CN101298770B - Bottom enlarging prestress conical pipe pile and construction method thereof - Google Patents

Bottom enlarging prestress conical pipe pile and construction method thereof Download PDF

Info

Publication number
CN101298770B
CN101298770B CN2008100118544A CN200810011854A CN101298770B CN 101298770 B CN101298770 B CN 101298770B CN 2008100118544 A CN2008100118544 A CN 2008100118544A CN 200810011854 A CN200810011854 A CN 200810011854A CN 101298770 B CN101298770 B CN 101298770B
Authority
CN
China
Prior art keywords
pile
pipe pile
prestressed
prestress
conical pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2008100118544A
Other languages
Chinese (zh)
Other versions
CN101298770A (en
Inventor
孔纲强
杨庆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dalian University of Technology
Original Assignee
Dalian University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dalian University of Technology filed Critical Dalian University of Technology
Priority to CN2008100118544A priority Critical patent/CN101298770B/en
Publication of CN101298770A publication Critical patent/CN101298770A/en
Application granted granted Critical
Publication of CN101298770B publication Critical patent/CN101298770B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

本发明属于建筑桩基础技术领域,尤其涉及一种扩底预应力锥形管桩。其特征是包括预应力锥形管桩桩身和扩大头两部分,桩身采用对多节同一倾角的截顶倒锥形体管节的拼接或者不同倾角的截顶倒锥形体管节的拼接形成的预应力锥形管桩;扩大头中的钢筋笼采用变径放射状形式。桩身横截面为圆环形、空心四边形、空心六边形或空心三角形。本发明的效果和益处是提高桩侧正摩阻力和桩端阻力,并同时能有效降低负摩阻力对桩身的影响,保证桩身强度和施工压入效率。扩底预应力锥形管桩能同时发挥预应力管桩、锥形桩和扩底桩的优点并避免其各自的不足:提高单位材料强度利用率,提高桩侧正摩阻力和桩端阻力且同时能有效降低桩侧负摩阻力对桩体的影响,从而提高基桩整体承载力。

Figure 200810011854

The invention belongs to the technical field of building pile foundations, in particular to a prestressed conical pipe pile with expanded bottom. It is characterized in that it consists of two parts: the prestressed tapered pipe pile body and the enlarged head. The pile body is formed by splicing multiple truncated inverted cone pipe sections with the same inclination angle or splicing truncated inverted cone body pipe sections with different inclination angles. The prestressed tapered pipe pile; the reinforcement cage in the enlarged head adopts a radial form of variable diameter. The cross section of the pile body is circular, hollow quadrangular, hollow hexagonal or hollow triangular. The effect and benefit of the invention is to increase the positive frictional resistance of the pile side and the pile end resistance, and at the same time effectively reduce the influence of the negative frictional resistance on the pile body, so as to ensure the strength of the pile body and the construction press-in efficiency. The expanded-bottom prestressed conical pile can take advantage of the advantages of prestressed tubular piles, conical piles and expanded-bottom piles at the same time and avoid their respective shortcomings: improve the utilization rate of unit material strength, increase the positive friction resistance of the pile side and the pile end resistance and At the same time, it can effectively reduce the influence of pile side negative friction resistance on the pile body, thereby improving the overall bearing capacity of the foundation pile.

Figure 200810011854

Description

一种扩底预应力锥形管桩及其施工方法 A prestressed conical pipe pile with expanded bottom and its construction method

技术领域technical field

本发明属于建筑桩基础技术领域,尤其涉及一种扩底预应力锥形管桩及其施工方法。The invention belongs to the technical field of building pile foundations, and in particular relates to a bottom-expanding prestressed conical pipe pile and a construction method thereof.

