DE2019301A1 - Method and device for the production of concrete elements, preferably cable duct blocks - Google Patents

Method and device for the production of concrete elements, preferably cable duct blocks

Info

Publication number
DE2019301A1
DE2019301A1 DE19702019301 DE2019301A DE2019301A1 DE 2019301 A1 DE2019301 A1 DE 2019301A1 DE 19702019301 DE19702019301 DE 19702019301 DE 2019301 A DE2019301 A DE 2019301A DE 2019301 A1 DE2019301 A1 DE 2019301A1
Authority
DE
Germany
Prior art keywords
elements
mold
concrete
cavity
mold frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
DE19702019301
Other languages
German (de)
Inventor
Wilfried Baum
Joachim Beer
Peter Foerster
Irene Franke
Manfred Heimer
Rolf Jaehnel
Lothar Kellner
Heinz Rudolph
Friedrich-Karl Steinbach
Claus Uebel
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BAUSTOFFKOMBINAT NOBITZ VEB
Original Assignee
BAUSTOFFKOMBINAT NOBITZ VEB
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BAUSTOFFKOMBINAT NOBITZ VEB filed Critical BAUSTOFFKOMBINAT NOBITZ VEB
Publication of DE2019301A1 publication Critical patent/DE2019301A1/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B1/00Producing shaped prefabricated articles from the material
    • B28B1/08Producing shaped prefabricated articles from the material by vibrating or jolting
    • B28B1/087Producing shaped prefabricated articles from the material by vibrating or jolting by means acting on the mould ; Fixation thereof to the mould
    • B28B1/0873Producing shaped prefabricated articles from the material by vibrating or jolting by means acting on the mould ; Fixation thereof to the mould the mould being placed on vibrating or jolting supports, e.g. moulding tables
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B1/00Producing shaped prefabricated articles from the material
    • B28B1/08Producing shaped prefabricated articles from the material by vibrating or jolting
    • B28B1/10Producing shaped prefabricated articles from the material by vibrating or jolting and applying pressure otherwise than by the use of presses
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B1/00Producing shaped prefabricated articles from the material
    • B28B1/44Producing shaped prefabricated articles from the material by forcing cores into filled moulds for forming hollow articles
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B7/00Moulds; Cores; Mandrels
    • B28B7/16Moulds for making shaped articles with cavities or holes open to the surface, e.g. with blind holes
    • B28B7/18Moulds for making shaped articles with cavities or holes open to the surface, e.g. with blind holes the holes passing completely through the article

Landscapes

  • Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Chemical & Material Sciences (AREA)
  • Ceramic Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Press-Shaping Or Shaping Using Conveyers (AREA)
  • Devices For Post-Treatments, Processing, Supply, Discharge, And Other Processes (AREA)
  • Moulds, Cores, Or Mandrels (AREA)

Description

"Verfahren und Vorrichtung zur Herstellung von Betonelementen, vorzugsweise Kabelkanalformsteinen11 *U I αOU T"Method and device for the production of concrete elements, preferably cable duct blocks 11 * UI αOU T

Die Erfindung betrifft ein Verfahren und eine Vorrichtung zur Herstellung von Betonelementen, insbesondere Kabelkanalformsteinen« The invention relates to a method and an apparatus for the production of concrete elements, especially cable duct blocks «

Zur Herstellung von Betonelementen, insbesondere Kabelkanalformsteinen, sind die verschiedensten Verfahren bekannt • und in Anwendung, Neben der manuellen Herstellung von Betonelementen» Insbesondere Kabelkanalformsteinen, in zerlegbaren Formen gibt es bekannte Verfahren und Vorrichtungen zur maschinellen Herstellung»For the production of concrete elements, especially cable duct blocks, The most diverse processes are known • and in use, In addition to the manual production of Concrete elements »In particular, cable duct blocks, there are known methods and devices in dismountable forms for machine production »

Es sind Verfahren und Vorrichtungen bekannt, bei denen insbesondere Kabelkanalformsteine analog der Rohrfertigung in vertikaler Anordnung gefertigt werden» Die Befilllung der wahlweise über oder unter Flur angeordneten Formeneinrich-' tungen erfolgt in bekannter Weise durch Dosierbänder. Die Verdichtung der eingebrachten Masse erfolgt dabei durch Kernvibratoren und Außenvibratoren».There are known methods and devices in which in particular Cable duct blocks analogous to pipe production in vertical Arrangement to be made »The filling of the mold equipment arranged either above or below the corridor operations is carried out in a known manner by metering belts. The mass introduced is then compacted Core vibrators and external vibrators ».

Bei weiteren bekannten Verfahren werden vorzugsweise Kabelkanalformsteine In waagerechter Anordnung gefertigt· Dabei wird in einem Tferfahren die Fertigung auf einer um 180° kippbaren Vorrichtung vorgenommen, wobei die aussparungsbildenden Kfemelemente erst die eine Hälfte des Betonformlings erfassen \and nach Drehen der Form die andere Hälfte bearbeitet wird* Bei diesen bekannten Verfahren werden die formbildenden Kernel^mente als Vibratoren ausgebildet*In other known processes, molded cable duct blocks are preferably manufactured in a horizontal arrangement the production is done in one step by 180 ° tiltable device made, the recess-forming Kfemelemente only half of the concrete molding capture \ and after rotating the shape, edit the other half will * In these known processes, the shape-forming Kernel elements designed as vibrators *

Bei -einem weiteren Verfahren werden Betonelement in eine)? • kombinierten Form, bei der durch die Formaußenteile ein dreiseitig geschlossener Rahmen entsteht, in dem die/aussparungbildenden Elemente gelagert sind, hergestellt* Bti diesenIn another process, concrete elements are converted into a)? • Combined form, with a three-sided form due to the outer form parts closed frame is created in which the / recess-forming Elements are stored, manufactured * Bti these

000840/1143 '-3 ~ 000840/1143 '- 3 ~

,■ ' * BADOWQiKlAl., ■ '* BADOWQiKlAl.

