DE3036468A1 - industrialised cell and frame assembled building - has completely prefab. room cell units inserted in prefab. frame - Google Patents

industrialised cell and frame assembled building - has completely prefab. room cell units inserted in prefab. frame

Info

Publication number
DE3036468A1
DE3036468A1 DE19803036468 DE3036468A DE3036468A1 DE 3036468 A1 DE3036468 A1 DE 3036468A1 DE 19803036468 DE19803036468 DE 19803036468 DE 3036468 A DE3036468 A DE 3036468A DE 3036468 A1 DE3036468 A1 DE 3036468A1
Authority
DE
Germany
Prior art keywords
slide
frame
figures
steel
elements
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
DE19803036468
Other languages
German (de)
Inventor
Günter 1000 Berlin Krause
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to DE19803036468 priority Critical patent/DE3036468A1/en
Publication of DE3036468A1 publication Critical patent/DE3036468A1/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/348Structures composed of units comprising at least considerable parts of two sides of a room, e.g. box-like or cell-like units closed or in skeleton form
    • E04B1/34807Elements integrated in a skeleton

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

A building, of one or more storeys, is constructed from three-dimensional elements inserted into a framework. The three-dimensional elements are completely prefabricated, in a usable state, before insertion into the framework. Steel may be used. The units can be produced on a conveyor-belt system. For economy in weight and bulk, divided elements can be detachably screwed together in the door case area. Hooks and eyes for transport are pref. immobile and detachable. Reinforced concrete, aluminium, plastics and wood are also suitable materials.

Description

Beschleibung für: Description for:

Verfahren zur Herstellung eines ein- oder mehrgeschossigen Gebäudes aus Einschubraumelementen im Einschubgestell Die obengenannte Erfindung ist schon in abgewandelten Formen vorgeschlagen worden, wie z. B. iln Stockwerkshäuserbau, so ausgeführt, daß in einem Stahlgeriist Raumelemente eingehängt werden. Dabei hätte der Nutzer die Möglichkeit, bei einem Umzug seine Wohnzelle an den neuen Ort mitzunehmen. Diese Baumethode ist in der vorliegenden Erfindung mit einbezogen, aber außerdem sind noch eine Reihe von Möglichkeiten enthalten: U.a. durch die Auswechslung von Einschubraumelementen kann ohne aufwendige bauliche Veränderungen jederzeit das Gebäude anderweitig genutzt werden, d. h. von einem Wohnhaus in ein Kaufhaus oder Krankenhaus, vielleicht in ein Fabrikgebäude umgewandelt werden usw. Also fast jede Art von Umwandlung ist denkbar, welches bei den traditionellen Baumethoden sehr zeitraubend und kostenaufwendig ist. Als nächstes bietet diese Erfindung die einzig richtige Alternative, um dem chronischen Raumbedarf in Ballungsgebieten entgegenzuwirken und wegen der immer wieder steigenden Erstellungskosten, dem Facharbeitermangel ist dieses Hochbauverfahren geeignet, optimalste Wirtschaftlichkeit durch die fabrikmäßige Fließbandfertigung im Fertigbauverfahren sicherzusteilen. Zumal erfahrungsgemäß bei der Fließbandfertigung angelernte Arbeitskräfte ausreichen, wie dies die Fertigung vi(der anderer Konsumgüter beweist. Ohne Störung durch Witterungseiflüsse und bei unvermeidlichen Außenarbeiten kann die Baustelle, örtlich begrenzt, durch Abdeckungen geschützt werden. Ggf. auf dem Einschubgestell (Nr. 1) und über der Transportplattform (Blatt 2 Nr. 17). Process for the production of a one-storey or multi-storey building from slide-in space elements in the slide-in rack The above-mentioned invention is already has been proposed in modified forms, e.g. B. in multi-storey buildings, designed in such a way that room elements are suspended in a steel framework. Would have the user has the option of taking his / her living quarters with him to the new location when moving. This construction method is included in the present invention, but also as well a number of possibilities are still included: e.g. by replacing Slide-in room elements can do that at any time without complex structural changes Buildings are used for other purposes, d. H. from a residential building to a department store or Hospital, maybe converted into a factory building, etc. So almost every one Type of conversion is conceivable, which is very much with traditional building methods is time consuming and costly. Next, this invention offers the only one the right alternative to counteract the chronic need for space in metropolitan areas and because of the constantly rising production costs, the shortage of skilled workers this building construction method is suitable, optimal economic efficiency due to the factory-like Assembling assembly line production in the prefabricated process. Especially based on experience Semi-skilled workers in assembly line production are sufficient, as is the case with production vi (which proves other consumer goods. Without disturbance by weather ice rivers and at Unavoidable external work can be locally restricted by the construction site using covers to be protected. If necessary on the slide-in frame (No. 1) and above the transport platform (Sheet 2 No. 17).

