EP0995840A2 - Portal und Tragrahmen für eines oder mehrere Verkehrszeichen über einer Strasse, und Verfahren zum Entfernen, Installieren und Austauschen davon - Google Patents

Portal und Tragrahmen für eines oder mehrere Verkehrszeichen über einer Strasse, und Verfahren zum Entfernen, Installieren und Austauschen davon Download PDF

Info

Publication number
EP0995840A2
EP0995840A2 EP99203438A EP99203438A EP0995840A2 EP 0995840 A2 EP0995840 A2 EP 0995840A2 EP 99203438 A EP99203438 A EP 99203438A EP 99203438 A EP99203438 A EP 99203438A EP 0995840 A2 EP0995840 A2 EP 0995840A2
Authority
EP
European Patent Office
Prior art keywords
signalling
rail system
panels
gantry
main rail
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
EP99203438A
Other languages
English (en)
French (fr)
Other versions
EP0995840A3 (de
Inventor
Johan Jan Gaastra
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hoka BV
Original Assignee
Hoka BV
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hoka BV filed Critical Hoka BV
Publication of EP0995840A2 publication Critical patent/EP0995840A2/de
Publication of EP0995840A3 publication Critical patent/EP0995840A3/de
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G09EDUCATION; CRYPTOGRAPHY; DISPLAY; ADVERTISING; SEALS
    • G09FDISPLAYING; ADVERTISING; SIGNS; LABELS OR NAME-PLATES; SEALS
    • G09F7/00Signs, name or number plates, letters, numerals, or symbols; Panels or boards
    • G09F7/02Signs, plates, panels or boards using readily-detachable elements bearing or forming symbols
    • G09F7/08Signs, plates, panels or boards using readily-detachable elements bearing or forming symbols the elements being secured or adapted to be secured by means of grooves, rails, or slits
    • G09F7/10Signs, plates, panels or boards using readily-detachable elements bearing or forming symbols the elements being secured or adapted to be secured by means of grooves, rails, or slits and slideably mounted
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01FADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
    • E01F9/00Arrangement of road signs or traffic signals; Arrangements for enforcing caution
    • E01F9/60Upright bodies, e.g. marker posts or bollards; Supports for road signs
    • E01F9/696Overhead structures, e.g. gantries; Foundation means specially adapted therefor

