EP0758699B1 - Method for installing tapered piles, tapered piles, and foundation structures made with these piles - Google Patents
Method for installing tapered piles, tapered piles, and foundation structures made with these piles Download PDFInfo
- Publication number
- EP0758699B1 EP0758699B1 EP96111806A EP96111806A EP0758699B1 EP 0758699 B1 EP0758699 B1 EP 0758699B1 EP 96111806 A EP96111806 A EP 96111806A EP 96111806 A EP96111806 A EP 96111806A EP 0758699 B1 EP0758699 B1 EP 0758699B1
- Authority
- EP
- European Patent Office
- Prior art keywords
- piles
- pile
- ground
- concrete
- concrete piles
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/10—Deep foundations
- E02D27/12—Pile foundations
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/10—Deep foundations
- E02D27/12—Pile foundations
- E02D27/14—Pile framings, i.e. piles assembled to form the substructure
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D3/00—Improving or preserving soil or rock, e.g. preserving permafrost soil
- E02D3/02—Improving by compacting
- E02D3/08—Improving by compacting by inserting stones or lost bodies, e.g. compaction piles
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/24—Prefabricated piles
- E02D5/30—Prefabricated piles made of concrete or reinforced concrete or made of steel and concrete
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D7/00—Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
- E02D7/18—Placing by vibrating
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D7/00—Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
- E02D7/26—Placing by using several means simultaneously
Definitions
- the invention initially relates to a method for introduction of piles tapering in the direction of insertion the ground, which is used to support or support buildings or building parts, in particular building foundations serve (preamble of claim 1).
- Such, in the Piles also called “nails” by experts are from DE-PS 194 125 in the form of hollow ramming piles tapering downwards known from reinforced concrete. According to the title cited above In this patent, these piles are said to be in the ground be rammed in.
- steam-driven battering rams usual ramming of piles, sheet piling and the like referred to by steam-driven battering rams.
- This composition of the pile to be driven in from several Elements has the further disadvantage that the elements shift at their junctures can, or that the junction from the flight of the Elements to the side, so that the entire pile in has one or more kinks.
- the aforementioned are often Shifts or kinks after insertion of the concrete pile can no longer be determined and therefore a permanent threat to the structure supported by it represent.
- WO 94/17252 discloses piles and methods which should contribute to an improvement of the foundation. To do this, use a slightly tapered pile Hammering or vibration driven into the ground. The created hole is either directly with cement or similar poured out or struts first inserted and then poured cement into it.
- the task or problem of the invention is in contrast, initially in a procedure for collecting of piles according to the preamble of claim 1 in to create the earth with a relatively small Work and material expenditure is feasible, the so driven piles under the one resting on them No or practically no longer set the building load, i.e. not penetrate further into the ground, which is a corresponding lowering (settlement) of the building in question would result.
- the piles reciprocate in their longitudinal direction Vibrations and in this way initially in the Earth can be driven to a position that is short before reaching its intended final depth it is convenient that the vibrations are then switched off and then a final phase of driving in by application a vibration-free force acting in the driving direction on the pile until it is pre-tensioned is firmly held in the ground.
- This bias can also be seen as a wedging or bracing of the pile be understood with the adjacent soil.
- the bringing in such piles by means of in their longitudinal direction and vibrations are compared to the known Ramming cheaper because it is essential with a less equipment expenditure and also one essential less noise can occur.
- a preferred embodiment of the method according to the invention is the subject of claim 2 the pile is not under the longitudinal vibrations or -vibrations set, but by means of an appropriate Tensile or compressive force over a portion of its length in depressed the ground. It is therefore relative to the earth firmly held so that the on it in its longitudinal direction acting vibrations can not lead to it moved aside or even damaged.
- the invention further relates to the configurations from Concrete or reinforced concrete existing piles for the implementation of the method according to the invention can be used can. For this purpose, reference is made to claims 3 to 11.
- the concrete piles are over their entire Length with a tapered or arched downward Provide taper.
- the surfaces roughened the outside of the piles or there are there deepenings.
- the piles take on their diameter viewed from the bottom up constantly. This has a constant displacement of the soil with the introduction of the piles. It will also hold the Piles in the ground with the pretension explained in claim 1 further consolidated.
- the further in such piles provided roughening or deepening support the The piles in question stop in or on the side of the ground.
- Claim 5 gives the Possibility of inclining or tapering the piles in Dependence on the consistency of the respective soil choose. This tendency can be around 2-6%.
- Claim 7 includes a preferred embodiment of the Invention for creating outer surfaces or sides of the Concrete pile, which have roughening and / or depressions.
- the claims 9 and 10 allow the attachment both a vibrator as well as a foundation, e.g. one Support plate.
- the principle of driving the piles 1 into the ground 2 is shown in Figs. 1-4.
- the stake in question 1 is with a only schematically indicated bracket 3 in placed vertically on the ground 2 and then by a pushing or pulling force according to arrow 4 over a Section 5 of its total length L pressed into the ground. This indentation is vibration-free or vibration-free.
- the upper end face 6 of the Pile 1 a vibrator, here only schematically indicated vibrator 7, placed in the, not shown Way connected to the upper portion 8 of the pile 1 and this in its longitudinal direction A-B according to the Arrows 9 swings up and down until it is the one shown in FIG Has reached the driving position.
- the pile 1 is tapered downwards. He can any cross-sectional shape, e.g. square or rectangular 7 have. He could also use an oval instead or have a circular cross-section. Furthermore, the Post 1 "trumpet-like" towards its upper end face expand as it is by the dash-dotted lines Lines 12 in Fig. 1 is indicated above.
- piles have one Design of the taper of its outer sides in such a way that after driving in and final impressions in stick the earth to it.
- the rejuvenation of the Piles depending on the consistency of each Soil can be chosen, in such a way that with harder The inclination of the outside of the concrete pile whose longitudinal central axis A-B is smaller and a softer one In contrast, soil is larger.
- the Inclination of each of the outer sides of the pile 1 in question its longitudinal central axis A-B is about 2 to 6%.
- the task of Invention roughened the surfaces of the outside of the piles or be provided with depressions. This will further their liability or friction on the surrounding Soil increased. For this it is recommended to use the concrete piles to produce from a porous concrete material, the the aforementioned porosity the roughening or indentation forms.
- the piles 1 are made of concrete or reinforced concrete. You can also hollow and be made from a porous concrete, so that through its hollow interior (not shown) about the porous concrete in the ground is sucked off can be. This reduces the on very damp floors Risk of excessive slipperiness on the outside of the pile on Ground.
- FIGS. 5 and 6 schematically show arrangements and Devices shown to the piles according to the invention in the Bring in soil.
- 5 is a smaller one, off-road vehicle 14 at the construction site by means of Common, hydraulically operated supports 15 supported and possibly held firmly by a ballast 16. It carries a via only schematically indicated struts 17 likewise only schematically indicated bracket 18, in the a hydraulic system 19 is attached.
- the movable part 19 ' this hydraulic is fixed in a manner not shown the upper region of the vibrator 7 connected via a only indicated connection 20 at the upper area 8 of the pile 1 attacks.
- the hydraulics 19 ensures the so-called Preload, i.e. the last vibrationless impression of the Pile 1 into the ground from the position shown in FIG. 3 in that of Fig. 4.
- FIG. 6 shows the Post 1 before it is placed in the ground. This matches with 1.
- the second cable 26 is moved by the roller 29 of the tractor and overflows another pulley 30 of leader 23, which as well the aforementioned pulley 28 in the upper area is appropriate.
