CH439133A - Process for producing a pile in the ground and concrete pile for carrying out the process - Google Patents

Process for producing a pile in the ground and concrete pile for carrying out the process

Info

Publication number
CH439133A
CH439133A CH533766A CH533766A CH439133A CH 439133 A CH439133 A CH 439133A CH 533766 A CH533766 A CH 533766A CH 533766 A CH533766 A CH 533766A CH 439133 A CH439133 A CH 439133A
Authority
CH
Switzerland
Prior art keywords
pile
concrete
concreted
ground
tip
Prior art date
Application number
CH533766A
Other languages
German (de)
Inventor
Brunhart Edy
Original Assignee
Brunhart Edy
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Brunhart Edy filed Critical Brunhart Edy
Priority to CH533766A priority Critical patent/CH439133A/en
Priority to AT346867A priority patent/AT285465B/en
Publication of CH439133A publication Critical patent/CH439133A/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/52Piles composed of separable parts, e.g. telescopic tubes ; Piles composed of segments
    • E02D5/523Piles composed of separable parts, e.g. telescopic tubes ; Piles composed of segments composed of segments

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)

Description

  

  Verfahren     zur    Herstellung einer     Pfählung        in    Baugrund  und Betonpfahl zur Durchführung des Verfahrens    Die Erfindung bezieht<I>sich</I> auf ein Verfahren zur  Herstellung einer     Pfählung    in Baugrund.  



  Es sind bereits     Fertigbetonpfähle        bekannt,    welche  in das Erdreich geschlagen     werden.    Bei solchen vollen  Pfählen ist indessen keine Kontrolle über ihren Zustand  möglich, nachdem sie     in        den        Baugrund    eingeschlagen  sind. Ferner sind Betonpfähle bekannt, wobei das     Erd-          material    durch ein     Stahlrohr    verdrängt wird, und nach  dem die gewünschte Tiefe erreicht ist, wird dieses wie  der durch hydraulische Hebegeräte oder dgl. zurückge  zogen unter gleichzeitiger Ausbetonierung.

   Hierzu sind  jedoch     komplizierte        Spezialmaschinen        erforderlich,    und  es ist ein erheblicher Aufwand notwendig. Bei grösseren  Tiefen wird zudem der     Rückzug    des Rohres problema  tisch, weil die Reibung .des Erdreiches - je nach Bau  grund - relativ gross wird.  



  Durch das     erfindungsgemässe    Verfahren sollen diese  Nachteile behoben werden und :die     Pfählung    durch  übliche Rammen durchgeführt werden. Das     erfindungs-          gemässe    Verfahren ist     dadurch    gekennzeichnet, dass ein  mit einer lose aufgesteckten Spitze     versehener,    vorfabri  zierter     Hohlbetonpfahl    oder mehrere koaxial überein  ander liegende Betonpfähle in den Baugrund     gerammt     werden,

   hernach in die     zentrale    Pfahlöffnung eine be  schränkte Menge Frischbeton     eingefüllt    und dieser bei  der Pfahlspitze durch einen Stempel verdichtet wird, wo  bei dieser     Frischbeton    samt der     Pfahlspitze    aus der  Pfahlöffnung verdrängt wird und unter dem Pfahl einen  Betonfuss bildet, hernach der Stempel herausgezogen  und der     Pfahl-Hohlraum    ganz mit Beton gefüllt wird.  



  Der     erfindungsgemässe    Betonpfahl ist dadurch ge  kennzeichnet, :dass er ein metallisches     Zentralrohr    und  um dieses herum eine Betonhülle aufweist und am  obern Pfahlende Mittel vorhanden sind, um     diese    mit  einem weitem Pfahl     verbinden    zu können.  



  In der Zeichnung sind Ausführungsbeispiele der Er  findung dargestellt. Es zeigen:       Fig.    1 eine Rammeinrichtung samt Betonpfahl vor  dem Eintreiben,         Fig.    2 eine     fertige        Pfählung    mit mehreren     überein-          anderliegenden    Betonpfählen,       Fig.    3 den Vorderteil eines Pfahles mit aufgesetztem  Spitz,       Fig.4    einen Querschnitt durch den Kopfteil eines  Pfahles,       Fig.5    einen Längsschnitt durch die Verbindungs  stelle     zweier    Pfähle,

         Fig.    6 einen Längsschnitt durch eine Ausführungs  variante einer Verbindungsstelle zweier Pfähle.  