背景技术Background technique

桩基础竖向承载力由桩侧摩阻力和桩端阻力两部分组成。传统的等截面桩存在单位材料强度利用率低、桩体受桩侧负摩阻力影响显著等不足;预应力混凝土管桩具有桩身强度高(C60~C80)、沉桩能力强、单桩承载力高、施工周期短、造价低等优点。目前常用的锥形桩利用倒锥形体斜面,将部分垂直向下的力转化为水平力,充分发挥桩侧土体承载能力,从而提高桩侧摩阻力,预应力锥形管桩(如:ZL200420063381.x等)较等直径预应力管桩,有更好的土层穿透力、更高的桩体单位承载力等方面的优势,但是由于桩底截面积较小,导致桩端阻力发挥受到限制;目前常用的扩底桩(如:ZL200410102711.6、ZL200510009681.9等)是在传统等截面桩的基础上,对桩底进行扩大头以增大桩端截面积,从而提高桩端阻力值,但是该法对桩侧摩阻力的提高并无改进,且容易受到桩侧负摩阻力的影响而削落桩基础整体承载能力。The vertical bearing capacity of pile foundation is composed of two parts: pile side friction resistance and pile tip resistance. Traditional equal-section piles have disadvantages such as low utilization rate of unit material strength, and the pile body is significantly affected by pile side negative friction resistance; prestressed concrete pipe piles have high pile strength (C60-C80), strong pile sinking capacity, and single pile bearing High strength, short construction period, low cost and other advantages. At present, the commonly used conical piles use the inclined surface of the inverted cone to convert part of the vertical downward force into a horizontal force, so as to fully exert the bearing capacity of the soil on the pile side, thereby improving the frictional resistance of the pile side. .x, etc.) have the advantages of better soil penetration and higher pile unit bearing capacity than prestressed pipe piles with equal diameters. Restrictions; currently commonly used bottom expansion piles (such as: ZL200410102711.6, ZL200510009681.9, etc.) are based on traditional equal-section piles, and the bottom of the pile is enlarged to increase the cross-sectional area of the pile end, thereby increasing the resistance value of the pile end , but this method does not improve the pile side friction resistance, and is easily affected by the pile side negative friction resistance and reduces the overall bearing capacity of the pile foundation.

先张法预应力混凝土(或高强混凝土)管桩是采用先张法预应力工艺和离心成型法制成的一种空心筒体细长混凝土预制构件,主要由圆筒形桩身、端头板和钢套箍等组成;该桩型具有桩身强度高、沉桩能力强、单桩承载力高、施工周期短、造价低等优点且易于批量生产,因而在实际工程中得到了广泛的应用;针对预应力管桩的原材料选择,管节制造、管桩拼接、质量控制、产品检验、储存、运输等相关细节制定了相应的技术规范(如:产品国家标准《先张法预应力混凝土管桩》GB13476-1999,《先张法预应力混凝土薄壁管桩》JC888-2001,《先张法预应力管桩生产工艺技术规程》(FS/QW01-2002),预应力混凝土管桩(图集)03SG409,广东标准《预应力管桩基础技术规程》DBJ15-22-98等),属于相对成熟的技术。Pretensioned prestressed concrete (or high-strength concrete) pipe pile is a hollow cylindrical slender concrete prefabricated component made by pretensioned prestressing process and centrifugal forming method. It is mainly composed of cylindrical pile body, end plate and Composed of steel hoops, etc.; this pile type has the advantages of high pile body strength, strong pile sinking capacity, high single pile bearing capacity, short construction period, low cost, etc., and is easy to mass-produce, so it has been widely used in actual engineering; For the selection of raw materials for prestressed pipe piles, corresponding technical specifications have been formulated for pipe joint manufacturing, pipe pile splicing, quality control, product inspection, storage, transportation and other related details (such as: the national product standard "Pretensioned Prestressed Concrete "GB13476-1999, "Pretensioned Prestressed Concrete Thin-walled Pipe Pile" JC888-2001, "Technical Regulations for the Production of Pretensioned Prestressed Pipe Pile" (FS/QW01-2002), Prestressed Concrete Pipe Pile (Atlas )03SG409, Guangdong standard "Technical Regulations for Prestressed Pipe Pile Foundation" DBJ15-22-98, etc.), which are relatively mature technologies.