- the cable 26 runs from the deflection roller 30 to a lower guide roller 31 of the leader and from there back up to the vibrator 7. This cable serves at corresponding drive via the roller 29, via which then not operated vibrator the pole 1 from the position 3 to the end position shown in FIG. 4, i.e. to give him the pretension already explained.
- Both the device 14 and the tractor 21 are because of required off-road capability with a caterpillar drive Mistake.
- Fig. 7 shows the possibility of executing one of the piles 1 in perspective. From this is both the Taper the pile from its top face 6 to to its lower end face 13 as well as a rectangular one or square cross-sectional shape. It could but also an oval or circular cross-sectional shape be provided.
- the cast-on pin 35 can be gripped of the pile by a crane or to connect to the Serve vibrator.
- FIG. 8 shows in this example a top view of part of the bottom 2 with a total of nine piles 1, each of which is the upper one End faces are recognizable. What to apply to this The foundation is for the sake of simplifying the drawing only indicated by dash-dotted lines in FIG. 8.
- FIG. 9 shows a view in the direction of arrow 32 with cast foundation 33.
- the foundation 33 is on the top end faces 6 of the piles 1, which are in are on a common level. You can do this in Pour the material of the piles 1 embedded iron rods 34 his. These iron struts 34 are in one of the piles 1 in Fig. 8 indicated. You can stop the piles at her Set down on the ground and also to transfer the Vibrations from vibrator 7 serve on the piles.
- So is a foundation 33 created in Fig. 8 by a group this single foundation of piles 1, here of eight Piles in the square and one in the middle of the square arranged pile is formed. Brackets 35 and 34 are firmly connected to the upper end faces of the piles 1.
- FIGS. 10, 11 An arrangement of the piles according to FIGS. 10, 11 may be provided, which, like the piles after the Embodiment of Figures 8, 9 according to the teaching of Invention are introduced into the ground. It is a Area 36 shown, in which a number of support posts 1 in several rows next to or on top of each other C-D and E-F is driven into the soil 2.
- the distances a between the support piles are relative low. They are chosen, for example 0.5 m, that according to the respective load and the soil value areas 37 with the driving of the supporting piles between them compacted earth, which is cross-hatched in Fig. 11 are shown.
- the support piles taper 1 from above, i.e.
- the piles can be configured as previously explained. This creates a total area between the piles compacted soil. They also serve here as well as in the other embodiments, the side walls 38 of the soil as contact and support areas for the tapered side walls 39 of the support piles 1.
- the load of the structure indicated by the arrows 40 presses on the supporting piles 1.
- the length L of the piles is in the range of 8 - 12 m, while the dimension of the upper end face 6 50 x 50 cm and the lower end face 13 is 15 x 15 cm.
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Engineering & Computer Science (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- Mining & Mineral Resources (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Agronomy & Crop Science (AREA)
- Environmental & Geological Engineering (AREA)
- Soil Sciences (AREA)
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
- Piles And Underground Anchors (AREA)
Abstract
Description
Die Erfindung betrifft zunächst ein Verfahren zur Einbringung von sich in Einbringrichtung verjüngenden Pfählen in den Erdboden, die zur Abstützung bzw. dem Tragen von Bauwerken oder Bauwerksteilen, insbesondere von Bauwerksfundamenten dienen (Oberbegriff des Anspruches 1). Derartige, in der Fachwelt auch "Nägel" genannte Pfähle sind aus DE-PS 194 125 in Form von hohlen, sich nach unten verjüngenden Rammpfählen aus Eisenbeton bekannt. Gemäß dem vorstehend zitierten Titel dieser Patentschrift sollen diese Pfähle in den Erdboden eingerammt werden. Hiermit ist vermutlich auf das seinerzeit übliche Einrammen von Pfählen, Spundwänden und dergleichen mittels dampfbetriebener Rammbären Bezug genommen. Mit so eingerammten Pfählen sind die Nachteile verbunden, daß nach jedem Rammstoß und damit auch nach dem letzten Rammstoß der betreffende Pfahl sich um ein kurzes Stück nach oben bewegt (gewissermaßen rückfedert) und damit einen gewissen Schlupf zu dem angrenzenden Erdboden erhält. Hiermit wird sich aber bei der späteren Belastung durch das aufgesetzte Gebäude eine gewisse nachteilige Setzung (Einsinken in den Erdboden) der Pfähle und damit des Gebäudes ergeben. Setzungen des auf solchen Pfählen ruhenden Gebäudes sind aber zu vermeiden, da sie zu Bauschäden und Reklamationen führen können. Die letztgenannten Nachteile ergeben sich auch beim Gegenstand von CH-PS 622.570, der einen Satz von vorfabrizierten Betonpfahlelementen und einen mit diesen hergestellten Betonrammpfahl betrifft. Es sind kegelstumpfförmige Pfahlelemente vorgesehen, die mit weiteren Pfahlelementen fluchtend zusammengesetzt werden und den einzurammenden Betonpfahl ergeben. Diese Zusammensetzung des einzurammenden Pfahles aus mehreren Elementen hat den weiteren Nachteil, daß die Elemente sich an ihren Verbindungsstellen zueinander verschieben können, oder daß die Verbindungsstelle aus der Flucht der Elemente zur Seite ausweicht, so daß der gesamte Pfahl in sich ein oder mehrere Knickstellen aufweist. Hiermit erhält man eine instabile Gründung. Hinzu kommt, daß oft die vorgenannten Verschiebungen oder Knickungen nach dem Einbringen des Betonpfahles nicht mehr festzustellen sind und somit eine bleibende Gefährdung für das hiervon getragene Bauwerk darstellen.The invention initially relates to a method for introduction of piles tapering in the direction of insertion the ground, which is used to support or support buildings or building parts, in particular building foundations serve (preamble of claim 1). Such, in the Piles also called "nails" by experts are from DE-PS 194 125 in the form of hollow ramming piles tapering downwards known from reinforced concrete. According to the title cited above In this patent, these piles are said to be in the ground be rammed in. Hereby presumably at that time usual ramming of piles, sheet piling and the like referred to by steam-driven battering rams. With like this driven piles have the disadvantages that after every ram and thus also after the last ram the pile in question moves up a short distance (spring back, so to speak) and thus a certain amount of slip to the adjacent earth. This will, however in the event of subsequent loading by the attached building a certain disadvantageous settlement (sinking into the ground) of the piles and thus the building. Settlement of the Such dormant buildings are to be avoided, however they can lead to construction damage and complaints. The the latter disadvantages also arise with the subject from CH-PS 622.570, which is a set of prefabricated concrete pile elements and a concrete pile made with them concerns. They are frustoconical pile elements provided that put together in alignment with other pile elements and result in the concrete pile to be driven. This composition of the pile to be driven in from several Elements has the further disadvantage that the elements shift at their junctures can, or that the junction from the flight of the Elements to the side, so that the entire pile in has one or more kinks. Hereby receives an unstable foundation. In addition, the aforementioned are often Shifts or kinks after insertion of the concrete pile can no longer be determined and therefore a permanent threat to the structure supported by it represent.
In der WO 94/17252 werden Pfähle und Verfahren offenbart, die zu einer Verbesserung des Fundaments beitragen sollen. Hierzu wird ein leicht konisch zulaufender Pfahl mittels Hämmern oder Vibration in den Boden getrieben. Das entstandene Loch wird entweder direkt mit Zement oder ähnlichem ausgegossen oder es werden zuerst Verstrebungen eingesetzt und dann Zement darin eingegossen.WO 94/17252 discloses piles and methods which should contribute to an improvement of the foundation. To do this, use a slightly tapered pile Hammering or vibration driven into the ground. The created hole is either directly with cement or similar poured out or struts first inserted and then poured cement into it.
