EP1118737A2 - Burial crypt - Google Patents
Burial crypt Download PDFInfo
- Publication number
- EP1118737A2 EP1118737A2 EP01107209A EP01107209A EP1118737A2 EP 1118737 A2 EP1118737 A2 EP 1118737A2 EP 01107209 A EP01107209 A EP 01107209A EP 01107209 A EP01107209 A EP 01107209A EP 1118737 A2 EP1118737 A2 EP 1118737A2
- Authority
- EP
- European Patent Office
- Prior art keywords
- chamber
- burial
- support walls
- floor
- walls
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H13/00—Monuments; Tombs; Burial vaults; Columbaria
Definitions
- gas passages which are designed so that leachate not in the gas lock and through this into the Burial chamber can penetrate.
- this burial chamber narrow ceiling tile that always remains in this place. It serves as a support plate for a foundation block for the Shot of a gravestone.
- This well-known burial chamber has some disadvantages.
- One of Disadvantages is that their chamber rings are loosely placed on top of each other and the bottom chamber ring are loose on the base plate lies on. There is also a in the base plate Opening above a bone pit, which is only loose by means of a plate is covered. The ceiling tiles also lie loosely on the top chamber ring. This can cause leachate penetrate into the burial chamber from the surrounding area, from high groundwater or stratified water remain silent. This can cause the process of decay in the burial chamber be significantly affected. In practice also very often omitted the base plate, so that the Burial chamber also from below for the penetration of water, in particular of groundwater and backwater, is open.
- Another major disadvantage of this burial chamber is in that at each subsequent opening of the grave for subsequent burial or the earth cover for burial again cleared away with the planting on it and set aside must be created and that after burial the Earth cover can be applied again on the burial chamber got to.
- the planting must also be cleared first and are practically completely renewed. That causes at each subsequent burial a significant one Workload with corresponding costs. This creates often also additional costs for an at least partial Replacement of the planting if it is removed suffered.
- the earth cover must be outside the Ground plan area of the burial chamber are removed. Moreover must in this area, i.e. from the top of the burial chamber to the earth level, a hem formwork to be installed, the the collapse of the earth around the burial chamber prevented. This hem formwork must again afterwards be removed, both when installing and removing corresponding work required and accordingly Costs.
- this burial chamber is use as a recessed burial chamber in which two superimposed chamber areas are available for Place the second coffin above the one already in the Lower coffin located in the burial chamber Support rods required to place the upper coffin on it can be.
- This has the further disadvantage that at the second burial the burial chamber into the lower chamber area is open and that the lower coffin is fully visible, regardless of the Condition of the coffin and its contents. The same applies to the exhalations that may emanate from the lower coffin the decomposition process. This is particularly uncomfortable if this process of decay is due to the temporal Distance from the previous burial is in full swing. This allows for the participants in the second burial just unreasonable conditions occur.
- This burial chamber Another disadvantage of this burial chamber is that after the refilling of the earth cover a setting of the soil is inevitable. Therefore, this earth cover must a certain time either from what was left at first Excavation or supplemented with otherwise obtained soil become. This fact also has the disadvantage that the planting was only reintroduced after this setting time can be. Otherwise one must be used immediately Planting removed in between and after Complement the earth cover to be reintroduced.
- the invention has for its object a burial chamber to create prefabricated parts that are relatively simple is to be built in, the trouble-free decomposition process enables and easier at subsequent burials and easier and with less labor and cost possible are.
- the longitudinal support walls have a greater length, can hold a whole group of burial chambers within the retaining walls be accommodated.
- the longitudinal support walls are equal to the length of the chamber parts, are the longitudinal support walls in this height range on the Parts of the chamber.
- the retaining walls are built in and then in place and Position, make sure that if one of the Burial chambers for burial, especially for subsequent burial, is opened, no soil from the area in fall into the burial chamber or even in large quantities can break in. This is after installing the retaining walls and the burial chambers in the outside area no earthworks more needed.
- the lid of the burial chamber is designed as a trough is housed in the earth cover for the gas lock is both as a gas filter and as a planting soil for planting can be used for any subsequent Burial of the trough serving as a lid with all of it Content lifted and apart for the time of burial be stored.
- the planting remains completely undisturbed, since they are neither removed nor stored separately must become.
- Trough properly maintained. Neither are they other earthworks required, such as that with the known Burial chamber is necessary. It goes without saying the area around the gas lock is also untouched. The gas lock is therefore not at risk of damage. It the subsequent refilling of the Earth cover with the corresponding personnel expenditure and Expense. There is no need to replant the grave as well.
- the Any number of available burial chambers enlarge.
- the support walls set up at the same level as the chamber rings become.
- the retaining walls are not only made up of the filling material supported from the outside but at the same time also complaining what their stability is greatly increased.
- the support walls by the weight of the Burial chambers weighed down, so that also their stability is increased.
- Spacer ensures that the chamber rings or Floor trays are not accidentally too close together are set up and therefore their troughs too dense stand side by side, which makes lifting and sitting down of a single trough could be difficult.
- the spacers not be used separately.
- the Kemmerrings or Floor trays hold the right mutual ones by themselves Distance, while also supporting each other, so that unevenness of the surface on which it is placed not to an inclination of adjacent chamber rings or floor trays.
- an embodiment according to claim 11 can local irregularities of the bottom of the pit for the Burial chambers, in particular locally different load capacities of the ground, through which the foot thresholds balance, because the thresholds are much longer than the width of the individual chamber rings or floor trays can. Especially with an overlapping arrangement of the Thresholds practically result in one Leveling of the contact surface of the chamber rings or floor trays.
- the burial chamber 160 shown in FIG. 1 has one Chamber part in the form of a floor pan 161 and a trough 162 on.
- the trough 162 serves as a cover for the floor pan 161.
- the floor pan 161 has an annularly closed peripheral wall 163, which has a rectangular plan area. At the a bottom 164 connects to the lower end of the peripheral wall 163, which is made in one piece with the peripheral wall 163 is.
- the floor pan 161 is made of reinforced concrete.
- the upper edge of the floor pan 161 is encircling Edge profile 165 provided. It is through a gutter 166 formed, which has a V-shaped cross section. she is arranged symmetrically to the center plane of the peripheral wall 163.
- the trough 162 is designed similar to the floor pan 161. He has an annular closed peripheral wall 167 and one Bottom 168 produced in one piece therewith. His top Edge 169 is flat. At the bottom of the bottom 168 is in the continuation of the peripheral wall 167 a peripheral edge profile 171 available, as a counter profile to the upper edge profile 165 of the floor pan 161 is formed. It is through a circumferential roof-shaped rib 172 is formed, the fits exactly into the groove 166.
- the trough 162 has a certain clear height, which in general is about 60 cm. At a certain height above that Bottom 168, trough 162 has a series of drainage openings 173 on. The trough 162 takes an earth cover 174 on.
- Gas locks are arranged in the trough 162, which is a gas and air exchange between the interior of the Allow burial chamber 160 and the surrounding area.
- the floor trays 161 a spacer on each of its long sides 175 on. It is designed as a rib 176 and with the Circumferential wall 163 made in one piece.
- the ribs 176 start a certain distance above the bottom of the Bottom 164 and also end a certain distance below the upper edge of the peripheral wall 163 (Fig. 2).
- the Ribs 176 are aligned vertically.
- the Bottom tray 161 is designed to be symmetrical on the envelope. This supports two adjacent burial chambers 160 on their long sides alternately against each other from (Fig. 4).
- Fig. 4 is the group of burial chambers 160 surrounded by two pairs of retaining walls, each in pairs are aligned parallel to each other and with each other are aligned at right angles to each other.