bekannten Verfahren werden bei der Entschalung zuerst die Formseitenteile in horizontaler Richtung bewegt» wobei die Kernrohre zwangsweise verzögernd gezogen werden·known processes are first the Mold side parts moved in a horizontal direction »whereby the core tubes are drawn with a forced delay ·

Es ist weiterhin bekannt, daß zur Erzielung von glatten Innenwandungen der Aussparungen der Betonelemente die Kern«· elemente in Drehung versetzt werden,It is also known that to achieve smooth Inner walls of the recesses of the concrete elements the core «· elements are set in rotation,

Bei den bekannten Verfahren und Vorrichtungen der Senkrecht» fertigung handelt es sich um aus der Rohrfertigung entlehnteWith the known methods and devices of the vertical » production is borrowed from pipe production

* Technologien, die auch die Nachteile der Rohrfertigung auf die vorzugsweise zu fertigenden Kabelkanalformetelne Übertragen· Insbesondere die Befüllung der stehenden Formen ist unökonomisch, da ein grc3orer Zeitaufwand durch den geringem Einfüllquerschnitt erforderlich ist.* Technologies that also address the disadvantages of pipe manufacturing Transfer the cable duct formulas to be preferably manufactured In particular, the filling of the standing forms is uneconomical, since a greater expenditure of time due to the low Filling cross-section is required.

Bei diesen bekannten Verfahren ist die Verdichtung unter Auflast wahrscheinlich nicht voll wirksam, da die Wirkfläche zu klein ist und gegenüber Volumen und Länge dee Betonformlings in einem ungünstigen Verhältnis- steht· Es wird be-In these known methods, the compression under load is probably not fully effective, since the effective area is too small and compared to the volume and length of the concrete molding is in an unfavorable relationship - it will be

m hauptet, daß keine gleichmäßige Verdichtung am gesamten Betonquerschnitt vorliegt, so daß bei Schwerpunktverlagerung der friachentschalten Elemente beim !!Transport bzw« Bewegen eine De formierung und Rißbildung eintritt, die insbesondere bei Kabelkanalformsteinen die Gebrauchsfähigkeit des Betonelement; es In trage stellt« Außerdem kann die Lagerfläche, die zu>r Nachbehandlung der Elemente erforderlich ist, nicht optimal genutzt werden· m claims that there is no uniform compaction of the entire concrete cross-section, so that when the center of gravity of the friachentschalt elements is shifted during transport or movement, deformation and cracking occurs, which in particular in the case of cable duct blocks, the usability of the concrete element; It also states that the storage space that is required for subsequent treatment of the elements cannot be used optimally.

0Q8848/U4f0Q8848 / U4f

ORIGINAL INSPECTEDORIGINAL INSPECTED

Bel diesen Verfahren besteht ein weiterer Nachteil, darin* daß erhebliche Aufwendungen an Bauleistungen für dM Aufstellen der Maschineneinrichtung, da Fundamentgruben bis 2,5 m Tiefe geschaffen werden müssen, erforderlich sind. Bei diesen Verfahren werden die neuesten technischen Erkenntnisse des Bntschalens durch Drehen der Kernelemente nicht angewendet, so daß ein zusätzlicher Arbeitsgang erforderlich ist, um eine hohe Qualität der Aussparungen bei insbesondere Kabelkanalformsteinen su erreichen« , This method has a further disadvantage, in that considerable construction work is required for setting up the machine equipment, since foundation pits up to 2.5 m deep have to be created. In this process, the latest technical knowledge of unblocking by turning the core elements is not used, so that an additional work step is required in order to achieve a high quality of the recesses, especially in cable duct blocks .

Bei den bekannten Verfahren der Waagerechtfertigung bestehen Nachteile in der komplizierten Technologie durch mehrmaliges Verändern der Arbeitsebene·In the known methods of horizontal justification, there are disadvantages in the complicated technology changing the working level several times

Weitere Nachteile der bekannten Verfahren In der Sntscha« lungstedmologie bestehen darin, daß IfessriJtagsteltcn beim gemeinsamen swangswelsen Entschalen alt den Keintlraenten Über die gesamte Läng· des Betonelementee geführt werden müssen. Dabei tritt ein erheblicher Verschleiß aller form« bildender Elemente auf, die bei. der kombinierten Anordnung eines geschlossenen Formrahmens mit eingelagerten Kern· elementen einen frühzeitigen Verschleiß der gesamten Vorrichtung irerureacht» Ein Austausch von Verschleißteilen ist koste aaufwendig. Außerdem werden die Kopfseiten der Form bei diesen Verfahren manuell entschalt, so daß eine EueätEliche Arbeitskraft erforderlich und damit keine optimale Ökonomie erreichbar ist. Weiterhin ist die Qualität des Betonelements von den manuellen Fertigkeiten des Bedienenden abhängig« Sine Verkettung mit Nachfolge-Further disadvantages of the known procedures in the Sntscha « lung theory consist in the fact that knowledge common swangswelsen demoulding old the Keintlraente Be guided over the entire length of the concrete elements have to. There is considerable wear and tear of all shapes " of the constituent elements that at. the combined arrangement a closed mold frame with embedded core elements ensure premature wear of the entire device. »An exchange of wear parts is expensive. In addition, the head pages of the Mold manually demolded in this process, so that a New labor required and therefore none optimal economy can be achieved. Furthermore, the quality of the concrete element is from the manual skills dependent on the operator «Sine concatenation with successor

.00.8848/114:3.-- ..00.8848 / 114: 3 .--.

technologien ist bei allen bekannten Verfahren nicht im Einsäte und auf Grund der spezifischen Konstruktionsauslegungen aufwendig»technology is not used in any of the known processes and due to the specific construction designs expensive »

Zweck der Erfindung ist es, ein Verfahren und eine Vorrichtung zu schaffen, mit deren Hilfe Betonelemente, insbesondere Kabelkanalformsteine, nach einem technologisch günstigen Verfahren mit hohem ökonomischem Nutzen hergestellt werden können. The purpose of the invention is to provide a method and a device with the help of which concrete elements, in particular Cable duct blocks, can be produced by a technologically favorable process with high economic benefit.

