EP1109709B1 - Method and device for controlling a traffic installation - Google Patents

Method and device for controlling a traffic installation Download PDF

Info

Publication number
EP1109709B1
EP1109709B1 EP99928991A EP99928991A EP1109709B1 EP 1109709 B1 EP1109709 B1 EP 1109709B1 EP 99928991 A EP99928991 A EP 99928991A EP 99928991 A EP99928991 A EP 99928991A EP 1109709 B1 EP1109709 B1 EP 1109709B1
Authority
EP
European Patent Office
Prior art keywords
route
installation
elements
assigned
parameter
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
EP99928991A
Other languages
German (de)
French (fr)
Other versions
EP1109709A1 (en
Inventor
Peter Ellenberger
Stephan Germann
Roland Gutknecht
Walter Schenker
Urs Zuend
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Siemens Schweiz AG
Original Assignee
Siemens Schweiz AG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Siemens Schweiz AG filed Critical Siemens Schweiz AG
Publication of EP1109709A1 publication Critical patent/EP1109709A1/en
Application granted granted Critical
Publication of EP1109709B1 publication Critical patent/EP1109709B1/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L21/00Station blocking between signal boxes in one yard
    • B61L21/10Arrangements for trains which are closely following one another
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L19/00Arrangements for interlocking between points and signals by means of a single interlocking device, e.g. central control
    • B61L19/06Interlocking devices having electrical operation

Definitions

  • the present invention relates to a method according to the preamble of patent claim 1.
  • isolation table and footnotes become projectors needs, which may need to be considered when controlling the system elements recognize and master them based on their professional experience. It is the exact knowledge of the entire range of functions of the interlocking system modules required.
  • the present invention is therefore based on the object of a method for the control and To specify the monitoring of a traffic control system having actuating and monitoring elements, which is easy to implement for systems with any route structure.
  • the invention is explained in more detail below using a drawing, for example.
  • One is shown Railway installation with two tracks GL1, GL2 running parallel from A to B or from C to D, the via two connecting tracks GL12, GL21 and two each connecting to these connecting tracks GL12, GL21 Points W1, W3 or W4, W2 are connected to each other.
  • the tracks are GL1, GL2 divided into different areas, which are monitored by (track) free detectors FM1, ..., FM14 are realized in the form of track circuits or axle counters.
  • a Freimelder FM processes the information from one or more track circuits and / or of axle counters.
  • the determined state of the associated track section is sent to an interlocking reported. For security reasons, these messages become antivalent or redundant trained ..
  • Track vacancy detection devices with direct or alternating voltage track circuits or Axle counters are e.g. in [1], pages 277-316 or in [3].
  • the elements of a railway system to be controlled are assigned at least one parameter (or an auxiliary variable) that describes at least one possible state, condition or assignment that is important within a control process. All necessary parameters must be provided so that the control process can be fully and unambiguously implemented.
  • Several parameters are preferably assigned in a parameter list as follows: elements parameter description States / assignments abbreviation give way 1 resolution assigned freelancer (FM No.) 2 location apportioned u just G 3 Function type roadway w flank protection s für Psychologyweg d free detector 1 Sequence in the route outside driveway 0 Position within the route (FW Pos.
  • the parameter list can be adapted to the needs of the project planner. Parameters can be changed, added or omitted. After adjusting the parameter list once to existing system elements, further changes should no longer be necessary or should be avoided. Based on the parameter list, which can now be used for the elements of any system, a table is created for a system to be configured, in which the parameter values or the possible states and assignments of the system elements for all required routes are specified.
  • Table 2 shows the parameter values and the possible states and assignments of the system elements for route 5. A column is provided for each parameter to be taken into account.
  • the complete one Table with the parameters for all system elements includes a total of all five routes twenty columns plus one column for the list of investment items. The conditions for the investment elements are given in 29 lines.
  • closure table expanded according to the invention in connection with the parameter list all conditions for the control of the plant or for the creation and dismantling of the Routes completely and clearly described.
  • a Control program that can run on a system computer manually or preferably automatically to be created. Due to the technical workability of the lock table, in which all conditions and assignments are specified in full, the control program can by a Program generator are generated automatically.
  • the first one provided in the lock table is particularly important for an advantageous control of the system Parameter by which the FM free detector is identified in its order in the route and the other system elements (switches, signals, etc.) at least one vacant detector FM can be assigned.
  • These measures are particularly related to the warranty Increased security during the control process is an advantage.
  • the availability of the routes increases. Sections of set routes can due to the fixed order of the FM free signal after the vehicle has passed through again be released, whereby a partial dissolution of the route is achieved.
  • the "dissolved" Sections of the driveway are therefore already available for the construction of further driveways Available if the vehicle has not yet reached the end of the route.
  • a clear signal FM is registered when a vehicle passes through a track section, so that all system elements assigned to the Freimelder FM can be released as soon as the Section is decoupled from the driveway.
  • Parameters 2 and 3 for turnouts relate to the adjustable position or the function that the Which takes up in the driveway. For example, is not driven on, but serves as side protection, through which enemy trains are kept away from the set route.
  • Parameter 2 for free detectors concerns the condition to be fulfilled for the changeover of the start signal to green (or trip approval).
  • parameter 3 specifies the criteria used to monitor a section.
  • Parameter 4 specifies which The route, or preferably a section of the route, is thus to be met or released.
  • Parameter 2 for signals defines the function of the signal. Parameter 3 gives the Driving term to be displayed and parameter 4 specifies the condition for the signal change is fulfilled.
  • additional lines are preferably provided, in which additional Conditions are specified that are used as parameters in the lock table (e.g. as parameters No. 4 for the placement of signals) must be taken into account. Multiple conditions can also be in one additional line can be linked.
  • line 29, they are in line 27 and line 28 specified conditions A and B AND-linked.
  • the result of the link created by the variable T1 is represented, is in the line 5 provided for the signal S5, under parameter 4 as a condition specified.
  • the signal S5 should only be changed to a driving concept of driving, if through the barrier BA1 shown in the drawing and a monitoring device BÜ the associated level crossing was secured. In this way, any other application-specific Conditions are taken into account. Conditions A, B, ... can, i.e. Naturally also be considered individually in lines 1, ..., 26.
  • the elements FM, S, etc. are preferably in the columns and Parameters specified in the lines.
  • the solution according to the invention can also identify occurring errors and correct them at the process logic level.
  • track sections are monitored, as mentioned above, for example by means of axle counters and / or track circuits.
  • a logical combination of the count results from two axle counters determines whether a train has passed a section of track and has left it completely. If a train has passed the relevant section of the track and the axle counters have different counting results, the route is not resolved in known systems. The fault is difficult to localize today due to many possible influences.
  • Free detectors are axle counters and / or track circuits or other devices for detecting the occupancy of a rail section.
  • the lines of the locking table are sorted according to parameter 1 (the values of parameter 1 increase steadily from line to line.) From the drawing it can be seen that the order of the free detectors FM8 FM9 FM10 FM11 FM12, FM5, FM6 and FM7 corresponds to the sequence of the track sections that are traversed sequentially when using the route 5.
  • axle counters which may be faulty and / or Glelsstrom
  • the axle counters which may be faulty and / or Glelsstrom
  • the necessary Corrective measures based on detailed error information targeted at the Process control level can be applied.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Train Traffic Observation, Control, And Security (AREA)
  • Traffic Control Systems (AREA)
  • Road Signs Or Road Markings (AREA)

