EP0182958A1 - Track-handling apparatus for a railroad track section - Google Patents

Track-handling apparatus for a railroad track section Download PDF

Info

Publication number
EP0182958A1
EP0182958A1 EP85105094A EP85105094A EP0182958A1 EP 0182958 A1 EP0182958 A1 EP 0182958A1 EP 85105094 A EP85105094 A EP 85105094A EP 85105094 A EP85105094 A EP 85105094A EP 0182958 A1 EP0182958 A1 EP 0182958A1
Authority
EP
European Patent Office
Prior art keywords
track
panel
support
carriage
ballast
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP85105094A
Other languages
German (de)
French (fr)
Other versions
EP0182958B1 (en
Inventor
Hans Hurni
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Matisa Materiel Industriel SA
Original Assignee
Matisa Materiel Industriel SA
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Matisa Materiel Industriel SA filed Critical Matisa Materiel Industriel SA
Publication of EP0182958A1 publication Critical patent/EP0182958A1/en
Application granted granted Critical
Publication of EP0182958B1 publication Critical patent/EP0182958B1/en
Expired legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B29/00Laying, rebuilding, or taking-up tracks; Tools or machines therefor
    • E01B29/02Transporting, laying, removing, or renewing lengths of assembled track, assembled switches, or assembled crossings

Definitions

  • the present invention aims to eliminate these two disadvantages inherent in the establishment of the sole of the handling device under the panel to be handled.
  • each sole 3 in a horizontal plane is controlled by a jack 32 bearing on an extension 27 of the lower cross member 6 of the upright from its position transverse to the track as shown in these three figures to a position parallel to the track, or vice versa according to the sequence of the process of putting the handling device on site or removing it from the site; in their position parallel to the track, these two support flanges are located in the extension of one another in a zone between the end of the crosspieces of the panel and the first two lateral supports 28.
  • the handling device is then placed directly, according to FIG. 3, in a transverse position on the rails of panel A, its two support flanges 3 plumb with two crosspieces adjacent to this panel and so that the upright 1 either directly above an area outside these two crosspieces.
  • the first two lateral supports 28 of the support are lowered and supported on the ballast below this zone next to the sign.
  • the lower arm 37 carries the console 15 to which the carrying arm 9 is articulated, also identical to that of the first embodiment and the upper arm 36 carries the double console 24 on which are supported the two jacks 23 and 26 for adjusting the height movement of the carriage 7 and for controlling the tilting of the carrying arm 9.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Machines For Laying And Maintaining Railways (AREA)

Abstract

1. An apparatus for handling a railway-track switch panel (A) by grasping and tilting it from its position on the ground up to an oblique position within the transverse gauge of the track and vice versa for the laying thereof and the depositing and transporting thereof on a suitable rail vehicle, and comprising a support (1) having a resting shoe (3) intended to be placed on the ballast in position extending in the transverse direction of the track below the level of the base of the rails of the panel, a column (4) attached to the shoe (3) and intended to be set up on a side of the panel, and a carriage (7) mounted for sliding and adjustable in height along the column (4) by means of a driving member (26), a horizontal pivot pin (8) parallel to the track and borne by the carriage (7), a carrier arm (9) extending in the transverse direction of the track and articulated at one end to the pivot pin (8), at least two rail hooking members (17, 18) mounted on the carrier arm (9) grasping the panel, and a driving member (23) for tilting the carrier arm (9) by pivoting around the pivot pin (8), the support (1) having two first lateral props (28) which are independent of at least one resting shoe (3), are displaceable and adjustable in height by means of two jacks (29), are arranged on this side of the resting shoe (3) in the transverse direction of the track, are spaced on both sides from the resting shoe (3) in the longitudinal direction of the track and are intended to rest on the ballast, the resting shoe (3) being articulated around a vertical pivot pin (5, 50) which is integral with the column (4) of the support (1) and being driven in rotation in a horizontal plane by a driving member (32) from its transverse position up to a position parallel to the track and vice versa, said shoe (3) being shifted substantially by half a tie spacing with respect to the plumb line of the carrier arm (9) in its position transverse to the track, the driving member for the tilting of the carrier arm being a piston-cylinder unit (23) established in combination with the carriage (7) to permit the locking of said arm (9) in position parallel to the ballast platform supporting the panel, and the carrier arm (9) comprising at its end opposite the horizontal pivot pin (8) a third lateral prop (30) which is displaceable and adjustable in height by means of a piston-cylinder unit (31) and intended to rest against the ballast opposite the first two props, between two ties of the panel.

Description

La présente invention a pour objet un appareil de manutention d'un panneau d'appareil de voie ferrée par saisie et basculement de celui-ci depuis sa position au sol jusqu'en position oblique dans le gabarit transversal de la voie et vice-versa en vue de sa pose, de sa dépose et de son transport sur un véhicule ferroviaire approprié et comprenant un support comportant une semelle d'appui destinée à être posée sur le ballast en position étendue dans la direction transversale de la voie au-dessous du niveau du patin des rails du panneau, un montant relié à la semelle et destiné à être érigé d'un côté du panneau, et un chariot monté coulissant et réglable en hauteur le long du montant à l'aide d'un organe moteur, un pivot horizontal parallèle à la voie porté par le chariot, un bras de portage étendu dans la direction transversale de la voie et articulé par une extrémité au pivot, au moins deux organes d'accrochage de rails montés sur le bras de portage pour la saisie du panneau, et un organe moteur pour basculer le bras de portage par pivotement autour du pivot.The present invention relates to an apparatus for handling a railroad track panel by gripping and tilting it from its position on the ground to an oblique position in the transverse gauge of the track and vice versa. view of its installation, its removal and its transport on a suitable railway vehicle and comprising a support comprising a support sole intended to be placed on the ballast in the extended position in the transverse direction of the track below the level of the pad of the panel rails, an upright connected to the sole and intended to be erected on one side of the panel, and a carriage mounted sliding and adjustable in height along the upright using a driving member, a horizontal pivot parallel to the track carried by the carriage, a carrying arm extended in the transverse direction of the track and articulated by one end to the pivot, at least two rail fastening members mounted on the carrying arm for gripping the panel, and an organ ne motor to tilt the carrying arm by pivoting around the pivot.