Der Erfindung liegt die Aufgabe zugrunde, eine Vorrichtung im Baukastenprinzip, die sich für Verkettungen mit bekannten nachfolgetechnologien eignet, zu schaffen· Mit dieser Vorrichtung soll nach einer bestimmten Verfahrenstechnologie gearbeitet werden, die so abgestimmt ist, daß außer den vorzugsweise zu fertigenden Kabelkanalformeteinen auch andere Betonelemente durch einfachstes Auswechseln von Zusatzeinrichtungen unter Beachtung von günstigem Verschleiß, Qualitäts- und Sicherheitsmerkmalen hergestellt werden können.The invention is based on the object of a device based on the modular principle that is suitable for interlinking with known subsequent technologies suitable to create this device is to be used according to a certain process technology that is coordinated in such a way that that apart from the cable duct shapes that are preferably to be manufactured also other concrete elements by simply exchanging additional equipment taking into account favorable wear, quality and safety features can be produced.

Der Erfindung liegt weiter zugrunde, daß der subjektive Einfluß des Bedienungspersonals durch einen hohen Mechani-The invention is also based on the subjective Influence of the operating personnel through a high mechanical

sierungsgrad beseitigt wird·degree of transformation is eliminated

Erfindungsgemäß besteht die Vorrichtung in der Baukastenbauweiee ame des universellen {Äasehioenrahmen aua Profilstählen, der allseitig aus Gründen der Sicherheit verkleidet ist und di@ Auflast, den Formenyahmen, den Beton-According to the invention, the device is modular name of the universal {Äasehioenrahmen aua profile steels, which is clad on all sides for safety reasons and di @ Auflast, the mold frame, the concrete

- 6 009848/1143 - 6 009848/1143

auf geber und Jfostenbeschicker' aufnimmt. Vom Maschinenrahmen feetrennt sind die Brett zuführung, die Dreh- und Zieheinrichtung der hohlraumbildenden Elenente und der Kitteltisch angeordnet« Die Steuerung und der Antrieb aller Bewegungsvorsänge an der Torrichtung erfolgt durch ein elektrohydrau-. lisches Prinzip mit vollautomatischem Ablauf«on donors and feeders'. From the machine frame The board infeed, the turning and pulling device of the cavity-forming element and the plastering table are separated arranged «The control and the drive of all movement curtains on the door direction is carried out by an electrohydraulic. lical principle with fully automatic process "

Erfindungsgemäß ergibt sich das Zusammenwirken der einzelnen Baugruppen wie folgt: "According to the invention, the interaction of the individual results Assemblies as follows: "

Nachdem die Hydraulik in Betrieb genommen wurde, wird der Formlingsunterlagenvorschub betätigt und die Pormlingsunterläge in die Arbeitsstellung auf den Bütteltisch eingefahren· Dabei wird die Steuerung iür das Senken des Formrahmena ausgelöst, indem durch einen Endachalterkontakt das Wegeventil für die entsprechenden Arbeitszylinder betätigt wird. Gleichzeitig wird von demselben Kontakt die Rückwärtsbewegung de:? Formliifcgsunterlagenvorschubeinrichtung ausgelöst. Erreicht der abgesenkte Formrahmen die Arbeitsstellung, wird durch einen Endschalterkontakt das Wegeventil für die Arbeitszylinder des Formrahmens geschlossen» Gleichzeitig betätigt I der Endschalterkontakt das Offnen des Wegeventils der Arbeitszylinder für das Einschieben der Formkopfteile. Datei werden die Zentrierstifte mit in Arbeitsstellung gebracht«! Durch die Fo rmlingsunterlagenvorachub-Inbetriebnahme wurde gleichzeitig das Zellenrad des Betonaufgebers in Bewegung gesetzt und. somit zwangsweise der laatenbeschicker gefüllt·After the hydraulic system has been put into operation, the preform feed is actuated and the preforms are moved into the working position on the shaker table.The control for lowering the mold frame is triggered by actuating the directional control valve for the corresponding working cylinder through an end switch contact. At the same time, the backward movement de :? Form document feeder triggered. When the lowered mold frame reaches the working position, a limit switch contact closes the directional control valve for the working cylinder of the mold frame »At the same time, the limit switch contact opens the directional control valve of the working cylinder for inserting the mold head parts. File, the centering pins are also brought into working position « ! During the initial commissioning of the foiling documents, the cell wheel of the concrete feeder was set in motion and at the same time. thus the lat feeder is forcibly filled

* Der Antrieb des Zellenrades wird Über einjZeitrelaia ge- * The drive of the cell wheel is controlled via a time relay

■ f ' {■ f '{

. steuert, bainit eine tiberschüttung des Kaattnbtechicktr·. controls, bainite an overflow of the Kaattnbtechicktr ·