Eine Vielzahl von Einsparungsmöglichkeiten und rationelles Bauverfahren dabei ist noch nicht erwähnt worden, wie z. B. das Einsparen von Arbeitskräften und Baumaterialien, damit verbunden die Energie-Einsparung, die schnelle Fertigung, bei wenigerArbeitsgerten, keine Baugerüste, weniger tateria1icntran.portc -in- die Stockvierke, erheblich weniger unrroduktive Bewegungen auf der Baustelle u. s-..A variety of savings and efficient construction methods it has not yet been mentioned how z. B. saving manpower and building materials, associated with energy savings, rapid production, with fewer tools, no scaffolding, less tateria1icntran.portc -in- die Stock images, significantly less unproductive movements on the construction site, etc.

Die fabrikmäßig- vorgefertigten Einschubraumelemente vereinigen alle Vorteile der Massenfertigung, sie sind besonders geeignet für Entwicklungsländer und aufgrund ihrer Konstruktion und Baumethode in erdbebengefährdcten Gebieten, sie würden die Sicherheitsrisiken erheblich reduzieren.The factory prefabricated slide-in space elements unite all of them Advantages of mass production, they are especially suitable for developing countries and due to their design and construction method in seismic areas, they would significantly reduce the security risks.

Noch ein nicht unwesentlicher Faktor bei der serienmäßigen Fertigung von Einschubraumelementen ist die Möglichkeit, daß der Nutzer schon in der Herstellungsstätte seine Räume ausstatten kann, vvas eine erhebliche Vereinfachung bedeutet. Die Einschubraumelemente werden sofort auf einem Transportwagen montiert, der gleichzeitig für den Transport zum Einschubgestell (Figuren 1, 12 -14) geeignet ist.Another not insignificant factor in series production of slide-in space elements is the possibility that the user is already in the manufacturing facility can equip its rooms, vvas means a considerable simplification. The slide-in space elements are immediately mounted on a trolley, which is also used for transport is suitable for the slide-in frame (Figures 1, 12-14).

Um die Einschubraumelemente rationell aufzunehmen, ist ein Einschubgestell (Figuren 1. 12 - 14) erforderlich, was in seiner Planung und statischen cherung auf die Einschubraumelemente abgestimmt sein muß.In order to accommodate the slide-in space elements efficiently, there is a slide-in rack (Figures 1. 12 - 14) what is required in its planning and static security must be matched to the slide-in space elements.

Die Einschubraumelemente müßten aus Gewichtsgründen in einer sogenannten Leichtbauweise ausgeführt sein, um auch einen rsikolosen Transport auf dem Weg zur Baustelle und auf dieser zu gewährleisten, es würde sich das Stahlträgerskelett anbieten (Figuren 7-, 8 und 10, 11), bestehend aus T-Stahlträger (Figur 10, Nr. 3) innen mit einem geraden Flächenmaterial (Figur 5, 1ONr. 8, 11) versehen, evtl. aus Kunstharz gebundenem Material, welches von gerirgem Gewicht ist, fortgesetzt nach außen wird der T-Stahlträgerraum (Figur 10 Schnitt A - B),wie ersichtlich, mit nicht brennbaren Dämm-Materialien ausgefüllt, das allen Anforderungen für ausreichenden Schall-, Wärme- und Brandschutz genügt (Figur 10 Nr. 2 und 4). Als abschließende Außenverkleidung eine Aluminiumverkleidung (Figur 5 Nr. 7) mit Aussparungen auf der äußeren Decke, notwendig, um die Transporthaken in die Durchbrüche an den T-Stahlträgern (Figur 3, 4, Figur 11 Schnitt 0 - D) einzubringen. Bei der Stahlträerkonstruktion ist auch auf die Durchbrüche für Fenster, Türen usw. zu tchten(Figuren 7, 8, 11 ), außerdem sind in den Zustmmenstoßstellen von unterschiedlichen Mtterialien, wie Fußböden und Wandverbindungen Feuchtigkeitsisoliermaterialien aufzutragen , um das Eindringen von Feuchtigkeit an diesen Stellen zu vermeiden.The insertion space elements would have to be in a so-called for weight reasons Lightweight construction to also ensure a risk-free transport on the way to Construction site and on this to ensure it would be the steel girder skeleton offer (Figures 7-, 8 and 10, 11), consisting of T-steel girders (Figure 10, No. 3) on the inside with a straight surface material (Figure 5, 1ONr. 8, 11), possibly made of synthetic resin bonded material, which is of little weight, continued to the outside is the T-steel girder space (Figure 10, section A - B), as can be seen Filled with non-flammable insulation materials that meet all requirements for sufficient Noise, heat and fire protection are sufficient (Figure 10 No. 2 and 4). As a final Outer cladding an aluminum cladding (Figure 5 No. 7) with recesses the outer ceiling, necessary to insert the transport hook into the openings on the T-steel girders (Figure 3, 4, Figure 11 section 0 - D) to be introduced. With the steel girder construction also pay attention to the openings for windows, doors, etc. (Figures 7, 8, 11 ), and there are also different materials in the contact points, such as Apply moisture-proofing materials to floors and wall joints to protect the Avoid penetration of moisture in these areas.

