EP0758699B1 - Method for installing tapered piles, tapered piles, and foundation structures made with these piles - Google Patents

Method for installing tapered piles, tapered piles, and foundation structures made with these piles Download PDF

Info

Publication number
EP0758699B1
EP0758699B1 EP96111806A EP96111806A EP0758699B1 EP 0758699 B1 EP0758699 B1 EP 0758699B1 EP 96111806 A EP96111806 A EP 96111806A EP 96111806 A EP96111806 A EP 96111806A EP 0758699 B1 EP0758699 B1 EP 0758699B1
Authority
EP
European Patent Office
Prior art keywords
piles
pile
ground
concrete
concrete piles
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
EP96111806A
Other languages
German (de)
French (fr)
Other versions
EP0758699A1 (en
Inventor
Helmut Dipl.-Ing. Hemmerlein
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dipling Helmut Hemmerlein & Co Bau Kg GmbH
Original Assignee
Dipling Helmut Hemmerlein & Co Bau Kg GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from DE29512311U external-priority patent/DE29512311U1/en
Priority claimed from DE29601080U external-priority patent/DE29601080U1/en
Application filed by Dipling Helmut Hemmerlein & Co Bau Kg GmbH filed Critical Dipling Helmut Hemmerlein & Co Bau Kg GmbH
Publication of EP0758699A1 publication Critical patent/EP0758699A1/en
Application granted granted Critical
Publication of EP0758699B1 publication Critical patent/EP0758699B1/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/10Deep foundations
    • E02D27/12Pile foundations
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/10Deep foundations
    • E02D27/12Pile foundations
    • E02D27/14Pile framings, i.e. piles assembled to form the substructure
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/02Improving by compacting
    • E02D3/08Improving by compacting by inserting stones or lost bodies, e.g. compaction piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/24Prefabricated piles
    • E02D5/30Prefabricated piles made of concrete or reinforced concrete or made of steel and concrete
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D7/00Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
    • E02D7/18Placing by vibrating
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D7/00Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
    • E02D7/26Placing by using several means simultaneously

Definitions

  • the invention initially relates to a method for introduction of piles tapering in the direction of insertion the ground, which is used to support or support buildings or building parts, in particular building foundations serve (preamble of claim 1).
  • Such, in the Piles also called “nails” by experts are from DE-PS 194 125 in the form of hollow ramming piles tapering downwards known from reinforced concrete. According to the title cited above In this patent, these piles are said to be in the ground be rammed in.
  • steam-driven battering rams usual ramming of piles, sheet piling and the like referred to by steam-driven battering rams.
  • This composition of the pile to be driven in from several Elements has the further disadvantage that the elements shift at their junctures can, or that the junction from the flight of the Elements to the side, so that the entire pile in has one or more kinks.
  • the aforementioned are often Shifts or kinks after insertion of the concrete pile can no longer be determined and therefore a permanent threat to the structure supported by it represent.
  • WO 94/17252 discloses piles and methods which should contribute to an improvement of the foundation. To do this, use a slightly tapered pile Hammering or vibration driven into the ground. The created hole is either directly with cement or similar poured out or struts first inserted and then poured cement into it.
  • the task or problem of the invention is in contrast, initially in a procedure for collecting of piles according to the preamble of claim 1 in to create the earth with a relatively small Work and material expenditure is feasible, the so driven piles under the one resting on them No or practically no longer set the building load, i.e. not penetrate further into the ground, which is a corresponding lowering (settlement) of the building in question would result.
  • the piles reciprocate in their longitudinal direction Vibrations and in this way initially in the Earth can be driven to a position that is short before reaching its intended final depth it is convenient that the vibrations are then switched off and then a final phase of driving in by application a vibration-free force acting in the driving direction on the pile until it is pre-tensioned is firmly held in the ground.
  • This bias can also be seen as a wedging or bracing of the pile be understood with the adjacent soil.
  • the bringing in such piles by means of in their longitudinal direction and vibrations are compared to the known Ramming cheaper because it is essential with a less equipment expenditure and also one essential less noise can occur.
  • a preferred embodiment of the method according to the invention is the subject of claim 2 the pile is not under the longitudinal vibrations or -vibrations set, but by means of an appropriate Tensile or compressive force over a portion of its length in depressed the ground. It is therefore relative to the earth firmly held so that the on it in its longitudinal direction acting vibrations can not lead to it moved aside or even damaged.
  • the invention further relates to the configurations from Concrete or reinforced concrete existing piles for the implementation of the method according to the invention can be used can. For this purpose, reference is made to claims 3 to 11.
  • the concrete piles are over their entire Length with a tapered or arched downward Provide taper.
  • the surfaces roughened the outside of the piles or there are there deepenings.
  • the piles take on their diameter viewed from the bottom up constantly. This has a constant displacement of the soil with the introduction of the piles. It will also hold the Piles in the ground with the pretension explained in claim 1 further consolidated.
  • the further in such piles provided roughening or deepening support the The piles in question stop in or on the side of the ground.
  • Claim 5 gives the Possibility of inclining or tapering the piles in Dependence on the consistency of the respective soil choose. This tendency can be around 2-6%.
  • Claim 7 includes a preferred embodiment of the Invention for creating outer surfaces or sides of the Concrete pile, which have roughening and / or depressions.
  • the claims 9 and 10 allow the attachment both a vibrator as well as a foundation, e.g. one Support plate.
  • the principle of driving the piles 1 into the ground 2 is shown in Figs. 1-4.
  • the stake in question 1 is with a only schematically indicated bracket 3 in placed vertically on the ground 2 and then by a pushing or pulling force according to arrow 4 over a Section 5 of its total length L pressed into the ground. This indentation is vibration-free or vibration-free.
  • the upper end face 6 of the Pile 1 a vibrator, here only schematically indicated vibrator 7, placed in the, not shown Way connected to the upper portion 8 of the pile 1 and this in its longitudinal direction A-B according to the Arrows 9 swings up and down until it is the one shown in FIG Has reached the driving position.
  • the pile 1 is tapered downwards. He can any cross-sectional shape, e.g. square or rectangular 7 have. He could also use an oval instead or have a circular cross-section. Furthermore, the Post 1 "trumpet-like" towards its upper end face expand as it is by the dash-dotted lines Lines 12 in Fig. 1 is indicated above.
  • piles have one Design of the taper of its outer sides in such a way that after driving in and final impressions in stick the earth to it.
  • the rejuvenation of the Piles depending on the consistency of each Soil can be chosen, in such a way that with harder The inclination of the outside of the concrete pile whose longitudinal central axis A-B is smaller and a softer one In contrast, soil is larger.
  • the Inclination of each of the outer sides of the pile 1 in question its longitudinal central axis A-B is about 2 to 6%.
  • the task of Invention roughened the surfaces of the outside of the piles or be provided with depressions. This will further their liability or friction on the surrounding Soil increased. For this it is recommended to use the concrete piles to produce from a porous concrete material, the the aforementioned porosity the roughening or indentation forms.
  • the piles 1 are made of concrete or reinforced concrete. You can also hollow and be made from a porous concrete, so that through its hollow interior (not shown) about the porous concrete in the ground is sucked off can be. This reduces the on very damp floors Risk of excessive slipperiness on the outside of the pile on Ground.
  • FIGS. 5 and 6 schematically show arrangements and Devices shown to the piles according to the invention in the Bring in soil.
  • 5 is a smaller one, off-road vehicle 14 at the construction site by means of Common, hydraulically operated supports 15 supported and possibly held firmly by a ballast 16. It carries a via only schematically indicated struts 17 likewise only schematically indicated bracket 18, in the a hydraulic system 19 is attached.
  • the movable part 19 ' this hydraulic is fixed in a manner not shown the upper region of the vibrator 7 connected via a only indicated connection 20 at the upper area 8 of the pile 1 attacks.
  • the hydraulics 19 ensures the so-called Preload, i.e. the last vibrationless impression of the Pile 1 into the ground from the position shown in FIG. 3 in that of Fig. 4.
  • FIG. 6 shows the Post 1 before it is placed in the ground. This matches with 1.
  • the second cable 26 is moved by the roller 29 of the tractor and overflows another pulley 30 of leader 23, which as well the aforementioned pulley 28 in the upper area is appropriate.
  • the cable 26 runs from the deflection roller 30 to a lower guide roller 31 of the leader and from there back up to the vibrator 7. This cable serves at corresponding drive via the roller 29, via which then not operated vibrator the pole 1 from the position 3 to the end position shown in FIG. 4, i.e. to give him the pretension already explained.
  • Both the device 14 and the tractor 21 are because of required off-road capability with a caterpillar drive Mistake.
  • Fig. 7 shows the possibility of executing one of the piles 1 in perspective. From this is both the Taper the pile from its top face 6 to to its lower end face 13 as well as a rectangular one or square cross-sectional shape. It could but also an oval or circular cross-sectional shape be provided.
  • the cast-on pin 35 can be gripped of the pile by a crane or to connect to the Serve vibrator.
  • FIG. 8 shows in this example a top view of part of the bottom 2 with a total of nine piles 1, each of which is the upper one End faces are recognizable. What to apply to this The foundation is for the sake of simplifying the drawing only indicated by dash-dotted lines in FIG. 8.
  • FIG. 9 shows a view in the direction of arrow 32 with cast foundation 33.
  • the foundation 33 is on the top end faces 6 of the piles 1, which are in are on a common level. You can do this in Pour the material of the piles 1 embedded iron rods 34 his. These iron struts 34 are in one of the piles 1 in Fig. 8 indicated. You can stop the piles at her Set down on the ground and also to transfer the Vibrations from vibrator 7 serve on the piles.
  • So is a foundation 33 created in Fig. 8 by a group this single foundation of piles 1, here of eight Piles in the square and one in the middle of the square arranged pile is formed. Brackets 35 and 34 are firmly connected to the upper end faces of the piles 1.
  • FIGS. 10, 11 An arrangement of the piles according to FIGS. 10, 11 may be provided, which, like the piles after the Embodiment of Figures 8, 9 according to the teaching of Invention are introduced into the ground. It is a Area 36 shown, in which a number of support posts 1 in several rows next to or on top of each other C-D and E-F is driven into the soil 2.
  • the distances a between the support piles are relative low. They are chosen, for example 0.5 m, that according to the respective load and the soil value areas 37 with the driving of the supporting piles between them compacted earth, which is cross-hatched in Fig. 11 are shown.
  • the support piles taper 1 from above, i.e.
  • the piles can be configured as previously explained. This creates a total area between the piles compacted soil. They also serve here as well as in the other embodiments, the side walls 38 of the soil as contact and support areas for the tapered side walls 39 of the support piles 1.
  • the load of the structure indicated by the arrows 40 presses on the supporting piles 1.
  • the length L of the piles is in the range of 8 - 12 m, while the dimension of the upper end face 6 50 x 50 cm and the lower end face 13 is 15 x 15 cm.