Abstract

The invention relates to a method for controlling and monitoring a traffic installation comprising control and monitoring elements, notably switch points (W1, ..., W4), signals (S1, ..., S8) and track non-occupancy indicators (FM1, ..., FM14). By means of a control process based on a track blocking table, which in response to a request for the establishment of a route blocks and controls all setting elements associated with said route such that they are unavailable to other requests for the establishment of other routes and operations, at least two routes for rail vehicles can be set. At least one parameter (1, 2, 3, 4) is assigned to the installation elements (W1, ..., W4; S1, ..., S8; FM1, ..., FM14) which relates to the conditions or assignments to be defined or taken into consideration for each intended route, so that by means of a parameter (1) assigned to the track non-occupancy indicators (FM1, ..., FM14) the track non-occupancy indicator (FM1, ..., FM14) sequence along a route is defined and by means of a further parameter (1) assigned to the other installation elements (W1, ..., W4; S1, ..., S8) the association of said other elements with at least one of the track non-occupancy indicators (FM1, ..., FM14) is defined. As a result of the above parameter assignments the control process based on said assignment permits a simple and safe control of the installation to be controlled. The above control process is further made easier to carry out by the complete and technically executable description of operating conditions. The measures provided for in the invention also permit a more rapid establishment and suppression of travel routes and recognition of disturbances in track non-occupancy indicators.

Description

Die vorliegende Erfindung betrifft ein Verfahren nach dem Oberbegriff des Patentanspruchs 1.The present invention relates to a method according to the preamble of patent claim 1.

Zur Erstellung von Fahrwegen kommen in Stellwerken für den Eisenbahnverkehr verschiedene Verfahren zur Anwendung. Nach dem Verschlusstafelprinzip arbeitende Stellwerke basieren auf der Verwendung von in [2], Fig. 25 und Fig. 26 dargestellten Verschluss- und Isoliertabellen, in denen der statische Zustand von Anlageelementen, wie Bahnübergänge, Geleise, Streckenblöcke, Signale und Weichen für die vorgesehenen Fahrstrasseneinstellungen dargestellt ist. Für Regeln und zum Teil auch prozessabhängige Beziehungen zwischen den Anlageelementen, die durch die Betriebsordnung und geographische Eigenheiten bestimmt sind, werden in Fussnoten zu den Tabellen Zusatzkonditionen angegeben, die bei der Steuerung einzelner Anlageelemente zu berücksichtigen sind. Die Formulierungen dieser Zusatzkonditionen sind in der Praxis nicht bei allen Konditionen ein-eindeutig. Die Vollständigkeit der Beschreibung des Systems, das der sicheren Bildung, Überwachung und Auflösung von Fahrstrassen dient, mittels Verschluss-, Isoliertabelle und Fussnoten ist daher kaum je gewährleistet. Abhängigkeiten zwischen Fahrstrassen, welche während den Prozessabläufen entstehen bzw. ändern, werden nicht erfasst. Für die korrekte Umsetzung von Verschluss-, Isoliertabelle und Fussnoten werden Projektierer benötigt, welche gegebenenfalls zu berücksichtigende Zusammenhänge bei der Steuerung der Anlageelemente aufgrund ihrer Berufserfahrung erkennen und beherrschen. Es ist dabei die genaue Kenntnis des gesamten Funktionsumfangs der Anlagemodule des Stellwerkes erforderlich.Various procedures are used in signal boxes for railway traffic to create routes to use. Interlockings operating according to the locking panel principle are based on use of closure and isolation tables shown in [2], Fig. 25 and Fig. 26, in which the static Condition of system elements such as level crossings, tracks, track blocks, signals and switches for the intended route settings are shown. For rules and sometimes also process-dependent Relationships between the investment elements by the operational rules and geographical Peculiarities are determined, additional conditions are given in footnotes to the tables, that must be taken into account when controlling individual system elements. The wording of this In practice, additional conditions are not unique for all conditions. The completeness of Description of the system, the safe formation, monitoring and resolution of driveways is therefore hardly ever guaranteed by means of a lock and isolation table and footnotes. dependencies between routes that arise or change during the processes are not recorded. For the correct implementation of the lock, isolation table and footnotes become projectors needs, which may need to be considered when controlling the system elements recognize and master them based on their professional experience. It is the exact knowledge of the entire range of functions of the interlocking system modules required.

Der vorliegenden Erfindung liegt daher die Aufgabe zugrunde, ein Verfahren für die Steuerung und Überwachung einer Stell- und Überwachungselemente aufweisenden verkehrstechnischen Anlage anzugeben, welches für Anlagen mit beliebigen Fahrwegstrukturen einfach realisierbar ist.The present invention is therefore based on the object of a method for the control and To specify the monitoring of a traffic control system having actuating and monitoring elements, which is easy to implement for systems with any route structure.

Diese Aufgabe wird durch die im Patentanspruch 1 angegebenen Massnahmen gelöst. Vorteilhafte Ausgestaltungen der Erfindung sind in weiteren Ansprüchen angegeben.This object is achieved by the measures specified in claim 1 solved. Advantageous embodiments of the invention are specified in further claims.

Das erfindungsgemässe Verfahren erlaubt die einfache Projektierung von verkehrstechnischen Anlagen, insbesondere von elektronischen Stellwerken in der Eisenbahntechnik. Erfindungsgemäss basieren die für den Auf- und/oder Abbau der Fahrwege vorgesehenen Steuerprozesse auf der vollständigen Zuordnung von Parametern zu den Anlageelementen. Ferner erfolgt eine Listung der Gleisfreimeldevorrichtungen in Abhängigkeit der Reihenfolge, in der diese beim Befahren der einzustellenden Fahrstrasse passiert werden. Dies erlaubt insbesondere die Steigerung der Verfügbarkeit der verkehrstechnischen Anlage. Fahrstrassen können schneller ab- und wieder aufgebaut werden. Zudem lassen sich Störungen leichter erkennen und korrigieren.