Im Füllraum der Isoliermaterialien werden (Figur 10 Schnitt A - B) Installationseinheiten im Sanitär-, Elektro- und Heizungsbereich vorgefertigt untergebracht, um darin die Leitungsenden miteinander zu verbinden. Bei Beriick.'ichtiflder Innendurchbrüche wird die Innenausstattung vorgenornmen.. Der Fußbodenbelag wird dem Nutzungszweck angepaßt. An der unteren Türzarge sind Öffnungen vorhanden (Figur 2 Nr. 3) zur löslichen Verbindung durch eine Schraubenverbindung mit dem Einschubgestell, die durch die Türschwelle verdeckt sind. Die Türzarge ist auch die Verbindungsstelle, für die aus Gewichts- und Volumengriinden geteilten Einschubraumelementen (Nr. 9) (Figuren 5, 6) mittels löslicher Schraubenverbindung Bei der Stahlträgerskelettfertigung aus T-Trägern sind kaum größere Toleranzen zu erwarten, nls das bei der Stahlbetonfertigung oft auftreten kann, was für den Einschub in das Einschubgestell sehr wichtig ist.In the filling space of the insulating materials (Figure 10, section A - B) Pre-assembled installation units in the sanitary, electrical and heating areas, in order to connect the line ends together. In the event of any internal breakthroughs the interior is pre-arranged .. The floor covering is the purpose of use customized. On the lower door frame there are openings (Figure 2 No. 3) for the removable Connection by a screw connection with the rack, which is through the Threshold are covered. The door frame is also the connection point for the for weight and volume reasons divided slide-in space elements (No. 9) (Figures 5, 6) by means of a detachable screw connection in the production of steel girder skeletons Larger tolerances are hardly to be expected from T-beams, as is the case with reinforced concrete production can often occur, which is very important for the insertion in the rack.

Zum Einschub von Einschubraumelementen bei diesem beschriebenen Verfahren ist ein Einschubgestellt (Figur 1, 12 - 14) erforderlich.For inserting insert space elements in the method described a slide-in rack (Figures 1, 12-14) is required.

Dieses wird am vorgesehenen Standort des Gebäudes aus Stahlträgern, überwiegend aus Doppel T-Stahlträger oder auch aus Stahlbeton vorgefertigt. Sollte keine Unterkellerung vorgesehen sein, so ist ein Leerrausn zwinnd vorzusehen, einmal aus gesundheitlichen Gründen und außerdem um Versorgungseinrichtungen unterzubringen.This is made of steel girders at the intended location of the building, Prefabricated mainly from double T steel girders or from reinforced concrete. Should If no basement is to be provided, an empty room must be provided, once for health reasons and also to accommodate utilities.

Dieser Keller (Figur 1) })bzw. Leerraum oder auch Souterrain kann durch bekannte Verfahren in Fertigbauweise erstellt werden.This basement (Figure 1)}) or. Empty space or basement can be created by known methods in prefabricated construction.

Dieses so entstandene Einschubgestell (Figuren 1, 12 -14) hat zur Unterbringung der Versorgungsleitungen, wie Be- und Entwässerungsleutungen, Heizungs- und Elektroleitungen, dem Heizungsabgasschacht (Figur 2 Nr. 5), dem Treppenhaus, evtl. einem Aufzug einen Versorgungstrakt ('Figur 2 Nr. 6). Auf jedem Treppenabsatz ist eine Versorgungsübergabestation (Figur 2 Nr. 4) an die,die Einschubraumelementen-Versorgungsleitungen in schnell löslicher Form, evtl. als Schlauchmerbindung angeschlossen werden. Die Zwischenräume von Einschubraumelementen und Einschul)gestellerl (Figur 1 Nr. 1) werden auch mit Isoliermaterialien, so wie bereits erwähnt bei den Einschubraumelementen (Figur 10 Schnitt A - B), ausgefüllt.This resulting rack (Figures 1, 12-14) has to Accommodation of the supply lines, such as irrigation and drainage systems, heating and electrical cables, the heating exhaust shaft (Figure 2 No. 5), the stairwell, possibly an elevator a supply wing ('Figure 2 No. 6). On every landing is a supply transfer station (Figure 2 No. 4) to the, the rack element supply lines in a quickly soluble form, possibly connected as a hose tie. the Interstices between slide-in room elements and single-use racks (Figure 1, No. 1) are also provided with insulating materials, as already mentioned for the slide-in space elements (Figure 10 section A - B), filled in.