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Engineering & Computer Science (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Agronomy & Crop Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Soil Sciences (AREA)
  • Piles And Underground Anchors (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The piles (1) decrease in size in direction of setting. They are subjected to vibrations (9), to and fro in longitudinal pile direction, and in this way are driven into the ground (2) until they reach a position, which is slightly short of their final position. The vibrations are stopped, and a pressure or traction force (10), free of vibrations, and acting in direction of insertion, is applied to the pile, until it is held in the ground with a certain prestress. Initially, each pile is drawn or pressed into the ground over part (5) of its length, without vibrations, which are applied after this process. The piles consist of concrete and decrease in size conically or in an arch-shape.

Description

Die Erfindung betrifft zunächst ein Verfahren zur Einbringung von sich in Einbringrichtung verjüngenden Pfählen in den Erdboden, die zur Abstützung bzw. dem Tragen von Bauwerken oder Bauwerksteilen, insbesondere von Bauwerksfundamenten dienen (Oberbegriff des Anspruches 1). Derartige, in der Fachwelt auch "Nägel" genannte Pfähle sind aus DE-PS 194 125 in Form von hohlen, sich nach unten verjüngenden Rammpfählen aus Eisenbeton bekannt. Gemäß dem vorstehend zitierten Titel dieser Patentschrift sollen diese Pfähle in den Erdboden eingerammt werden. Hiermit ist vermutlich auf das seinerzeit übliche Einrammen von Pfählen, Spundwänden und dergleichen mittels dampfbetriebener Rammbären Bezug genommen. Mit so eingerammten Pfählen sind die Nachteile verbunden, daß nach jedem Rammstoß und damit auch nach dem letzten Rammstoß der betreffende Pfahl sich um ein kurzes Stück nach oben bewegt (gewissermaßen rückfedert) und damit einen gewissen Schlupf zu dem angrenzenden Erdboden erhält. Hiermit wird sich aber bei der späteren Belastung durch das aufgesetzte Gebäude eine gewisse nachteilige Setzung (Einsinken in den Erdboden) der Pfähle und damit des Gebäudes ergeben. Setzungen des auf solchen Pfählen ruhenden Gebäudes sind aber zu vermeiden, da sie zu Bauschäden und Reklamationen führen können. Die letztgenannten Nachteile ergeben sich auch beim Gegenstand von CH-PS 622.570, der einen Satz von vorfabrizierten Betonpfahlelementen und einen mit diesen hergestellten Betonrammpfahl betrifft. Es sind kegelstumpfförmige Pfahlelemente vorgesehen, die mit weiteren Pfahlelementen fluchtend zusammengesetzt werden und den einzurammenden Betonpfahl ergeben. Diese Zusammensetzung des einzurammenden Pfahles aus mehreren Elementen hat den weiteren Nachteil, daß die Elemente sich an ihren Verbindungsstellen zueinander verschieben können, oder daß die Verbindungsstelle aus der Flucht der Elemente zur Seite ausweicht, so daß der gesamte Pfahl in sich ein oder mehrere Knickstellen aufweist. Hiermit erhält man eine instabile Gründung. Hinzu kommt, daß oft die vorgenannten Verschiebungen oder Knickungen nach dem Einbringen des Betonpfahles nicht mehr festzustellen sind und somit eine bleibende Gefährdung für das hiervon getragene Bauwerk darstellen.The invention initially relates to a method for introduction of piles tapering in the direction of insertion the ground, which is used to support or support buildings or building parts, in particular building foundations serve (preamble of claim 1). Such, in the Piles also called "nails" by experts are from DE-PS 194 125 in the form of hollow ramming piles tapering downwards known from reinforced concrete. According to the title cited above In this patent, these piles are said to be in the ground be rammed in. Hereby presumably at that time usual ramming of piles, sheet piling and the like referred to by steam-driven battering rams. With like this driven piles have the disadvantages that after every ram and thus also after the last ram the pile in question moves up a short distance (spring back, so to speak) and thus a certain amount of slip to the adjacent earth. This will, however in the event of subsequent loading by the attached building a certain disadvantageous settlement (sinking into the ground) of the piles and thus the building. Settlement of the Such dormant buildings are to be avoided, however they can lead to construction damage and complaints. The the latter disadvantages also arise with the subject from CH-PS 622.570, which is a set of prefabricated concrete pile elements and a concrete pile made with them concerns. They are frustoconical pile elements provided that put together in alignment with other pile elements and result in the concrete pile to be driven. This composition of the pile to be driven in from several Elements has the further disadvantage that the elements shift at their junctures can, or that the junction from the flight of the Elements to the side, so that the entire pile in has one or more kinks. Hereby receives an unstable foundation. In addition, the aforementioned are often Shifts or kinks after insertion of the concrete pile can no longer be determined and therefore a permanent threat to the structure supported by it represent.

In der WO 94/17252 werden Pfähle und Verfahren offenbart, die zu einer Verbesserung des Fundaments beitragen sollen. Hierzu wird ein leicht konisch zulaufender Pfahl mittels Hämmern oder Vibration in den Boden getrieben. Das entstandene Loch wird entweder direkt mit Zement oder ähnlichem ausgegossen oder es werden zuerst Verstrebungen eingesetzt und dann Zement darin eingegossen.WO 94/17252 discloses piles and methods which should contribute to an improvement of the foundation. To do this, use a slightly tapered pile Hammering or vibration driven into the ground. The created hole is either directly with cement or similar poured out or struts first inserted and then poured cement into it.

Zur Schaffung von Gründungen für größere und damit entsprechend schwere Bauwerke, z.B. ist dabei an über 40 m hohe Lagergebäude gedacht, ist es derzeit in der Praxis üblich, relativ tiefe, zylindrische Löcher in den Erdboden zu bohren, danach in das Loch eine Bewehrung einzubringen und schließlich dieses Loch mit Beton auszugießen. Die Löcher müssen so lang sein, bis eine tragfähige Erdschicht erreicht wird, auf welcher der durch das Ausgießen entstandene zylindrische Betonpfahl sich mit der Gebäudelast abstützen kann. To create foundations for larger and therefore accordingly heavy structures, e.g. is about 40 m high Warehouse, it is currently common in practice drilling relatively deep, cylindrical holes in the ground, then insert reinforcement into the hole and finally pour this hole in concrete. The holes must be long enough to reach a stable layer of earth on which the cylindrical created by the pouring The concrete pile can support itself with the building load.

