DE202011001850U1 - crane - Google Patents
crane Download PDFInfo
- Publication number
- DE202011001850U1 DE202011001850U1 DE202011001850U DE202011001850U DE202011001850U1 DE 202011001850 U1 DE202011001850 U1 DE 202011001850U1 DE 202011001850 U DE202011001850 U DE 202011001850U DE 202011001850 U DE202011001850 U DE 202011001850U DE 202011001850 U1 DE202011001850 U1 DE 202011001850U1
- Authority
- DE
- Germany
- Prior art keywords
- crane
- jib
- load
- boom
- stranding
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C23/00—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
- B66C23/18—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes
- B66C23/20—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes with supporting couples provided by walls of buildings or like structures
- B66C23/207—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes with supporting couples provided by walls of buildings or like structures with supporting couples provided by wind turbines
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F03—MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
- F03D—WIND MOTORS
- F03D13/00—Assembly, mounting or commissioning of wind motors; Arrangements specially adapted for transporting wind motor components
- F03D13/10—Assembly of wind motors; Arrangements for erecting wind motors
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/72—Wind turbines with rotation axis in wind direction
Abstract
Kran (30), insbesondere Kran (30) zur Montage einer Windkraftanlage, mit wenigstens einem Krangrundkörper (31), mit wenigstens einem Kranausleger (32) und mit wenigstens einem Befestigungsmittel, mittels dessen der Kran (30) mittelbar und/oder unmittelbar auf und/oder mit einem Gegenstück aufsetzbar und/oder verbindbar ist, wobei der Kran (30) derart beschaffen ist, daß mittels des Kranes (30) durch Zusammenwirken mit einem weiteren Kran (1), insbesondere einem Mobilkran (1) wenigstens eine Last (22) bewegbar und/oder hebbar ist, und/oder wobei der Kran (30) wenigstens ein Mittel aufweist, mittels dessen der Kran (30) mit wenigstens einem weiteren Kran (1) derart verbindbar ist, daß mittels des Kranes (30) und durch Zusammenwirken mit einem weiteren Kran (1) wenigstens eine Last (22) bewegbar und/oder hebbar ist.Crane (30), in particular crane (30) for mounting a wind turbine, with at least one crane base body (31), with at least one crane jib (32) and with at least one fastening means, by means of which the crane (30) indirectly and / or directly on and / or with a counterpart can be placed and / or connected, wherein the crane (30) is such that by means of the crane (30) by cooperation with another crane (1), in particular a mobile crane (1) at least one load (22 ) and / or wherein the crane (30) has at least one means by means of which the crane (30) with at least one other crane (1) is connectable such that by means of the crane (30) and through Cooperation with another crane (1) at least one load (22) is movable and / or liftable.
Description
Die vorliegende Erfindung betrifft einen Kran, insbesondere einen Kran zur Montage einer Windkraftanlage.The present invention relates to a crane, in particular a crane for mounting a wind turbine.
Bei der Montage von Windkraftanlagen wird zuerst ein hoher Turm errichtet und sodann werden in einem weiteren Montageschritt auf diesem Turm z. B. die beiden schweren Teile Gondel und Rotorblattstern montiert. Die Nabenhöhe steigt aktuell noch immer, um homogenere Windverhältnisse zu erreichen. Gondel und Rotorblattstern sind somit die am höchsten zu hebenden Teile und teilweise zugleich auch die Teile mit dem größten Gewicht. Diese Teile bestimmen also die erforderliche Tragkraft des zur Montage zu verwendenden Krans.When installing wind turbines, a high tower is first built and then in a further assembly step on this tower z. B. the two heavy parts gondola and rotor blade mounted star. The hub height is currently still rising to achieve more homogeneous wind conditions. Gondola and rotor blade star are thus the highest parts to be lifted and sometimes also the parts with the largest weight. These parts thus determine the required load capacity of the crane to be used for mounting.