Zur Schaffung von Gründungen für größere und damit entsprechend schwere Bauwerke, z.B. ist dabei an über 40 m hohe Lagergebäude gedacht, ist es derzeit in der Praxis üblich, relativ tiefe, zylindrische Löcher in den Erdboden zu bohren, danach in das Loch eine Bewehrung einzubringen und schließlich dieses Loch mit Beton auszugießen. Die Löcher müssen so lang sein, bis eine tragfähige Erdschicht erreicht wird, auf welcher der durch das Ausgießen entstandene zylindrische Betonpfahl sich mit der Gebäudelast abstützen kann. To create foundations for larger and therefore accordingly heavy structures, e.g. is about 40 m high Warehouse, it is currently common in practice drilling relatively deep, cylindrical holes in the ground, then insert reinforcement into the hole and finally pour this hole in concrete. The holes must be long enough to reach a stable layer of earth on which the cylindrical created by the pouring The concrete pile can support itself with the building load.
Die Reibung zwischen der zylindrischen Außenwand des Betonpfahles und der Lochwandung reicht nämlich nicht aus, um die später auf diesem Betonpfahl ruhende Last aufzunehmen. Aus Vorstehendem ergibt sich oft eine relativ große Lochlänge, z.B. von 20 m, bis die tragfähige Erdschicht erreicht ist. Die Kosten für die Herstellung solcher Betonpfähle sind außerordentlich hoch. Hinzu kommt, daß deren aus dem Erdreich hervorragenden oberen Enden noch mit einem Preßlufthammer geebnet und auf das jeweils gleiche Niveau gebracht werden müssen, da in der Regel mehrere Betonpfähle miteinander eine Gründung bilden. Trotz dieses großen Fertigungsaufwandes kann es bei einem Nachgeben der an sich als tragfähig eingeschätzten Bodenschicht geschehen, daß die auf derartigen Pfählen ruhenden Gebäude sich setzen. Dies kann zu Rissen im Gebäude und weiteren Schäden führen. So kann bei dem vorstehend als Beispiel zitierten Lagergebäude damit die Höhe von Lagerflächen sich in Relation zu anderen Flächen ändern. Da in solchen Lagergebäuden computergesteuerte, fahrbare Geräte zur Beladung bzw. Entladung betrieben werden und hierbei eine exakte Einhaltung der jeweiligen Höhenlage der zu erfassenden Paletten oder dergleichen zwingend erforderlich ist, kann durch solche Setzungen das gesamte Gebäude oder wesentliche Bereiche davon funktionsunfähig werden.The friction between the cylindrical outer wall of the concrete pile and the hole wall is not sufficient to the later to take up a load resting on this concrete pile. Out The above often results in a relatively large hole length, e.g. of 20 m until the stable soil layer is reached. The cost of manufacturing such concrete piles is extremely high. On top of that comes from the ground outstanding top ends with a jackhammer leveled and brought to the same level have to be, since usually several concrete piles with each other form a foundation. Despite this great manufacturing effort it can be considered viable if the estimated soil layer that happen on such Pile dormant buildings sit down. This can be too Cracks in the building and further damage. So at the warehouse building cited above as an example Height of storage areas in relation to other areas to change. Since in such warehouse buildings computer-controlled Mobile devices can be operated for loading and unloading and an exact adherence to the respective altitude of the pallets or the like to be recorded is absolutely necessary the entire building can be or essential areas of it become inoperable.
Die Aufgaben- bzw. Problemstellung der Erfindung besteht
demgegenüber zunächst darin, ein Verfahren für das Eintreiben
von Pfählen gemäß dem Oberbegriff des Anspruches 1 in
den Erdboden zu schaffen, das mit einem relativ geringen
Arbeits- und Materialaufwand durchführbar ist, wobei die so
eingetriebenen Pfähle sich unter der auf ihnen ruhenden
Gebäudelast nicht oder praktisch nicht mehr setzen, d.h.
nicht noch weiter in den Erdboden eindringen, was eine
entsprechende Absenkung (Setzung) des betreffenden Gebäudes
zur Folge hätte.The task or problem of the invention is
in contrast, initially in a procedure for collecting
of piles according to the preamble of
Zur Lösung dieser Aufgaben- bzw. Problemstellung ist daher
zunächst gemäß dem Kennzeichen des Anspruches 1 vorgesehen,
daß die Pfähle in in ihrer Längsrichtung hin- und hergehende
Schwingungen versetzt und in dieser Weise zunächst in den
Erdboden bis zu einer Position eingetrieben werden, die kurz
vor Erreichen ihrer vorgesehenen, endgültigen Tiefenlage
gelegen ist, daß danach die Schwingungen abgestellt werden
und dann eine Endphase des Eintreibens durch Aufbringen
einer in Eintreibrichtung wirkenden, schwingungsfreien Kraft
auf den Pfahl erfolgt, bis dieser mit einer gewissen Vorspannung
im Erdboden fest gehalten ist. Diese Vorspannung
kann auch als ein sich Verkeilen oder Verspannen des Pfahles
mit dem angrenzenden Erdreich verstanden werden. Das Einbringen
solcher Pfähle mittels in ihrer Längsrichtung hin-
und hergehenden Schwingungen ist gegenüber dem vorbekannten
Einrammen günstiger, weil es demgegenüber mit einem wesentlich
geringeren apparativen Aufwand und auch einer wesentlich
geringeren Geräuschentwicklung erfolgen kann. Es muß
aber berücksichtigt werden, daß nach dem Abstellen des
betreffenden Schwingungserzeugers, z.B. eines Vibrators,
dieser noch etwas hin- und herschwingt, wodurch sich ein
geringes Eindrücken und sich wieder nach oben Bewegen des
Pfahles relativ zum Erdboden ergibt. Damit erhält der betreffende
Pfahl bzw. erhalten die betreffenden Pfähle ein
gewisses Maß an Schlupf relativ zum Erdboden. Es würden also
im Prinzip dann die gleichen Nachteile vorliegen wie bei dem
eingangs erläuterten Rammen mit der Gefahr einer späteren,
nachteiligen Setzung der Pfähle und damit des Gebäudes. Um
nun sowohl die Vorteile eines leichten und schnellen, mit
relativ geringem Geräteaufwand auf der Baustelle durchführbaren
Einbringens solcher Pfähle mittels Schwingungen bzw.
