EP0370888A1 - Method for the construction at low water of a foundation beam for a facing overlying a work such as a slope, a bank or the like, and foundation beam thus obtained - Google Patents

Method for the construction at low water of a foundation beam for a facing overlying a work such as a slope, a bank or the like, and foundation beam thus obtained Download PDF

Info

Publication number
EP0370888A1
EP0370888A1 EP89403197A EP89403197A EP0370888A1 EP 0370888 A1 EP0370888 A1 EP 0370888A1 EP 89403197 A EP89403197 A EP 89403197A EP 89403197 A EP89403197 A EP 89403197A EP 0370888 A1 EP0370888 A1 EP 0370888A1
Authority
EP
European Patent Office
Prior art keywords
envelopes
concrete
row
riprap
envelope
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
EP89403197A
Other languages
German (de)
French (fr)
Inventor
Pierre Le Foll
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Etude Promotion Architecture "sepra" Ste
Original Assignee
Etude Promotion Architecture "sepra" Ste
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Etude Promotion Architecture "sepra" Ste filed Critical Etude Promotion Architecture "sepra" Ste
Publication of EP0370888A1 publication Critical patent/EP0370888A1/en
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/12Revetment of banks, dams, watercourses, or the like, e.g. the sea-floor
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/01Flat foundations
    • E02D27/02Flat foundations without substantial excavation

Definitions

  • the present invention relates to a method for the construction or repair in low water of a foundation beam of a riprap covering a structure such as a bank, a pier or the like.
  • the structure thus formed generally resists well to the stresses to which it is subjected by moving water: current, waves, whirlpools, tide ... whether it is sea water or water from sensitive rivers. at the tide.
  • the present invention aims to remedy these drawbacks by proposing the use of concrete, so that the concrete poured parts and not yet consolidated constituting the foundation beam are not deteriorated when the sea or the river water rises and covers them. In addition, it must be possible to arm the beam in order to improve the overall resistance.
  • the low beam construction process of the foundation beam consists of: - digging a trench, - to hang under a lifter suspended from a lifting machine a plurality of flexible envelopes having a parallelepiped shape and arranged side by side in at least one row at a spacing such that when they are filled, their adjoining transverse walls are strongly pressed the against each other, - lower the spreader until it rests on support means, such as trestles, so that the row of envelopes is housed in the trench by touching the bottom thereof when filling begins , - to introduce longitudinal reinforcements by crossing the transverse walls of all the envelopes of the row and leaving them protruding at least from the last to ensure the connection with the next row, - pour concrete into the envelopes, in particular by means of a pump, to deposit a first layer in one direction from one envelope to the next in order to inflate the transverse walls in this direction, then a second layer in the direction opposite in order to inflate the other trans
  • the method consists in rolling a skirt of each envelope located above the handles attached to the lifting beam, in order to allow the pouring of the concrete, and after filling, to crease and tighten the skirt on itself to form a twist and to tie this twist to close the corresponding envelope.
  • transverse reinforcing elements are inserted into the envelopes filled before setting of the concrete, these reinforcing elements being intended to allow the connection of the beam with the protective layer of said riprap.
  • the invention also extends to the foundation beam obtained by implementing the above method.
  • the beam is then formed by a plurality of aligned sections of concrete filling flexible envelopes closed and separated from each other by the compressed walls of these envelopes, each section having, at the same level on one side, projecting transverse parts s 'fitting into hollow transverse parts of the adjoining section and, on the other side, hollow transverse parts, the projecting parts being separated on the same side, from one level to the next, by hollow parts.
  • Reinforcement elements can be inserted into the sections of wrapped concrete in order to project along the slope of the riprap for the connection of the foundation beam with the riprap.
  • the structure to which the method of the invention applies is a pier 1 on which is built a roadway 2 bordered at least on one side by a sidewalk 3 and a concrete parapet 4.
  • the pier is constituted in the form of a slope with the natural terrain 5 which is covered by a riprap 6.
  • the sloping surface 7 of the riprap which connects the circulation surface of the carriageway 2 to the bottom 8 of the river or the sea, is coated with a riprap 9 whose foot abuts a foundation 10.
  • the bottom of the riprap 9, the foundation 10 and the neighboring part of the bottom 8 are covered by a reinforcing embankment 11 intended to protect this area from the devastating action of the sea or the river.
  • a trench 11 is dug at the foot of the slope and a lifter 12 extending in line with the trench, is suspended from a lifting device 13.
  • the lifter is made by two beams 14 connected by crosspieces 15 and delimiting between them windows 16 through which the pipe 17 of a concrete pump 18 can pour concrete as is indicated in the following.
  • hooks 19 are fixed to the outside of the side members 14 of the lifter 12 opposite the crosspieces 15.
  • Flexible envelopes 20 are hung on the lifter and their dimensions are such, relative to the spacing of the hooks 19, that they retain, in pendant, their parallelepiped shape and that they touch by their transverse walls; however, due to their flexibility, they can deform and the deformation of each of the transverse walls is transmitted without breaking the contact with the contiguous transverse wall.
  • Trestles 21 are installed on the ground to receive the lifter 12 when it is lowered to its lower level. In this position, the bottoms 22 of the envelopes 20 rest on the bottom 23 of the trench 11 and said transverse walls of these envelopes remain in contact. It is important that the envelopes remain suspended from the spreader, but they can take a slight "slack" to be sure that their bottoms rest on that of the trench, their transverse walls being always in contact despite this slight slack.
  • envelopes 20 can be of the type shown in Figures 2 to 4. They can be made of woven polypropylene fabric. They have a parallelepiped shape and have two transverse walls 24, 25 and two longitudinal walls 26, 27 connected together and with the bottom 23. In the upper corners, straps are formed in a U and fixed by their branches on the two adjoining walls in order to constitute suspension handles 28 intended to be threaded on the hooks 19. Said walls 24 to 27 of the envelopes are extended, by a skirt 29 capable of being pleated and tightened on itself, the twist thus formed being capable of 'be tied in 30 to close the corresponding envelope.
  • the envelopes 20 of this type or another being suspended from the lifter 12 which rests on the trestles 21, the skirts 29 are rolled on themselves to form a roller 31 completely releasing the mouth said envelopes; it is also possible to fold the transverse walls 24, 25 and fold the longitudinal walls 26, 27 down and out.
  • a first layer of concrete 32.1 is poured in the direction of arrow F of the envelope 20.1 up to envelope 20.n; the wall 25 of the envelope 20.i during casting then deforms towards the outside and pushes back the wall 24 of the following envelope 20.i + 1; it follows that in each envelope, the layer 32.1 of concrete has a projecting transverse part 33 on the right and a hollow transverse part 34 on the left, the projecting parts fitting into the hollow parts.
  • a second layer of concrete 32.2 is poured in the direction of arrow G from the envelope 20.n to the envelope 20.i; it is now, the wall 24 of each envelope 20.i during casting which deforms towards the outside and pushes back the wall 25 of the following envelope 20.i-1; as a result, in each envelope, the layer 32.2 has a projecting transverse part 35 on the left and a hollow transverse part 36 on the right, respectively surmounting a hollow part 34 and a solid part 33 of the underlying layer 32.1 and s' fitting respectively into a hollow part 36 and a projecting part 35 of the neighboring envelopes 20i-1 and 20 i + 1 of the same layer.
  • a third layer 32.3 is poured in the direction of arrow F, then a fourth layer 32.4 is poured in the direction of arrow G.
  • the protruding and hollow parts thus formed overlap one another by alternating from layer to layer. the following and it follows that the sections of enveloped concrete 37 are perfectly interconnected and are separated from each other only by the flexible walls 24 and 25 strongly tightened by the hydrostatic pressure of the concrete.
  • reinforcements 38 are slid into the row of bags 20, preferably before pouring the concrete.
  • these frames are three in number. They extend over the entire length of the row passing through small openings made in the transverse walls of the envelopes and protrude by at least one of their ends 39 the last envelope of the row considered to penetrate during the construction of the next row in the first envelope thereof and thus ensure a solid connection, after pouring and consolidation of the concrete, of the two rows aligned with each other.
  • each envelope 20 is detached from the lifter 12 and its skirt 19 is then unrolled, pleated and tightened on itself in order to form the aforementioned twist intended to be knotted at 30 to close the envelope considered and subtract the section of concrete 39 corresponding to the action of water when said section is submerged, this action being particularly devastating as long as the concrete is not set and perfectly consolidated.
  • closure means such as adhesive tape, hook-and-loop tape, staples, etc. can be used.
  • the lifter 12 is then moved to the next location above the trench 11 to build the row which extends the one thus built.
  • reinforcing elements 40 can be inserted transversely into the sections of the wrapped concrete 37 in order to project parallel to the sloping surface 7 of the riprap and to ensure the connection of the foundation beam with the riprap 9 whatever its method of construction.