Dabei ist zu beachten, daß bei Mobilkranen in hohen Hubhöhen eine große Tragkraft nur noch mit sehr aufwendigen Maßnahmen erreichbar ist. Bei großen Hubhöhen nimmt die zulässige Tragkraft ab und zur Erhöhung der Tragkraft muß ggf. ein stärkerer Kran eingesetzt werden, der einen entsprechend für diese Hubhöhe und Traglast ausgelegten und zugelassenen Kranausleger aufweist. Aufwand und Kosten für eine derartige Montage steigen somit mit einer Zunahme der Hubhöhe und der erforderlichen Traglast entsprechend an.It should be noted that in mobile cranes in high lifting heights a high load capacity can only be achieved with very complex measures. For large lifting heights, the permissible load-bearing capacity decreases and, to increase the load-bearing capacity, it may be necessary to use a stronger crane which has a crane jib designed and approved for this lifting height and load. Effort and cost of such assembly thus increase accordingly with an increase in the lifting height and the required load.
Erschwerend tritt hinzu, daß der Rotorblattstern ein stark windanfälliges Teil ist. Dies bedeutet, daß der Rotorblattstern bei Windlast sehr große Kräfte in den Kranausleger einbringt und somit bei der Montage des Rotorblattsterns auf ein Zeitfenster mit wenig Wind gewartet werden muß.To make matters worse, that the rotor blade star is a strong wind-prone part. This means that the rotor blade star brings in wind load very large forces in the crane boom and thus must be waited for a time window with little wind during assembly of the rotor blade star.
Andere Lösungen zur Montage von Gondel und Rotorblattstern sind beispielsweise in der
Eine ähnliche Lösung ist aus der
Darüber hinaus sind noch kleinere Krane zur Wartung von Windenenergieanlagen bekannt (
Es ist daher die Aufgabe der vorliegenden Erfindung, einen Kran der eingangs genannten Art in vorteilhafter Weise weiterzubilden, insbesondere dahingehend, daß auch mit einem Mobilkran mit vergleichsweise geringer Tragkraft an sich zu schwere Lasten wie eine Gondel oder ein Rotor bzw. Rotorblattstern einer Windkraftanlage in hohe Hubhöhen hebbar und montierbar sind.It is therefore an object of the present invention to develop a crane of the type mentioned in an advantageous manner, in particular to the effect that even with a mobile crane with comparatively low load capacity to heavy loads such as a gondola or a rotor or rotor blade star of a wind turbine in high Lifting heights are liftable and mountable.
Diese Aufgabe wird erfindungsgemäß gelöst durch einen Kran mit den Merkmalen des Anspruchs 1. Danach ist vorgesehen, daß ein Kran, insbesondere Kran zur Montage einer Windkraftanlage, mit wenigstens einem Krangrundkörper, mit wenigstens einem Kranausleger und mit wenigstens einem Befestigungsmittel versehen ist, mittels dessen der Kran mittelbar und/oder unmittelbar auf und/oder mit einem Gegenstück aufsetzbar und/oder verbindbar ist, wobei der Kran derart beschaffen ist, daß mittels des Kranes durch Zusammenwirken mit einem weiteren Kran, insbesondere einem Mobilkran wenigstens eine Last bewegbar und/oder hebbar ist, und/oder wobei der Kran wenigstens ein Mittel aufweist, mittels dessen der Kran mit wenigstens einem weiteren Kran derart verbindbar ist, so daß mittels des Kranes und durch Zusammenwirken mit einem weiteren Kran wenigstens eine Last bewegbar und/oder hebbar ist.This object is achieved by a crane with the features of claim 1. Thereafter, it is provided that a crane, in particular crane for mounting a wind turbine, is provided with at least one crane body, with at least one jib and at least one fastening means by means of which Crane indirectly and / or directly on and / or with a counterpart placed and / or connectable, the crane is such that by means of the crane by interaction with another crane, in particular a mobile crane at least one load is movable and / or liftable , and / or wherein the crane has at least one means by means of which the crane is connectable to at least one further crane, so that at least one load is movable and / or liftable by means of the crane and by cooperation with another crane.
Die Last kann beispielsweise eine Gondel oder ein Rotor bzw. Rotorblattstern einer Windkraftanlage sein. Das Gegenstück, auf das der Kran aufgesetzt wird und an diesem befestigt wird, kann beispielsweise das Turmendstück eines Turmes einer Windkraftanlage sein. Insbesondere ist es denkbar, daß der Turm der Windkraftanlage bereits insoweit fertiggestellt ist, daß im wesentlichen nur noch die Gondel und der Rotor bzw. Rotorblattstern der Windkraftanlage für eine Fertigstellung der Anlage montiert werden müssen.The load may be, for example, a nacelle or a rotor or rotor blade star of a wind turbine. The counterpart on which the crane is placed and fastened to it can be for example the tower end of a tower of a wind turbine. In particular, it is conceivable that the tower of the wind turbine is already completed so far that essentially only the nacelle and the rotor or rotor blade star of the wind turbine must be mounted for completion of the system.