- longitudinal support walls 181 Support walls referred to as transverse support walls 182. From the latter only one is shown in FIG. The other is as to be seen standing outside the drawing sheet.
- the longitudinal support walls 181 a mutual distance in the height range the floor pan 161 is equal to the length of the floor pan 161.
- the wall section 181.1 located in this height range lies with its wall surface facing the burial chamber 160 183 on the outside of the floor pan 161, namely their narrow side, immediately.
- the wall section 181.2 of the trough 162 is the wall surface 184 against the wall surface 183 by a certain one Measure about 2 to 3 cm, so that between the Wall section 181.2 and the outside of the trough 162 corresponding gap 165 remains open. This will make it Lifting and lifting the trough 162 and reinserting it and depositing the trough 162 on the floor pan 161 facilitated.
- the gap between the trough and the retaining walls can also be created in that the Outside of the peripheral wall 167 by a corresponding amount is reset and the support walls 181 and 182 continuously have flat wall surfaces.
- the transverse support walls 182 are between the two longitudinal support walls 181 arranged.
- the width of the transverse support walls 182 is therefore equal to the clear distance of the longitudinal support walls 181. Da this distance for the wall sections 181.1 and 181.2 is of different sizes, the transverse support wall 182 also has a different width (Fig. 5).
- the one below Wall section 182.1 has a width that is equal to the distance of the wall surfaces is 183.
- the wall section 182.2 has one Width, which is equal to the distance between the wall surfaces 184.
- the transverse support wall 182 In view of that adjacent to the transverse support wall 182 Grave chamber 160 (Fig. 4) only one spacer in The shape of the rib 176 is present, the transverse support wall 182 also provided with a spacer 187, which as in the bottom tubs 161 is formed as a rib 188 and in generally the same shape as the ribs 176, in each But the same height as this one.
- the transverse support wall 182 without executing their spacer 187 and remove it if necessary.
- it is the wall surface 191 of the wall section facing the burial chambers 160 182.2 by a certain amount of about 2 to 3 cm opposite the wall surface 192 of the wall section 182.2 reset like that regarding the wall surfaces of the inside of the longitudinal support walls 181 has been explained. If this If this does not occur, the transverse support wall 182 can pass over it entire height have a constant wall thickness.
- Fig. 1 and Fig. 5 is a modification of the longitudinal support walls 181 and the transverse support walls 182 indicated by dash-dotted lines.
- This modification relates to a baseboard 193 the longitudinal support walls 181 and a skirting 194 in the Cross support walls 182.
- These baseboards are general on the outside of the Retaining walls arranged. If necessary, they are with the relevant support wall made in one piece, it also It is appropriate that the steel reinforcement of the retaining wall at least a certain distance up to the baseboard continued into it. Meet these baseboards two tasks. Firstly, they increase the footprint or bottom surface of the associated retaining wall, whereby is caused by the weight of the retaining wall Surface pressure in the floor below the retaining wall decreased. On the other hand, they increase the stability of the assigned retaining wall by acting on it Weight force of the above the baseboard Padding material.
- cover plates 201 are provided for this are similar to the cover plates 196 and with a Web part are provided, which is matched to the gap 185 is. These cover plates 201 also expediently extend on the one hand up to the inner edge 202 of the transverse wall 203 of the trough 162 and on the other hand to the outer edge 204 of the longitudinal support wall 181.
- the burial chambers 160 rest on thresholds 205. These are arranged in two rows parallel to the longitudinal support walls the group of burial chambers 160 are aligned.
- the Bumps 205 have a length that is a multiple of that Width of the burial chambers 160.
- the thresholds 205 can be arranged one behind the other in their longitudinal direction be cursed with each other. It is more convenient arrange them laterally offset and at the same time in to arrange their longitudinal direction so that they partially each other overlap (Fig. 9). It is appropriate that the Overlap area in the area of the long side of a burial chamber 160 is located (Fig. 9).
- the support walls 207 used here the height of the thresholds 205 higher than the burial chambers 160 executed so that its upper edge 208 again same height with the upper edge 169 of the troughs 162. Otherwise, the support walls 207 are largely the same Support walls 181 and 182 formed.
- the individual burial chambers 160 have due to the spacers 175 sufficient in the area of their long sides large mutual distance. Through this space this can be done from troughs 162 through the drainage openings 173 (Fig. 1) leaking water, for example Rain water or excess water, without further ado flow away. Since on the narrow sides of the floor troughs 161 Wall section 181.1 of the longitudinal support walls 181 is tight it is expedient in this wall section 181.1 or several continuous drainage grooves from top to bottom 209 to be provided. Then this can also be done in the area of Narrow sides of the troughs 162 leaking water more easily flow away.
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Revetment (AREA)
- Catching Or Destruction (AREA)
- Feeding And Watering For Cattle Raising And Animal Husbandry (AREA)
- Pens And Brushes (AREA)
- Physical Deposition Of Substances That Are Components Of Semiconductor Devices (AREA)
- Pusher Or Impeller Conveyors (AREA)
- Sewage (AREA)
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
- Filling Or Discharging Of Gas Storage Vessels (AREA)
Abstract
Description
Die herkömmliche Erdbestattung kann unter ungünstigen Umständen erhebliche Probleme mit sich bringen. Bei ungünstiger mineralogischer Zusammensetzung des Erdbodens, z.B. bei hohem Schluff- oder Tonanteil, und auch bei ungünstiger Wasserführung, z.B. bei häufigem Stauwasser, bei Schichtwasser, bei Haftwasser oder bei hochstehendem Grundwasser, ist eine vollständige Verwesung innerhalb einer bestimmten Ruhezeit nicht gewährleistet. Die für die Verwesung wichtigen aeroben Bakterien können nicht wirksam werden und die notwendigen Oxidationsvorgänge können nicht stattfinden. Das erfordert oft teuere Meliorationsmaßnahmen, z.B. Entwässerungsmaßnahmen oder künstliche Belüftung des Bodens. Manchmal hilft nur das Auffüllen des Bodens, was praktisch auf eine Neuanlage des betreffenden Gräberfeldes hinausläuft. Trotz der zuerst genannten Maßnahmen kann die Wiederbelegung eines Gräberfeldes nach Ablauf der üblichen Ruhezeit mit unangenehmen und für das Friedhofspersonal manchmal unzumutbaren Begleiterscheinungen belastet sein.Conventional burial can be unfavorable May cause significant problems. With less favorable mineralogical composition of the soil, e.g. with high silt or clay content, and also with unfavorable Water supply, e.g. with frequent backwater, with layer water, with sticky water or with high groundwater, is a complete decay within a certain one Rest period not guaranteed. The important ones for decay aerobic bacteria cannot take effect and that necessary oxidation processes cannot take place. The often requires expensive remediation measures, e.g. Drainage measures or artificial ventilation of the floor. Sometimes only helps filling the floor, which is practical on a new creation of the relevant burial ground results. Despite the measures mentioned first, the reoccupation of a burial ground after the usual rest period unpleasant and sometimes unacceptable for the cemetery staff Side effects may be burdened.
