DE8709267U1 - Tower tip of a rotating construction crane designed as a transport and assembly unit - Google Patents

Tower tip of a rotating construction crane designed as a transport and assembly unit

Info

Publication number
DE8709267U1
DE8709267U1 DE8709267U DE8709267U DE8709267U1 DE 8709267 U1 DE8709267 U1 DE 8709267U1 DE 8709267 U DE8709267 U DE 8709267U DE 8709267 U DE8709267 U DE 8709267U DE 8709267 U1 DE8709267 U1 DE 8709267U1
Authority
DE
Germany
Prior art keywords
tower top
tower
rope
boom
transport
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
DE8709267U
Other languages
German (de)
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MAN GHH Logistics GmbH
Original Assignee
MAN GHH Logistics GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MAN GHH Logistics GmbH filed Critical MAN GHH Logistics GmbH
Priority to DE8709267U priority Critical patent/DE8709267U1/en
Publication of DE8709267U1 publication Critical patent/DE8709267U1/en
Priority to EP19880110546 priority patent/EP0298391B1/en
Expired legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/18Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes
    • B66C23/26Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes for use on building sites; constructed, e.g. with separable parts, to facilitate rapid assembly or dismantling, for operation at successively higher levels, for transport by road or rail
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/62Constructional features or details
    • B66C23/82Luffing gear

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Structural Engineering (AREA)
  • Transportation (AREA)
  • Jib Cranes (AREA)

Description

sk-grsk-gr

M.A.N. HOLFFKRAN GmbhM.A.N. HOLFFKRAN Gmbh Nürnberg, 26. Juni 1987Nuremberg, 26 June 1987

§ Als Transport- und Montageeinheit ausgebildete Turmspitze eines oben drehenden Baukrans§ Tower tip of a rotating construction crane designed as a transport and assembly unit

Die Neuerung bezieht sich auf eine als Transport- und Montageeinheit ausgebildete Turmspitze eines oben drehenden Baukrans, dessen Ausleger mittels Seileinziehwerk ein- und auswippbar ist, mit einer oder mehreren, an der Spitze des Turmspitze angeordneten, der Umlenkung des Nippseils dienenden Seilrollen.The innovation relates to a tower top of a top-rotating construction crane designed as a transport and assembly unit, the boom of which can be luffed in and out by means of a rope hoisting mechanism, with one or more rope pulleys arranged at the top of the tower top serving to deflect the snatch rope.

Es ist ein oben drehender, eine Turmspitze, einen Ausleger und einen Gegenausleger aufweisender Baukran bekannt, bei dem das Bin- und Auswippen des Auslegers mit einem Seilainziehwerk (Wippwerk) erfolgt, das auf dem Gegenausleger bzw. im sich hinter der Turmspitze befindlichen Maschinenhaus angeordnet ist. Bisher wurden für den Turmkopf die Turmspitze, der Gegenausleger/Maschinenhaus und der im Betriebszustand des Krans an der Hauptabspannung des Auslegers befestige Rollenblock als getrennteA top-spinning construction crane with a tower top, a boom and a counter boom is known, in which the boom is luffed up and out using a rope hoist (luffing mechanism) that is arranged on the counter boom or in the machine house behind the tower top. Up to now, the tower top, the counter boom/machine house and the roller block attached to the main guying of the boom when the crane is in operation have been used as separate units for the tower head.

Einheiten zum Kranaufstellungort transportiert. Da das Auslegereinziehwerk am Gegenausleger, Umlenkrollen art der Turmspitze und der Rollenblock an tta? Hauptabspannung angeordnet sind, konnte das Einscheren des Mippseils nicät im Herstellerwerk, sondern nur manuell an der Baustelle vorgenommen werden, ule manuelle Seileinscherung an der Baustelle ist jedoch anstrengend und erhöht die Montagezeit.units transported to the crane installation site. Since the boom retraction mechanism is arranged on the counter boom, pulleys on the tower tip and the pulley block on the main guy, the boom rope could not be reeved in the manufacturer's factory but only manually on site. However, manual rope reeving on site is strenuous and increases the assembly time.