  • Den für die Überwachung und Freimeldung von Gleisabschnitten vorgesehenen Anlageelementen, nachstehend Freimelder genannt, werden neu für jeden zu erstellenden Fahrweg Parameter zugeordnet, durch die die Reihenfolge der Freimelder innerhalb eines einzustellenden Fahrweges festgelegt wird.
  • Den weiteren Anlageelementen ist wenigstens ein Parameter zugeordnet, durch den die Zuordnung eines Anlageelementes zu einem oder mehreren Freimeldern festgelegt wird.
  • Gegebenenfalls sind den Anlageelementen weitere Parameter zugeordnet, die steuerungsrelevante Informationen enthalten. Dadurch entfallen Fussnoten zu den Tabellen.
  • Komplexe Betriebsbedingungen werden vorzugsweise in einer wenigstens eine Zeile aufweisenden Tabelle erfasst und vollständig beschrieben. Daraus wird der Zustand eines logischen Parameters bestimmt, der den Anlageelementen zugeordnet werden kann.
The method according to the invention allows the simple project planning of traffic engineering systems, in particular of electronic signal boxes in railway engineering. According to the invention, the control processes provided for the construction and / or dismantling of the travel routes are based on the complete assignment of parameters to the system elements. Furthermore, the track vacancy detection devices are listed depending on the order in which they are passed when driving on the route to be set. In particular, this allows the availability of the traffic system to be increased. Routes can be dismantled and rebuilt more quickly. In addition, faults are easier to identify and correct.
  • The system elements intended for monitoring and clearing track sections, hereinafter referred to as free indicators, are now assigned parameters for each route to be created, by means of which the sequence of the free indicators within a route to be set is determined.
  • At least one parameter is assigned to the further investment elements, by means of which the assignment of an investment element to one or more vacant notices is determined.
  • If necessary, further parameters are assigned to the system elements, which contain control-relevant information. This eliminates footnotes to the tables.
  • Complex operating conditions are preferably recorded in a table having at least one row and described in full. From this, the state of a logical parameter is determined, which can be assigned to the system elements.

Die für den Auf- und/oder Abbau der Fahrwege vorgesehenen Steuerprozesse sind durch die in der Tabelle angegebene Zuordnung von Parametern zu den Anlageelementen mit geringem Aufwand eindeutig und sicher realisierbar.The control processes provided for the construction and / or dismantling of the travel routes are given in the table specified assignment of parameters to the system elements clearly with little effort and can be implemented safely.

Die Erfindung wird nachfolgend anhand einer Zeichnung beispielsweise näher erläutert. Gezeigt ist eine Eisenbahnanlage mit zwei parallel von A nach B bzw. von C nach D geführten Geleisen GL1, GL2, die über zwei Verbindungsgeleise GL12, GL21 und je zwei an diese Verbindungsgeleise GL12, GL21 anschliessenden Weichen W1, W3 bzw. W4, W2 miteinander verbunden sind. Die Geleise GL1, GL2 sind in verschiedene Bereiche unterteilt, die von (Gleis-) Freimeldern FM1, ..., FM14 überwacht werden, die in Form von Gleisstromkreisen oder Achszählern realisiert sind.The invention is explained in more detail below using a drawing, for example. One is shown Railway installation with two tracks GL1, GL2 running parallel from A to B or from C to D, the via two connecting tracks GL12, GL21 and two each connecting to these connecting tracks GL12, GL21 Points W1, W3 or W4, W2 are connected to each other. The tracks are GL1, GL2 divided into different areas, which are monitored by (track) free detectors FM1, ..., FM14 are realized in the form of track circuits or axle counters.

Ein Freimelder FM verarbeitet die Information von einem oder mehreren Gleisstromkreisen und/oder von Achszählem. Der ermittelte Zustand des zugehörigen Gleisabschnittes wird an ein Stellwerk gemeldet. Aus sicherheitstechnischen Gründen werden diese Meldungen antivalent oder redundant ausgebildet.. Gleisfreimeldevorrichtungen mit Gleich- oder Wechselspannungs-Gleisstromkreisen oder Achszählern sind z.B. in [1], Seiten 277 - 316 oder in [3] beschrieben.A Freimelder FM processes the information from one or more track circuits and / or of axle counters. The determined state of the associated track section is sent to an interlocking reported. For security reasons, these messages become antivalent or redundant trained .. Track vacancy detection devices with direct or alternating voltage track circuits or Axle counters are e.g. in [1], pages 277-316 or in [3].

In der gezeigten Eisenbahnanlage sind die Gleisbereiche um die Weichen W1, ..., W4 bis zur Mitte der zugehörigen Verbindungsgeleise GL12, GL21 durch die Freimelder FM3, FM5, FM10 und FM12 überwacht. Anschliessend an die den Freimeldern FM1, FM7, FM8 und FM14 zugehörigen Bereiche sind Signale S1, S4, S5 bzw. S8 vorgesehen. Den den Freimeldern FM4 und FM11 zugehörigen Bereichen sind die Signale S2 und S3 bzw. S6 und S7 zugeordnet. Zwischen den Punkten A, B, C und D können ausgehend von Punkt A oder Punkt C folgende Fahrwege erstellt werden (Ranglerfahrstrecken ausgenommen) :

Fahrweg 1
von A über Geleise GL1 nach B,
Fahrweg 2
von A über Geleise GL1, Verbindungsgeleise GL12, Geleise 2, Verbindungsgeleise GL21 und Geleise GL1 nach B,
Fahrweg 3
von A über Geleise GL1, Verbindungsgeleise GL12 und Geleise 2 nach D,
Fahrweg 4
von C über Geleise GL2 nach D und
Fahrweg 5
von C über Geleise GL2, Verbindungsgeleise GL21 und Geleise 1 nach B.
In the railway system shown, the track areas around the turnouts W1, ..., W4 to the middle of the associated connecting track GL12, GL21 are monitored by the free detectors FM3, FM5, FM10 and FM12. Following the areas associated with the free detectors FM1, FM7, FM8 and FM14, signals S1, S4, S5 and S8 are provided. Signals S2 and S3 or S6 and S7 are assigned to the areas belonging to the free detectors FM4 and FM11. The following routes can be created between points A, B, C and D starting from point A or point C (excluding ranger routes):
Route 1
from A via track GL1 to B,
Route 2
from A via track GL1, connecting track GL12, track 2, connecting track GL21 and track GL1 to B,
Route 3
from A via track GL1, connecting track GL12 and track 2 to D,
Route 4
from C via track GL2 to D and
Route 5
from C via track GL2, connecting track GL21 and track 1 to B.

Mit der Aufforderung zum Aufbau eines Fahrweges (z.B. Fahrweg 1) werden alle diesem Fahrweg zugehörigen Stellelemente von einem Steuerprozess gegenüber anderen Aufforderungen zum Aufbau von weiteren Fahrwegen (z.B. einer der Fahrwege 2, 3, 4 oder 5) und Bedienungen gesperrt und danach gestellt. Selbstverständlich können noch weitere Fahrwege, wie Rangierfahrstrassen, Einfahrten oder Ausfahrten gestellt werden. Zur Erläuterung der Erfindung wird nachstehend daher nur der Vorgang zum Auf- und Abbau von Fahrweg 5 erläutert. Für diesen Fahrweg, der anhand eines Steuerprozesses eingestellt wird, befinden sich die Anlageelemente S1, ..., S8, W1, ..., W4, FM1, ..., FM14 in den in nachstehender Tabelle 1 angegebenen Zuständen, sofern die in den Parametern angegebenen Bedingungen erfüllt sind.With the request to build a route (e.g. route 1), all associated with this route Control elements of a control process versus other calls to build other routes (e.g. one of routes 2, 3, 4 or 5) and controls blocked and then posed. Of course, other routes, such as shunting routes, driveways or Exits are made. To explain the invention, therefore, only the process for Construction and dismantling of route 5 explained. For this route, which is set using a control process the system elements S1, ..., S8, W1, ..., W4, FM1, ..., FM14 are in the following Table 1 states provided the conditions specified in the parameters are fulfilled.