Definitions

  • the present invention relates to a gantry for supporting one or more signalling panels above a roadway, comprising a mast and a bearing arm, which is attached to the mast at a distance above the roadway and extends over the roadway, for signalling panels.
  • Such gantries which are arranged over the roadway and have signalling panels for giving signals to passing traffic are very generally known.
  • a person has to ascend along the mast or in some other way in order to reach the catwalk of the bearing arm. This person can then move along the catwalk of the bearing arm and carry out his/her work.
  • One object of the present invention is to prevent the abovementioned drawbacks.
  • signalling panels are understood in a broad sense to mean road signs bearing traffic instructions, road signs bearing information, such as information on directions and distances to be travelled and other route information, and the signalling panels may be both panels with permanently visible information and signals, for example signs with text printed on them, as well as signalling panels with information which is not permanent but is predetermined, as well as panels with any information which can be stipulated in more detail and in particular can be programmed, and signals which may be supplied, for example, by radio or electronic means.
  • the signalling panels may in this case be signalling panels with lights, such as for example LEDs, traffic lights and fibre-optic cable lights.
  • Another object of the present invention is to overcome the above drawbacks.
  • the particular object of the present invention is to provide a gantry of the type referred to at the outset in which the signalling panels are accessible for maintenance, replacement, etc. without obstruction to the traffic, or at least with minimal obstruction.
  • the bearing arm is provided with a main rail system which extends in the longitudinal direction thereof, preferably supports the signalling panels and along which the signalling panels can be displaced.
  • the signalling panels By attaching the signalling panels to the bearing arm in such a manner that they can be displaced along the main rail system, they can, if appropriate in succession, be displaced to a location from which, if appropriate, they can be removed or dealt with in some other way for maintenance.
  • the signalling panels are also supported by the main rail system, i.e. signalling panels are suspended from the bearing arm via the main rail system even when the signalling panels are carrying out their signalling task and do not have to be displaced.
  • the signalling panels can be moved to their location where a signalling task is to be carried out by means of the main rail system and then to be uncoupled from the main rail system in order to be suspended from the bearing arm in some other way, which can be realized in various manners by an average person skilled in the art.
  • the gantry according to the invention may contain one signalling panel, but may also contain a larger number of signalling panels, in principle even an unlimited number of signalling panels. In this case, the number of signalling panels will tend to be limited more by the length of the bearing arm and the width of each signalling panel.
  • the signalling panels are provided with wheels and/or shoes for engaging on the main rail system, the main rail system and the wheels and/or shoes being designed in such a manner that the panels are substantially fixed in the directions which are transverse with respect to the main rail system.
  • fixing in the longitudinal direction of the main rail system is also advantageous, but this can be achieved in a very wide variety of ways, for example by completely filling the main rail system with signalling panels or, if appropriate, placing spacers between adjoining signalling panels and positioning a stop or some other blocking means at the ends of the main rail system, preventing movement of the overall assembly in the longitudinal direction of the main rail system.
  • main rail system extends horizontally. There is then no need to overcome or resist any force of gravity during displacement, the same, incidentally, also applying when the gantry becomes operative.
  • the main rail system is accommodated in a housing, in which the signalling panels are or can be held as well.
  • the housing will preferably be substantially completely closed, in which case, in order to ensure that the signalling panels are visible, a wall which is transparent in some way, for example a window preferably made from plastic, is positioned in front of the active surfaces of the signalling panels.
  • a transparent wall is understood to mean a wall which is transparent to a sufficient extent for the signal given by the signalling panel behind it to be visible to the people in the traffic.
  • the main rail system at one end extends as far as or beyond a side of the roadway on which there is no traffic, such as for example the hard shoulder.
  • the work can then be carried out from the side on which there is no traffic, in particular the hard shoulder in the case of a motorway.
  • signalling panels which adjoin one another in the longitudinal direction of the main rail system are or at least can be connected to one another by means of releasable coupling means. This is because connecting signalling panels which adjoin one another in the longitudinal direction of the main rail system by means of coupling means makes it possible to displace all the signalling panels by exerting a pulling or pushing force on only one of the signalling panels.