N/RP 07a.8961N/RP 07a.8961

; Hill I I < « «»*'l
' ' · If· · ·
; Hill II < « «»*'l
'' · If· · ·

Der Neuerung liegt daher die Aufgabe zugrunde, eine Turmspitze der eingangs genannten Art so zu gestalten, daß der Turmkopf des Baukrans an der Baustelle in relativ kurzer Zeit montiert bzw. demontiert werden kann.The innovation is therefore based on the task of designing a tower top of the type mentioned above in such a way that the tower head of the construction crane can be assembled or disassembled at the construction site in a relatively short time.

Diese Aufgabe wird neuerungsgemMß dadurch gelöst, daß das mit dem Nippseil versehene Seileinziehwerk an einem Träger der Turmspitze befestigt ist, daß das Wippseil Über die ümlenkroiie bzw. ümlenkroilen an der spitze der Turmspitze und eine oder mehrere, in einem TrMger gelagerte, weitere Umlenkrollen zur Spitze der Turmspitze geführt und dort befestigt ist, und daß der Träger der Umlenkrollen mit der Turmspitze fest, jedoch lösbar, verbunden ist.This task is solved according to the innovation in that the rope pulling mechanism equipped with the nipping rope is attached to a support of the tower top, that the luffing rope is guided to the top of the tower via the pulley or pulleys at the top of the tower top and one or more additional pulleys mounted in a support and is attached there, and that the support of the pulleys is firmly but detachably connected to the tower top.

Bei der neuerungsgemäßen Turmspitze mit integriertem Einziehwerk werden das Wippseil bereits im Herstellerwerk maschinell eingeschert und die Turmspitze mit dem an ihr fixierten Rollenbiock zur Baustelle transportiert. Die Montage bzw. Demontage des Turmkopfes an der Baustelle ist relativ einfach und zeitsparend.In the case of the new tower top with integrated retraction mechanism, the luffing rope is mechanically reeved in the manufacturer's factory and the tower top is transported to the construction site with the roller block attached to it. The assembly and disassembly of the tower head at the construction site is relatively simple and time-saving.

In der Zeichnung ist ein AusfUhrungsbeispiel der Erfindung schematisch dargestellt. Es zeigt:An embodiment of the invention is shown schematically in the drawing. It shows:

Figur 1 eine Seitenansicht auf die Turmspitze im Montagezustand,Figure 1 is a side view of the tower top in assembled condition,

Figur 2 eine Ansicht auf die Turmspitze im Montagezustand, in Richtung des Pfeiles A nach Figur 1 gesehen, undFigure 2 is a view of the tower top in the assembled state, seen in the direction of arrow A in Figure 1, and

Figur 3 eine Seitenansicht auf den Turmkopf eines oben drehenden Baukrans im Betriebszustand.Figure 3 is a side view of the tower head of a top-spinning construction crane in operating condition.

N/RP 07a.8961N/RP 07a.8961

Die Turmspitze weist ein Unterteil 1a, einen Drehrahmen 1b mit Drehwerk und ein in Richtung eines Gegenauslegers 2 schräg stehendes, in Fachwerkbauweise ausgeführtes Maststück 1c auf. Das Maststück 1c ist in seinem unteren Bereich mit einem waagrechten Träger 3 versehen, der zwischen den oberen und unteren Längsholmen 4a, 4b verläuft und mit diesen fest verbunden ist. Auf dem Träger 3 ist das Aueleger-Einziehwerk 5 befestigt, das im wesentlichen aus einer Seiltrommel 6 und derem motorischen Antrieb besteht. Auf der Seiltrommel 6 ist ein nippseil 7 befestigt, das unter mehrfacher Seiiexnscnefüng über - beispielsweise vier&mdash; Umlenkrollen 8 an der Spitze der Turmspitze 1 und weitere - beispielsweise vier - Umlenkrollen 9, zu einem Bestpunkt 11 an der Spitze der Turmspitze geführt ist. Die Umlenkrollen 8, 9 sind je auf einer gemeinsamen waagrechten Achse gelagert und Über ihre Achsen in entsprechenden Ausnehmungen ihrer Tragkonstruktion abgestützt. Die Tragkonstruktion c*ir Umlenkrollen 8 und das Einziehwerk 5 sind sowohl im Transport- und Montagefall als auch im Betriebszustand des Krans mit der Turmspitze verbunden.The tower top has a lower part 1a, a rotating frame 1b with rotating mechanism and a mast section 1c, which is inclined towards a counter boom 2 and is designed in a lattice construction. The mast section 1c is provided in its lower area with a horizontal support 3, which runs between the upper and lower longitudinal beams 4a, 4b and is firmly connected to them. The boom retraction mechanism 5 is attached to the support 3, which essentially consists of a cable drum 6 and its motor drive. A nip rope 7 is attached to the cable drum 6, which is guided with multiple side bends over - for example four - deflection rollers 8 at the top of the tower top 1 and further - for example four - deflection rollers 9, to a best point 11 at the top of the tower top. The deflection rollers 8, 9 are each mounted on a common horizontal axis and are supported via their axes in corresponding recesses in their supporting structure. The supporting structure c*ir deflection rollers 8 and the retraction mechanism 5 are connected to the tower tip both during transport and assembly and when the crane is in operation.