Den Elementen einer zu steuernden Eisenbahnanlage ist endungsgemäss wenigstens ein Parameter (bzw. eine Hilfsgrösse) zugeordnet, der wenigstens einen möglichen Zustand, eine Bedingung oder eine Zuordnung beschreibt, die innerhalb eines Steuerprozesses von Bedeutung ist. Damit der Steuerprozess vollständig und eindeutig realisiert werden kann, müssen alle notwendigen Parameter vorgesehen sein. Vorzugsweise sind mehrere Parameter in einer Parameterliste wie folgt zugeordnet: Elemente Parameter Bezeichnung Zustände/Zuordnungen Abkürzung Weichen 1 Auflösung zugeordneter Freimelder (FM Nr.) 2 Lage umgelegt u gerade g 3 Funktionsart Fahrweg w Flankenschutz s Durchrutschweg d Freimelder 1 Reihenfolge im Fahrweg ausserhalb Fahrweg 0 Position innerhalb Fahrweg (FW Pos. Nr.) 2 Bedingung für Fahrbegriffeinstellung des Startsignals keine Bedingung kb frei fs belegt bs 3 Überwachung keine Bedingung kb frei solange Signal auf "Fahrt" ff nicht überfahren nu 4 Auflösung Regelauflösung ra durch Belegung Ib durch Belegung und wieder Freiwerden If besonderer Verschluss bv keine Auflösung ka Signale 1 Auflösung zugeordneter Freimelder (FM Nr.) 2 Beanspruchung Startsignal des Fahrwegs ws Zielsignal des Fahrwegs wz Transitsignal des Fahrweges wt Schutzsignal ss Zielbeanspruchung feindlicher Fahrstrassen abfragen zb Startbeanspruchung feindlicher Fahrstrassen abfragen sb Nebensignal ns 3 Signalbegriff halt halt Geschwindigkeit x km/h Vx Geschwindigkeit y km/h Vy keine Bedeutung kb 4 Bedingung für Fahrtstellung oder Überwachung Zielbeanspruchung feindlicher Fahrstrassen abfragen zb Zielsignal hell / Dauerüberwachung zh keine Bedingung kb Konditionen 1 Elementart Art des Anlageelelementes FM, SI, W 2 Elementbezeichnung Nummer 1, 2, 3, ... 3 Bedingung 1 4 Bedingung 2 Verknüpfung 1 Verknüpfung von Konditionen Variable T1 ist "1", falls A, B ... T1=A UND B;
T1=A OR B
Bild 1) Parameterliste
The elements of a railway system to be controlled are assigned at least one parameter (or an auxiliary variable) that describes at least one possible state, condition or assignment that is important within a control process. All necessary parameters must be provided so that the control process can be fully and unambiguously implemented. Several parameters are preferably assigned in a parameter list as follows: elements parameter description States / assignments abbreviation give way 1 resolution assigned freelancer (FM No.) 2 location apportioned u just G 3 Function type roadway w flank protection s Durchrutschweg d free detector 1 Sequence in the route outside driveway 0 Position within the route (FW Pos. No.) 2 Condition for driving term setting of the start signal No condition kb free fs busy bs 3 monitoring No condition kb free as long as signal on "drive" ff do not run over nu 4 resolution rule Resolution ra by occupancy ib by occupancy and freeing up again If special closure bv no resolution ka signals 1 resolution assigned freelancer (FM No.) 2 demand Start signal of the route ws Target signal of the route wz Transit signal of the route wt protection signal ss Query the target load of enemy routes eg Query the start stress of enemy routes sb crosstalk ns 3 signal aspect stop stop Speed x km / h Vx Speed y km / h Vy no meaning kb 4 Condition for driving position or surveillance Query the target load of enemy routes eg Target signal bright / continuous monitoring zh No condition kb conditions 1 Element Type of investment element FM, SI, W 2 item Description number 1, 2, 3, ... 3 Condition 1 4 Condition 2 shortcut 1 Linking conditions Variable T1 is "1" if A, B ... T1 = A AND B;
T1 = A OR B
Figure 1) List of parameters

Selbstverständlich kann die Parameterliste den Bedürfnissen des Projektierers beliebig angepasst werden. Parameter können umgestellt, hinzugefügt oder weggelassen werden. Nach einmaliger Anpassung der Parameterliste an vorhandene Anlageelemente, sollten weitere Veränderungen nicht mehr notwendig sein bzw. vermieden werden. Ausgehend von der Parameterliste, die nun für die Elemente beliebiger Anlagen verwendbar ist, wird für eine zu projektierende Anlage eine Tabelle erstellt, in der die Parameterwerte bzw. die möglichen Zustände und Zuordnungen der Anlageelemente für alle benötigten Fahrstrassen festgelegt werden.

Figure 00050001
Of course, the parameter list can be adapted to the needs of the project planner. Parameters can be changed, added or omitted. After adjusting the parameter list once to existing system elements, further changes should no longer be necessary or should be avoided. Based on the parameter list, which can now be used for the elements of any system, a table is created for a system to be configured, in which the parameter values or the possible states and assignments of the system elements for all required routes are specified.
Figure 00050001

Tabelle 2 zeigt die Parameterwerte bzw. die möglichen Zustände und Zuordnungen der Anlageelemente für den Fahrweg 5. Für jeden zu berücksichtigenden Parameter ist eine Spalte vorgesehen. Die vollständige Tabelle mit den Parametern für alle Anlageelemente umfasst für alle fünf Fahrstrassen insgesamt zwanzig Spalten sowie eine Spalte für die Liste der Anlageelemente. Die Bedingungen für die Anlageelemente sind in 29 Zeilen angegeben.Table 2 shows the parameter values and the possible states and assignments of the system elements for route 5. A column is provided for each parameter to be taken into account. The complete one Table with the parameters for all system elements includes a total of all five routes twenty columns plus one column for the list of investment items. The conditions for the investment elements are given in 29 lines.

Durch diese erfindungsgemäss erweiterte Verschlusstabelle in Verbindung mit der Parameterliste werden alle Bedingungen für die Steuerung der Anlage bzw. zur Erstellung und zum Abbau der Fahrstrassen vollständig und eindeutig beschrieben. Basierend auf der Verschlusstabelle kann daher ein auf einem Anlagerechner lauffähiges Steuerungsprogramm manuell oder vorzugsweise automatisch erstellt werden. Aufgrund der technischen Abarbeitbarkeit der Verschlusstabelle, in der alle Bedingungen und Zuordnungen vollständig angegeben sind, kann das Steuerprogramm durch einen Programmgenerator automatisch erzeugt werden.By means of this closure table expanded according to the invention in connection with the parameter list all conditions for the control of the plant or for the creation and dismantling of the Routes completely and clearly described. Based on the lock table, a Control program that can run on a system computer manually or preferably automatically to be created. Due to the technical workability of the lock table, in which all conditions and assignments are specified in full, the control program can by a Program generator are generated automatically.