Besonders vorteilhaft ist es, daß der Kran durch einen weiteren Kran, insbesondere einen Mobilkran auf die Höhe des Turmendstückes gehoben und dort montiert wird. Da der auf dem Turmendstück befestigte Kran dort sicher montiert ist, ist es nur erforderlich, für die Montage der Gondel und des Rotors, also den mitunter schwersten Komponenten der Windkraftanlage, einen Mobilkran bereitzustellen, der in der Lage ist, den auf dem Turmendstück zu befestigenden Kran in die erforderliche Höhe heben zu können. Nicht erforderlich ist es jedoch insbesondere, in diese Höhe mittels des Mobilkranes auch die schweren Bauteile der Windkraftanlage heben zu können.It is particularly advantageous that the crane is lifted by a further crane, in particular a mobile crane to the height of the tower end piece and mounted there. Since the crane mounted on the tower end piece is securely mounted there, it is only necessary to provide for the installation of the nacelle and the rotor, so sometimes the heaviest components of the wind turbine, a mobile crane, which is able to be attached to the tower end piece To lift the crane to the required height. However, it is not necessary in particular to be able to lift the heavy components of the wind turbine into this height by means of the mobile crane.
Der Krangrundkörper kann beispielsweise sowohl seitlich als auch oben an dem Gegenstück, insbesondere dem Turmendstück aufgesetzt und dort befestigt werden.The crane base body can for example be placed both laterally and on top of the counterpart, in particular the tower end piece and fastened there.
Der Krangrundkörper selbst ist vorzugweise länglich und ggf. teilweise trapezförmig ausgebildet. Von Vorteil ist es, wenn wenigstens zwei oder mehrere Ansatzpunkte für das Befestigungsmittel in der Betriebsstellung am unteren Ende des Kranes vorgesehen sind, wobei die Ansatzpunkte vorzugsweise auf das Gegenstück aufgesetzt werden können. Ferner ist von Vorteil, wenn in einem mittleren Bereich des Krangrundkörpers der Kranausleger angelenkt ist und in der Arbeitsstellung am oberen Ende des Krangrundkörpers ein Rollenmittel für ein Wippverseilungsmittel vorgesehen ist. Dies erlaubt es insbesondere, den Kranausleger einfach wippen zu können. The crane body itself is preferably elongate and possibly partially trapezoidal. It is advantageous if at least two or more attachment points for the fastening means are provided in the operating position at the lower end of the crane, wherein the attachment points can preferably be placed on the counterpart. It is also advantageous if in a central region of the crane body of the crane boom is articulated and in the working position at the upper end of the crane body a roller means is provided for a Wippverseilungsmittel. This allows in particular to be able to simply rock the crane boom.
Das Mittel, mittels dessen der Kran mit wenigstens einem weiteren Kran derart verbindbar ist, so daß mittels des Kranes und durch Zusammenwirken mit einem weiteren Kran wenigstens eine Last bewegbar und/oder hebbar ist, kann ein Mittel sein, daß eine unmittelbare und/oder mittelbare Verbindung der beiden Krane ermöglicht. Insbesondere kann ein derartiges Mittel dadurch ausgebildet sein, daß die Verseilung der zweiten Kranes, insbesondere des Mobilkranes, in den Kran, der vorzugsweise bereits auf dem Gegenstück angeordnet und an diesem befestigt ist, einscherbar ist bzw. eingeschert werden kann, so daß vorzugsweise die Verseilung des ersten, auf dem Gegenstück befindlichen Kranes, zumindest teilweise durch die Verseilung des zweiten Kranes, z. B. des Mobilkranes gebildet wird.The means by which the crane is connectable to at least one other crane such that by means of the crane and by cooperation with another crane at least one load is movable and / or liftable, may be a means that an immediate and / or indirect Connection of the two cranes allows. In particular, such a means may be formed in that the stranding of the second crane, in particular of the mobile crane, in the crane, which is preferably already arranged on the counterpart and secured thereto, can be sheared or sheared, so that preferably the stranding the first, located on the counterpart crane, at least partially by the stranding of the second crane, z. B. the mobile crane is formed.