发明内容Contents of the invention

本发明要解决的技术问题是提供一种可以同时提高桩侧正摩阻力和桩端阻力值,且能有效降低桩侧负摩阻力对桩体影响的扩底预应力锥形管桩。The technical problem to be solved by the present invention is to provide a prestressed tapered pipe pile with enlarged bottom that can simultaneously increase the positive frictional resistance of the pile side and the resistance value of the pile end, and can effectively reduce the influence of the negative frictional resistance of the pile side on the pile body.

本发明的技术解决方案如下:Technical solution of the present invention is as follows:

本发明对传统的等直径预应力管桩生产设备进行改进以适应对预应力锥形管桩生产的需要,根据实际工程设计所得的锥形角θ、桩长L以及上下桩径Di的大小调整锥形筒桩身、端头板和钢套箍的大小尺寸,采用先张法预应力工艺和离心成型法制成预应力锥形管桩管节。根据锥形筒桩身的不同可以制作管节桩身横截面为圆环形、空心四边形、空心六边形或空心三角形形状的预应力锥形管桩。通过对多节同一倾角的截顶倒锥形体管节的拼接或者不同倾角的截顶倒锥形体管节的拼接形成预应力锥形管桩。The present invention improves the traditional equal-diameter prestressed pipe pile production equipment to meet the needs of the production of prestressed conical pipe piles, according to the actual engineering design of the tapered angle θ, pile length L and the size of the upper and lower pile diameters D i Adjust the size of the conical tube pile body, end plate and steel hoop, and make the prestressed conical tube pile joints by pretensioning prestressing process and centrifugal forming method. According to the difference of the tapered barrel pile body, the prestressed tapered pipe pile with the cross section of the pipe joint pile body in the shape of a circular ring, a hollow quadrilateral, a hollow hexagon or a hollow triangle can be manufactured. The prestressed conical pipe pile is formed by splicing multiple truncated inverted cone pipe sections with the same inclination angle or splicing truncated inverted conical body pipe sections with different inclination angles.

为使桩端扩大头有较好的力学性能,本发明设计一种变径放射状钢筋笼:用一种可以活动的铰接体连接主筋与箍筋,和休止板一起形成一种可以变径的放射状钢筋笼体系。在钢筋笼下放过程中,由于钢筋笼上端受力,钢筋笼处于收缩状态使其能顺利穿过管桩下沉至扩底空洞;当钢筋笼下端下沉至设计高度并接触土体时,钢筋笼随着钢筋本身自重或者上端箍筋施加的荷载而逐渐向外侧展开成放射状;最后达到休止板位置而停止进一步发展使钢筋笼处于较合理的放射状。In order to make the enlarged head of the pile end have better mechanical properties, the present invention designs a radial reinforcement cage with variable diameter: a movable hinge body is used to connect the main reinforcement and the stirrup, and together with the rest plate, a radial reinforcement cage with variable diameter is formed. Steel cage system. During the lowering of the reinforcement cage, due to the stress on the upper end of the reinforcement cage, the reinforcement cage is in a contracted state so that it can pass through the pipe pile and sink to the bottom expansion cavity; when the lower end of the reinforcement cage sinks to the design height and touches the soil, the reinforcement cage With the self-weight of the steel bar itself or the load imposed by the upper stirrup, the cage gradually expands outward into a radial shape; finally reaches the position of the rest plate and stops further development, so that the steel cage is in a more reasonable radial shape.

本发明的效果和益处是预应力锥形管桩桩身能提高桩侧正摩阻力,并同时能有效降低负摩阻力对桩身的影响,且预制的预应力锥形管桩桩身容易保证桩身强度和施工压入效率;桩端扩大头可以有效提高桩端阻力,变径放射状钢筋笼能改善桩端扩大头的力学性能以确保强度。扩底预应力锥形管桩能同时发挥预应力管桩、锥形桩和扩底桩的优点并避免其各自的不足:提高单位材料强度利用率,提高桩侧正摩阻力和桩端阻力且同时能有效降低桩侧负摩阻力对桩体的影响,从而提高基桩整体承载力。该桩型桩身斜面的倾角不易太大,对于中短桩效果更好些。The effect and benefit of the present invention are that the prestressed tapered pipe pile body can increase the positive friction resistance of the pile side, and at the same time can effectively reduce the influence of the negative friction resistance on the pile body, and the prefabricated prestressed tapered pipe pile body is easy to ensure Pile body strength and construction press-in efficiency; the pile end expansion head can effectively increase the resistance of the pile end, and the variable-diameter radial reinforcement cage can improve the mechanical properties of the pile end expansion head to ensure strength. The expanded-bottom prestressed conical pile can take advantage of the advantages of prestressed tubular piles, conical piles and expanded-bottom piles at the same time and avoid their respective shortcomings: improve the utilization rate of unit material strength, increase the positive friction resistance of the pile side and the pile end resistance and At the same time, it can effectively reduce the influence of pile side negative friction resistance on the pile body, thereby improving the overall bearing capacity of the foundation pile. The inclination angle of the inclined surface of the pile body of this pile type is not easy to be too large, and the effect is better for medium and short piles.