Zusätzliche Konditionen für beliebige Anlageelemente, die bisher nur mit grossem Aufwand berücksichtigt werden konnten, werden neu in zusätzlichen Zeilen eingefügt. Durch eine in einer weiteren Zeile vorgesehene logische Verknüpfung T1 von mehreren Konditionen können auch komplexere Bedingungen berücksichtigt werden. Diese Konditionen oder Verknüpfungen von Konditionen können als Parameter in weiteren Zeilen berücksichtigt werden.Additional conditions for any investment elements that were previously only taken into account with great effort could be inserted in new lines. By one on another line provided logical link T1 of several conditions can also more complex conditions be taken into account. These conditions or relationships of conditions can be used as parameters in other lines.

Durch diese vollständige und problemorientierte in einer einheitlichen, bahntechnischen Syntax (siehe Tabellen in Bild 1 und Bild 2) gehaltene Beschreibung zur Steuerung des Prozesses ist es möglich, zur Überprüfung der Resultate des auf einer Datenverarbeitungsanlage laufenden Stellprozesses für das Einstellen und Auflösen von Fahrstrassen die Beschreibung direkt zu nutzen. Damit lassen sich Fehler in der Verarbeitung des Rechnersystems leicht feststellen.Through this complete and problem-oriented in a uniform, technical syntax (see Tables in Fig. 1 and Fig. 2) for the control of the process it is possible to Review of the results of the positioning process running on a data processing system for the Setting and dissolving routes to use the description directly. This allows errors in easily determine the processing of the computer system.

Besonders wichtig für eine vorteilhafte Steuerung der Anlage ist der erste in der Verschlusstabelle vorgesehene Parameter, durch den die Freimelder FM entsprechend ihrer Reihenfolge im Fahrweg gekennzeichnet werden und die weiteren Anlageelemente (Weichen, Signale, etc.) wenigstens einem Freimelder FM zugeordnet werden. Diese Massnahmen sind insbesondere in bezug auf die Gewährleistung erhöhter Sicherheit beim Ablauf des Steuerungsprozesses von Vorteil. Ferner wird durch diese Massnahmen die Verfügbarkeit der Fahrstrassen erhöht. Abschnitte von eingestellten Fahrstrassen können aufgrund der festgelegten Reihenfolge der Freimelder FM nach der Durchfahrt des Fahrzeugs wieder freigegeben werden, wodurch eine partielle Auflösung der Fahrstrasse erzielt wird. Die "aufgelösten" Abschnitte der Fahrstrasse stehen daher bereits dann für den Aufbau weiterer Fahrstrassen wieder zur Verfügung, wenn das Fahrzeug das Ende der Fahrstrasse gegebenenfalls noch nicht erreicht hat. Durch einen Freimelder FM wird nämlich die Durchfahrt eines Fahrzeugs durch einen Gleisabschnitt registriert, so dass alle dem Freimelder FM zugeordneten Anlageelemente freigegeben werden können, sobald der Abschnitt von der Fahrstrasse abgekoppelt wird.The first one provided in the lock table is particularly important for an advantageous control of the system Parameter by which the FM free detector is identified in its order in the route and the other system elements (switches, signals, etc.) at least one vacant detector FM can be assigned. These measures are particularly related to the warranty Increased security during the control process is an advantage. Furthermore, through these measures the availability of the routes increases. Sections of set routes can due to the fixed order of the FM free signal after the vehicle has passed through again be released, whereby a partial dissolution of the route is achieved. The "dissolved" Sections of the driveway are therefore already available for the construction of further driveways Available if the vehicle has not yet reached the end of the route. By A clear signal FM is registered when a vehicle passes through a track section, so that all system elements assigned to the Freimelder FM can be released as soon as the Section is decoupled from the driveway.

Der erste Parameter der beispielsweise angegebenen Liste gemäss Bild 1 für die gezeigte Anlage wurde oben erläutert. Parameter 2 und 3 für Weichen betreffen die einstellbare Lage bzw. die Funktion, die die Welche im Fahrweg einnimmt. Z.B. wird sie nicht befahren, sondern dient als Flankenschutz, durch den feindliche Züge von der eingestellten Fahrstrasse ferngehalten werden. Parameter 2 für Freimelder betrifft die zu erfüllende Bedingung für die Umstellung des Startsignals auf grün (bzw. Fahrtfreigabe). Parameter 3 gibt an nach welchen Kriterien ein Abschnitt zu überwachen ist. Parameter 4 gibt an, welche Kriterien zu erfüllen sind damit die Fahrstrasse oder vorzugsweise ein Fahrstrassenabschnitt aufgelöst bzw. freigegeben wird. Parameter 2 für Signale definiert die Funktion des Signals. Parameter 3 gibt den anzuzeigenden Fahrbegriff an und Parameter 4 gibt die Bedingung an, die für die Signaländerung zu erfüllen ist.The first parameter of the list given, for example, in Figure 1 for the system shown was explained above. Parameters 2 and 3 for turnouts relate to the adjustable position or the function that the Which takes up in the driveway. For example, is not driven on, but serves as side protection, through which enemy trains are kept away from the set route. Parameter 2 for free detectors concerns the condition to be fulfilled for the changeover of the start signal to green (or trip approval). parameter 3 specifies the criteria used to monitor a section. Parameter 4 specifies which The route, or preferably a section of the route, is thus to be met or released. Parameter 2 for signals defines the function of the signal. Parameter 3 gives the Driving term to be displayed and parameter 4 specifies the condition for the signal change is fulfilled.

Bei der Steuerung der Anlage sind unter Umständen besondere Forderungen des Anwenders zu berücksichtigen, die auf ein spezielles Betriebsreglement oder eine besondere geographische Einbettung der zu steuernden Anlage gestützt sind. Deshalb sind vorzugsweise weitere Zeilen vorgesehen, in denen zusätzliche Konditionen angegeben sind, die als Parameter in der Verschlusstabelle (z.B. als Parameter Nr. 4 für das Stellen von Signalen) zu berücksichtigen sind. Mehrere Bedingungen können auch in einer zusätzlichen Zeile verknüpft werden. In der Verschlusstabelle, Zeile 29, sind die in Zeile 27 und Zeile 28 angegebenen Konditionen A und B UND-verknüpft. Das Ergebnis der Verknüpfung, das durch die Variable T1 repräsentiert wird, ist in der für das Signal S5 vorgesehenen Zeile 5, unter Parameter 4 als Bedingung angegeben. Das Signal S5 soll dabei nur dann auf einen Fahrbegriff Fahrt umgestellt werden, wenn durch die in der Zeichnung angegebene Barriere BA1 sowie eine Überwachungseinrichtung BÜ der zugehörige Bahnübergang gesichert wurde. Auf diese Weise können beliebige weitere anwendungsspezifische Bedingungen berücksichtigt werden. Die Konditionen A, B, ... können, d.h. natürlich auch einzeln in den Zeilen 1, ..., 26 berücksichtigt werden.When controlling the system, special requirements of the user may have to be taken into account, which to a special operating regulations or a special geographical embedding of the controlling system are supported. Therefore, additional lines are preferably provided, in which additional Conditions are specified that are used as parameters in the lock table (e.g. as parameters No. 4 for the placement of signals) must be taken into account. Multiple conditions can also be in one additional line can be linked. In the lock table, line 29, they are in line 27 and line 28 specified conditions A and B AND-linked. The result of the link created by the variable T1 is represented, is in the line 5 provided for the signal S5, under parameter 4 as a condition specified. The signal S5 should only be changed to a driving concept of driving, if through the barrier BA1 shown in the drawing and a monitoring device BÜ the associated level crossing was secured. In this way, any other application-specific Conditions are taken into account. Conditions A, B, ... can, i.e. Naturally also be considered individually in lines 1, ..., 26.

