EP0135516A1 - Verfahren und vorrichtung zur steuerung einer einschlagvorrichtung. - Google Patents
Verfahren und vorrichtung zur steuerung einer einschlagvorrichtung.Info
- Publication number
- EP0135516A1 EP0135516A1 EP84900604A EP84900604A EP0135516A1 EP 0135516 A1 EP0135516 A1 EP 0135516A1 EP 84900604 A EP84900604 A EP 84900604A EP 84900604 A EP84900604 A EP 84900604A EP 0135516 A1 EP0135516 A1 EP 0135516A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- chisel
- molten electrolyte
- impedance
- measuring circuit
- electrolyte
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- C—CHEMISTRY; METALLURGY
- C25—ELECTROLYTIC OR ELECTROPHORETIC PROCESSES; APPARATUS THEREFOR
- C25C—PROCESSES FOR THE ELECTROLYTIC PRODUCTION, RECOVERY OR REFINING OF METALS; APPARATUS THEREFOR
- C25C3/00—Electrolytic production, recovery or refining of metals by electrolysis of melts
- C25C3/06—Electrolytic production, recovery or refining of metals by electrolysis of melts of aluminium
- C25C3/14—Devices for feeding or crust breaking
Definitions
- the present invention relates to a method for controlling an impact device with an up / down movable chisel for the crust forming on the molten electrolyte of a melt flow electrolysis cell, by detection of the chisel / molten electrolyte contact, using the chisel as a sensor in an electrical measuring circuit, changes in signal caused by changes in the impedance between the chisel and the molten electrolyte for control purposes are recorded, and a device for controlling an impact device with a chisel movable up and down for the crust which forms on the molten electrolyte of a melt flow electrolysis cell by detection of the chisel / molten electrolyte contact with an electrical measuring circuit, comprising the chisel as a sensor on which the chisel / molten electrolyte path appears as a contact-significant impedance element.
- the aluminum oxide or the alumina in the electrolyte is consumed.
- alumina concentration must be increased by adding new aluminum oxide.
- maximum restraint of the process gases is guaranteed if the operation is carried out automatically at short intervals.
- the non-continuous supply of alumina can also be used along the entire longitudinal or transverse cell axis.
- the known storage bunkers or alumina silos arranged on the electrolysis cells are generally in the form of funnels or containers with a funnel-shaped or conically tapering lower part.
- the content of the silos arranged on the cell usually covers one to two times the daily requirement, which is why they are also called daily silos.
- the day silos are mostly fed in a closed pipe system, preferably by means of dense flow from the central alumina supply.
- the supply of alumina from the day silo to a breakthrough in the crust covering the molten electrolyte takes place in known devices. usually by opening at least one flap that is swiveled for batching, or according to other systems with dosing screws, dosing cylinders or dosing volume.
- day silos on the electrolytic cells are dispensed with, the metering devices are located outside the area of the electrolytic cell.
- alumina charging and hammering device for breaking the crust are always combined locally and functionally.
- An electronic process control initially triggers the lowering and lifting of the ice cream of the impacting device, followed immediately by the clay charging.
- the chisel is used as a sensor in an electrical measuring circuit that leads from the chisel to the cathode of the cell via a recording device. If the chisel is immersed in the molten electrolyte, the DC voltage generated by the direct electrolysis between the molten electrolyte and the cell cathode appears on the registering device as an indication that the chisel has contacted the molten electrolyte and as a control criterion.
- the anode / cathode voltage is subject to fluctuations. It is known that such melt flow electrolysis cells are powered by the electrolysis current, ie from a current source / and a plurality of such cells are connected in series in the electrolysis current path. For this reason, the anode / cathode voltages on the individual cells are set in accordance with the instantaneous current resistance between anodes and cathodes and are not kept constant by a rigid supply voltage. As already mentioned above, the anode / cathode voltage can therefore fluctuate in large areas, particularly when anode effects occur. Such fluctuations, in general Unpredictable disturbance variables influencing the anode / cathode voltage of the cell are included in the measurement when using the known method, because with this method a voltage measurement of cell operating variables takes place.
