsstützwand 181 hin.Correspondingly, the gap 185 between the Longitudinal support wall 181 and the grave chambers 160 bridged (Fig. 4). Cover plates 201 are provided for this are similar to the cover plates 196 and with a Web part are provided, which is matched to the gap 185 is. These cover plates 201 also expediently extend on the one hand up to the inner edge 202 of the transverse wall 203 of the trough 162 and on the other hand to the outer edge 204 of the longitudinal support wall 181.

Aus Fig. 8 und Fig. 9 sind Grabkammern 160 ersichtlich, bei denen die Zubehörteile abgewandelt sind.8 and 9 show burial chambers 160, where the accessories are modified.

Die Grabkammern 160 ruhen auf Bodenschwellen 205. Diese sind in zwei Reihen angeordnet, die parallel zu den Längsstützwänden der Gruppe der Grabkammern 160 ausgerichtet sind. Die Bodenschwellen 205 haben eine Länge, die ein Mehrfaches der Breite der Grabkammern 160 ist. Die Bodenschwellen 205 können in ihrer Längsrichtung hintereinander angeordnet sein, wobei sie untereinander fluchten. Zweckmäßiger ist es, sie seitlich versetzt anzuordnen und sie gleichzeitig in ihrer Längsrichtung so anzuordnen, daß sie einander teilweise überlappen (Fig. 9). Dabei ist es zweckmäßig, daß der Überlappungsbereich im Bereich der Längsseite einer Grabkammer 160 gelegen ist (Fig. 9).The burial chambers 160 rest on thresholds 205. These are arranged in two rows parallel to the longitudinal support walls the group of burial chambers 160 are aligned. The Bumps 205 have a length that is a multiple of that Width of the burial chambers 160. The thresholds 205 can be arranged one behind the other in their longitudinal direction be cursed with each other. It is more convenient arrange them laterally offset and at the same time in to arrange their longitudinal direction so that they partially each other overlap (Fig. 9). It is appropriate that the Overlap area in the area of the long side of a burial chamber 160 is located (Fig. 9).

Da die Grabkammern 160 aufgrund der unter ihnen angeordneten Bodenschwellen 205 um die Höhe der Bodenschwellen gegenüber der Oberfläche 206 der Grube für die Grabkammern 160 höhergelegen sind, sind die dabei verwendeten Stützwände 207 um das Höhenmaß der Bodenschwellen 205 höher als die Grabkammern 160 ausgeführt, damit ihr oberer Rand 208 wieder auf gleicher Höhe mit dem oberen Rand 169 der Tröge 162 liegt. Im übrigen sind die Stützwände 207 weitgehend gleich den Stützwänden 181 und 182 ausgebildet.Because the burial chambers 160 due to the arranged below them Thresholds 205 compared to the height of the thresholds the surface 206 of the pit for the burial chambers 160 is higher are the support walls 207 used here the height of the thresholds 205 higher than the burial chambers 160 executed so that its upper edge 208 again same height with the upper edge 169 of the troughs 162. Otherwise, the support walls 207 are largely the same Support walls 181 and 182 formed.

Die einzelnen Grabkammern 160 haben aufgrund der Abstandshalter 175 im Bereich ihrer Längsseiten einen ausreichend großen gegenseitigen Abstand. Durch diesen Zwischenraum kann das aus den Trögen 162 durch die Entwässerungsöffnungen 173 (Fig. 1) austretende Wasser, beispielsweise Regenwasser oder überschüssiges Gießwasser, ohne weiteres abfließen. Da an den Schmalseiten der Bodenwannen 161 der Wandabschnitt 181.1 der Längsstützwände 181 eng anliegt ist es zweckmäßig, in diesem Wandabschnitt 181.1 eine oder mehrere von oben nach unten durchgehende Entwässerungsrillen 209 vorzusehen. Dann kann auch das im Bereich der Schmalseiten der Tröge 162 austretende Wasser leichter abfließen. The individual burial chambers 160 have due to the spacers 175 sufficient in the area of their long sides large mutual distance. Through this space this can be done from troughs 162 through the drainage openings 173 (Fig. 1) leaking water, for example Rain water or excess water, without further ado flow away. Since on the narrow sides of the floor troughs 161 Wall section 181.1 of the longitudinal support walls 181 is tight it is expedient in this wall section 181.1 or several continuous drainage grooves from top to bottom 209 to be provided. Then this can also be done in the area of Narrow sides of the troughs 162 leaking water more easily flow away.