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Environmental & Geological Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Revetment (AREA)

Abstract

The method consists in hooking aligned and joined flexible sheaths (20) beneath a swing bar, in lowering the swing bar until it rests on supports with its sheaths touching the bottom (23) of a trench, in pouring concrete into the sheaths in successive layers (31.1 to 31.4) and alternately in one direction (arrow F) and in the opposite direction (arrow G), in closing the sheaths and in unhooking them, and in moving the swing bar to the next location. <IMAGE>

Description

La présente invention concerne un procédé pour la construction ou la réparation en basses eaux d'une poutre de fondation d'un perré recouvrant un ouvrage tel qu'une berge, une jetée ou autre.The present invention relates to a method for the construction or repair in low water of a foundation beam of a riprap covering a structure such as a bank, a pier or the like.

Jusqu'à présent, la fondation est constituée par des blocs en roches dures disposés les uns à côté des autres et reliés entre eux. Le poids de ces blocs et leur liaison sont essentiels pour assurer une tenue de l'ouvrage.Until now, the foundation has been made up of hard rock blocks arranged next to each other and connected together. The weight of these blocks and their connection are essential to ensure that the structure is held.

La structure ainsi constituée résiste généralement bien aux sollicitations auxquelles elle est soumise par l'eau en mouvement : courant, vagues, tourbillons, marée ... qu'il s'agisse de l'eau de mer ou de l'eau des rivières sensibles à la marée.The structure thus formed generally resists well to the stresses to which it is subjected by moving water: current, waves, whirlpools, tide ... whether it is sea water or water from sensitive rivers. at the tide.

Cependant, sa réparation ou sa construction de proche en proche soulève des difficultés majeures. Tout d'abord, une main d'oeuvre compétente ne se trouve plus en quantité suffisante, les conditions de travail sont pénibles et fatigantes, le coût de la réfection est trop onéreux. Ensuite et surtout, il n'est possible de travailler de façon économique que lorsque l'eau découvre, c'est-à-dire trois à quatre heures par marée et jamais à la même heure, ce qui suppose une disponibilité pratiquement permanente de la main d'oeuvre.However, its repair or its construction step by step raises major difficulties. First of all, a competent workforce is no longer in sufficient quantity, the working conditions are painful and tiring, the cost of repairing is too expensive. Then and above all, it is only possible to work economically when the water is uncovered, that is to say three to four hours per tide and never at the same time, which implies a practically permanent availability of the workforce.

La présente invention vise à remédier à ces inconvénients en proposant d'utiliser du béton, de telle façon que les parties coulées en béton et non encore consolidées constituant la poutre de fondation ne soient pas détériorées lorsque la mer ou l'eau de la rivière monte et les recouvre. En outre, il doit être possible d'armer la poutre afin d'améliorer la résistance d'ensemble.The present invention aims to remedy these drawbacks by proposing the use of concrete, so that the concrete poured parts and not yet consolidated constituting the foundation beam are not deteriorated when the sea or the river water rises and covers them. In addition, it must be possible to arm the beam in order to improve the overall resistance.