Die Tragkonstruktion 10 samt Umlenkrollen 9 - der sogenannte Rollenblock - ist im Transport und Montagefall der Turmspitze über Bolzen-Lochverbindungen an einem Querträger 1?der oberen Längsholme 4a fest, aber lösbar, fixiert. - Im Betriebszustand des an der Baustelle montierten Baukrans ist der Rollenblock 9,10, nachdem er von der Turmspitze 1 gelöst worden ist» mit der Hauptabspannung 12 des mm eine waagrechte Achse schwenkbar an der Turmspitze 1 angelenkten Auslegers 13 fest, jedoch lösbar, verbunden.The supporting structure 10 including the deflection rollers 9 - the so-called roller block - is fixed firmly but detachably to a crossbeam 1 of the upper longitudinal beams 4a via bolt-hole connections during transport and assembly of the tower tip. - When the construction crane is in operation at the construction site, the roller block 9, 10, after it has been released from the tower tip 1, is firmly but detachably connected to the main guy 12 of the boom 13, which is pivotably connected to the tower tip 1 on a horizontal axis.

Die im Herstellerwerk fertig montierte Turmspitze - d. h. das Maststück 1c mit integriertem Einziehwerk mit Wippseil, denThe tower top fully assembled in the manufacturer's factory - i.e. the mast section 1c with integrated retraction mechanism with luffing rope, the

/RP 07a.8961/RP07a.8961

■ · ■■ · ■

&bull; ··

* · &Lgr; &Lgr; &Lgr; &Phi; 41 A
·· Ct*
* · Λ Λ Λ Λ Φ 41 A
·· Ct*

Umlenkrollen 8, dem eingescherten Rollenblock 9, 10, der Gegenayslegerabspannung 16, dem Drehrahmen 1b und dem Unterteil la - wird in an sich bekannter Weise auf das letzte TurmstUck des Baukrans gesetzt und dort verbolzt. Anschließend werden der Gegenausleger 2 und der Wippausleger 13 montiert sowie die Gegengewichte 14 hochgezogen und eingehängt. Sodann werden die den Rollenblock 9, 10 mit dem MaststUck 1c verbindenden Bolzen 15 gelöst und der Rollenblock 9, 10 wird mittels eines Autokrans von der Turmspitze zu der Hauptabspannung 12 des Auslegers 13, unter gleichzeitigen Abspulen des Wippseils 7 von der Seiltrommel 6, gezogen und mit der Hauptabspannung 12 verbolzt.Deflection rollers 8, the reeved roller block 9, 10, the counter-jib guying 16, the rotating frame 1b and the lower part la - is placed in a known manner on the last tower section of the construction crane and bolted there. The counter-jib 2 and the luffing jib 13 are then mounted and the counterweights 14 are pulled up and attached. The bolts 15 connecting the roller block 9, 10 to the mast section 1c are then loosened and the roller block 9, 10 is pulled by means of a mobile crane from the top of the tower to the main guying 12 of the jib 13, while simultaneously unwinding the luffing rope 7 from the cable drum 6, and bolted to the main guying 12.