  Der bei diesem Verfahren zur Anwendung kom  mende Pfahl wird als vorfabrizierter     Betonpfahl    1 aus  geführt und weist in seinem Zentrum einen Hohlraum  2 auf. Zu diesem Zwecke wird um ein     Stahlblechrohr     3 von etwa 0,4 mm Dicke ein     Betonmantel    4 ange  bracht. Der     Querschnitt        dieses        Betorrnantels        isst        viereckig,     wobei die Ecken     angefast    sind. Es ist darauf zu achten,  dass ein hochwertiger Beton mit Festigkeit von 400 bis  450     kg/cm2    erreicht wird, da der Pfahl bei der Rammar  beit einer grossen Belastung ausgesetzt ist.

   Der Beton  querschnitt soll     mindestens    das Doppelte,     vorzugsweise     das Dreifache des     Hohlraum-Querschnittes        betragen.     Zur Dämpfung der Schläge des     Rammbärs    5 ist ein auf  den Betonpfahl aufgesetzter Kopf 6 vorgesehen, der  vorzugsweise mit mehreren     Holz-    und/oder     Gummilagen          mit    dazwischen gelegten Stahlplatten versehen ist.

   Der  Pfahl ist unten mit einer     Spitze    18 versehen, welche vor  zugsweise aus einem     als        Aussenhülse    bestehenden Blech  konus besteht, welcher mit     ausgehärtetem    Beton ausge  füllt ist. Ein     zylindrischer    Ansatz 20 dieser Spitze ragt  lose in die Pfahlöffnung 2 hinein.

   Die Länge eines  solchen     Pfahles        wird    aus Transportgründen mit nicht  mehr als 4 bis 7 m     gewählt.    Falls eine grössere     Pfäh-          1ungstiefe        erforderlich        ist,        müssen        mehrere        solcher          Pfähle    in koaxialer Anordnung übereinander gestellt  und an den Stossstellen miteinander verbunden werden.

    Diese Verbindung kann gemäss den     Fig.    4 und 5 aus  geführt werden, indem die an den Ecken einbetonierten  Flacheisen 8 an der     stirnseitigen    Trennfuge durch eine  Schweissnaht 10     miteinander    verbunden werden. Zwi-      sehen die beiden Stirnseiten der Betonpfähle wird eine  Bleifolie 12 von etwa 2 mm Dicke gelegt, um allfällige  Unebenheiten auszugleichen und eine möglichst gute       Druckübertragung    vom einen auf den andern Pfahl     zu          erhalten.     



  Ein andere Ausführungsform zur Verbindung von  zwei     übereinanderliegenden    Pfählen besteht darin, dass  im Kopf des einen Pfahles mehrere Büchsen 14 einbe  toniert werden und anderseits im Fuss eines aufzusetzen  den     Pfahles        in    die     Büchsen        einsteokbare    Stäbe 16 - oder       umgekehrt    - an genau     übereinstimmenden    Stellen ein  betoniert sind, so     dass    bei einem Aufsetzen eines zweiten       Pfahles    die Stäbe 16 in die Büchsen 14 eingreifen und  dadurch die beiden     Pfähle    relativ zueinander zentrieren.

    Auch hier wird     zwischen    die     Stirnflächen    vorzugsweise  eine Bleifolie oder dgl. eingelegt.  



  Sobald die     gewünschte        Pfählungstiefe    durch einen  oder mehrere     übereinanderliegende    Betonpfähle erreicht  ist und ein     tragfähiger        Grund        vorliegt,        wird        in        die    zen  trale     Pfahlöffnung    2     Frischbeton        eingefüllt,

          so        dass    sich  dieser oberhalb der     Pfahlspitze    18     ansammelt.    Der  Frischbeton 22 wird     sodann        mit        Hilfe    eines von oben  herabgelassenen     Stempels    24 verdichtet, so     dass    dieser  Frischbeton die Pfahlspitze nach unten aus der Pfahl  öffnung herausdrückt.