Un tel appareil a déjà fait l'objet de la demande de brevet suisse n° 2147/84-7. Cet appareil a été conçu dans un but de simplification et d'économie des moyens connus destinés à être utilisés dans le cadre des travaux de pose, de dépose ou de substitution de panneaux d'appareils de voie montés tels que des aiguillages, croisements ou objets similaires, et par lesquels le problème du transport sur la voie de tels panneaux dont la largeur dépasse notablement celle du gabarit de circulation a été résolu en les chargeant en position oblique sur des wagons appropriés de manière à ce qu'ils puissent s'inscrire sensiblement en diagonale dans les limites du rectangle constitué à peu de choses près par ce gabarit.Such a device has already been the subject of Swiss patent application No. 2147 / 84-7. This device has been designed for the purpose of simplification and economy of the known means intended to be used in the context of the installation, removal or replacement work of mounted switchboard panels such as switches, crossings or objects similar, and by which the problem of transporting on the track such signs whose width significantly exceeds that of the traffic gauge has been resolved by loading them in an oblique position on appropriate wagons so that they can register substantially diagonally within the limits of the rectangle formed more or less by this template.

Ces moyens connus sont de types différents et sont utilisés selon trois principales méthodes.These known means are of different types and are used according to three main methods.

Dans une première méthode illustrée par les brevets US 1 994 717 et SU 896 144, le wagon de transport est équipé de mécanismes à leviers articulés et de treuils propres à saisir, soulever, ramener sur ce wagon et mettre en position oblique un panneau d'appareil de voie situé à côté dudit wagon de transport, ou vice-versa. De ce fait cette méthode nécessite soit le montage d'une voie auxiliaire de roulement à côté du lieu de pose ou de dépose, soit l'occupation temporaire d'une voie de circulation parallèle. En outre, les mécanismes à leviers articulés et les treuils constituent un équipement lourd et compliqué qui doit être nécessairement complété par des moyens d'équilibrage du wagon lorsque la charge déportée est soulevée, comme cela est montré et décrit dans le brevet SU 896 144. Dans l'agencement décrit dans ce brevet soviétique, il est en outre prévu un moyen permettant la pose du panneau en avant du wagon de transport, mais ce moyen n'est pas simple car il est constitué par une poutre de portage solidaire du mécanisme à leviers articulés qui est montée mobile par translaton dans la direction de la voie pour pouvoir être placée en porte-à- faux au-dessus du lieu de pose.In a first method illustrated by US patents 1,994,717 and SU 896,144, the transport wagon is equipped with mechanisms with articulated levers and winches suitable for grasping, lifting, bringing back on this wagon and placing a panel switchgear located next to said transport wagon, or vice versa. Therefore this method requires either the mounting of an auxiliary rolling track next to the place of installation or removal, or the temporary occupation of a parallel traffic lane. In addition, the articulated lever mechanisms and the winches constitute heavy and complicated equipment which must necessarily be supplemented by means for balancing the wagon when the offset load is raised, as is shown and described in patent SU 896,144. In the arrangement described in this Soviet patent, there is further provided a means allowing the installation of the panel in front of the transport wagon, but this means is not simple because it consists of a carrying beam integral with the mechanism articulated levers which is mounted movable by translaton in the direction of the track so that it can be placed in a cantilever above the place of installation.

Dans une seconde méthode illustrée par la demande de brevet français publiée 2 314 299, des portiques enjambant le panneau d'appareil de voie sont préalablement installés le long de ce dernier pour ensuite le soulever et libérer ainsi le passage à son aplomb d'un wagon de chargement approprié à rouler également sur le ballast tout au moins à l'une de ses deux extrémités. Les portiques sont équipés de bras de portage et de treuils pour soulever et rabaisser le panneau dans sa position horizontale, et le wagon de transport est équipé de mécanismes à leviers articulés pour permettre la mise en position oblique du panneau d'appareil de voie en vue de son transport ou vice-versa sa mise en position horizontale pour son enlèvement et son déchargement par les portiques. Les leviers des mécanismes solidaires du wagon sont prévus déplaçables sur celui-ci dans la direction de sa longueur afin de pouvoir être placés entre les traverses du panneau.In a second method illustrated by the published French patent application 2 314 299, gantries spanning the switchgear panel are previously installed along the latter, then lifting it up and thus freeing the passage above it from a wagon of suitable loading to also roll on the ballast at least at one of its two ends. The gantry cranes are equipped with carrying arms and winches to raise and lower the panel in its horizontal position, and the transport wagon is equipped with mechanisms with articulated levers to allow the oblique positioning of the panel switchgear for its transport or vice versa its horizontal position for its removal and unloading by gantry cranes. The levers of the mechanisms integral with the wagon are provided that can be moved thereon in the direction of its length so that it can be placed between the crosspieces of the panel.

Dans une troisième méthode faisant également appel à des portiques et qui est illustrée par le brevet SU 767 262, ceux-ci sont constitués en forme de ponts roulants à treuils de levage aptes à soulever et à abaisser en position horizontale ou oblique le panneau d'appareil de voie. Ces portiques servent ici au transfert du panneau entre des wagons de transport de panneaux et un wagon à console de portage destiné à surplomber par cette console l'emplacement de pose ou de dépose du panneau, cette console étant également munie de moyens de levage. Evidem- ment pendant le transfert, le panneau engage le gabarit de la voie parallèle.In a third method also using gantries and which is illustrated by patent SU 767 262, these are constituted in the form of traveling cranes with lifting winches capable of lifting and lowering in horizontal or oblique position the panel switchgear. These gantries are used here for the transfer of the panel between wagons for transporting panels and a wagon with a carrying console intended to overhang by this console the installation or removal location of the panel, this console also being provided with lifting means. Obviously during the transfer, the panel engages the gauge of the parallel track.

La seconde et la troisième méthode ne nécessitent plus l'occupation temporaire d'une voie auxiliaire comme dans la première méthode, ce qui présente déjà un avantage considérable, mais les moyens utilisés restent néanmoins importants et compliqués et font appel à la fois à des portiques pour soulever les panneaux et à des mécanismes à leviers ou à des treuils pour les mettre en oblique, que ces mécanismes soient installés sur le wagon de transport comme dans la seconde méthode ou que ces treuils soient installés sur les portiques comme dans la troisième méthode.The second and third methods no longer require the temporary occupation of an auxiliary channel as in the first method, which already has a considerable advantage, but the means used nevertheless remain important and complicated and use both gantry cranes to lift the panels and to lever mechanisms or to winches to put them obliquely, whether these mechanisms are installed on the transport wagon as in the second method or that these winches are installed on the gantries as in the third method.