  • the signalling panels may each comprise a multiplicity of LEDs.
  • Each signalling panel may, for example, be equipped with a matrix of a large number of LEDs which are then activated so as to light up or not light up depending on the signal which it is desired to emit.
  • the LEDs may, if appropriate, be suitable for giving different coloured signals, for example by using LEDs of different colours or by using LEDs which are able to emit light of more than one colour.
  • the adjacent signalling panels may be connected to one another, in which case a signal which is to be emitted can be formed by means of LEDs on two or, if appropriate, more panels.
  • the signal may, for example, be an arrow, a speed limit, an (overtaking) ban, a message, an indication that the lane has to be exited/must not be driven on, etc.
  • the gantry furthermore comprises an auxiliary rail system which is or can be releasably arranged next to and in line with the main rail system, and in which a signalling panel can be held and fixed by means of fixing means.
  • a signalling panel can then be transferred from the main rail system into the auxiliary rail system by sliding and/or moving this signalling panel directly out of the main rail system into the auxiliary rail system. Then, the signalling panel, if appropriate inside the main rail system, can be inspected for repair or maintenance.
  • the signalling panel is uncoupled from the main rail system and the gantry together with the auxiliary rail system, in order then to be temporarily moved away together with the auxiliary rail system, in order, for example, to be able to remove a following signalling panel or, if appropriate, to be taken to a workplace for maintenance and/or repair.
  • the gantry furthermore comprises a hoist device, which is or at least may be arranged at one end of the main rail system, and with which a signalling panel, which may be fixedly held in an auxiliary rail system according to Claim 9, can be hoisted up or lowered.
  • a hoist device which is or at least may be arranged at one end of the main rail system, and with which a signalling panel, which may be fixedly held in an auxiliary rail system according to Claim 9, can be hoisted up or lowered.
  • the invention furthermore relates to an assembly of a gantry according to the invention and one or more auxiliary rail systems, also according to the invention, which can be used in this gantry.
  • the invention also relates to an assembly of a gantry according to the invention and a hoist device according to the invention.
  • the invention furthermore also relates to a frame for signalling panels above a roadway, which frame is provided with attachment means for attaching the frame to a gantry, preferably the bearing arm thereof, characterized in that the frame is provided with a main rail system which extends in the longitudinal direction thereof, preferably supports the signalling panels and along which the signalling panels can be displaced.
  • a frame of this nature can be designed in more detail as described in the characterizing clauses of Claims 2-10, in which case, in Claims 9 and 10, the word frame should be substituted for gantry.
  • the invention furthermore in particular also relates to a number of methods for handling one or more signalling panels.
  • the invention relates to a method for removing a signalling panel from the gantry according to the invention, characterized
  • the invention furthermore in particular also relates to a method for placing a signalling panel in a gantry according to the invention, characterized
  • the invention furthermore in particular also relates to a method for replacing one or more signalling panels in a gantry according to the invention, characterized
  • Figure 1 shows a highly diagrammatic view of a gantry 1, comprising two masts 3 which are positioned on either side of the roadway 4 and between them support a horizontal bearing arm 2.
  • the bearing arm 2 comprises three horizontal bars 5 which are arranged in a triangular pattern, with sloping struts 6 between them.
  • the bearing arm 2 may be designed in a completely different way within the scope of the invention.
  • the roadway 4 comprises a left-hand lane 7, a right-hand lane 8 and a hard shoulder 9.
  • a housing 10 is arranged on the bearing arm 2 and has a transparent, sealed window 11, behind which there are one or more signalling panels which are denoted by dashed lines as 30 in Fig. 1 and are visible to people in traffic at least when those panels are emitting a signal via the window 11.
  • the housing 10 is attached to the bearing arm 2 by means of top clamping means 12, which are clamped securely onto the top, front bar 5, and bottom clamping means 13, which are clamped securely onto the bottom bar 5.
  • top clamping means 12 which are clamped securely onto the top, front bar 5, and bottom clamping means 13, which are clamped securely onto the bottom bar 5.
  • bottom clamping means 13 which are clamped securely onto the bottom bar 5.
  • the intermediate arm 14 between the housing 10 and the bottom clamping means 13 is designed so that its length can be adjusted.
  • the housing 10 which is substantially closed and of which at least the right-hand end (as seen in Figure 1) and, if appropriate, also the left-hand end is provided with a removable end closure, is provided on the inside with a main rail system which comprises a bottom rail 15 and a top rail 16. If the bottom rail and the top rail were both to be of U-shaped design, were to be aligned with respect to one another and were to have an internal width equal to the thickness of the bottom or top edge of the signalling panels 30, the bottom and top edges of the signalling panels 30 could be fitted directly into the bottom and top rails, respective.