Eine Abhilfe wurde mit einer wiederverwertbaren Grabkammer versucht (DE-OS 35 37 367.9), die größtenteils aus Betonfertigteilen besteht. Sie weist mehrere Kammerringe auf, die in einer Grube aufeinandergestellt werden, wobei sie durch umlaufende Absätze sowohl am oberen wie auch am unteren Rand der Kammerringe untereinander geführt werden. An der untersten Stelle befindet sich eine Basisplatte, auf die die Kammerringe lose aufgesetzt sind. Auf dem obersten Kammerring sind Deckenplatten aufgelegt, die den Innenraum der Grabkammer nach oben abschließen. Diese Deckenplatten befinden sich etwa 60 cm unter dem Erdniveau. Der Zwischenraum wird mit Erde, insbesondere mit Mutterboden, bis zum Erdniveau aufgefüllt. Diese Erdabdeckung der Grabkammer umschließt eine Gasschleuse, die auf eine Durchlaßöffnung in einer der Deckenplatten aufgesetzt ist. Sie hat Gasdurchtrittsöffnungen, die so gestaltet sind, daß Sickerwasser nicht in die Gasschleuse und durch diese hindurch in die Grabkammer eindringen kann. Bei einem in der Grabkammer entstehenden Überdruck der dortigen Gasathmosphäre, z.B. beim Absinken des athmosphärischen Luftdruckes, vermag ein Teil des Gasinhaltes der Grabkammer durch die Gasschleuse und ihre Gasdurchtrittsöffnungen hindurch auszutreten. Deshalb müssen die Gasdurchtrittsöffnungen der Gasschleuse um ein bestimmtes Maß unterhalb des Erdniveaus liegen, oder, anders ausgedrückt, es muß oberhalb der Gasaustrittsöffnungen noch eine gewisse Schichtdicke der Erdabdeckung verbleiben, damit diese Erdschicht als Filter wirken kann, in dem die Bodenfauna und Flora die aus der Grabkammer austretenden Gase von denjenigen Bestandteilen befreien, die Geruchsbelästigungen auslösen könnten.A remedy was with a reusable burial chamber tried (DE-OS 35 37 367.9), mostly made of precast concrete consists. It has several chamber rings that be stacked on top of each other in a pit, passing through circulating paragraphs both at the top and at the bottom the chamber rings are guided among themselves. At the The lowest point is a base plate on which the Chamber rings are loosely placed. On the top chamber ring are ceiling tiles that cover the interior of the Complete the burial chamber at the top. These ceiling tiles are about 60 cm below ground level. The gap is with soil, especially with topsoil, until Earth level filled up. This earth cover of the burial chamber encloses a gas lock that opens into a passage one of the ceiling panels is attached. It has gas passages, which are designed so that leachate not in the gas lock and through this into the Burial chamber can penetrate. One in the burial chamber resulting overpressure of the gas atmosphere there, e.g. when the atmospheric pressure drops, is able to Part of the gas content of the burial chamber through the gas lock and exit through their gas passages. Therefore the gas passage openings of the gas lock must a certain amount below earth level, or, in other words, it must be above the gas outlet a certain layer thickness of the earth cover remains, so that this layer of earth can act as a filter, in where the soil fauna and flora emerge from the burial chamber Free gases from those components that Could cause unpleasant smells.
An einer Stirnseite dieser Grabkammer befindet sich eine schmale Deckenplatte, die stets an dieser Stelle verbleibt. Sie dient als Tragplatte für einen Fundamentblock für die Aufnahme eines Grabsteins.There is one on one end of this burial chamber narrow ceiling tile that always remains in this place. It serves as a support plate for a foundation block for the Shot of a gravestone.
Diese bekannte Grabkammer hat einige Nachteile. Einer der Nachteile ist, daß ihre Kammerringe lose aufeinandergesetzt sind und der unterste Kammerring lose auf der Basisplatte aufliegt. In der Basisplatte befindet sich zudem eine Öffnung über einer Knochengrube, die nur lose mittels einer Platte abgedeckt wird. Auch die Deckenplatten liegen lose auf dem obersten Kammerring auf. Dadurch kann Sickerwasser aus der Umgebung in die Grabkammer eindringen, von hochstehendem Grundwasser oder Schichtwasser ganz zu schweigen. Dadurch kann der Verwesungsprozeß in der Grabkammer erheblich beeinträchtigt werden. In der Praxis wird zudem sehr häufig die Basisplatte weggelassen, so daß die Grabkammer auch von unten her für das Eindringen von Wasser, insbesondere von Grundwasser und Stauwasser, offen ist. Dieser Aufbau und diese Einbauweise der bekannten Grabkammer erfordert es, jede Grabkammer an ein Drainagesystem anzuschließen, damit das eindringende Wasser so bald wie möglich abgeführt und zu einer Kläranlage geleitet werden kann. Diese zusätzliche Drainage verursacht erhebliche Kosten beim Einbau und bei der Unterhaltung der Drainage. Außerdem entstehen für die Klärung der abgeleiteten Wassermengen weitere Kosten.This well-known burial chamber has some disadvantages. One of Disadvantages is that their chamber rings are loosely placed on top of each other and the bottom chamber ring are loose on the base plate lies on. There is also a in the base plate Opening above a bone pit, which is only loose by means of a plate is covered. The ceiling tiles also lie loosely on the top chamber ring. This can cause leachate penetrate into the burial chamber from the surrounding area, from high groundwater or stratified water remain silent. This can cause the process of decay in the burial chamber be significantly affected. In practice also very often omitted the base plate, so that the Burial chamber also from below for the penetration of water, in particular of groundwater and backwater, is open. This structure and this way of installing the well-known burial chamber it is necessary to connect each burial chamber to a drainage system, so that the penetrating water as soon as possible can be discharged and sent to a sewage treatment plant. This additional drainage causes significant costs in the Installation and maintenance of the drainage. Moreover arise for the clarification of the discharged water quantities additional costs.
Ein weiterer großer Nachteil dieser Grabkammer besteht darin, daß bei jeder folgenden Graböffnung zwecks Nachbestattung oder zwecks erneuter Bestattung die Erdabdeckung mit der darauf befindlichen Bepflanzung abgeräumt und beiseite geschafft werden muß und daß nach der Bestattung die Erdabdeckung wieder auf der Grabkammer aufgebracht werden muß. Dabei muß zuvor auch die Bepflanzung zunächst abgeräumt werden und praktisch vollständig erneuert werden. Das verursacht bei jeder folgenden Bestattung einen erheblichen Arbeitsaufwand mit entsprechenden Kosten. Dabei entstehen häufig auch zusätzliche Kosten für einen zumindest teilweisen Ersatz der Bepflanzung wenn diese beim Herausnehmen gelitten hat.Another major disadvantage of this burial chamber is in that at each subsequent opening of the grave for subsequent burial or the earth cover for burial again cleared away with the planting on it and set aside must be created and that after burial the Earth cover can be applied again on the burial chamber got to. The planting must also be cleared first and are practically completely renewed. That causes at each subsequent burial a significant one Workload with corresponding costs. This creates often also additional costs for an at least partial Replacement of the planting if it is removed suffered.
Bei diesen Arbeiten muß die Erdabdeckung bis außerhalb des Grundrißbereiches der Grabkammer abgetragen werden. Außerdem muß in diesem Bereich, d.h. vom oberen Rand der Grabkammer bis zum Erdniveau, eine Saumschalung eingebaut werden, die das Einbrechen des Erdbereiches in der Umgebung der Grabkammer verhindert. Diese Saumschalung muß nachher wieder entfernt werden, was sowohl beim Einbau wie auch beim Ausbau entsprechende Arbeitsleistungen erfordert und dementsprechend Kosten verursacht. During this work, the earth cover must be outside the Ground plan area of the burial chamber are removed. Moreover must in this area, i.e. from the top of the burial chamber to the earth level, a hem formwork to be installed, the the collapse of the earth around the burial chamber prevented. This hem formwork must again afterwards be removed, both when installing and removing corresponding work required and accordingly Costs.