N/RP 07a.8961N/RP 07a.8961

Claims (2)

&bull; · t · ca · · ·» «, a a ·· · «a a a· a sk-gr M.A.N. Wolffkran GmbH Nürnberg, 26. Juni 1987 Schutzansprüch e&bull; · t · ca · · ·» «, a a ·· · «a a a· a sk-gr M.A.N. Wolffkran GmbH Nuremberg, June 26, 1987 Claims 1. Als Transport---und Montageeinheit ausgebildete Turmspitze eines oben drehenden Baukrans, dessen Ausleger mittels Seileinziehwerk ein- und auswippbar ist, mit einer oder mehreren, an der Spitze der Turmspitze angeordneten, der Umlenkung des Wippseils dienenden Seilrollen, dadurch gekennzeichnet, daß das mit den Hippseil (7) versehene Seile^nziehwerk (5) an einem Träger (3) der Turmspitze (1) befestigt ist, daß das Wippseil (7) über die Umlenkrolle bzw. Umlenkrolleu (8) an der Spitze der Turmspitze (1) und eine oder mehrere, in einem Träger (10) gelagerte, weitere Umlenkrollen (9) zur Spitze der Turmspitze geführt und dort befestigt ist, und daß der Träger (IrO) der Umlenkrollen (9) mit der Turmspitze (1) fest, jedoch lösbar, verbunden ist.1. Tower top designed as a transport and assembly unit of a top-rotating construction crane, the boom of which can be luffed in and out by means of a rope hoisting mechanism, with one or more rope pulleys arranged at the top of the tower top and serving to deflect the luffing rope, characterized in that the rope hoisting mechanism (5) provided with the luffing rope (7) is fastened to a support (3) of the tower top (1), that the luffing rope (7) is guided to the top of the tower top via the deflection pulley or deflection pulley (8) at the top of the tower top (1) and one or more further deflection pulleys (9) mounted in a support (10) and is fastened there, and that the support (IrO) of the deflection pulleys (9) is firmly but detachably connected to the tower top (1). 2. Mit der Turmspitze nach Anspruch 1 versehener Baukran, dadurch gekennzeichnet, daß der Träger (10} der Umlenkrolle bzw. Umlenkrollen (9) von der Turmspitze gelöst und mit der Hauptabepanftting (12) des Auslegers <13) verbunden wird.2. Construction crane provided with the tower top according to claim 1, characterized in that the carrier (10) of the deflection roller or deflection rollers (9) is detached from the tower top and connected to the main support (12) of the boom <13). N/KP 07a*8961N/KP 07a*8961
DE8709267U 1987-07-04 1987-07-04 Tower tip of a rotating construction crane designed as a transport and assembly unit Expired DE8709267U1 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
DE8709267U DE8709267U1 (en) 1987-07-04 1987-07-04 Tower tip of a rotating construction crane designed as a transport and assembly unit
EP19880110546 EP0298391B1 (en) 1987-07-04 1988-07-01 Building crane with a turning mast head constructed as a transport and assembly unit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE8709267U DE8709267U1 (en) 1987-07-04 1987-07-04 Tower tip of a rotating construction crane designed as a transport and assembly unit

Publications (1)

Publication Number Publication Date
DE8709267U1 true DE8709267U1 (en) 1987-08-20

Family

ID=6809747

Family Applications (1)

Application Number Title Priority Date Filing Date
DE8709267U Expired DE8709267U1 (en) 1987-07-04 1987-07-04 Tower tip of a rotating construction crane designed as a transport and assembly unit

Country Status (2)

Country Link
EP (1) EP0298391B1 (en)
DE (1) DE8709267U1 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2756551A1 (en) * 1996-12-03 1998-06-05 Potain Sa METHOD AND DEVICE FOR MOUNTING THE TIE RODS OF TOWER CRANE BOOMS
EP1982947A2 (en) 2007-04-20 2008-10-22 Wilbert Turmkrane GmbH Luffing crane with transport holder for roller blocks
DE102012019248A1 (en) * 2012-09-28 2014-04-03 Liebherr-Werk Biberach Gmbh Tower Crane
DE202017000243U1 (en) * 2017-01-16 2018-04-18 Liebherr-Werk Nenzing Gmbh Boom adjustment device for a working device

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2706882B1 (en) * 1993-06-22 1995-08-11 Potain Sa
FR2892405B1 (en) * 2005-10-26 2007-12-07 Potain Soc Par Actions Simplif METHOD AND DEVICE FOR MOUNTING A CRANE WITH AN ADJUSTABLE ARROW
DE102007009402B4 (en) * 2007-02-23 2009-10-08 Wolffkran Ag Luffing jib tower crane
ES2344493B1 (en) * 2007-08-03 2011-06-06 Linden Comansa, S.L . IMPROVEMENTS IN FOLDING PEN CRANES.