Vibrationen zu haben, als auch die erläuterten nachteiligen
Setzungen zu vermeiden, ist gemäß der zweiten Hälfte des
Kennzeichens des Anspruches 1 vorgesehen, daß die Schwingungserzeugung
kurz vor Erreichen der Endstellung des Pfahles
aufhört und dann das letzte Stück des Eintreibvorganges
durch eine auf den Pfahl wirkende, schwingungsfreie Zug-
oder Druckkraft erfolgt. Diese Belastung treibt ihn satt und
ohne Schlupf in den Boden. Es ist die o.g. Vorspannung
erreicht. Damit sind Setzungen vermieden bzw. sie haben nur
noch einen so geringen Betrag, daß dies sich auf das Bauwerk
nicht nachträglich auswirkt. Als weiterer Vorteil kommt
hinzu, daß die Belastung eines so vorgespannten Pfahles
elektronisch aufgezeichnet und als Grundlage von bodenmechanischen
Berechnungen verwertet werden kann.To solve this task or problem is therefore
initially provided according to the characterizing part of
Eine bevorzugte Ausführungsform des erfindungsgemäßen Verfahrens
ist Gegenstand des Anspruches 2. Hierbei wird zunächst
der Pfahl nicht unter die Längsschwingungen oder
-vibrationen gesetzt, sondern mittels einer entsprechenden
Zug- oder Druckkraft über einen Teilbereich seiner Länge in
den Erdboden eingedrückt. Somit ist er vom Erdboden relativ
fest gehalten, so daß die auf ihn in seiner Längsrichtung
wirkenden Schwingungen nicht dazu führen können, daß er sich
zur Seite bewegt oder sogar beschädigt wird.A preferred embodiment of the method according to the invention
is the subject of
Die Erfindung betrifft ferner die Ausgestaltungen von aus Beton oder Stahlbeton bestehenden Pfählen, die für die Durchführung des erfindungsgemäßen Verfahrens eingesetzt werden können. Hierzu wird auf die Ansprüche 3 bis 11 verwiesen.The invention further relates to the configurations from Concrete or reinforced concrete existing piles for the implementation of the method according to the invention can be used can. For this purpose, reference is made to claims 3 to 11.
Gemäß Anspruch 3 sind die Betonpfähle über ihre gesamte
Länge mit einer konisch oder bogenförmig nach unten verlaufenden
Verjüngung versehen. Außerdem sind die Oberflächen
der Außenseiten der Pfähle aufgerauht oder es befinden sich
dort Vertiefungen. Somit nehmen die Pfähle in ihrem Durchmesser
von unten nach oben betrachtet ständig zu. Dies hat
ein ständiges Verdrängen des Erdreiches mit dem Einbringen
der Pfähle zur Folge. Es wird auch hierdurch der Halt der
Pfähle in der Erde mit der zum Anspruch 1 erläuterten Vorspannung
weiter gefestigt. Die ferner bei derartigen Pfählen
vorgesehenen Aufrauhungen oder Vertiefungen unterstützen den
Halt der betreffenden Pfähle im bzw. am seitlichen Erdreich.
Die vorstehend erläuterten Vorteile werden mit dem Stand der
Technik gemäß US-PS 3 820 347 nicht erreicht. Zum einen sind
die dort vorgesehenen Pfähle nicht über ihre gesamte Länge
konisch oder bogenförmig zulaufend, sondern nur auf der
unteren Hälfte ihrer Länge. Dagegen ist der Durchmesser der
oberen Hälfte (die Begriffe "unten" und "oben" sind immer
bezogen auf deren Position nach ihrem Einbringen in den
Erdboden) dieser Pfähle gleichbleibend. Somit kann dort
nicht die für den Halt des Pfahles im Erdreich laut Anspruch
1 zu schaffende Vorspannung erreicht werden. Schließlich
zeigt diese Literaturstelle auch nicht die zum Gegenstand
des Anspruches 3 gehörenden Aufrauhungen oder Vertiefungen.
Insbesondere bei einem relativ weichen Erdboden kann Erde in
diese Aufrauhungen oder Vertiefungen eindringen, wodurch der
Halt des Pfahles entsprechend verbessert wird. Es fehlt also
beim Gegenstand dieser Literaturstelle das synergistische
Zusammenwirken der sich über die ganze Länge erstreckenden
Verjüngung und der Aufrauhungen oder Vertiefungen um die
Pfähle, einschließlich der von ihnen getragenen Last, in der
Einbringlage zu halten und weitere Setzungen zu vermeiden.
Die mit der Erfindung von den Pfählen ausgeübte Haltekraft
ist so groß, daß es nicht mehr notwendig ist, daß die Pfähle
mit ihrem zuerst in den Erdboden einzutreibenden, unteren
Ende auf einer tragfähigen Erdschicht zur Auflage und Abstützung
kommen müssen.According to
Die Gegenstände der Ansprüche 4 und 5 befassen sich mit der
hier vorteilhaften Neigung bzw. Steigung der Außenseiten der
Pfähle zu ihrer Längsmittelachse. Anspruch 5 gibt dabei die
Möglichkeit, die Neigung oder Verjüngung der Pfähle in
Abhängigkeit von der Konsistenz des jeweiligen Erdbodens zu
wählen. Diese Neigung kann etwa 2 - 6 % betragen.The subjects of
Durch das "trompeten"-artige Erweitern der Betonpfähle in
ihrem oberen Endbereich gemäß Anspruch 6 wird eine zusätzliche
Verdrängung des Erdreiches im oberen Bereich der Betonpfähle
erreicht. Hiermit wird die Tragfähigkeit solcher
Betonpfähle zusätzlich erhöht. By the "trumpet-like" expansion of the concrete piles in
its upper end portion according to
Anspruch 7 beinhaltet eine bevorzugte Ausführungsform der
Erfindung zur Schaffung von Außenflächen oder -seiten des
Betonpfahles, die Aufrauhungen und/oder Vertiefungen aufweisen.
Zum Gegenstand des Anspruches 8 ist darauf hinzuweisen, daß
die genannte US-PS 3 820 347 zwar Pfähle mit einem etwa
quadratischen Querschnitt zeigt; nicht aber Pfähle mit
runden oder elliptischen Querschnitten.Regarding the subject of
Die Ansprüche 9 und 10 ermöglichen die Anbringung sowohl
eines Vibrators als auch eines Fundamentes, z.B. einer
Tragplatte.The
Weitere Vorteile und Merkmale der Erfindung sind sowohl den vorstehend erläuterten Unteransprüchen, auf deren Inhalt hiermit ausdrücklich Bezug genommen wird, als auch der nachfolgenden Beschreibung und der zugehörigen Zeichnung von erfindungsgemäßen Ausführungsmöglichkeiten zu entnehmen. In der Zeichnung zeigt:
- Fig. 1 bis 4 :
- verschiedene Stadien des Eintreibvorganges gemäß dem-erfindungsgemäßen Verfahren, mit Darstellung von Pfählen nach der Erfindung,
- Fig. 5 :
- eine erste Ausführungsmöglichkeit eines Gerätes zur Durchführung des Eintreibvorganges,
- Fig. 6 :
- eine zweite Ausführungsmöglichkeit eines Gerätes zur Durchführung des Eintreibvorganges,
- Fig. 7 :
- einen Pfahl nach der Erfindung in perspektivischer Ansicht,
- Fig. 8, 9 :
- in Teilansichten die Erfindung im Zusammenhang mit einer Gründung für ein Einzelfundament, mit Darstellung von Pfählen nach der Erfindung,
- Fig. 10, 11 :
- eine Ausführungsmöglichkeit der Erfindung im Zusammenhang mit einer Gründung in Form eines plattenförmigen Fundamentes, mit Darstellung von Pfählen nach der Erfindung. Dabei ist Fig. 11 ein Schnitt gemäß der Linie XI-XI in Fig. 10.
- 1 to 4:
- different stages of the driving-in process according to the method according to the invention, showing piles according to the invention,
- Fig. 5:
- a first possibility of executing a device for carrying out the driving-in process,
- Fig. 6:
- a second embodiment of a device for carrying out the driving-in process,
- Fig. 7:
- a pile according to the invention in a perspective view,
- 8, 9:
- in partial views the invention in connection with a foundation for a single foundation, showing piles according to the invention,
- 10, 11:
- an embodiment of the invention in connection with a foundation in the form of a plate-shaped foundation, showing piles according to the invention. 11 is a section along the line XI-XI in FIG. 10.