In grösseren Tabellenformaten werden die Elemente FM, S, etc. vorzugsweise in den Spalten und die Parameter in den Zeilen angegeben.In larger table formats, the elements FM, S, etc. are preferably in the columns and Parameters specified in the lines.

Durch die erfindungsgemässe Lösung können zudem auftretende Fehler erkannt und auf der Ebene der Prozesslogik korrigiert werden. In den heutigen Stellwerken erfolgt eine Überwachung von Gleisabschnitten, wie oben erwähnt, z.B. mittels Achszählern und/oder Gleisstromkreisen. Durch eine logische Verknüpfung der Zählergebnisse von zwei Achszählern wird festgestellt, ob ein Zug einen Gleisabschnitt passiert und vollständig verlassen hat. Sofern ein Zug den betreffenden Gleisabschnitt passiert hat und die Achszähler unterschiedliche Zählergebnisse aufweisen, wird bei bekannten Anlagen die Fahrstrasse nicht aufgelöst. Der Fehler lässt sich heute infolge vieler möglicher Einwirkungen nur schwer lokalisieren. Durch die logische Verknüpfung der Zählergebnisse von mehreren sich folgender Abschnitte von Achszählern untereinander sind Fehlerkorrekturen direkt in der Achszähllogik möglich. Der Aufwand für einen solchen Verbund unter Achszählern ist gross.
Erfindungsgemäss wird jedoch festgestellt in welcher Reihenfolge die Freimelder innerhalb einer Fahrstrasse angeordnet sind und passiert werden. Freimelder sind Achszähler und/oder Gleisstromkreise oder weitere Einrichtungen zur Detektion der Belegung eines Schienenabschnittes.
In der nachstehenden Tabelle sind die Zeilen der Verschlusstabelle nach Parameter 1 sortiert (die Werte von Parameter 1 steigen von Zeile zu Zeile stetig an.) Aus der Zeichnung ist ersichtlich, dass die Reihenfolge der Freimelder FM8 FM9 FM10 FM11 FM12, FM5, FM6 und FM7 der Reihenfolge der Gleisabschnitte entspricht, die bei der Benutzung des Fahrweges 5 sequentiell durchfahren werden.
The solution according to the invention can also identify occurring errors and correct them at the process logic level. In today's signal boxes, track sections are monitored, as mentioned above, for example by means of axle counters and / or track circuits. A logical combination of the count results from two axle counters determines whether a train has passed a section of track and has left it completely. If a train has passed the relevant section of the track and the axle counters have different counting results, the route is not resolved in known systems. The fault is difficult to localize today due to many possible influences. By logically linking the counting results of several successive sections of axle counters to each other, error corrections are possible directly in the axle counting logic. The effort for such a network among axle counters is great.
According to the invention, however, it is determined in what order the vacant detectors are arranged and passed within a route. Free detectors are axle counters and / or track circuits or other devices for detecting the occupancy of a rail section.
In the table below, the lines of the locking table are sorted according to parameter 1 (the values of parameter 1 increase steadily from line to line.) From the drawing it can be seen that the order of the free detectors FM8 FM9 FM10 FM11 FM12, FM5, FM6 and FM7 corresponds to the sequence of the track sections that are traversed sequentially when using the route 5.

Für die Auflösung der Fahrstrasse ist unter Parameter 4 die Bedingung If (Belegung und wieder Freiwerden) angegeben. Jeder dieser Gleisabschnitte muss daher vor der Auflösung belegt und wieder frei sein.

Figure 00080001
For the dissolution of the route, the condition If (occupancy and release) is specified under parameter 4. Each of these track sections must therefore be occupied before the dissolution and be free again.
Figure 00080001

Falls nun die Freimelder FM8, FM9, FM10 und FM12 die Erfüllung von Bedingung If von Parameter 4 melden (Gleisabschnitt belegt und wieder freigegeben), kann leicht festgestellt werden, dass bei Freimelder FM11 ein Fehler aufgetreten ist. Zur Verifikation dieses Sachverhalts können die Meldungen von weiteren Freimeldern (FM5, FM6 und FM7) abgewartet werden. Anschliessend werden nach der Bearbeitung des Fehlerbildes mit Hilfe logischer Regeln wenn erforderlich und möglich bahntechnisch zulässige Korrekturmassnahmen bei der Freigabe der Gleisabschnitte eingeleitet. Die befahrene Fahrstrasse kann entsprechend den vorgesehenen Sicherheitsregeln gesperrt oder ganz oder teilweise aufgelöst werden. Sind Korrekturen nicht zulässig, d.h. es wird kein Fehlverhalten erkannt, kann zur optischen Überprüfung des betreffenden Gleisabschnittes aufgefordert werden (z.B. wird geprüft, ob sich ein Wagen von der Zugskomposition löste). Zudem können die unter Umständen fehlerhaften Achszähler und/oder Glelsstromkreise einem Testverfahren unterworfen werden oder, so weit erforderlich, bis zur Instandstellung deaktiviert und funktionell substituiert werden. Besonders vorteilhaft ist, dass die notwendigen Korrekturmassnahmen basierend auf einer detaillierten Fehlerinformation zielgerichtet auf der Ebene der Prozesssteuerung angewendet werden können.If the free detectors FM8, FM9, FM10 and FM12 fulfill the condition If of parameter 4 report (track section occupied and released again), it can easily be ascertained that with free signaling FM11 an error has occurred. To verify this, the reports from further free detectors (FM5, FM6 and FM7) are awaited. Then after editing of the fault pattern using logical rules if necessary and possible permitted by rail technology Corrective measures initiated when the track sections are released. The busy driveway can be blocked or completely or partially dissolved in accordance with the security rules provided become. If corrections are not permitted, i.e. no misconduct is recognized, can lead to optical Inspection of the relevant track section may be requested (e.g. it is checked whether there is a wagon detached from the train composition). In addition, the axle counters, which may be faulty and / or Glelsstromkunden be subjected to a test procedure or, if necessary, until Maintenance deactivated and functionally substituted. It is particularly advantageous that the necessary Corrective measures based on detailed error information targeted at the Process control level can be applied.