Ein weiterer Nachteil dieser Grabkammer ist der, daß sie bei einer Verwendung als vertiefte Grabkammer, bei der zwei übereinanderliegende Kammerbereiche vorhanden sind, für das Unterbringen des zweiten Sarges oberhalb des bereits in der Grabkammer befindlichen unteren Sarges das Einbringen von Stützstäben erfordert, damit darauf der obere Sarg abgestellt werden kann. Das hat den weiteren Nachteil zur Folge, daß bei der zweiten Bestattung die Grabkammer bis in den unteren Kammerbereich hinein offen ist und daß dadurch der untere Sarg voll sichtbar ist, ohne Rücksicht auf den Zustand des Sarges und seines Inhaltes. Des gleiche gilt für die vom unteren Sarg möglicherweise ausgehenden Ausdünstungen des Verwesungsprozesses. Das ist besonders unangenehm, wenn dieser Verwesungsprozeß aufgrund des zeitlichen Abstandes der vorangehenden Bestattung in vollem Gange ist. Dadurch können für die Teilnehmer an der zweiten Bestattung nachgerade unzumutbare Verhältnisse auftreten.Another disadvantage of this burial chamber is that it is use as a recessed burial chamber in which two superimposed chamber areas are available for Place the second coffin above the one already in the Lower coffin located in the burial chamber Support rods required to place the upper coffin on it can be. This has the further disadvantage that at the second burial the burial chamber into the lower chamber area is open and that the lower coffin is fully visible, regardless of the Condition of the coffin and its contents. The same applies to the exhalations that may emanate from the lower coffin the decomposition process. This is particularly uncomfortable if this process of decay is due to the temporal Distance from the previous burial is in full swing. This allows for the participants in the second burial just unreasonable conditions occur.
Ein weiterer Nachteil dieser Grabkammer ist der, daß nach dem erneuten Einfüllen der Erdabdeckung ein Setzen des Erdreiches unvermeidlich ist. Daher muß diese Erdabdeckung nach einer gewissen Zeit entweder aus zunächst übriggebliebenem Erdaushub oder mit anderweitig beschafftem Erdreich ergänzt werden. Dieser Umstand hat auch den Nachteil zur Folge, daß die Bepflanzung erst nach dieser Setzzeit wieder eingebracht werden kann. Andernfalls muß eine sofort eingesetzte Bepflanzung zwischendurch wieder entfernt und nach dem Ergänzen der Erdabdeckung wieder eingebracht werden.Another disadvantage of this burial chamber is that after the refilling of the earth cover a setting of the soil is inevitable. Therefore, this earth cover must a certain time either from what was left at first Excavation or supplemented with otherwise obtained soil become. This fact also has the disadvantage that the planting was only reintroduced after this setting time can be. Otherwise one must be used immediately Planting removed in between and after Complement the earth cover to be reintroduced.
Der Erfindung liegt die Aufgabe zugrunde, eine Grabkammer aus Fertigbauteilen zu schaffen, die verhältnismäßig einfach einzubauen ist, die einen störungsfreien Verwesungsprozeß ermöglicht und bei der nachfolgende Bestattungen einfacher und leichter und mit geringerem Arbeits- und Kostenaufwand möglich sind. The invention has for its object a burial chamber to create prefabricated parts that are relatively simple is to be built in, the trouble-free decomposition process enables and easier at subsequent burials and easier and with less labor and cost possible are.
Dadurch, daß die Längsstützwände eine größere Länge haben, kann innerhalb der Stützwände eine ganze Gruppe von Grabkammern untergebracht werden.Because the longitudinal support walls have a greater length, can hold a whole group of burial chambers within the retaining walls be accommodated.
Dadurch, daß im Höhenbereich von der Unterkante bis höchstens zur Oberkante der Kammerteile der gegenseitige Abstand der Längsstützwände gleich der Länge der Kammerteile ist, liegen die Längsstützwände in diesem Höhenberich an den Kammerteilen an. Dadurch, daß in dem darüberliegenden Höhenbereich die Längsstützwände einen gegenseitigen Abstand haben, der größer als die Länge der Kammerteile und damit größer als die Länge der mit den Kammerteilen fluchtenden Trögen ist, ist in diesem Höhenbereich ein ausreichender Abstand zwischen den Trögen und den sie umgebenden Stützwänden vorhanden. Entsprechendes gilt für die Querstützwände.Because in the height range from the lower edge to at most the mutual distance to the upper edge of the chamber parts the longitudinal support walls are equal to the length of the chamber parts, are the longitudinal support walls in this height range on the Parts of the chamber. The fact that in the height range above the longitudinal support walls a mutual distance have the greater than the length of the chamber parts and thus greater than the length of those aligned with the chamber parts Is trough, is sufficient at this altitude Distance between the troughs and the supporting walls surrounding them available. The same applies to the transverse support walls.
Da die Stützwände fest eingebaut werden und dann an Ort und Stelle verbleiben, sorgen sie dafür, daß dann, wenn eine der Grabkammern für eine Bestattung, insbesondere für eine Nachbestattung, geöffnet wird, kein Erdreich aus der Umgebung in die Grabkammer hineinfallen oder gar in größerer Menge hineinbrechen kann. Dadurch sind nach dem Einbau der Stützwände und der Grabkammern in deren Außenbereich keine Erdarbeiten mehr erforderlich.Since the retaining walls are built in and then in place and Position, make sure that if one of the Burial chambers for burial, especially for subsequent burial, is opened, no soil from the area in fall into the burial chamber or even in large quantities can break in. This is after installing the retaining walls and the burial chambers in the outside area no earthworks more needed.
Dadurch, daß der Deckel der Grabkammer als Trog ausgebildet ist, in dem die Erdabdeckung für die Gasschleuse untergebracht ist, die sowohl als Gasfilter wie auch als Pflanzboden für die Befplanzung dient, kann bei jeder folgenden Bestattung der als Deckel dienende Trog mit seinem gesamten Inhalt abgehoben und für die Zeit der Bestattung abseits gelagert werden. Dabei bleibt die Bepflanzung völlig ungestört, da sie weder herausgenommen noch gesondert gelagert werden muß. Sie kann im Gegenteil in der Zwischenzeit im Trog sachgerecht gepflegt werden. Es sind auch keinerlei sonstige Erdarbeiten erforderlich, wie das bei der bekannten Grabkammer notwenig ist. Dabei bleibt selbstverständlich auch die Umgebung der Gasschleuse unberührt. Die Gasschleuse ist daher keiner Gefahr einer Beschädigung ausgesetzt. Es entfällt damit auch das nachträgliche Wiedereinfüllen der Erdabdeckung mit dem entsprechenden Personalaufwand und Kostenaufwand. Das erneute Bepflanzen des Grabes entfällt ebenso.Because the lid of the burial chamber is designed as a trough is housed in the earth cover for the gas lock is both as a gas filter and as a planting soil for planting can be used for any subsequent Burial of the trough serving as a lid with all of it Content lifted and apart for the time of burial be stored. The planting remains completely undisturbed, since they are neither removed nor stored separately must become. On the contrary, in the meantime, Trough properly maintained. Neither are they other earthworks required, such as that with the known Burial chamber is necessary. It goes without saying the area around the gas lock is also untouched. The gas lock is therefore not at risk of damage. It the subsequent refilling of the Earth cover with the corresponding personnel expenditure and Expense. There is no need to replant the grave as well.
Durch eine Ausgestaltung nach Anspruch 2 läßt sich die Anzahl der verfügbaren Grabkammern praktisch beliebig vergrößern.By an embodiment according to claim 2, the Any number of available burial chambers enlarge.
Durch eine Ausgestaltung nach Anspruch 3 wird eine besonders enge Trennfuge zwischen den Längsstützwänden und den Querstützwänden erreicht, so daß besondere Abdichtungsmaßnahmen entfallen können.By an embodiment according to claim 3 particularly narrow joint between the longitudinal support walls and reached the transverse support walls, so that special sealing measures can be omitted.