Das Prinzip des Eintreibens der Pfähle 1 in den Erdboden 2
ist in den Fig. 1 - 4 dargestellt. Der betreffende Pfahl 1
wird mit einer nur schematisch angedeuteten Halterung 3 in
senkrechter Lage auf den Erdboden 2 aufgesetzt und dann
durch eine Druck- oder Zugkraft gemäß Pfeil 4 über einen
Teilbereich 5 seiner Gesamtlänge L in den Erdboden eingedrückt.
Dieses'Eindrücken erfolgt schwingungs- bzw. vibrationsfrei.
Danach wird auf die obere Stirnfläche 6 des
Pfahles 1 ein Schwingungserzeuger, hier ein nur schematisch
angedeuteter Vibrator 7, aufgesetzt, der in nicht dargestellter
Weise mit dem oberen Bereich 8 des Pfahles 1 verbunden
ist und diesen in seiner Längsrichtung A-B gemäß den
Pfeilen 9 auf- und abschwingt, bis er die in Fig. 3 dargestellte
Eintreiblage erreicht hat. Danach wird der Vibrator
7 weggenommen oder abgeschaltet und es wird gemäß Pfeil 10
der Pfahl noch um den weiteren Betrag 11 vibrations- bzw.
schwingungsfrei in seine Endposition gemäß Fig. 4 gedrückt.
In dieser Position hat er die zur Erfindung beschriebene
Vorspannung. Hiermit wird der erläuterte nachteilige Schlupf
zwischen Pfahl 1 und Erdboden 2 vermieden, der nach Beendigung
der Vibration gemäß der Position der Fig. 3 auftreten
kann. Der Pfahl ist fest im Erdreich verklemmt.The principle of driving the
Zusammengefaßt ergibt sich, daß das zunächst durch Ziehen
oder Drücken am Pfahl 1 erfolgte Eindrücken um den Betrag 5
ihn im Erdreich hält, so daß die dann erfolgenden Vibrationen,
welche den Pfahl 1 um den Hauptteil seiner Länge einbringen,
den Pfahl nicht zur Seite bewegen oder beschädigen
können. Die letzte, bereits geschilderte Phase des Überganges
von Fig. 3 nach Fig. 4 durch die Kraft 10 schafft die
endgültige, fixe Eintreiblage und Vorspannung, in der bei
der vorgesehenen Belastung praktisch kein Setzen des Pfahles
mehr in das Erdreich hinein erfolgt.In summary, it follows that this is initially done by pulling
or pressing on
Wie in Fig. 1 - 4 und insbesondere in Fig. 7 dargestellt,
ist der Pfahl 1 nach unten konisch verjüngt. Er kann eine
beliebige Querschnittsform, z.B. quadratisch oder rechteckig
gemäß Fig. 7 haben. Er könnte stattdessen auch einen ovalen
oder kreisrunden Querschnitt besitzen. Ferner kann sich der
Pfahl 1 in Richtung zu seiner oberen Stirnfläche hin "trompeten"-artig
erweitern, wie es durch die strichpunktierten
Linien 12 in Fig. 1 oben angedeutet ist.As shown in FIGS. 1-4 and in particular in FIG. 7,
the
Statt einer konischen Verjüngung der Pfähle nach unten kann
eine solche Verjüngung auch bogenförmig verlaufen. Die
Pfähle weisen in einer bevorzugten Ausführungsform eine
Ausgestaltung der Verjüngung ihrer Außenseiten derart auf,
daß sie nach ihrem Eintreiben und endgültigen Eindrücken in
den Erdboden an diesem haften. Dabei kann die Verjüngung der
Pfähle in Abhängigkeit von der Konsistenz des jeweiligen
Erdbodens gewählt werden, und zwar derart, daß bei härterem
Erdboden die Neigung der Außenseiten des Betonpfahles zu
dessen Längsmittelachse A-B kleiner und bei einem weicheren
Erdboden demgegenüber größer ist. Beispielsweise kann die
Neigung jeder der Außenseiten des betreffenden Pfahles 1 zu
seiner Längsmittelachse A-B etwa 2 bis 6 % betragen.
Schließlich können auch im Sinne der Aufgabenstellung der
Erfindung die Oberflächen der Außenseiten der Pfähle aufgerauht
oder mit Vertiefungen versehen sein. Hierdurch wird
weiter ihre Haftung oder Reibung an dem sie umgebenden
Erdreich erhöht. Hierzu empfiehlt es sich, die Betonpfähle
aus einem porösen Betonmaterial herzustellen, wobei die
vorgenannte Porösität die Aufrauhungen oder Vertiefungen
bildet.Instead of tapering the piles downwards
such a taper is also arched. The
In a preferred embodiment, piles have one
Design of the taper of its outer sides in such a way
that after driving in and final impressions in
stick the earth to it. The rejuvenation of the
Piles depending on the consistency of each
Soil can be chosen, in such a way that with harder
The inclination of the outside of the concrete pile
whose longitudinal central axis A-B is smaller and a softer one
In contrast, soil is larger. For example, the
Inclination of each of the outer sides of the
Durch die konische Verjüngung des Pfahles verklemmen sich
seine Seitenflächen beim Eintreiben mit dem daran anliegenden
Erdreich. Im Gegensatz zu dem erläuterten Stand der
Technik, bei dem in den Erdboden eingegossene zylindrische
Betonpfähle sich auf einer tragenden Bodenschicht abstützen,
ist es hier nicht notwendig, daß die untere Stirnfläche 13
des Pfahles ein festes Widerlager in Form einer tragenden
Bodenschicht findet. Während die vorbekannten zylindrischen
Betonpfähle sehr lang sein müssen, z.B. 20 m, genügen für
eine hinreichende Gründung mit Pfählen, die nach der Erfindung
ausgebildet und eingetrieben sind, eine demgegenüber
kleinere Pfahllänge von z.B. 8 - 12 m. Es versteht sich, daß
die Erfindung nicht auf Pfähle dieser Länge beschränkt ist.The conical taper of the pile jams
its side surfaces when driving in with the adjacent one
Soil. In contrast to the explained state of the
Technique in which cylindrical cast in the ground
Concrete piles are supported on a load-bearing layer of soil,
it is not necessary here for the
Erwähnt sei noch, daß vom Prinzip her das Eindrücken des
Pfahles aus der Position der Fig. 1 in die Position der Fig.
2 durch Aufbringen einer Zug- oder Druckkraft 4 nicht unbedingt
notwendig ist. Man könnte stattdessen bei auf dem
Erdboden aufgesetztem Pfahl gemäß Fig. 1 bereits mit der
Aufbringung der senkrechten Schwingungen mittels eines
Vibrators 7 oder dergleichen beginnen und dies so lange
fortsetzen, bis der Pfahl die Position der Fig. 3 erreicht
hat. Danach erfolgt der weitere Eintreibvorgang wie oben
erläutert.It should also be mentioned that in principle the impression of the
Pile from the position of FIG. 1 to the position of FIG.