ORIGINAL INSPECTEDORIGINAL INSPECTED

vermieden wird„ Das Absetzen der Form in Verbindung mit der Abschaltung des Zeitrelais bewirkt die Inbetriebnahme des Kastenbeschickers, der nunmehr die fünfseitig geschlossene >¥orm in zwei horizontalen Richtungen durch einen Arbeitszylinder betätigt, einmal überstreicht und die Form mit ca· V3 ihres Volumens befüllt· Das Vorfüllen hängt ab von der Konsistenz und der Korntrennung· Pie Abschaltung dieses Bewegungsvorganges erfolgt über Endschalterkontakt, der gleichzeitig den Rüttler für die Vorverdichtung einschaltet. Die Verdichtungszeit wird über ein Zeitrelais gesteuert und kann verändert werden, Der Rüttler wird wahlweise so gelagert, daS die Schwingungen sowohl vertikal als auch horizontal in den Tisch und somit in das Betonelement eingetragen werden« Bei Abschaltung des Rüttlers über Zeitrelais erfolgt die Auslösung des Getriebemotors, der'die Dreh- und Zieheinrichtung der hohlraumbildenden Ele-i^nte in Arbeitsstellung bringt. Dabei tritt durch das Einfahren der hohlraumbildenden Elemente ein zusätzliches Verdichten des vorgefüllten und vorverdichte· ten Materials durch Preßwirkung auf. Kurz vor Erreichen der Arbeitsstellung wird durch die Dreh- und Ziehvorrichtung ein Endschalterkontakt ausgelöst, der den Vorschub des Kastenbeschicke rs in Betrieb setzt« Die Befüllung des Formrahmens steht also in wechselseitiger Beziehung mit den zur Form gehörenden Elementen der Dreh- und Zieheinrichtung· Nachdem der Kastenbeschicker durph die gesteuerte Abhängigkeit von der Dreh" und Zieheinrichtung stillgesetzt wurde, wird durcli den gleichen den kontaktauslösenden Endschalter das Magnetventil des Arbeitszylinder für das Senken der Auflast be- Avoided "the settling of the form in connection with the Switching off the time relay causes the box feeder to start up, which is now the five-sided closed > ¥ orm in two horizontal directions by a working cylinder actuated, passed over once and the mold is filled with approx · V3 of its volume · The pre-filling depends on the Consistency and the grain separation switches on the vibrator for pre-compaction. The compaction time is controlled by a time relay and can The vibrator can optionally be stored in such a way that the vibrations are absorbed both vertically and horizontally Table and thus entered into the concrete element «At The shaker is switched off via a time relay, the gear motor, which is the turning and pulling device, is triggered brings the cavity-forming element into working position. The retraction of the cavity-forming elements results in an additional compression of the pre-filled and pre-compressed · th material by pressing action. Shortly before the working position is reached, the turning and pulling device engages Limit switch contact triggered, the feed of the box feeder rs in operation «The filling of the mold frame is therefore in mutual relationship with that belonging to the mold Elements of the turning and pulling device · After the box feeder due to the controlled dependence on the turning and pulling device was stopped, is durcli load the same as the contact-releasing limit switch the solenoid valve of the working cylinder for lowering the load

• - 8 -• - 8th -

009841/1U3009841 / 1U3

ORIGINAL IMSPECTEDORIGINAL IMSPECTED

tätigt, Kurz vor Erreichen der Arbeitsstellung der Auflast wird über einen Endschalterkontakt der Rüttler erneut be-makes, shortly before reaching the working position of the load if the vibrator is loaded again via a limit switch contact

tätigt und das Element unter Auflast fertig verdichtet. Die ;-Auflast senkt sich während der Rüttelbewegung auf die fest- gelegte Höhe des Elements, Dieselbe gibt den Kontaktpnnkt für das Abschalten der Senkbewegung der Auflast· Durch einen Endschalterkontakt wird das Magentventil für die Arbeitszylinder des Formrahmens geöffnet. Das Heben der die Längsseiten des Betonelements begrenzenden Formteile erfolgt dabei unter der sich auf dem Betonelement befindlichen Auflast· Gleichzeitig mit dem Heben der Form wird die Drehbewegung der hohlraumbildenden Elemente ausgelöst und nach ca. 2 Sekunden Beharrung der Dreh- und Ziehvorrichtung das Ausfahren derselben aus dem frischgeformten Betonelement vorgenommen. Erst nach Beendigung dieses Vorganges erfolgt durcZi Endschaltersteuerung das Öffnen des Magnetventils für den Arbeitszylinder der Auflast. Nach der Beendigung der Hubbewegung der Auflast erfolgt das Entschalen der Formkopfteile in der Art, daß zuerst die Zentrierstifte über 50 mm gezogen werden und danach die senkrecht stehenden Formkopfteile ^ folgen, Die im Bereitschaft stehende Formlingsunterlage wird nach Abziehen der kompletten Formkopfteile durch den Formlingsunterlagenvorschub auf den Arbeitstisch gebracht, so daß das nächste Betonelement nach dem gleichen Ablaufprinzip gefertigt werden kann. Zwangsweise wird durch die Verschiebung der Formlingsunterlage die mit dem Betonelement belegtie Formlin gsunterlage aus der Maschine ausgefahren und der nächsten Verkettungseinheit übergeben·and the element is completely compacted under load. The; -upload drops during the shaking movement to the specified height of the element. This provides the contact point for switching off the lowering movement of the load · A limit switch contact opens the solenoid valve for the working cylinder of the mold frame. The lifting of the molded parts delimiting the long sides of the concrete element takes place under the load on the concrete element.Simultaneously with the lifting of the mold, the rotary movement of the cavity-forming elements is triggered and, after about 2 seconds of persistence, the rotating and pulling device extends the same from the freshly formed concrete element. Only after completion of this process does the limit switch control open the solenoid valve for the working cylinder of the load. After the end of the lifting movement of the load, the mold head parts are demoulded in such a way that first the centering pins are pulled over 50 mm and then the vertical mold head parts ^ follow Working table brought so that the next concrete element can be manufactured using the same sequence principle. By shifting the molding base, the molding base covered with the concrete element is forced out of the machine and transferred to the next interlinking unit.

- 9 - . 009848/1143 - 9 -. 009848/1143

Die Erfindung soll nachstehend an einem Ausführüngsbeispiei erläutert werden, tn der zugehörigen Zeichnung »eigens.The invention is to be used below in an exemplary embodiment are explained in the accompanying drawing »specially.

Fig· 1: die Vorderansicht,Fig. 1: the front view,

Pig· 2: die Draufsicht nach Pig· 1 und 3»Pig · 2: the top view of Pig · 1 and 3 »

Pig, 3* eine Seitenansicht nach Pig* 1»Pig, 3 * a side view after Pig * 1 »

Fig, 4-1 Schnitt nach Fig^ 3,Fig, 4-1 section according to Fig ^ 3,

Pigf 5! Einzelheit X nach Pig, 3,Pigf 5 ! Detail X after Pig, 3,

Pig· 6: Schnitt nach Fig. 5,Pig 6: section according to Fig. 5,

Pig· ?ϊ Taktfolge schema..Pig ·? Ϊ Timing scheme ..