L'appareil de manutention auquel se rapporte la présente invention, du genre décrit en début d'exposé et ayant fait l'objet de la demande de brevet suisse précitée, constitue une simplification et une économie par rapport aux moyens mis en oeuvre dans ces trois méthodes connues dans ce sens qu'il se suffit à lui-même pour saisir le panneau au sol, le lever en position oblique dans le gabarit de la voie et le charger directement dans cette position sur un véhicule ferroviaire approprié à son transport introduit par déplacement sur le ballast dans la direction longitudinale de la voie entre la semelle d'appui et le bras de portage, et déchargé et posé par les opérations inverses. Aisément repliable, de structure simple et légère comparativement au matériel connu, cet appareil répond bien au but recherché. Il peut être transporté et mis en place par une main d'oeuvre réduite et sans matériel spécialisé. De par sa conception il se prête en outre aisément à son propre transport avec le panneau d'appareil de voie chargé, sans qu'il soit nécessaire de le désolidariser de ce dernier, par simple rabattement de sa semelle sous le véhicule de transport.The handling device to which the present invention relates, of the kind described at the beginning of the description and which was the subject of the aforementioned Swiss patent application, constitutes a simplification and an economy compared to the means used in these three metho known in the sense that it is sufficient by itself to grasp the panel on the ground, lift it in an oblique position in the gauge of the track and load it directly into this position on a railway vehicle suitable for its transport introduced by displacement on the ballast in the longitudinal direction of the track between the support sole and the carrying arm, and unloaded and installed by the reverse operations. Easily foldable, of simple and light structure compared to known material, this device responds well to the desired goal. It can be transported and set up by a reduced workforce and without specialized equipment. By design, it also easily lends itself to its own transport with the loaded track switch panel, without it being necessary to detach it from the latter, by simply folding its sole under the transport vehicle.

Cependant, la mise en place d'un appareil de manutention de ce genre sous un panneau à remplacer présente l'inconvénient de nécessiter le creusement préalable, sous ce panneau et dans le ballast, d'une saignée transversale destinée à l'introduction de la semelle d'appui. En outre au moment de sa mise en place, aussi brève soit- elle, l'appareil doit nécessairement être suffisamment écarté vers l'extérieur du panneau pour que l'extrémité de sa semelle puisse être engagée dans cette saignée, ce qui peut présenter également un inconvénient lors de la présence d'une voie de circulation parallèle située du côté du panneau par lequel doit être effectué cet engagement.However, the installation of a handling device of this kind under a panel to be replaced has the drawback of requiring the prior digging, under this panel and in the ballast, of a transverse groove intended for the introduction of the support sole. In addition, at the time of its installation, however brief it may be, the apparatus must necessarily be sufficiently spread towards the outside of the panel so that the end of its sole can be engaged in this grooving, which may also have a drawback when there is a parallel traffic lane located on the side of the panel by which this engagement must be carried out.

La présente invention a pour but la suppression de ces deux inconvénients inhérents à la mise en place de la semelle de l'appareil de manutention sous le panneau à manipuler.The present invention aims to eliminate these two disadvantages inherent in the establishment of the sole of the handling device under the panel to be handled.

A cet effet, l'appareil de manutention selon l'invention est caractérisé en ce que le support comporte deux premiers appuis latéraux indépendants d'au moins une semelle d'appui, déplaçables et réglables en hauteur par le moyen de deux vérins, disposés en deçà de la semelle d'appui dans la direction transversale de la voie, espacés de part et d'autre de la semelle d'appui dans la direction longitudinale de la voie et destinés à prendre appui sur le ballast, en ce que la semelle d'appui est articulée autour d'un pivot vertical solidaire du montant du support et commandée en rotation dans un plan horizontal par un organe moteur depuis sa position transversale jusqu'à une position parallèle à la voie et vice-versa, ladite semelle étant décalée sensiblement d'un demi travelage par rapport à l'aplomb du bras de portage dans sa position transversale à la voie, en ce que l'organe moteur du basculement du bras de portage est un vérin établi en liaison avec le chariot pour permettre le blocage de ce bras en position parallèle à la plate-forme de ballast supportant le panneau et en ce que le bras de portage comporte à son extrémité opposée au pivot horizontal un troisième appui latéral déplaçable et réglable en hauteur par le moyen d'un vérin et destiné à prendre appui sur le ballast à l'opposé des deux premiers appuis entre deux traverses du panneau.To this end, the handling device according to the invention tion is characterized in that the support comprises two first lateral supports independent of at least one support sole, displaceable and adjustable in height by means of two jacks, arranged below the support sole in the transverse direction of the track, spaced on either side of the support sole in the longitudinal direction of the track and intended to bear on the ballast, in that the support sole is articulated around a vertical pivot integral with the amount of the support and controlled in rotation in a horizontal plane by a drive member from its transverse position to a position parallel to the track and vice-versa, said sole being offset substantially by half a travelage relative to the plumb of the carrying arm in its position transverse to the track, in that the motor for tilting the carrying arm is a jack established in connection with the carriage to allow the blocking of this arm in position parallel to the platform ballast supporting the panel and in that the carrying arm comprises at its end opposite to the horizontal pivot a third movable lateral support, adjustable in height by means of a jack and intended to bear on the ballast opposite the two first supports between two crosspieces of the panel.

Grâce à cette caractéristique, la mise en place de la semelle d'appui sous le panneau d'un appareil de voie à remplacer peut se faire sans nécessiter le creusement préalable d'une saignée dans le ballast sur lequel repose ce panneau et sans nécessiter le déplacement de l'appareil de manutention vers l'extérieur du panneau pour pouvoir engager sa semelle sous lui.Thanks to this characteristic, the installation of the support sole under the panel of a track device to be replaced can be done without requiring the prior digging of a groove in the ballast on which this panel rests and without requiring the displacement of the handling device towards the outside of the panel in order to be able to engage its sole under it.

Le dessin et la description qui suivent mettront clairement en évidence ces effets.The following drawing and description will clearly demonstrate these effects.

Le dessin représente, à titre d'exemples, deux formes d'exécution de l'objet de l'invention et illustre le processus de sa mise en place.

  • La figure 1 est une vue de face de la première forme d'exécution.
  • La figure 2 en est une vue de profil selon la flèche f de la figure 1.
  • Les figures 3 à 8 sont des représentations schématiques des diverses phases du processus de sa mise en place et de la mise en oblique d'un panneau d'appareil de voie à remplacer.
  • La figure 9 est une vue de profil de la seconde forme d'exécution.
  • La figure 10 est une coupe partielle selon I-I de la Fig. 2.
The drawing shows, by way of example, two embodiments of the subject of the invention and illustrates the process of its implementation.
  • Figure 1 is a front view of the first embodiment.
  • FIG. 2 is a side view thereof according to the arrow f in FIG. 1.
  • Figures 3 to 8 are schematic representations of the various phases of the process of its installation and the oblique placement of a switchboard panel to be replaced.
  • Figure 9 is a side view of the second embodiment.
  • FIG. 10 is a partial section on II of FIG. 2.