- the object of the present invention is to design the method or the device of the type mentioned at the beginning in such a way that the disadvantages mentioned above are eliminated.
- the impedance between the chisel and the molten electrolyte is detected by means of an active impedance measuring circuit.
- the measuring circuit is provided with an active signal source, a current or voltage source, and the impedance between chisel and molten electrolyte is registered by registering the resulting current or voltage signal Measuring circuit recorded that results, at least primarily, from the closing of the measuring circuit by immersing the ice cream in the molten electrolyte.
- the hammering device is preferably activated such that when the impedance measured by means of the active impedance measuring circuit reaches a predetermined minimum value, the chisel is raised.
- the impact device is to be operated with as little energy as possible, which in the normal case is just sufficient to penetrate the crust, so it is proposed that the chisel be lowered with a predetermined force, monitored, whether the minimum value is reached within a specified period of time, otherwise the lowering force increases.
- the operating energy for the impact device is increased by raising the lowering force in order to force the breakthrough.
- the operational safety of such a wrapping device is increased by detecting the time span of reaching or falling below the minimum value and generating an indication when a predetermined maximum time span is exceeded.
- the device of the type mentioned at the outset is designed in accordance with the invention in such a way that the measuring circuit with a circuit-associated, active source and measuring device is an impedance measuring circuit.
- the measuring circuit from the chisel via the active source and measuring device must be connected to a connection which preferably contacts the molten electrolyte with low resistance. Where this connector is located is of secondary importance. It is thus possible to arrange this connection point directly at the area where the chisel is immersed in the molten electrolyte. If this connection point is practically at the same potential with respect to the operating parameters of the cell as the area in which the chisel is immersed in the molten electrolyte, then when it is immersed in cell operation, there appears practically a zero potential difference between the connection point and the chisel. In such a case, the measuring circuit remains unaffected by the operating parameters of the cell, in particular by the anode / cathode voltage, and a direct current impedance measurement can be carried out.
- the source be an alternating signal source and thus an alternating signal impedance is measured.
- the detected impedance is largely independent of the cell operating variables and interfering variables mentioned when the measuring circuit is closed on the one hand via the chisel and on the other hand via a connection which is connected to the molten electrolyte at low resistance.
- connection point for the molten electrolyte is a connection point of the cell itself. This can be on the ground or cathode side, for example. If an AC impedance is measured with an AC signal source, it is further proposed to provide DC decoupling capacitors in the circuit which decouple DC operating values from the circuit in terms of high impedance, but which act as low-resistance elements on the measuring circuit operating frequency used.
- FIG. 1 shows a schematic vertical cross section through an electrolysis cell with a measuring circuit according to the invention, with an alternating signal source
- FIG. 2 shows an illustration analogous to FIG. 1, with a measuring circuit according to the invention, in a connection type that differs from FIG. 1, basically for direct current or alternating current impedance measurement, with a
- a steel trough 10 is lined with an insulation and carbon layer, which is not shown individually for reasons of clarity, the carbon base containing the cathode bars running in the transverse direction of the row.
- the cell encapsulation includes a horizontal cover 22 and mobile sloping cover plates 24, which are electrically insulated from the board of the steel tub 10.
- the impact device 28 is fastened in the anodic structure 26 with at least 5 kOh in an electrically insulating manner.
- This impact device pneumatically actuates a chisel 30 which can be moved vertically up and down and which is shown in the rest position above the carbon anodes 16.
- the lowermost working position of the ice cream is shown in dashed lines, which dips into the molten electrolyte, closes the electrical measuring circuit, in FIG. 1 an alternating current circuit, and is raised again to the rest position in the next moment.
- an AC circuit connected in an electrically conductive manner is fed by an AC voltage source 32,
- the electronic relay 34 eats the alternating current signal resulting as a function of the circuit impedance and sends a corresponding signal to the electronic process control 36.
- Two decoupling capacitors 40 in the alternating current circuit cause the DC potential separation between the electrolytic cell and the electronic process control or. the relay 34.