   Durch Nachfüllen von weiterem  Frischbeton und weiteres Verdichten desselben gelangt  dieser unter den     Pfahl    und bildet sodann einen in     Fig.     2 dargestellten     verbreiterten    Betonfuss 26 von etwa       zwiebelförmiger    Gestalt. Der Stempel 24 wird hernach  aus der Öffnung 2 herausgezogen und diese durch hoch  wertigen Beton     ausgefüllt.     



  Dadurch lässt sich eine     Betonpfählung    unter Ver  wendung normaler,     serienmässiger        Rammgerüste    30 und  Rammbären herstellen. Das     Rammgerüst    kann zudem  relativ leicht     ausgeführt    werden, wodurch Installations  kosten     gespart    werden. Zudem ist es möglich, grosse       Pfählungstiefen    zu     erreichen,    beispielsweise 20 und mehr  Meter, falls vorher     kein    fester     Baugrund        angetroffen     wird.

   Durch die     Bildung    eines Betonfusses unter den       Pfählen        wird    eine hohe     Tragfähigkeit        erreicht,    wenn    kein völlig fester Baugrund vorhanden ist. Ein weiterer       Vorteil    besteht darin, dass durch. den zentralen Hohl  raum     eine    optische     Kontrolle        bezüglich    des Pfahles       während    der gesamten     Rammnarbeit    möglich ist.



  Method for producing a pile in building ground and concrete pile for carrying out the method The invention relates <I> </I> to a method for producing a pile in building ground.



  Prefabricated concrete piles are already known which are driven into the ground. With such full piles, however, it is not possible to check their condition after they have been driven into the ground. Concrete piles are also known, the earth material being displaced by a steel pipe, and after the desired depth has been reached, this is withdrawn, as is the case with hydraulic lifting devices or the like, with simultaneous concreting.

   For this, however, complicated special machines are required and a considerable effort is required. At greater depths, the retraction of the pipe is also problematic because the friction of the soil - depending on the construction ground - is relatively large.



  These disadvantages are to be eliminated by the method according to the invention and: the pile is to be carried out by conventional rams. The method according to the invention is characterized in that a prefabricated hollow concrete pile provided with a loosely attached point or several concrete piles lying coaxially one on top of the other are driven into the subsoil,

   then a limited amount of fresh concrete is poured into the central pile opening and this is compacted by a punch at the pile tip, where the fresh concrete and the pile tip are displaced from the pile opening and a concrete foot is formed under the pile, then the punch is pulled out and the pile The cavity is completely filled with concrete.



  The concrete pile according to the invention is characterized in that: it has a metallic central tube and a concrete shell around it, and means are provided at the upper end of the pile in order to be able to connect it to a wide pile.



  In the drawing, exemplary embodiments of the invention are shown. 1 shows a ramming device including a concrete pile before driving in, FIG. 2 shows a finished pile with several concrete piles lying on top of one another, FIG. 3 shows the front part of a pile with an attached point, FIG. 4 shows a cross section through the head part of a pile, FIG .5 a longitudinal section through the junction of two piles;

         Fig. 6 is a longitudinal section through an execution variant of a connection point of two piles.



  The pile coming to use in this method is implemented as a prefabricated concrete pile 1 and has a cavity 2 in its center. For this purpose, a concrete jacket 4 is placed around a sheet steel pipe 3 of about 0.4 mm thickness. The cross-section of this concrete shell is square, with the corners being chamfered. It must be ensured that a high-quality concrete with a strength of 400 to 450 kg / cm2 is achieved, as the pile is exposed to a great deal of stress during pile driving.

   The concrete cross-section should be at least twice, preferably three times, the cavity cross-section. To dampen the blows of the ram 5, a head 6 placed on the concrete post is provided, which is preferably provided with several layers of wood and / or rubber with steel plates placed in between.

   The pile is provided at the bottom with a tip 18, which consists preferably of an existing sheet metal cone as an outer sleeve, which is filled out with hardened concrete. A cylindrical extension 20 of this point protrudes loosely into the pile opening 2.

   The length of such a pile is chosen to be no more than 4 to 7 m for reasons of transport. If a greater pile depth is required, several such piles must be placed one on top of the other in a coaxial arrangement and connected to one another at the joints.

    This connection can be carried out according to FIGS. 4 and 5, in that the flat irons 8, which are concreted in at the corners, are connected to one another by a weld 10 at the end-side separating joint. A lead foil 12 approximately 2 mm thick is placed between the two end faces of the concrete piles in order to compensate for any unevenness and to obtain the best possible pressure transfer from one pile to the other.