Die durch das :i n nchi eucn von Ei nschubraumclementen in die Einschubgestelle äußerlich sichtbaren Zwischenräume (Figur2 Nr. 1) sowohl an der Vorderfront, als auch der Hinterfront des Gebaudes, werden zur optischen Verbesserung der Außenfassade mit einem geeigneten Profilkunststoff abgedeckt.The through the: in nch eucn of insert space elements in the racks externally visible spaces (Figure 2 No. 1) both on the front as also the rear of the building are used to visually improve the exterior facade covered with a suitable profile plastic.

Bei Vorhandensein von Einschubraumelementen (Figur 3 und 4) und den Einschubgestellen (Figuren 1, 12 -14) kann das Einschubraumelement von einem hcrkömmlichen, geeigneten, beweglichen Kranwagen, dessen Transporthaken in die vorgesehenen Stellen (Figur 11 Schnitt C - D) und(Figur 3, 4) angebracht werden, in das Einschubgestell eingeschoben werden. Dabei ist die Einschub- und Ausziehöse (Figur 9 und 11 Nr. 20) zu verwerten.In the presence of slide-in space elements (Figures 3 and 4) and the With slide-in racks (Figures 1, 12-14), the slide-in compartment element can be replaced by a conventional, suitable, movable crane truck, its transport hook in the designated places (Figure 11 section C - D) and (Figure 3, 4) are attached to the rack be inserted. The push-in and pull-out eyelets (Figures 9 and 11 No. 20) to be recycled.

Auch pneumatische, hydraulische und elektrische Verschiebewerkzeuge können verwendet werden, da Strom und Preßluft immer vorhanden sein können.Also pneumatic, hydraulic and electric shifting tools can be used because electricity and compressed air can always be available.

Da Baugrund, speziell in Innenstädten,in der Regel sehr teuer ist, ist eine Bebauung in größere Höhe unbedingt erforderlich.Since building land, especially in city centers, is usually very expensive, a building at a higher height is absolutely necessary.

Um in dieser Höhe Einschubraumelejaente einzuschiebenoder wenn möglich oder nötig, hineinzuziehen in das Einschubgestell, ist ein Einschub-Kran (Figuren 12 - 14) als Transportmittel, ähritich wie der Fassadenlift zum Fensterputzen, zum Transport der Einschubraumelemente (Nr. 16) in größere Höhen entwickelt worden, wie auf Blatt 2 aus der Zeichnung zu entnehmen ist, bezeichnet mit Nr. 10 - 22. An dem Einschub-Kran ist mit Stahlseilen (Nr. 22) die Transportplattform (Nr. 16) angebracht.In order to insert slide-in space elements at this height or if possible or if you need to pull yourself into the slide-in frame, a slide-in crane (Figures 12 - 14) as a means of transport, similar to the facade lift for window cleaning, for Transport of the slide-in space elements (No. 16) to greater heights has been developed, as can be seen on sheet 2 of the drawing, designated with no. 10 - 22. The transport platform (no.16) is attached to the push-in crane with steel cables (no.22) appropriate.

Diese kann bei Bedarf durch das Herausnehmen oder Hinzufügen von Segmenten (Figur 13 Nr, 19) verstellt werden, so daß die Transportplattform dadurch an unterschiedlichen Gleitrollenführungen (Nr. 21) verwendet werden kann.This can be done by removing or adding segments if necessary (Figure 13 No. 19) can be adjusted so that the transport platform is thereby at different Roller guides (No. 21) can be used.

Das vorhergehend erwähnte Transportmittel zum Transport von Einschubraumelementen in höhere Gebäudebereiche ist auf dem Gebäude beweglich nach links und rechts aufgestellt(Figur 12).The aforementioned means of transport for transporting slide-in space elements in higher building areas is set up on the building so that it can be moved to the left and right (fig 12).

Seine Funktion ist mit einem herkömmlichen Kran Elektromotorantrieb (Nr. 10) Stahlseilen (Nr. 22) über Seilzugrollen (Nr. 13) und Seilrollen (Nr. 12) ablaufend, an die Transportplattform (Nr. 17) angebracht, vergleichbar.Its function is electric motor drive with a conventional crane (No. 10) Steel cables (No. 22) over pulleys (No. 13) and pulleys (No. 12) running down, attached to the transport platform (No. 17), comparable.

Die Transportplattform läuft auf Gleitrollen (Nr. 18) an der Außenfassade auf der Gleitrollenführung (Nr. 21) entlang.The transport platform runs on castors (No. 18) on the outer facade along the roller guide (No. 21).