2 not necessarily by applying a tensile or
Die Pfähle 1 sind aus Beton oder Stahlbeton. Sie können auch
hohl und dabei aus einem porösen Beton herstellbar sein, so
daß durch ihren hohlen Innenraum (nicht dargestellt) über
den porösen Beton im Erdreich befindliches Wasser abgesaugt
werden kann. Dies verringert bei sehr feuchten Böden die
Gefahr einer zu großen Schlüpfrigkeit der Pfahlaußenseite am
Boden. The
In den Figuren 5 und 6 sind schematisch Anordnungen und
Geräte gezeigt, um die Pfähle nach der Erfindung in den
Erdboden einzubringen. Im Beispiel der Fig. 5 ist ein kleineres,
geländegängiges Fahrzeug 14 an der Baustelle mittels
üblicher, hydraulisch zu betätigender Stützen 15 abgestützt
und gegebenenfalls durch einen Ballast 16 fest gehalten. Es
trägt über nur schematisch angedeutete Streben 17 eine
ebenfalls nur schematisch angedeutete Halterung 18, in der
eine Hydraulik 19 befestigt ist. Der bewegliche Teil 19'
dieser Hydraulik ist in nicht dargestellter Weise fest mit
dem oberen Bereich des Vibrators 7 verbunden, der über eine
nur angedeutete Verbindung 20 am oberen Bereich 8 des Pfahles
1 angreift. Die Hydraulik 19 sorgt für die sogenannte
Vorspannung, d.h. das letzte schwingungslose Eindrücken des
Pfahles 1 in den Erdboden aus der Position gemäß Fig. 3 in
die der Fig. 4. Sie kann auch bei entsprechender Ausbildung
für das Eindrücken des Bereiches 5 des Pfahles 1 aus der
Position der Fig. 1 in die der Fig. 2 dienen. Die Belastungsergebnisse
der erläuterten Hydraulik 19 können elektronisch
aufgezeichnet und ausgewertet werden. Die genaue
senkrechte Lage der Halterung 18 kann durch hydraulische
Verstellung der Abstützungen 15 des Gerätes 14 erreicht
werden.FIGS. 5 and 6 schematically show arrangements and
Devices shown to the piles according to the invention in the
Bring in soil. 5 is a smaller one,
off-
In der Ausführungsform nach Fig. 6 ist ein fahrbarer Traktor
21 vorgesehen, der über eine Strebenanordnung 22 ein Gerüst
23 trägt, das hier nur schematisch angedeutet ist. Das
Gerüst 23 stützt sich bei 24 am Erdboden ab. Es sind zwei
Seilzüge 25 und 26 in Form von Seilwinden vorgesehen. Diese
Seilzüge bewirken über das Gerüst 23, auch Mäkler genannt,
und die daran angebrachten, nachstehend näher erläuterten
Umlenkrollen folgendes:6 is a
Das Seil 25, welches von der Rolle 27 des Traktors auf und
ab bewegt werden kann, läuft über eine Zwischenrolle 28' zu
einer Umlenkrolle 28 des Mäklers 23. Hieran hängt der Vibrator
7 und an diesem der Pfahl 1. Dabei zeigt Fig. 6 den
Pfahl 1 vor seinem Einbringen in den Erdboden. Dies entspricht
der Stellung gemäß Fig. 1. Der zweite Seilzug 26
wird von der Rolle 29 des Traktors bewegt und läuft über
eine weitere Umlenkrolle 30 des Mäklers 23, die ebenso wie
die vorgenannte Umlenkrolle 28 in dessen oberen Bereich
angebracht ist. Der Seilzug 26 läuft von der Umlenkrolle 30
zu einer unteren Umlenkrolle 31 des Mäklers und von da
wieder nach oben zum Vibrator 7. Dieser Seilzug dient bei
entsprechendem Antrieb über die Rolle 29 dazu, über den dann
nicht betriebenen Vibrator den Pfahl 1 aus der Position
gemäß Fig. 3 in die Endlage gemäß Fig. 4 zu drücken, d.h.
ihm die bereits erläuterte Vorspannung zu geben.The
Es versteht sich, daß die vorbeschriebenen Ausführungen nach
Fig. 5 und 6 nur beispielhaft sind und daß die Lehre der
Ansprüche 1 - 3 auch mit anderen Geräteausführungen verwirklicht
werden kann. Die Einstellung der senkrechten Lage der
Halterung bzw. des Mäklers 23 kann durch in der Zeichnung
nicht dargestellte hydraulische Stützen dieses Mäklers
erfolgen.It is understood that the above-mentioned remarks after
5 and 6 are only exemplary and that the teaching of
Claims 1 - 3 also realized with other device versions
can be. The adjustment of the vertical position of the
Bracket or
Sowohl das Gerät 14 als auch der Traktor 21 sind wegen der
geforderten Geländegängigkeit zweckmäßigerweise mit Raupenantrieb
versehen.Both the
Fig. 7 zeigt die Ausführungsmöglichkeit eines des Pfähle 1
in perspektivischer Darstellung. Hieraus ist sowohl die
Verjüngung des Pfahles von seiner oberen Stirnfläche 6 bis
zu seiner unteren Stirnfläche 13 als auch eine rechteckige
bzw. quadratische Querschnittsform zu erkennen. Es könnte
aber auch eine ovale oder kreisförmige Querschnittsform
vorgesehen sein. Der angegossene Zapfen 35 kann zum Erfassen
des Pfahles durch einen Kran oder auch zum Verbinden mit dem
Vibrator dienen.Fig. 7 shows the possibility of executing one of the
Die Figuren 8, 9 zeigen die Schaffung einer Einzelgründung
bzw. eines Einzelfundamentes mit der Erfindung. Fig. 8 zeigt
in diesem Beispiel in der Draufsicht einen Teil des Bodens 2
mit insgesamt neun Pfählen 1, von denen jeweils die oberen
Stirnflächen erkennbar sind. Das hierauf aufzubringende
Fundament ist aus Gründen der zeichnerischen Vereinfachung
in Fig. 8 nur strichpunktiert angedeutet.Figures 8, 9 show the creation of a single foundation
or a single foundation with the invention. Fig. 8 shows
in this example a top view of part of the bottom 2
with a total of nine
Fig. 9 zeigt hierzu eine Ansicht in Pfeilrichtung 32 mit
angegossenem Fundament 33. Das Fundament 33 ist auf die
oberen Stirnflächen 6 der Pfähle 1 aufgesetzt, die sich in
einer gemeinsamen Ebene befinden. Es kann hierzu mit in das
Material der Pfähle 1 eingelassenen Eisenstäben 34 vergossen
sein. Diese Eisenstreben 34 sind in einem der Pfähle 1 in
Fig. 8 angedeutet. Sie können zum Halt der Pfähle bei ihrem
Aufsetzen auf den Erdboden und auch zur Übertragung der
Schwingungen vom Vibrator 7 auf die Pfähle dienen. Somit ist
ein Fundament 33 geschaffen, das in Fig. 8 von einer Gruppe
diese Einzelgründung bildender Pfähle 1, hier von acht
Pfählen im Quadrat und einem in der Mitte des Quadrates
angeordneten Pfahl gebildet ist. Die Halterungen 35 und 34
sind mit den oberen Stirnflächen der Pfähle 1 fest verbunden.
Sie können sowohl zum Aufbringen und Halt des Vibrators,
als auch einer Fundamentplatte gemäß Ziffer 33 in Fig.