- one connection 42 of the measuring circuit generally designated 44 is connected to the chisel 30, the other connection 46 to one of the anode trees 18.
- the measuring circuit 44 generally comprises an active signal source 48, a signal generator for DC or preferably AC signals and a measuring device 50, a current or voltage measuring device for impedance measurement.
- the impact device is preferably controlled in accordance with the impedance measurement signal, preferably via a process control. 2 now shows with function blocks how the essential functions of the control can be implemented in a structure specially created for this purpose, whereby in most cases, as mentioned, the use of an already provided process control will be indicated. According to FIG.
- output A of the measuring device 50 acts on the one input of a comparator unit 52, at the second input of which a reference signal source 54, preferably a Dar, is connected.
- the comparator unit 52 only emits a signal with a high level if the output signal of the measuring device 50 falls below the switching value set with the source 54. Is If the output signal of the measuring device 50 is proportional to the circular impedance, ie to the impedance between the chisel 30 and the anode tree 18, then a signal with a high level only appears at the output of the comparator unit 52 if that which is significant for contacting the chisel and the molten electrolyte Minimum impedance is registered.
- a bistable unit such as a FLIP-FLOP 56
- the turning device 28 is controlled pneumatically by a control unit 58 with control inputs d and u, corresponding to the control of the lowering movement and lifting movement.
- a start switch S- is closed and a control voltage U_ is applied to the lowering input d of the control unit 58, via a changeover switch S 2 which is then shown in the position shown.
- the chisel is lowered and finally contacts the molten electrolyte.
- the changeover switch S2 is switched to the position shown in broken lines, which means that the ice cream 30 is retrieved via the
- Control unit 58 triggers.
- a time delay circuit for example a monostable multivibrator 59 with an adjustable pulse length ⁇ , at the end of the pulse appearing at output A59, a monostable multivibrator 60 a pulse generates, which is fed to an AND gate 62.
- the second input of the AND gate 62 is connected to the output of the comparator unit 52.
- this pulse appears at the output of the AND gate 62, it means that the contact between the chisel and the electrolyte has been maintained during the set time period T. That is, a bistable circuit, such as a FLIP-FLOP 64, is set. which leads to a display on the display device 66.
- the FLIP-FLOP 64 is reset on a falling edge at the output A__ of the comparator unit 52, which indicates that the contact between the chisel and the electrolyte has been broken again by retrieving the chisel.
- a second time delay circuit 68 such as a monostable multivibrator with an adjustable output pulse length ⁇ _, is also triggered.
- a pulse is generated by a monostable multivibrator 70. This pulse is fed to the AND gate 72.
- the pulse at the output of the monostable multivibrator 70 only appears at the output of the AND gate 72 if the second input of said gate is at logic '1', which, with the inverter 75, is only the case if the output signal of the FLIP-FLOP 56 indicates that the contact between the chisel and the electrolyte has not been established.
- the pulse at the exit of the gate 72 thus indicates that after triggering the lowering movement of the ice cream, waiting for the time period ⁇ , there has still not been contact between the chisel and the electrolyte. This means that the crust has not been broken. That is why ⁇ A-
- the flip-flop 74 ge is, the output to the control input E_ fi of a power adjustment device 76 acts, by means of which the pressure force, respectively.
- the pressure P with which the chisel 30 is driven downward is then increased.
- the FLIP-FLOP 74 is reset by the rising switching edge at the output of the FLIP-FLOP 56: the crust is broken through.
- the FLIP-FLOP 56 is reset after passing through the return path of the ice cream 30 by a limit switch S p , only shown schematically, the impact cycle is ended. It goes without saying that when the chisel is under increased pressure, the chisel is preferably only, at least partially, retrieved in order to attempt a new breakthrough. The control to be provided for this is not shown in FIG. 2.
- a further time delay unit for example a monostable multivibrator 78 with an adjustable pulse length ⁇ _, is triggered, at the end of which a pulse is generated again via a monostable multivibrator 80.