Dans sa première forme d'exécution représentée figures 1, 2 et 10, selon une configuration choisie au-dessus d'un panneau d'aiguillage A à remplacer et qui sera décrite plus loin, l'appareil de manutention comprend un support 1 composé de deux semelles d'appui 3, d'un montant 4 constitué par deux colonnes verticales parallèles 5 reliées à leurs parties basses par une traverse 6 et d'un chariot 7 constitué par un cadre rigide monté coulissant le long des deux colonnes 5, un pivot horizontal 8 parallèle à la voie porté par le chariot 7 et un bras de portage 9 étendu dans la direction transversale de la voie et articulé par une extrémité au pivot 8.In its first embodiment shown in Figures 1, 2 and 10, according to a configuration chosen above a switch panel A to be replaced and which will be described later, the handling device comprises a support 1 composed of two support flanges 3, of an upright 4 constituted by two parallel vertical columns 5 connected to their lower parts by a cross-member 6 and a carriage 7 constituted by a rigid frame mounted sliding along the two columns 5, a pivot horizontal 8 parallel to the track carried by the carriage 7 and a carrying arm 9 extended in the transverse direction of the track and articulated by one end to the pivot 8.

Les deux semelles d'appui 3, montrées ici en position parallèle en travers de la voie, sont espacées l'une de l'autre dans cette position d'une valeur sensiblement égale à un travelage moyen et sont frettées chacune d'elles à l'extrémité inférieure de l'une des deux colonnes verticales 5 du montant. Leur longueur est prévue suffisante pour s'étendre au-delà d'un axe longitudinal passant par le centre de gravité du panneau A et leur largeur est prévue inférieure à la largeur d'une traverse dudit panneau.The two support flanges 3, shown here in parallel position across the track, are spaced from each other in this position by a value substantially equal to an average travelage and are hooped each of them at l of one of the two columns vertical 5 of the upright. Their length is provided sufficient to extend beyond a longitudinal axis passing through the center of gravity of the panel A and their width is provided less than the width of a crosspiece of said panel.

Les deux colonnes verticales 5 du montant sont cylindriques et montées à rotation dans deux paliers verticaux 10 portés par la traverse basse 6 qui, elle, est située au-dessus des deux semelles d'appui 3, ces deux paliers 10 étant à l'écartement précité de ces dernières et ces deux colonnes 5 étant immobilisées axialement dans ces paliers d'une part et en-dessous par les deux semelles d'appui et d'autre part et au-dessus par deux colliers 11.The two vertical columns 5 of the upright are cylindrical and mounted for rotation in two vertical bearings 10 carried by the lower cross member 6 which, for its part, is located above the two support flanges 3, these two bearings 10 being at a spacing mentioned above of these latter and these two columns 5 being immobilized axially in these bearings on the one hand and below by the two support flanges and on the other hand and above by two collars 11.

Le cadre du chariot 7 comprend deux coulisseaux verticaux 12 reliés rigidement par une traverse basse 13 et une traverse haute 14.The frame of the carriage 7 comprises two vertical slides 12 rigidly connected by a low cross member 13 and a high cross member 14.

Le pivot 8 est porté par une console 15 fixée à la traverse basse 13 du cadre du chariot 7 et située à mi-distance des deux coulisseaux 12 de manière à ce que chaque semelle d'appui 3 se trouve décalée d'un demi- travelage par rapport à l'aplomb du bras de portage 9 articulé audit pivot.The pivot 8 is carried by a console 15 fixed to the lower cross member 13 of the frame of the carriage 7 and located midway between the two slides 12 so that each support sole 3 is offset by half a travelage relative to the vertical alignment of the carrying arm 9 articulated to said pivot.

Le bras de portage 9 comporte ici une rallonge télescopique 16 et deux organes d'accrochage de rails montés l'un sur le bras de portage 9 et l'autre sur sa rallonge 16. Ces organes d'accrochage sont ici constitués chacun par l'association d'un galet rotatif 17 prenant sous la semelle du rail et d'une broche amovible 18 de retenue du champignon du rail, ces organes étant fixés sur deux coulisseaux 19 montés mobiles par translation le long de deux glissières 20 fixées l'une au bras de portage 9 et l'autre à sa rallonge 16. Les coulisseaux 19 peuvent être bloqués en position choisie sur les glissières 20 par le moyen de vis de blocage à tête de manoeu-21 et la distance entre les deux organes d'accrochage peut encore être réglée dans de plus grandes proportions par le moyen d'un vérin hydraulique 22 de commande d'extension ou de rétraction de la rallonge 16.The carrying arm 9 here comprises a telescopic extension 16 and two rail hooking members mounted one on the carrying arm 9 and the other on its extension 16. These hooking members are here each constituted by the association of a rotary roller 17 taking under the sole of the rail and a removable pin 18 for retaining the rail head, these members being fixed on two sliders 19 mounted movable by translation along two slides 20 fixed one to the carrying arm 9 and the other to its extension 16. The sliders 19 can be locked in the chosen position on the slides 20 by means of locking screw with maneuvering head-21 and the distance between the two fastening members can be further adjusted in greater proportions by means of a hydraulic cylinder 22 for controlling the extension or retracting the extension 16.

Le basculement du bras de portage 9 autour du pivot 8 est commandé et réglé par un vérin hydraulique 23 prenant appui sur une double console 24 fixée à la traverse haute 14 du cadre du chariot 7, ce vérin permettant à fin de course d'extension le blocage de ce bras en position parallèle à la plate-forme de ballast supportant le panneau, c'est-à-dire ici à angle droit par rapport au cadre du chariot 7.The tilting of the carrying arm 9 around the pivot 8 is controlled and adjusted by a hydraulic cylinder 23 bearing on a double console 24 fixed to the upper cross member 14 of the frame of the carriage 7, this cylinder allowing the extension stroke to be blocking of this arm in position parallel to the ballast platform supporting the panel, that is to say here at right angles to the frame of the carriage 7.

Le déplacement en hauteur du chariot 7 le long des deux colonnes verticales 5 du montant est commandé et réglé par un vérin hydraulique 26 relié d'une part à la double console 24 déjà citée et d'autre part à la traverse basse 6 de liaison des deux colonnes 5 du montant.The displacement in height of the carriage 7 along the two vertical columns 5 of the upright is controlled and adjusted by a hydraulic cylinder 26 connected on the one hand to the double console 24 already mentioned and on the other hand to the low cross member 6 for connecting the two columns 5 of the amount.

La traverse basse 6 du montant comporte deux extensions latérales 27 supportant deux premiers appuis latéraux 28 indépendants des semelles d'appui 3, déplaçables et réglables en hauteur par le moyen de deux vérins hydrauliques 29, espacés de part et d'autre des deux semelles d'appui 3 dans la direction longitudinale de la voie et en deçà desdites semelles d'appui dans la direction transversale de la voie.The lower cross member 6 of the upright has two lateral extensions 27 supporting two first lateral supports 28 independent of the support flanges 3, displaceable and adjustable in height by means of two hydraulic jacks 29, spaced on either side of the two flanges d 'support 3 in the longitudinal direction of the track and below said support flanges in the transverse direction of the track.