Bei einer Ausgestaltung nach Anspruch 4 können die Stützwände auf dem gleichen Erdniveau wie die Kammerringe aufgestellt werden. Durch eine Ausgestaltung nach Anspruch 5 werden die Stützwände durch das Auffüllmaterial nicht nur von außen abgestützt sondern zugleich auch beschwert, was ihre Standfestigkeit stark erhöht. Bei einer Ausgestaltung nach Anspruch 6 werden die Stützwände durch das Gewicht der Grabkammern beschwert, so daß auch dadurch ihre Standfestigkeit erhöht wird.In an embodiment according to claim 4, the support walls set up at the same level as the chamber rings become. By an embodiment according to claim 5 the retaining walls are not only made up of the filling material supported from the outside but at the same time also complaining what their stability is greatly increased. In one configuration according to claim 6, the support walls by the weight of the Burial chambers weighed down, so that also their stability is increased.
Mit einer Ausgestaltung nach Anspruch 7 wird durch die Abstandshalter gewährleistet, daß die Kammerringe oder Bodenwannen nicht versehentlich zu dicht nebeneinander aufgestellt werden und dadurch auch ihre Tröge zu dicht nebeneinander stehen, wodurch das Herausheben und Hineinsetzen eines einzelnen Troges erschwert werden könnte. Bei der Weiterbildung nach Anspruch 8 müssen die Abstandshalter nicht gesondert eingesetzt werden. Die Kemmerringe oder Bodenwannen halten von selbst den richtigen gegenseitigen Abstand ein, wobei sie sich außerdem gegenseitig abstützen, so daß Unebenheiten des Untergrundes, auf dem sie aufgesetzt werden, nicht zu einer Schrägstellung benachbarter Kammerringe oder Bodenwannen führen kann.With an embodiment according to claim 7 Spacer ensures that the chamber rings or Floor trays are not accidentally too close together are set up and therefore their troughs too dense stand side by side, which makes lifting and sitting down of a single trough could be difficult. At the training according to claim 8, the spacers not be used separately. The Kemmerrings or Floor trays hold the right mutual ones by themselves Distance, while also supporting each other, so that unevenness of the surface on which it is placed not to an inclination of adjacent chamber rings or floor trays.
Mit einer Ausgestaltung nach Anspruch 9 werden einerseits offene Spalten zwischen den einzelnen Grabkammern vermieden und außerdem die Möglichkeit geschaffen, die Grabkammern mit einem so großen gegenseitigen Abstand anzuordnen und dafür die Abdeckplatten so breit zu machen, daß man darauf auch quer zur Grabkammer gut stehen kann, ohne auf die Erdabdeckung der benachbarten Grabkammer zu treten. Ähnliches gilt auch bei einer Ausgestaltung nach Anspruch 10 für den Spalt zwischen den Schmalseiten der Grabkammern und den benachbarten Längsstützwänden, wenngleich dort die Breite der Abdeckplatten geringer gehalten werden kann, weil entlang der Längsstützwände ohnehin wenigstens auf einer Seite ein Fußweg oder gar ein Fahrweg vorgesehen wird, über den die einzelnen Grabkammern zu erreichen sind.With an embodiment according to claim 9 on the one hand Avoid open gaps between the individual burial chambers and also created the opportunity to use the burial chambers such a large mutual distance and for that to make the cover plates so wide that you can put them on can stand well across the burial chamber without having to cover the earth to enter the neighboring burial chamber. Similar thing also applies to an embodiment according to claim 10 Gap between the narrow sides of the burial chambers and the adjacent longitudinal support walls, although there the width the cover plates can be kept lower because anyway along the longitudinal support walls at least on one Side a footpath or even a driveway is provided over which the individual burial chambers can be reached.
Mit einer Ausgestaltung nach Anspruch 11 lassen sich örtliche Unregelmäßigkeiten des Bodens der Grube für die Grabkammern, insbesondere örtlich unterschiedliche Tragfähigkeiten des Bodens, durch die Fußschwellen ausgleichen, weil die Bodenschwellen wesentlich länger als die Breite der einzelnen Kammerringe oder Bodenwannen ausgeführt werden können. Vor allem bei einer überlappenden Anordnung der Bodenschwellen ergibt sie praktisch von selbst eine Nivelierung der Auflagefläche der Kammerringe oder Bodenwannen.With an embodiment according to claim 11 can local irregularities of the bottom of the pit for the Burial chambers, in particular locally different load capacities of the ground, through which the foot thresholds balance, because the thresholds are much longer than the width of the individual chamber rings or floor trays can. Especially with an overlapping arrangement of the Thresholds practically result in one Leveling of the contact surface of the chamber rings or floor trays.
Durch eine Ausgestaltung nach Anspruch 12 wird dafür gesorgt, daß das beispielsweise aus den Trögen austretende Wasser sich nicht zwischen dem Trog und der benachbarten Stützwand stauen kann, sondern sofort bis unterhalb der Kammerringe ablaufen kann. Through an embodiment according to claim 12 worried that the exiting from the troughs, for example Water does not get between the trough and the neighboring one Retaining wall can jam, but immediately to below the Chamber rings can expire.
Im folgenden wird die Erfindung anhand mehrerer in der Zeichnung dargestellter Ausführungsbeispiele näher erläutert. Es zeigen:
- Fig. 1
- einen Längsschnitt einer Grabkammer und einen Querschnitt zweier Längsstützwände;
- Fig. 2
- einen Querschnitt der Grabkammer nach Fig. 1;
- Fig. 3
- eine Draufsicht einer einzelnen Grabkammer nach Fig. 1;
- Fig. 4
- eine ausschnittweise dargestellte Draufsicht einer Gruppe von Grabkammern, zum Teil bei abgenommener Abdeckung;
- Fig. 5
- eine Ansicht einer Querstützwand;
- Fig. 6
- eine Seitenansicht der Querstützwand nach Fig. 5;
- Fig. 7
- einen ausschnittweise und vergrößert dargestellten Querschnitt zweier benachbarter Grabkammern;
- Fig. 8
- einen ausschnittweise dargestellten Querschnitt einer Grabkammer mit abgewandelter Längsstützwand und mit einer Bodenschwelle;
- Fig. 9
- eine Draufsicht auf zwei Grabkammern mit Bodenschwellen nach Fig. 8.
- Fig. 1
- a longitudinal section of a burial chamber and a cross section of two longitudinal support walls;
- Fig. 2
- a cross section of the burial chamber of FIG. 1;
- Fig. 3
- a plan view of a single burial chamber of FIG. 1;
- Fig. 4
- a fragmentary plan view of a group of burial chambers, partly with the cover removed;
- Fig. 5
- a view of a transverse support wall;
- Fig. 6
- a side view of the transverse support wall of FIG. 5;
- Fig. 7
- a detail and enlarged cross-section of two adjacent burial chambers;
- Fig. 8
- a section of a cross-section of a burial chamber with modified longitudinal support wall and with a threshold;
- Fig. 9
- a plan view of two burial chambers with thresholds according to FIG. 8.