附图说明Description of drawings

图1为本发明的一种结构示意图。Fig. 1 is a kind of structure diagram of the present invention.

图2(a)为本发明的预应力锥形管桩端头板截面示意图。Fig. 2(a) is a schematic cross-sectional view of the end plate of the prestressed tapered pipe pile of the present invention.

图2(b)为本发明的预应力锥形管桩管节布置示意图。Fig. 2(b) is a schematic diagram of the layout of the pipe joints of the prestressed tapered pipe pile of the present invention.

图2(c)为本发明的预应力锥形管桩管节截面示意图。Fig. 2(c) is a schematic cross-sectional view of the pipe joint of the prestressed conical pipe pile of the present invention.

图3(a)为本发明的变径放射状钢筋笼收缩状示意图。Fig. 3(a) is a schematic diagram showing the shrinkage of the diameter-reducing radial reinforcement cage of the present invention.

图3(b)为本发明的变径放射状钢筋笼展开状示意图。Fig. 3(b) is a schematic diagram of the unfolded radial reinforcement cage with variable diameter according to the present invention.

图4为本发明的施工过程示意图。Fig. 4 is a schematic diagram of the construction process of the present invention.

图中:1为外形呈截顶倒锥形的预制预应力锥形管桩,水平截面为上大下小的圆环形;2为现浇桩端扩大头;3为锥形筒桩身;4为端头板;5为钢套箍;6为螺栓孔;7为预应力筋锚孔;8为预应力筋;9为螺旋箍筋;10为箍筋;11为主筋;12为可活动铰接体;13为休止板;图4(a)沉桩前(实线箭头表示沉桩荷载方向);图4(b)一个管节沉桩完成;图4(c)电焊联结法连接两管节接头;图4(d)沉桩完成;图4(e)取管桩内浮土和桩靴及扩底成空腔(虚线箭头表示取浮土方向);图4(f)下钢筋笼(虚线箭头表示下钢筋笼方向);图4(g)现浇桩端扩大头(虚线箭头表示浇筑混凝土方向);图4(h)成桩。In the figure: 1 is a prefabricated prestressed conical pipe pile with a truncated top and inverted cone shape, and the horizontal section is a circular ring with a large upper part and a smaller lower part; 2 is the enlarged head of the cast-in-place pile; 3 is the tapered cylindrical pile body; 4 is the end plate; 5 is the steel ferrule; 6 is the bolt hole; 7 is the anchor hole of the prestressed tendon; 8 is the prestressed tendon; 9 is the spiral stirrup; 10 is the stirrup; 11 is the main tendon; 12 is movable Hinged body; 13 is a resting plate; Fig. 4(a) before pile sinking (the solid line arrow indicates the direction of pile sinking load); Fig. 4(b) one pipe joint pile sinking is completed; Fig. 4(c) two pipes are connected by electric welding Fig. 4(d) the pile sinking is completed; Fig. 4(e) take the floating soil in the pipe pile and the spud can and expand the bottom to form a cavity (the dotted line arrow indicates the direction of taking the floating soil); Fig. 4(f) the lower reinforcement cage (the dotted line The arrow indicates the direction of the lower reinforcement cage); Figure 4(g) the enlarged head of the cast-in-place pile (the dotted arrow indicates the direction of pouring concrete); Figure 4(h) the pile.