Die Seilrollen (Nr. 12) sind transportabel konzipiert, so daß diese, nach jeder Seite, d. h. zu@ Transport von Einschubraumelementen an der Vorderfront und Rückfront des Gebäudes aufgestellt werden können. Das ermöglicht, geteilte Einschubrawnelemente von jeder möglichen Seite einzuschieben, was aus Gewichts- und Volumengründen nötig sein kann. Das durch den Einschub-Kran (Blatt 2 Figuren 12 -14) in das gewünschte Stockwerk emporgezogene Einschubraumelement (Figur 14 Nr.16) wird, nachdem die Transportplattform gegen ein Abschieben vom Einschubgestell gesichert ist, mittels einer hydraulischen Einschubvorrichtung (Blatt 2 Nr. 15) die mit der Einschub- und Ausziehöse (Nr. 20) und (Figur 9) verbunden ist, in das Einschubgestell eingeschoben, wobei mittels der schon erwähnten Verschiebewerkzeuge vor Ort korrigierend eingegriffen werden kann.The pulleys (No. 12) are designed to be transportable so that they to each side, d. H. to @ Transport of slide-in compartment elements on the front and rear of the building can be set up. This enables split slide-in brown elements to be inserted from every possible side, which is necessary for weight and volume reasons can be. The push-in crane (sheet 2, Figures 12-14) in the desired The slide-in space element (Figure 14, No. 16) raised on the first floor is after the transport platform is secured against being pushed off the rack by means of a hydraulic Insertion device (sheet 2 no.15) with the insert and pull-out eyelets (no.20) and (Figure 9) is connected, inserted into the rack, with means the already mentioned shifting tools can be corrected on site can.

Diese Transporteinrichtung (Blatt 2 Figuren 12 - 14) kann bei Bedarf, verbunden mit der Transportplattform oder einem Putzbalkon zum Fensterputzen, zu Instandsetzungs- und ähnlichen Gebäudearbeiten genutzt werden, dabei genügt evtl. schon eine Seilrolle (Nr. 12), was mittels Umstellung am Getriebe (Nr. 14) möglich ist.This transport device (sheet 2, Figures 12-14) can, if necessary, connected to the transport platform or a cleaning balcony for cleaning windows Repair and similar building work can be used; already a pulley (no.12), which can be done by changing the gearbox (no.14) is.

Auch bei einem Umzug des Nutzers wird die Transporteinrichtung benutzt, wobei das gesamte Inventar mit umzieht, ein nicht zu unterschätzender Vorteil. Bei Nutzungsumwandlung des Gebäudes ist eine weitere Verwendungsvariante des Einschub-Krans (Figuren 12 - 14) gegeben. Außerdem kann die Einschub-Krananlage für den Aufzugsbetrieb genutzt werden (Figuren 12 - 14), so daß diese Anlage aufgrund seiner vielseitigen Verwendung mehr als rechtfertigt und sich somit in das erhitich kostensparende Gesamtkonzept einfügt.The transport facility is also used when the user moves, with the entire inventory moving, an advantage that should not be underestimated. at Converting the building to use is another use of the push-in crane (Figures 12-14) given. In addition, the push-in crane system can be used for elevator operation are used (Figures 12-14), so that this system due to its versatile Use more than justifies and is therefore part of the overall cost-saving concept inserts.

Die vorliegende Beschreibung hat eine Reihe von kostensparenden Varianten aufgezeigt: für den Hersteller, aber auch der Nutzer profitiert von diesen Einschubraumelementen-Gebäuden, in Form von geringeren Mieten und bi1tigerem Eigentumserwerb bei beliebiger Raumzahl in individueller Innenaufterlung sowie gleichbleibendem Wohnkomfort gegenüber allen bisherigen Baumethoden, in unterschiedlicher Grundrißausführung, nur erheblich wirtschaftlicher, eine zukunftsweisende Erfindung.The present description has a number of cost-saving variants shown: for the manufacturer, but also the user benefits from these slide-in room element buildings, in the form of lower rents and cheaper property acquisition for any number of rooms in individual interior layout as well as consistent living comfort for everyone previous construction methods, in different floor plans, only considerably more economical, a pioneering invention.

