EP0467001A1 - Zug zum Verlegen neuer Gleise und Verfahren zum Verlegen derselben mit einem solchen Zug - Google Patents
Zug zum Verlegen neuer Gleise und Verfahren zum Verlegen derselben mit einem solchen Zug Download PDFInfo
- Publication number
- EP0467001A1 EP0467001A1 EP90810558A EP90810558A EP0467001A1 EP 0467001 A1 EP0467001 A1 EP 0467001A1 EP 90810558 A EP90810558 A EP 90810558A EP 90810558 A EP90810558 A EP 90810558A EP 0467001 A1 EP0467001 A1 EP 0467001A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- wagon
- rails
- laying
- handling
- sleepers
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B29/00—Laying, rebuilding, or taking-up tracks; Tools or machines therefor
- E01B29/05—Transporting, laying, removing, or renewing both rails and sleepers
Definitions
- the invention relates to a train for laying new railways comprising a transport wagon, a device for laying sleepers and a device for laying rails, as well as a method for laying tracks. such a train.
- the present invention aims to eliminate the disadvantages of the current working system and to create a laying train capable of handling not only the new sleepers, but also the new rails, for example 36 m in length, which allows install sleepers and rails in a single continuous operation.
- the laying train according to the invention is characterized in that the sleeper laying and rail laying devices are installed on a laying wagon arranged between said transport wagon and a rail handling wagon, that the laying wagon and the handling wagon are fitted with tracked bogies and articulated with each other and with the transport wagon, that said three wagons are provided with upper tracks arranged to bring the new rails towards the head of the train, where there is the handling wagon, which the laying and handling wagons are furthermore equipped with lower raceways arranged to bring the new rails to the rail laying device to place them on the sleepers below the laying wagon, and that the handling wagon is further provided with facilities for lowering the rails from the upper raceways to the lower raceways.
- the equipment of this laying train allows the sleepers and rails to be brought onto storage wagons and that the rails, stored on at least one wagon which is directly coupled to the transport wagon, are routed, one after the 'other, along the work wagons, therefore transport, laying and handling wagons, at the place of laying while the sleepers are laid below the train.
- the train provided with at least one gantry for the transfer of the sleepers and movable on storage wagons arranged behind the transport wagon, on it and on the wagon , is characterized in that the upper raceways located on the transport wagon and on the laying wagon comprise horizontal guide rollers and vertical guide rollers, partially motorized, arranged to center the two rails on the wagon transport in an area where the gantry must move freely, and to separate the two rails after this area on the laying wagon so as to allow the descent of the sleepers to be laid.
- the handling wagon To reduce the length of the train when it travels to the site, it is advantageous for the handling wagon to be fitted with a movable beam slidably mounted in the longitudinal direction on the chassis of this wagon, between a transport position. retracted and a working position deployed forward, said beam being provided with the raceways and the facilities necessary to descend the rails from the upper raceways to the lower raceways.
- the invention also relates to a method for laying new railways defined by the characterizing clause of claim 9, and preferred execution steps are defined by claim 10.
- the laying train comprises: a transport wagon 1 which rolls with its two bogies 2 on existing rails, or on rails already laid, a laying wagon 3 provided with a bogie with tracks 4 which rolls on the track ballast and the rear end of which rests by means of a joint 15 on the chassis of the transport wagon 1, and a rail handling wagon 5, also provided with a bogie with tracks 6 and hooked by a hinge 22 to the chassis of the laying wagon 3.
- This train moves in the direction indicated in the figures by the arrow F.
- the two tracked bogies 4 and 6 have wheels 4a, respectively 6a, which are retracted during the work and lowered if the train moves on the rails while the tracks are retracted.
- the three articulated wagons form a single unit which can be incorporated into the trains.
- At the rear of the storage wagons 7 are coupled storage wagons for the new sleepers. All these wagons run on the R5 rails already installed.
- the transport wagon 1 is equipped with a drive unit 9 which provides the energy for all the working elements, as well as the drive for the pulls.
- traction devices 10 At the tail of this wagon are mounted traction devices 10, followed towards the front by guide rollers 11 adjustable in height.