Bien entendu, l'exécution de cette poutre doit être rapide, efficace et bon marché. Elle doit pouvoir être interrompue sans dommage lorsque l'eau remonte. Elle ne doit nécessiter qu'un effectif réduit de personnel. La poutre ainsi obtenue en béton doit enfin être solide, résistante et fiable.Of course, the execution of this beam must be quick, efficient and inexpensive. It must be able to be interrupted without damage when the water rises. It should only require a reduced number of staff. The beam thus obtained in concrete must finally be solid, resistant and reliable.

Dans ce but et conformément à l'invnetion, le procédé de construction en basses eaux de la poutre de fondation consiste :
- à creuser une tranchée,
- à accrocher sous un palonnier suspendu à un engin de levage une pluralité d'enveloppes souples ayant une forme parallé­lépipédique et disposées côte à côte suivant au moins une rangée à un écartement tel que lors de leur remplissage, leurs parois transversales contiguës soient fortement pressées les unes contre les autres,
- à descendre le palonnier jusqu'à ce qu'il repose sur des moyens d'appui, tels que des chevalets, de façon que la rangée d'enveloppes soit logée dans la tranchée en touchant le fond de celle-ci lorsque le remplissage commence,
- à introduire des armatures longitudinales en traversant les parois transversales de toutes les enveloppes de la rangée et en les laissant dépasser au moins de la dernière pour assurer la liaison avec la rangée suivante,
- à couler du béton dans les enveloppes, notamment au moyen d'une pompe, pour y déposer une première couche dans un sens d'une enveloppe à la suivante afin de gonfler les parois transversales dans ce sens, puis une deuxième couche dans le sens opposé afin de gonfler les autres parois transversales et ainsi de suite de niveau en niveau jusqu'à ce que le remplissage soit effectué,
- à fermer les enveloppes à leur partie supérieure et à les décrocher du palonnier,
- à déplacer longitudinalement ce palonnier pour mettre en place en bout une autre rangée d'enveloppes alignée avec celle considérée, la première enveloppe de cette autre rangée étant percée pour recevoir les extrémités dépassantes des armatures de la rangée déjà coulée.
For this purpose and in accordance with the invnetion, the low beam construction process of the foundation beam consists of:
- digging a trench,
- to hang under a lifter suspended from a lifting machine a plurality of flexible envelopes having a parallelepiped shape and arranged side by side in at least one row at a spacing such that when they are filled, their adjoining transverse walls are strongly pressed the against each other,
- lower the spreader until it rests on support means, such as trestles, so that the row of envelopes is housed in the trench by touching the bottom thereof when filling begins ,
- to introduce longitudinal reinforcements by crossing the transverse walls of all the envelopes of the row and leaving them protruding at least from the last to ensure the connection with the next row,
- pour concrete into the envelopes, in particular by means of a pump, to deposit a first layer in one direction from one envelope to the next in order to inflate the transverse walls in this direction, then a second layer in the direction opposite in order to inflate the other transverse walls and so on from level to level until filling is completed,
- close the envelopes at their upper part and unhook them from the lifter,
- To move this lifter longitudinally to put in place another row of envelopes aligned with that considered, the first envelope of this other row being pierced to receive the protruding ends of the reinforcements of the already cast row.

Selon un mode d'exécution particulier, le procédé consiste à rouler une jupe de chaque enveloppe située au-dessus des poignées accrochées au palonnier, afin de permettre la coulée du béton, et après remplissage, à plisser et resserrer la jupe sur elle-même pour former un tortillon et à nouer ce tortillon pour fermer l'enveloppe correspondante.According to a particular embodiment, the method consists in rolling a skirt of each envelope located above the handles attached to the lifting beam, in order to allow the pouring of the concrete, and after filling, to crease and tighten the skirt on itself to form a twist and to tie this twist to close the corresponding envelope.

Avantageusement, du côté de la pente du perré, des éléments transversaux d'armature sont fichés dans les enveloppes remplies avant prise du béton, ces éléments d'armature étant destinés à permettre la liaison de la poutre avec la couche de protection dudit perré.Advantageously, on the side of the slope of the riprap, transverse reinforcing elements are inserted into the envelopes filled before setting of the concrete, these reinforcing elements being intended to allow the connection of the beam with the protective layer of said riprap.

L'invention s'étend par ailleurs, à la poutre de fondation obtenue par la mise en oeuvre du procédé précité.The invention also extends to the foundation beam obtained by implementing the above method.

La poutre est alors constituée par une pluralité de tronçons alignés en béton remplissant des enveloppes souples fermées et séparés les uns des autres par les parois comprimées de ces enveloppes, chaque tronçon présentant, à un même niveau d'un côté, des parties transversales saillantes s'emboîtant dans des parties transversales creuses du tronçon contigu et, de l'autre côté, des parties transversales creuses, les parties saillantes étant séparées d'un même côté, d'un niveau au suivant, par des parties creuses.The beam is then formed by a plurality of aligned sections of concrete filling flexible envelopes closed and separated from each other by the compressed walls of these envelopes, each section having, at the same level on one side, projecting transverse parts s 'fitting into hollow transverse parts of the adjoining section and, on the other side, hollow transverse parts, the projecting parts being separated on the same side, from one level to the next, by hollow parts.

Tous les tronçons de béton enveloppé sont traversés par des armatures longitudinales communes dont au moins une extrémité fait saillie.All sections of wrapped concrete are crossed by common longitudinal reinforcement, at least one end of which protrudes.

Des éléments d'armature peuvent être fichés dans les tronçons de béton enveloppé afin de faire saillie suivant la pente du perré pour la liaison de la poutre de fondation avec le perré.Reinforcement elements can be inserted into the sections of wrapped concrete in order to project along the slope of the riprap for the connection of the foundation beam with the riprap.