- the output pulse of the monostable multivibrator 80 appears at the AND gate 82 only if the FLIP-FLOP 74 is still set at the same time, i.e. is still working with increased chisel power. This means that the chisel could not penetrate into the molten electrolyte even at elevated pressure.
- This state is also indicated on display 66 via an OR gate 84.
- control system which is also referred to as electronic process control. This can be done in a timed .5
- the preferably used AC voltage source from FIG. 1 can emit an adjustable voltage which is preferably between 20 and 40 V, in particular between 20 and 25 V.
- the entire resistance of the AC circuit closed via the molten electrolyte is designed here in such a way that the AC voltage source emits a current of a few milli-amperes at the set voltage.
- the electronic relay (converter) built into the AC circuit forwards the signal to the central electronic process control, which is usually located outside the electrolysis hall.
- a capacitor is installed in the alternating current circuit. These capacitors separate the potential between the electrolysis cell, possibly occurring stray currents and the electronic process control.
- All elements of the measuring circuit are located in the area of the electrolysis cell, but outside the hot, corrosive zone.
- the electronic process control causes a signal to lower the chisel into the working position and - after contact with it
- the electrolyte is produced - for example via the electronic relay, the immediate lifting of the ice cream in the rest position or - if the measuring circuit is not closed within the specified time period ⁇ after the ice cream has been lowered - that the pneumatic or hydraulic pressure P is on the chisel is enlarged.
- the chisel In the rest position, the chisel is located outside the area of the anode body, on the one hand because of mechanical effects when changing the anode, and on the other hand because of the increasing temperature and corrosion effects in the direction of the crust breakthrough.
- the measuring circuit is not closed.
- the electronic process control triggers an increase in pressure.
- a reduced line pressure of, for example, 3-4 bar. Bring it Chisel with this reduced line pressure does not have enough force, the electronic process control causes the system to switch to the normal line pressure of, for example, 7-8 bar.
- the electronic process control will trigger an optical and / or acoustic signal .
- the cell operator can then correct the fault.
- the same signal is triggered if the AC circuit during a time ⁇ that exceeds the normal operating cycle of the impact device. remains closed because, for example, the chisel is jammed.
- the voltage source of FIG. 1 preferably outputs a voltage between 20 and 40 V, in particular 20 and 25 V, an alternating current of a few milliamps flowing when contact is made between the chisel and the electrolyte.
- the device according to the invention and the method according to the invention can therefore not only be used to control the charging of clay, but also to carry out the following monitoring procedures:
Landscapes
- Chemical & Material Sciences (AREA)
- Engineering & Computer Science (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Electrochemistry (AREA)
- Materials Engineering (AREA)
- Metallurgy (AREA)
- Organic Chemistry (AREA)
- Electrolytic Production Of Metals (AREA)
Description
Claims
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
AT84900604T ATE22938T1 (de) | 1983-02-10 | 1984-02-09 | Verfahren und vorrichtung zur steuerung einer einschlagvorrichtung. |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CH739/83 | 1983-02-10 | ||