具体实施方式Detailed ways

以下结合技术方案和附图详细叙述本发明的具体实施例。Specific embodiments of the present invention will be described in detail below in conjunction with technical solutions and accompanying drawings.

首先采用静压法、锤击法、震动法、射水法、预钻孔法及中掘法等方法将带有桩尖(靴)的第一节预应力锥形管桩管节(也称底桩,如图2所示)沉入土中(如图4(a)(b)所示);其次采用端头板电焊联结法连接第二节预应力锥形管桩管节并使之沉入土中(如图4(c)所示),依次完成后面几节管桩使桩底沉到设计标高处、桩长达到设计要求(如图4(d)所示);接着取出桩尖(靴),利用取土设备(如空气吸土设备等)取出管桩内位于桩身下部的土塞(采用开口型桩尖(靴)时,土塞高度约为1/3桩长,采用闭口型桩尖(靴)时,土塞高度相对小些),检验管桩桩身质量以及复测沉桩长度等情况;然后利用扩底设备对桩底进行扩底,使桩端底部形成一个大于下部桩径的底座空腔、用空气吸土设备取出空腔内土(如图4(e)所示);再接着下沉处于收缩状的变径放射状钢筋笼(如图3(a)所示),当钢筋笼下沉至设计标高时,在钢筋笼上端施加一个荷载使其展开成放射状(如图3(b)所示),完成钢筋笼的下放过程(如图4(f)所示);再然后现浇混凝土在桩底形成桩大头并确保桩大头规则成型和现浇桩大头与预制预应力管桩相连良好(如图4(g)所示);最后成桩完成(如图4(h)所示)。Firstly, the first section of prestressed conical pipe pile pipe joint (also called the bottom) with the pile point (boot) is made by static pressure method, hammering method, vibration method, water jet method, pre-drilling method and middle digging method. Pile, as shown in Fig. 2) sinks into the soil (as shown in Fig. 4(a)(b)); secondly, the end plate electric welding connection method is used to connect the second prestressed conical pipe pile pipe joint and make it sink into the soil (as shown in Figure 4(c)), complete the following sections of pipe piles in sequence so that the bottom of the pile sinks to the design elevation, and the pile length meets the design requirements (as shown in Figure 4(d)); then take out the pile tip (boots), use earth-taking equipment (such as air suction equipment, etc.) to take out the soil plug located in the lower part of the pile body in the pipe pile (when using an open pile point (boot), the height of the soil plug is about 1/3 of the pile length, and use For the closed pile tip (boot), the height of the soil plug is relatively small), inspect the quality of the pipe pile body and re-measure the length of the pile sinking, etc.; then use the bottom expansion equipment to expand the bottom of the pile to form a For the cavity of the base that is larger than the diameter of the lower pile, the soil in the cavity is taken out with air suction equipment (as shown in Figure 4(e)); As shown), when the reinforcement cage sinks to the design elevation, a load is applied on the upper end of the reinforcement cage to make it unfold radially (as shown in Figure 3(b)), and the lowering process of the reinforcement cage is completed (Figure 4(f) shown); then cast-in-place concrete forms the pile head at the bottom of the pile and ensures that the pile head is formed regularly and the cast-in-place pile head is well connected with the prefabricated prestressed pipe pile (as shown in Figure 4(g)); finally the pile is completed ( As shown in Figure 4(h)).

Claims (3)

