EP0415987A1 - Verfahren zur kontinuierlichen herstellung von bandstahl oder stahlblech aus nach dem bogenstranggiessverfahren hergestellten flachprodukten. - Google Patents
Verfahren zur kontinuierlichen herstellung von bandstahl oder stahlblech aus nach dem bogenstranggiessverfahren hergestellten flachprodukten.Info
- Publication number
- EP0415987A1 EP0415987A1 EP89906038A EP89906038A EP0415987A1 EP 0415987 A1 EP0415987 A1 EP 0415987A1 EP 89906038 A EP89906038 A EP 89906038A EP 89906038 A EP89906038 A EP 89906038A EP 0415987 A1 EP0415987 A1 EP 0415987A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- deformation
- flat product
- strand
- strip
- heating
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 28
- 229910000831 Steel Inorganic materials 0.000 title claims description 20
- 239000010959 steel Substances 0.000 title claims description 20
- 238000009749 continuous casting Methods 0.000 title claims description 10
- 238000010924 continuous production Methods 0.000 title claims description 4
- 238000005096 rolling process Methods 0.000 claims abstract description 41
- 238000005266 casting Methods 0.000 claims abstract description 17
- 238000007493 shaping process Methods 0.000 claims abstract description 16
- 238000010438 heat treatment Methods 0.000 claims description 32
- 230000001939 inductive effect Effects 0.000 claims description 17
- 238000001816 cooling Methods 0.000 claims description 6
- 238000004804 winding Methods 0.000 claims description 6
- 238000005520 cutting process Methods 0.000 claims description 3
- 238000007711 solidification Methods 0.000 claims description 3
- 230000008023 solidification Effects 0.000 claims description 3
- 239000002184 metal Substances 0.000 claims description 2
- 238000003303 reheating Methods 0.000 claims description 2
- 230000006698 induction Effects 0.000 abstract description 7
- 238000009434 installation Methods 0.000 abstract description 4
- 239000000047 product Substances 0.000 description 32
- 239000007795 chemical reaction product Substances 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 3
- 238000004519 manufacturing process Methods 0.000 description 3
- 238000010079 rubber tapping Methods 0.000 description 3
- 238000010276 construction Methods 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 230000000694 effects Effects 0.000 description 1
- 230000002349 favourable effect Effects 0.000 description 1
- 238000007654 immersion Methods 0.000 description 1
- 238000002844 melting Methods 0.000 description 1
- 230000008018 melting Effects 0.000 description 1
- 230000005855 radiation Effects 0.000 description 1
- 238000003892 spreading Methods 0.000 description 1
- 238000011144 upstream manufacturing Methods 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21B—ROLLING OF METAL
- B21B1/00—Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations
- B21B1/46—Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations for rolling metal immediately subsequent to continuous casting
- B21B1/463—Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations for rolling metal immediately subsequent to continuous casting in a continuous process, i.e. the cast not being cut before rolling
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B22—CASTING; POWDER METALLURGY
- B22D—CASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
- B22D11/00—Continuous casting of metals, i.e. casting in indefinite lengths
- B22D11/12—Accessories for subsequent treating or working cast stock in situ
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21B—ROLLING OF METAL
- B21B1/00—Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations
- B21B1/46—Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations for rolling metal immediately subsequent to continuous casting
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B22—CASTING; POWDER METALLURGY
- B22D—CASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
- B22D11/00—Continuous casting of metals, i.e. casting in indefinite lengths
- B22D11/12—Accessories for subsequent treating or working cast stock in situ
- B22D11/1206—Accessories for subsequent treating or working cast stock in situ for plastic shaping of strands
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21B—ROLLING OF METAL
- B21B1/00—Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations
- B21B1/22—Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations for rolling plates, strips, bands or sheets of indefinite length
- B21B1/24—Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations for rolling plates, strips, bands or sheets of indefinite length in a continuous or semi-continuous process
- B21B1/26—Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations for rolling plates, strips, bands or sheets of indefinite length in a continuous or semi-continuous process by hot-rolling, e.g. Steckel hot mill
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21B—ROLLING OF METAL
- B21B45/00—Devices for surface or other treatment of work, specially combined with or arranged in, or specially adapted for use in connection with, metal-rolling mills
- B21B45/004—Heating the product
Definitions
- the invention relates to a process for the continuous production of steel strip or sheet steel from flat products produced by the sheet continuous casting process with a horizontal outlet direction.
- the last stand of the rolling mill results in rolling speeds which are too low in order to be able to maintain the required final rolling temperatures of at least approximately 865 degrees C. That , the strip experiences too much cooling between one rolling stage and the subsequent one, owing to the low speed identical to the casting speed when it enters the rolling train.
- One has moved away from this solution because the problem could not be solved economically even with heat protection devices and heated rollers; because this would result in a significant increase in investment and operating costs.
- Another proposed solution provides for the strip to be cut off in front of a heating furnace, in which the strip is then heat-treated (temperature compensation) over its entire cross-section.
- This can be, for example, a gas-heated roller furnace, with which a strip temperature of approx. 1100 degrees C can be set independently of the casting speed to be taken into account at the furnace outlet, that is to say an optimum temperature for the subsequent rolling process.