CH73983 | 1983-02-10 |
Publications (2)
Publication Number | Publication Date |
---|---|
EP0135516A1 true EP0135516A1 (de) | 1985-04-03 |
EP0135516B1 EP0135516B1 (de) | 1986-10-15 |
Family
ID=4194080
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP84900604A Expired EP0135516B1 (de) | 1983-02-10 | 1984-02-09 | Verfahren und vorrichtung zur steuerung einer einschlagvorrichtung |
Country Status (6)
Country | Link |
---|---|
US (1) | US4563255A (de) |
EP (1) | EP0135516B1 (de) |
AU (1) | AU567029B2 (de) |
DE (2) | DE3305236C2 (de) |
IT (1) | IT1175323B (de) |
WO (1) | WO1984003108A1 (de) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2009074319A1 (de) * | 2007-12-11 | 2009-06-18 | Robert Bosch Gmbh | Vorrichtung zum messen des metallniveaus in einem reduktionsbecken |
Families Citing this family (20)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4702324A (en) * | 1984-05-14 | 1987-10-27 | Aluminum Company Of America | Control system for positioning and operating a pneumatic percussion tool |
IT1196487B (it) * | 1986-07-15 | 1988-11-16 | Techmo Car Spa | Procedimento per depurare i gas emessi dai forni di elettrolisi per la produzione di alluminio e relativa apparecchiatura |
JPH05504513A (ja) * | 1990-10-15 | 1993-07-15 | トレスキー、ミロスラフ | 回路から欠陥部品を除去する装置 |
DE69308854T2 (de) * | 1992-07-14 | 1997-10-16 | Portland Smelter Serv Pty | Zufuhrvorrichtung für aluminiumoxid zu einer elektrolytischen schmelzvorrichtung |
CA2192563C (en) * | 1994-07-15 | 2003-03-25 | Peter Jones | Actuator |
FR2727985B1 (fr) * | 1994-12-09 | 1997-01-24 | Pechiney Aluminium | Procede et dispositif de mesure de la temperature et du niveau du bain d'electrolyse fondu dans les cuves de production d'aluminium |
DE29910803U1 (de) | 1999-06-21 | 1999-09-16 | VAW Aluminium-Technologie GmbH, 53117 Bonn | Schaltungsanordnung zum Steuern eines Krustenbrechers |
US6436270B1 (en) * | 1999-07-19 | 2002-08-20 | Ab Rexroth Mecman | Method and device for controlling the movement of a feeding and breaking chisel in an aluminum production cell |
US6649035B2 (en) * | 2001-05-04 | 2003-11-18 | Ross Operating Valve Company | Low energy and non-heat transferring crust breaking system |
US6732761B2 (en) * | 2001-08-03 | 2004-05-11 | Ross Operating Valve Company | Solenoid valve for reduced energy consumption |
DE102004033964B3 (de) * | 2004-07-14 | 2006-03-30 | Bosch Rexroth Ag | Einrichtung und Verfahren zum Betrieb einer Krustenbrechvorrichtung für Metallschmelzen |
CN101275245B (zh) * | 2008-01-14 | 2010-10-13 | 贵州莱利斯机械设计制造有限责任公司 | 一种双阳极碳块残极自动压脱方法及装置 |
DE102008010175B4 (de) * | 2008-02-20 | 2011-08-25 | Robert Bosch GmbH, 70469 | System für reduzierten Druckluftverbrauch in metallurgischer Industrie |
US7915550B2 (en) * | 2008-06-17 | 2011-03-29 | Mac Valves, Inc. | Pneumatic system electrical contact device |
US8367953B2 (en) * | 2008-06-17 | 2013-02-05 | Mac Valves, Inc. | Pneumatic system electrical contact device |
DE102009052776A1 (de) * | 2009-11-11 | 2011-05-12 | Robert Bosch Gmbh | Verfahren und Einrichtung zum Betrieb einer Krustenbrechvorrichtung für Metallschmelzen |
NO336059B1 (no) * | 2012-12-27 | 2015-05-04 | Sinvent As | Fremgangsmåte og apparat for rensing av karbonanoder |
CN107287621B (zh) * | 2017-07-07 | 2023-08-18 | 新乡宏达冶金振动设备有限公司 | 一种电解质清理机 |
CN107497793B (zh) * | 2017-09-30 | 2024-03-12 | 中冶赛迪技术研究中心有限公司 | 一种铝槽打壳锤头超声振动清洗装置及方法 |
CN109594103B (zh) * | 2019-02-20 | 2020-01-10 | 长江师范学院 | 铝电解槽阳极效应预警方法 |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE1064628B (de) * | 1958-07-22 | 1959-09-03 | Vaw Ver Aluminium Werke Ag | Anordnung zur ununterbrochenen UEberwachung des Ohmschen Widerstandes von aktiven Zweipolen |