- the traction devices 10 consist of rail clamps with telescopic arms making it possible to remove the rails from the storage wagons 7 and bring them to the motorized rollers provided with a clamping system for advancing the new rails from the storage wagon 7 on the guide rollers 11, towards the laying wagon 3.
- the rails being advanced on the transport and laying wagons are designated as R1.
- FIG. 8 schematically shows on an enlarged scale a traction device 10 consisting of rail clamps 31 mounted on a telescopic arm 31 controlled by a jack 31 b, and motorized rollers 34, 35 provided with a clamping system 36 comprising a jack.
- the whole assembly mentioned is installed on a traction head 33, itself mounted on a support 33c by means of a parallelogram composed of articulated arms 33a.
- the arms 33a are adjustable in height by a jack 33b.
- the support 33c is mounted on a platform 32 which can be moved in the horizontal plane.
- the laying wagon 3 is equipped with a conveyor 16 for the sleepers and a device for laying the sleepers 17 (FIG. 5), the latter being monitored from a cabin placed under the chassis.
- the conveyor 16 receives the sleepers T brought by the gantry 13, as indicated by the arrow F1 in FIG. 1.
- This gantry 13, which carries thirty sleepers per passage, is provided, as illustrated in FIG. 7, with a beam 13a which can be raised or lowered according to the double arrow and which is fitted with crossbars 13b.
- the conveyor 16 is used to store and route these sleepers to the sleeper laying device 17 which lowers the sleepers according to arrow F2 in Figure 1 to place them on the ballast.
- the installed crosspieces are designated by T1.
- This laying wagon 3 is provided with horizontal guide rollers 18 and partially motorized vertical guide rollers 19 forming the upper raceway for the new rails. They are arranged so as to center the two rails R1 which arrive on the transport wagon 1 in an area where the gantry 13 must move freely and to separate the two rails R1 after this area on the laying wagon 3 so as to allow the descent of the sleepers to be laid.
- this laying wagon 3 includes a lower raceway for the rails, consisting of motorized guide rollers 20 which are suspended below the chassis and rail clamps 21 ( Figure 1) provided with rollers for laying the new rails. on the sleepers T1 which have just been laid.
- the rails being laid on the sleepers T1 are designated by R4 ( Figures 1, 3 and 7).
- the handling wagon 5 consists of a central chassis 5a and a movable beam 23 slidably mounted thereon in the longitudinal direction between a working position deployed forward ( Figures 2, 4, 6) and a retracted transport position 23 ', as shown in phantom in Figure 4.
- On this central chassis 5a of the handling wagon 5 and on the beam 23 are installed guide rollers 25 partially motorized and forming the upper raceway for the rails which, in their position on the upper raceway are designated by R2.
- sliding installations 27 are provided, displaceable vertically according to the double arrow F3 in FIG.
- rollers 28 which belong in the high position to the tracks upper bearings and in the lower position to the lower raceways, as will be explained later in relation to FIGS. 9 and 10.
- auxiliary rollers 29 (FIGS. 2 and 6) as well as motorized traction stations 30 ( Figures 2 and 5) belonging to the lower raceways.
- FIGS. 11 and 12 One of the traction stations 30 suspended from the central chassis 5a is shown in FIGS. 11 and 12. It comprises an upper roller 38 motorized and driven by a reduction motor 39, as well as lower rollers 40.
- the roller 38 is mounted by the 'intermediate of a horizontal telescopic rod 43 fixed to the central frame 5a, and a vertical telescopic rod 44, both movable in the direction of the double arrows.
- the lower rollers 40 are mounted on an arm 45 rocking in the direction of the curved arrow and articulated on a support 42 fixed to the central chassis 5a.
- a clamping system 41 working with a jack makes it possible to clamp the rail R3.
- the guide rollers 25 are mounted on pivoting frames 24, which are articulated to the central frame 5a, around a horizontal axis 24a.
- the sliding installations 27 are movably fixed vertically by uprights 27a to the chassis 5a, respectively to the beam 23 and can be raised and lowered by towing cables 27c driven by winches 27d. These sliding installations 27 are provided at their lower ends with arms 27b carrying the rollers 28.