De son côté le bras de portage 9 comporte à son extrémité opposée au pivot 8 un troisième appui latéral 30 déplaçable et réglable en hauteur par le moyen d'un vérin hydraulique 31 lié à la rallonge télescopique 16 de ce bras.For its part, the carrying arm 9 has at its end opposite the pivot 8 a third lateral support 30 movable and adjustable in height by means of a hydraulic cylinder 31 connected to the telescopic extension 16 of this arm.

Enfin, la rotation de chaque semelle 3 dans un plan horizontal est commandée par un vérin 32 prenant appui sur une extension 27 de la traverse basse 6 du montant depuis sa position transversale à la voie telle que représentée sur ces trois figures jusqu'à une position parallèle à la voie, ou vice-versa selon la séquence du processus de mise en place de l'appareil de manutention sur le chantier ou de son retrait de ce dernier; dans leur position parallèle à la voie ces deux semelles d'appui sont situées dans le prolongement l'une de l'autre dans une zone comprise entre l'extrémité des traverses du panneau et les deux premiers appuis latéraux 28.Finally, the rotation of each sole 3 in a horizontal plane is controlled by a jack 32 bearing on an extension 27 of the lower cross member 6 of the upright from its position transverse to the track as shown in these three figures to a position parallel to the track, or vice versa according to the sequence of the process of putting the handling device on site or removing it from the site; in their position parallel to the track, these two support flanges are located in the extension of one another in a zone between the end of the crosspieces of the panel and the first two lateral supports 28.

La mise en place de cet appareil de manutention sur un panneau d'appareil de voie à remplacer tel que le panneau d'aiguillage A est illustrée en détail par les figures 3 à 8.The positioning of this handling device on a track device panel to be replaced such as the switch panel A is illustrated in detail in FIGS. 3 to 8.

Il est tout d'abord posé, pour fixer les idées et à titre d'exemple, que cet appareil de manutention est amené sur les lieux de travail par un wagon approprié à son transport, par exemple du type connu comportant une poutre longitudinale de portage présentant un plan incliné de chargement à l'angle correspondant à la position oblique d'inscription du panneau dans le gabarit de circulation de la voie ainsi que des moyens de déplacement mixtes pour rouler sur la voie et au moins par l'une de ses deux extrémités sur une plate-forme de ballast.It is first of all posed, to fix the ideas and by way of example, that this handling device is brought to the workplaces by a wagon suitable for its transport, for example of the known type comprising a longitudinal carrying beam having an inclined loading plane at the angle corresponding to the oblique position of inscription of the panel in the gauge of circulation of the track as well as mixed displacement means for rolling on the track and at least by one of its two ends on a ballast platform.

L'appareil de manutention est alors directement posé, selon la figure 3, en position transversale sur les rails du panneau A, ses deux semelles d'appui 3 à l'aplomb de deux traverses voisines de ce panneau et de telle sorte que le montant 1 soit à l'aplomb d'une zone extérieure à ces deux traverses. Les deux premiers appuis latéraux 28 du support sont abaissés et mis en appui sur le ballast en deçà de cette zone à côté du panneau.The handling device is then placed directly, according to FIG. 3, in a transverse position on the rails of panel A, its two support flanges 3 plumb with two crosspieces adjacent to this panel and so that the upright 1 either directly above an area outside these two crosspieces. The first two lateral supports 28 of the support are lowered and supported on the ballast below this zone next to the sign.

Après dégagement du wagon de transport de dessous le bras de portage 9 relevé, celui-ci est abaissé et bloqué en position parallèle au panneau A à l'aide du vérin 23 et le troisième appui latéral 30 situé à son extrémité est mis à son tour en appui sur le ballast, entre les deux traverses mentionnées. A ce moment et selon la figure 4, les deux vérins 29 et le vérin 31 de réglage en hauteur des trois appuis latéraux 28 et 30 sont mis en action pour soulever légèrement le support 1 de manière à dégager les deux semelles 3 de leur appui sur les rails du panneau A et celles-ci sont alors retirées de dessous ce panneau par rotation dans un plan horizontal jusqu'en position parallèle à la voie au-dessus de la zone déjà mentionnée extérieure au panneau, l'une dans un sens et l'autre dans l'autre, en les ouvrant comme les deux branches d'une paire de ciseaux, à l'aide des deux vérins 32, non représentés ici pour plus de clarté.After release of the transport wagon from below the raised carrying arm 9, this is lowered and locked in position parallel to the panel A using the jack 23 and the third lateral support 30 located at its end is put in turn resting on the ballast, between the two mentioned crosspieces. At this time and according to FIG. 4, the two jacks 29 and the jack 31 for adjusting the height of the three lateral supports 28 and 30 are actuated to slightly lift the support 1 so as to release the two flanges 3 from their support on the rails of panel A and these are then removed from below this panel by rotation in a horizontal plane to a position parallel to the track above the area already mentioned outside the panel, one in one direction and the 'Another in the other, by opening them like the two branches of a pair of scissors, using the two jacks 32, not shown here for clarity.

Puis selon la figure 5 le support 1 est abaissé au moyen des vérins de réglage des trois appuis latéraux 28 et 30 et le panneau A est accroché au bras de portage 9 par les organes d'accrochage de rails 17 de ce dernier. Avant l'accrochage du panneau A, un support auxiliaire 38 comportant un morceau de rail peut être placé en pont sous deux rails obliques pour assurer le parallélisme des prises afin de faciliter l'accrochage.Then according to Figure 5 the support 1 is lowered by means of the adjustment cylinders of the three lateral supports 28 and 30 and the panel A is attached to the carrying arm 9 by the rail hooking members 17 of the latter. Before the attachment of the panel A, an auxiliary support 38 comprising a piece of rail can be placed in bridge under two oblique rails to ensure the parallelism of the sockets in order to facilitate the attachment.