Claims (1)

Patent ansprüche 1. Die Erfindung "VerfakZren zur Herstellung eines ein-oder mehrgeschossigen Gebäudes aus Einschubraumelementen im Einschubgestell'1 ist dadurch gekennzeichnet, daß die Einschubelemente (Figuren 3 - 6),komplett fabrikmäßig vorgeferti.gt,bis zur Nutzung,in das vorgefertigte Einschubgestell (Figur 1, 12-14) eingeschohen werden.(BeBtehend aus Stahl) -2. ist dadurch gekennzeichnet, dtß die Einschubraumelemente (Figur 3 - 6) auf einem TransJortgerat fflließbandartig bis zur sofortigen Nutzung vorgefertigt werden, um auf diesem Transportgerät zum Einschubgetell transportiert zu werden. Claims 1. The invention "Process for the production of a one-storey or multi-storey building made up of slide-in room elements in the slide-in rack 1 is characterized in that the insert elements (Figures 3 - 6) are completely factory-made prefabricated, until use, in the prefabricated slide-in frame (Figure 1, 12-14) (Consisting of steel) -2. is characterized by the fact that the Slide-in space elements (Figures 3 - 6) on a transport device like a conveyor belt up to can be prefabricated for immediate use in order to be placed on this transport device for the slide-in table to be transported. 3. ist dadurch gekennzeichnet, daß die EinSchubraumelemente bei der Fertigung mit Installationseinheiten für den Sanitär-, Elektro- und Heizungsbereich zusammensteckbar von Raumeinheit zu Raumeinheit, im Isolierbereich (Figur 10 Schnitt A - B) versehen ist.3. is characterized in that the EinSchubraumelemente at the Production with installation units for the sanitary, electrical and heating sectors Can be plugged together from room unit to room unit, in the insulating area (Figure 10 section A - B) is provided. 4. ist dadurch gekennzeichnet, d.tß aus Gewichts- und Volumengründen geteilte vorgefertigte Einschubraumelemente (Figur 5,6) mittels löslicher Schraubverbindung im Bereich der Türzarge miteinander verbunden sind.4. is characterized, d.tß for weight and volume reasons divided prefabricated slide-in space elements (Figure 5,6) by means of a soluble screw connection are connected to each other in the area of the door frame. 5. ist dadurch gekennzeichnet, daß die Einschubraumelemente am Einschubgestell mittel, löslicher Schraubverbindung im Bereich der Türschwelle verbunden sind. (Figur 2 Nr.3) 6. ist dadurch gekennzeichnet von dem Stahlträgerskelett (Figur 7, 8 und 10, 11) in der zeichnerisch dargestellten Ausführung der Einschubraumelemente (Figur 5, 6), umschlossen mit einer Aluminiumverkleidung ( Figur 5, 6).5. is characterized in that the slide-in space elements on the slide-in frame medium, soluble screw connection in the area of the door sill. (Figure 2 No. 3) 6. is characterized by the steel girder skeleton (Figures 7, 8 and 10, 11) in the embodiment of the slide-in space elements shown in the drawing (FIG 5, 6), enclosed with an aluminum cladding (Figures 5, 6). 7. ist dadurch gekennzeichnet, daß die Einschubraumelementenwande (Figur 10 Schnitt A - B) mit nicht brennharen Dammmaterialien ausgefüllt sind, was den Anfrderungen für -ausreichenden Schall-, Wirme- und Brandsehutz genügt 8. ist dadurch gekennzeichnet, daß die Traneportösen und Haken (Figur 3 und 4) stationär und abnehmbar anzuordnen sind, (Figur 11 Schnitt E - D) 9. ist durch den Einschub und Ausziehöse gekennzeichnet (Figur 9, 11 Nr. 20) 10. ist dadurch gekennzeichnet, daß die Einschubraumelemente auch aus Stahlbeton, Aluminium, Kunststoffe und Holz herzustellen sind, 12. Di e Erfindung 'Verfahren zur Herstellung eines ein- oder mehrgeschossigen Gebäudes aus Einschubraumelemente im Einschubgestell" ist durch das Einschubgestell gekennzeichnet (Figur 1, 12-14) bestehend aus Stahl, 13. ist durch den Versorgungsschacht (Figur 2 Nr. 6) gekennzeichnet, bestehend aus einer Stahltragerkonstruktion (Figur 1) Stahlbeton - Stahl oder auchen beiden Materialien zusammen 14. ist dadurch gekennzeichnet, daß ds Einschubgestellt (Figur 1, 12 - 14) und der Versorgungsschacht (Figur 2 Nr. 6) separat vorgefertigt, auch in Fertigbauweise erstellt werden kann. 7. is characterized in that the insertion space elements walls (Figure 10 section A - B) are filled with non-combustible dam materials, what the requirements for -sufficient noise, heat and fire protection is sufficient 8. is characterized in that the transport eyelets and hooks (Figures 3 and 4) are stationary and are to be arranged in a removable manner, (Figure 11 section E - D) 9. is through the insert and pull-out eyelets (Figure 9, 11 No. 20) 10. is characterized by that the slide-in space elements are also made of reinforced concrete, aluminum, plastics and wood are to be produced, 12. The invention 'method for producing a one or multi-storey building made of slide-in room elements in the slide-in frame "is through the rack marked (Figure 1, 12-14) made of steel, 13th is characterized by the supply shaft (Figure 2 No. 6), consisting of one Steel support structure (Figure 1) Reinforced concrete - steel or both materials together 14. is characterized in that the slide-in position (Figure 1, 12 - 14) and the supply shaft (Figure 2 No. 6) separately prefabricated, also in prefabricated construction can be created. 