- the new rails R2 which arrive are supported on the one hand by the rollers 25 of the pivoting frames 24 and on the other starts with the rollers 28.
- the preceding rails located on the lower raceway are designated by R3.
- This lower raceway comprises the auxiliary rollers 29 which are mounted to the frame 5b provided below the central chassis 5a.
- the guide rollers 25 forming the upper raceway and mounted on the beam 23 are linked to these by means of a double articulation 44 as shown in FIG. 9a, making it possible to lower the raceway in work (on the left 9a), and to lift (to the right of Figure 9a) to be able to retract the beam 23 in the running position upside down.
- the rails R3 Before lowering the sliding installations 27, with the rails R2, in the low position, illustrated in FIG. 10, the rails R3 must first be moved back so that said lower raceway is free. Then, to allow the rails R2 to descend, the guide rollers 25 are retracted by means of the jacks 26 which cause the pivoting frames 24 to tilt about 90 about the axis 24a. After the descent, the rails R2 supported by the rollers 28 also rest on the auxiliary rollers 29 (FIG. 10). Then, they are taken by the traction stations 30 which make these rails move back into a position such that the rear end of the rails, now in position R3 according to FIGS. 5 and 6, are located opposite the front end of the rails R4 to be spliced to these. After the jointing, they are taken below the laying wagon 3 by the rail clamps 21 to be placed on the crosspieces T1.
- the pivoting frames 24 are tilted 90 ′, thus retracting the guide rollers 25.
- the two rails supported only by the guide roller 28 can be lowered by the sliding installations 27 on the lower raceways, namely on the auxiliary rollers 29, as shown for the rails R3 in FIG. 9 and for the rails R2 in FIG. 10.
- your rails are taken up by traction stations 30 which move them back to the laying wagon 3, where the rails in position R4 are supported and guided by rollers 20 and roller clamps 21, in the separated position, as illustrated in FIG. 13.
- the gantry crane 13, moving on the continuous tracks 14, brings the thirty first sleepers and deposits them on the transporter 16.
- the train advances by its own means and the sleepers are laid by the poses sleepers 17, in automatic cycles, at the prescribed distance.
- the rails R4 are centered and placed on the crosspieces T so that they can be spliced through the ribs 37 to the rail R5 laid in the previous interval (Fig.13).
- the rails R3 are moved back to the front end of the rails R4 by the traction stations 30 and are held stationary so that they can be linked by fishplates 37 to the rails R4, as shown in the figure. 14.
- the new rails are routed on the upper tracks and lowered on the lower tracks as soon as the laying train is advanced by a length of rail to be laid.
- the installation of the rails which has just been described can be carried out at a working speed of approximately 300 m / hour.
- the laying of the sleepers and rails which has just been described constitutes the first stage of the work, and this first stage is followed by a second stage during which the rails are welded and then fixed on the sleepers.
- This second stage takes place as follows: a welding machine, a rail neutralization installation and a tightening machine for fixing the rails to the sleepers are brought to the site.
- first long bar 216 to 432 m
- this first long bar is neutralized, that is to say brought and maintained at a prescribed temperature, and fixed to the crosspieces.
- the welding machine advances and welds the next rails to form the second long bar, and as soon as the first long bar is fixed to the sleepers the welding machine moves back and welds the first and second long bars together; then the second long bar is neutralized and fixed on the crosspieces, and during this time the third long bars are welded and so on.