- the strip is cut to a standard length, which can be, for example, 50 m for a specific coil weight, for which a corresponding furnace length of approximately 150 m is required if the required buffer effect is taken into account.
- the thin slab or the "preliminary strip” can be rolled out at higher speeds, and there is therefore no fear of the temperature dropping below the minimum temperature permitted for the final rolling stage.
- the excess length of the furnace which is approximately 3 times the length of the strip section, also results in an enormous space requirement, on which many steelworks are not equipped.
- the dimensions of the system and thus of the furnace set limits for the length of the successive strip sections to be treated and thus also for the final coil weight, which in turn limits the scope for use with regard to the production of coils with the largest diameter. Accordingly, a plant of this type does not offer the possibility of using even thinner starting slabs, should this become possible due to the technological development of the continuous casting process. Assuming an initial thickness of 25 mm - as has already been hypothetically done - instead of 50 mm, the band would have to be divided into lengths of approximately 100 m in order to achieve the same final bundle weight, for which a length in for the treatment furnace would have to be provided on the order of 300 m, which is convenient and economic ⁇ Lich not feasible.
- the aim of the present invention is to create a method of the type described at the outset and a corresponding system for carrying out this method, with which steel strip can be produced continuously from flat product coming from a continuous sheet caster without taking on the aforementioned disadvantages.
- the tapping of the casting strand in the first roll stand being carried out at the speed at which the rolling stock leaves the arc section of the continuous casting installation.
- the process is thus said to be carried out "in line” with practically unlimited flexibility, so that it is possible to produce coils of any weight and length or sheets without changing the dimensional parameters of the system, since the rolled strip is separated at least after the first Rolling process or after all operations are carried out immediately before the reel-up or stacking device.
- the rolled-out strip can be reeled in according to the desired coil weight following the shaping of the flat product or, after the rolled-out strip has been separated off after the shaping of the flat product, can be stacked in predetermined lengths into sheet steel packages, if necessary after cooling and straightening.
- the flat product is thus first pierced in a first roll stand at the output speed of the product from the continuous sheet casting installation and passes through the successive rolling stages at speeds corresponding to the deformations in the individual passes.
- the thus-rolled strip is then either coiled and, after the coil weight is reached desired, separated or the tape is divided into ge desired lengths and stacked in sheets.
- An essential aspect of the present invention is the inductive re-heating of the flat product after descaling to temperatures of approximately 1100 degrees with the best possible temperature compensation, because in this way an undercooling of the strip can be counteracted in a favorable manner.
- the starting strand After passing through the rolling stands, the starting strand can be cut off with the device which is present anyway for dividing the rolled strips, or it can be cut off by a further separating device downstream of the first deformation stage.
- the separating device can be arranged behind the first deforming device and between the first deforming device and the further deforming device there can be a device for winding and unwinding the flat product, which is arranged upstream of the separating device.
- the device for winding and unwinding the flat product is preferably arranged behind the device for inductive heating and in front of the further deformation device.
- either a separating device for the rolled strip and at least one reel for winding the strip is arranged downstream of this system, or a separating device for the rolled strip, a cooling device, a straightening machine and a stacking device for the separated metal sheets.
- the system additionally comprises at least one device for inductive heating for intermediate heating between the further rolling stands.
- the system is also equipped with devices for adjusting the cross-section of the passage between the rollers of the first shaping device and the further rolling stands in order to enable the start-up strand located at the head of the casting strand to pass and immediately after it has passed Cross sections can be traced back to the usual throughput values.
- the separating device for separating the starting strand is used, which is located behind the first deformation stage.
- Fig. 3 shows a modified embodiment of the invention.
- the system according to the invention is roughly shown schematically, by means of which the corresponding method is described.
- a continuous casting mold which is identified in the drawing by 1
- the flat product 2 is produced.
- the flat product 2 guided and transported in conventional support rollers passes from the initial vertical direction over the arc section formed by the support rollers the horizontal position over.
- the flat product according to the invention passes through a first deformation stage 3, in which it is brought to a maximum thickness of 25 mm, for example.
- the deformation stage 3 can consist of one or more rolling devices, preferably in a four-way arrangement.
- a furnace 5 which is preferably equipped with an inductive heating device.
- this furnace 5 there is a temperature equalization over the entire cross section of the flat product 2, so that it reaches the first stand 6 of the further shaping device with a sufficient rolling temperature. If a piercing speed which is too slow, corresponding to the speed at exit from the sheet path, leads to a considerable drop in temperature, so that an insufficient deformation temperature results in the second roll stand 7 of the further deformation device, then further intermediate heating can possibly take place in the form of a second induction furnace 8 between the roll stands 6 and 7, which can be shorter than the furnace 5.
- the second induction furnace is only required if the furnace 5 is not sufficient to move along the entire length during the deformation three rolling stands 6, 7 and 9 existing further deformation device to set the corresponding temperature gradient, in such a way that when the last rolling stand 9 is pierced, the temperature is within the order of magnitude sufficient for good deformation.
- the flat product 2 now referred to as strip 2 1 , has the desired thickness.