BezugszeichenlisteReference list

160160
GrabkammerBurial chamber
161161
BodenwanneFloor pan
162162
TroqTroq
163163
UmfangswandPeripheral wall
164164
Bodenground
165165
RandprofilEdge profile
166166
RinneGutter
167167
UmfangswandPeripheral wall
168168
Bodenground
169169
Randedge
171171
RandprofilEdge profile
172172
RinneGutter
173173
EntwässerungsöffnungenDrainage openings
174174
ErdabdeckungEarth cover
175175
AbstandshalterSpacers
176176
Ripperib
181181
LängsstützwändeLongitudinal support walls
182182
QuerstützwändeCross retaining walls
183183
WandflächeWall surface
184184
WandflächeWall surface
185185
Spaltgap
186186
ÜbergangsflächeTransition area
187187
AbstandshalterSpacers
188188
Ripperib
191191
WandflächeWall surface
192192
WandflächeWall surface
193193
SockelleisteSkirting board
194194
SockelleisteSkirting board
195195
Spaltgap
196196
AbdeckplattenCover plates
197197
StegteilBridge part
198198
InnenrandInside edge
199199
LängswandLongitudinal wall
201201
AbdeckplattenCover plates
202202
InnenrandInside edge
203203
QuerwandTransverse wall
204204
AußenrandOuter edge
205205
BodenschwellenThresholds
206206
Oberflächesurface
207207
StützwändeRetaining walls
208208
Randedge
209209
EntwässerungsrillenDrainage grooves

Claims (12)