Divers autres caractéristiques et avantages de l'invention ressortent d'ailleurs de la description détaillée qui suit.Various other characteristics and advantages of the invention will also emerge from the detailed description which follows.

Une forme de réalisation de l'objet de l'invention est représentée, à titre d'exemple non limitatif, sur le dessin annexé.An embodiment of the object of the invention is shown, by way of nonlimiting example, in the accompanying drawing.

Sur ce dessin :

  • - la figure 1 est une coupe transversale d'un ouvrage auquel la poutre de fondation de l'invention est appliquée,
  • - la figure 2 est une perspective montrant une enveloppe souple utilisée pour constituer la poutre,
  • - la figure 3 est une coupe verticale prise suivant la ligne III-III de la figure 2, lorsque la jupe de l'enveloppe est roulée.
  • - la figure 4 est une coupe longitudinale partielle de la poutre finie,
  • - la figure 5 est une perspective avec arrachement illustrant une première phase du procédé.
  • - les figures 6 à 9 sont des coupes-élévations concernant les phases suivantes du procédé,
  • - la figure 10 est une coupe transversale prise suivant la ligne X-X de la figure 9.
On this drawing :
  • FIG. 1 is a cross section of a structure to which the foundation beam of the invention is applied,
  • FIG. 2 is a perspective showing a flexible envelope used to form the beam,
  • - Figure 3 is a vertical section taken along line III-III of Figure 2, when the envelope skirt is rolled.
  • FIG. 4 is a partial longitudinal section of the finished beam,
  • - Figure 5 is a cutaway view illustrating a first phase of the process.
  • - Figures 6 to 9 are sectional elevations concerning the following phases of the process,
  • - Figure 10 is a cross section taken along line XX of Figure 9.

Dans l'exemple représenté, l'ouvrage auquel le procédé de l'invention s'applique est une jetée 1 sur laquelle est construite une chaussée 2 bordée d'un côté au moins par un trottoir 3 et un parapet en béton 4. La jetée est constituée en forme de talus avec le terrain naturel 5 qui est recouvert par un enrochement 6. La surface en pente 7 de l'enrochement qui relie la surface de circulation de la chaussée 2 au fond 8 de la rivière ou de la mer, est revêtue d'un perré 9 dont le pied bute contre une fondation 10. Le pied du perré 9, la fondation 10 et la partie voisine du fond 8 sont recouverts par un remblai de renforcement 11 destiné à soustraire cette zone à l'action dévastatrice de la mer ou de la rivière. Le niveau de l'eau sur le perré s'élève et s'abaisse au gré des marées et à ce mouvement de flux et de reflux, s'ajoute celui des vagues, des remous, courants ... A marée basse, le perré 9 et la fondation 10 sont découverts et l'on ne dispose alors que de trois à quatre heures pour travailler "à sec".In the example shown, the structure to which the method of the invention applies is a pier 1 on which is built a roadway 2 bordered at least on one side by a sidewalk 3 and a concrete parapet 4. The pier is constituted in the form of a slope with the natural terrain 5 which is covered by a riprap 6. The sloping surface 7 of the riprap which connects the circulation surface of the carriageway 2 to the bottom 8 of the river or the sea, is coated with a riprap 9 whose foot abuts a foundation 10. The bottom of the riprap 9, the foundation 10 and the neighboring part of the bottom 8 are covered by a reinforcing embankment 11 intended to protect this area from the devastating action of the sea or the river. The water level on the river rises and falls with the tides and this movement of ebb and flow, is added that of waves, eddies, currents ... At low tide, the river 9 and the foundation 10 are discovered and there are then only three to four hours to work "dry".

Comme le montre la figure 5, pour reconstruire la fondation 10, une tranchée 11 est creusée au pied du talus et un palonnier 12 s'étendant à l'aplomb de la tranchée, est suspendu à un engin de levage 13. Le palonnier est constitué par deux longerons 14 reliés par des traverses 15 et délimitant entre celles-ci des fenêtres 16 à travers lesquelles le tuyau 17 d'une pompe à béton 18 peut déverser du béton cemme cela est indiqué dans ce qui suit.As shown in Figure 5, to rebuild the foundation 10, a trench 11 is dug at the foot of the slope and a lifter 12 extending in line with the trench, is suspended from a lifting device 13. The lifter is made by two beams 14 connected by crosspieces 15 and delimiting between them windows 16 through which the pipe 17 of a concrete pump 18 can pour concrete as is indicated in the following.

Ainsi que cela ressort maintenant de la figure 6, des crochets 19 sont fixés à l'extérieur des longerons 14 du palonnier 12 en regard des traverses 15. Des enveloppes souples 20 sont accrochées au palonnier et leurs dimensions sont telles, par rapport à l'écartement des crochets 19, qu'elles conservent, en pendant, leur forme parallélépipédique et qu'elles se touchent par leurs parois transversales ; cependant, en raison de leur souplesse, elles peuvent se déformer et la déformation de chacune des parois transversales se transmet sans rompre le contact à la paroi transversale contiguë.As is now apparent from FIG. 6, hooks 19 are fixed to the outside of the side members 14 of the lifter 12 opposite the crosspieces 15. Flexible envelopes 20 are hung on the lifter and their dimensions are such, relative to the spacing of the hooks 19, that they retain, in pendant, their parallelepiped shape and that they touch by their transverse walls; however, due to their flexibility, they can deform and the deformation of each of the transverse walls is transmitted without breaking the contact with the contiguous transverse wall.