15. ist dadurch gekennzeichnet, daß die geteilten (Figur 5, 6) oder die ganzen (Figur 2) Einschubraumeinheiten in das Einschubgestellt (Figuren 1, 12 -14) mittels eines geeigneten beweglichen Kranwagens (Figur 3, 4) eingeschoben oder herausgezogen werden kann.15. is characterized in that the divided (Figure 5, 6) or the entire (Figure 2) rack units in the rack (Figures 1, 12 -14) by means of a suitable movable crane carriage (Figure 3, 4) inserted or can be pulled out. 16. Die Erfindung "Verfahren zur Herstellung eines ein-oder mehrgeschossigen Gebäudes aus Einschubraumeinheiten im Einschubgestell" ist dadurch gekennzeichnet, daß das Einschubgestell ruf dem D:tch einen nach links und rechts beweglichen Einsc:hub-ran (Figuren 12 - 14) hat, bestehend aus Stahl, 17. ist dadurch gekennzeichnet, daß an den Einschub-Kranseilen (Nr. 22) eine Tr.msportplattform ( Blatt 2 Nr. 17) angebracht ist, auf der eine hydrauliche Druck- und Zugvorrichtung ist. (Nr. 15), 18. ist dadurch gekennzeichnet, daß an der Transprotplattform Gleit- und Abstandsrollen sind. (Nr. 18), 19. ist durch die transportablen Seilrollen (Nr. 12) gekennzeichnet, 20. ist gekenazeichnet durch die Versorgungsleitungs-Übergabestation auf jedem Treppenpodest (Figur 2 Nr. 4) im Versorgungsschacht (Figur 2 Nr. 6), 21. ist dadurch gekennzeichnet, daß an die Versorgunge-Übergabestationen (Figur 2 Nr. 4) die Versorgungsleitungen, von den Einschubraumelementen leicht löslich, mittels Schlauchverbindung angeschlossen sind, 22. ist gekennzeichnet durch die Kunststoff-Profilabdeckung für die optische Verbesserung der Außenfassaden (Figur 1 Nr. 2) 23. ist dadurch gekennzeichnet, daß die Transportplattform (Nr. 17) durch austauschbare Segmente (Nr. 19) nach Bedarf verstellbar ist 24. ist gekennzeichnet durch die Gleitrollenführung (Nr. 21),die sich durch die Stahlgerüst- oder Stahlbetonkonstruktion vom Einschubgestell ergibt.16. The invention "Process for the production of a one-story or multi-story Building made up of rack units in the rack "is characterized by that the slide-in frame calls the D: tch an Einsc: hub-ran that can be moved to the left and right (Figures 12-14) has, consisting of steel, 17. is characterized in that A transport platform (sheet 2 no. 17) is attached to the push-in crane ropes (No. 22) is on which a hydraulic push and pull device is. (No. 15), 18th is through characterized in that sliding and spacer rollers are on the transport platform. (No. 18), 19. is marked by the transportable pulley (No. 12), 20. is marked by the supply line transfer station on each stair landing (Figure 2 No. 4) in the supply shaft (Figure 2 No. 6), 21. is characterized that to the supply transfer stations (Figure 2 No. 4) the supply lines, Easily detachable from the slide-in space elements, connected by means of a hose connection are, 22. is characterized by the plastic profile cover for the optical Improvement of the external facades (Figure 1 No. 2) 23. is characterized in that the transport platform (No. 17) with exchangeable segments (No. 19) as required is adjustable 24. is characterized by the sliding roller guide (no. 21), the results from the steel frame or reinforced concrete construction of the slide-in frame. 25. ist dadurch gekennzeichnet, daß die Elnschub-Krnanlage---(Figuren 12 -14) so konstruiert ist, daß diese auch bei Fensterputz-, Tntindsetzungs- und ihnlichen GebLudearbeiten verwendet werden kann.25. is characterized in that the Elnschub-Krnanlage --- (Figures 12-14) is constructed in such a way that it can also be used for window cleaning, Tntindsetzungs- and Similar building work can be used. 26. ist dadurch gekennze.chnet, daß das Getriebe (Nr. 11) eine Umstellvorrichtung zum Antrieb von nur einer Seilzugrolle (Nr.13) hat, 27. ist dadurch gekennzeichnet, daß die Einschub-Krananlage für den Aufzugsantrieb genutzt wird.26. is thereby gekennze.chnet that the transmission (no. 11) has a changeover device for driving only one pulley (number 13), 27. is characterized by that the push-in crane system is used for the elevator drive.
DE19803036468 1980-09-24 1980-09-24 industrialised cell and frame assembled building - has completely prefab. room cell units inserted in prefab. frame Withdrawn DE3036468A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE19803036468 DE3036468A1 (en) 1980-09-24 1980-09-24 industrialised cell and frame assembled building - has completely prefab. room cell units inserted in prefab. frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE19803036468 DE3036468A1 (en) 1980-09-24 1980-09-24 industrialised cell and frame assembled building - has completely prefab. room cell units inserted in prefab. frame