Ein derartiger Mobilkran kann beispielsweise ein bodengebundener, fahrbarer Mobilkran sein, der einen telekopierbaren Kranausleger aufweist. Denkbar ist aber auch, daß beispielsweise bei Montagen von Windkraftanlagen auf See der zweite Kran bzw. Mobilkran ein See- bzw. Schiffskran ist.Such a mobile crane may for example be a ground-based, mobile mobile crane having a telescopic crane boom. It is also conceivable that, for example, in installations of wind turbines at sea, the second crane or mobile crane is a sea or ship crane.
Die erforderliche Hebekraft kann unproblematisch durch den Mobilkran aufgebracht werden und durch das Zusammenwirken der beiden Kräne kann somit selbst für sehr hohe Hubhöhen, die sich ja aus der geplanten Höhe der Windkraftanlage ergeben, ein Mobilkran eingesetzt werden, der für diese geplante Höhe an sich nicht die erforderliche Last heben kann. Ein effizienterer Einsatz von Maschinen und Material wird somit vorteilhaft ermöglicht.The required lifting force can be applied by the mobile crane problem-free and by the interaction of the two cranes can thus be used even for very high lifting heights, which indeed result from the planned height of the wind turbine, a mobile crane, which for this planned height is not the can lift required load. A more efficient use of machines and material is thus advantageously made possible.
Des weiteren kann vorgesehen sein, daß der Kranausleger zumindest teilweise gabelförmig und/oder zumindest teilweise torförmig ausgebildet ist, so daß der Kranausleger vorzugsweise wenigstens zwei Kranauslegerarme aufweist, zwischen denen eine zu bewegende Last gehoben werden kann und/oder daß wenigstens zwei Kranausleger vorgesehen sind, zwischen denen eine zu bewegende Last gehoben werden kann. Dadurch ergibt sich der Vorteil, daß die zu bewegende Last leichter manövriert werden kann und der Kran darüber hinaus auch hinsichtlich seiner Abmessungen vorteilhaft gestaltet werden kann. Denn aufgrund der Tatsache, daß die zu bewegende Last zwischen die vorzugsweise zwei Kranauslegerarme eines gabelförmig und/oder torförmig ausgebildeten Kranauslegers gehoben werden kann, erlaubt es, z. B. im Falle des Hebens einer Gondel einer Windkraftanlage diese einfach auf das Turmendstück, auf dem ja auch der Kran selbst sitzt, hinein schwenken zu können und dort auch aufzusetzen.Furthermore, it can be provided that the crane boom is at least partially fork-shaped and / or at least partially peat-shaped, so that the crane boom preferably has at least two crane jib arms between which a load to be moved can be lifted and / or that at least two jibs are provided between which a load to be moved can be lifted. This results in the advantage that the load to be moved can be maneuvered easier and the crane can also be made advantageous in terms of its dimensions beyond. Because due to the fact that the load to be moved between the preferably two crane boom arms of a fork-shaped and / or gate-shaped crane boom can be lifted, it allows z. B. in the case of lifting a nacelle of a wind turbine this simply on the Turmendstück, on the yes even the crane sits, to be able to pivot in there and also put on.
Darüber hinaus kann vorgesehen sein, daß der Kranausleger gegenüber dem Krangrundkörper in einer Betriebsstellung um eine horizontale Achse verschwenkbar ist. Dadurch wird es insbesondere möglich, den Kranausleger wippen zu können.In addition, it can be provided that the crane boom relative to the crane body in an operating position about a horizontal axis is pivotable. This makes it possible in particular to be able to rock the crane boom.
Es ist ferner denkbar, daß das Mittel, mittels dessen der Kran mit dem wenigstens einen weiteren Kran verbindbar ist, wenigstens eine Rolle umfasst, mittels derer wenigstens ein Hubseil des Kranes in den Kran einscherbar und/oder führbar ist.It is also conceivable that the means by means of which the crane is connectable to the at least one further crane comprises at least one roller by means of which at least one hoist rope of the crane can be scrapped and / or guided into the crane.