Die aus Fig. 1 ersichtliche Grabkammer 160 weist einen
Kammerteil in Form einer Bodenwanne 161 und einen Trog 162
auf. Der Trog 162 dient als Deckel für die Bodenwanne 161.The
Die Bodenwanne 161 hat eine ringförmig geschlossene Umfangswand
163, die eine rechteckförmige Grundrißfläche hat. Am
unteren Ende der Umfangswand 163 schließt ein Boden 164 an,
der zusammen mit der Umfangswand 163 einstückig hergestellt
ist. Die Bodenwanne 161 ist aus Stahlbeton hergestellt.The
Der obere Rand der Bodenwanne 161 ist mit einem umlaufenden
Randprofil 165 versehen. Es wird durch eine Rinne 166
gebildet, die einen V-förmigen Querschnitt hat. Sie ist
symmetrisch zur Mittenebene der Umfangswand 163 angeordnet. The upper edge of the
Der Trog 162 ist ähnlich der Bodenwanne 161 gestaltet. Er
weist eine ringförmig geschlossene Umfangswand 167 und einen
einstückig damit hergestellten Boden 168 auf. Sein oberer
Rand 169 ist eben. An der Unterseite des Bodens 168 ist in
der Fortsetzung der Umfangswand 167 ein umlaufendes Randprofil
171 vorhanden, das als Gegenprofil zum oberen Randprofil
165 der Bodenwanne 161 ausgebildet ist. Es wird durch
eine umlaufende dachkantförmige Rippe 172 gebildet, die
genau in die Rinne 166 hineinpaßt.The
Der Trog 162 hat eine bestimmte lichte Höhe, die im allgemeinen
etwa 60 cm beträgt. In einer bestimmten Höhe über dem
Boden 168 weist der Trog 162 eine Reihe von Entwässerungsöffnungen
173 auf. Der Trog 162 nimmt eine Erdabdeckung 174
auf.The
Im Trog 162 sind nicht dargestellte Gasschleusen angeordnet,
die einen Gas- und Luftaustausch zwischen dem Innenraum der
Grabkammer 160 und der Umgebung ermöglichen.Gas locks, not shown, are arranged in the
Wie aus Fig. 4 zu ersehen ist, ist eine weitgehend
beliebige Anzahl Grabkammern 160 in einem bestimmten gegenseitigen
Abstand nebeneinander angeordnet, wobei ihre Längsseiten
parallel zueinander ausgerichtet sind. Damit dieser
Abstand beim Einbau der Grabkammern 160 ohne großen Meß- und
Richtaufwand eingehalten werden kann, weisen die Bodenwannen
161 an jeder ihrer Längsseite einen Abstandshalter
175 auf. Er ist als Rippe 176 ausgebildet und mit der
Umfangswand 163 einstückig hergestellt. Die Rippen 176
beginnen eine gewisse Strecke oberhalb der Unterseite des
Bodens 164 und enden ebenfalls eine gewisse Strecke unterhalb
des oberen Randes der Umfangswand 163 (Fig. 2). Die
Rippen 176 sind lotrecht ausgerichtet. Wie aus Fig. 3 zu
ersehen ist, haben die Rippen 176 in Umfangsrichtung im
selben Umlaufsinn von der Mitte der betreffenden Längsseite
der Umfangswand 163 einen bestimmten Abstand, der auf beiden
Seiten gleich ist. In Bezug auf die Rippen 176 ist die
Bodenwanne 161 gewissermaßen auf Umschlag symmetrisch ausgebildet.
Dadurch stützen sich zwei einander benachbarte Grabkammern
160 an ihren Längsseiten wechselseitig gegeneinander
ab (Fig. 4).As can be seen from Fig. 4, one is largely
any number of
Wie aus Fig. 4 ersichtlich ist, ist die Gruppe der Grabkammern
160 von zwei Paar Stützwänden umgeben, die je paarweise
parallel zueinander ausgerichtet sind und untereinander
rechtwinklig zueinander ausgerichtet sind. Zur
besseren Unterscheidung werden die in der Längsrichtung der
Gruppe der Grabkammern 160 verlaufenden beiden Stützwände
als Längsstützwände 181 und die quer dazu verlaufenden
Stützwände als Querstützwände 182 bezeichnet. Von letzteren
ist in Fig. 4 nur eine dargestellt. Die andere ist als
außerhalb des Zeichnungsblattes stehend zu betrachten.As can be seen from Fig. 4, is the group of
Wie aus Fig. 1 ersichtlich ist, haben die Längsstützwände
181 einen gegenseitigen Abstand, der im Höhenbereich
der Bodenwanne 161 gleich der Länge der Bodenwanne 161 ist.
Der in diesem Höhenbereich gelegene Wandabschnitt 181.1
liegt mit seiner der Grabkammer 160 zugekehrten Wandfläche
183 an der Außenseite der Bodenwanne 161, und zwar an
deren Schmalseite, unmittelbar an. Bei dem im Höhenbereich
des Troges 162 gelegenen Wandabschnitt 181.2 ist die Wandfläche
184 gegenüber der Wandfläche 183 um ein bestimmtes
Maß von etwa 2 bis 3 cm zurückgesetzt, so daß zwischen dem
Wandabschnitt 181.2 und der Außenseite des Troges 162 ein
entsprechender Spalt 165 offenbleibt. Dadurch wird das
Anheben und Herausheben des Troges 162 und das Wiedereinsetzen
und Absetzen des Troges 162 auf die Bodenwanne 161
erleichtert. Der Spalt zwischen dem Trog und den Stützwänden
kann aber auch dadurch geschaffen werden, daß die
Außenseite der Umfangswand 167 um ein entsprechendes Maß
zurückgesetzt ist und die Stützwände 181 und 182 durchgehend
ebene Wandflächen haben. As can be seen from Fig. 1, the longitudinal support walls
181 a mutual distance in the height range
the
Die Querstützwände 182 sind zwischen den beiden Längsstützwänden
181 angeordnet. Die Breite der Querstützwände 182 ist
daher gleich dem lichten Abstand der Längsstützwände 181. Da
dieser Abstand bei den Wandabschnitten 181.1 und 181.2
unterschiedlich groß ist, hat auch die Querstützwand 182
eine unterschiedliche Breite (Fig. 5). Der unten gelegene
Wandabschnitt 182.1 hat eine Breite, die gleich dem Abstand
der Wandflächen 183 ist. Der Wandabschnitt 182.2 hat eine
Breite, die gleich dem Abstand der Wandflächen 184 ist. An
der Übergangsstelle vom Wandabschnitt 182.1 zum Wandabschnitt
182.2 ist eine Übergangsfläche 186 vorhanden, die
auf die Übergangsfläche zwischen den beiden Wandabschnitten
181.1 und 181.2 der Längsstützwände 181 abgestimmt
ist. Diese ist im allgemeinen eine abwärts geneigte ebene
Fläche.The
Im Hinblick darauf, daß an der der Querstützwand 182 benachbarten
Grabkammer 160 (Fig. 4) nur ein Abstandshalter in
Form der Rippe 176 vorhanden ist, ist die Querstützwand 182
ebenfalls mit einem Abstandshalter 187 versehen, der wie bei
den Bodenwannen 161 als Rippe 188 ausgebildet ist und im
allgemeinen die gleiche Form wie die Rippen 176, in jedem
Falle aber die gleiche Höhe wie diese hat.In view of that adjacent to the
Falls die Bodenwannen ganz allgemein oder die der Querstützwand
182 benachbarte Bodenwanne insbesondere auf der der
Querstützwand 182 zugekehrten Längsseite ohne den Abstandshalter
175 ausgeführt ist oder dieser aus irgend einem
Grunde entfernt worden ist, dann ist auch die Querstützwand
182 ohne ihren Abstandshalter 187 auszuführen und
dieser erforderlichenfalls zu entfernen. In diesem Falle ist
die den Grabkammern 160 zugekehrte Wandfläche 191 des Wandabschnittes
182.2 um ein bestimmtes Maß von etwa 2 bis 3 cm
gegenüber der Wandfläche 192 des Wandabschnittes 182.2
zurückgesetzt, wie das bezüglich der Wandflächen der Innenseite
der Längsstützwände 181 erläutert wurde. Wenn dieser
Fall nicht eintritt, kann die Querstützwand 182 über ihre
gesamte Höhe eine gleichbleibende Wanddicke haben. If the floor trays in general or that of the
In Fig. 1 und Fig. 5 ist eine Abwandlung der Längsstützwände
181 und der Querstützwände 182 strichpunktiet angedeutet.