  • the signalling panels are provided, on their top and bottom sides, with running means, for example wheels or easily movable shoes, which interact with the respective rail; if appropriate these features may be provided in combination.
  • running means for example wheels or easily movable shoes, which interact with the respective rail; if appropriate these features may be provided in combination.
  • wheels 17 and 18 have been selected for both the bottom side and the top side.
  • the wheels 17 and 18 and the bottom and top rails 15 and 16 are designed, in combination, in such a manner that it is impossible, or at least scarcely possible, for the signalling panel 30 to move in any transverse direction with respect to the main rail system 15, 16.
  • a transverse direction is understood to mean a direction which is parallel to the plane of the drawing in accordance with Figure 3.
  • the signalling panel 30 can be raised slightly due to the slight clearance at the top rail 16 between the wheel 18 and the top side of the top rail 16, but this can still be regarded as being substantially fixed in the vertical transverse direction.
  • the top rail 16 and the bottom rail 15 extend at least as far as the right-hand end of the housing 10.
  • the rails 15 and 16 may also extend as far as the left-hand end, but in that case it is advantageous, in the section between the left-hand end and the window 11, for spacers to be placed in the rails 15 or 16 or for a stop to be placed on the rails 15 and 16 at the location of approximately the left-hand end of the window 11, so that the signalling panels, in the exemplary embodiment six (indicated by dashed lines in Figure 1), can all be pushed from the right-hand side to a location precisely behind the window 11 without them being pushed on too far or without the possibility of them subsequently sliding to the left.
  • the signalling panels 30 it is extremely advantageous for the signalling panels 30 to be coupled to one another, in the sense that signalling panels which adjoin one another in the longitudinal direction of the main rail system are connected to one another via simple connecting means (indicated highly diagrammatically by 31 in Fig. 1) in such a manner that it is possible to pull the signalling panel 30 which is located on the far right and, in so doing, at the same time to pull with it signalling panels 30 which are located to the left of this panel. In this way, each signalling panel 30 can be removed from the housing 10 one by one from the right-hand side.
  • the hoist device 20 comprises a hoist mechanism 25 with cable 21 for attaching to the auxiliary frame 22 and an inclined bar 26 and horizontal bar 27 for attaching the hoist mechanism 25 to the housing 10.
  • the attachment to the housing 10 by means of inclined bar 26 and horizontal bar 27 may be removable, in which case the hoist device 20 is put in place only when it is required and after the end has been removed from the housing. By paying out or hauling in the cable 21, it is possible to move the auxiliary frame 22 upwards or downwards.
  • the auxiliary frame 22 comprises a substantially U-shaped system of rods which can be fitted into the sleeve cavities 28 and 29 ( Figure 2) of the housing 10.
  • the bottom horizontal bar bears a bottom auxiliary rail 23 which, in the position in which it has been fitted into the sleeve cavity 28, lies precisely in line with the bottom main rail 15.
  • the top horizontal bar of the frame bears a top auxiliary rail 24 on its underside, which top auxiliary rail, when the top horizontal bar has been fitted into the sleeve cavity 29, lies precisely in line with the top main rail 16.
  • the horizontal dimension of the auxiliary frame 22 is such that a signalling panel 30 can be held fully therein.
  • the right-hand signalling panel 30 in the housing can be pulled until it is completely or almost completely inside the auxiliary frame 22, in the auxiliary rails 23, 24. Then, the signalling panel 30 which is located furthest to the right is uncoupled from the following signalling panel 30, which is coupled thereto on the left-hand side, after which the signalling panel 30 which is situated furthest to the right and has been uncoupled from the signalling panel 30 which adjoins it on the left-hand side, can be pushed further until it is completely inside the auxiliary frame 22 and can be fixed thereto, and the auxiliary frame 22, holding the signalling panel 30 which is furthest to the right and has already been uncoupled from the housing 10, can be moved downwards, for example by means of the hoist device 20. Then, a following signalling panel 30 can be removed, etc. It will also be clear that the signalling panels 30 can be placed into the housing 10 in a similar manner but in reverse order.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
  • Road Signs Or Road Markings (AREA)
EP99203438A 1998-10-19 1999-10-19 Portal und Tragrahmen für eines oder mehrere Verkehrszeichen über einer Strasse, und Verfahren zum Entfernen, Installieren und Austauschen davon Withdrawn EP0995840A3 (de)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
NL1010350 1998-10-19
NL1010350A NL1010350C2 (nl) 1998-10-19 1998-10-19 Portaal en frame voor het boven een rijweg dragen van één of meer signaleringspanelen en werkwijzen voor het verwijderen, plaatsen respectievelijk omwisselen van signaleringspanelen.