1. bottom enlarging prestress conical pipe pile, comprise prestress conical pipe pile pile body and enlarged footing two parts, it is characterized in that: pile body adopts the prestress conical pipe pile that is spliced to form to the truncation back taper body tube coupling of the splicing of the truncation back taper body tube coupling at the same inclination angle of more piece or different angle; Reinforcing cage in the enlarged footing adopts the radial form of reducing.
2. a kind of bottom enlarging prestress conical pipe pile according to claim 1 is characterized in that: the pile body cross section is annular, hollow quadrangle, hollow hexagon or hollow triangle.
3. the job practices of the described a kind of bottom enlarging prestress conical pipe pile of claim 1 is characterized in that following steps:
(1) the first segment prestress conical pipe pile tube coupling that adopts static pressure method, hammering method, lash method, water jetting, prebored hole method or middle pick method will have shoe sinks in the soil;
(2) adopt end plate electric welding connecting method to connect the second joint prestress conical pipe pile tube coupling and make it to sink in the soil, finish successively and sink to the design elevation place at the bottom of a few pipe joint stakes in back make, stake reaches designing requirement;
(3) take out shoe, utilize borrow equipment to take out the soil plug that is positioned at the pile body bottom in the pile tube;
(4) expand the end at the bottom of utilizing bottom-expanding equipment to stake, make a bottom portion form a base cavity pocket, inhale indigenous equipment with air and take out soil in the cavity greater than bottom stake footpath;
(5) sink to being in the radial reinforcing cage of contraction-like reducing, when reinforcing cage sank down into design elevation, apply a load that it is launched into was radial in the reinforcing cage upper end, finished the process of transferring of reinforcing cage;
(6) cast-in-situ concrete forms the stake major part and guarantees that a major part rule moulding links to each other well with prefabricated prestressing pipe pile with the present walling pile major part at the bottom of stake, and pile is finished.
CN2008100118544A 2008-06-12 2008-06-12 Bottom enlarging prestress conical pipe pile and construction method thereof Expired - Fee Related CN101298770B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2008100118544A CN101298770B (en) 2008-06-12 2008-06-12 Bottom enlarging prestress conical pipe pile and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2008100118544A CN101298770B (en) 2008-06-12 2008-06-12 Bottom enlarging prestress conical pipe pile and construction method thereof

Publications (2)

Publication Number Publication Date
CN101298770A CN101298770A (en) 2008-11-05
CN101298770B true CN101298770B (en) 2010-06-23

Family

ID=40078704

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2008100118544A Expired - Fee Related CN101298770B (en) 2008-06-12 2008-06-12 Bottom enlarging prestress conical pipe pile and construction method thereof

Country Status (1)

Country Link
CN (1) CN101298770B (en)

Families Citing this family (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101649613B (en) * 2009-09-03 2011-11-30 广州市建筑科学研究院新技术开发中心有限公司 Enlarged head prestress tubular pile and construction method thereof
CN101899838B (en) * 2010-04-27 2012-02-01 河海大学 Construction method of small-diameter prestressed pipe pile composite foundation with grouting and expansion
CN102587372A (en) * 2012-02-27 2012-07-18 侯隆飙 Construction method for burying pile by under reaming and grouting
CN102839655B (en) * 2012-09-18 2014-04-09 中国地质大学(武汉) Cast-in-place five-star-shaped end part threaded tapered pile and construction method of cast-in-place five-star-shaped end part threaded tapered pile
CN102839654A (en) * 2012-09-18 2012-12-26 中国地质大学(武汉) Cast-in-place X-shaped tapered pile with threaded end and construction method of tapered pile
CN102936902A (en) * 2012-10-30 2013-02-20 广东明阳风电产业集团有限公司 Cup-shaped concrete wind power tower foundation
CN103266603A (en) * 2013-05-27 2013-08-28 浙江城建建设集团有限公司 Construction method for pre-drilling hole-forming base-expanding and grouting of prestressed concrete special-shaped pile
CN103911986B (en) * 2014-03-31 2016-01-20 福建工程学院 A kind of construction method combining strike-on steel pipe pile
CN106245629B (en) * 2016-09-13 2018-10-16 大连理工大学 A kind of anti-skid uplift pile in mountain area and its design method
CN107587506A (en) * 2017-09-08 2018-01-16 江苏景源万河环境科技有限公司 A kind of precast prestressed anchor pole rod member and construction
CN110055954A (en) * 2018-01-17 2019-07-26 中国电力科学研究院有限公司 A kind of squeezed bored concrete pile force bearing disk arrangement of reinforcement device and application method
CN109024562B (en) * 2018-10-29 2024-03-15 中南大学 Graded-propulsion large-diameter long prefabricated pipe pile and construction method thereof
CN110029666B (en) * 2019-05-27 2024-05-14 山西大学 Mold for micro pile to resist expansive soil protector and manufacturing and using method thereof
CN111877324A (en) * 2020-06-28 2020-11-03 东南大学 Expanded-base composite pile and construction method thereof
CN113089627B (en) * 2021-03-10 2022-09-20 中电建路桥集团有限公司 Construction method of prestressed pipe pile composite foundation for deep soft soil surcharge preloading
CN113152418B (en) * 2021-03-10 2022-07-12 中电建路桥集团有限公司 Preloading tubular pile composite foundation suitable for deep soft soil area
CN113266002A (en) * 2021-06-12 2021-08-17 江苏新高新型建材有限公司 Compression-resistant and anti-pulling tower type prestressed concrete pile and processing method thereof
CN114197755B (en) * 2022-01-05 2023-05-30 国网安徽省电力有限公司亳州供电公司 Reducing type reinforcement cage