Diese Abwandlung betrifft eine Sockelleiste 193 bei
den Längsstützwänden 181 bzw. eine Sockelleiste 194 bei den
Querstützwänden 182. Diese Sockelleisten sind im allgemeinen
auf der von den Grabkammern abgekehrten Außenseite der
Stützwände angeordnet. Gegebenenfalls sind sie mit der
betreffenden Stützwand einstückig hergestellt, wobei es auch
zweckmäßig ist, daß die Stahlbewehrung der Stützwand
zumindest eine gewisse Strecke bis in die Sockelleiste
hinein weitergeführt ist. Diese Sockelleisten erfüllen
zweierlei Aufgaben. Zum einen vergrößern sie die Aufstandsfläche
oder Bodenfläche der zugehörigen Stützwand, wodurch
sich die durch die Gewichtskraft der Stützwand hervorgerufene
Flächenpressung im Boden unterhalb der Stützwand
verringert. Zum anderen erhöhen sie die Standfestigkeit der
zugeordneten Stützwand durch die darauf einwirkende
Gewichtskraft des oberhalb der Sockelleiste eingebrachten
Auffüllmaterials.In Fig. 1 and Fig. 5 is a modification of the
Bedingt durch die Abstandshalter 175 ist der gegenseitige
Abstand zweier Grabkammern 160 verhältnismäßig groß
(Fig. 4). Entsprechend weit ist der zwischen ihnen
bestehende Spalt 195 (Fig. 6). Dieser wird durch eine
Anzahl Abdeckplatten 196 überbrückt. Sie haben ein
näherungsweise T-förmiges Profil, dessen Stegteil 197 auf
den Spalt 195 zwischen den Grabkammern 160 abgestimmt ist,
so daß er ein Führungselement für die Abdeckplatte 196
bildet. Die Abdeckplatten 196 erstrecken sich zweckmäßigerweise
bis zum Innenrand 198 der Längswand 199 der Tröge 162
hin.Due to the
In entsprechender Weise wird der Spalt 185 zwischen der
Längsstützwand 181 und den Grabkammern 160 überbrückt
(Fig. 4). Dafür sind Abdeckplatten 201 vorhanden, die
ähnlich den Abdeckplatten 196 ausgebildet sind und mit einem
Stegteil versehen sind, der auf den Spalt 185 abgestimmt
ist. Auch diese Abdeckplatten 201 erstrecken sich zweckmäßigerweise
einerseits bis zum Innenrand 202 der Querwand
203 des Troges 162 und andererseits bis zum Außenrand
204 der Längsstützwand 181 hin.Correspondingly, the
Aus Fig. 8 und Fig. 9 sind Grabkammern 160 ersichtlich,
bei denen die Zubehörteile abgewandelt sind.8 and 9
Die Grabkammern 160 ruhen auf Bodenschwellen 205. Diese sind
in zwei Reihen angeordnet, die parallel zu den Längsstützwänden
der Gruppe der Grabkammern 160 ausgerichtet sind. Die
Bodenschwellen 205 haben eine Länge, die ein Mehrfaches der
Breite der Grabkammern 160 ist. Die Bodenschwellen 205
können in ihrer Längsrichtung hintereinander angeordnet
sein, wobei sie untereinander fluchten. Zweckmäßiger ist es,
sie seitlich versetzt anzuordnen und sie gleichzeitig in
ihrer Längsrichtung so anzuordnen, daß sie einander teilweise
überlappen (Fig. 9). Dabei ist es zweckmäßig, daß der
Überlappungsbereich im Bereich der Längsseite einer Grabkammer
160 gelegen ist (Fig. 9).The
Da die Grabkammern 160 aufgrund der unter ihnen angeordneten
Bodenschwellen 205 um die Höhe der Bodenschwellen gegenüber
der Oberfläche 206 der Grube für die Grabkammern 160 höhergelegen
sind, sind die dabei verwendeten Stützwände 207 um
das Höhenmaß der Bodenschwellen 205 höher als die Grabkammern
160 ausgeführt, damit ihr oberer Rand 208 wieder auf
gleicher Höhe mit dem oberen Rand 169 der Tröge 162 liegt.
Im übrigen sind die Stützwände 207 weitgehend gleich den
Stützwänden 181 und 182 ausgebildet.Because the
Die einzelnen Grabkammern 160 haben aufgrund der Abstandshalter
175 im Bereich ihrer Längsseiten einen ausreichend
großen gegenseitigen Abstand. Durch diesen Zwischenraum
kann das aus den Trögen 162 durch die Entwässerungsöffnungen
173 (Fig. 1) austretende Wasser, beispielsweise
Regenwasser oder überschüssiges Gießwasser, ohne weiteres
abfließen. Da an den Schmalseiten der Bodenwannen 161 der
Wandabschnitt 181.1 der Längsstützwände 181 eng anliegt ist
es zweckmäßig, in diesem Wandabschnitt 181.1 eine oder
mehrere von oben nach unten durchgehende Entwässerungsrillen
209 vorzusehen. Dann kann auch das im Bereich der
Schmalseiten der Tröge 162 austretende Wasser leichter
abfließen. The
- 160160
- GrabkammerBurial chamber
- 161161
- BodenwanneFloor pan
- 162162
- TroqTroq
- 163163
- UmfangswandPeripheral wall
- 164164
- Bodenground
- 165165
- RandprofilEdge profile
- 166166
- RinneGutter
- 167167
- UmfangswandPeripheral wall
- 168168
- Bodenground
- 169169
- Randedge
- 171171
- RandprofilEdge profile
- 172172
- RinneGutter
- 173173
- EntwässerungsöffnungenDrainage openings
- 174174
- ErdabdeckungEarth cover
- 175175
- AbstandshalterSpacers
- 176176
- Ripperib
- 181181
- LängsstützwändeLongitudinal support walls
- 182182
- QuerstützwändeCross retaining walls
- 183183
- WandflächeWall surface
- 184184
- WandflächeWall surface
- 185185
- Spaltgap
- 186186
- ÜbergangsflächeTransition area
- 187187
- AbstandshalterSpacers
- 188188
- Ripperib
- 191191
- WandflächeWall surface
- 192192
- WandflächeWall surface
- 193193
- SockelleisteSkirting board
- 194194
- SockelleisteSkirting board
- 195195
- Spaltgap
- 196196
- AbdeckplattenCover plates
- 197197
- StegteilBridge part
- 198198
- InnenrandInside edge
- 199199
- LängswandLongitudinal wall
- 201201
- AbdeckplattenCover plates
- 202202
- InnenrandInside edge
- 203203
- QuerwandTransverse wall
- 204204
- AußenrandOuter edge
- 205205
- BodenschwellenThresholds
- 206206
- Oberflächesurface
- 207207
- StützwändeRetaining walls
- 208208
- Randedge
- 209209
- EntwässerungsrillenDrainage grooves
Claims (12)
gekennzeichnet durch das Merkmal:
characterized by the characteristic:
gekennzeichnet durch das Merkmal:
characterized by the characteristic:
gekennzeichnet durch das Merkmal:
characterized by the characteristic:
gekennzeichnet durch das Merkmal:
characterized by the characteristic:
gekennzeichnet durch die Merkmale
characterized by the characteristics
gekennzeichnet durch die Merkmale
characterized by the characteristics
gekennzeichnet durch die Merkmale
characterized by the characteristics
gekennzeichnet durch die Merkmale
characterized by the characteristics
gekennzeichnet durch die Merkmale
characterized by the characteristics
gekennzeichnet durch die Merkmale
characterized by the characteristics
gekennzeichnet durch das Merkmal:
characterized by the characteristic:
Applications Claiming Priority (7)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE4118408 | 1991-06-05 | ||
DE19914118408 DE4118408A1 (en) | 1991-06-05 | 1991-06-05 | Burial chambers formed of pre-cast sections - chambers are watertight and ventilated through cover trough to ensure decomposition |
DE9109653U | 1991-08-03 | ||
DE9109652U DE9109652U1 (en) | 1991-08-03 | 1991-08-03 | Burial chamber |