Selon la figure 6, qui correspond à la configuration représentée en détail figure 1, le chariot 7 et le bras de portage 9 sont alors soulevés en parallèle par le vérin 26 et le vérin 31 du troisième appui latéral 30 jusqu'à ce que le panneau A accroché au bras de portage soit relevé d'une hauteur suffisante pour permettre l'engagement des deux semelles d'appui 3 entre lui et la plate-forme de ballast ainsi dégagée, par rotation de ces deux semelles jusqu'à leur arrivée à l'aplomb du lit dégagé des deux traverses déjà mentionnées. A ce moment ou préalablement.et seulement à l'extérieur des traverses du panneau, une zone de ballast 33 est excavée sous le talon des semelles 3 et sous leurs vérins de commande 32 non représentés mais bien visibles figure 1, jusqu'au niveau du fond du lit dégagé des deux traverses en question.According to Figure 6, which corresponds to the configuration shown in detail in Figure 1, the carriage 7 and the carrying arm 9 are then lifted in parallel by the cylinder 26 and the cylinder 31 of the third lateral support 30 until the panel Attached to the carrying arm is raised to a height sufficient to allow the engagement of the two support flanges 3 between it and the ballast platform thus released, by rotation of these two soles until they arrive directly above the cleared bed of the two crosspieces already mentioned. At this time or previously. And only outside the crosspieces of the panel, a ballast zone 33 is excavated under the heel of the flanges 3 and under their control jacks 32 not shown but clearly visible in FIG. 1, up to the level of the bottom of the bed cleared from the two crosspieces in question.

Ensuite et selon la figure 7, le support 1 est abaissé par relâchement simultané des vérins des trois appuis latéraux 28 et 30 jusqu'à ce que les deux semelles 3 prennent appui dans le fond du lit des deux traverses, puis le troisième appui 30 est relevé, l'appareil de manutention étant ainsi maintenu en équilibre sur les deux semelles 3 et sur les deux premiers appuis 28.Then and according to FIG. 7, the support 1 is lowered by simultaneous release of the jacks of the three lateral supports 28 and 30 until the two flanges 3 bear on the bottom of the bed of the two crosspieces, then the third support 30 is raised, the handling device thus being kept in balance on the two flanges 3 and on the first two supports 28.

Enfin et selon la figure 8, le panneau A saisi de la manière qui vient d'être décrite est relevé et mis dans sa position oblique d'inscription dans le gabarit de circulation et à la hauteur voulue par le moyen du vérin 26 de réglage du déplacement vertical du chariot 7 et par le vérin 23 de commande du basculement du bras de portage 9, en vue de son chargement direct sur le plan incliné du wagon de transport amené sous lui par roulage sur la plate-forme de ballast dégagée.Finally and according to FIG. 8, the panel A grasped in the manner which has just been described is raised and placed in its oblique position of inscription in the circulation template and at the desired height by means of the jack 26 for adjusting the vertical movement of the carriage 7 and by the jack 23 for controlling the tilting of the carrying arm 9, with a view to its direct loading onto the inclined plane of the transport wagon brought under it by rolling on the released ballast platform.

Bien entendu, selon l'importance de la longueur du panneau A à manipuler, deux ou plusieurs appareils de manutention seront mis en place le long dudit panneau et actionnés simultanément dans les diverses phases de travail qui viennent d'être décrites.Of course, depending on the importance of the length of the panel A to be handled, two or more handling devices will be placed along said panel and actuated simultaneously in the various working phases which have just been described.

Dans une variante allégée représentée figure 9 et qui a été conçue aussi bien pour la manipulation de charges unitaires plus faibles que pour celle de panneaux courts ou légers de voies secondaires à travelage pouvant présenter d'importantes irrégularités, le support de l'appareil de manutention ne comporte qu'une seule semelle d'appui 3 et un montant constitué d'une seule colonne verticale 5. Tous les autres éléments semblables également à ceux déjà décrits portent sur cette figure 9 les mêmes numéros de repère.In a lighter variant shown in FIG. 9 and which has been designed both for handling lower unit loads than for that of short or light panels of secondary travelage tracks which can present significant irregularities, the support of the handling device has only one support sole 3 and an amount consisting of a single vertical column 5. All the other elements similar also to those already described relate to this Figure 9 the same reference numbers.

La colonne verticale 5 est ici fixée rigidement à la traverse basse 6 et la semelle 3 est articulée autour d'un pivot vertical 50 solidaire de cette colonne 5 et portant une flasque 34 de retenue axiale de la semelle. La rotation de cette semelle 3 autour du pivot 50 est ici également assurée par un vérin 32 prenant appui sur une extension 27 de la traverse basse 6.The vertical column 5 is here rigidly fixed to the lower cross member 6 and the sole 3 is articulated around a vertical pivot 50 integral with this column 5 and carrying a flange 34 for axial retention of the sole. The rotation of this sole 3 around the pivot 50 is here also ensured by a jack 32 bearing on an extension 27 of the lower cross member 6.

Le chariot 7 ne comporte qu'un coulisseau 12 et celui-ci est immobilisé en rotation autour de la colonne verticale 5 par une liaison du type à clavetage libre engageant une rainure 35.The carriage 7 has only one slide 12 and the latter is immobilized in rotation around the vertical column 5 by a link of the free keying type engaging a groove 35.

Deux bras déportés 36 et 37 sont fixés respectivement en haut et en bas du coulisseau 12 dans les mêmes positions que les deux traverses 13 et 14 du chariot de la première forme d'exécution et sont réunis à leurs extrémités par une entretoise 38.Two offset arms 36 and 37 are fixed respectively at the top and bottom of the slide 12 in the same positions as the two cross-members 13 and 14 of the carriage of the first embodiment and are joined at their ends by a spacer 38.

Le bras inférieur 37 porte la console 15 à laquelle est articulé le bras de portage 9, identique également à celui de la première forme d'exécution et le bras supérieur 36 porte la double console 24 sur laquelle sont mis en appui les deux vérins 23 et 26 de réglage du déplacement en hauteur du chariot 7 et de commande du basculement du bras de portage 9.The lower arm 37 carries the console 15 to which the carrying arm 9 is articulated, also identical to that of the first embodiment and the upper arm 36 carries the double console 24 on which are supported the two jacks 23 and 26 for adjusting the height movement of the carriage 7 and for controlling the tilting of the carrying arm 9.

La traverse basse 6 comporte également deux premiers appuis latéraux 28 déplaçables en hauteur par deux vérins 29 et le bras de portage 9 comporte également le troisième appui 30, non visible sur cette figure.The lower crossmember 6 also comprises two first lateral supports 28 movable in height by two jacks 29 and the carrying arm 9 also includes the third support 30, not visible in this figure.

Dans sa position transversale à la voie, la semelle 3 de cette variante est décalée sensiblement d'un demi travelage moyen par rapport à l'aplomb du bras de portage afin que le troisième appui porté par le bras de portage 9 soit situé ici également au-dessus d'une case séparant deux traverses voisines.In its transverse position to the track, the sole 3 of this variant is offset substantially by an average half travelage relative to the vertical alignment of the carrying arm so that the third support carried by the carrying arm 9 is located here also at - above a box separating two neighboring sleepers.

D'autres variantes, non représentées, peuvent être apportées.Other variants, not shown, can be made.