9 dienen. Es versteht sich, daß für die Gründung eines
Bauwerkes dessen Gewicht und Größe aufnehmende Anzahl von
solchen Einzelgründungen vorzusehen ist. Eine Komprimierung
des Bodens zwischen den einzelnen Einzelgründungen braucht
hier nicht vorgesehen zu sein. Läßt man aber eine gewisse
Bodensetzung des Bauwerkes zu und ist der zwischen den
Pfählen bestehende Boden komprimiert, so kann er auch zur
Lastübernahme aus dem Bauwerk mit herangezogen werden. Dazu
sind Bodennachuntersuchungen nach dem Pfahlsetzen angebracht.9 shows a view in the direction of
Ferner kann eine Anordnung der Pfähle gemäß den Figuren 10,
11 vorgesehen sein, die ebenso wie die Pfähle nach dem
Ausführungsbeispiel der Figuren 8, 9 gemäß der Lehre der
Erfindung in den Erdboden eingebracht werden. Es ist ein
Areal 36 gezeigt, in dem eine Anzahl von Tragpfählen 1 in
mehreren nebeneinander bzw. übereinander liegenden Reihen
C-D und E-F in das Erdreich 2 eingetrieben ist. Die Abstände
a zwischen den Tragpfählen (siehe Fig. 10) sind relativ
gering. Sie sind so gewählt, beispielsweise 0,5 m, daß
entsprechend der jeweiligen Belastung und dem Bodenwert mit
dem Eintreiben der Tragpfähle zwischen ihnen Bereiche 37 mit
verdichteter Erde entstehen, die kreuzschraffiert in Fig. 11
dargestellt sind. Auch hier verjüngen sich die Tragpfähle 1
von oben, d.h. von ihren Stirnseiten 6 her nach unten zu
ihren Stirnflächen 13, und zwar ebenso wie in den übrigen
Ausführungsbeispielen in einer bevorzugt konischen Form der
Verjüngung. Auch in diesem Ausführungsbeispiel sowie dem
zuvor anhand der Fig. 8, 9 erörterten Ausführungsbeispiel
können die Pfähle wie zuvor erläutert ausgestaltet sein.
Damit entsteht zwischen den Pfählen insgesamt ein Bereich
verdichteten Erdreiches. Außerdem dienen auch hier, ebenso
wie bei den übrigen Ausführungsbeispielen, die Seitenwände
38 des Erdreiches als Anlage- und Abstützflächen für die
sich nach unten verjüngenden Seitenwände 39 der Tragpfähle
1. Die mit den Pfeilen 40 angedeutete Last des Bauwerkes
drückt auf die Tragpfähle 1. Im vorliegenden Ausführungsbeispiel
liegt die Länge L der Tragpfähle im Bereich von 8 - 12
m, während die Abmessung der oberen Stirnfläche 6 50 x 50 cm
und der unteren Stirnfläche 13 15 x 15 cm ausmacht. Aufnahme
und Abstützung der Last 40 erfolgt, wie erläutert, in der
gleichen Weise wie bei den vorhergehenden Ausführungsbeispielen.
Zusätzlich ist hier noch der o.g. Effekt gegeben,
daß durch die geringen Abstände a zwischen den Tragpfählen 1
insgesamt eine verdichtete Erdplatte geschaffen wird. Eine
solche Platte ist mit wesentlich geringerem Aufwand herstellbar
als eine sonst aus Stahlbeton zu gießende Grundplatte.
Die Anordnung nach den Figuren 10, 11 empfiehlt sich
insbesondere bei Vorhandensein von weichen und damit kaum
tragfähigen Böden. Das Bauwerk kann mit einem Fundament
analog dem Teil 33 in Fig. 9 auf die dargestellten Einzelpfähle,
hier zwölf Stück, aufgelegt oder mit davon vorragenden
Bewehrungen (siehe Ziffer 34 in Fig. 8, 9) vergossen
werden.An arrangement of the piles according to FIGS. 10,
11 may be provided, which, like the piles after the
Embodiment of Figures 8, 9 according to the teaching of
Invention are introduced into the ground. It is a
Claims (11)
- A method of inserting piles (1) into the ground (2), the piles (1) tapering in the insertion direction and serving to support or carry structures or structural members, in particular building foundations, characterised in that the piles (1) are set into vibration (9) in their longitudinal direction (A - B) and in this way are first driven into the ground (2) into a position just short of their final depth, in that thereafter the vibrations are stopped and then a final phase of the driving process is carried out by exerting a vibration-free tensile or compressive force (10) on the pile in the driving direction (4) until the pile is firmly held in the ground with a certain prestress.
- A method according to claim 1, characterised in that the respective pile (1) is first drawn or pushed into the ground (2) vibrationlessly over a portion (5) of its length (L) and in that only then are the vibrations (9) transmitted to the pile.
- Concrete piles for carrying out the method according to claim 1 or 2, wherein the concrete piles taper downwards in a conical or curved manner over their entire length, characterised in that the surfaces of the outsides (1') of the concrete piles (1) are roughened or provided with recesses.
- Concrete piles according to claim 3, characterised by an inclination of the outsides (1') of the piles (1) relative to their longitudinal central axis (A - B) such that, after the piles have been driven and finally pushed into the ground (2), they adhere thereto.
- Concrete piles according to claim 4, characterised in that, for harder ground, the inclination of the outsides (1') of the concrete pile relative to its longitudinal central axis (A - B) is less than for softer ground.
- Concrete piles according to one or more of claims 3 to 5, characterised in that the concrete piles (1) expand upwards and outwards in a trumpet-like manner in the region of their upper ends (8).
- Concrete piles according to one or more of claims 3 to 6, characterised in that the concrete piles (1) comprise a porous concrete for producing the roughening or recesses.
- Concrete piles according to one or more of claims 3 to 7, characterised in that the piles (1) have an approximately square or round or approximately elliptical cross-section.
- Concrete piles for carrying out the method according to claim 1 or 2, and according to one or more of claims 3 to 8, characterised in that the piles (1) have, in their upper region (8), a mounting (35; 34) accessible from the upper end surface (6) and provided for attaching a vibrator.
- Concrete piles according to claim 9, characterised in that the mountings (35; 34) are formed for securing a foundation block (33).
- Concrete piles according to claim 10, characterised in that the foundation block (33) is cast with iron supports (34) which project upwards from the upper regions (8) of the piles (1) beyond the upper end surfaces (6) thereof.