Des chevalets 21 (figure 5 et 7) sont installés sur le sol pour recevoir le palonnier 12 lorsqu'il est descendu à son niveau inférieur. Dans cette position, les fonds 22 des enveloppes 20 reposent sur le fond 23 de la tranchée 11 et lesdites parois transversales de ces enveloppes restent en contact. Il est important que les enveloppes restent suspendues au palonnier, mais elles peuvent prendre un léger "mou" pour être sûr que leurs fonds reposent sur celui de la tranchée, leurs parois transversales étant toujours en contact malgré ce léger mou.Trestles 21 (FIGS. 5 and 7) are installed on the ground to receive the lifter 12 when it is lowered to its lower level. In this position, the bottoms 22 of the envelopes 20 rest on the bottom 23 of the trench 11 and said transverse walls of these envelopes remain in contact. It is important that the envelopes remain suspended from the spreader, but they can take a slight "slack" to be sure that their bottoms rest on that of the trench, their transverse walls being always in contact despite this slight slack.

Ces enveloppes 20 peuvent être du type représenté sur les figures 2 à 4. Elles peuvent être fabriquées en toile de polypropylène tissée. Elles présentent une forme parallélépipédique et comportent deux parois transversales 24, 25 et deux parois longitudinales 26, 27 reliées entre elles et avec le fond 23. Dans les angles supérieurs, des sangles sont formées en U et fixées par leurs branches sur les deux parois contiguës afin de constituer des poignées de suspension 28 destinées à être enfilées sur les crochets 19. Lesdites parois 24 à 27 des enveloppes sont prolongées, par une jupe 29 susceptible d'être plissée et resserrée sur elle-même, le tortillon ainsi formé étant susceptible d'être noué en 30 pour fermer l'enveloppe correspondante.These envelopes 20 can be of the type shown in Figures 2 to 4. They can be made of woven polypropylene fabric. They have a parallelepiped shape and have two transverse walls 24, 25 and two longitudinal walls 26, 27 connected together and with the bottom 23. In the upper corners, straps are formed in a U and fixed by their branches on the two adjoining walls in order to constitute suspension handles 28 intended to be threaded on the hooks 19. Said walls 24 to 27 of the envelopes are extended, by a skirt 29 capable of being pleated and tightened on itself, the twist thus formed being capable of 'be tied in 30 to close the corresponding envelope.

Comme le montrent les figures 3 et 7, les enveloppes 20 de ce type ou d'un autre étant suspendues au palonnier 12 qui repose sur les chevalets 21, les jupes 29 sont roulées sur elles-mêmes pour former un rouleau 31 dégageant complètement l'embouchure desdites enveloppes ; on peut aussi plisser les parois transversales 24, 25 et rabattre vers le bas et l'extérieur les parois longitudinales 26, 27.As shown in Figures 3 and 7, the envelopes 20 of this type or another being suspended from the lifter 12 which rests on the trestles 21, the skirts 29 are rolled on themselves to form a roller 31 completely releasing the mouth said envelopes; it is also possible to fold the transverse walls 24, 25 and fold the longitudinal walls 26, 27 down and out.

Ainsi que cela est indiqué dans ce qui précède et que cela ressort des figures 4 et 8, du béton est coulé dans les enveloppes 20 au moyen de la pompe à béton 18. Mais cette coulée s'effectue par couches successives tantôt dans un sens (flèche F), tantôt dans le sens opposé (flèche G).As indicated in the foregoing and as can be seen from FIGS. 4 and 8, concrete is poured into the casings 20 by means of the concrete pump 18. However, this pouring takes place in successive layers, sometimes in one direction ( arrow F), sometimes in the opposite direction (arrow G).

Plus précisément, si l'on considère la figure 8, les enveloppes étant désignées par les références 20.1 à 20.n de la gauche vers la droite, une première couche de béton 32.1 est coulée dans le sens de la flèche F de l'enveloppe 20.1 jusqu'à l'enveloppe 20.n ; la paroi 25 de l'enveloppe 20.i en cours de coulée se déforme alors vers l'extérieur et repousse la paroi 24 de l'enveloppe suivante 20.i+1 ; il en résulte que dans chaque enveloppe, la couche 32.1 de béton présente une partie transversale saillante 33 à droite et une partie transversale creuse 34 à gauche, les parties saillantes s'emboîtant dans les parties creuses.More specifically, if we consider Figure 8, the envelopes being designated by the references 20.1 to 20.n from left to right, a first layer of concrete 32.1 is poured in the direction of arrow F of the envelope 20.1 up to envelope 20.n; the wall 25 of the envelope 20.i during casting then deforms towards the outside and pushes back the wall 24 of the following envelope 20.i + 1; it follows that in each envelope, the layer 32.1 of concrete has a projecting transverse part 33 on the right and a hollow transverse part 34 on the left, the projecting parts fitting into the hollow parts.

Une deuxième couche de béton 32.2 est coulée dans le sens de la flèche G de l'enveloppe 20.n jusqu'à l'enveloppe 20.i ; c'est maintenant, la paroi 24 de chaque enveloppe 20.i en cours de coulée qui se déforme vers l'extérieur et repousse la paroi 25 de l'enveloppe suivante 20.i-1 ; il en résulte que, dans chaque enveloppe, la couche 32.2 présente une partie transversale saillante 35 à gauche et une partie transversale creuse 36 à droite, surmontant respectivement une partie creuse 34 et une partie pleine 33 de la couche sous-jacente 32.1 et s'emboîtant respectivement dans une partie creuse 36 et une partie saillante 35 des enveloppes voisines 20i-1 et 20 i+1 de la même couche.A second layer of concrete 32.2 is poured in the direction of arrow G from the envelope 20.n to the envelope 20.i; it is now, the wall 24 of each envelope 20.i during casting which deforms towards the outside and pushes back the wall 25 of the following envelope 20.i-1; as a result, in each envelope, the layer 32.2 has a projecting transverse part 35 on the left and a hollow transverse part 36 on the right, respectively surmounting a hollow part 34 and a solid part 33 of the underlying layer 32.1 and s' fitting respectively into a hollow part 36 and a projecting part 35 of the neighboring envelopes 20i-1 and 20 i + 1 of the same layer.