Literatur:

  • [1] R. Hämmerli, Die Grundsätze der Sicherungsanlagen für den Eisenbahnbetrieb, herausgegeben von den Schweizerischen Bundesbahnen (SBB Kr I), Auflage vom Februar 1990, Band 1
  • [2] R. Hämmerli, Die Grundsätze der Sicherungsanlagen für den Eisenbahnbetrieb, herausgegeben von den Schweizerischen Bundesbahnen (SBB Kr I), Auflage vom Februar 1990, Band 2
  • [3] EP 0 831 006 A1
  • Literature:
  • [1] R. Hämmerli, The principles of safety systems for railway operations, published by the Swiss Federal Railways (SBB Kr I), edition from February 1990, Volume 1
  • [2] R. Hämmerli, The principles of safety systems for railway operations, published by the Swiss Federal Railways (SBB Kr I), edition from February 1990, volume 2
  • [3] EP 0 831 006 A1
  • Claims (12)

    1. Method for controlling and monitoring a railway engineering installation, which has actuating and monitoring elements, in particular points (W1, ..., W4), signals (S1, ..., S8) and release devices (FM1, ..., FM14), with which a control process based on an interlocking table, which, when a request is made to construct a route, blocks all the actuating elements associated with this route in respect of other requests to construct further routes and operating systems and then actuates these, ensures that at least two routes can be controlled for rail vehicles, characterised in that at least one parameter (1, 2, 3, 4) is assigned to the elements (W1, ..., W4; S1, ..., S8; FM1, ..., FM14) of the installation, relating to the statuses or assignments to be controlled or taken into account for each specified route, that one of the parameters (1) assigned to the release devices (FM1, ..., FM14) is used to determine the sequence of the release devices (FM1, ..., FM14) within the route and that one of the parameters (1) assigned to the other installation elements (W1, ..., W4; S1, ..., S8) is used to determine its association with at least one of the release devices (FM1, ..., FM14).
    2. Method according to Claim 1, characterised in that an interlocking table is used, in which the parameters are assigned to the installation elements (W1, ..., W4; S1, ..., S8; FM1, ..., FM14) and that the control process is generated manually or automatically on the basis of the interlocking table.
    3. Method according to Claim 2, characterised in that rows or columns are provided in the interlocking table for every installation element (W1, ..., W4; S1, ..., S8; FM1, ..., FM14) and that additional conditions (A, B) are specified in further rows or columns, relating to any other statuses to be taken into account.
    4. Method according to Claim 3, characterised in that the additional conditions (A, B) can be used individually or combined with each other through combinations specified in further rows or columns as parameters for the installation elements (W1, ..., W4; S1, ..., S8; FM1, ..., FM14).
    5. Method according to one of Claims 1-4, characterised in that, after construction and during occupancy of a route, it is determined whether the release devices associated with the route (FM8, FM9, FM10, FM11, FM12, FM5, FM6, FM7) are passed in sequence and that all the installation elements (W1, ..., W4; S1, ..., S8) assigned to a release device (FM8; FM9; FM10; FM11; FM12; FM5; FM6; FM7) are released, once the track section monitored by the release device (FM8; FM9; FM10; FM11; FM12; FM5; FM6; FM7) has been passed by the vehicle.
    6. Method according to Claim 5, characterised in that all the installation elements (W1, ..., W4; S1, ..., S8) released after occupancy of a track section are used as necessary for the construction of other routes.
    7. Method according to one of Claims 1 to 6, characterised in that the sequence of the release reports is verified by the release devices (FM8, FM9, FM10, FM11, FM12, FM5, FM6, FM7) during occupancy of a route (route 5).
    8. Method according to Claim 7, characterised in that corrective measures are instituted in the event of non-compliance with the sequence of release reports.
    9. Method according to Claim 8, characterised in that the release device (FM11), from which a release report is outstanding and/or the associated track section is checked.
    10. Method according to Claim 8 or 9, characterised in that, in the absence of a release report, the route is blocked or wholly or partially released.
    11. Method according to one of the preceding claims, characterised in that an interlocking table is used, in which all the parameters and combinations required for process control are assigned to the installation elements (W1, ..., W4; S1, ..., S8; FM1, ..., FM14) and that the control process is generated manually or automatically on the basis of the interlocking table.
    12. Method according to one of the preceding claims, characterised in that the results of the actuating process operating on a data processing installation are verified using the generated interlocking table, which, supplemented by the parameter list, forms a complete installation description.
    EP99928991A 1998-08-19 1999-07-19 Method and device for controlling a traffic installation Expired - Lifetime EP1109709B1 (en)

    Applications Claiming Priority (5)

    Application Number Priority Date Filing Date Title
    CH170498 1998-08-19
    CH170498 1998-08-19
    CH19499 1999-02-02
    CH19499 1999-02-02
    PCT/CH1999/000331 WO2000010860A1 (en) 1998-08-19 1999-07-19 Method and device for controlling a traffic installation

    Publications (2)

    Publication Number Publication Date
    EP1109709A1 EP1109709A1 (en) 2001-06-27
    EP1109709B1 true EP1109709B1 (en) 2002-11-27

    Family

    ID=25683840

    Family Applications (1)

    Application Number Title Priority Date Filing Date
    EP99928991A Expired - Lifetime EP1109709B1 (en) 1998-08-19 1999-07-19 Method and device for controlling a traffic installation

    Country Status (6)

    Country Link
    EP (1) EP1109709B1 (en)
    JP (1) JP3523203B2 (en)
    AT (1) ATE228451T1 (en)
    DE (1) DE59903573D1 (en)
    HU (1) HU223978B1 (en)
    WO (1) WO2000010860A1 (en)

    Cited By (2)

    * Cited by examiner, † Cited by third party
    Publication number Priority date Publication date Assignee Title
    CN110901701A (en) * 2019-12-06 2020-03-24 上海富欣智能交通控制有限公司 Rail train route handling method and system
    CN111814280A (en) * 2020-06-10 2020-10-23 中国兵器科学研究院 Urban rail transit planning method, server and computer-readable storage medium

    Families Citing this family (4)

    * Cited by examiner, † Cited by third party
    Publication number Priority date Publication date Assignee Title
    GB2392987B (en) 2001-05-08 2005-08-31 Safetran Systems Corp Condition monitoring system
    WO2006000182A1 (en) * 2004-06-24 2006-01-05 Siemens Aktiengesellschaft Method for planning routes for signal boxes
    EP1893464B1 (en) * 2005-06-21 2010-05-12 Siemens Schweiz AG Method for the formation of random logic operations in a control unit, and control unit
    CN108082213A (en) * 2017-11-10 2018-05-29 北京全路通信信号研究设计院集团有限公司 Static interlocking table-based route control method and device and computer storage medium

    Family Cites Families (3)

    * Cited by examiner, † Cited by third party
    Publication number Priority date Publication date Assignee Title
    BR8106402A (en) * 1980-10-08 1982-06-22 Westinghouse Electric Corp APPARATUS TO DETERMINE THE ROUTE OF AT LEAST ONE VEHICLE THAT MOVES LONG PAIN RAILROAD TRACKS AND METHOD OF CONTROL OF THE MOVEMENT OF A VEHICLE ALONG A TRACK
    DE3922620C1 (en) * 1989-07-10 1991-02-28 Ivv Ingenieurgesellschaft Fuer Verkehrsplanung Und Verkehrssicherung Gmbh, 3300 Braunschweig, De
    FR2739824B1 (en) * 1995-10-13 1997-11-14 Gec Alsthom Transport Sa RAIL INTERLOCKING SYSTEM WITH SOFTWARE ARCHITECTURE AND ITS IMPLEMENTATION METHOD