FR1376385A (fr) * | 1962-12-07 | 1964-10-23 | Vmw Ranshofen Berndorf Ag | Procédé et dispositif pour l'addition automatique d'alumine dans les fours d'électrolyse pour la production d'aluminium |
IT949765B (it) * | 1972-03-01 | 1973-06-11 | Cronzio De Nora Impianti Elett | Metodo e relativo dispositivo per proteggere gli anodi contro il pericolo di cortocircuiti in celle a catodo di mercurio |
FR2483965A1 (fr) * | 1980-06-06 | 1981-12-11 | Aluminium Grece | Procede et appareillage de controle de l'alimentation en alumine d'une cellule pour la production d'aluminium par electrolyse |
FR2487386A1 (fr) * | 1980-07-23 | 1982-01-29 | Pechiney Aluminium | Procede et appareillage pour reguler de facon precise la cadence d'introduction et la teneur en alumine d'une cuve d'electrolyse ignee, et application a la production d'aluminium |
-
1983
- 1983-02-16 DE DE3305236A patent/DE3305236C2/de not_active Expired
-
1984
- 1984-02-09 AU AU24373/84A patent/AU567029B2/en not_active Expired
- 1984-02-09 IT IT19515/84A patent/IT1175323B/it active
- 1984-02-09 WO PCT/CH1984/000019 patent/WO1984003108A1/de active IP Right Grant
- 1984-02-09 DE DE8484900604T patent/DE3460987D1/de not_active Expired
- 1984-02-09 US US06/667,488 patent/US4563255A/en not_active Expired - Lifetime
- 1984-02-09 EP EP84900604A patent/EP0135516B1/de not_active Expired
Non-Patent Citations (1)
Title |
---|
See references of WO8403108A1 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2009074319A1 (de) * | 2007-12-11 | 2009-06-18 | Robert Bosch Gmbh | Vorrichtung zum messen des metallniveaus in einem reduktionsbecken |
Also Published As
Publication number | Publication date |
---|---|
US4563255A (en) | 1986-01-07 |
DE3305236C2 (de) | 1985-11-21 |
IT1175323B (it) | 1987-07-01 |
EP0135516B1 (de) | 1986-10-15 |
WO1984003108A1 (en) | 1984-08-16 |
IT8419515A0 (it) | 1984-02-09 |
DE3305236A1 (de) | 1984-09-20 |
AU567029B2 (en) | 1987-11-05 |
DE3460987D1 (en) | 1986-11-27 |
AU2437384A (en) | 1984-08-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP0135516A1 (de) | Verfahren und vorrichtung zur steuerung einer einschlagvorrichtung. | |
DE69503342T2 (de) | Verfahren und Vorrichtung zum Messen der Temperatur und Badhöhe des geschmolzenen Elektrolyts in Aluminium-Schmelzflussöfen | |
EP0517100B1 (de) | Elektrolysezelle zur Aluminiumgewinnung | |
WO2013186022A1 (de) | Verfahren und einrichtung zur bestimmung des verbrauchs an elektrodenmaterial beim betrieb eines elektroofens | |
DE1926099A1 (de) | Verfahren zur Steuerung der Zufuehrung von Aluminiumoxid zu einer Aluminiumreduktionszelle | |
DE1925201A1 (de) | Verfahren zum Betreiben eines Elektrolyseofens fuer die Reduktion von Aluminiumoxyd | |
NL8102771A (nl) | Werkwijze en inrichting voor het regelen van de toe- voer van aluminiumoxyde aan een cel voor de vorming van aluminium door electrolyse. | |
DE2308565A1 (de) | Verfahren und vorrichtung zur gewinnung von metallen | |
EP0091399B1 (de) | Vorrichtung zum Messen der Badtemperatur in einer Aluminium-Schmelzflusselektrolysezelle | |
DE2729945A1 (de) | Verfahren und vorrichtung zur regelung der speisematerialzufuhr zu einem schmelzsalzbad | |
DE1802787A1 (de) | Verfahren zur Begrenzung eines Anodeneffektes in einer elektrolytischen Zelle zur Herstellung von Aluminium | |
CH651856A5 (de) | Schmelzflusselektrolysezelle zur herstellung von aluminium und damit ausgeruestete halle. | |
DE2731908C2 (de) | Verfahren und Vorrichtung zum Herstellen von Aluminium | |
EP0017188B1 (de) | Anode für die Alkalichlorid-Elektrolyse und Verfahren zur Herstellung von Chlor | |
DE2107675B2 (de) | Verfahren und Vorrichtung zum Regulieren der Al tief 2 0 tief 3 -Konzentration im Fluoridelektrolyten bei der Aluminiumelektrolyse | |