Une troisième couche 32.3 est coulée dans le sens de la flèche F, puis une quatrième couche 32.4 dans le sens de la flèche G.A third layer 32.3 is poured in the direction of arrow F, then a fourth layer 32.4 is poured in the direction of arrow G.

Les parties saillantes et creuses ainsi formées s'imbriquent les unes dans les autres en alternant d'une couche à la suivante et il en résulte que les tronçons de béton enveloppé 37 sont parfaitement reliés entre eux et ne sont séparés les uns des autres que par les parois souples 24 et 25 fortement serrées par la pression hydrostatique du béton.The protruding and hollow parts thus formed overlap one another by alternating from layer to layer. the following and it follows that the sections of enveloped concrete 37 are perfectly interconnected and are separated from each other only by the flexible walls 24 and 25 strongly tightened by the hydrostatic pressure of the concrete.

Par ailleurs, des armatures 38 sont glissées dans la rangée de sacs 20, de préférence avant coulée du béton. Dans l'exemple représenté, ces armatures sont au nombre de trois. Elles s'étendent sur toute la longueur de la rangée en traversant de petites ouvertures pratiquées dans les parois transversales des enveloppes et dépassent par au moins l'une de leurs extrémités 39 la dernière enveloppe de la rangée considérée pour pénétrer lors de la construction de la rangée suivante dans la première enveloppe de celle-ci et assurer ainsi une solide liaison, après coulée et consolidation du béton, des deux rangées alignées entre elles.Furthermore, reinforcements 38 are slid into the row of bags 20, preferably before pouring the concrete. In the example shown, these frames are three in number. They extend over the entire length of the row passing through small openings made in the transverse walls of the envelopes and protrude by at least one of their ends 39 the last envelope of the row considered to penetrate during the construction of the next row in the first envelope thereof and thus ensure a solid connection, after pouring and consolidation of the concrete, of the two rows aligned with each other.

Comme le montrent maintenant les figures 4 et 9, chaque enveloppe 20 est décrochée du palonnier 12 et sa jupe 19 est alors déroulée, plissée et resserrée sur elle-même afin de former le tortillon précité destiné à être noué en 30 pour fermer l'enveloppe considérée et soustraire le tronçon de béton 39 correspondant à l'action de l'eau lorsque ledit tronçon est immergé, cette action étant particulièrement dévastatrice tant que le béton n'est pas pris et parfaitement consolidé. Bien entendu, d'autres moyens de fermeture tels que de la bande adhésive, de la bande auto-agrippante, des agrafes ... peuvent être mis en oeuvre.As FIGS. 4 and 9 now show, each envelope 20 is detached from the lifter 12 and its skirt 19 is then unrolled, pleated and tightened on itself in order to form the aforementioned twist intended to be knotted at 30 to close the envelope considered and subtract the section of concrete 39 corresponding to the action of water when said section is submerged, this action being particularly devastating as long as the concrete is not set and perfectly consolidated. Of course, other closure means such as adhesive tape, hook-and-loop tape, staples, etc. can be used.

Le palonnier 12 est ensuite déplacé vers l'emplacement suivant au-dessus de la tranchée 11 pour construire la rangée qui prolonge celle ainsi édifiée.The lifter 12 is then moved to the next location above the trench 11 to build the row which extends the one thus built.

Il est important de remarquer en outre que la souplesse des enveloppes 20 alliée à la technique particulière du bétonnage permet de bien encastrer les tronçons 37 les uns dans les autres et d'assurer une assise parfaite de la poutre ainsi constituée sur le fond de la fouille ou tranchée 11 et éventuellement contre les flancs de celle-ci.It is important to note moreover that the flexibility of the envelopes 20 combined with the particular technique of concreting makes it possible to embed the sections 37 well one inside the other and to ensure a perfect seat of the beam thus formed on the bottom of the excavation. or trench 11 and possibly against the sides thereof.

Par ailleurs, et ainsi que cela ressort de la figure 10, des éléments d'armature 40 peuvent être fichés transversalement dans les tronçons du béton enveloppé 37 afin de faire saillie parallèlement à la surface pentue 7 de l'enrochement et d'assurer la liaison de la poutre de fondation avec le perré 9 quel que soit son mode de construction.Furthermore, and as can be seen from FIG. 10, reinforcing elements 40 can be inserted transversely into the sections of the wrapped concrete 37 in order to project parallel to the sloping surface 7 of the riprap and to ensure the connection of the foundation beam with the riprap 9 whatever its method of construction.

Claims (6)