DE9109653U DE9109653U1 (en) | 1991-08-03 | 1991-08-03 | Burial chamber |
DE9109652U | 1991-08-03 | ||
EP92109351A EP0528124B1 (en) | 1991-06-05 | 1992-06-03 | Burial crypt |
Related Parent Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP92109351A Division EP0528124B1 (en) | 1991-06-05 | 1992-06-03 | Burial crypt |
Publications (2)
Publication Number | Publication Date |
---|---|
EP1118737A2 true EP1118737A2 (en) | 2001-07-25 |
EP1118737A3 EP1118737A3 (en) | 2002-01-23 |
Family
ID=27202561
Family Applications (3)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP92109351A Expired - Lifetime EP0528124B1 (en) | 1991-06-05 | 1992-06-03 | Burial crypt |
EP01107210A Withdrawn EP1118738A3 (en) | 1991-06-05 | 1992-06-03 | Burial crypt |
EP01107209A Withdrawn EP1118737A3 (en) | 1991-06-05 | 1992-06-03 | Burial crypt |
Family Applications Before (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP92109351A Expired - Lifetime EP0528124B1 (en) | 1991-06-05 | 1992-06-03 | Burial crypt |
EP01107210A Withdrawn EP1118738A3 (en) | 1991-06-05 | 1992-06-03 | Burial crypt |
Country Status (3)
Country | Link |
---|---|
EP (3) | EP0528124B1 (en) |
AT (1) | ATE207571T1 (en) |
DE (1) | DE59209925D1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1469145A1 (en) * | 2003-04-17 | 2004-10-20 | Brunhilde Suckfüll | Re-usable tomb and tomb arrangement |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3537367A1 (en) | 1985-10-21 | 1987-04-23 | Gerhard Suckfuell | Burial chamber |
Family Cites Families (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
BE395521A (en) * | ||||
DE510244C (en) * | 1930-10-17 | Gustav Gresse | Gravestone substructure | |
FR48301E (en) * | 1936-10-21 | 1937-12-27 | Monolithic vault | |
DE2059547A1 (en) * | 1970-12-03 | 1972-06-08 | Freinecker Karl | Crypt |
FR2133476A1 (en) * | 1971-04-14 | 1972-12-01 | Cordier Henri | Burial vault construction - using panels having flat and corrugated sheet pref sealed with polyester resin coat |
US3772826A (en) * | 1971-05-27 | 1973-11-20 | G Ferver | Burial crypt and planter |
FR2461795A1 (en) * | 1979-07-18 | 1981-02-06 | Augias Francis | Individual burial chamber in concrete box form - has ventilated side and floor cavities with low pressure inner ventilation |
DE3534327C1 (en) * | 1985-09-26 | 1987-04-02 | Franz Fichtl | Prefabricated container forming coffin-receiving vault - comprises GRP trough and lid with perimeter holes allowing air circulation |
FR2620753B1 (en) * | 1987-09-18 | 1990-02-02 | Tuyaux Bonna | PROCESS FOR MANUFACTURING FUNERAL CELLARS AND CELLARS OBTAINED BY SAID METHOD |
US4977652A (en) * | 1989-11-13 | 1990-12-18 | Gray Graham | Tree forest cemetery |
FR2663667A1 (en) * | 1990-06-22 | 1991-12-27 | Cardi Bernard | Prefabricated tomb made of reinforced concrete |
-
1992
- 1992-06-03 EP EP92109351A patent/EP0528124B1/en not_active Expired - Lifetime
- 1992-06-03 EP EP01107210A patent/EP1118738A3/en not_active Withdrawn
- 1992-06-03 DE DE59209925T patent/DE59209925D1/en not_active Expired - Fee Related
- 1992-06-03 AT AT92109351T patent/ATE207571T1/en not_active IP Right Cessation
- 1992-06-03 EP EP01107209A patent/EP1118737A3/en not_active Withdrawn
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3537367A1 (en) | 1985-10-21 | 1987-04-23 | Gerhard Suckfuell | Burial chamber |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1469145A1 (en) * | 2003-04-17 | 2004-10-20 | Brunhilde Suckfüll | Re-usable tomb and tomb arrangement |
Also Published As
Publication number | Publication date |
---|---|
EP1118738A2 (en) | 2001-07-25 |
DE59209925D1 (en) | 2001-11-29 |
EP1118738A3 (en) | 2002-01-23 |
EP0528124B1 (en) | 2001-10-24 |
EP1118737A3 (en) | 2002-01-23 |
ATE207571T1 (en) | 2001-11-15 |
EP0528124A1 (en) | 1993-02-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE1941281C3 (en) | Building | |
DE2920873C2 (en) | Device for planting trees and the like, especially in traffic areas | |
DE2519232C3 (en) | Plantable retaining wall | |
EP0322667B1 (en) | Method for building a wall, construction element and connection slab for applying the method, and wall built by the method | |
EP0086489A1 (en) | Waste water treatment plant | |
EP0826092B1 (en) | Mobile collapsible flood barrier of horizontally s-toothed stackable sections | |
DE2253906B2 (en) | ORNAMENTAL GARDEN ARRANGED ON A SUPPORTING SURFACE, PREFERABLY A FLAT ROOF | |
DE2242131C3 (en) | Transformer station, substation or the like | |
EP1118737A2 (en) | Burial crypt | |
DE2724224C3 (en) | Drainage element for the production of drainage lines designed as a hollow wall as well as a soil drainage system formed from drainage elements | |
DE4400183A1 (en) | Hexagonal drainage elements assembled as drainage lining for open refuse tip | |
DE4236193A1 (en) | Underground-drain access shaft - is in plastic annular sections forming double wall filled with free-flowing and hardening material | |
DE3507240A1 (en) | Landfill site, in particular for storing special refuse | |
DE9109652U1 (en) | Burial chamber | |
DE4118408A1 (en) | Burial chambers formed of pre-cast sections - chambers are watertight and ventilated through cover trough to ensure decomposition | |
EP2363532A1 (en) | Plant trough as stackable module | |
DE102019108576A1 (en) | Device and method for water level regulation | |
DE8809824U1 (en) | Hollow floor | |
DE2313316A1 (en) | SQUARE SHAPED FORMWORK FOR SUPPORTING WALLS | |
DE19613380C1 (en) | Tomb chamber ventilation system | |
EP1469145B1 (en) | Re-usable tomb and tomb arrangement | |
DE4223874C2 (en) | Flat support plate for composting and bio filter systems | |
EP0139031A1 (en) | Set of stones for vertical composite walls | |
DE3714742C2 (en) | ||
DE2845556C2 (en) | Roller trough made of prefabricated reinforced concrete parts for a wastewater treatment plant that works according to the disc immersion drip method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
AC | Divisional application: reference to earlier application |
Ref document number: 528124 Country of ref document: EP |
|
AK | Designated contracting states |
Kind code of ref document: A2 Designated state(s): AT BE CH DE DK FR LI NL |
|
PUAL | Search report despatched |
Free format text: ORIGINAL CODE: 0009013 |
|
AK | Designated contracting states |
Kind code of ref document: A3 Designated state(s): AT BE CH DE DK FR LI NL |
|
AKX | Designation fees paid |
Free format text: AT BE CH DE DK FR LI NL |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN |
|
18D | Application deemed to be withdrawn |
Effective date: 20020724 |