- the method concludes either by reeling the rolled strip 2 1 on the reel 11 and severing at 10 after reaching the desired bundle or "coil" weight, or by severing the strip 2 1 in desired lengths and then stacking on a stacking device 12, which is shown schematically in FIG. 2.
- the device for severing the belt 10 at the beginning of the work cycle can also be used to sever the starting strand (not shown here) which, after passing through the switched-off induction furnace 5 and the extended rollers of the shaping device 6, 7 and 9, and so on the possibly provided and also switched off intermediate heating device 8 is separated.
- Corresponding adjusting devices are provided, by means of which the rollers are re-adjusted to the normal nip required for the deformation immediately after passing through the starting strand.
- the heating devices 5 are preferably composed of mutually independent zones, so that, starting from the state of the switched-off furnace, the furnace zones passed through by the starting piece are successively switched on for heating.
- the flat product 2 resulting from the casting and rolling process has a temperature of 1075 degrees C on leaving the first deformation stage 3, which drops to 1049 degrees C on the way to the descaling device 4. Due to the press water descaling provided in this arrangement, the temperature suddenly drops to 969 degrees C and cools down to furnace 5 to 934 degrees C.
- the temperature rises again to 1134 degrees C, with temperature compensation taking place over the entire cross section of the flat product.
- the latter experiences a decrease in the temperature to 1104 degrees C before reaching the mill stand 6, which due to the contact with the rolls in the mill stand is only 1063 degrees C as it exits the mill stand.
- the partially rolled strip is heated in an intermediate inductive furnace 8 from 1020 degrees C to 1120 degrees C.
- the temperature is 1090 degrees C and drops again to 1053 degrees C when leaving the roll stand until it has dropped to 988 degrees C when entering the third and last roll stand 9.
- This temperature is sufficient as the piercing temperature for the last rolling process; the rolling stock 2 1 leaves the last rolling stand 9 at a temperature of 953 degrees C and is then separated and stacked in desired lengths at a still further reduced temperature or is wound up as shown in FIG. 1.
- the speed in the exemplary embodiment when leaving the first deformation stage 3 is 0.08 m / sec. or 4.8 m / min. This corresponds to the piercing speed when entering the rolling stand of the further shaping device, where the thickness of the flat product is still 25 mm.
- the tapping speed when entering the rolling stand 7 is 10.2 m / min. with simultaneous deformation of the flat product from 25 mm to 12.3 mm.
- the rolling stock enters the last rolling stand at a speed of 19.8 m / min. and a thickness of 6.2 mm and leaves the mill stand with a finished thickness of 4.05 m and a speed of 30.6 m / min.
- the heating preceding the first roll stand of the further shaping device and, if appropriate, intermediate heating between the first and further roll stands must be set such that the flat product or the rolled strip is heated after the first pass to a temperature of approx. 1100 degrees C and the temperature level is maintained so that the final rolling temperature in the last rolling stand does not fall below the limit of 860 degrees C.
- a reel-up and reel-out device 12 is used.
- the coiling and uncoiling device is installed behind the induction furnace 5.
- the arrangement is supplemented by the descaling device 4.
- the winding and unwinding reel 12 is wound with flat material until the desired coil size is reached. After the wound bundle has been brought into the unwinding position (on the right in the drawing), the flat material is fed for further processing to the further shaping devices 6, 7 and 9, which consist of one or more shaping frames.
- an additional induction furnace 8 can be installed between the roll stands of the further shaping device.
- the finished bundle is at 11, e.g. on a downcoiler.
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Metal Rolling (AREA)
Description
Claims
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| AT89906038T ATE83409T1 (de) | 1988-05-26 | 1989-05-23 | Verfahren zur kontinuierlichen herstellung von bandstahl oder stahlblech aus nach dem bogenstranggiessverfahren hergestellten flachprodukten. |