Ainsi les organes d'accrochage de rails montés sur le bras de portage 9 peuvent être remplacés par d'autres de types connus aptes à la saisie du champignon du rail plutôt que son patin, par exemple des pinces à galets opposés.Thus the rail hooking members mounted on the carrying arm 9 can be replaced by others of known types suitable for gripping the rail head rather than its shoe, for example clamps with opposite rollers.

La rallonge 16 du bras de portage 9 est pratique car elle permet une grande amplitude des déplacements relatifs entre organes d'accrochage, mais cette rallonge n'est pas indispensable, non plus que l'utilisation du support auxiliaire 38 placé en pont sous deux rails de la voie pour faciliter la prise.The extension 16 of the carrying arm 9 is practical because it allows a large amplitude of the relative movements between fastening members, but this extension is not essential, nor is the use of the auxiliary support 38 placed in bridge under two rails of the track to facilitate grip.

Les deux premiers appuis latéraux 28 peuvent être fixés avec leurs vérins 29 non plus à la traverse basse 6 du montant mais au chariot 7, par le moyen de deux consoles déportées fixées aux deux coulisseaux 12 de ce chariot. Dans ce cas, il sera bien sûr tenu compte des différences de courses à donner aux vérins pour assurer les mêmes capacités de déplacement relatifs entre les divers organes mobiles de l'appareil de manutention. Cependant les deux formes d'exécution données en exemple présentent sur cette variante l'avantage d'une réduction des courses utiles des vérins mentionnés.The first two lateral supports 28 can be fixed with their jacks 29 no longer to the lower cross member 6 of the upright but to the carriage 7, by means of two offset consoles fixed to the two slides 12 of this carriage. In this case, it will of course be taken into account the differences in strokes to be given to the jacks to ensure the same relative displacement capacities between the various mobile members of the handling device. However, the two embodiments given as an example have the advantage over this variant of reducing the useful strokes of the cylinders mentioned.

Claims (3)

1. Appareil de manutention d'un panneau d'appareil de voie ferrée par saisie et basculement de celui-ci depuis sa position au sol jusqu'en position oblique dans le gabarit transversal de la voie et vice-versa en vue de sa pose, de sa dépose et de son transport sur un véhicule ferroviaire approprié, et comprenant un support comportant une semelle d'appui destinée à être posée sur le ballast en position étendue dans la direction transversale de la voie au-dessous du niveau du patin des rails du panneau, un montant relié à la semelle et destiné à être érigé d'un côté du panneau, et un chariot monté coulissant et réglable en hauteur le long du montant à l'aide d'un organe moteur, un pivot horizontal parallèle à la voie porté par le chariot, un bras de portage étendu dans la direction transversale de la voie et articulé par une extrémité au pivot, au moins deux organes d'accrochage de rails montés sur le bras de portage pour la saisie du panneau, et un organe moteur pour basculer le bras de portage par pivotement autour du pivot, caractérisé en ce que le support (1) comporte deux premiers appuis latéraux (28) indépendants d'au moins une semelle d'appui (3), déplaçables et réglables en hauteur par le moyen de deux vérins (29), disposés en deçà de la semelle d'appui (3) dans la direction transversale de la voie, espacés de part et d'autre de la semelle d'appui (3) dans la direction longitudinale de la voie, et destinés à prendre appui sur le ballast, en ce que la semelle d'appui (3) est articulée autour d'un pivot vertical (5, 50) solidaire du montant (4) du support (1) et commandée en rotation dans un plan horizontal par un organe moteur (32) depuis sa position transversale jusqu'à une position parallèle à la voie et vice-versa, ladite semelle (3) étant décalée sensiblement d'un demi travelage par rapport à l'aplomb du bras de portage (9) dans sa position transversale à la voie, en ce que l'organe moteur du basculement du bras de portage est un vérin (23) établi en liaison avec le chariot (7) pour permettre le blocage de ce bras (9) en position parallèle à la plate-forme de ballast supportant le panneau, et en ce que le bras de portage (9) comporte à son extrémité opposée au pivot horizontal (8) un troisième appui latéral (30) déplaçable et réglable en hauteur par le moyen d'un vérin (31) et destiné à prendre appui sur le ballast à l'opposé des deux premiers appuis, entre deux traverses du panneau.1. Apparatus for handling a railroad track panel by gripping and tilting it from its position on the ground to an oblique position in the transverse gauge of the track and vice versa for its installation, of its removal and transport on an appropriate railway vehicle, and comprising a support comprising a support sole intended to be placed on the ballast in the extended position in the transverse direction of the track below the level of the pad of the rails of the panel, an upright connected to the sole and intended to be erected on one side of the panel, and a carriage mounted sliding and adjustable in height along the upright using a driving member, a horizontal pivot parallel to the track carried by the carriage, a carrying arm extended in the transverse direction of the track and articulated by one end to the pivot, at least two rail fastening members mounted on the carrying arm for gripping the panel, and a motor member to tilt the arm of portage by pivoting around the pivot, characterized in that the support (1) comprises two first lateral supports (28) independent of at least one support sole (3), displaceable and adjustable in height by means of two jacks ( 29), arranged below the support sole (3) in the transverse direction of the track, spaced on either side of the support sole (3) in the longitudinal direction of the track, and intended for bear on the ballast, in that the support sole (3) is articulated around a vertical pivot (5, 50) integral with the upright (4) of the support (1) and controlled in rotation in a horizontal plane by a drive member (32) from its transverse position to a position parallel to the track and vice versa, said sole (3) being offset substantially by half a travelage relative to the vertical alignment of the carrying arm (9) in its position transverse to the track, in that the driving member of the tilting of the carrying arm is a jack (23) established in connection with the carriage (7) to allow the blocking of this arm (9) in position parallel to the ballast platform supporting the panel, and in that the arm carrying (9) comprises at its end opposite the horizontal pivot (8) a third lateral support (30) movable and adjustable in height by means of a jack (31) and intended to bear on the ballast opposite of the first two supports, between two crosspieces of the panel. 2. Appareil selon la revendication 1, caractérisé en ce qu'il comporte deux semelles d'appui (3) frettées à l'extrémité inférieure de deux colonnes verticales cylindriques parallèles (5, fig. 1 et 2) constituant le montant (4) et montées à rotation dans deux paliers (10) portés par une traverse basse (6), en ce que le chariot (7) est un cadre composé de deux coulisseaux (12) verticaux reliés rigidement par deux traverses d'extrémités (13, 14) et montés déplaçables par translation le long des deux colonnes (5), et en ce que l'organe moteur de réglage du déplacement en hauteur du chariot (7) est constitué par un vérin (26) mis en appui sur la traverse basse (6).2. Apparatus according to claim 1, characterized in that it comprises two support flanges (3) hooped at the lower end of two parallel cylindrical vertical columns (5, fig. 1 and 2) constituting the upright (4) and rotatably mounted in two bearings (10) carried by a low cross member (6), in that the carriage (7) is a frame composed of two vertical slides (12) rigidly connected by two end cross members (13, 14 ) and mounted movable by translation along the two columns (5), and in that the motor member for adjusting the height displacement of the carriage (7) is constituted by a jack (26) supported on the lower cross member ( 6). 3. Appareil selon la revendication 2, caractérisé en ce que les deux premiers appuis latéraux (28) et leurs vérins de réglage (29) sont fixés sur deux extensions latérales déportées (27) de la traverse basse (6).3. Apparatus according to claim 2, characterized in that the first two lateral supports (28) and their adjustment cylinders (29) are fixed on two offset lateral extensions (27) of the bottom crossmember (6).
EP19850105094 1984-11-14 1985-04-26 Track-handling apparatus for a railroad track section Expired EP0182958B1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CH5442/84 1984-11-14
CH544284A CH661303A5 (en) 1984-11-14 1984-11-14 APPARATUS FOR HANDLING A RAILWAY APPARATUS PANEL.