1.- Procédé pour la construction en basses eaux d'une poutre de fondation (10) d'un perré (9) recouvrant un ouvrage (1) tel qu'une berge, une jetée ou autre, consistant à creuser une tranchée (11) pour y loger la poutre, caractérisé en ce qu'il consiste également :
- à accrocher sous un palonnier (12) suspendu à un engin de levage (13) une pluralité d'enveloppes souples (20) ayant une forme parallélépipédique et disposées côte à côte suivant au moins une rangée à un écartement tel que lors de leur remplissage, leurs parois transversales contiguës (24, 25) soient fortement pressées les unes contre les autres,
- à descendre le palonnier (12) jusqu 'à ce qu'il repose sur des moyens d'appui (21), tels que des chevalets, de façon que la rangée d'enveloppes soit logée dans la tranchée (11) en touchant le fond (23) de celle-ci lorsque le remplissage commence,
- à introduire des armatures longitudinales (38) en traversant les parois transversales (24, 25) de toutes les enveloppes (20) de la rangée et en les laissant dépasser (en 39) au moins de la dernière pour assurer la liaison avec la rangée suivante,
- à couler du béton dans les enveloppes, notamment au moyen d'une pompe (18), pour y déposer une première couche (32.1) dans un sens (flèche F) d'une enveloppe (20) à la suivante afin de gonfler (en 33) les parois transversales (25) dans ce sens, puis une deuxième couche (32.2) dans le sens opposé (flèche G) afin de gonfler (en 35) les autres parois transversales (24) à l'inverse et ainsi de suite de niveau en niveau jusqu'à ce que le remplissage soit effectué,
- à fermer (en 30) les enveloppes à leur partie supérieure et à les décrocher du palonnier,
- à déplacer longitudinalement ce palonnier (12) pour mettre en place en bout une autre rangée d'enveloppes alignée avec celle considérée, la première enveloppe de cette autre rangée étant percée pour recevoir les extrémités dépassantes des armatures de la rangée déjà coulée.
1.- Method for the construction in low water of a foundation beam (10) of a riprap (9) covering a structure (1) such as a bank, a pier or other, consisting in digging a trench (11 ) to accommodate the beam, characterized in that it also consists of:
- To hang under a lifter (12) suspended from a lifting device (13) a plurality of flexible envelopes (20) having a parallelepiped shape and arranged side by side in at least one row at a spacing such as during their filling , their adjoining transverse walls (24, 25) are strongly pressed against each other,
- lower the lifter (12) until it rests on support means (21), such as trestles, so that the row of envelopes is housed in the trench (11) by touching the bottom (23) thereof when filling begins,
- to introduce longitudinal reinforcements (38) by crossing the transverse walls (24, 25) of all the envelopes (20) of the row and letting them protrude (at 39) at least from the last to ensure the connection with the row next,
- pouring concrete into the envelopes, in particular by means of a pump (18), to deposit there a first layer (32.1) in one direction (arrow F) from one envelope (20) to the next in order to inflate ( in 33) the transverse walls (25) in this direction, then a second layer (32.2) in the opposite direction (arrow G) in order to inflate (in 35) the other transverse walls (24) in reverse and so on from level to level until filling is complete,
- to close (at 30) the envelopes at their upper part and unhook them from the lifter,
- To move this lifter (12) longitudinally to put in place at the end another row of envelopes aligned with that considered, the first envelope of this other row being pierced to receive the protruding ends of the reinforcements of the already cast row.
2.- Procédé selon la revendication 1, caractérisé en ce qu'il consiste à rouler une jupe (29) de chaque enveloppe (20) située au-dessus des poignées (28) accrochées au palonnier (12), afin de permettre la coulée du béton, et après remplissage, à dérouler la jupe, puis à la plisser et la resserrer sur elle-même pour former un tortillon et à nouer ce tortillon (en 30) pour fermer l'enveloppe correspondante.2.- Method according to claim 1, characterized in that it consists in rolling a skirt (29) of each envelope (20) located above the handles (28) attached to the lifter (12), in order to allow the casting of concrete, and after filling, unroll the skirt, then pleat and tighten it on itself to form a twist and tie this twist (at 30) to close the corresponding envelope. 3.- Procédé selon la revendication 1 ou 2, caractérisé en ce que du côté de la pente du perré, des éléments transversaux d'armature (42) sont fichés dans les enveloppes remplies avant prise du béton, ces éléments d'armature étant destinés à permettre la liaison de la poutre avec la couche de protection dudit perré.3.- Method according to claim 1 or 2, characterized in that on the side of the slope of the riprap, transverse reinforcing elements (42) are inserted into the envelopes filled before setting of the concrete, these reinforcing elements being intended to allow the connection of the beam with the protective layer of said riprap. 4.- Poutre de fondation du pied du perré d'un ouvrage tel qu'une berge, une jetée ou autre, obtenus par la mise en oeuvre du procédé selon la revendication 1 ou 2 et caractérisée en ce qu'elle est constituée par une pluralité de tronçons alignés en béton remplissant des enveloppes souples fermées et séparés les uns des autres par les parois comprimées de ces enveloppes, chaque tronçon présentant, à un même niveau d'un côté, des parties transversales saillantes s'emboîtant dans des parties transversales creuses du tronçon contigu et, de l'autre côté, des parties transversales creuses, les parties saillantes étant séparées d'un même côté, d'un niveau au suivant, par des parties creuses.4.- Foundation beam of the foot of the riprap of a structure such as a bank, a pier or other, obtained by the implementation of the method according to claim 1 or 2 and characterized in that it is constituted by a plurality of aligned sections of concrete filling flexible envelopes closed and separated from each other by the compressed walls of these envelopes, each section having, at the same level on one side, protruding transverse parts fitting into hollow transverse parts of the contiguous section and, on the other side, hollow transverse parts, the projecting parts being separated on the same side, from one level to the next, by hollow parts. 5.- Poutre selon la revendication 4, caractérisée en ce que tous les tronçons de béton enveloppé sont traversés par des armatures longitudinales communes dont au moins une extrémité fait saillie.5. Beam according to claim 4, characterized in that all the sections of enveloped concrete are crossed by common longitudinal reinforcements of which at least one end projects. 6.- Poutre selon la revendication 5, caractérisée en ce que des éléments d'armature sont fichés dans les tronçons de béton enveloppé afin de faire saillie suivant la pente du perré pour la liaison de la poutre de fondation avec le perré.6. Beam according to claim 5, characterized in that reinforcing elements are inserted into the sections of wrapped concrete so as to project along the slope of the riprap for the connection of the foundation beam with the riprap.
EP89403197A 1988-11-21 1989-11-21 Method for the construction at low water of a foundation beam for a facing overlying a work such as a slope, a bank or the like, and foundation beam thus obtained Withdrawn EP0370888A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
FR8815123 1988-11-21
FR8815123A FR2639380B1 (en) 1988-11-21 1988-11-21 PROCESS FOR THE CONSTRUCTION IN LOW WATER OF A FOUNDATION BEAM OF A PERRE COVERING A WORK SUCH AS A BANK, A JET OR OTHER AND FOUNDATION BEAM THUS OBTAINED