Applications Claiming Priority (7)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| IT2075288 | 1988-05-26 | ||
| IT20752/88A IT1224318B (it) | 1988-05-26 | 1988-05-26 | Processo ed impianto per la produzione continua di nastro di acciaio |
| DE8800629 | 1988-10-10 | ||
| WOPCT/DE88/00629 | 1988-10-10 | ||
| DE3840812A DE3840812A1 (de) | 1988-05-26 | 1988-11-30 | Verfahren und anlage zur kontinuierlichen herstellung von stahlband oder stahlblech nach dem stranggussverfahren |
| DE3840812 | 1988-11-30 | ||
| PCT/DE1989/000332 WO1989011363A1 (fr) | 1988-05-26 | 1989-05-23 | Procede pour produire en continu du feuillard d'acier ou de la tole d'acier a partir de produits plats fabriques selon le procede de coulee continue en arc |
Publications (3)
| Publication Number | Publication Date |
|---|---|
| EP0415987A1 true EP0415987A1 (de) | 1991-03-13 |
| EP0415987B1 EP0415987B1 (de) | 1992-12-16 |
| EP0415987B2 EP0415987B2 (de) | 1999-11-24 |
Family
ID=27198581
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| EP89906038A Expired - Lifetime EP0415987B2 (de) | 1988-05-26 | 1989-05-23 | Verfahren zur kontinuierlichen herstellung von bandstahl oder stahlblech aus nach dem bogenstranggiessverfahren hergestellten flachprodukten |
Country Status (11)
| Country | Link |
|---|---|
| EP (1) | EP0415987B2 (de) |
| KR (1) | KR950014488B1 (de) |
| AU (1) | AU624831B2 (de) |
| BG (1) | BG51443A3 (de) |
| DE (2) | DE3840812A1 (de) |
| DK (1) | DK171539B1 (de) |
| FI (1) | FI92161C (de) |
| IT (1) | IT1224318B (de) |
| TR (1) | TR25630A (de) |
| WO (1) | WO1989011363A1 (de) |
| ZA (1) | ZA893835B (de) |
Cited By (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| EP1662011A1 (de) | 2004-11-24 | 2006-05-31 | ARVEDI, Giovanni | Warmgewalztes Stahlband mit den Eigenschaften eines kaltgewalzten Bandes |
| WO2007072516A1 (en) * | 2005-12-22 | 2007-06-28 | Giovanni Arvedi | Process and related plant for producing steel strips with solution of continuity |
| AU2006324143B2 (en) * | 2006-01-10 | 2008-12-04 | Sms Demag Ag | Method for continuous casting and rolling at increased casting speed followed by hot rolling of relatively thin metal strands, especially steel strands, and a continuous casting and rolling installation |
| AU2005330323B2 (en) * | 2005-04-07 | 2010-07-22 | Giovanni Arvedi | Process and system for manufacturing metal strips and sheets without solution of continuity between continuous casting and rolling |
| US8365806B2 (en) | 2005-12-16 | 2013-02-05 | Sms Siemag Aktiengesellschaft | Method and device for producing a metal strip by continuous casting and rolling |
| WO2013088408A2 (en) | 2011-12-16 | 2013-06-20 | Arvedi Steel Engineering S.P.A. | Device for supporting and oscillating continuous casting moulds in continuous casting plants |
| US8601851B2 (en) | 2005-10-31 | 2013-12-10 | Sms Siemag Aktiengesellschaft | Method and finishing train for hot-rolling starting material |
| US9314828B2 (en) | 2008-10-30 | 2016-04-19 | Siemens Aktiengesellschaft | Method for adjusting a discharge thickness of rolling stock that passes through a multi-stand mill train, control and/or regulation device and rolling mill |
Families Citing this family (43)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| IT1229749B (it) * | 1989-05-17 | 1991-09-10 | Giovanni Arvedi | Forno ad induzione di riscaldo ed omogeneizzazione della temperatura per la laminazione di nastri sottili di acciaio. |
| IT1244295B (it) * | 1990-07-09 | 1994-07-08 | Giovanni Arvedi | Processo ed impianto per l'ottenimento di nastri di acciaio avvolti, aventi caratteristiche di laminati a freddo ottenuti direttamente in linea di laminazione a caldo |
| DE4028542A1 (de) * | 1990-09-06 | 1992-03-12 | Mannesmann Ag | Vorrichtung zum zwischenerwaermen von warmgewalztem band |
| NL9100911A (nl) * | 1991-03-22 | 1992-10-16 | Hoogovens Groep Bv | Inrichting en werkwijze voor het vervaardigen van warmgewalst staal. |
| WO1992022389A1 (en) * | 1991-06-18 | 1992-12-23 | Mannesmann Ag | Process and plant for obtaining steel strip coils having cold-rolled characteristics and directly obtained in a hot-rolling line |
| AT398396B (de) * | 1993-02-16 | 1994-11-25 | Voest Alpine Ind Anlagen | Verfahren zum herstellen eines bandes, vorstreifens oder einer bramme |
| IT1262073B (it) * | 1993-02-16 | 1996-06-19 | Danieli Off Mecc | Lingottiera per colata continua di bramme sottili |