Grabkammer mit den Merkmalen: es ist wenigstens ein ringsum geschlossener Kammerteil in Form eines Kammerringes oder einer Bodenwanne (161) vorhanden, der eine bestimmte Höhe hat, es ist ein Deckel (162) vorhanden, der auf dem oberen Rand des Kammerteils (161) aufliegt und ihn nach oben abschließt und der eine Erdabdeckung aufnimmt, im Deckel und/oder in einer Umfangswand des Kammerteils (161) ist eine Durchgangsöffnung vorhanden, an die eine Gasschleuse gasdicht anschließbar ist, gekennzeichnet durch die Merkmale: der Deckel ist als Trog (161) ausgebildet, der die Erdabdeckung aufnimmt, es sind Stützwände (181; 182) vorhanden, die den Trog (162) unmittelbar oder, bei der Anordnung mehrerer seitlich nebeneinander aufgereihter Kammerteile (161), zum Teil mittelbar außen ringsum in geringem Abstand umgeben, es sind zwei Paar Stützwände (181; 182) vorhanden, von denen die Stützwände des einen Paares als Längsstützwände (181) und die Stützwände des anderen Paares als Querstützwände (182) dienen, die Stützwände (181; 182) jedes Paares sind parallel zueinander ausgerichtet, die Querstützwände (182) sind rechtwinklig zu den Längsstützwänden (181) ausgerichtet und zwischen diesen angeordnet, die Längsstützwände (181) sind in einem bestimmten gegenseitigen Abstand angeordnet, wobei dieser Abstand im Höhenbereich von der Unterkante bis höchstens zur Oberkante der vorhandenen Kammerringe oder Bodenwannen (161) mindestens gleich der Länge eines Kammerringes oder einer Bodenwanne (161) ist und wobei dieser Abstand im darüberliegenden Höhenbereich um ein bestimmtes Maß größer als die Länge eines Kammerringes oder der Bodenwanne (161) ist, die Länge der Längsstützwände (181) ist größer als die zweifache Breite eines Kammerringes oder einer Bodenwanne (161) und beträgt bis zum Mehrfachen der Breite eines Kammerringes oder einer Bodenwanne (161), die Länge der Querstützwände (182) ist gleich dem lichten Abstand der Längsstützwände (181), der gegenseitige Abstand der Querstützwände (182) ist größer als die zweifache Breite eines Kammerringes oder einer Bodenwanne (161) und beträgt bis zum Mehrfachen der Breite eines Kammerringes oder einer Bodenwanne (161), innerhalb der Stützwände (181; 182) ist eine Gruppe von Kammerteilen (160) in Form eines Kammerringes oder einer Bodenwanne (161) vorhanden, die mit parallel zu einander ausgerichteter Längsseite in einem bestimmten gegenseitigen Abstand in Richtung der Längsstützwände (181) nebeneinander angeordnet sind und deren Anzahl auf den lichten Abstand der Querstützwände (182) abgestimmt ist. Burial chamber with the features: there is at least one all-round closed chamber part in the form of a chamber ring or a floor pan (161) which has a certain height, there is a cover (162), which rests on the upper edge of the chamber part (161) and closes it off at the top and that takes up an earth cover, There is a through opening in the cover and / or in a peripheral wall of the chamber part (161), to which a gas lock can be connected in a gas-tight manner, characterized by the characteristics: the cover is designed as a trough (161) which receives the earth cover, there are support walls (181; 182) which surround the trough (162) directly or, in the case of the arrangement of a plurality of chamber parts (161) arranged side by side, in some cases indirectly outside all around at a short distance, there are two pairs of supporting walls (181; 182), of which the supporting walls of one pair serve as longitudinal supporting walls (181) and the supporting walls of the other pair serve as transverse supporting walls (182), the support walls (181; 182) of each pair are aligned parallel to one another, the transverse support walls (182) are aligned at right angles to the longitudinal support walls (181) and are arranged between them, the longitudinal support walls (181) are arranged at a certain mutual distance, wherein this distance in the height range from the lower edge to at most the upper edge of the existing chamber rings or floor trays (161) is at least equal to the length of a chamber ring or floor tray (161) and this distance in the height range above is a certain amount greater than the length of a chamber ring or the floor pan (161), the length of the longitudinal support walls (181) is greater than twice the width of a chamber ring or a floor pan (161) and is up to a multiple of the width of a chamber ring or floor pan (161), the length of the transverse support walls (182) is equal to the clear distance between the longitudinal support walls (181), the mutual spacing of the transverse support walls (182) is greater than twice the width of a chamber ring or a floor pan (161) and is up to a multiple of the width of a chamber ring or floor pan (161), within the supporting walls (181; 182) there is a group of chamber parts (160) in the form of a chamber ring or a floor pan (161), which are arranged next to one another with a longitudinal side aligned parallel to one another at a certain mutual distance in the direction of the longitudinal support walls (181) and the number of which is matched to the clear distance between the transverse support walls (182). Grabkammer nach Anspruch 1,
gekennzeichnet durch das Merkmal: es sind mehrere Längsstützwände (181) vorhanden, die in der Längsrichtung aneinander anschließen, vorzugsweise ist die Trennfuge zwischen zwei benachbarten Längsstützwänden (181) innerhalb der Breitenerstreckung eines Kammerringes oder einer Bodenwanne (161) gelegen.
Burial chamber according to claim 1,
characterized by the characteristic: there are a plurality of longitudinal support walls (181) which adjoin one another in the longitudinal direction, the parting line between two adjacent longitudinal support walls (181) is preferably located within the width of a chamber ring or a floor pan (161).
Grabkammer nach Anspruch 1 oder 2,
gekennzeichnet durch das Merkmal: die Stirnfläche der Querstützwände (182) ist auf die innere Profillinie (183; 184) der Längsstützwände (181) abgestimmt.
Burial chamber according to claim 1 or 2,
characterized by the characteristic: the end face of the transverse support walls (182) is matched to the inner profile line (183; 184) of the longitudinal support walls (181).
Grabkammer nach einem der Ansprüche 1 bis 3,
gekennzeichnet durch das Merkmal: die Stützwände (181'; 182) haben eine Höhe, die zumindest annähernd gleich der Summe der Höhe der vorhandenen Kammerringe oder Bodenwannen (161) und der Höhe des Troges (162) ist.
Burial chamber according to one of claims 1 to 3,
characterized by the characteristic: the support walls (181 '; 182) have a height which is at least approximately equal to the sum of the height of the existing chamber rings or floor trays (161) and the height of the trough (162).
Grabkammer nach nach einem der Ansprüche 1 bis 4,
gekennzeichnet durch das Merkmal: die Stützwände (181; 182) haben eine Sockelleiste (193), die von den Grabkammern (160) abgekehrt ist.