  Another embodiment for connecting two piles lying one above the other is that several bushes 14 are concreted in the head of one pile and on the other hand in the foot of a pile that can be inserted into the bushes, rods 16 - or vice versa - are concreted at exactly matching points, so that when a second post is placed, the rods 16 engage in the bushes 14 and thereby center the two posts relative to one another.

    Here, too, a lead foil or the like is preferably inserted between the end faces.



  As soon as the desired pile depth has been reached by one or more superimposed concrete piles and there is a stable base, fresh concrete is poured into the central pile opening 2,

          so that it collects above the pole tip 18. The fresh concrete 22 is then compacted with the aid of a punch 24 lowered from above, so that this fresh concrete presses the pile tip downward out of the pile opening.

   By refilling with more fresh concrete and further compacting it, this gets under the pile and then forms a widened concrete foot 26, shown in FIG. 2, of approximately the shape of an onion. The punch 24 is then pulled out of the opening 2 and this is filled with high-quality concrete.



  As a result, a concrete pile can be produced using normal, standard ramming frames 30 and rams. The ramming structure can also be made relatively light, which saves installation costs. It is also possible to reach great pile depths, for example 20 and more meters, if no solid subsoil is found beforehand.

   By forming a concrete foot under the piles, a high load-bearing capacity is achieved if there is no completely solid foundation. Another benefit is that through. the central cavity, visual control of the pile is possible during the entire pile driving work.

 

Claims (1)

PATENTANSPRÜCHE I. Verfahren zur Herstellung einer Pfählung in Bau grund, dadurch gekennzeichnet, dass ein mit einer lose aufgesteckten Spitze versehener, vorfabrizierter Hohl betonpfahl oder mehrere koaxial übereinanderliegende Betonpfähle in den Baugrund gerammt werden, her nach in die zentrale Pfahlöffnung eine beschränkte Menge Frischbeton eingefüllt und .dieser bei der Pfahl- spitze durch einen Stempel verdichtet wird, PATENT CLAIMS I. A method for producing a pile in construction ground, characterized in that a prefabricated hollow concrete pile provided with a loosely attached tip or several coaxially superposed concrete piles are rammed into the ground, a limited amount of fresh concrete is poured into the central pile opening and .this is compacted by a punch at the pole tip, wobei dieser Frischbeton samt der Pfahlspitze aus der Pfahlöffnung verdrängt wird und unter dem Pfahl einen Betonfuss bildet, hernach der Stempel herausgezogen und der Pfahl-Hohlraum ganz mit Beton gefüllt wird. this fresh concrete together with the pile tip is displaced from the pile opening and forms a concrete foot under the pile, after which the punch is pulled out and the pile cavity is completely filled with concrete. 1I. Betonpfahl zur Durchführung des Verfahrens nach Patentanspruch I, dadurch gekennzeichnet, dass er ein metallisches Zentralrohr und um dieses herum eine Betonhülle aufweist und am obern Pfahlende Mittel vorhanden sind, um diese mit einem weitern Pfahl verbinden zu können. UNTERANSPRÜCHE 1. 1I. Concrete pile for carrying out the method according to claim 1, characterized in that it has a metallic central tube and a concrete shell around it, and means are provided at the upper end of the pile in order to be able to connect it to a further pile. SUBCLAIMS 1. Betonpfahl nach Patentanspruch II, dadurch ge- kennzeichnet, dass die B.otonhülle einen viereckigen Querschnitt hat und an den angefasten Ecken Stahl stücke einbetoniert sind, deren oberer Rand zur Ver- schweissung mit den Stahlstücken eines darüber liegen den Pfahles bestimmt ist. Concrete pile according to patent claim II, characterized in that the clay shell has a square cross-section and pieces of steel are concreted in at the chamfered corners, the upper edge of which is intended to be welded to the steel pieces of a pile above it. z. Betonpfahl nach Patentanspruch II, dadurch ge kennzeichnet, dass am Pfahlkopf mehrere Hülsen in den Beton einbetoniert sind und am Stahlfuss vor stehende Stäbe einbetoniert sind, welche bezüglich der Büchsen übereinstimmend angeordnet sind. z. Concrete pile according to claim II, characterized in that several sleeves are concreted into the concrete on the pile head and rods are concreted in front of the steel foot, which are arranged coincidentally with respect to the bushings.
CH533766A 1966-04-13 1966-04-13 Process for producing a pile in the ground and concrete pile for carrying out the process CH439133A (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CH533766A CH439133A (en) 1966-04-13 1966-04-13 Process for producing a pile in the ground and concrete pile for carrying out the process
AT346867A AT285465B (en) 1966-04-13 1967-04-13 Device for the production of a concrete pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CH533766A CH439133A (en) 1966-04-13 1966-04-13 Process for producing a pile in the ground and concrete pile for carrying out the process