    Cited By (3)

    * Cited by examiner, † Cited by third party
    Publication number Priority date Publication date Assignee Title
    CN110901701A (en) * 2019-12-06 2020-03-24 上海富欣智能交通控制有限公司 Rail train route handling method and system
    CN110901701B (en) * 2019-12-06 2021-08-03 上海富欣智能交通控制有限公司 Rail train route handling method and system
    CN111814280A (en) * 2020-06-10 2020-10-23 中国兵器科学研究院 Urban rail transit planning method, server and computer-readable storage medium

    Also Published As

    Publication number Publication date
    HU223978B1 (en) 2005-04-28
    HUP0103280A2 (en) 2001-11-28
    DE59903573D1 (en) 2003-01-09
    JP3523203B2 (en) 2004-04-26
    JP2002523288A (en) 2002-07-30
    EP1109709A1 (en) 2001-06-27
    WO2000010860A1 (en) 2000-03-02
    ATE228451T1 (en) 2002-12-15
    HUP0103280A3 (en) 2003-04-28

    Similar Documents

    Publication Publication Date Title
    DE102019212177A1 (en) Process and route control center for operating a rail line
    EP0739802B1 (en) Method for improving availability of multi-section axle counters
    EP3075625B1 (en) Method and system for dynamic path securing in a multi-track track system
    EP1097077A2 (en) Method for reducing data in railway operation
    EP1109709B1 (en) Method and device for controlling a traffic installation
    EP3075626B1 (en) Method and system for operating a railway system
    DE19535856A1 (en) Computer control system with distributed requirement, non-synchronised region and control computers in different hierarchical planes for railway station signal handling where several trains are awaiting signals for the same track
    EP1292480A1 (en) Method for indicating whether a railway track is free or occupied
    EP0920391B1 (en) Process of controlling and monitoring a traffic control system
    EP3109127A1 (en) Method for signalling an expansion of a movement authority from a route control station to a positioning body
    EP4116170A1 (en) Method for operating a train control system
    DE2543089C2 (en) Circuit arrangement for securing track vacancy detection information
    EP3580114B1 (en) Method and apparatus for setting at least one route for a railway installation
    DE10240376B4 (en) Safe train log book
    EP3612429B1 (en) Method for operating a railway and interlocking for such a railway
    EP1637427B1 (en) Train safety assembly and method
    EP2143614B1 (en) Method and device for secured notification that a section of track is available
    EP1893464B1 (en) Method for the formation of random logic operations in a control unit, and control unit
    CH692851A5 (en) A method for treating and regulating Gesamtzugfahrstrassen using remaining Teilzugfahrstrassen.
    DE1605419C (en) Device for triggering point-setting orders in process signal boxes with automatic program control
    DE1455390C (en) Device for creating routes in railway signal boxes
    CH691963A5 (en) Method for avoiding route- resolving interference in signal boxes and means for implementing the method.
    DD294902B5 (en) Method for automatic train notification
    DE1928667A1 (en) Minus-axis locking circuit for turnout zones in process signal boxes with automatic program control
    DE1530391B2 (en) DEVICE FOR THE TRIGGERING OF TURNOUT COMMANDS IN SWITCHING PLANTS WITH INDEPENDENT PROGRAM CONTROL

    Legal Events

    Date Code Title Description
    PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

    Free format text: ORIGINAL CODE: 0009012

    17P Request for examination filed

    Effective date: 20010120

    AK Designated contracting states

    Kind code of ref document: A1

    Designated state(s): AT BE CH CY DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE

    GRAG Despatch of communication of intention to grant

    Free format text: ORIGINAL CODE: EPIDOS AGRA

    GRAG Despatch of communication of intention to grant

    Free format text: ORIGINAL CODE: EPIDOS AGRA

    17Q First examination report despatched

    Effective date: 20020304

    GRAG Despatch of communication of intention to grant

    Free format text: ORIGINAL CODE: EPIDOS AGRA

    GRAH Despatch of communication of intention to grant a patent

    Free format text: ORIGINAL CODE: EPIDOS IGRA

    GRAH Despatch of communication of intention to grant a patent

    Free format text: ORIGINAL CODE: EPIDOS IGRA

    GRAA (expected) grant

    Free format text: ORIGINAL CODE: 0009210

    AK Designated contracting states

    Kind code of ref document: B1

    Designated state(s): AT CH DE FR GB IT LI

    REF Corresponds to:

    Ref document number: 228451

    Country of ref document: AT

    Date of ref document: 20021215

    Kind code of ref document: T

    REG Reference to a national code

    Ref country code: GB

    Ref legal event code: FG4D

    Free format text: NOT ENGLISH

    REG Reference to a national code

    Ref country code: CH

    Ref legal event code: EP

    GBT Gb: translation of ep patent filed (gb section 77(6)(a)/1977)

    Effective date: 20021127

    REF Corresponds to:

    Ref document number: 59903573

    Country of ref document: DE

    Date of ref document: 20030109

    ET Fr: translation filed
    PLBE No opposition filed within time limit

    Free format text: ORIGINAL CODE: 0009261

    STAA Information on the status of an ep patent application or granted ep patent

    Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

    26N No opposition filed

    Effective date: 20030828

    REG Reference to a national code

    Ref country code: CH

    Ref legal event code: PCOW

    Free format text: SIEMENS SCHWEIZ AG;FREILAGERSTRASSE 40;8047 ZUERICH (CH)

    PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

    Ref country code: IT

    Payment date: 20100728

    Year of fee payment: 12

    Ref country code: FR

    Payment date: 20100809

    Year of fee payment: 12

    Ref country code: AT

    Payment date: 20100609

    Year of fee payment: 12

    PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

    Ref country code: DE

    Payment date: 20100920

    Year of fee payment: 12

    REG Reference to a national code

    Ref country code: AT

    Ref legal event code: MM01

    Ref document number: 228451

    Country of ref document: AT

    Kind code of ref document: T

    Effective date: 20110719

    REG Reference to a national code

    Ref country code: FR

    Ref legal event code: ST

    Effective date: 20120330

    PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

    Ref country code: FR

    Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

    Effective date: 20110801

    Ref country code: DE

    Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

    Effective date: 20120201

    REG Reference to a national code

    Ref country code: DE

    Ref legal event code: R119

    Ref document number: 59903573

    Country of ref document: DE

    Effective date: 20120201

    PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

    Ref country code: IT

    Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

    Effective date: 20110719

    PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

    Ref country code: GB

    Payment date: 20120709

    Year of fee payment: 14

    PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

    Ref country code: AT

    Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

    Effective date: 20110719

    PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

    Ref country code: CH

    Payment date: 20131010

    Year of fee payment: 15

    GBPC Gb: european patent ceased through non-payment of renewal fee

    Effective date: 20130719

    PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

    Ref country code: GB

    Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

    Effective date: 20130719

    REG Reference to a national code

    Ref country code: CH

    Ref legal event code: PL

    PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

    Ref country code: CH

    Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

    Effective date: 20140731

    Ref country code: LI

    Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

    Effective date: 20140731