| DE4402402B4 (de) * | 1994-01-27 | 2004-05-13 | Sms Demag Ag | Verfahren zur Herstellung von warmgewalztem Stahlband aus stranggegossenem Vormaterial und Anlage zur Durchführung des Verfahrens |
| IT1267916B1 (it) * | 1994-03-31 | 1997-02-18 | Danieli Off Mecc | Procedimento per la produzione di nastro partendo da bramme sottili e relativo impianto |
| BR9505870A (pt) * | 1994-04-04 | 1996-02-21 | Nippon Steel Corp | Método e aparelho de fundição continua de cilindro duplo |
| TW297788B (de) * | 1994-12-15 | 1997-02-11 | Sumitomo Metal Ind | |
| EP0721813B1 (de) | 1995-01-16 | 1999-01-27 | MANNESMANN Aktiengesellschaft | Vorrichtung zum Führen von warmgewalztem Band durch einen Induktor |
| DE19540978A1 (de) * | 1995-11-03 | 1997-05-07 | Schloemann Siemag Ag | Produktionsanlage zum kontinuierlichen- oder diskontinuierlichen Auswalzen von Warmband |
| DE19613718C1 (de) * | 1996-03-28 | 1997-10-23 | Mannesmann Ag | Verfahren und Anlage zur Herstellung von warmgewalztem Stahlband |
| DE19617856C1 (de) * | 1996-04-23 | 1997-04-17 | Mannesmann Ag | Verfahren zur Herstellung von warmgewalztem Stahlband |
| DE19645497A1 (de) * | 1996-11-05 | 1998-05-07 | Schloemann Siemag Ag | Verfahren zum Walzen von Grobblechen |
| US6533876B1 (en) * | 1996-12-19 | 2003-03-18 | Corus Staal | Process and device for producing a steel strip or sheet |
| EP0904861B1 (de) * | 1997-09-11 | 2003-06-04 | Nkk Corporation | Verfahren zum Warmwalzen von dünnem Walzband und entsprechende Warmwalzenanlage |
| US6233994B1 (en) * | 1997-11-24 | 2001-05-22 | Morgan Construction Company | Apparatus for and method of processing billets in a rolling mill |
| IT1302582B1 (it) * | 1998-10-01 | 2000-09-29 | Giovanni Arvedi | Processo e relativa linea di produzione per la fabbricazione direttadi pezzi finiti stampati o imbutiti da nastro a caldo ultrasottile |
| DE10302265A1 (de) * | 2003-01-22 | 2004-07-29 | Sms Demag Ag | Verfahren und Vorrichtung zur Erzeugung von stranggegossenen Stahlbrammen |
| AT504782B1 (de) | 2005-11-09 | 2008-08-15 | Siemens Vai Metals Tech Gmbh | Verfahren zur herstellung eines warmgewalzten stahlbandes und kombinierte giess- und walzanlage zur durchführung des verfahrens |
| CA2636652A1 (en) * | 2006-01-26 | 2007-08-02 | Giovanni Arvedi | Hot rolled dual phase steel strip having features of a cold rolled strip |
| DE102007005015A1 (de) | 2006-06-26 | 2008-01-03 | Sms Demag Ag | Verfahren und Anlage zur Herstellung von Warmband-Walzgut aus Siliziumstahl auf der Basis von Dünnbrammen |
| KR101271973B1 (ko) * | 2006-12-27 | 2013-06-07 | 주식회사 포스코 | 미니밀 공정에서의 단상역 압연방법 |
| DE102008020412A1 (de) | 2007-08-24 | 2009-02-26 | Sms Demag Ag | Verfahren und Vorrichtung zum Herstellen eines Metallbandes durch Gießwalzen |
| RU2438805C1 (ru) * | 2007-09-13 | 2012-01-10 | Смс Зимаг Аг | Компактная гибкая csp установка для непрерывного производства полос, предназначенная для эксплуатации в непрерывном, полунепрерывном и периодическом режиме |
| AT506065B1 (de) * | 2007-11-22 | 2009-06-15 | Siemens Vai Metals Tech Gmbh | Verfahren zum kontinuierlichen austenitischen walzen eines in einem kontinuierlichen giessprozess hergestellten vorbandes und kombinierte giess- und walzanlage zur durchführung des verfahrens |
| DE102009018683A1 (de) | 2009-04-23 | 2010-10-28 | Sms Siemag Ag | Verfahren und Vorrichtung zum Stranggießen einer Bramme |
| DE102009037278A1 (de) | 2009-08-12 | 2011-02-17 | Sms Siemag Ag | Vorrichtung und Verfahren zum Herstellen eines dünnen Warmbandes |
| IT1400002B1 (it) | 2010-05-10 | 2013-05-09 | Danieli Off Mecc | Procedimento ed impianto per la produzione di prodotti laminati piani |
| IT1400629B1 (it) * | 2010-06-22 | 2013-06-14 | Danieli Off Mecc | Procedimento ed impianto di colata e laminazione per realizzare prodotti laminati metallici lunghi |
| DE102011006357A1 (de) | 2010-10-08 | 2012-04-12 | Sms Siemag Ag | Walzstraße zum Herstellen eines Metallbandes und Verfahren zur Herstellung einer Walzstraße |
| EP2441539A1 (de) | 2010-10-12 | 2012-04-18 | Siemens VAI Metals Technologies GmbH | Energie- und ausbringungsoptimiertes Verfahren und Anlage zur Erzeugung von Stahlwarmband |
| EP2441538A1 (de) | 2010-10-12 | 2012-04-18 | Siemens VAI Metals Technologies GmbH | Stranggießvorrichtung mit dynamischer Strangdickenreduzierung |
| EP2441540A1 (de) | 2010-10-12 | 2012-04-18 | Siemens VAI Metals Technologies GmbH | Verfahren und Anlage zur energieeffizienten Erzeugung von Stahlwarmband |