Publications (1)

Publication Number Publication Date
DE3036468A1 true DE3036468A1 (en) 1982-05-06

Family

ID=6112981

Family Applications (1)

Application Number Title Priority Date Filing Date
DE19803036468 Withdrawn DE3036468A1 (en) 1980-09-24 1980-09-24 industrialised cell and frame assembled building - has completely prefab. room cell units inserted in prefab. frame

Country Status (1)

Country Link
DE (1) DE3036468A1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4028914A1 (en) * 1990-09-12 1992-03-19 Nuedling Franz C Basaltwerk Building constructed from prefab elements - has air conditioning equipment embodied in some elements
DE102013201171A1 (en) 2013-01-24 2014-07-24 Infracor Gmbh Method and system for using an industrial property
WO2015097226A3 (en) * 2013-12-23 2015-09-24 GEIGER, Gunter, Grant Building, in particular a hospital

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4028914A1 (en) * 1990-09-12 1992-03-19 Nuedling Franz C Basaltwerk Building constructed from prefab elements - has air conditioning equipment embodied in some elements
DE102013201171A1 (en) 2013-01-24 2014-07-24 Infracor Gmbh Method and system for using an industrial property
WO2014114558A1 (en) * 2013-01-24 2014-07-31 Infracor Gmbh Method and system for using an industrial site
WO2015097226A3 (en) * 2013-12-23 2015-09-24 GEIGER, Gunter, Grant Building, in particular a hospital
CN106164388A (en) * 2013-12-23 2016-11-23 冈特·格兰特·盖格 Building, in particular hospital
US10167645B2 (en) 2013-12-23 2019-01-01 Gunter Geiger Building, in particular a hospital
US10883287B2 (en) 2013-12-23 2021-01-05 Gunter Geiger Building, in particular a hospital

Similar Documents

Publication Publication Date Title
EP0038800B1 (en) Skeleton-frame system for the erection of building constructions
DE102019107165A1 (en) Method for retrofitting a building with an elevator system, component set for carrying out the method, elevator system and prefabricated shaft for the elevator system
EP0639677B1 (en) Building composed from modules of prefabricated units
DE3036468A1 (en) industrialised cell and frame assembled building - has completely prefab. room cell units inserted in prefab. frame
EP3230538B1 (en) Modular swimming pool system
DE19836942B4 (en) Room cell made of wood and wood-based materials
DE2020607B2 (en) Multi-storey building made up of standardized, prefabricated room cells
EP0568165B1 (en) Method of integrating construction and building block for its implementation
DE102017118004A1 (en) Drywall partitioning system and method of assembling such a drywall partitioning system
DE29907386U1 (en) Modular deck house
DE2940884A1 (en) Prefab. bathroom or toilet room cell - has reinforcement linking concrete walls, ceiling and floor, of same thickness as rendering
EP1892069A2 (en) Production line for making a prefabricated panels for building walls
CN215803697U (en) Building engineering construction safety control rail
EP0665341A1 (en) Accomodation unit and method for manufacturing as well as floor frame therefore
DE2228967A1 (en) CASED CONCRETE PRECAST AND CASED CONCRETE PRECAST CONSTRUCTION
DE2115469A1 (en) Buildings made from prefabricated elements and methods of erecting such a building
DE857442C (en) Process for the production of buildings, especially in series construction
DE2322920A1 (en) PRE-FABRICATED COMPONENT FOR THE MANUFACTURE OF BUILDINGS
DE102006024316A1 (en) Room module for providing temporary accommodation during road and building construction comprises a floor and side walls with supports provided with supporting elements in the upper end region with bearings for absorbing oscillations
DE897918C (en) Garage, shed, makeshift home or the like.
DE2125803A1 (en) Process for the production of high-rise buildings, preferably residential high-rise buildings made of concrete
DE2112335C3 (en) Prefabricated, transportable room element for the erection of structures
CH490588A (en) Prefabricated element
DE2206848A1 (en) TERM CONSTRUCTION SYSTEM
DE2546932A1 (en) Prefabricated building - complex volumetric units form lightweight material load bearing structure

Legal Events

Date Code Title Description
8139 Disposal/non-payment of the annual fee