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Machines For Laying And Maintaining Railways (AREA)
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE90810558T DE69003676D1 (de) | 1990-07-19 | 1990-07-19 | Zug zum verlegen neuer gleise und verfahren zum verlegen derselben mit einem solchen zug. |
EP19900810558 EP0467001B1 (de) | 1990-07-19 | 1990-07-19 | Zug zum Verlegen neuer Gleise und Verfahren zum Verlegen derselben mit einem solchen Zug |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
EP19900810558 EP0467001B1 (de) | 1990-07-19 | 1990-07-19 | Zug zum Verlegen neuer Gleise und Verfahren zum Verlegen derselben mit einem solchen Zug |
Publications (2)
Publication Number | Publication Date |
---|---|
EP0467001A1 true EP0467001A1 (de) | 1992-01-22 |
EP0467001B1 EP0467001B1 (de) | 1993-09-29 |
Family
ID=8205941
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP19900810558 Expired - Lifetime EP0467001B1 (de) | 1990-07-19 | 1990-07-19 | Zug zum Verlegen neuer Gleise und Verfahren zum Verlegen derselben mit einem solchen Zug |
Country Status (2)
Country | Link |
---|---|
EP (1) | EP0467001B1 (de) |
DE (1) | DE69003676D1 (de) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB2486524A (en) * | 2010-12-13 | 2012-06-20 | Babcock Rail Ltd | Method and vehicle for transporting rail track and sleepers |
ES2522923A1 (es) * | 2014-01-27 | 2014-11-19 | Ferrovial Agromán S.A. | Plataforma ferroviaria para la descarga de trenes carrileros |
CN110271568A (zh) * | 2019-07-22 | 2019-09-24 | 株洲长远智造股份有限公司 | 钢轨运输车及钢轨运输方法 |
CN117144734A (zh) * | 2023-08-25 | 2023-12-01 | 成都工投装备有限公司 | 一种半自动化轨道组装装置 |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DK0853160T3 (da) | 1997-01-10 | 2004-08-16 | Plasser Bahnbaumasch Franz | Vogn til aftrækning af langskinner, der opbevares på transportvogne |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US1345175A (en) * | 1920-02-06 | 1920-06-29 | Hall Harry | Track-laying machine |
FR541579A (fr) * | 1921-01-27 | 1922-07-29 | Système pour la pose et la dépose mécaniques des voies de chemins de fer | |
FR725544A (fr) * | 1931-11-03 | 1932-05-13 | Moyens et outillage nouveaux pour la substitution mécanique des rails sur voies ferrées |
-
1990
- 1990-07-19 EP EP19900810558 patent/EP0467001B1/de not_active Expired - Lifetime
- 1990-07-19 DE DE90810558T patent/DE69003676D1/de not_active Expired - Lifetime
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US1345175A (en) * | 1920-02-06 | 1920-06-29 | Hall Harry | Track-laying machine |
FR541579A (fr) * | 1921-01-27 | 1922-07-29 | Système pour la pose et la dépose mécaniques des voies de chemins de fer | |
FR725544A (fr) * | 1931-11-03 | 1932-05-13 | Moyens et outillage nouveaux pour la substitution mécanique des rails sur voies ferrées |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB2486524A (en) * | 2010-12-13 | 2012-06-20 | Babcock Rail Ltd | Method and vehicle for transporting rail track and sleepers |
ES2522923A1 (es) * | 2014-01-27 | 2014-11-19 | Ferrovial Agromán S.A. | Plataforma ferroviaria para la descarga de trenes carrileros |
CN110271568A (zh) * | 2019-07-22 | 2019-09-24 | 株洲长远智造股份有限公司 | 钢轨运输车及钢轨运输方法 |
CN110271568B (zh) * | 2019-07-22 | 2024-04-09 | 株洲长远智造股份有限公司 | 钢轨运输车及钢轨运输方法 |
CN117144734A (zh) * | 2023-08-25 | 2023-12-01 | 成都工投装备有限公司 | 一种半自动化轨道组装装置 |
CN117144734B (zh) * | 2023-08-25 | 2024-03-19 | 成都工投装备有限公司 | 一种半自动化轨道组装装置 |
Also Published As
Publication number | Publication date |
---|---|
DE69003676D1 (de) | 1993-11-04 |
EP0467001B1 (de) | 1993-09-29 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP0004985A1 (de) | Zug zum Erneuern eines Eisenbahngleises | |
EP0431092B1 (de) | Verfahren zum kontinuierlichen Verschweissen von Schienensträngen und Zugfahrzeug für dessen Durchführung | |
EP0355240B1 (de) | Zug zur Erneuerung eines Eisenbahngleises | |