Die Reibung zwischen der zylindrischen Außenwand des Betonpfahles und der Lochwandung reicht nämlich nicht aus, um die später auf diesem Betonpfahl ruhende Last aufzunehmen. Aus Vorstehendem ergibt sich oft eine relativ große Lochlänge, z.B. von 20 m, bis die tragfähige Erdschicht erreicht ist. Die Kosten für die Herstellung solcher Betonpfähle sind außerordentlich hoch. Hinzu kommt, daß deren aus dem Erdreich hervorragenden oberen Enden noch mit einem Preßlufthammer geebnet und auf das jeweils gleiche Niveau gebracht werden müssen, da in der Regel mehrere Betonpfähle miteinander eine Gründung bilden. Trotz dieses großen Fertigungsaufwandes kann es bei einem Nachgeben der an sich als tragfähig eingeschätzten Bodenschicht geschehen, daß die auf derartigen Pfählen ruhenden Gebäude sich setzen. Dies kann zu Rissen im Gebäude und weiteren Schäden führen. So kann bei dem vorstehend als Beispiel zitierten Lagergebäude damit die Höhe von Lagerflächen sich in Relation zu anderen Flächen ändern. Da in solchen Lagergebäuden computergesteuerte, fahrbare Geräte zur Beladung bzw. Entladung betrieben werden und hierbei eine exakte Einhaltung der jeweiligen Höhenlage der zu erfassenden Paletten oder dergleichen zwingend erforderlich ist, kann durch solche Setzungen das gesamte Gebäude oder wesentliche Bereiche davon funktionsunfähig werden.The friction between the cylindrical outer wall of the concrete pile and the hole wall is not sufficient to the later to take up a load resting on this concrete pile. Out The above often results in a relatively large hole length, e.g. of 20 m until the stable soil layer is reached. The cost of manufacturing such concrete piles is extremely high. On top of that comes from the ground outstanding top ends with a jackhammer leveled and brought to the same level have to be, since usually several concrete piles with each other form a foundation. Despite this great manufacturing effort it can be considered viable if the estimated soil layer that happen on such Pile dormant buildings sit down. This can be too Cracks in the building and further damage. So at the warehouse building cited above as an example Height of storage areas in relation to other areas to change. Since in such warehouse buildings computer-controlled Mobile devices can be operated for loading and unloading and an exact adherence to the respective altitude of the pallets or the like to be recorded is absolutely necessary the entire building can be or essential areas of it become inoperable.

Die Aufgaben- bzw. Problemstellung der Erfindung besteht demgegenüber zunächst darin, ein Verfahren für das Eintreiben von Pfählen gemäß dem Oberbegriff des Anspruches 1 in den Erdboden zu schaffen, das mit einem relativ geringen Arbeits- und Materialaufwand durchführbar ist, wobei die so eingetriebenen Pfähle sich unter der auf ihnen ruhenden Gebäudelast nicht oder praktisch nicht mehr setzen, d.h. nicht noch weiter in den Erdboden eindringen, was eine entsprechende Absenkung (Setzung) des betreffenden Gebäudes zur Folge hätte.The task or problem of the invention is in contrast, initially in a procedure for collecting of piles according to the preamble of claim 1 in to create the earth with a relatively small Work and material expenditure is feasible, the so driven piles under the one resting on them No or practically no longer set the building load, i.e. not penetrate further into the ground, which is a corresponding lowering (settlement) of the building in question would result.

Zur Lösung dieser Aufgaben- bzw. Problemstellung ist daher zunächst gemäß dem Kennzeichen des Anspruches 1 vorgesehen, daß die Pfähle in in ihrer Längsrichtung hin- und hergehende Schwingungen versetzt und in dieser Weise zunächst in den Erdboden bis zu einer Position eingetrieben werden, die kurz vor Erreichen ihrer vorgesehenen, endgültigen Tiefenlage gelegen ist, daß danach die Schwingungen abgestellt werden und dann eine Endphase des Eintreibens durch Aufbringen einer in Eintreibrichtung wirkenden, schwingungsfreien Kraft auf den Pfahl erfolgt, bis dieser mit einer gewissen Vorspannung im Erdboden fest gehalten ist. Diese Vorspannung kann auch als ein sich Verkeilen oder Verspannen des Pfahles mit dem angrenzenden Erdreich verstanden werden. Das Einbringen solcher Pfähle mittels in ihrer Längsrichtung hin- und hergehenden Schwingungen ist gegenüber dem vorbekannten Einrammen günstiger, weil es demgegenüber mit einem wesentlich geringeren apparativen Aufwand und auch einer wesentlich geringeren Geräuschentwicklung erfolgen kann. Es muß aber berücksichtigt werden, daß nach dem Abstellen des betreffenden Schwingungserzeugers, z.B. eines Vibrators, dieser noch etwas hin- und herschwingt, wodurch sich ein geringes Eindrücken und sich wieder nach oben Bewegen des Pfahles relativ zum Erdboden ergibt. Damit erhält der betreffende Pfahl bzw. erhalten die betreffenden Pfähle ein gewisses Maß an Schlupf relativ zum Erdboden. Es würden also im Prinzip dann die gleichen Nachteile vorliegen wie bei dem eingangs erläuterten Rammen mit der Gefahr einer späteren, nachteiligen Setzung der Pfähle und damit des Gebäudes. Um nun sowohl die Vorteile eines leichten und schnellen, mit relativ geringem Geräteaufwand auf der Baustelle durchführbaren Einbringens solcher Pfähle mittels Schwingungen bzw. Vibrationen zu haben, als auch die erläuterten nachteiligen Setzungen zu vermeiden, ist gemäß der zweiten Hälfte des Kennzeichens des Anspruches 1 vorgesehen, daß die Schwingungserzeugung kurz vor Erreichen der Endstellung des Pfahles aufhört und dann das letzte Stück des Eintreibvorganges durch eine auf den Pfahl wirkende, schwingungsfreie Zug- oder Druckkraft erfolgt. Diese Belastung treibt ihn satt und ohne Schlupf in den Boden. Es ist die o.g. Vorspannung erreicht. Damit sind Setzungen vermieden bzw. sie haben nur noch einen so geringen Betrag, daß dies sich auf das Bauwerk nicht nachträglich auswirkt. Als weiterer Vorteil kommt hinzu, daß die Belastung eines so vorgespannten Pfahles elektronisch aufgezeichnet und als Grundlage von bodenmechanischen Berechnungen verwertet werden kann.To solve this task or problem is therefore initially provided according to the characterizing part of claim 1, that the piles reciprocate in their longitudinal direction Vibrations and in this way initially in the Earth can be driven to a position that is short before reaching its intended final depth it is convenient that the vibrations are then switched off and then a final phase of driving in by application a vibration-free force acting in the driving direction on the pile until it is pre-tensioned is firmly held in the ground. This bias can also be seen as a wedging or bracing of the pile be understood with the adjacent soil. The bringing in such piles by means of in their longitudinal direction and vibrations are compared to the known Ramming cheaper because it is essential with a less equipment expenditure and also one essential less noise can occur. It must but take into account that after turning off the vibration generator concerned, e.g. a vibrator, this still swings back and forth a little, which makes one slight indentation and moving up again Pile relative to the ground. The person concerned thus receives Pile or receive the piles in question some degree of slip relative to the ground. So it would in principle then the same disadvantages as with the rams explained at the beginning with the risk of a later, disadvantageous settlement of the piles and thus the building. Around now both the advantages of a light and fast, with relatively small amount of equipment can be carried out on the construction site Introduction of such piles using vibrations or To have vibrations as well as the explained disadvantageous Avoiding settlements is according to the second half of the Characteristic of claim 1 provided that the vibration generation shortly before reaching the end position of the pile stops and then the last piece of the driving process due to a vibration-free pull acting on the pile or pressure force. This burden drives him full and without slipping into the ground. It is the above preload reached. So settlements are avoided or they only have still such a small amount that this affects the building does not affect afterwards. Another advantage comes added that the load on such a prestressed pile electronically recorded and as the basis of soil mechanics Calculations can be used.

Eine bevorzugte Ausführungsform des erfindungsgemäßen Verfahrens ist Gegenstand des Anspruches 2. Hierbei wird zunächst der Pfahl nicht unter die Längsschwingungen oder -vibrationen gesetzt, sondern mittels einer entsprechenden Zug- oder Druckkraft über einen Teilbereich seiner Länge in den Erdboden eingedrückt. Somit ist er vom Erdboden relativ fest gehalten, so daß die auf ihn in seiner Längsrichtung wirkenden Schwingungen nicht dazu führen können, daß er sich zur Seite bewegt oder sogar beschädigt wird.A preferred embodiment of the method according to the invention is the subject of claim 2 the pile is not under the longitudinal vibrations or -vibrations set, but by means of an appropriate Tensile or compressive force over a portion of its length in depressed the ground. It is therefore relative to the earth firmly held so that the on it in its longitudinal direction acting vibrations can not lead to it moved aside or even damaged.

Die Erfindung betrifft ferner die Ausgestaltungen von aus Beton oder Stahlbeton bestehenden Pfählen, die für die Durchführung des erfindungsgemäßen Verfahrens eingesetzt werden können. Hierzu wird auf die Ansprüche 3 bis 11 verwiesen.The invention further relates to the configurations from Concrete or reinforced concrete existing piles for the implementation of the method according to the invention can be used can. For this purpose, reference is made to claims 3 to 11.