Applications Claiming Priority (6)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE29512311U DE29512311U1 (en) | 1995-07-31 | 1995-07-31 | Arrangement for surface compaction of soils |
DE29512311U | 1995-07-31 | ||
DE19535183 | 1995-09-25 | ||
DE1995135183 DE19535183A1 (en) | 1995-07-31 | 1995-09-25 | Driving procedure for piles to support building foundations - piles are vibrated and driven-in partially, and settled by pressure force |
DE29601080U DE29601080U1 (en) | 1995-07-31 | 1996-01-23 | Concrete piles for installation in the ground, as well as foundations made from several such piles and, if necessary, foundation formation, as well as devices for installing the concrete piles |
DE29601080U | 1996-01-23 |
Publications (2)
Publication Number | Publication Date |
---|---|
EP0758699A1 EP0758699A1 (en) | 1997-02-19 |
EP0758699B1 true EP0758699B1 (en) | 2001-10-17 |
Family
ID=27215498
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP96111806A Expired - Lifetime EP0758699B1 (en) | 1995-07-31 | 1996-07-23 | Method for installing tapered piles, tapered piles, and foundation structures made with these piles |
Country Status (2)
Country | Link |
---|---|
EP (1) | EP0758699B1 (en) |
AT (1) | ATE207168T1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101331703B1 (en) * | 2009-04-10 | 2013-11-20 | 신닛테츠스미킨 카부시키카이샤 | Steel pipe pile |
Families Citing this family (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0902128A3 (en) * | 1997-09-11 | 1999-04-28 | Van Splunder Funderingstechniek B.V. | Method for installing a foundation for a traffic course as well as device |
GB2330370B (en) * | 1997-10-18 | 2001-11-28 | Roxbury Ltd | Improvements in piling arrangements |
GB9724024D0 (en) | 1997-11-13 | 1998-01-14 | Kvaerner Cementation Found Ltd | Improved piling method |
GB2354276B (en) * | 1997-11-13 | 2001-05-09 | Kvaerner Cementation Found Ltd | Improved methods and apparatus for boring and piling |
US6672015B2 (en) * | 1999-02-25 | 2004-01-06 | Menard Soltraitement | Concrete pile made of such a concrete and method for drilling a hole adapted for receiving the improved concrete pile in a weak ground |
NL1017350C1 (en) * | 2001-02-13 | 2002-08-14 | Prepoton Panelcraft Groep B V | Foundation for greenhouses and the like. |
GB2384510B (en) * | 2002-01-23 | 2005-06-22 | Cementation Found Skanska Ltd | Construction and design of foundation elements |
CN101298770B (en) * | 2008-06-12 | 2010-06-23 | 大连理工大学 | Bottom enlarging prestress conical pipe pile and construction method thereof |
BRPI1009653A2 (en) * | 2009-06-24 | 2018-06-19 | Geopier Foundation Company Inc. | soil improvement device and soil improvement method |
US9915050B2 (en) | 2009-06-24 | 2018-03-13 | Geopier Foundation Company, Inc. | Apparatus and method for ground improvement |
US8328470B2 (en) * | 2009-06-24 | 2012-12-11 | Geopier Foundation Company, Inc. | Apparatus and method for ground improvement |
NL2006996C2 (en) | 2011-06-24 | 2013-01-02 | Schokindustrie B V | REJUVENATED FOUNDATION POLE. |
GB2580041B8 (en) * | 2018-12-19 | 2023-06-07 | Keltbray Ltd | Improvements in and relating to pile foundations |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE194125C (en) | ||||
DE230436C (en) * | 1910-02-05 | 1911-01-26 | Wilhelm Bechtel | reinforced concrete pile |
US3820347A (en) * | 1971-11-01 | 1974-06-28 | Oolite Ind Inc | Tapered piles and methods of using tapered piles |
CH622570A5 (en) | 1977-09-29 | 1981-04-15 | Fietz & Leuthold Ag | Set of prefabricated concrete-pile elements and impact-driven concrete pile produced with the same |
JPS61179920A (en) * | 1985-02-05 | 1986-08-12 | Ohbayashigumi Ltd | Rocking device for underground penetrating member |
NL8701500A (en) * | 1987-06-26 | 1989-01-16 | Ringvaart B V De | Building foundation construction method - uses driven piles with inserted top rods, concrete slabs, and foundation beams |
GB9301891D0 (en) * | 1993-01-30 | 1993-03-17 | Roxbury Ltd | Improvements in or relating to foundations |
-
1996
- 1996-07-23 AT AT96111806T patent/ATE207168T1/en not_active IP Right Cessation
- 1996-07-23 EP EP96111806A patent/EP0758699B1/en not_active Expired - Lifetime
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101331703B1 (en) * | 2009-04-10 | 2013-11-20 | 신닛테츠스미킨 카부시키카이샤 | Steel pipe pile |
Also Published As
Publication number | Publication date |
---|---|
EP0758699A1 (en) | 1997-02-19 |
ATE207168T1 (en) | 2001-11-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE69215811T2 (en) | SHORT PILLARS FROM AGGLOMERATE AND METHOD AND DEVICE FOR PRODUCING THE SAME | |
EP0758699B1 (en) | Method for installing tapered piles, tapered piles, and foundation structures made with these piles | |
EP0080143B1 (en) | Foundation for a pole, a pillar or the like | |
DE2005066A1 (en) | Method and device for anchoring | |
DE4224042A1 (en) | Method and device for pile foundation | |
EP0516942B1 (en) | Method and device for stabilising friction soils and bordering cohesive soils | |
EP0788572A1 (en) | Building underpinning process | |
DE1963852A1 (en) | Method of erecting a structure that is at least partially submerged in a body of water | |
DE19535183A1 (en) | Driving procedure for piles to support building foundations - piles are vibrated and driven-in partially, and settled by pressure force | |
DE19509088A1 (en) | Method of producing recoverable jacket for use in pile driving | |
DE19532931A1 (en) | Building foundation construction method | |
DE29601080U1 (en) | Concrete piles for installation in the ground, as well as foundations made from several such piles and, if necessary, foundation formation, as well as devices for installing the concrete piles | |
DE2948879C2 (en) | Process for the production of in-situ concrete driven piles | |
DE1910556A1 (en) | Process for the production of foundation piles from in-situ concrete with extensions of the pile shaft and the pile base, as well as internal formwork for carrying out the process | |
EP0987375A1 (en) | Foundation pile and device as well as method for driving the same into the ground | |
DE3201601A1 (en) | Method of placing sheet pile walls or the like in the earth by flushing and also a construction element for carrying out the method | |
DE2148748C3 (en) | Methods of lifting and leveling buildings | |
DE1923227A1 (en) | Anchoring device for hollow pillars | |
DE1409606C (en) | Procedure for the foundation of a floating tank with driven piles | |
CH439133A (en) | Process for producing a pile in the ground and concrete pile for carrying out the process | |
DE2851619A1 (en) | Concrete post foundation hole prodn. - involves lowering pipe into ground using vibrator and core is removed using differential air pressure | |
DE2619431A1 (en) | On site concrete pile prodn. - has casing with releasable ram foot rammed into soil and pipe filled with setting concrete | |
DE623318C (en) | ||
DE2612813A1 (en) | FOUNDATION POST | |
EP0970281B1 (en) | Method for stabilizing embankments |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AT BE CH DE DK FR GB IT LI NL SE |
|
17P | Request for examination filed |
Effective date: 19970507 |
|
17Q | First examination report despatched |
Effective date: 19971113 |
|
GRAG | Despatch of communication of intention to grant |
Free format text: ORIGINAL CODE: EPIDOS AGRA |
|
GRAG | Despatch of communication of intention to grant |
Free format text: ORIGINAL CODE: EPIDOS AGRA |
|
GRAH | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOS IGRA |
|
GRAH | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOS IGRA |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AT BE CH DE DK FR GB IT LI NL SE |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: NL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20011017 Ref country code: IT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRE;WARNING: LAPSES OF ITALIAN PATENTS WITH EFFECTIVE DATE BEFORE 2007 MAY HAVE OCCURRED AT ANY TIME BEFORE 2007. THE CORRECT EFFECTIVE DATE MAY BE DIFFERENT FROM THE ONE RECORDED.SCRIBED TIME-LIMIT Effective date: 20011017 Ref country code: GB Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20011017 Ref country code: FR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20011017 |
|
REF | Corresponds to: |
Ref document number: 207168 Country of ref document: AT Date of ref document: 20011115 Kind code of ref document: T |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP |
|
REF | Corresponds to: |
Ref document number: 59607930 Country of ref document: DE Date of ref document: 20011122 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20020117 Ref country code: DK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20020117 |
|
NLV1 | Nl: lapsed or annulled due to failure to fulfill the requirements of art. 29p and 29m of the patents act | ||
GBV | Gb: ep patent (uk) treated as always having been void in accordance with gb section 77(7)/1977 [no translation filed] |
Effective date: 20011017 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: AT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20020723 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20020731 Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20020731 Ref country code: BE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20020731 |
|
EN | Fr: translation not filed | ||
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
26N | No opposition filed | ||
BERE | Be: lapsed |
Owner name: HELMUT *HEMMERLEIN G.M.B.H. & CO. BAU K.G. Effective date: 20020731 |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20040823 Year of fee payment: 9 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20060201 |