| ITMI20120760A1 (it) * | 2012-05-07 | 2013-11-08 | Arvedi Steel Engineering S P A | Impianto e procedimento per la produzione di un nastro d'acciaio laminato a caldo in un'ampia gamma dimensionale |
| DE102012224531A1 (de) | 2012-07-27 | 2014-01-30 | Sms Siemag Ag | Verfahren zur Herstellung von kornorientierten Silizium-Stählen |
| US10471502B2 (en) * | 2013-12-26 | 2019-11-12 | Posco | Continuous casting and rolling apparatus and method |
| DE102014221068A1 (de) | 2014-10-16 | 2016-04-21 | Sms Group Gmbh | Anlage und Verfahren zur Herstellung von Grobblechen |
| DE102015223787A1 (de) | 2015-10-09 | 2017-04-13 | Sms Group Gmbh | Verfahren und Vorrichtung zum Herstellen eines metallischen Bandes durch Endloswalzen |
| WO2020100729A1 (ja) * | 2018-11-14 | 2020-05-22 | 日本製鉄株式会社 | 薄板鋼板の製造装置及び薄板鋼板の製造方法 |
| IT202000020434A1 (it) * | 2020-08-26 | 2022-02-26 | Danieli Off Mecc | Processo e apparato per produrre prodotti siderurgici, in particolare di tipo merchant, in particolare in modalita’ endless |
Family Cites Families (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE942262C (de) * | 1939-01-04 | 1956-05-03 | Fritz Grah Dipl Ing | Anlage zum Stranggiessen von Metallstraengen mit nachgeschalteten Walzeinrichtungen |
| GB1199805A (en) * | 1967-04-20 | 1970-07-22 | British Iron Steel Research | Continuous Casting |
| DE1758515A1 (de) * | 1968-06-18 | 1971-01-21 | Mannesmann Ag | Verfahren zum Herstellen von Elektroblechen mit magnetischer Vorzugsrichtung in Walzrichtung aus einer Eisen/Silizium-Stahllegierung |
| DE3241745C2 (de) * | 1982-11-11 | 1985-08-08 | Mannesmann AG, 4000 Düsseldorf | Verfahren zum Herstellen von warmgewalztem Stahlband aus stranggegossenem Vormaterial in unmittelbar aufeinanderfolgenden Arbeitsschritten |
| EP0326190B1 (de) * | 1987-04-13 | 1992-05-13 | Thyssen Stahl Aktiengesellschaft | Anlage zum Herstellen eines Stahlbandes mit einer Dicke von 2 bis 25 mm |
-
1988
- 1988-05-26 IT IT20752/88A patent/IT1224318B/it active
- 1988-11-30 DE DE3840812A patent/DE3840812A1/de active Granted
-
1989
- 1989-05-22 ZA ZA893835A patent/ZA893835B/xx unknown
- 1989-05-23 KR KR1019900700155A patent/KR950014488B1/ko not_active Expired - Lifetime
- 1989-05-23 EP EP89906038A patent/EP0415987B2/de not_active Expired - Lifetime
- 1989-05-23 WO PCT/DE1989/000332 patent/WO1989011363A1/de not_active Ceased
- 1989-05-23 DE DE8989906038T patent/DE58903052D1/de not_active Expired - Lifetime
- 1989-05-23 AU AU36862/89A patent/AU624831B2/en not_active Expired
- 1989-05-26 TR TR89/0485A patent/TR25630A/xx unknown
-
1990
- 1990-09-27 FI FI904757A patent/FI92161C/fi not_active IP Right Cessation
- 1990-11-23 DK DK279290A patent/DK171539B1/da not_active IP Right Cessation
- 1990-11-26 BG BG093307A patent/BG51443A3/xx unknown
Non-Patent Citations (1)
| Title |
|---|
| See references of WO8911363A1 * |
Cited By (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| EP1662011A1 (de) | 2004-11-24 | 2006-05-31 | ARVEDI, Giovanni | Warmgewalztes Stahlband mit den Eigenschaften eines kaltgewalzten Bandes |
| AU2005330323B2 (en) * | 2005-04-07 | 2010-07-22 | Giovanni Arvedi | Process and system for manufacturing metal strips and sheets without solution of continuity between continuous casting and rolling |
| US8601851B2 (en) | 2005-10-31 | 2013-12-10 | Sms Siemag Aktiengesellschaft | Method and finishing train for hot-rolling starting material |
| US8365806B2 (en) | 2005-12-16 | 2013-02-05 | Sms Siemag Aktiengesellschaft | Method and device for producing a metal strip by continuous casting and rolling |
| WO2007072516A1 (en) * | 2005-12-22 | 2007-06-28 | Giovanni Arvedi | Process and related plant for producing steel strips with solution of continuity |
| AU2006324143B2 (en) * | 2006-01-10 | 2008-12-04 | Sms Demag Ag | Method for continuous casting and rolling at increased casting speed followed by hot rolling of relatively thin metal strands, especially steel strands, and a continuous casting and rolling installation |
| US7958931B2 (en) | 2006-01-10 | 2011-06-14 | Sms Siemag Aktiengesellschaft | Method of casting rolling with increased casting speed and subsequent hot rolling of relatively thin metal strands, particularly steel material strands and casting rolling apparatus |
| US9314828B2 (en) | 2008-10-30 | 2016-04-19 | Siemens Aktiengesellschaft | Method for adjusting a discharge thickness of rolling stock that passes through a multi-stand mill train, control and/or regulation device and rolling mill |
| WO2013088408A2 (en) | 2011-12-16 | 2013-06-20 | Arvedi Steel Engineering S.P.A. | Device for supporting and oscillating continuous casting moulds in continuous casting plants |