Gemäß Anspruch 3 sind die Betonpfähle über ihre gesamte Länge mit einer konisch oder bogenförmig nach unten verlaufenden Verjüngung versehen. Außerdem sind die Oberflächen der Außenseiten der Pfähle aufgerauht oder es befinden sich dort Vertiefungen. Somit nehmen die Pfähle in ihrem Durchmesser von unten nach oben betrachtet ständig zu. Dies hat ein ständiges Verdrängen des Erdreiches mit dem Einbringen der Pfähle zur Folge. Es wird auch hierdurch der Halt der Pfähle in der Erde mit der zum Anspruch 1 erläuterten Vorspannung weiter gefestigt. Die ferner bei derartigen Pfählen vorgesehenen Aufrauhungen oder Vertiefungen unterstützen den Halt der betreffenden Pfähle im bzw. am seitlichen Erdreich. Die vorstehend erläuterten Vorteile werden mit dem Stand der Technik gemäß US-PS 3 820 347 nicht erreicht. Zum einen sind die dort vorgesehenen Pfähle nicht über ihre gesamte Länge konisch oder bogenförmig zulaufend, sondern nur auf der unteren Hälfte ihrer Länge. Dagegen ist der Durchmesser der oberen Hälfte (die Begriffe "unten" und "oben" sind immer bezogen auf deren Position nach ihrem Einbringen in den Erdboden) dieser Pfähle gleichbleibend. Somit kann dort nicht die für den Halt des Pfahles im Erdreich laut Anspruch 1 zu schaffende Vorspannung erreicht werden. Schließlich zeigt diese Literaturstelle auch nicht die zum Gegenstand des Anspruches 3 gehörenden Aufrauhungen oder Vertiefungen. Insbesondere bei einem relativ weichen Erdboden kann Erde in diese Aufrauhungen oder Vertiefungen eindringen, wodurch der Halt des Pfahles entsprechend verbessert wird. Es fehlt also beim Gegenstand dieser Literaturstelle das synergistische Zusammenwirken der sich über die ganze Länge erstreckenden Verjüngung und der Aufrauhungen oder Vertiefungen um die Pfähle, einschließlich der von ihnen getragenen Last, in der Einbringlage zu halten und weitere Setzungen zu vermeiden. Die mit der Erfindung von den Pfählen ausgeübte Haltekraft ist so groß, daß es nicht mehr notwendig ist, daß die Pfähle mit ihrem zuerst in den Erdboden einzutreibenden, unteren Ende auf einer tragfähigen Erdschicht zur Auflage und Abstützung kommen müssen.According to claim 3, the concrete piles are over their entire Length with a tapered or arched downward Provide taper. In addition, the surfaces roughened the outside of the piles or there are there deepenings. Thus, the piles take on their diameter viewed from the bottom up constantly. this has a constant displacement of the soil with the introduction of the piles. It will also hold the Piles in the ground with the pretension explained in claim 1 further consolidated. The further in such piles provided roughening or deepening support the The piles in question stop in or on the side of the ground. The advantages explained above are with the state of the Technology according to US Pat. No. 3,820,347 not achieved. For one are the piles provided there are not along their entire length tapered or arched, but only on the lower half of their length. In contrast, the diameter is the top half (the terms "bottom" and "top" are always based on their position after their introduction in the Soil) of these piles. So there not according to the claim for holding the pile in the ground 1 preload to be created. Finally this reference does not show the subject of claim 3 belonging roughening or depressions. Especially in the case of a relatively soft soil, soil can be in these roughening or depressions penetrate, causing the The stake is improved accordingly. So it is missing the subject of this reference is synergistic Interaction of those extending over the entire length Rejuvenation and the roughening or depressions around the Piles, including the load they carry, in the Keep insertion position and avoid further settlement. The holding force exerted by the piles with the invention is so big that it is no longer necessary for the piles with their lower one to be driven into the ground first End on a stable layer of earth for support and support have to come.

Die Gegenstände der Ansprüche 4 und 5 befassen sich mit der hier vorteilhaften Neigung bzw. Steigung der Außenseiten der Pfähle zu ihrer Längsmittelachse. Anspruch 5 gibt dabei die Möglichkeit, die Neigung oder Verjüngung der Pfähle in Abhängigkeit von der Konsistenz des jeweiligen Erdbodens zu wählen. Diese Neigung kann etwa 2 - 6 % betragen.The subjects of claims 4 and 5 deal with the advantageous slope or slope of the outer sides of the Piles to their central longitudinal axis. Claim 5 gives the Possibility of inclining or tapering the piles in Dependence on the consistency of the respective soil choose. This tendency can be around 2-6%.

Durch das "trompeten"-artige Erweitern der Betonpfähle in ihrem oberen Endbereich gemäß Anspruch 6 wird eine zusätzliche Verdrängung des Erdreiches im oberen Bereich der Betonpfähle erreicht. Hiermit wird die Tragfähigkeit solcher Betonpfähle zusätzlich erhöht. By the "trumpet-like" expansion of the concrete piles in its upper end portion according to claim 6 is an additional Displacement of the soil in the upper area of the concrete piles reached. Hereby the load capacity of such Concrete piles additionally raised.

Anspruch 7 beinhaltet eine bevorzugte Ausführungsform der Erfindung zur Schaffung von Außenflächen oder -seiten des Betonpfahles, die Aufrauhungen und/oder Vertiefungen aufweisen.Claim 7 includes a preferred embodiment of the Invention for creating outer surfaces or sides of the Concrete pile, which have roughening and / or depressions.

Zum Gegenstand des Anspruches 8 ist darauf hinzuweisen, daß die genannte US-PS 3 820 347 zwar Pfähle mit einem etwa quadratischen Querschnitt zeigt; nicht aber Pfähle mit runden oder elliptischen Querschnitten.Regarding the subject of claim 8 it should be noted that the aforementioned US Pat. No. 3,820,347 piles with an approximately shows square cross section; but not piles round or elliptical cross sections.

Die Ansprüche 9 und 10 ermöglichen die Anbringung sowohl eines Vibrators als auch eines Fundamentes, z.B. einer Tragplatte.The claims 9 and 10 allow the attachment both a vibrator as well as a foundation, e.g. one Support plate.

Weitere Vorteile und Merkmale der Erfindung sind sowohl den vorstehend erläuterten Unteransprüchen, auf deren Inhalt hiermit ausdrücklich Bezug genommen wird, als auch der nachfolgenden Beschreibung und der zugehörigen Zeichnung von erfindungsgemäßen Ausführungsmöglichkeiten zu entnehmen. In der Zeichnung zeigt:

Fig. 1 bis 4 :
verschiedene Stadien des Eintreibvorganges gemäß dem-erfindungsgemäßen Verfahren, mit Darstellung von Pfählen nach der Erfindung,
Fig. 5 :
eine erste Ausführungsmöglichkeit eines Gerätes zur Durchführung des Eintreibvorganges,
Fig. 6 :
eine zweite Ausführungsmöglichkeit eines Gerätes zur Durchführung des Eintreibvorganges,
Fig. 7 :
einen Pfahl nach der Erfindung in perspektivischer Ansicht,
Fig. 8, 9 :
in Teilansichten die Erfindung im Zusammenhang mit einer Gründung für ein Einzelfundament, mit Darstellung von Pfählen nach der Erfindung,
Fig. 10, 11 :
eine Ausführungsmöglichkeit der Erfindung im Zusammenhang mit einer Gründung in Form eines plattenförmigen Fundamentes, mit Darstellung von Pfählen nach der Erfindung. Dabei ist Fig. 11 ein Schnitt gemäß der Linie XI-XI in Fig. 10.
Further advantages and features of the invention can be found both in the subclaims explained above, the content of which is hereby expressly incorporated by reference, and in the following description and the associated drawing of possible embodiments of the invention. The drawing shows:
1 to 4:
different stages of the driving-in process according to the method according to the invention, showing piles according to the invention,
Fig. 5:
a first possibility of executing a device for carrying out the driving-in process,
Fig. 6:
a second embodiment of a device for carrying out the driving-in process,
Fig. 7:
a pile according to the invention in a perspective view,
8, 9:
in partial views the invention in connection with a foundation for a single foundation, showing piles according to the invention,
10, 11:
an embodiment of the invention in connection with a foundation in the form of a plate-shaped foundation, showing piles according to the invention. 11 is a section along the line XI-XI in FIG. 10.