Publications (2)

Publication Number Publication Date
EP0182958A1 true EP0182958A1 (en) 1986-06-04
EP0182958B1 EP0182958B1 (en) 1987-09-23

Family

ID=4293651

Family Applications (1)

Application Number Title Priority Date Filing Date
EP19850105094 Expired EP0182958B1 (en) 1984-11-14 1985-04-26 Track-handling apparatus for a railroad track section

Country Status (3)

Country Link
EP (1) EP0182958B1 (en)
CH (1) CH661303A5 (en)
DE (2) DE182958T1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11091883B2 (en) * 2016-04-12 2021-08-17 Matisa Materiel Industriel S.A. System for securing railway apparatus equipped with a securing mechanism, and associated transport method and vehicle

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
ITMN20000013A1 (en) * 2000-03-10 2001-09-10 Amfag Spa REMOVABLE SHOWER FOR KITCHEN

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3698324A (en) * 1970-12-03 1972-10-17 Mannix Construction Inc Machine for inserting ties beneath a railroad track
FR2314299A1 (en) * 1975-06-13 1977-01-07 Profimex Railway track transportation and laying wagon - has box girder frame with inclining platform controlled by hydraulic rams
FR2325765A1 (en) * 1975-09-26 1977-04-22 Drouard Freres Ets Railway track renewal wagon - has twin bogies with central girder supporting two swinging arms and hydraulic jacks to raise wagon above track

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3698324A (en) * 1970-12-03 1972-10-17 Mannix Construction Inc Machine for inserting ties beneath a railroad track
FR2314299A1 (en) * 1975-06-13 1977-01-07 Profimex Railway track transportation and laying wagon - has box girder frame with inclining platform controlled by hydraulic rams
FR2325765A1 (en) * 1975-09-26 1977-04-22 Drouard Freres Ets Railway track renewal wagon - has twin bogies with central girder supporting two swinging arms and hydraulic jacks to raise wagon above track

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11091883B2 (en) * 2016-04-12 2021-08-17 Matisa Materiel Industriel S.A. System for securing railway apparatus equipped with a securing mechanism, and associated transport method and vehicle

Also Published As

Publication number Publication date
EP0182958B1 (en) 1987-09-23
DE182958T1 (en) 1986-11-06
DE3560685D1 (en) 1987-10-29
CH661303A5 (en) 1987-07-15

Similar Documents

Publication Publication Date Title
EP0355240B1 (en) Train for renewing a railway track
EP3456601B1 (en) System for handling of longitudinal construction element, handling vehicle equipped with such a system
CA2043243C (en) Retractable apron for covering the pit of a variable spacing lifting jack
EP0146164B1 (en) Method for the renewal of railroad switches, and railroad machine for carrying it out
FR2611370A1 (en) ROULON RAILWAY TREATMENT MACHINE, ESPECIALLY FILLING MACHINE, LIFTING AND RAILWAY DRESSING MACHINE FOR THE NEEDLE AND CROSS AREA
FR2562572A1 (en) ROLL-UP SYSTEM AND METHOD FOR RECEIVING AND / OR INSTALLING RAILWAY WORKS
EP0182958B1 (en) Track-handling apparatus for a railroad track section
EP0505240B1 (en) Device for placing and replacing rail components and procedure for using this device
EP0108168A1 (en) Track installation replacement method and train for carrying out the method
EP0160898B1 (en) Handling apparatus for assembled railway switches or crossings
FR2470705A1 (en) DEVICE FOR REMOVING A LOAD ON THE GROUND FROM A TRUCK, AND REVERSE, AND METHOD OF USE THEREOF
EP0773153B1 (en) Mobile platform for surmounting height deviations
FR2535359A1 (en) Method for the replacement of railway lines and handling frame for implementing the same
FR2572432A1 (en) RAILWAY TROLLEY FOR REPLACEMENT OR INSTALLATION AND REMOVAL AS WELL AS FOR THE TRANSPORTATION OF RAILWAYS.
CH658085A5 (en) Device for laying and removing a railway track gear panel
FR2546925A1 (en) Multi-chassis rail track laying and dismantling machine
FR2522597A1 (en) LOAD HANDLING APPARATUS
FR2546924A1 (en) Multi chassis rail track laying and lifting machine
FR2536770A1 (en) Twin chassis railway track section replacement machine
CH657398A5 (en) Apparatus for handling a railway track gear panel
EP0064426B1 (en) Semi-automatic box-car loading device
FR2490166A1 (en) Vehicle for lateral unloading of containers - has four bogey pick=up frame, reducing load over-turning moment
CH657650A5 (en) Apparatus for handling a railway gear panel
FR2538425A1 (en) Railway ballast mobile clearing and levelling machine
FR2546923A1 (en) Rail tack sections laying and lifting machine

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): DE FR IT

ITCL It: translation for ep claims filed

Representative=s name: STUDIO UPIT DR. APRA'

17P Request for examination filed

Effective date: 19860609

DET De: translation of patent claims
17Q First examination report despatched

Effective date: 19870219

ITF It: translation for a ep patent filed

Owner name: STUDIO APRA' BREVETTI

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): DE FR IT

REF Corresponds to:

Ref document number: 3560685

Country of ref document: DE

Date of ref document: 19871029

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed
ITTA It: last paid annual fee
PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: FR

Payment date: 19930419

Year of fee payment: 9

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 19930422

Year of fee payment: 9

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DE

Effective date: 19940428

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FR

Effective date: 19941229

REG Reference to a national code

Ref country code: FR

Ref legal event code: ST