Publications (1)

Publication Number Publication Date
CH439133A true CH439133A (en) 1967-06-30

Family

ID=4291885

Family Applications (1)

Application Number Title Priority Date Filing Date
CH533766A CH439133A (en) 1966-04-13 1966-04-13 Process for producing a pile in the ground and concrete pile for carrying out the process

Country Status (2)

Country Link
AT (1) AT285465B (en)
CH (1) CH439133A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL1029126C2 (en) * 2005-05-25 2006-11-28 Betonson B V Application method for securing reinforcing band to hollow concrete pile, involves securing band around pile once concrete has set
NL1031876C2 (en) * 2005-05-25 2007-01-04 Betonson B V Securing reinforcing band around concrete pile, comprises securing band around set pile and then tightening or pressing it into place

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19942016B4 (en) * 1999-09-03 2006-01-05 Franki Grundbau Gmbh Apparatus and method for producing a soil column of viable granular filler material

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL1029126C2 (en) * 2005-05-25 2006-11-28 Betonson B V Application method for securing reinforcing band to hollow concrete pile, involves securing band around pile once concrete has set
NL1031876C2 (en) * 2005-05-25 2007-01-04 Betonson B V Securing reinforcing band around concrete pile, comprises securing band around set pile and then tightening or pressing it into place

Also Published As

Publication number Publication date
AT285465B (en) 1970-10-27

Similar Documents

Publication Publication Date Title
DE69228324T2 (en) PRESERVED FOUNDATION PILE AND FOUNDATION
DE3145882C2 (en) Method of making a foundation for a mast or the like.
DE2101084A1 (en) Procedure for erecting a structure
DE2444576A1 (en) COMPOSITE SUPPORT AND FOUNDATION PILLAR FOR VARIOUS STRUCTURES, AND METHOD OF MANUFACTURING THESE
EP0758699B1 (en) Method for installing tapered piles, tapered piles, and foundation structures made with these piles
DE1292586B (en) Method and device for producing a concrete casing pipe
CH439133A (en) Process for producing a pile in the ground and concrete pile for carrying out the process
DE69938438T2 (en) A CONCRETE ELEMENTS AND PILLAR METHOD EMBEDDED IN CONCRETE
DE3343961C2 (en)
DE4319239C2 (en) Method and device for the foundation of load-bearing structural parts or foundation parts
DE1963852A1 (en) Method of erecting a structure that is at least partially submerged in a body of water
DE3626169A1 (en) Foundation with pile support
DE2120691A1 (en) Method of manufacturing a composite pile
DE2948879C2 (en) Process for the production of in-situ concrete driven piles
DE1910556A1 (en) Process for the production of foundation piles from in-situ concrete with extensions of the pile shaft and the pile base, as well as internal formwork for carrying out the process
AT387256B (en) Arrangement for providing a foundation for a pole
DE902959C (en) Device and method for the production of foundation piles
DE1944644C3 (en) Process for the production of a reinforced concrete pile from in-situ concrete used for the foundation of a corner post and steel pipe for the implementation of the process
DE3320772A1 (en) Method of producing wall-shaped structures in the earth and displacement body for carrying out the method
DE2341661C3 (en) Method and device for erecting a mast
AT357328B (en) LOST FORMWORK FOR A FOUNDATION OF A SUPPORTING COMPONENT
AT360435B (en) LOCAL CONCRETE PILE
CH672652A5 (en)
DE2851619A1 (en) Concrete post foundation hole prodn. - involves lowering pipe into ground using vibrator and core is removed using differential air pressure
DE4439115A1 (en) Foundation pile with reinforcing tube