Das Prinzip des Eintreibens der Pfähle 1 in den Erdboden 2 ist in den Fig. 1 - 4 dargestellt. Der betreffende Pfahl 1 wird mit einer nur schematisch angedeuteten Halterung 3 in senkrechter Lage auf den Erdboden 2 aufgesetzt und dann durch eine Druck- oder Zugkraft gemäß Pfeil 4 über einen Teilbereich 5 seiner Gesamtlänge L in den Erdboden eingedrückt. Dieses'Eindrücken erfolgt schwingungs- bzw. vibrationsfrei. Danach wird auf die obere Stirnfläche 6 des Pfahles 1 ein Schwingungserzeuger, hier ein nur schematisch angedeuteter Vibrator 7, aufgesetzt, der in nicht dargestellter Weise mit dem oberen Bereich 8 des Pfahles 1 verbunden ist und diesen in seiner Längsrichtung A-B gemäß den Pfeilen 9 auf- und abschwingt, bis er die in Fig. 3 dargestellte Eintreiblage erreicht hat. Danach wird der Vibrator 7 weggenommen oder abgeschaltet und es wird gemäß Pfeil 10 der Pfahl noch um den weiteren Betrag 11 vibrations- bzw. schwingungsfrei in seine Endposition gemäß Fig. 4 gedrückt. In dieser Position hat er die zur Erfindung beschriebene Vorspannung. Hiermit wird der erläuterte nachteilige Schlupf zwischen Pfahl 1 und Erdboden 2 vermieden, der nach Beendigung der Vibration gemäß der Position der Fig. 3 auftreten kann. Der Pfahl ist fest im Erdreich verklemmt.The principle of driving the piles 1 into the ground 2 is shown in Figs. 1-4. The stake in question 1 is with a only schematically indicated bracket 3 in placed vertically on the ground 2 and then by a pushing or pulling force according to arrow 4 over a Section 5 of its total length L pressed into the ground. This indentation is vibration-free or vibration-free. Then the upper end face 6 of the Pile 1 a vibrator, here only schematically indicated vibrator 7, placed in the, not shown Way connected to the upper portion 8 of the pile 1 and this in its longitudinal direction A-B according to the Arrows 9 swings up and down until it is the one shown in FIG Has reached the driving position. After that, the vibrator 7 removed or switched off and it is according to arrow 10 the pile by a further amount 11 vibration or pressed vibration-free into its end position shown in FIG. 4. In this position he has the one described for the invention Preload. This explains the disadvantageous slip avoided between pile 1 and ground 2, the one after completion the vibration according to the position of FIG. 3 occur can. The pile is stuck in the ground.

Zusammengefaßt ergibt sich, daß das zunächst durch Ziehen oder Drücken am Pfahl 1 erfolgte Eindrücken um den Betrag 5 ihn im Erdreich hält, so daß die dann erfolgenden Vibrationen, welche den Pfahl 1 um den Hauptteil seiner Länge einbringen, den Pfahl nicht zur Seite bewegen oder beschädigen können. Die letzte, bereits geschilderte Phase des Überganges von Fig. 3 nach Fig. 4 durch die Kraft 10 schafft die endgültige, fixe Eintreiblage und Vorspannung, in der bei der vorgesehenen Belastung praktisch kein Setzen des Pfahles mehr in das Erdreich hinein erfolgt.In summary, it follows that this is initially done by pulling or pressing on post 1 was done by the amount 5 holds it in the ground so that the vibrations that then occur which bring the pole 1 around the main part of its length, Do not move or damage the pile to the side can. The last phase of the transition, already described from Fig. 3 to Fig. 4 by the force 10 creates the final, fixed driving position and preload, in the case of the intended load practically no setting of the pile more into the ground.

Wie in Fig. 1 - 4 und insbesondere in Fig. 7 dargestellt, ist der Pfahl 1 nach unten konisch verjüngt. Er kann eine beliebige Querschnittsform, z.B. quadratisch oder rechteckig gemäß Fig. 7 haben. Er könnte stattdessen auch einen ovalen oder kreisrunden Querschnitt besitzen. Ferner kann sich der Pfahl 1 in Richtung zu seiner oberen Stirnfläche hin "trompeten"-artig erweitern, wie es durch die strichpunktierten Linien 12 in Fig. 1 oben angedeutet ist.As shown in FIGS. 1-4 and in particular in FIG. 7, the pile 1 is tapered downwards. He can any cross-sectional shape, e.g. square or rectangular 7 have. He could also use an oval instead or have a circular cross-section. Furthermore, the Post 1 "trumpet-like" towards its upper end face expand as it is by the dash-dotted lines Lines 12 in Fig. 1 is indicated above.

Statt einer konischen Verjüngung der Pfähle nach unten kann eine solche Verjüngung auch bogenförmig verlaufen. Die Pfähle weisen in einer bevorzugten Ausführungsform eine Ausgestaltung der Verjüngung ihrer Außenseiten derart auf, daß sie nach ihrem Eintreiben und endgültigen Eindrücken in den Erdboden an diesem haften. Dabei kann die Verjüngung der Pfähle in Abhängigkeit von der Konsistenz des jeweiligen Erdbodens gewählt werden, und zwar derart, daß bei härterem Erdboden die Neigung der Außenseiten des Betonpfahles zu dessen Längsmittelachse A-B kleiner und bei einem weicheren Erdboden demgegenüber größer ist. Beispielsweise kann die Neigung jeder der Außenseiten des betreffenden Pfahles 1 zu seiner Längsmittelachse A-B etwa 2 bis 6 % betragen. Schließlich können auch im Sinne der Aufgabenstellung der Erfindung die Oberflächen der Außenseiten der Pfähle aufgerauht oder mit Vertiefungen versehen sein. Hierdurch wird weiter ihre Haftung oder Reibung an dem sie umgebenden Erdreich erhöht. Hierzu empfiehlt es sich, die Betonpfähle aus einem porösen Betonmaterial herzustellen, wobei die vorgenannte Porösität die Aufrauhungen oder Vertiefungen bildet.Instead of tapering the piles downwards such a taper is also arched. The In a preferred embodiment, piles have one Design of the taper of its outer sides in such a way that after driving in and final impressions in stick the earth to it. The rejuvenation of the Piles depending on the consistency of each Soil can be chosen, in such a way that with harder The inclination of the outside of the concrete pile whose longitudinal central axis A-B is smaller and a softer one In contrast, soil is larger. For example, the Inclination of each of the outer sides of the pile 1 in question its longitudinal central axis A-B is about 2 to 6%. Finally, in terms of the task of Invention roughened the surfaces of the outside of the piles or be provided with depressions. This will further their liability or friction on the surrounding Soil increased. For this it is recommended to use the concrete piles to produce from a porous concrete material, the the aforementioned porosity the roughening or indentation forms.

Durch die konische Verjüngung des Pfahles verklemmen sich seine Seitenflächen beim Eintreiben mit dem daran anliegenden Erdreich. Im Gegensatz zu dem erläuterten Stand der Technik, bei dem in den Erdboden eingegossene zylindrische Betonpfähle sich auf einer tragenden Bodenschicht abstützen, ist es hier nicht notwendig, daß die untere Stirnfläche 13 des Pfahles ein festes Widerlager in Form einer tragenden Bodenschicht findet. Während die vorbekannten zylindrischen Betonpfähle sehr lang sein müssen, z.B. 20 m, genügen für eine hinreichende Gründung mit Pfählen, die nach der Erfindung ausgebildet und eingetrieben sind, eine demgegenüber kleinere Pfahllänge von z.B. 8 - 12 m. Es versteht sich, daß die Erfindung nicht auf Pfähle dieser Länge beschränkt ist.The conical taper of the pile jams its side surfaces when driving in with the adjacent one Soil. In contrast to the explained state of the Technique in which cylindrical cast in the ground Concrete piles are supported on a load-bearing layer of soil, it is not necessary here for the lower end face 13 of the pile a fixed abutment in the form of a load-bearing one Soil layer finds. While the previously known cylindrical Concrete piles must be very long, e.g. 20 m, are enough for adequate foundation with piles according to the invention trained and driven, one against it smaller pile length of e.g. 8 - 12 m. It is understood that the invention is not limited to piles of this length.

Erwähnt sei noch, daß vom Prinzip her das Eindrücken des Pfahles aus der Position der Fig. 1 in die Position der Fig. 2 durch Aufbringen einer Zug- oder Druckkraft 4 nicht unbedingt notwendig ist. Man könnte stattdessen bei auf dem Erdboden aufgesetztem Pfahl gemäß Fig. 1 bereits mit der Aufbringung der senkrechten Schwingungen mittels eines Vibrators 7 oder dergleichen beginnen und dies so lange fortsetzen, bis der Pfahl die Position der Fig. 3 erreicht hat. Danach erfolgt der weitere Eintreibvorgang wie oben erläutert.It should also be mentioned that in principle the impression of the Pile from the position of FIG. 1 to the position of FIG. 2 not necessarily by applying a tensile or compressive force 4 necessary is. You could instead go to the 1 already with the Application of the vertical vibrations using a Vibrators 7 or the like start for so long continue until the post reaches the position of Fig. 3 Has. Then the driving-in process continues as above explained.

Die Pfähle 1 sind aus Beton oder Stahlbeton. Sie können auch hohl und dabei aus einem porösen Beton herstellbar sein, so daß durch ihren hohlen Innenraum (nicht dargestellt) über den porösen Beton im Erdreich befindliches Wasser abgesaugt werden kann. Dies verringert bei sehr feuchten Böden die Gefahr einer zu großen Schlüpfrigkeit der Pfahlaußenseite am Boden. The piles 1 are made of concrete or reinforced concrete. You can also hollow and be made from a porous concrete, so that through its hollow interior (not shown) about the porous concrete in the ground is sucked off can be. This reduces the on very damp floors Risk of excessive slipperiness on the outside of the pile on Ground.