Außerdem kann vorgesehen sein, daß am äußeren Ende des wenigstens einen Kranauslegers wenigstens ein Rollenkopf angeordnet ist und daß das Hubseil den wenigstens einen Rollenkopf mit der Hakenflasche verbindet oder daß mittels des Hubseils der wenigstens eine Rollenkopf mit der Hakenflasche verbindbar ist.In addition, it can be provided that at least one roller head is arranged at the outer end of the at least one crane jib and that the hoisting rope connects the at least one roller head with the hook bottle or that by means of the hoisting rope, the at least one roller head with the hook bottle is connectable.
Es ist vorteilhaft möglich, daß der Kran eine Wippverseilung aufweist, mittels derer zumindest der wenigstens eine Kranausleger wippbar ist.It is advantageously possible that the crane has a Wippverseilung, by means of which at least the at least one crane boom is tiltable.
Darüber hinaus ist denkbar, daß die Wippverseilung das äußere Ende des Kranauslegers mit einem Anlenkpunkt des Krangrundkörpers verbindet, wobei dieser Anlenkpunkt vorzugsweise an einem äußeren, vorzugsweise in Betriebsstellung oberen Ende des Krangrundkörpers angeordnet ist und/oder daß die Wippverseilung durch einen Teil der Verseilung des weiteren Kranes ausgebildet wird.In addition, it is conceivable that the Wippverseilung connects the outer end of the crane jib with a pivot point of the crane body, this pivot point is preferably located at an outer, preferably in the operating position upper end of the crane body and / or that the Wippverseilung by a part of the stranding of the other Crane is being trained.
Weiter vorteilhaft ist die Wippverseilung mit ihren beiden Strängen in der Nähe der Schenkel des Auslegers geführt.Further advantageously, the Wippverseilung is performed with their two strands in the vicinity of the legs of the boom.
Des weiteren kann vorgesehen sein, daß wenigstens ein Steuerungs- und/oder Regelungsmittel vorgesehen ist, mittels dessen der Einschervorgang wenigstens des Hubseiles und/oder der Wippverseilung steuer- und/oder regelbar ist.Furthermore, it can be provided that at least one control and / or regulating means is provided, by means of which the Einschervorgang at least the hoisting rope and / or the Wippverseilung is taxable and / or regulated.
Vorzugsweise ist vorgesehen, daß der Kran derart beschaffen und ausgeführt ist, daß der Kran sich bei dem Einschervorgang in eine aufrechte Position aufrichtet und die am Hubseil angeordnete Hakenflasche zur Spitze des Kranauslegers ziehbar und/oder gezogen ist.Preferably, it is provided that the crane is designed and executed in such a way that the crane rises in an upright position during the shearing-in process and the hook block arranged on the hoisting rope can be pulled and / or pulled towards the tip of the crane jib.
Außerdem ist es möglich, daß in der Endstellung in der aufrechten Position beim Einschervorgang sich die Hakenflasche mit dem Kranausleger über wenigstens eine erste Anschlagfläche formschlüssig verbindet und/oder anlegt und/oder sich der Kranausleger mit dem Krangrundkörper über wenigstens eine zweite Anschlagfläche formschlüssig verbindet und/oder anlegt. It is also possible that in the end position in the upright position during Einschervorgang the hook block with the crane boom via at least one first stop surface positively connects and / or applies and / or the crane boom with the crane body via at least one second stop surface positively connects and / or applies.
Dies ist insbesondere von Vorteil, wenn der Kran wie vorgesehen am Boden montiert wird und im Anschluß hieran die Verseilung des Kranes eingeschert wird. Nach dem Einschervorgang und nach einem weiteren Einziehen der Seile hebt sich der Kran vom Boden oder der Montagevorrichtung ab. Dabei sind die Anschlagflächen derart gewählt, daß sich der Kran geeignet gemäß seinem Schwerpunkt ausrichten kann. Der Kran kann sodann vorzugsweise von einem Mobilkran in seine Verbindungsposition mit dem Gegenstück, insbesondere dem Turmabschlußstück eines Turmes einer Windkraftanlage gehoben werden und die Verbindungen des Kranes mit dem Gegenstück können sodann hergestellt werden. Dabei liegt der Schwerpunkt des Kranes soweit hinten, also in Richtung des den Kran hebenden Mobilkranes, so daß die Hauptlast des zu montierenden Kranes auf dem Turmabschlußstück über die Stränge des Hubseils zwischen dem Rollenkopf und dem äußeren Ende des Krangrundkörpers in den Ausleger des Mobilkranes eingeleitet werden kann. Sodann können Hubseil und Wippverseilung wieder ausgelassen werden und der Kranausleger des nunmehr am Gegenstück montierten Kranes sowie die am Hubseilende befindliche Hakenflasche werden frei und kommen in Arbeitspositionen.This is particularly advantageous when the crane is mounted as intended on the ground and in connection thereto the stranding of the crane is sheared. After the Einschervorgang and after further retraction of the cables, the crane stands out from the ground or the mounting device. The stop surfaces are chosen such that the crane can align properly according to its center of gravity. The crane may then preferably be lifted by a mobile crane into its connecting position with the counterpart, in particular the tower end piece of a tower of a wind turbine, and the connections of the crane with the counterpart can then be made. The focus of the crane is so far behind, ie in the direction of the crane lifting mobile crane, so that the main load of the crane to be mounted on the tower end piece on the strands of Hubseils between the roller head and the outer end of the crane body are introduced into the boom of the mobile crane can. Then the hoisting rope and treading stranding can be left out again and the crane boom of the now mounted on the counterpart crane and the hook rope located on Hubseilende are free and come in working positions.