Nachdem das elektrohydraulische Steuersystem 1 durch Einschalten der Pumpe in Be-irieb genommen wurde, wird der Formlingsunterlagenvorschub ?., der im wesentlichen aus zwei parallelen Rohrträgern mit Traverse 3 besteht, durch einen Arbeitszylinder 4- betätigt und die Formlingsunterlage 51 die im Magazin 6 an unterster Stelle liegt, in Bereitstel*- lung und mit einem nochmaligen Vorschub durch die nächstfolgende Pormlingsunterläge 5 in Arbeitsstellung auf den Rütteltisch 7 gebracht. Bei eingeschaltetem elektrohydraulischem Steuersystem 1 wird dabei zwangsweise die Steuerung für das Senken des Formrahmens 8 ausgelöst. Das Senken sowie das spätere Heben des Formrahm'ens 8 wird durch zwei Arbeitszylinder 9 getätigt. Zwangsweise erfolgt die Rückwärtsbewegung der FormlingsunterlageivvOrschubeinxichtung 2 durcli umkehrbares Arbeiten des Arbeitszylinders A· Gleichzeitig mit Betätigung des FormlingsunterXagenvorsc hübe 2 wird die Dosiereinrichtung, ein Zellenrad 10 des Betonaufgebers 11 in Drehung versetzt und somit der Kastenbesctiicker 12 mitAfter the electrohydraulic control system 1 by switching on the pump has been put into operation, the Blank document feed?., Which essentially consists of two parallel pipe supports with traverse 3, actuated by a working cylinder 4- and the molding pad 51 which is at the bottom of magazine 6, in readiness * - ment and with a repeated feed through the next following Pormlingsunterlagen 5 in working position on the Vibrating table 7 brought. When the electrohydraulic is switched on Control system 1 is forced to trigger the control for lowering the mold frame 8. Lowering as well the later lifting of the mold frame 8 is carried out by two working cylinders 9 made. The backward movement is compulsory of the molding underlaying 2 durcli reversible working of the working cylinder A · Simultaneously with actuation of the molding under Xagenvorsc hübe 2, the Dosing device, a cellular wheel 10 of the concrete feeder 11 set in rotation and thus the box container 12 with it

- 10 009848/1143 - 10 009848/1143

ν · BAD ORIGINAL.ν · BAD ORIGINAL.

^fffimmtenMange Beton gefüllt,, Dabei wird eine genaue Dosierung $|§r ein Zeitrelais erwirkto Erreicht der ?orm·- rahpeii § seine Arbeitsstellung, werden über Arbeitszylinder die koii^fftten formkopfteile 14» bestehend aus senkrecht ste^eiideii ijlasken 15, die in einer Platte mit eingesetzten Zentrierstiften 16 verlagert sind, in Arbeitsstellung gebracht. Damit ist der Formrahmen 8 fünfseitig geschlossen und eine Befüllung mit Beton durch den Kastenbeschicker 12 nach Abschalten des Zeitrelais mögliche Das Befüllen erfolgt so, daß der Kastenbeschicker 12 den fünfseitig geschlossenen Formrahiaen 6 in horizontaler Richtung überstreicht und der Formrahmen 8 fcit " ca„ Hy seines Volumens vorgefüllt wirdc Die Bewegung des iCastenbefchickers 12 wiro lurch einen Arbeitszylinder 26, der gegenläufig arbeitety herbeigeführt„ Die Betätigung des Arbeitszylinders 26 erfolgt über ein Wegeventil· Dabei wird in paralleler Führung der Zastenbeschicker 12 durch Zahnräder 27 und Zahnstangen 28 zwangsgeführt«, In Abhängigkeit von der Vorfüllung wird nach Beendigung derselben der Rüttler 17 des Rütteltisches 7 für die Vorverdichtung eingeschaltet« Die Vorverdichtungszeit wird in Abhängigkeit von der Konsistenz | und der Größe der Betonelemente über ein Zeitrelais gesteuert. In Abhängigkeit von der Ausschaltung des Rüttlers 17 des Rütteltisches 7 wird die Dreh- und Zieheinrichtung 18, die aus den drehbar gelagerten hohlraumbildenden Elementen 19 sowie dem dazu gehörigen Gruppenantrieb 20, der Führung 21, deren Antrieb 22 und dem Übertragungsmechanismus 23 besteht, in Arbeitsstellung gebracht ο Beim Einfahren der hohlraumbilaend«&n Elemente 19 in den Formrahmen 8 erfolgt eine zu-^ fffimmtenMange concrete is filled, an exact dosage is obtained for a time relay o When the? orm · - rahpeii § reaches its working position, the coii ^ fftten molded head parts 14 "consisting of vertical st ^ eiideii ijlasken 15, the are displaced in a plate with inserted centering pins 16, brought into working position. The mold frame 8 is closed on five sides and filling with concrete by the box feeder 12 is possible after the time relay has been switched off. The filling takes place in such a way that the box feeder 12 sweeps over the mold frame 6, which is closed on five sides, in the horizontal direction and the mold frame 8 fcit "approx" Hy of its volume wirdc prefilled the movement of the iCastenbefchickers 12 wiro lurch a working cylinder 26, the counter y operates brought "the operation of the working cylinder 26 via a directional control valve · in this case, in a parallel guidance of the Zastenbeschicker 12 positively driven by gears 27 and toothed racks 28 ', depending on the After pre-filling, the vibrator 17 of the vibrating table 7 is switched on for the pre-compaction Eh- and pulling device 18, which consists of the rotatably mounted cavity-forming elements 19 and the associated group drive 20, the guide 21, its drive 22 and the transmission mechanism 23, brought into working position ο When the hollow space elements 19 are inserted into the mold frame 8 is there an