In den Figuren 5 und 6 sind schematisch Anordnungen und Geräte gezeigt, um die Pfähle nach der Erfindung in den Erdboden einzubringen. Im Beispiel der Fig. 5 ist ein kleineres, geländegängiges Fahrzeug 14 an der Baustelle mittels üblicher, hydraulisch zu betätigender Stützen 15 abgestützt und gegebenenfalls durch einen Ballast 16 fest gehalten. Es trägt über nur schematisch angedeutete Streben 17 eine ebenfalls nur schematisch angedeutete Halterung 18, in der eine Hydraulik 19 befestigt ist. Der bewegliche Teil 19' dieser Hydraulik ist in nicht dargestellter Weise fest mit dem oberen Bereich des Vibrators 7 verbunden, der über eine nur angedeutete Verbindung 20 am oberen Bereich 8 des Pfahles 1 angreift. Die Hydraulik 19 sorgt für die sogenannte Vorspannung, d.h. das letzte schwingungslose Eindrücken des Pfahles 1 in den Erdboden aus der Position gemäß Fig. 3 in die der Fig. 4. Sie kann auch bei entsprechender Ausbildung für das Eindrücken des Bereiches 5 des Pfahles 1 aus der Position der Fig. 1 in die der Fig. 2 dienen. Die Belastungsergebnisse der erläuterten Hydraulik 19 können elektronisch aufgezeichnet und ausgewertet werden. Die genaue senkrechte Lage der Halterung 18 kann durch hydraulische Verstellung der Abstützungen 15 des Gerätes 14 erreicht werden.FIGS. 5 and 6 schematically show arrangements and Devices shown to the piles according to the invention in the Bring in soil. 5 is a smaller one, off-road vehicle 14 at the construction site by means of Common, hydraulically operated supports 15 supported and possibly held firmly by a ballast 16. It carries a via only schematically indicated struts 17 likewise only schematically indicated bracket 18, in the a hydraulic system 19 is attached. The movable part 19 ' this hydraulic is fixed in a manner not shown the upper region of the vibrator 7 connected via a only indicated connection 20 at the upper area 8 of the pile 1 attacks. The hydraulics 19 ensures the so-called Preload, i.e. the last vibrationless impression of the Pile 1 into the ground from the position shown in FIG. 3 in that of Fig. 4. It can also with appropriate training for indenting the area 5 of the pile 1 from the 1 position in that of FIG. 2 serve. The stress results The hydraulic system 19 explained can be electronic be recorded and evaluated. The exact vertical position of the bracket 18 can by hydraulic Adjustment of the supports 15 of the device 14 reached become.

In der Ausführungsform nach Fig. 6 ist ein fahrbarer Traktor 21 vorgesehen, der über eine Strebenanordnung 22 ein Gerüst 23 trägt, das hier nur schematisch angedeutet ist. Das Gerüst 23 stützt sich bei 24 am Erdboden ab. Es sind zwei Seilzüge 25 und 26 in Form von Seilwinden vorgesehen. Diese Seilzüge bewirken über das Gerüst 23, auch Mäkler genannt, und die daran angebrachten, nachstehend näher erläuterten Umlenkrollen folgendes:6 is a mobile tractor 21 provided a scaffold via a strut arrangement 22 23 carries, which is only indicated schematically here. The Scaffold 23 is supported on the ground at 24. There are two Cable pulls 25 and 26 are provided in the form of cable winches. This Cable pulls bring about the scaffold 23, also called leader and attached to them, explained in more detail below The following pulleys:

Das Seil 25, welches von der Rolle 27 des Traktors auf und ab bewegt werden kann, läuft über eine Zwischenrolle 28' zu einer Umlenkrolle 28 des Mäklers 23. Hieran hängt der Vibrator 7 und an diesem der Pfahl 1. Dabei zeigt Fig. 6 den Pfahl 1 vor seinem Einbringen in den Erdboden. Dies entspricht der Stellung gemäß Fig. 1. Der zweite Seilzug 26 wird von der Rolle 29 des Traktors bewegt und läuft über eine weitere Umlenkrolle 30 des Mäklers 23, die ebenso wie die vorgenannte Umlenkrolle 28 in dessen oberen Bereich angebracht ist. Der Seilzug 26 läuft von der Umlenkrolle 30 zu einer unteren Umlenkrolle 31 des Mäklers und von da wieder nach oben zum Vibrator 7. Dieser Seilzug dient bei entsprechendem Antrieb über die Rolle 29 dazu, über den dann nicht betriebenen Vibrator den Pfahl 1 aus der Position gemäß Fig. 3 in die Endlage gemäß Fig. 4 zu drücken, d.h. ihm die bereits erläuterte Vorspannung zu geben.The rope 25, which from the roller 27 of the tractor on and can be moved, runs via an intermediate roller 28 ' a deflection roller 28 of the leader 23. The vibrator hangs on this 7 and on this the pile 1. FIG. 6 shows the Post 1 before it is placed in the ground. This matches with 1. The second cable 26 is moved by the roller 29 of the tractor and overflows another pulley 30 of leader 23, which as well the aforementioned pulley 28 in the upper area is appropriate. The cable 26 runs from the deflection roller 30 to a lower guide roller 31 of the leader and from there back up to the vibrator 7. This cable serves at corresponding drive via the roller 29, via which then not operated vibrator the pole 1 from the position 3 to the end position shown in FIG. 4, i.e. to give him the pretension already explained.

Es versteht sich, daß die vorbeschriebenen Ausführungen nach Fig. 5 und 6 nur beispielhaft sind und daß die Lehre der Ansprüche 1 - 3 auch mit anderen Geräteausführungen verwirklicht werden kann. Die Einstellung der senkrechten Lage der Halterung bzw. des Mäklers 23 kann durch in der Zeichnung nicht dargestellte hydraulische Stützen dieses Mäklers erfolgen.It is understood that the above-mentioned remarks after 5 and 6 are only exemplary and that the teaching of Claims 1 - 3 also realized with other device versions can be. The adjustment of the vertical position of the Bracket or leader 23 can by in the drawing hydraulic supports of this leader, not shown respectively.

Sowohl das Gerät 14 als auch der Traktor 21 sind wegen der geforderten Geländegängigkeit zweckmäßigerweise mit Raupenantrieb versehen.Both the device 14 and the tractor 21 are because of required off-road capability with a caterpillar drive Mistake.

Fig. 7 zeigt die Ausführungsmöglichkeit eines des Pfähle 1 in perspektivischer Darstellung. Hieraus ist sowohl die Verjüngung des Pfahles von seiner oberen Stirnfläche 6 bis zu seiner unteren Stirnfläche 13 als auch eine rechteckige bzw. quadratische Querschnittsform zu erkennen. Es könnte aber auch eine ovale oder kreisförmige Querschnittsform vorgesehen sein. Der angegossene Zapfen 35 kann zum Erfassen des Pfahles durch einen Kran oder auch zum Verbinden mit dem Vibrator dienen.Fig. 7 shows the possibility of executing one of the piles 1 in perspective. From this is both the Taper the pile from its top face 6 to to its lower end face 13 as well as a rectangular one or square cross-sectional shape. It could but also an oval or circular cross-sectional shape be provided. The cast-on pin 35 can be gripped of the pile by a crane or to connect to the Serve vibrator.

Die Figuren 8, 9 zeigen die Schaffung einer Einzelgründung bzw. eines Einzelfundamentes mit der Erfindung. Fig. 8 zeigt in diesem Beispiel in der Draufsicht einen Teil des Bodens 2 mit insgesamt neun Pfählen 1, von denen jeweils die oberen Stirnflächen erkennbar sind. Das hierauf aufzubringende Fundament ist aus Gründen der zeichnerischen Vereinfachung in Fig. 8 nur strichpunktiert angedeutet.Figures 8, 9 show the creation of a single foundation or a single foundation with the invention. Fig. 8 shows in this example a top view of part of the bottom 2 with a total of nine piles 1, each of which is the upper one End faces are recognizable. What to apply to this The foundation is for the sake of simplifying the drawing only indicated by dash-dotted lines in FIG. 8.