Des weiteren kann vorgesehen sein, daß wenigstens ein hydraulischer Antrieb zwischen dem wenigstens einen Kranausleger und dem wenigstens einen Krangrundkörper vorgesehen ist, mittels dessen die Last in Richtung der Wippachse des Kranauslegers ausrichtbar ist.Furthermore, it can be provided that at least one hydraulic drive is provided between the at least one crane jib and the at least one crane base body, by means of which the load can be aligned in the direction of the luffing axis of the crane jib.
Besonders vorteilhaft ist es, wenn die Wippachse in wenigstens einer Lagerbuchse geführt ist und/oder das wenigstens zwei hydraulische Antriebe vorgesehen sind.It is particularly advantageous if the rocking axis is guided in at least one bearing bush and / or the at least two hydraulic drives are provided.
Ferner kann vorgesehen sein, daß wenigstens ein Wegsteuerungsmittel vorgesehen ist, mittels dessen die wenigstens zwei hydraulischen Antriebe synchronisierbar sind.Furthermore, it can be provided that at least one path control means is provided, by means of which the at least two hydraulic drives can be synchronized.
Darüber hinaus betrifft die vorliegende Erfindung ein Kransystem mit den Merkmalen des Anspruchs 14. Danach ist vorgesehen, daß ein derartiges Kransystem aus wenigstens einem Kran nach einem der Ansprüche 1 bis 13 und wenigstens einem weiteren Kran, insbesondere einem Mobilkran besteht. Ein derartiges Kransystem kann besonders vorteilhaft zur Montage einer Windkraftanlage verwendet werden. Insbesondere ist von Vorteil, daß der wenigstens eine weitere Kran, insbesondere der Mobilkran, in der benötigten Hubhöhe nicht zwangsläufig eine Traglast aufweisen muss, die für die in dieser Höhe zu montierenden Elemente wie Gondel, Rotor, bzw. Rotorblattstern oder sonstige Komponenten der Windkraftanlage erforderlich wäre.In addition, the present invention relates to a crane system with the features of claim 14. Thereafter, it is provided that such a crane system consists of at least one crane according to one of claims 1 to 13 and at least one other crane, in particular a mobile crane. Such a crane system can be used particularly advantageously for mounting a wind turbine. In particular, it is advantageous that the at least one further crane, in particular the mobile crane, does not necessarily have to have a load in the required lifting height, which is required for the elements to be mounted at this height, such as nacelle, rotor, rotor blade or other components of the wind turbine would.
Weitere Einzelheiten und Vorteile der Erfindung sollen nachstehend anhand eines in der Zeichnung dargestellten Ausführungsbeispiels näher erläutert werden.Further details and advantages of the invention will be explained below with reference to an embodiment shown in the drawing.