Publications (1)

Publication Number Publication Date
EP0370888A1 true EP0370888A1 (en) 1990-05-30

Family

ID=9372051

Family Applications (1)

Application Number Title Priority Date Filing Date
EP89403197A Withdrawn EP0370888A1 (en) 1988-11-21 1989-11-21 Method for the construction at low water of a foundation beam for a facing overlying a work such as a slope, a bank or the like, and foundation beam thus obtained

Country Status (2)

Country Link
EP (1) EP0370888A1 (en)
FR (1) FR2639380B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110761247A (en) * 2019-11-28 2020-02-07 合肥工业大学 Modular polygonal side slope protection device

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1945771A1 (en) * 1968-09-12 1970-09-03 Prepakt Nv Shut-off device, especially two-way shut-off device for viscous materials such as (asphalt) mortar
FR2376254A1 (en) * 1976-12-30 1978-07-28 Brown Christopher CONSOLIDATION UNIT FOR THE REINFORCEMENT OF BREAKWATERS, SHOULDER DIGES AND OTHERS
EP0106745A2 (en) * 1982-09-24 1984-04-25 Citra-France Method and installation for putting a protection layer on an under water floor
EP0138259A2 (en) * 1983-09-29 1985-04-24 Fluvio Labor, Personenvennootschap met beperkte aansprakelijkheid Drainage structure and method of making a reinforced dike slope
US4594206A (en) * 1983-09-21 1986-06-10 Grafton Harry D Concrete structures for use in shore protection and/or wave control and method of making same

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1945771A1 (en) * 1968-09-12 1970-09-03 Prepakt Nv Shut-off device, especially two-way shut-off device for viscous materials such as (asphalt) mortar
FR2376254A1 (en) * 1976-12-30 1978-07-28 Brown Christopher CONSOLIDATION UNIT FOR THE REINFORCEMENT OF BREAKWATERS, SHOULDER DIGES AND OTHERS
EP0106745A2 (en) * 1982-09-24 1984-04-25 Citra-France Method and installation for putting a protection layer on an under water floor
US4594206A (en) * 1983-09-21 1986-06-10 Grafton Harry D Concrete structures for use in shore protection and/or wave control and method of making same
EP0138259A2 (en) * 1983-09-29 1985-04-24 Fluvio Labor, Personenvennootschap met beperkte aansprakelijkheid Drainage structure and method of making a reinforced dike slope

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110761247A (en) * 2019-11-28 2020-02-07 合肥工业大学 Modular polygonal side slope protection device
CN110761247B (en) * 2019-11-28 2024-04-16 合肥工业大学 Modularized polygonal side slope protection device

Also Published As

Publication number Publication date
FR2639380B1 (en) 1991-02-22
FR2639380A1 (en) 1990-05-25

Similar Documents

Publication Publication Date Title
CA1217349A (en) Engineering of reinforced concrete structures, such as tunnels, underpasses and the like, and precast concrete elements used in said engineering processes
CA2263275C (en) Method for the fabrication of a dam or barrier
FR2657370A1 (en) METHOD AND ELEMENT FOR PRODUCING STRUCTURES FOR CONTAINING SOIL SURFACES
EP0392894A1 (en) Underground tubular construction and method for its construction
CA1302111C (en) Process and apparatus for making a rigid load-bearing slab
FR2465835A1 (en) METHOD FOR CONSTRUCTING A BRIDGE-SUSPENDED BRIDGE OR SUSPENSION BRIDGE
EP1877625A1 (en) Elongated device for maritime and waterway planning and production method thereof
EP0028558B1 (en) Method of improving the sliding resistance of a civil engineering construction and its foundation
NO300648B1 (en) Duvet-shaped tablecloths comprising a sleeve of a flexible and stretch-resistant cloth material
EP0370889A1 (en) Method for the construction of a protection facing for works such as a slope, a bank or the like, and facing thus obtained
EP0370888A1 (en) Method for the construction at low water of a foundation beam for a facing overlying a work such as a slope, a bank or the like, and foundation beam thus obtained
EP1308562B1 (en) Net- or mesh- structure for erosion protection
EP0165355A1 (en) Method of realizing a basement underneath an existing structure
FR2821105A1 (en) WATERPROOF AND RESISTANT WALL FOR THE CONSTRUCTION OF A TANK
FR2476712A1 (en) Triangular cross section hollow groyne - has sets of three rectangular section sparred beams to build triangular frame
FR2660681A1 (en) Connection element and methods for constructing walls which are connected at their base to a sole plate or to a baseplate
EP2563975B1 (en) Molded wall having prefabricated cladding
FR2473085A1 (en) Mfr. of continuous concrete wall - is cast in sections using successive trenches containing overlapping reinforcing frames and transverse bulkheads
FR2649428A1 (en) COMPONENT ELEMENTS OF EROSION DEFENSE STRUCTURES, RESULTING STRUCTURE AND METHOD FOR REINFORCING AND PLACING THE SAME
FR2822858A1 (en) Emergency dyke for flood protection comprises inflated tubes held down by layers of sheet material and weighted lines in sleeves
FR2477194A1 (en) Modular sections for constructing underwater structures - have flexible joints allowing lateral displacement without rupture and are filled with pressurised paste
EP0273077B1 (en) Retaining structure and method for realizing this retaining structure
FR2656885A1 (en) Improved coating for protecting soil subject to erosion, and implementation method
WO1990001089A1 (en) Process for repairing foundations including damaged pile heads, in particular for timber piles
FR2773830A1 (en) Earth wall supporting system for excavation, e.g. foundation pit

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): BE DE ES GB IT LU NL SE

17P Request for examination filed

Effective date: 19901029

17Q First examination report despatched

Effective date: 19910809

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN

18D Application deemed to be withdrawn

Effective date: 19920616