DE3125045C2 (de) | Vorrichtung zum portionsweisen Zuführen von fluidisierbarem Schüttgut und Verfahren zum Betreiben der Vorrichtung | |
DE2335029C3 (de) | Verfahren zum Führen einer Zelle für die Gewinnung von Aluminium durch die Elektrolyse von Aluminiumoxid in einer Fluoridschmelze | |
DE2438078C3 (de) | Verfahren zum Schöpfen von Aluminium aus einer Zelle zur Gewinnung von Aluminium durch Elektrolyse | |
DE2657116C2 (de) | Überwachungsmethode für das Metallschmelzen in Lichtbogenöfen | |
DE2335029B2 (de) | Verfahren zum fuehren einer zelle fuer die gewinnung von aluminium durch die elektrolyse von aluminiumoxid in einer fluoridschmelze | |
AT271924B (de) | Verfahren und Einrichtung zum automatischen Aufbrechen der Krusten von Aluminiumelektrolyse-Bäderbatterien und zum Chargieren dieser Bäder mit Tonerde | |
CH659137A5 (en) | Test probe for determining the voltage drop across bottom carbon elements of aluminium fusion electrolysis cells | |
DE2438078A1 (de) | Verfahren zum schoepfen von aluminium aus einer zelle zur gewinnung von aluminium durch elektrolyse | |
EP0112279A2 (de) | Vorrichtung zur portionenweisen Dosierung eines fluidisierbaren Schüttgutes und Verfahren zu deren Betrieb | |
DE2310011A1 (de) | Verfahren und vorrichtung zur verhuetung von kurzschluessen in quecksilberelektrolysezellen |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
17P | Request for examination filed |
Effective date: 19840913 |
|
AK | Designated contracting states |
Designated state(s): AT BE CH DE FR GB LI LU NL SE |
|
17Q | First examination report despatched |
Effective date: 19860211 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AT CH DE FR GB LI NL SE |
|
REF | Corresponds to: |
Ref document number: 22938 Country of ref document: AT Date of ref document: 19861115 Kind code of ref document: T |
|
REF | Corresponds to: |
Ref document number: 3460987 Country of ref document: DE Date of ref document: 19861127 |
|
ET | Fr: translation filed | ||
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
26N | No opposition filed | ||
EAL | Se: european patent in force in sweden |
Ref document number: 84900604.4 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: AT Payment date: 19960202 Year of fee payment: 13 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: AT Effective date: 19970209 |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: IF02 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: GB Payment date: 20030124 Year of fee payment: 20 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: FR Payment date: 20030219 Year of fee payment: 20 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: SE Payment date: 20030224 Year of fee payment: 20 Ref country code: NL Payment date: 20030224 Year of fee payment: 20 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: CH Payment date: 20030304 Year of fee payment: 20 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20030306 Year of fee payment: 20 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LI Free format text: LAPSE BECAUSE OF EXPIRATION OF PROTECTION Effective date: 20040208 Ref country code: GB Free format text: LAPSE BECAUSE OF EXPIRATION OF PROTECTION Effective date: 20040208 Ref country code: CH Free format text: LAPSE BECAUSE OF EXPIRATION OF PROTECTION Effective date: 20040208 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: NL Free format text: LAPSE BECAUSE OF EXPIRATION OF PROTECTION Effective date: 20040209 |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: PE20 |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
EUG | Se: european patent has lapsed | ||
NLV7 | Nl: ceased due to reaching the maximum lifetime of a patent |
Effective date: 20040209 |