Fig. 9 zeigt hierzu eine Ansicht in Pfeilrichtung 32 mit angegossenem Fundament 33. Das Fundament 33 ist auf die oberen Stirnflächen 6 der Pfähle 1 aufgesetzt, die sich in einer gemeinsamen Ebene befinden. Es kann hierzu mit in das Material der Pfähle 1 eingelassenen Eisenstäben 34 vergossen sein. Diese Eisenstreben 34 sind in einem der Pfähle 1 in Fig. 8 angedeutet. Sie können zum Halt der Pfähle bei ihrem Aufsetzen auf den Erdboden und auch zur Übertragung der Schwingungen vom Vibrator 7 auf die Pfähle dienen. Somit ist ein Fundament 33 geschaffen, das in Fig. 8 von einer Gruppe diese Einzelgründung bildender Pfähle 1, hier von acht Pfählen im Quadrat und einem in der Mitte des Quadrates angeordneten Pfahl gebildet ist. Die Halterungen 35 und 34 sind mit den oberen Stirnflächen der Pfähle 1 fest verbunden. Sie können sowohl zum Aufbringen und Halt des Vibrators, als auch einer Fundamentplatte gemäß Ziffer 33 in Fig. 9 dienen. Es versteht sich, daß für die Gründung eines Bauwerkes dessen Gewicht und Größe aufnehmende Anzahl von solchen Einzelgründungen vorzusehen ist. Eine Komprimierung des Bodens zwischen den einzelnen Einzelgründungen braucht hier nicht vorgesehen zu sein. Läßt man aber eine gewisse Bodensetzung des Bauwerkes zu und ist der zwischen den Pfählen bestehende Boden komprimiert, so kann er auch zur Lastübernahme aus dem Bauwerk mit herangezogen werden. Dazu sind Bodennachuntersuchungen nach dem Pfahlsetzen angebracht.9 shows a view in the direction of arrow 32 with cast foundation 33. The foundation 33 is on the top end faces 6 of the piles 1, which are in are on a common level. You can do this in Pour the material of the piles 1 embedded iron rods 34 his. These iron struts 34 are in one of the piles 1 in Fig. 8 indicated. You can stop the piles at her Set down on the ground and also to transfer the Vibrations from vibrator 7 serve on the piles. So is a foundation 33 created in Fig. 8 by a group this single foundation of piles 1, here of eight Piles in the square and one in the middle of the square arranged pile is formed. Brackets 35 and 34 are firmly connected to the upper end faces of the piles 1. You can use it to attach and hold the vibrator, as well as a foundation plate according to number 33 in Fig. 9 serve. It goes without saying that for the establishment of a Building whose weight and size absorbing number of such individual foundations are to be provided. A compression of the soil between the individual foundations not to be provided here. But leave a certain one Soil of the building and is between the Pile existing soil compressed, so it can also be used for Load transfer from the building can also be used. To Soil examinations are appropriate after stake setting.

Ferner kann eine Anordnung der Pfähle gemäß den Figuren 10, 11 vorgesehen sein, die ebenso wie die Pfähle nach dem Ausführungsbeispiel der Figuren 8, 9 gemäß der Lehre der Erfindung in den Erdboden eingebracht werden. Es ist ein Areal 36 gezeigt, in dem eine Anzahl von Tragpfählen 1 in mehreren nebeneinander bzw. übereinander liegenden Reihen C-D und E-F in das Erdreich 2 eingetrieben ist. Die Abstände a zwischen den Tragpfählen (siehe Fig. 10) sind relativ gering. Sie sind so gewählt, beispielsweise 0,5 m, daß entsprechend der jeweiligen Belastung und dem Bodenwert mit dem Eintreiben der Tragpfähle zwischen ihnen Bereiche 37 mit verdichteter Erde entstehen, die kreuzschraffiert in Fig. 11 dargestellt sind. Auch hier verjüngen sich die Tragpfähle 1 von oben, d.h. von ihren Stirnseiten 6 her nach unten zu ihren Stirnflächen 13, und zwar ebenso wie in den übrigen Ausführungsbeispielen in einer bevorzugt konischen Form der Verjüngung. Auch in diesem Ausführungsbeispiel sowie dem zuvor anhand der Fig. 8, 9 erörterten Ausführungsbeispiel können die Pfähle wie zuvor erläutert ausgestaltet sein. Damit entsteht zwischen den Pfählen insgesamt ein Bereich verdichteten Erdreiches. Außerdem dienen auch hier, ebenso wie bei den übrigen Ausführungsbeispielen, die Seitenwände 38 des Erdreiches als Anlage- und Abstützflächen für die sich nach unten verjüngenden Seitenwände 39 der Tragpfähle 1. Die mit den Pfeilen 40 angedeutete Last des Bauwerkes drückt auf die Tragpfähle 1. Im vorliegenden Ausführungsbeispiel liegt die Länge L der Tragpfähle im Bereich von 8 - 12 m, während die Abmessung der oberen Stirnfläche 6 50 x 50 cm und der unteren Stirnfläche 13 15 x 15 cm ausmacht. Aufnahme und Abstützung der Last 40 erfolgt, wie erläutert, in der gleichen Weise wie bei den vorhergehenden Ausführungsbeispielen. Zusätzlich ist hier noch der o.g. Effekt gegeben, daß durch die geringen Abstände a zwischen den Tragpfählen 1 insgesamt eine verdichtete Erdplatte geschaffen wird. Eine solche Platte ist mit wesentlich geringerem Aufwand herstellbar als eine sonst aus Stahlbeton zu gießende Grundplatte. Die Anordnung nach den Figuren 10, 11 empfiehlt sich insbesondere bei Vorhandensein von weichen und damit kaum tragfähigen Böden. Das Bauwerk kann mit einem Fundament analog dem Teil 33 in Fig. 9 auf die dargestellten Einzelpfähle, hier zwölf Stück, aufgelegt oder mit davon vorragenden Bewehrungen (siehe Ziffer 34 in Fig. 8, 9) vergossen werden.An arrangement of the piles according to FIGS. 10, 11 may be provided, which, like the piles after the Embodiment of Figures 8, 9 according to the teaching of Invention are introduced into the ground. It is a Area 36 shown, in which a number of support posts 1 in several rows next to or on top of each other C-D and E-F is driven into the soil 2. The distances a between the support piles (see Fig. 10) are relative low. They are chosen, for example 0.5 m, that according to the respective load and the soil value areas 37 with the driving of the supporting piles between them compacted earth, which is cross-hatched in Fig. 11 are shown. Here, too, the support piles taper 1 from above, i.e. from their end faces 6 downwards their end faces 13, as well as in the rest Embodiments in a preferably conical shape Rejuvenation. In this embodiment as well Embodiment previously discussed with reference to FIGS. 8, 9 the piles can be configured as previously explained. This creates a total area between the piles compacted soil. They also serve here as well as in the other embodiments, the side walls 38 of the soil as contact and support areas for the tapered side walls 39 of the support piles 1. The load of the structure indicated by the arrows 40 presses on the supporting piles 1. In the present embodiment the length L of the piles is in the range of 8 - 12 m, while the dimension of the upper end face 6 50 x 50 cm and the lower end face 13 is 15 x 15 cm. admission and support of the load 40 takes place, as explained, in the same way as in the previous embodiments. In addition, here is the above Given effect that due to the small distances a between the supporting piles 1 overall a compacted earth plate is created. A such a plate can be produced with much less effort as a base plate otherwise to be cast from reinforced concrete. The arrangement according to Figures 10, 11 is recommended especially in the presence of soft and therefore hardly load-bearing floors. The building can with a foundation analogous to part 33 in FIG. 9 on the individual piles shown, here twelve pieces, laid on or with outstanding ones Reinforcement (see number 34 in Fig. 8, 9) cast become.

Claims (11)

  1. A method of inserting piles (1) into the ground (2), the piles (1) tapering in the insertion direction and serving to support or carry structures or structural members, in particular building foundations, characterised in that the piles (1) are set into vibration (9) in their longitudinal direction (A - B) and in this way are first driven into the ground (2) into a position just short of their final depth, in that thereafter the vibrations are stopped and then a final phase of the driving process is carried out by exerting a vibration-free tensile or compressive force (10) on the pile in the driving direction (4) until the pile is firmly held in the ground with a certain prestress.
  2. A method according to claim 1, characterised in that the respective pile (1) is first drawn or pushed into the ground (2) vibrationlessly over a portion (5) of its length (L) and in that only then are the vibrations (9) transmitted to the pile.
  3. Concrete piles for carrying out the method according to claim 1 or 2, wherein the concrete piles taper downwards in a conical or curved manner over their entire length, characterised in that the surfaces of the outsides (1') of the concrete piles (1) are roughened or provided with recesses.
  4. Concrete piles according to claim 3, characterised by an inclination of the outsides (1') of the piles (1) relative to their longitudinal central axis (A - B) such that, after the piles have been driven and finally pushed into the ground (2), they adhere thereto.
  5. Concrete piles according to claim 4, characterised in that, for harder ground, the inclination of the outsides (1') of the concrete pile relative to its longitudinal central axis (A - B) is less than for softer ground.
  6. Concrete piles according to one or more of claims 3 to 5, characterised in that the concrete piles (1) expand upwards and outwards in a trumpet-like manner in the region of their upper ends (8).
  7. Concrete piles according to one or more of claims 3 to 6, characterised in that the concrete piles (1) comprise a porous concrete for producing the roughening or recesses.
  8. Concrete piles according to one or more of claims 3 to 7, characterised in that the piles (1) have an approximately square or round or approximately elliptical cross-section.
  9. Concrete piles for carrying out the method according to claim 1 or 2, and according to one or more of claims 3 to 8, characterised in that the piles (1) have, in their upper region (8), a mounting (35; 34) accessible from the upper end surface (6) and provided for attaching a vibrator.
  10. Concrete piles according to claim 9, characterised in that the mountings (35; 34) are formed for securing a foundation block (33).
  11. Concrete piles according to claim 10, characterised in that the foundation block (33) is cast with iron supports (34) which project upwards from the upper regions (8) of the piles (1) beyond the upper end surfaces (6) thereof.
EP96111806A 1995-07-31 1996-07-23 Method for installing tapered piles, tapered piles, and foundation structures made with these piles Expired - Lifetime EP0758699B1 (en)