' - 11 -'- 11 -

00984B/1U3 100984B / 1U3 1

BADORlQINAt. 'BADORlQINAt. '

AOAO

sät«liehe Verdichtung durch Preßwirkung auf Grund der besonderen Form der hohlraumbildenden Elemente 19· Nachdem die Dreh- und Zieheinrichtung 18 mit ihren hohlraumbildenden Elementen 19 ihr Arbeitsstellung erreicht hat, iat die Bedingung für ein erneutes Befahren des Pormrahmens 8 mit dem Kastenbeschicker 12 gegeben«, Die Restbefüllung des Pormrahmens 8 erfolgt,, Der Kastenbeschicker 12 geht in Befttlletellung unter den Betonaufg^ber 11» Bei Erreichung dieser Endstelluno erfolgt ein zwangsweises Absenken der Auflast 24, die durch zwei Führungskolben 29 ein Verkanten der Auflast 24- verhindert durch einen Arbeitszylinder 25. Die sich senkende Auflast 24, die eine Erhöhung der Verdichtungswirkung mit sich bringt und gleichzeitig den Formrahmen 8 an der sechsten Seite schließt und somit auch die Formgebung des Betonelement* tes in seiner Höhe toleriert, betätigt über einen Endschalterkontakt den Rüttler 1? ernaut, und das Betonelement wird fertig geformt und verdichtet. Hat die Auflast 24 die eingestellte Höhe des Betonelements erreicht, erfolgt dig. Unterbrechnung des Rüttel Vorganges» Zwangsläufig wird durch das Abschalten des Rüttlers 17 das Wegeventil für die Arbeitszylinder 9 des FormrÄhniens 8 geöffnet und der Formrahmen 8 wird bei stehenbleibende:? Auflast 24 in seine Ausgangsstellung gehoben. Mit Beginn des Aushebens des Formrahmens 8 werden die hohlrausnbildenden Betonelemente 19 in Drehung versetzt, und nach einer Verzögerung wird die Dreh- und Zieheinrichtung durcfc Betätigung des Antriebes 22 in Ausgangsstellung gebracht. Übea? Endschalterbetätigung erfolgt die Öffnung des Wegeventils für den Arbeitszylinder 25,-der die Auflast 24 in ihrensows compaction by pressing on the basis of the special Shape of the cavity-forming elements 19 · After the rotating and pulling device 18 with its cavity-forming Elements 19 has reached their working position, iat the condition for a new drive on the Pormrahmens 8 with the Box feeder 12 given «, the remaining filling of the Pormrahmens 8 takes place, the box feeder 12 goes into Befttlletellung under the concrete exercise 11 »On reaching this final position there is a compulsory lowering of the load 24, which by means of two guide pistons 29 prevents the load 24 from tilting through a working cylinder 25. The lowering Load 24, which brings about an increase in the compression effect and at the same time the mold frame 8 on the sixth Side closes and thus also the shape of the concrete element * tes tolerated in height, actuated via a limit switch contact the vibrator 1? ernaut, and the concrete element is ready shaped and compacted. Has the load 24 the set Reached the height of the concrete element, dig. Interruption of the shaking process »Inevitably, the shutdown of the vibrator 17, the directional control valve for the working cylinder 9 of the mold frame 8 is opened and the mold frame 8 is opened at stopping:? Load 24 lifted into its starting position. With the beginning of the excavation of the mold frame 8, the hollow-roughening concrete elements 19 are set in rotation, and After a delay, the turning and pulling device is brought into its starting position by actuating the drive 22. Ubea? When the limit switch is activated, the directional control valve opens for the working cylinder 25, -der the load 24 in their

- 12 -0Q9848/1U3- 12 -0Q9848 / 1U3

Führungskolben 29 naöh. oben bev/egt und dieselbe in seine Ausgangsstellung bringt. Die Auflast 24 fährt gegen einen, Endschalter, der das Wegeventil für die Arbeitszylinder 13 betätigt, die die kompletten Fonnkopfteile 14 so lösen, da2 zuerst die in einer Platte gelagerten Zentrierstifte 16 aus dem Betonelement; gezogen werden und anschließend die senkrecht· stehenden Porinkopfteile 14 vom Betonelement getrennt werden« Dadurch daß die Zßntrierstifte 16 zuerst aus dem frischgeforfinten Betonelement gezogen werden und anschließend erst die senkrechtstehenden Ponskopfteile 14 gelöst werden, wird eine Rißbildung am Kopfteil des Betonelements vermieden· Damit ist der Entschal-ungsvorgang des Betonelemente abgeschlossen, dasselbe liegt frei auf cer Formlingsunterlage 5· Di· in Ausgangsstellung gebrachten senkrechtstehenden Formkopfteile betätigen das Wegeventil für den Arbeitszylinder 4, der Über die parallelen Rohrträger mit Traverse 3 den Vorschub der Formlingsunterlagen 2 bewirkt und die in Bereitstellung stehende Formlingsunterlage 5 in Arbeitsstellung bringt· Das geschieht so, daß die neue Formlingsunterlage 5 die auf dem Rütteltiεi'a 7 liegende Formlingsunterlage 5 mit dem frischentechalten Betonelement vom Rütteltisch 7 herunterschiebt und der nächsten Verkettungseinheit übergibt„ Gleichzeitig liegt damit die nächste Formlingsunterläge 5 in Bereitschaft. Mit der Bereitstellung der Fornlingsunterlage 5 in Arbeitsstellung beginnt der automatische Ablauf der Maschine wie beschrieben.Guide piston 29 close. moved above and the same in his Starting position brings. The load 24 drives against one, Limit switch that controls the directional control valve for the working cylinder 13 operated, which solve the complete Fonnkopffteile 14 so that da2 first the centering pins 16 stored in a plate from the concrete element; are drawn and then the perpendicular standing porine head parts 14 are separated from the concrete element « Because the Zßntrierstifte 16 first from the freshly formed Concrete element are pulled and then only the vertical Ponskopffteile 14 are solved, is a Crack formation on the head part of the concrete element avoided · This is the demolding process of the concrete elements is completed, the same is exposed on the molded base 5 · Di · in the starting position brought upright mold head parts actuate the directional control valve for the working cylinder 4, the feed of the over the parallel pipe support with traverse 3 Forming pads 2 causes and bringing the ready-made molding pad 5 into working position · That happens so that the new molding pad 5 on the Rütteltiεi'a 7 Lying molding underlay 5 with the freshly techalten Concrete element pushed down from the vibrating table 7 and the next Interlinking unit transfers “At the same time, the Next molding documents 5 in readiness. With the deployment the preform 5 begins in the working position the automatic sequence of the machine as described.