Burial chamber according to one of claims 1 to 4,
characterized by the characteristic: the supporting walls (181; 182) have a baseboard (193) which faces away from the burial chambers (160).
Grabkammer nach einem der Ansprüche 1 bis 5,
gekennzeichnet durch die Merkmale zumindest die Längsstützwände (181) weisen je eine Sockelleiste (193) auf, die den Grabkammern (160) zugekehrt ist und auf der die Grabkammern (160) zumindest zum Teil aufliegen, die Stützwände haben eine Höhe, die um die Höhe der Sockelleiste (193) größer als die Summe der Höhe der vorhandenen Grabkammerringe oder Bodenwannen (161) und der Höhe des Troges (162) ist.
Burial chamber according to one of claims 1 to 5,
characterized by the characteristics at least the longitudinal support walls (181) each have a baseboard (193), facing the burial chambers (160) and on which the burial chambers (160) lie at least in part, the support walls have a height which is greater by the height of the skirting (193) than the sum of the height of the existing burial chamber rings or floor trays (161) and the height of the trough (162).
Grabkammer nach einem der Ansprüche 1 bis 6,
gekennzeichnet durch die Merkmale zwischen den Kammerringen (161) sind wenigstens je zwei Abstandshalter (175) mit einem gewissen gegenseitigen Abstand angeordnet.
Burial chamber according to one of claims 1 to 6,
characterized by the characteristics at least two spacers (175) are arranged at a certain mutual distance between the chamber rings (161).
Grabkammer nach Anspruch 7,
gekennzeichnet durch die Merkmale die Abstandshalter (175) sind einstückig mit dem Kammerring oder der Bodenwanne (161) hergestellt und vorzugsweise als lotrecht ausgerichtete Rippe (176) der Außenseite des Kammerringes oder der Bodenwanne (161) ausgebildet, bevorzugt sind je Längsseite je ein Abstandshalter (175) vorhanden, die in Umfangsrichtung im selben Umlaufsinn von der Mitte der betreffenden Längsseite einen bestimmten Abstand haben.
Burial chamber according to claim 7,
characterized by the characteristics the spacers (175) are produced in one piece with the chamber ring or the base pan (161) and are preferably designed as a vertically aligned rib (176) on the outside of the chamber ring or the base pan (161), there is preferably one spacer (175) for each long side, which has a certain distance in the circumferential direction in the same direction of rotation from the center of the long side in question.
Grebkammer nach einem der Ansprüche 1 bis 8,
gekennzeichnet durch die Merkmale der Zwischenraum (195) zwischen zwei einander benachbarten Grabkammern (160) wird durch eine oder mehrere Abdeckplatten (196) abgedeckt, vorzugsweise haben die Abdeckplatten (196) ein T-förmiges Profil, dessen Stegteil (197) auf den Spalt (195) zwischen den Grabkammern (160) abgestimmt ist, die Abdeckplatten (196) erstrecken sich vorzugsweise bis zum Innenrand (198) der Längswand (199) der Tröge (162) hin.
Greb chamber according to one of claims 1 to 8,
characterized by the characteristics the space (195) between two adjacent burial chambers (160) is covered by one or more cover plates (196), the cover plates (196) preferably have a T-shaped profile, the web part (197) of which is matched to the gap (195) between the burial chambers (160), the cover plates (196) preferably extend to the inner edge (198) of the longitudinal wall (199) of the troughs (162).
Grabkammer nach einem der Ansprüche 1 bis 9,
gekennzeichnet durch die Merkmale der Zwischenraum (185) zwischen einer Grabkammer (160) und einer benachbarten Stützwand (181) wird durch eine oder mehrere Abdeckplatten (201) abgedeckt, vorzugsweise haben die Abdeckplatten (201) ein T-förmiges Profil, dessen Stegteil auf den Spalt (185) zwischen der Grabkammer (160) und der Stützwand (181) abgestimmt ist, die Abdeckplatten (201) erstrecken sich vorzugsweise einerseits bis zum Innenrand (202) der Querwand (203) des Troges (162) und andererseits bis zum Außenrand (204) der Stützwand (181) hin.
Burial chamber according to one of claims 1 to 9,
characterized by the characteristics the space (185) between a burial chamber (160) and an adjacent supporting wall (181) is covered by one or more cover plates (201), the cover plates (201) preferably have a T-shaped profile, the web part of which is matched to the gap (185) between the burial chamber (160) and the support wall (181), the cover plates (201) preferably extend on the one hand to the inner edge (202) of the transverse wall (203) of the trough (162) and on the other hand to the outer edge (204) of the support wall (181).
Grabkammer nach einem der Ansprüche 1 bis 10,
gekennzeichnet durch die Merkmale es sind Bodenschwellen (205) vorhanden, die parallel zu den Längsstützwänden (207) ausgerichtet sind, die unterhalb des untersten Kammerringes oder der Bodenwanne (161) angeordnet sind und die eine Länge haben, die mindestens gleich der Breite von zwei Kammerringen oder Bodenwannen (161) ist, vorzugsweise sind die Bodenschwellen (205) in ihrer Längsrichtung in Bezug auf die Kammerringe oder Bodenwannen (161) um ein halbes Breitenmaß der Kammerringe oder Bodenwannen (161) gegenüber diesen versetzt angeordnet, die Bodenschwellen fluchten in der Längsrichtung miteinander und/oder zwei aufeinanderfolgende Bodenschwellen (205) sie sind seitlich zueinander versetzt angeordnet und in der Längsrichtung einander teilweise überlappend angeordnet.
Burial chamber according to one of claims 1 to 10,
characterized by the characteristics there are thresholds (205), which are aligned parallel to the longitudinal support walls (207), which are arranged below the lowest chamber ring or the floor pan (161) and which have a length which is at least equal to the width of two chamber rings or floor trays (161), the thresholds (205) are preferably offset in their longitudinal direction with respect to the chamber rings or floor trays (161) by half a width dimension of the chamber rings or floor trays (161), the thresholds are aligned with each other in the longitudinal direction and / or two successive thresholds (205) are laterally offset from one another and are partially overlapping in the longitudinal direction.
Grabkammer nach einem der Ansprüche 1 bis 11,
gekennzeichnet durch das Merkmal: die an den Kammerringen oder Bodenwannen (161) anliegenden Stützwände (181) weisen in der dem Kammerring oder der Bodenwanne (161) zugekehrten Wandfläche (183) eine oder mehrere von oben nach unten durchgehende Entwässerongsrillen (209) auf.
Burial chamber according to one of claims 1 to 11,
characterized by the characteristic: the support walls (181) abutting the chamber rings or floor troughs (161) have one or more drainage song grooves (209) running from top to bottom in the wall surface (183) facing the chamber ring or floor trough (161).
EP01107209A 1991-06-05 1992-06-03 Burial crypt Withdrawn EP1118737A3 (en)