Applications Claiming Priority (6)

Application Number Priority Date Filing Date Title
DE29512311U 1995-07-31
DE29512311U DE29512311U1 (en) 1995-07-31 1995-07-31 Arrangement for surface compaction of soils
DE19535183 1995-09-25
DE1995135183 DE19535183A1 (en) 1995-07-31 1995-09-25 Driving procedure for piles to support building foundations - piles are vibrated and driven-in partially, and settled by pressure force
DE29601080U DE29601080U1 (en) 1995-07-31 1996-01-23 Concrete piles for installation in the ground, as well as foundations made from several such piles and, if necessary, foundation formation, as well as devices for installing the concrete piles
DE29601080U 1996-01-23

Publications (2)

Publication Number Publication Date
EP0758699A1 EP0758699A1 (en) 1997-02-19
EP0758699B1 true EP0758699B1 (en) 2001-10-17

Family

ID=27215498

Family Applications (1)

Application Number Title Priority Date Filing Date
EP96111806A Expired - Lifetime EP0758699B1 (en) 1995-07-31 1996-07-23 Method for installing tapered piles, tapered piles, and foundation structures made with these piles

Country Status (2)

Country Link
EP (1) EP0758699B1 (en)
AT (1) ATE207168T1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101331703B1 (en) * 2009-04-10 2013-11-20 신닛테츠스미킨 카부시키카이샤 Steel pipe pile

Families Citing this family (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0902128A3 (en) * 1997-09-11 1999-04-28 Van Splunder Funderingstechniek B.V. Method for installing a foundation for a traffic course as well as device
GB2330370B (en) * 1997-10-18 2001-11-28 Roxbury Ltd Improvements in piling arrangements
GB9724024D0 (en) * 1997-11-13 1998-01-14 Kvaerner Cementation Found Ltd Improved piling method
GB2354276B (en) * 1997-11-13 2001-05-09 Kvaerner Cementation Found Ltd Improved methods and apparatus for boring and piling
US6672015B2 (en) * 1999-02-25 2004-01-06 Menard Soltraitement Concrete pile made of such a concrete and method for drilling a hole adapted for receiving the improved concrete pile in a weak ground
NL1017350C1 (en) * 2001-02-13 2002-08-14 Prepoton Panelcraft Groep B V Foundation for greenhouses and the like.
GB2384510B (en) * 2002-01-23 2005-06-22 Cementation Found Skanska Ltd Construction and design of foundation elements
CN101298770B (en) * 2008-06-12 2010-06-23 大连理工大学 Bottom enlarging prestress conical pipe pile and construction method thereof
EP2446089B1 (en) * 2009-06-24 2023-04-19 Geopier Foundation Company, Inc. Apparatus and method for ground improvement
US8328470B2 (en) * 2009-06-24 2012-12-11 Geopier Foundation Company, Inc. Apparatus and method for ground improvement
US9915050B2 (en) 2009-06-24 2018-03-13 Geopier Foundation Company, Inc. Apparatus and method for ground improvement
NL2006996C2 (en) 2011-06-24 2013-01-02 Schokindustrie B V REJUVENATED FOUNDATION POLE.
GB2580041B8 (en) * 2018-12-19 2023-06-07 Keltbray Ltd Improvements in and relating to pile foundations

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE194125C (en)
DE230436C (en) * 1910-02-05 1911-01-26 Wilhelm Bechtel reinforced concrete pile
US3820347A (en) * 1971-11-01 1974-06-28 Oolite Ind Inc Tapered piles and methods of using tapered piles
CH622570A5 (en) 1977-09-29 1981-04-15 Fietz & Leuthold Ag Set of prefabricated concrete-pile elements and impact-driven concrete pile produced with the same
JPS61179920A (en) * 1985-02-05 1986-08-12 Ohbayashigumi Ltd Rocking device for underground penetrating member
NL8701500A (en) * 1987-06-26 1989-01-16 Ringvaart B V De Building foundation construction method - uses driven piles with inserted top rods, concrete slabs, and foundation beams
GB9301891D0 (en) * 1993-01-30 1993-03-17 Roxbury Ltd Improvements in or relating to foundations

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101331703B1 (en) * 2009-04-10 2013-11-20 신닛테츠스미킨 카부시키카이샤 Steel pipe pile

Also Published As

Publication number Publication date
ATE207168T1 (en) 2001-11-15
EP0758699A1 (en) 1997-02-19

Similar Documents

Publication Publication Date Title
DE69215811T2 (en) SHORT PILLARS FROM AGGLOMERATE AND METHOD AND DEVICE FOR PRODUCING THE SAME
EP0758699B1 (en) Method for installing tapered piles, tapered piles, and foundation structures made with these piles
EP0080143B1 (en) Foundation for a pole, a pillar or the like
DE2005066A1 (en) Method and device for anchoring
DE4224042A1 (en) Method and device for pile foundation
EP0516942B1 (en) Method and device for stabilising friction soils and bordering cohesive soils
DE1947249B2 (en) PROCESS FOR PRODUCING A DIAP WALL IN THE SOIL AND FINISHED PART FOR CARRYING OUT THE PROCESS
EP0788572A1 (en) Building underpinning process
DE1963852A1 (en) Method of erecting a structure that is at least partially submerged in a body of water
DE19535183A1 (en) Driving procedure for piles to support building foundations - piles are vibrated and driven-in partially, and settled by pressure force
DE19509088A1 (en) Method of producing recoverable jacket for use in pile driving
DE29601080U1 (en) Concrete piles for installation in the ground, as well as foundations made from several such piles and, if necessary, foundation formation, as well as devices for installing the concrete piles
DE2948879C2 (en) Process for the production of in-situ concrete driven piles
DE1910556A1 (en) Process for the production of foundation piles from in-situ concrete with extensions of the pile shaft and the pile base, as well as internal formwork for carrying out the process
EP0987375A1 (en) Foundation pile and device as well as method for driving the same into the ground
DE3201601A1 (en) Method of placing sheet pile walls or the like in the earth by flushing and also a construction element for carrying out the method
DE2148748C3 (en) Methods of lifting and leveling buildings
DE1923227A1 (en) Anchoring device for hollow pillars
DE1409606C (en) Procedure for the foundation of a floating tank with driven piles
CH439133A (en) Process for producing a pile in the ground and concrete pile for carrying out the process
DE2851619A1 (en) Concrete post foundation hole prodn. - involves lowering pipe into ground using vibrator and core is removed using differential air pressure
DE2619431A1 (en) On site concrete pile prodn. - has casing with releasable ram foot rammed into soil and pipe filled with setting concrete
DE623318C (en)
DE2612813A1 (en) FOUNDATION POST
EP0970281B1 (en) Method for stabilizing embankments

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AT BE CH DE DK FR GB IT LI NL SE

17P Request for examination filed

Effective date: 19970507

17Q First examination report despatched

Effective date: 19971113

GRAG Despatch of communication of intention to grant

Free format text: ORIGINAL CODE: EPIDOS AGRA

GRAG Despatch of communication of intention to grant

Free format text: ORIGINAL CODE: EPIDOS AGRA

GRAH Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOS IGRA

GRAH Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOS IGRA

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AT BE CH DE DK FR GB IT LI NL SE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20011017

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRE;WARNING: LAPSES OF ITALIAN PATENTS WITH EFFECTIVE DATE BEFORE 2007 MAY HAVE OCCURRED AT ANY TIME BEFORE 2007. THE CORRECT EFFECTIVE DATE MAY BE DIFFERENT FROM THE ONE RECORDED.SCRIBED TIME-LIMIT

Effective date: 20011017

Ref country code: GB

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20011017

Ref country code: FR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20011017

REF Corresponds to:

Ref document number: 207168

Country of ref document: AT

Date of ref document: 20011115

Kind code of ref document: T

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REF Corresponds to:

Ref document number: 59607930

Country of ref document: DE

Date of ref document: 20011122

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20020117

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20020117

NLV1 Nl: lapsed or annulled due to failure to fulfill the requirements of art. 29p and 29m of the patents act
GBV Gb: ep patent (uk) treated as always having been void in accordance with gb section 77(7)/1977 [no translation filed]

Effective date: 20011017

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20020723

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20020731

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20020731

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20020731

EN Fr: translation not filed
PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed
BERE Be: lapsed

Owner name: HELMUT *HEMMERLEIN G.M.B.H. & CO. BAU K.G.

Effective date: 20020731

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 20040823

Year of fee payment: 9

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20060201