009848/1143009848/1143

Claims (9)

Patentansprüche:Patent claims: φ) Verfahren und Vorrichtung zur Herstellung von Betonelementen, vorzugsweise Kabelkanalformsteinen, dadurch gekennzeichnet, daß in einem maschinell allseitig geschlossenen Formrahmen (8) mit eingelagerten hohlraumbildenden Elementen (19) die waagerechte Fertigung des Betonelements so erfolgt, daß der anfangs fünfseitig geschlossene Formrahmen (8) vorgefüllt, mit einem vertikal oder horizontal wirkenden Rüttler (1?) vorverdichtet, anschließend die hohlraumbildenden Elemente (19) eingefahren, der fünfseitig geschlossene Formrahmen (8) fertiggefüllt und unter Auflastwirkung fertig verdichtet wird, so daß die Formgebung durch den sechsseitig geschlossenen Fonnrahmen (8) gewährleistet wird. φ) Method and device for the production of concrete elements, preferably molded cable duct blocks, characterized in that the horizontal production of the concrete element is carried out in a molded frame (8), which is closed on all sides by machine and with embedded cavity-forming elements (19), in such a way that the molded frame (8) which is initially closed on five sides pre-filled, pre-compressed with a vertically or horizontally acting vibrator (1?), then the cavity-forming elements (19) retracted, the five-sided closed mold frame (8) is completely filled and completely compressed under load, so that the shape is formed by the six-sided closed mold frame (8 ) is guaranteed. 2. Verfahren nach Anspruch 1, dadurch gekennzeichnet, daß der Ablauf der Formgebung vollautomatisch nach dem Taktfolgeechema Fig, 7 erfolgt*2. The method according to claim 1, characterized in that the process of shaping is fully automatic according to the cycle sequence scheme Fig, 7 takes place * 3· Verfahren nach Anspruch 1, dadurch gekennzeichnet, daß3 · The method according to claim 1, characterized in that 4 -4 - beim Einfahren der hohlraumbildenden Elemente (19) eine zusätzliche Verdichtung durch Preßwirkung erfolgt«when retracting the cavity-forming elements (19) an additional compression takes place by pressing action « 4. - Verfahren nach Anspruch 1, dadurch gekennzeichnet, daß bei der Herstellung von Kabelkanalformsteinen die Vorrichtung mit bekannten Verkettungselementen versehen werden kann, insbesondere daß das Ausfahren der Formliirr4. - The method according to claim 1, characterized in that in the manufacture of cable duct blocks, the device is provided with known interlinking elements can be, in particular that the extension of the Formliirr - 14 009848/1143 - 14 009848/1143 unterlage (5) Über eine Keilrieaenbahn in ein Abstapelgerät erfolgt ι welches ein ÜberβinanderstapeIn mehrerer Betonelemente mit und ohne Pormlingsunterlage (5) gestattet* support (5) via a V-belt conveyor into a stacking device takes place ι which is a stack of several Concrete elements with and without molded underlay (5) permitted * 5· Verfahren nach Anspruch 1, dadurch gekennzeichnet, daß gleichzeitig mit dem Heben des Formrahmens (8) das Drehen der hohlraumbildenden Elemente (19) unter Auflast (24) durchgeführt wird» wodurch ein Glätten der Hohlrauaiaiienwände und Seitenteile des Betonelements herbeigeführt ' wird«5. The method according to claim 1, characterized in that simultaneously with the lifting of the mold frame (8) the rotation of the cavity-forming elements (19) is carried out under load (24) "whereby a smoothing of the cavity walls and side parts of the concrete element is brought about " " 6. Verfahren nach Anspruch 1, dadurch gekennzeichnet, daß die Zentriferstifte (16) aus dem Betonelement herausgezogen we-rden, bevor die senkrecht stehenden Formköpfteile (1%) abgezogen werden·6. The method according to claim 1, characterized in that the centrifuge pins (16) pulled out of the concrete element before the vertical shaped head parts (1%) can be deducted 7. Vorrichtung zur Durchführung des Verfahrens nach7. Device for performing the method according to Anspruch 1, dadurch gekennzeichnet, daß der Rütteltisch λ (7) mit dem Rüttler (17) unabhängig vom Maschinenrahmen (30) aus Profilstahl schwingungsdämpfend aufgestellt ist, ohne daß sich eine nachteilige Wirkung auf die Verdichtung ergibt,Claim 1, characterized in that the vibrating table λ (7) with the vibrator (17) is set up vibration-dampening independently of the machine frame (30) made of profile steel, without any adverse effect on the compression, 8. Vorrichtung zur Durchführung des Verfahrens nach Anspruch 1, dadurch gekennzeichnet, daß die Baugruppen,8. Apparatus for performing the method according to claim 1, characterized in that the assemblies, ' die den Formrahmen (8) sechsseitig schließen, schwingung?-'' which close the mold frame (8) on six sides, vibration? - -15-009848/1143 -15- 009848/1143 -Vf--Vf- dämpfend gelagert werden und die Rüttelfrequenzen damit nicht in den Maschinenrahmen (30) unmittelbar übertragen werden können»be stored in a damping manner and the vibration frequencies with it cannot be transferred directly to the machine frame (30) » 9. Vorrichtung zur Durchführung des Verfahrens nach Anspruch 1» dadurch gekennzeichnet» daß der Formrahmen (8) mit den zwei Längsseitenteilen (31) sowie den notwendigen Trennschieden (32) bei ein-, zwei· und dreizügigen Elementen heb- und senkbar angeordnet wird und durch seine Konstruktion gestattet, daß derselbe durch die Formkopfteile (14) mit den Zentrierstiften (16) und den hohlraumbildenden Elementen (19) in waagerechter Richtung den Formrahmen (8) für.fseitig schließt.9. Apparatus for performing the method according to claim 1 »characterized» that the mold frame (8) with the two long side parts (31) as well as the necessary separators (32) for one-, two- and three-compartment units Elements can be raised and lowered and through its construction allows the same through the mold head parts (14) with the centering pins (16) and the cavity-forming elements (19) in the horizontal direction the mold frame (8) for.fseiten closes. 10» Vorrichtung zur Durchführung des Verfahrens nach Anspruch 1, dadurch gekennzeichnet, daß die zwei senkrecht stehenden Formkopfteile (14) in horizontaler Richtung verschiebbar angeordnet sind und hydraulisch betätigt werden·10 »Device for carrying out the method according to claim 1, characterized in that the two standing vertically Mold head parts (14) displaceable in the horizontal direction are arranged and operated hydraulically 11β Vorrichtung zur Durchführung des Verfahrens nach Anspruch 1, dadurch gekennzeichnet, daß die Zentrierstifte (16) an einer Platte (33) befestigt werden, die an zwei Arbeitszylindern (13) schwingungsdämpfend befestigt ist und die gleichzeitig die senkrecht stehenden Formkopfteile (14) in sich aufnimmt und gestattet, daß die Zentrierstifte (16) sich 50 mm in horizontaler Richtung bewegen, bevor die Formkopfteile (14) sich von dem Betonelement lösen*11 β device for carrying out the method according to claim 1, characterized in that the centering pins (16) are fastened to a plate (33) which is fastened to two working cylinders (13) in a vibration-damping manner and which at the same time hold the vertical mold head parts (14) in picks up and allows the centering pins (16) to move 50 mm in the horizontal direction before the mold head parts (14) separate from the concrete element * - 16 -- 16 - 009848/1143009848/1143
DE19702019301 1969-05-16 1970-04-22 Method and device for the production of concrete elements, preferably cable duct blocks Pending DE2019301A1 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DD13987069 1969-05-16