Applications Claiming Priority (7)

Application Number Priority Date Filing Date Title
DE4118408 1991-06-05
DE19914118408 DE4118408A1 (en) 1991-06-05 1991-06-05 Burial chambers formed of pre-cast sections - chambers are watertight and ventilated through cover trough to ensure decomposition
DE9109653U 1991-08-03
DE9109652U DE9109652U1 (en) 1991-08-03 1991-08-03 Burial chamber
DE9109653U DE9109653U1 (en) 1991-08-03 1991-08-03 Burial chamber
DE9109652U 1991-08-03
EP92109351A EP0528124B1 (en) 1991-06-05 1992-06-03 Burial crypt

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
EP92109351A Division EP0528124B1 (en) 1991-06-05 1992-06-03 Burial crypt

Publications (2)

Publication Number Publication Date
EP1118737A2 true EP1118737A2 (en) 2001-07-25
EP1118737A3 EP1118737A3 (en) 2002-01-23

Family

ID=27202561

Family Applications (3)

Application Number Title Priority Date Filing Date
EP92109351A Expired - Lifetime EP0528124B1 (en) 1991-06-05 1992-06-03 Burial crypt
EP01107210A Withdrawn EP1118738A3 (en) 1991-06-05 1992-06-03 Burial crypt
EP01107209A Withdrawn EP1118737A3 (en) 1991-06-05 1992-06-03 Burial crypt

Family Applications Before (2)

Application Number Title Priority Date Filing Date
EP92109351A Expired - Lifetime EP0528124B1 (en) 1991-06-05 1992-06-03 Burial crypt
EP01107210A Withdrawn EP1118738A3 (en) 1991-06-05 1992-06-03 Burial crypt

Country Status (3)

Country Link
EP (3) EP0528124B1 (en)
AT (1) ATE207571T1 (en)
DE (1) DE59209925D1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1469145A1 (en) * 2003-04-17 2004-10-20 Brunhilde Suckfüll Re-usable tomb and tomb arrangement

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3537367A1 (en) 1985-10-21 1987-04-23 Gerhard Suckfuell Burial chamber