Also Published As
| Publication number | Publication date |
|---|---|
| FI904757A0 (fi) | 1990-09-27 |
| DE58903052D1 (de) | 1993-01-28 |
| KR950014488B1 (ko) | 1995-12-02 |
| DK171539B1 (da) | 1996-12-30 |
| TR25630A (tr) | 1993-05-03 |
| EP0415987B2 (de) | 1999-11-24 |
| EP0415987B1 (de) | 1992-12-16 |
| DK279290A (da) | 1990-11-23 |
| ZA893835B (en) | 1990-02-28 |
| IT1224318B (it) | 1990-10-04 |
| WO1989011363A1 (fr) | 1989-11-30 |
| AU3686289A (en) | 1989-12-12 |
| KR900701437A (ko) | 1990-12-03 |
| AU624831B2 (en) | 1992-06-25 |
| FI92161C (fi) | 1994-10-10 |
| FI92161B (fi) | 1994-06-30 |
| DE3840812A1 (de) | 1990-04-05 |
| BG51443A3 (en) | 1993-05-14 |
| IT8820752A0 (it) | 1988-05-26 |
| DK279290D0 (da) | 1990-11-23 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| EP0415987B1 (de) | Verfahren zur kontinuierlichen herstellung von bandstahl oder stahlblech aus nach dem bogenstranggiessverfahren hergestellten flachprodukten | |
| DE69202088T2 (de) | Vorrichtung und Verfahren zur Herstellung von warmgewalztem Stahl. | |
| DE69102280T2 (de) | Verfahren und anlage zum herstellen von direkt einer warmwalzstrasse erzeugter stahlbandcoils mit kaltwalzeigenschaften. | |
| EP2964404B1 (de) | Verfahren zum herstellen eines metallbandes durch giesswalzen | |
| EP0611610A1 (de) | Verfahren zum Herstellen eines Bandes, Vorstreifens oder einer Bramme | |
| DE2256030A1 (de) | Verfahren und vorrichtung zum walzen von heissen metallwerkstuecken sowie aufwickler zur anwendung beim aufwickeln von heissen metallwerkstuecken | |
| EP0326190A2 (de) | Anlage zum Herstellen eines Stahlbandes mit einer Dicke von 2 bis 25 mm | |
| DE69507729T2 (de) | Verfahren zur Herstellung von Bandstahl, ausgehend von dünnen Bramen, und entsprechende Anlage | |
| DD262602A5 (de) | Verfahren und anlage zur herstellung von warmgewalztem stahlband | |
| EP2209573B1 (de) | Verfahren zum kontinuierlichen austenitischen walzen eines in einem kontinuierlichen giessprozess hergestellten vorbandes | |
| DE2909848A1 (de) | Verfahren zum stranggiessen von metall und vorrichtung zur durchfuehrung des verfahrens | |
| EP3558563A1 (de) | Verfahren zur endlosen herstellung eines aufgewickelten warmbands in einer giess-walz-verbundanlage, verfahren zum anfahren einer giess-walz-verbundanlage und giess-walz-verbundanlage | |
| AT410767B (de) | Verfahren und vorrichtung zur kontinuierlichen herstellung eines gewalzten metallbandes aus einermetallschmelze | |
| AT409227B (de) | Verfahren und anlage zur herstellung von warmgewalztem stahlband aus einer stahlschmelze | |
| EP3016762B1 (de) | Giesswalzanlage und verfahren zum herstellen von metallischem walzgut | |
| WO2016165933A1 (de) | GIEß-WALZ-ANLAGE UND VERFAHREN ZU DEREN BETRIEB | |
| EP3027331B1 (de) | Giesswalzanlage und verfahren zum herstellen von brammen | |
| EP3436204B1 (de) | Vorrichtung und verfahren zum plattieren einer warmen bramme | |
| DE3235703A1 (de) | Walzverfahren und kontinuierliches tandem-warmbandwalzwerk zur durchfuehrung des verfahrens | |
| EP3725450A2 (de) | Verfahren und vorrichtung zur herstellung eines mehrschichtigen verbundmaterials | |
| EP1059125A2 (de) | Verfahren zum Herstellen von Metallband | |
| EP0496726A2 (de) | Verfahren und Anlage zum kontinuierlichen Erzeugen von zu Ringen gewickeltem Draht | |
| DE10025080A1 (de) | Verfahren zum Herstellen von Metallband | |
| EP3790688A1 (de) | GIEß-WALZ-ANLAGE, UND VERFAHREN ZU DEREN BETRIEB | |
| WO1998034754A1 (de) | Induktionsschweisseinrichtung und arbeitsverfahren zum verbinden mehrerer vorbänder in einer anlage zur endlosherstellung von warmgewalztem stahlband |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
| 17P | Request for examination filed |
Effective date: 19901102 |
|
| AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AT BE CH DE FR GB IT LI LU NL SE |
|
| 17Q | First examination report despatched |
Effective date: 19920130 |
|
| GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
| AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AT BE CH DE FR GB IT LI LU NL SE |
|
| REF | Corresponds to: |
Ref document number: 83409 Country of ref document: AT Date of ref document: 19930115 Kind code of ref document: T |
|
| ET | Fr: translation filed | ||
| REF | Corresponds to: |
Ref document number: 58903052 Country of ref document: DE Date of ref document: 19930128 |
|
| ITF | It: translation for a ep patent filed | ||