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2039321U (en) * 1988-07-18 1989-06-14 阜新矿务局建设处 Taper pipe pile of reinforced concrete
CN2231275Y (en) * 1994-05-12 1996-07-17 王光明 Reinforced pile with rotary spray composite pile
EP0758699A1 (en) * 1995-07-31 1997-02-19 Dipl.Ing. Helmut Hemmerlein GmbH & CO. Bau KG. Method for installing tapered piles, tapered piles, and foundation structures made with these piles

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2039321U (en) * 1988-07-18 1989-06-14 阜新矿务局建设处 Taper pipe pile of reinforced concrete
CN2231275Y (en) * 1994-05-12 1996-07-17 王光明 Reinforced pile with rotary spray composite pile
EP0758699A1 (en) * 1995-07-31 1997-02-19 Dipl.Ing. Helmut Hemmerlein GmbH & CO. Bau KG. Method for installing tapered piles, tapered piles, and foundation structures made with these piles

Also Published As

Publication number Publication date
CN101298770A (en) 2008-11-05

Similar Documents

Publication Publication Date Title
CN101298770B (en) Bottom enlarging prestress conical pipe pile and construction method thereof
CN102051876A (en) Novel tree root structure pile and construction process thereof
CN108560544B (en) Sleeve connection assembled pile foundation and construction method thereof
WO2017096644A1 (en) Expanded-foot tubular pile having unfolding blade and piling method thereof
CN103603337B (en) Slip casting prefabricated pile and grouting method
CN107882051A (en) A kind of conical pipe anchor bar connecting structure for precast assembly structure
CN102345292B (en) A kind of composite prestressed uplift pile with enlarged footing
CN104314075A (en) Conical concrete pile tip, tubular pile provided with pile tip and production method of tubular pile
CN109024562A (en) A kind of long prefabricated tubular pile of major diameter and its construction method of classification propulsion
CN106245667A (en) A small-sized clump of piles and the attachment structure of cushion cap
CN110206021B (en) Prestressed light pile for quickly anchoring emergency bridge inhaul cable and construction method
CN102363957A (en) Post-tensioned pre-stressed compound uplift pile
CN110685215A (en) A kind of semi-assembled composite bridge pier and its construction method
CN202194130U (en) Composite prestressed uplift pile with enlarged head
CN109469055B (en) Local pipe seam type end expansion energy-absorbing anchor rod and construction method thereof
CN211142788U (en) A semi-fabricated composite bridge pier
CN112921789A (en) Structure structure of self-resetting socket-and-spigot type ECC (error correction code) mixed bridge pier and splicing method thereof
CN203603149U (en) Multipurpose pre-stress preformed pile with changeable strength
CN208039023U (en) A kind of assembled bridge pier structure
CN206706803U (en) Large diameter concrete filled steel pipe pile
CN114411717B (en) A prefabricated concrete pipe pile that can be lengthened and combined after grouting
CN202369915U (en) U-shaped pipe type prefabricated and assembled column supporting table structure
CN206052758U (en) The attachment structure of a small-sized clump of piles and cushion cap
CN115595873A (en) A prefabricated concrete bridge pier connected by outsourcing UHPC steel pipes and its construction method
CN208455613U (en) A socket-connected assembled pile foundation

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100623

Termination date: 20130612