Family Cites Families (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
BE395521A (en) *
DE510244C (en) * 1930-10-17 Gustav Gresse Gravestone substructure
FR48301E (en) * 1936-10-21 1937-12-27 Monolithic vault
DE2059547A1 (en) * 1970-12-03 1972-06-08 Freinecker Karl Crypt
FR2133476A1 (en) * 1971-04-14 1972-12-01 Cordier Henri Burial vault construction - using panels having flat and corrugated sheet pref sealed with polyester resin coat
US3772826A (en) * 1971-05-27 1973-11-20 G Ferver Burial crypt and planter
FR2461795A1 (en) * 1979-07-18 1981-02-06 Augias Francis Individual burial chamber in concrete box form - has ventilated side and floor cavities with low pressure inner ventilation
DE3534327C1 (en) * 1985-09-26 1987-04-02 Franz Fichtl Prefabricated container forming coffin-receiving vault - comprises GRP trough and lid with perimeter holes allowing air circulation
FR2620753B1 (en) * 1987-09-18 1990-02-02 Tuyaux Bonna PROCESS FOR MANUFACTURING FUNERAL CELLARS AND CELLARS OBTAINED BY SAID METHOD
US4977652A (en) * 1989-11-13 1990-12-18 Gray Graham Tree forest cemetery
FR2663667A1 (en) * 1990-06-22 1991-12-27 Cardi Bernard Prefabricated tomb made of reinforced concrete

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3537367A1 (en) 1985-10-21 1987-04-23 Gerhard Suckfuell Burial chamber

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1469145A1 (en) * 2003-04-17 2004-10-20 Brunhilde Suckfüll Re-usable tomb and tomb arrangement

Also Published As

Publication number Publication date
EP1118738A2 (en) 2001-07-25
DE59209925D1 (en) 2001-11-29
EP1118738A3 (en) 2002-01-23
EP0528124B1 (en) 2001-10-24
EP1118737A3 (en) 2002-01-23
ATE207571T1 (en) 2001-11-15
EP0528124A1 (en) 1993-02-24

Similar Documents

Publication Publication Date Title
DE1941281C3 (en) Building
DE2920873C2 (en) Device for planting trees and the like, especially in traffic areas
DE2519232C3 (en) Plantable retaining wall
EP0322667B1 (en) Method for building a wall, construction element and connection slab for applying the method, and wall built by the method
EP0086489A1 (en) Waste water treatment plant
EP0826092B1 (en) Mobile collapsible flood barrier of horizontally s-toothed stackable sections
DE2253906B2 (en) ORNAMENTAL GARDEN ARRANGED ON A SUPPORTING SURFACE, PREFERABLY A FLAT ROOF
DE2242131C3 (en) Transformer station, substation or the like
EP1118737A2 (en) Burial crypt
DE2724224C3 (en) Drainage element for the production of drainage lines designed as a hollow wall as well as a soil drainage system formed from drainage elements
DE4400183A1 (en) Hexagonal drainage elements assembled as drainage lining for open refuse tip
DE4236193A1 (en) Underground-drain access shaft - is in plastic annular sections forming double wall filled with free-flowing and hardening material
DE3507240A1 (en) Landfill site, in particular for storing special refuse
DE9109652U1 (en) Burial chamber
DE4118408A1 (en) Burial chambers formed of pre-cast sections - chambers are watertight and ventilated through cover trough to ensure decomposition
EP2363532A1 (en) Plant trough as stackable module
DE102019108576A1 (en) Device and method for water level regulation
DE8809824U1 (en) Hollow floor
DE2313316A1 (en) SQUARE SHAPED FORMWORK FOR SUPPORTING WALLS
DE19613380C1 (en) Tomb chamber ventilation system
EP1469145B1 (en) Re-usable tomb and tomb arrangement
DE4223874C2 (en) Flat support plate for composting and bio filter systems
EP0139031A1 (en) Set of stones for vertical composite walls
DE3714742C2 (en)
DE2845556C2 (en) Roller trough made of prefabricated reinforced concrete parts for a wastewater treatment plant that works according to the disc immersion drip method

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AC Divisional application: reference to earlier application

Ref document number: 528124

Country of ref document: EP

AK Designated contracting states

Kind code of ref document: A2

Designated state(s): AT BE CH DE DK FR LI NL

PUAL Search report despatched

Free format text: ORIGINAL CODE: 0009013

AK Designated contracting states

Kind code of ref document: A3

Designated state(s): AT BE CH DE DK FR LI NL

AKX Designation fees paid

Free format text: AT BE CH DE DK FR LI NL

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN

18D Application deemed to be withdrawn

Effective date: 20020724