Publications (2)

Publication Number Publication Date
EP0995840A2 true EP0995840A2 (de) 2000-04-26
EP0995840A3 EP0995840A3 (de) 2003-06-04

Family

ID=19767986

Family Applications (1)

Application Number Title Priority Date Filing Date
EP99203438A Withdrawn EP0995840A3 (de) 1998-10-19 1999-10-19 Portal und Tragrahmen für eines oder mehrere Verkehrszeichen über einer Strasse, und Verfahren zum Entfernen, Installieren und Austauschen davon

Country Status (2)

Country Link
EP (1) EP0995840A3 (de)
NL (1) NL1010350C2 (de)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE10244352A1 (de) * 2002-09-24 2004-04-01 alpine project technology ges. m.b.h. Geräteträger
WO2010106247A1 (fr) 2009-03-20 2010-09-23 Sanef Portique routier
CZ304403B6 (cs) * 2012-08-24 2014-04-16 Eurovia Cs, A.S. Silniční portál

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4212124A1 (de) * 1992-04-11 1993-10-14 Segor Gmbh & Co Kg Wechselverkehrszeichenanlage
GB2270461A (en) * 1992-09-11 1994-03-16 Magiboards Ltd Support apparatus
DE29712198U1 (de) * 1997-07-11 1997-09-04 Klimek Frank Schilderbrücke für den Straßenverkehr
DE19612484A1 (de) * 1996-03-29 1997-10-02 Henning Faseroptik Gmbh Schilderbrücke

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5008967A (en) 1989-07-13 1991-04-23 Modern Industries, Inc. Triangular truss walkout cantilever

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4212124A1 (de) * 1992-04-11 1993-10-14 Segor Gmbh & Co Kg Wechselverkehrszeichenanlage
GB2270461A (en) * 1992-09-11 1994-03-16 Magiboards Ltd Support apparatus
DE19612484A1 (de) * 1996-03-29 1997-10-02 Henning Faseroptik Gmbh Schilderbrücke
DE29712198U1 (de) * 1997-07-11 1997-09-04 Klimek Frank Schilderbrücke für den Straßenverkehr

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE10244352A1 (de) * 2002-09-24 2004-04-01 alpine project technology ges. m.b.h. Geräteträger
WO2010106247A1 (fr) 2009-03-20 2010-09-23 Sanef Portique routier
US8816877B2 (en) 2009-03-20 2014-08-26 Sanef Road gantry
CZ304403B6 (cs) * 2012-08-24 2014-04-16 Eurovia Cs, A.S. Silniční portál

Also Published As

Publication number Publication date
EP0995840A3 (de) 2003-06-04
NL1010350C2 (nl) 2000-05-08

Similar Documents

Publication Publication Date Title
EP0125817B1 (de) Versetzbare Fahrspurteiler
CN204435957U (zh) 一种无避让路边立体停车装置
CN204457008U (zh) 一种道路上空立体停车系统
EP0995840A2 (de) Portal und Tragrahmen für eines oder mehrere Verkehrszeichen über einer Strasse, und Verfahren zum Entfernen, Installieren und Austauschen davon
US4755089A (en) Vehicle adapted to facilitate the loading and unloading of objects
CN209907131U (zh) 一种自动式行人过街装置
CN108018788B (zh) 一种道路交通指示装置
US20190063017A1 (en) Structure for supporting an information or surveillance device above a road
PT2493653E (pt) Método para o funcionamento de uma linha de fluxo, um reboque de montagem, uma barra de tração e uma máquina pesada instalada sobre um reboque de montagem e uma linha de fluxo
CN108492743A (zh) 一种城市规划设计用指示牌
JP2005200844A (ja) 自走式トンネル内作業用台車
ES2907178T3 (es) Sistema de señalización de carretera sobre máquina de carretera
EP3107084A1 (de) Vorrichtung für dekorationen und werbung an brückengeländern oder am strassenrand
KR100710877B1 (ko) 유턴차선 표시용 완충식 도로 표지병
JPS6131512A (ja) 移動可能な車線分離装置とその移動方法
CN214006773U (zh) 一种建筑施工安全防护装置
CA1232784A (en) Transferable lane divider
DE3920309C1 (en) Mobile traffic warning unit for motorway - has energy source e.g. battery for motor which drives carriage and warning light
AU2020404443B2 (en) A vehicle mounted system for deploying and retrieving traffic barriers
CN217735090U (zh) 一种房建施工临边防护结构
CN211897991U (zh) 一种etc门架
CN212025986U (zh) 一种可拆卸组装的环保型显示装置
CN216623618U (zh) 一种可变化指示方向的指示牌
CN219386116U (zh) 一种智能交通护栏
KR102520130B1 (ko) 도로 공사용 라바콘 이송차량

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A2

Designated state(s): AT BE CH CY DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE

AX Request for extension of the european patent

Free format text: AL;LT;LV;MK;RO;SI

PUAL Search report despatched

Free format text: ORIGINAL CODE: 0009013

AK Designated contracting states

Designated state(s): AT BE CH CY DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE

AX Request for extension of the european patent

Extension state: AL LT LV MK RO SI

RIC1 Information provided on ipc code assigned before grant

Ipc: 7G 09F 7/10 B

Ipc: 7E 01F 9/011 A

AKX Designation fees paid
REG Reference to a national code

Ref country code: DE

Ref legal event code: 8566

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN

18D Application deemed to be withdrawn

Effective date: 20031205