Publications (1)

Publication Number Publication Date
DE2019301A1 true DE2019301A1 (en) 1970-11-26

Family

ID=5481217

Family Applications (1)

Application Number Title Priority Date Filing Date
DE19702019301 Pending DE2019301A1 (en) 1969-05-16 1970-04-22 Method and device for the production of concrete elements, preferably cable duct blocks

Country Status (4)

Country Link
CS (1) CS150627B2 (en)
DE (1) DE2019301A1 (en)
FR (1) FR2047845A5 (en)
RO (1) RO57586A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2643848A1 (en) * 1989-03-01 1990-09-07 Bulte Jacques Line for the automatic production of reinforced concrete formwork beams for slab floors

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2350449A1 (en) * 1976-05-05 1977-12-02 Kraemer Betonwerk Alois Concrete ceiling girders shuttering - has trapezoidal cross section and bottom plate and two converging sides and tubular core

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2643848A1 (en) * 1989-03-01 1990-09-07 Bulte Jacques Line for the automatic production of reinforced concrete formwork beams for slab floors

Also Published As

Publication number Publication date
FR2047845A5 (en) 1971-03-12
CS150627B2 (en) 1973-09-04
RO57586A (en) 1975-02-15

Similar Documents

Publication Publication Date Title
CH535641A (en) Process for relieving residual stresses in pipe blanks made of concrete and device for carrying out the process
EP0706864B1 (en) Process for making hollow building blocks
DE2019301A1 (en) Method and device for the production of concrete elements, preferably cable duct blocks
DE3429601C3 (en) Method and device for producing hollow cylindrical bodies made of concrete, in particular palisade stones
DE1182795B (en) Multi-daylight press
EP0010547A1 (en) Apparatus for manufacturing building units in pallet moulds
AT410294B (en) METHOD FOR PRODUCING HOLLOW BLOCKS AND DEVICE FOR IMPLEMENTING THE METHOD
DE1038472B (en) Method and device for changing production plates in a molding machine
DE2830479A1 (en) Concrete mould filling process - lowers component initially shutting off mould flush with top during filling
EP0175038A1 (en) Method of making building blocks with at least one cavity and apparatus for carrying out this method
DE1529916B2 (en) INJECTION MOLDING MACHINE FOR MANUFACTURING STRUCTURAL STEEL MATS
DE2549721A1 (en) Concrete pipe casting segmented mould - has stepped collar and base ring replaced by wooden board for drying
DE878324C (en) Forming machine for bodies with continuous cavities
DE2554984C3 (en) Method and device for the production of concrete moldings
DE4339118C1 (en) Method and device for producing molded articles from polymer concrete
DE2402787A1 (en) Cavity brick moulder with core punches - uses upper edge weighting plate which is independently raised and lowered
DE2216648C3 (en) Process for relieving residual stresses in pipe blanks and device for carrying out the process
DE7901607U1 (en) HEAT TREATMENT OVEN FOR THE CURING OF CONCRETE MATERIAL
AT410295B (en) Method for casting concrete bowl-shaped bodies for shaft base
DE874120C (en) Process for the production of a pipe from concrete or similar material
DE19805067B4 (en) Process for producing concrete parts
DE2040302C3 (en) Device for producing reinforced moldings made of concrete or the like
DE2218691A1 (en) High speed machine for compacting bulk goods
DE1584769B2 (en) Method and device for the production of concrete blocks with a surface made of lump-shaped material
CH388166A (en) Device for the simultaneous production of a number of concrete pipes