Es zeigen:Show it:
Die vorliegende Erfindung geht jetzt den Weg, daß ein bekannter Mobilkran
Die Verbindungselemente
Der Kran
Über den mindestens einen Rollenkopf
Der Kranausleger
Der Kran
Um für das Hubseil
Die Wippverseilung
Nach dem Einscheren werden beide Seile, Hubseil
Weiter verbindet sich der Kranausleger
Bei weiterem Einziehen der Seile hebt der Kran
Die Seile Hubseil
Der Kranausleger
Es ist vorteilhaft, wenn der Kran
Es sind ausschließlich Verbindungen über Seile zwischen dem Kran
Die Hakenflasche
Damit der Kran
Der Kran
ZITATE ENTHALTEN IN DER BESCHREIBUNG QUOTES INCLUDE IN THE DESCRIPTION
Diese Liste der vom Anmelder aufgeführten Dokumente wurde automatisiert erzeugt und ist ausschließlich zur besseren Information des Lesers aufgenommen. Die Liste ist nicht Bestandteil der deutschen Patent- bzw. Gebrauchsmusteranmeldung. Das DPMA übernimmt keinerlei Haftung für etwaige Fehler oder Auslassungen.This list of the documents listed by the applicant has been generated automatically and is included solely for the better information of the reader. The list is not part of the German patent or utility model application. The DPMA assumes no liability for any errors or omissions.
Zitierte PatentliteraturCited patent literature
- WO 2008/088408 A2 [0005] WO 2008/088408 A2 [0005]
- EP 1857670 A1 [0006] EP 1857670 A1 [0006]
- EP 1808600 A1 [0007] EP 1808600 A1 [0007]
- WO 2007/096008 A1 [0007] WO 2007/096008 A1 [0007]
- DE 202008008174 U1 [0057] DE 202008008174 U1 [0057]
Claims (15)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE202011001850U DE202011001850U1 (en) | 2011-01-24 | 2011-01-24 | crane |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE202011001850U DE202011001850U1 (en) | 2011-01-24 | 2011-01-24 | crane |
Publications (1)
Publication Number | Publication Date |
---|---|
DE202011001850U1 true DE202011001850U1 (en) | 2012-04-30 |
Family
ID=46512571
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE202011001850U Expired - Lifetime DE202011001850U1 (en) | 2011-01-24 | 2011-01-24 | crane |
Country Status (1)
Country | Link |
---|---|
DE (1) | DE202011001850U1 (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104085806A (en) * | 2014-07-04 | 2014-10-08 | 国家电网公司 | Lifter |
CN104495660A (en) * | 2015-01-04 | 2015-04-08 | 成都智科立信科技有限公司 | Internet of Things multiple-unit controlled heavy goods deploying lifting machine |
GB2558242A (en) * | 2016-12-22 | 2018-07-11 | Statoil Petroleum As | Installing or uninstalling components of a wind turbine |
CN111550061A (en) * | 2020-05-19 | 2020-08-18 | 中国建筑第八工程局有限公司 | Herringbone frame in hinged support form for hoisting steel beam of winch and method thereof |
WO2020234435A1 (en) * | 2019-05-21 | 2020-11-26 | Liftra Ip Aps | Wind turbine tower with crane connection elements and a crane with tower flange connection elements |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1808600A1 (en) | 2004-07-23 | 2007-07-18 | Gamesa Innovation And Technology, S.L. | Movable independent crane system used temporarily for moving or replacing components and mounting wind generators |
WO2007096008A1 (en) | 2006-02-27 | 2007-08-30 | Ecotecnia Energias Renovables, S.L. | Method and system for hoisting heavy parts onto a wind turbine |
EP1857670A1 (en) | 2006-05-20 | 2007-11-21 | W2E Wind to Energy GmbH | Method and system for erecting a wind turbine tower consisting of tower segments |
WO2008088408A2 (en) | 2006-10-02 | 2008-07-24 | Wind Tower Systems, Llc | Lifting system and appartus for constructing and enclosing wind turbine towers |
DE202008008174U1 (en) | 2008-06-18 | 2009-11-05 | Liebherr-Werk Ehingen Gmbh | Crane, preferably mobile or crawler crane |
WO2011082710A1 (en) * | 2010-01-07 | 2011-07-14 | Vestas Wind Systems A/S | Method of lifting a wind turbine component toward a top portion of a wind turbine tower |
-
2011
- 2011-01-24 DE DE202011001850U patent/DE202011001850U1/en not_active Expired - Lifetime
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1808600A1 (en) | 2004-07-23 | 2007-07-18 | Gamesa Innovation And Technology, S.L. | Movable independent crane system used temporarily for moving or replacing components and mounting wind generators |