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL98241C (en) *
GB191415558A (en) * 1914-02-18 1915-02-18 Charles Wolfe Blue Improvements in and relating to Tower Derricks.
GB322574A (en) * 1928-10-01 1929-12-12 Caswell Cranes & Erection Ltd Improvements in and connected with tower cranes
FR1051231A (en) * 1951-08-23 1954-01-14 Lifting gear
DE1188783B (en) * 1962-08-10 1965-03-11 Hilgers A G Climbing crane
DE2217379B2 (en) * 1972-04-11 1981-04-30 Tax, Hans, 8000 München Tower crane with jib near top - has hoist winch cab and switchgear permanently wired up in container
FR2229253A7 (en) * 1973-05-09 1974-12-06 Tornborg Et Lundberg Ab
DE3226211C2 (en) * 1981-12-21 1986-06-12 Liebherr-Werk Biberach Gmbh, 7950 Biberach Tower crane
DE3510116A1 (en) * 1984-04-25 1985-10-31 Liebherr-Werk Biberach Gmbh, 7950 Biberach Tower crane slewing at the top

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2756551A1 (en) * 1996-12-03 1998-06-05 Potain Sa METHOD AND DEVICE FOR MOUNTING THE TIE RODS OF TOWER CRANE BOOMS
EP0846650A1 (en) * 1996-12-03 1998-06-10 Potain Method and device for mounting jib tension elements on tower cranes
EP1982947A2 (en) 2007-04-20 2008-10-22 Wilbert Turmkrane GmbH Luffing crane with transport holder for roller blocks
DE102007019747A1 (en) 2007-04-20 2008-10-30 Wilbert Turmkrane Gmbh Luffing crane with transport bracket for roller blocks
DE102007019747B4 (en) * 2007-04-20 2009-02-05 Wilbert Turmkrane Gmbh Luffing crane with transport bracket for roller blocks
EP1982947A3 (en) * 2007-04-20 2010-01-06 Wilbert Turmkrane GmbH Luffing crane with transport holder for roller blocks
DE102012019248A1 (en) * 2012-09-28 2014-04-03 Liebherr-Werk Biberach Gmbh Tower Crane
DE202017000243U1 (en) * 2017-01-16 2018-04-18 Liebherr-Werk Nenzing Gmbh Boom adjustment device for a working device

Also Published As

Publication number Publication date
EP0298391A1 (en) 1989-01-11
EP0298391B1 (en) 1991-10-09

Similar Documents

Publication Publication Date Title
DE10303555B4 (en) Method for craneless mounting of a rotor blade of a wind energy plant
EP2426077B1 (en) Crane
DE102009056245B4 (en) Wind turbine with lifting device
DE102013011489A1 (en) Tower Crane
DE202010003269U1 (en) crane
EP1266861A1 (en) Telescopic crane with a superlift device
DE3108455A1 (en) CRANE
DE8709267U1 (en) Tower tip of a rotating construction crane designed as a transport and assembly unit
EP3466866B1 (en) Winch mounting frame and winch assembly
DE19731049B4 (en) Crane with bridge jib
DE202011001850U1 (en) crane
DE3311736C2 (en)
DE3340845C1 (en) Lattice boom crane with main boom that can be dismantled
DE3911868A1 (en) TOWER TURNING CRANE, PREFERABLY TURNING TURN TURNING CRANE
EP2655243B1 (en) Jib bracing system for a tower crane
DE2556216C2 (en) Tower crane with self-supporting concrete distribution arm
DE3042287A1 (en) Heavy-duty telescopic crane jib - has fly jib attached by pivot pins to main jib and gantry
DE3307892C2 (en) Tower crane with jib and counter jib
AT524611B1 (en) Load transport system for transporting a load in a work area
DE1406305B2 (en) Construction crane
DE2336209A1 (en) MOBILE CRANE WITH TELESCOPIC BOOM WITH CABLE SUSPENSION
WO2001094249A1 (en) Method and device for mounting a wind turbine
DE102009032426B3 (en) Device for mounting and/or demounting ballast and/or ballasted stone on crane i.e. tower crane, has lifting device including rolling and hook blocks that are fastened to cantilever, where hoist rope of crane returns back to blocks
DE4327919C2 (en) Lifting device
AT17622U1 (en) Load transport system for transporting a load in a work area