| GBT | Gb: translation of ep patent filed (gb section 77(6)(a)/1977) |
Effective date: 19930226 |
|
| PLBI | Opposition filed |
Free format text: ORIGINAL CODE: 0009260 |
|
| 26 | Opposition filed |
Opponent name: SMS SCHLOEMANN-SIEMAG AG Effective date: 19930911 Opponent name: THYSSEN STAHL AG Effective date: 19930916 Opponent name: VOEST-ALPINE INDUSTRIEANLAGENBAU GESELLSCHAFT M.B. Effective date: 19930914 |
|
| NLR1 | Nl: opposition has been filed with the epo |
Opponent name: SMS SCHLOEMANN-SIEMAG AG Opponent name: THYSSEN STHAL AG Opponent name: VOEST-ALPINE INDUSTRIEANLAGEN GMBH |
|
| EPTA | Lu: last paid annual fee | ||
| EAL | Se: european patent in force in sweden |
Ref document number: 89906038.8 |
|
| APAE | Appeal reference modified |
Free format text: ORIGINAL CODE: EPIDOS REFNO |
|
| APAC | Appeal dossier modified |
Free format text: ORIGINAL CODE: EPIDOS NOAPO |
|
| PLAW | Interlocutory decision in opposition |
Free format text: ORIGINAL CODE: EPIDOS IDOP |
|
| PUAH | Patent maintained in amended form |
Free format text: ORIGINAL CODE: 0009272 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: PATENT MAINTAINED AS AMENDED |
|
| 27A | Patent maintained in amended form |
Effective date: 19991124 |
|
| AK | Designated contracting states |
Kind code of ref document: B2 Designated state(s): AT BE CH DE FR GB IT LI LU NL SE |
|
| REG | Reference to a national code |
Ref country code: CH Ref legal event code: AEN Free format text: AUFRECHTERHALTUNG DES PATENTES IN GEAENDERTER FORM |
|
| ET3 | Fr: translation filed ** decision concerning opposition | ||
| NLR2 | Nl: decision of opposition | ||
| ITF | It: translation for a ep patent filed | ||
| NLR3 | Nl: receipt of modified translations in the netherlands language after an opposition procedure | ||
| GBTA | Gb: translation of amended ep patent filed (gb section 77(6)(b)/1977) | ||
| REG | Reference to a national code |
Ref country code: CH Ref legal event code: PUEA Free format text: MANNESMANN AKTIENGESELLSCHAFT;GIOVANNI ARVEDI TRANSFER- ARVEDI, GIOVANNI |
|
| REG | Reference to a national code |
Ref country code: FR Ref legal event code: TQ |
|
| REG | Reference to a national code |
Ref country code: GB Ref legal event code: 732E |
|
| NLS | Nl: assignments of ep-patents |
Owner name: GIOVANNI ARVEDI |
|
| REG | Reference to a national code |
Ref country code: GB Ref legal event code: IF02 |
|
| APAH | Appeal reference modified |
Free format text: ORIGINAL CODE: EPIDOSCREFNO |
|
| REG | Reference to a national code |
Ref country code: CH Ref legal event code: PFA Owner name: ARVEDI, GIOVANNI Free format text: ARVEDI, GIOVANNI#VIA MERCATELLO, 26#I-25100 CREMONA (IT) -TRANSFER TO- ARVEDI, GIOVANNI#VIA MERCATELLO, 26#I-25100 CREMONA (IT) |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20080523 Year of fee payment: 20 Ref country code: CH Payment date: 20080515 Year of fee payment: 20 Ref country code: LU Payment date: 20080515 Year of fee payment: 20 |
|
| PLAB | Opposition data, opponent's data or that of the opponent's representative modified |
Free format text: ORIGINAL CODE: 0009299OPPO |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: AT Payment date: 20080515 Year of fee payment: 20 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: IT Payment date: 20080429 Year of fee payment: 20 Ref country code: BE Payment date: 20080620 Year of fee payment: 20 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: NL Payment date: 20080515 Year of fee payment: 20 Ref country code: SE Payment date: 20080513 Year of fee payment: 20 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: GB Payment date: 20080522 Year of fee payment: 20 |
|
| REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
| BE20 | Be: patent expired |
Owner name: *ARVEDI GIOVANNI Effective date: 20090523 |
|
| REG | Reference to a national code |
Ref country code: GB Ref legal event code: PE20 Expiry date: 20090522 |
|
| EUG | Se: european patent has lapsed | ||
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: NL Free format text: LAPSE BECAUSE OF EXPIRATION OF PROTECTION Effective date: 20090523 |
|
| NLV7 | Nl: ceased due to reaching the maximum lifetime of a patent |
Effective date: 20090523 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GB Free format text: LAPSE BECAUSE OF EXPIRATION OF PROTECTION Effective date: 20090522 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: FR Payment date: 20080425 Year of fee payment: 20 |