WO2007096008A1 (en) | 2006-02-27 | 2007-08-30 | Ecotecnia Energias Renovables, S.L. | Method and system for hoisting heavy parts onto a wind turbine |
EP1857670A1 (en) | 2006-05-20 | 2007-11-21 | W2E Wind to Energy GmbH | Method and system for erecting a wind turbine tower consisting of tower segments |
WO2008088408A2 (en) | 2006-10-02 | 2008-07-24 | Wind Tower Systems, Llc | Lifting system and appartus for constructing and enclosing wind turbine towers |
DE202008008174U1 (en) | 2008-06-18 | 2009-11-05 | Liebherr-Werk Ehingen Gmbh | Crane, preferably mobile or crawler crane |
WO2011082710A1 (en) * | 2010-01-07 | 2011-07-14 | Vestas Wind Systems A/S | Method of lifting a wind turbine component toward a top portion of a wind turbine tower |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104085806A (en) * | 2014-07-04 | 2014-10-08 | 国家电网公司 | Lifter |
CN104085806B (en) * | 2014-07-04 | 2016-02-03 | 国家电网公司 | A kind of elevator |
CN104495660A (en) * | 2015-01-04 | 2015-04-08 | 成都智科立信科技有限公司 | Internet of Things multiple-unit controlled heavy goods deploying lifting machine |
CN104495660B (en) * | 2015-01-04 | 2016-05-18 | 中核华兴达丰机械工程有限公司 | The large cargo allotment lifting machine of the polynary control of a kind of Internet of Things |
GB2558242A (en) * | 2016-12-22 | 2018-07-11 | Statoil Petroleum As | Installing or uninstalling components of a wind turbine |
WO2020234435A1 (en) * | 2019-05-21 | 2020-11-26 | Liftra Ip Aps | Wind turbine tower with crane connection elements and a crane with tower flange connection elements |
CN111550061A (en) * | 2020-05-19 | 2020-08-18 | 中国建筑第八工程局有限公司 | Herringbone frame in hinged support form for hoisting steel beam of winch and method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP2364948B1 (en) | Crane | |
DE102009056245B4 (en) | Wind turbine with lifting device | |
EP3016901B1 (en) | Tower crane and method of mounting a wind turbine rotor blade | |
EP2426077B1 (en) | Crane | |
EP2764237B1 (en) | Method and device for mounting a rotor of a wind energy plant | |
DE102017117121B4 (en) | crane | |
EP2163504B1 (en) | Method for lifting components of wind energy assemblies | |
DE102013011489A1 (en) | Tower Crane | |
EP2723670B1 (en) | Load handling apparatus for lifting, and method for mounting, rotor blades of a wind turbine | |
DE202010003269U1 (en) | crane | |
DE102010023275B4 (en) | Procedure for moving large cranes in the upgraded system and system for performing this procedure | |
DE202011001850U1 (en) | crane | |
EP2455322A1 (en) | Crane | |
DE102009058268A1 (en) | Crane e.g. crawler crane, has hoist rope guided over arm and including control cables that are provided with control ropes, where control ropes are directly attached to load i.e. rotor | |
DE4206630A1 (en) | Slewing tower-crane assembly - has hoist rope coupled to counterweight moving in opposite direction to load on hook | |
EP3466866A1 (en) | Winch mounting frame and winch assembly | |
EP2897892B1 (en) | Method for operating a crane, and crane | |
DE102014013953A1 (en) | Crane with a frame attached to the load hook for receiving a special load | |
WO2008009352A1 (en) | Arrangement of a lifting device on a rotor blade of a wind energy system and method | |
WO2008006573A1 (en) | Method for assembling a tower crane | |
EP2129609B1 (en) | Jib boom rotating tower crane | |
DE102007028778A1 (en) | Lattice tower crane for dam, has rotating assembly arranged on chassis, and rotating platform mounted on rotating assembly via distance pipe, where main extension arm and derrick extension arm are arranged on rotating platform | |
DE102020107417A1 (en) | Tower crane with adjustable counter ballast | |
AT510921B1 (en) | Device for transporting loads or persons | |
EP3715308A1 (en) | Stop means for suspending loads on a support means |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
R163 | Identified publications notified | ||
R207 | Utility model specification |
Effective date: 20120621 |
|
R150 | Utility model maintained after payment of first maintenance fee after three years | ||
R150 | Utility model maintained after payment of first maintenance fee after three years |
Effective date: 20140210 |
|
R151 | Utility model maintained after payment of second maintenance fee after six years | ||
R158 | Lapse of ip right after 8 years |