EP0466652B1 (de) | Vorrichtung zur Neutralisierung von neuen Eisenbahnschienen | |
FR2511278A1 (fr) | Appareil de soudage bout a bout de troncons de rails et procede pour former une voie continue a partir de troncons de rails | |
FR2618466A1 (fr) | Machine d'echange de traverses | |
EP0466651A1 (de) | Vorrichtung zur Auswechselung von Eisenbahnschienen | |
EP0146164B1 (de) | Verfahren zum Erneuern von Gleisweichen und Eisenbahnvorrichtung zu seiner Durchführung | |
EP0168103B1 (de) | Wagengruppe zum Auswechseln von Gleisen | |
EP0057128B1 (de) | Vorrichtung zum Auswechseln von Schwellen bei Eisenbahngleisen und Verfahren zur Benutzung dieser Vorrichtung | |
FR2666102A1 (fr) | Machine pour le remplacement des traverses d'une voie ferree. | |
FR2713679A1 (fr) | Train de travaux pour remplacer des traverses anciennes d'une voie ferrée par des traverses neuves et procédé pour la mise en Óoeuvre de celui-ci . | |
EP0467001B1 (de) | Zug zum Verlegen neuer Gleise und Verfahren zum Verlegen derselben mit einem solchen Zug | |
CA1182135A (fr) | Procede et installation de mise en paquets de tuyaux en fonte a emboitement | |
EP0168101A2 (de) | Mit Mitteln zum Abstützen und Führen beim Vorrücken versehene Eisenbahnwagengarnitur für die Erneuerung von Eisenbahngleisen | |
EP0505240B1 (de) | Vorrichtung zum Ver- und Ersetzen von Eisenbahnelementen und Verfahren zur Verwendung dieser Vorrichtung | |
EP0108168A1 (de) | Verfahren zum Auswechseln von einer Schienenwegeinrichtung und Bauzug zur Durchführung des Verfahrens | |
EP0551798A1 (de) | Vorrichtung zur Auswechslung und Neutralisierung von Eisenbahnschienen | |
FR2535359A1 (fr) | Procede de remplacement de voies ferrees et cadre de manutention pour sa mise en oeuvre | |
FR2572432A1 (fr) | Chariot sur rails pour le remplacement ou la pose et la depose ainsi que pour le transport de travees de voie ferree. | |
JP3854368B2 (ja) | 鉄道用レール交換装置及びこれを用いたレールの交換方法 | |
EP0388573B1 (de) | Gelenkzug zum Erneuern von Eisenbahnen | |
FR2666358A1 (fr) | Procede et machine de traitement de voie ferree. | |
EP2390414B1 (de) | Montageverfahren von Eisenbahnschienen zum Verankern in einem Betonbett, und Vorrichtung zur Umsetzung dieses Verfahrens | |
FR2666599A1 (fr) | Procede et dispositif pour la pose en continu et/ou le renouvellement de voies ferrees. |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AT BE CH DE DK ES FR GB GR IT LI LU NL SE |
|
RBV | Designated contracting states (corrected) |
Designated state(s): CH DE FR IT LI |
|
17P | Request for examination filed |
Effective date: 19920709 |
|
17Q | First examination report despatched |
Effective date: 19921106 |
|
RAP1 | Party data changed (applicant data changed or rights of an application transferred) |
Owner name: SCHEUCHZER S.A. |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): CH DE FR IT LI |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRE;WARNING: LAPSES OF ITALIAN PATENTS WITH EFFECTIVE DATE BEFORE 2007 MAY HAVE OCCURRED AT ANY TIME BEFORE 2007. THE CORRECT EFFECTIVE DATE MAY BE DIFFERENT FROM THE ONE RECORDED.SCRIBED TIME-LIMIT Effective date: 19930929 Ref country code: DE Effective date: 19930929 |
|
REF | Corresponds to: |
Ref document number: 69003676 Country of ref document: DE Date of ref document: 19931104 |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
26N | No opposition filed | ||
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FR Effective date: 19950331 |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: ST |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: CH Payment date: 19970701 Year of fee payment: 8 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 19980731 Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 19980731 |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |