DE1180104B - Tower crane - Google Patents

Tower crane

Info

Publication number
DE1180104B
DE1180104B DER32525A DER0032525A DE1180104B DE 1180104 B DE1180104 B DE 1180104B DE R32525 A DER32525 A DE R32525A DE R0032525 A DER0032525 A DE R0032525A DE 1180104 B DE1180104 B DE 1180104B
Authority
DE
Germany
Prior art keywords
tower
tower crane
sub
bogie
crane
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
DER32525A
Other languages
German (de)
Inventor
Georg Heigl
Dipl-Ing Richard Spatzek
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
REICH FA WILHELM
Original Assignee
REICH FA WILHELM
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by REICH FA WILHELM filed Critical REICH FA WILHELM
Priority to DER32525A priority Critical patent/DE1180104B/en
Publication of DE1180104B publication Critical patent/DE1180104B/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/18Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes
    • B66C23/26Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes for use on building sites; constructed, e.g. with separable parts, to facilitate rapid assembly or dismantling, for operation at successively higher levels, for transport by road or rail
    • B66C23/28Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes for use on building sites; constructed, e.g. with separable parts, to facilitate rapid assembly or dismantling, for operation at successively higher levels, for transport by road or rail constructed to operate at successively higher levels
    • B66C23/283Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes for use on building sites; constructed, e.g. with separable parts, to facilitate rapid assembly or dismantling, for operation at successively higher levels, for transport by road or rail constructed to operate at successively higher levels with frameworks composed of assembled elements
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/18Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes
    • B66C23/26Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes for use on building sites; constructed, e.g. with separable parts, to facilitate rapid assembly or dismantling, for operation at successively higher levels, for transport by road or rail
    • B66C23/34Self-erecting cranes, i.e. with hoisting gear adapted for crane erection purposes

Description

Turmdrehkran Die Erfindung bezieht sich auf Turmdrehkrane und bezweckt, Turmdrehkrane der üblichen Bauart und Bauhöhe auch für Hochhausbauten einsetzen zu können. Beim Bau von Hochhäusern werden vielfach Turmdrehkrane normaler Bauart mit entsprechend hoher Turmsäule benutzt. Diese haben jedoch den Nachteil, daß das am Fuß der Drehsäule befindliche Drehlager bereits durch das Gewicht des Turmes hohen Belastungen ausgesetzt ist, was sich ungünstig auf die vom Kran hebbare Nutzlast auswirkt, Ein weiterer Nachteil besteht darin, daß Krane mit sehr hoher Turmsäule vielfach durch einen Befestigungsring mit dem Gebäude verbunden werden müssen, um die Standsicherheit zu gewährleisten. Durch eine solche Verbindung wird aber die freie Drehbarkeit der Turmsäule um 360'-'' auf einen kleineren Winkel beschränkt.Tower crane The invention relates to tower cranes and aims Use tower cranes of the usual design and height also for high-rise buildings to be able to. When building high-rise buildings, tower cranes are often of normal construction used with a correspondingly high tower column. However, these have the disadvantage that the The pivot bearing located at the foot of the rotating column is already due to the weight of the tower is exposed to high loads, which has an adverse effect on the payload that can be lifted by the crane Another disadvantage is that cranes with very high tower columns often have to be connected to the building by a fastening ring in order to to ensure stability. However, through such a connection the Free rotation of the tower column by 360'- '' restricted to a smaller angle.

Ferner ist bekannt, Turmdrehkrane normaler Bauhöhe dadurch in Hochhauskrane umzuwandeln, daß auf die Turmdrehsäule an Stelle des Auslegers ein klappbarer Oberturm aufgesetzt werden kann, der seinerseits am oberen Ende den Ausleger trägt. Auch in diesem Fall wird jedoch das gesamte Gewicht des Hochhauskranes einschließlich der Last von dem am Fuß der unteren Turmdrehsäule befindlichen Drehlager aufgenommen. Zudem ist die Gesamthöhe auch beim Ansetzen eines klappbaren Oberturmes beschränkt, da dieser aus statischen Gründen eine ge- ringere Länge hat als die den Unterturm bildende normale Turmdrehsäule.It is also known to convert tower cranes of normal overall height into high-rise cranes in that a hinged upper tower can be placed on the tower rotating column in place of the boom, which in turn carries the boom at the upper end. In this case too, however, the entire weight of the high-rise crane including the load is absorbed by the pivot bearing located at the foot of the lower rotating tower column. In addition, the overall height is also limited a folding top tower during preparation, since this static reasons an overall ringere length than the sub tower forming normal slewing column.

Schließlich gibt es den sogenannten Hochhauskletterkran, d. h. einen aufstockbaren Hochhauskran, bei welchem mittels einer Hilfsvorrichtung die einzelnen Schüsse, welche die Bestandteile der nicht drehbaren Turmsäule bilden, in der gewünschten Anzahl aufeinandermontiert werden, worauf die Drehvorrichtung mit dem Ausleger und dem Gegengewichtsausleger oben auf dem Turm aufgesetzt werden. Das Gegengewicht muß bei einem solchen Turm stets oben angebracht sein, weil die Turmsäule selbst nicht drehbar ist. Daneben sind noch weitere Bauarten von Turmdrehkranen bekannt, bei denen eine den Ausleger und das Gegengewicht tragende Drehvorrichtung sich am oberen Ende der Turmsäule befindet.Finally, there is the so-called high-rise climbing crane, i. H. a extendable high-rise crane, in which the individual Shots, which form the components of the non-rotating tower column, in the desired Number to be mounted on top of each other, whereupon the rotating device with the boom and the counterweight boom on top of the tower. The counterweight must always be attached at the top of such a tower, because the tower column itself is not rotatable. In addition, other types of tower cranes are known, in which a rotating device supporting the boom and the counterweight is on at the top of the tower column.

Die Erfindung zeigt einen neuen Weg, um Turmdrehkrane der für normale Stockwerksbauten üblichen Höhe und Bauart für den Bau von Hochhäusern einzusetzen. Der Turmdrehkran für Hochhäuser nach der Erfindung ist dadurch gekennzeichnet, daß ein Turmdrehkran der üblichen Bauart und Bauhöhe, bestehend aus einer den Ausleger tragenden Turmdrehsäule samt Drehgestell und Winden; auf einem nicht drehbaren Unterturm angeordnet ist. Dabei kann dieser Unterturm aus fertigen Schüssen aufstockbar sein. Da er in seinen Dimensionen praktisch unbeschränkt ist, werden durch die Erfindung Türmdrehkrane auch für Höchstgebäude geschaffen. Dabei besteht ein weiterer Vorteil darin, daß das Drehgestell bei dem neuen Turmdrehkran für Hochhäuser nun die gleichen Belastungen aufzunehmen hat, welche bei der üblichen 'Benutzung des den oberen Teil des Hochhauskranes bildenden Turmdrehkranes für sich in Betracht kommen.The invention shows a new way to make tower cranes the for normal To use multi-storey buildings with the usual height and design for the construction of high-rise buildings. The tower crane for high-rise buildings according to the invention is characterized in that a tower crane of the usual type and height, consisting of a boom load-bearing rotating tower column with bogie and winches; on a non-rotating lower tower is arranged. This sub-tower can be topped up from finished sections. Since it is practically unlimited in its dimensions, the invention Tower cranes also created for tall buildings. There is another advantage to this in the fact that the bogie on the new tower crane for high-rise buildings is now the same Has to absorb loads, which with the usual 'use of the upper part of the tower crane forming high-rise cranes come into consideration.

Gegenüber den bekannten Turmdrehkranen für Hochhäuser besteht der Unterschied darin, daß die für den Bau bei Hochhäusern erforderliche Erhöhung der Turmsäule nicht wie bisher durch Zwischenschaltung von Säulenteilen zwischen dem am Fuß der Säule befindlichen Drehgestell und dem Anlenkpurikt des Auslegers und auch nicht durch Einschalten eines klappbaren Oberturmes zwischen dem auf einem Drehgestell ruhenden Unterturm und dem Ausleger erfolgt, sondern dadurch, daß das Drehgestell rriit den Winden eines normalen Turmdrehkranes nach Trennung von dessen Fahrgestell auf einen nicht drehbaren Unterturm beliebiger Höhe aufgesetzt wird.Compared to the well-known tower cranes for high-rise buildings, the The difference is that the increase in the required for the construction of high-rise buildings Tower column not as before by interposing column parts between the at the foot of the column located bogie and the articulation of the boom and not even by switching on a folding upper tower between the one on top of one Bogie resting lower tower and the boom takes place, but by the fact that the Bogie rriit the winches of a normal tower crane after separating from it Chassis is placed on a non-rotating lower tower of any height.

Die sich aus der Erfindung ergebenden Vorteile wirken sich auch wirtschaftlich aus, da der Bauunternehmer keinen speziellen. Hochhausdrehkran anzuschaffen braucht; sondern seine bereits vorhandenen Turmdrehkrane mit Hilfe verhältnismäßig einfacher Zusatzteile bei jeweiligem Bedarf in einen jeder' Gebäudehöhe anpaßbaren Hochhaus-Turmdrehkran umwandeln kann.The advantages resulting from the invention also have an economic effect off as the contractor does not have a special. Need to purchase a high-rise crane; but its already existing tower cranes with the help of relatively easier Additional parts as required in a high-rise tower crane that can be adjusted to any building height can convert.

In der Zeichnung ist der Gegenstand der Erfindung in einer Ausführungsform dargestellt.In the drawing, the subject matter of the invention is in one embodiment shown.

F i g. 1 zeigt einen Hochhaus-Turmdrehkran in Seitenansicht.F i g. 1 shows a high-rise tower crane in side view.

Die F i g. 2 bis 5 stellen einzelne Phasen beim Errichten des in F i g. 1 dargestellten Turmdrehkranes dar. Die F i g. 6 und 7 zeigen den Aufbau des Hochhaus-Turmdrehkranes nach einem anderen Verfahren.The F i g. 2 to 5 represent individual phases in the construction of the in F i g. 1 illustrated tower crane. The F i g. 6 and 7 show the construction of the high-rise tower crane using a different method.

Der Turmdrehkran 1 üblicher Bauart ist mit seinem die Winden und den Ballast tragenden Drehgestell 2 mittels der Drehverbindung 3 auf dem Kopfende des Unterturmes 4 drehbar gelagert. Der Unterturm 4 besteht aus fertigen, je nach der erforderlichen Höhe aufstockbaren Schüssen 5. Er ruht bei dem gezeichneten Beispiel freistehend auf einem Fundament 6. Mittels einer am Kopfende des Unterturms angebrachten Plattform bzw. Arbeitsbühne 7 kann der Unterturm an den bereits erstellten Teil des Gebäudes 8 angelehnt bzw. an diesem Gebäudeteil verankert sein. In dem Zwischenraum. zwischen dem Gebäude 8 und dem Unterturm 4 oder in dem Unterturm kann ein bekannter Materialaufzug vorgesehen sein.The tower crane 1 of the usual design is with its the winches and the Ballast-bearing bogie 2 by means of the rotary connection 3 on the head end of the Lower tower 4 rotatably mounted. The sub-tower 4 consists of finished, depending on the required height of top-up shots 5. It rests in the example shown free-standing on a foundation 6. By means of one attached to the head end of the lower tower Platform or working platform 7 can be attached to the lower tower on the part that has already been created of the building 8 ajar or be anchored to this part of the building. In the space in between. between the building 8 and the sub-tower 4 or in the sub-tower, a known Material elevator be provided.

Statt auf dem Fundament 6 kann der aufgerichtete Unterturm 4 mit seinem Fuß auf einer horizontalen Drehachse ruhen, in welchem Fall er mit seinem oberen Ende am Gebäude verankert sein muß. Der Unterturm kann auch durch nicht gezeichnete Seile abgespannt sein.Instead of the foundation 6, the erected lower tower 4 can with his Foot rest on a horizontal axis of rotation, in which case it is with its upper one Must be anchored to the building at the end. The sub-tower can also be through unsigned Be guyed ropes.

Bei einer anderen nicht gezeichneten Ausführungsform kann der Fuß des Unterturms mit einem Fahrwerk ausgestattet sein. Ist der Unterturm auf einer einzigen Schiene fahrbar, so ist sein oberes Ende an einer längs des Gebäudes angebrachten Schiene verschiebbar verankert, wobei die Führung am Gebäude mit einem Antrieb ausgestattet ist, der synchron mit dem Fahrwerk am Fuß des Turms läuft.In another embodiment, not shown, the foot of the lower tower be equipped with a landing gear. Is the sub-tower on one single rail, so its upper end is attached to a length of the building Slidably anchored rail, the guide being equipped with a drive on the building that runs synchronously with the undercarriage at the base of the tower.

Der obere Turmdrehkran 1 ist gemäß F i g. 1 in bekannter Weise mit einer teleskopierbaren Turmsäule ausgestattet, die aus den ineinanderschiebbaren Teilen 9 und 10 besteht. Der Ausleger 11 ist in üblicher Weise an das obere Teil der Turmsäule angelenkt. Er kann gegebenenfalls eine Laufkatze tragen.The upper tower crane 1 is shown in FIG. 1 equipped in a known manner with a telescopic tower column, which consists of the parts 9 and 10 that can be nested. The boom 11 is articulated in the usual way to the upper part of the tower column. He can carry a trolley if necessary.

Bei dem Aufrichten des Turmdrehkranes für Hochhäuser kann erfindungsgemäß so verfahren werden, daß an dem in einer Teilhöhe erstellten Gebäude 8 eine Verankerung für die Anbringung eines Flaschenzuges oder von Umlenkrollen 12 angebracht wird, über welche mittels eines Seilzuges 13 der auf dem Boden liegend montierte Unterturm 4 aufgerichtet wird. Dabei geschieht das Aufrichten mittels der Winden des bereits am Kopfende des Unterturms 4 befestigten Drehgestells 2, welches vorher von der Säule des Turmdrehkranes 1 abmontiert und mit seiner Drehvorrichtung 3 an dem Kopfende des Unterturms befestigt worden ist.When erecting the tower crane for high-rise buildings, the procedure according to the invention is such that an anchoring for the attachment of a pulley block or pulleys 12 is attached to the building 8 constructed at a partial height is erected. The erection takes place by means of the winches of the bogie 2 already attached to the head end of the lower tower 4, which has previously been dismantled from the column of the tower crane 1 and attached with its rotating device 3 to the head end of the lower tower.

Nach dem Aufrichten des Unterturms 4 wird der zusammengeschobene teleskopierbare Turm und der Ausleger des oberen Turmdrehkranes 1 am Fußende 15 des Turmes über einen zusätzlichen Aufstellbock 14, der die Form eines Auslegers besitzt, mittels der Winden des auf dem Kopf des aufgerichteten Unterturms 4 angebrachten Drehgestells 2 hochgezogen. Danach wird das Fußende 15 gelenkig mit dem Drehgestell 2 verbunden. Schließlich wird der Turmdrehkran 1 bis in die senkrechte Lage aufgerichtet und am Drehgestell 2 endgültig befestigt. Die beiden Teile 9 und 10 der teleskopierbaren Turmsäule werden dann ausgefahren und der Ausleger 11 in üblicher Weise ausgeschwenkt.After erecting the lower tower 4 , the telescopic tower pushed together and the jib of the upper tower crane 1 at the foot end 15 of the tower via an additional erecting frame 14, which has the shape of a jib, by means of the winches of the bogie 2 attached to the head of the erected lower tower 4 pulled up. The foot end 15 is then articulated to the bogie 2. Finally, the tower crane 1 is set up in the vertical position and finally attached to the bogie 2. The two parts 9 and 10 of the telescopic tower column are then extended and the boom 11 swiveled out in the usual way.

Vor dem Hochziehen des Turmdrehkrans 1 auf den aufgerichteten Unterturm 4 kann über den als Ausleger ausgebildeten Aufstellbock 14 der notwendige Ballast auf das Drehgestell 2 mittels der Winden dieses Gestells hochgezogen werden.Before pulling the tower crane 1 up onto the erected lower tower 4, the necessary ballast can be carried by means of the stand 14, which is designed as a boom be pulled up on the bogie 2 by means of the winches of this frame.

Nach einem anderen Verfahren kann entweder der liegend montierte Unterturm ohne anmontiertes Drehgestell aufgerichtet oder, besonders wenn kein Raum für den liegenden Unterturm vorhanden ist, der Unterturm 4 in senkrechter Stellung aus seinen einzelnen Schüssen 5 montiert werden, was mit Hilfe des später auf den Unterturm aufzusetzenden Turmdrehkranes 1 geschehen kann (F i g. 6). Danach wird der Turmdrehkran 1 umgelegt, das Drehgestell 2 abmontiert und vom Fahrgestell 17 getrennt. Nun kann über am Kopfende des Unterturms 4 angebrachte Umlenkrollen 16 das Drehgestell 2 mittels seiner eigenen Winden bis zum Kopfende hochgezogen, in waagerechte Lage gebracht und montiert werden (F i g. 7). Schließlich wird das Hochziehen und Aufmontieren des Turmes 1 mit Ausleger 11 in der in F i g. 2 bis 5 dargestellten und oben beschriebenen Weise ausgeführt.According to another method, either the horizontally mounted lower tower can be erected without the bogie attached or, especially if there is no space for the lower lower tower, the lower tower 4 can be assembled in a vertical position from its individual sections 5, which can be done with the help of the later to be placed on the lower tower Tower crane 1 can be done (Fig. 6). Then the tower crane 1 is turned over, the bogie 2 dismantled and separated from the chassis 17. The bogie 2 can now be pulled up to the head end by means of its own winches via deflection rollers 16 attached to the head end of the lower tower 4, brought into a horizontal position and assembled (FIG. 7). Finally, the lifting and mounting of the tower 1 with boom 11 is carried out in the manner shown in FIG. 2 to 5 shown and carried out above described manner.

Claims (14)

Patentansprüche: 1. Turmdrehkran, insbesondere für Hochhäuser, dadurch gekennzeichnet, daß ein Turmdrehkran der üblichen Bauart und Bauhöhe, bestehend aus einer den Ausleger tragenden Turmdrehsäule samt Drehgestell und Winden, auf einem nicht drehbaren Unterturm angeordnet ist. Claims: 1. Tower crane, especially for high-rise buildings, thereby characterized in that a tower crane of the usual type and height, consisting from a rotating tower column carrying the boom, including the bogie and winches a non-rotatable sub-tower is arranged. 2. Turmdrehkran nach Anspruch 1, dadurch gekennzeichnet, daß der Unterturm aus fertigen Schüssen aufstoekbar ist. 2. Tower crane according to claim 1, characterized in that the sub-tower can be topped up from finished shots. 3. Turmdrehkran nach den Ansprüchen 1 oder 2, dadurch gekennzeichnet, daß der Unterturm in bei Turmkranen an sich bekannter Weise freistehend auf Fundamenten ruht. 3. Tower crane according to claims 1 or 2, characterized in that the lower tower rests free-standing on foundations in a manner known per se in tower cranes. 4. Turmdrehkran nach einem der Ansprüche 1 bis 3, dadurch gekennzeichnet, da.ß der aufgerichtete Unterturm in bei Turmkranen an sich bekannter Weise mit seinem Fuß auf einer horizontalen Drehachse ruht und mit seinem oberen Ende am Gebäude verankert ist. 4. Tower crane according to one of claims 1 to 3, characterized in that the erect Lower tower in a manner known per se in tower cranes with its foot on a horizontal plane Rotation axis rests and is anchored with its upper end on the building. 5. Turmdrehkran nach einem der Ansprüche 1 bis 4, dadurch gekennzeichnet, daß der Unterturm in bei Turmkranen an sich bekannter Weise durch Seile abgespannt ist. 5. Tower crane according to one of claims 1 to 4, characterized in that the sub-tower in at Tower cranes in a known manner is guyed by ropes. 6. Turmdrehkran nach den Ansprüchen 1 oder 2, dadurch gekennzeichnet, daß der Fuß des Unterturms in an sich bekannter Weise mit einem Fahrwerk ausgestattet ist. 6. Tower crane after claims 1 or 2, characterized in that the foot of the sub-tower in an is equipped in a known manner with a chassis. 7. Turmdrehkran nach Anspruch 6, dadurch gekennzeichnet, daß der vorzugsweise in bekannter Weise auf nur einer Schiene fahrbare Unterturm an einer längs des Gebäudes angebrachten Schiene verschiebbar verankert ist. B. 7. Tower crane according to claim 6, characterized in that the preferably in a known manner on only one Rail movable lower tower on a rail attached along the building is anchored. B. Turmdrehkran nach Anspruch 7, dadurch gekennzeichnet, daß die Führung des Unterturms an dem Gebäude mit einem Antrieb ausgestattet ist, der synchron mit dem Fahrwerk am Fuß des Turmes läuft Tower crane according to Claim 7, characterized in that the Guiding of the lower tower on the building is equipped with a synchronous drive with the undercarriage running at the base of the tower 9. Turmdrehkran nach Anspruch 1, dadurch gekennzeichnet, daß der obere Turmdrehkran in bekannter Weise teleskopierbar ist. 9. Tower crane according to claim 1, characterized characterized in that the upper tower crane can be telescoped in a known manner. 10. Turmdrehkran nach Anspruch 1, dadurch gekennzeichnet, daß der obere Turmdrehkran unter bzw. nahe seiner Drehverbindung von seinem Fahrgestell trennbar und mit Mitteln für seine Verbindung mit dem Kopf des Unterturms ausgestattet ist. 10. tower crane according to claim 1, characterized in that the upper tower crane under or near its rotary joint separable from its chassis and with means for its connection with the head of the sub-tower is endowed. 11. Verfahren zum Aufstellen von Hochhaus-Turmdrehkranen nach einem der Ansprüche 1 bis 10, dadurch gekennzeichnet, daß an dem in einer Teilhöhe erstellten Gebäude eine Verankerung für dieAnbringung eines Flaschenzuges, oder von Umlenkrollen angebracht wird, über welche der liegende Turm über einen Seilzug aufgerichtet wird. 11. A method for erecting high-rise tower cranes according to one of the claims 1 to 10, characterized in that on the building created in a partial height an anchorage for the attachment of a pulley system or pulleys over which the lying tower is erected with a cable. 12. Verfahren nach Anspruch 11, dadurch gekennzeichnet, daß der liegende Unterturm mit dem an seinem Kopfende befestigten Drehgestell und den Winden des oberen Turmdrehkranes mittels dieser Winden aufgerichtet wird. 12. Procedure according to claim 11, characterized in that the lying sub-tower with the its head end attached to the bogie and the winches of the upper tower crane is erected by means of these winches. 13. Verfahren nach den Ansprüchen 11 und 12, dadurch gekennzeichnet, daß Turm und Ausleger des oberen Turmdrehkrans am Fußende des Turms über einen zusätzlichen Aufstellbock in Form eines Auslegers mittels der Winden des auf dem Kopf des errichteten Unterturms angebrachten Drehgestells hochgezogen, hiernach gelenkig mit dem Drehgestell verbunden und schließlich in bekannter Weise bis in die senkrechte Lage aufgerichtet wird. 13. The method according to claims 11 and 12, characterized in that the tower and boom of the upper tower crane at the foot end of the tower via an additional trestle in the form of a boom by means of the Winch hoisted the bogie attached to the head of the erected sub-tower, then articulated to the bogie and finally in a known manner is raised up in the vertical position. 14. Verfahren nach Anspruch 13, dadurch gekennzeichnet, daß vor dem oberen Turmdrehkran der Ballast auf das Drehgestell des aufgerichteten Unterturms über den vorgenannten, als Ausleger ausgebildeten Aufstellbock mittels der Winden hochgezogen wird. In Betracht gezogene Druckschriften: Deutsche Patentschriften Nr. 284 006, 327143, deutsche Auslegeschriften Nr. 1119 479, 1057 764; französische Patentschriften Nr. 1094 784, 1192 705; Lehrbuch »Kran- und Transportanlagen« von Michenfelder, 1912, S.35 und 36.14. The method according to claim 13, characterized in that in front of the upper tower crane, the ballast is pulled up on the bogie of the erected lower tower via the aforementioned support frame designed as a boom by means of the winches. Considered publications: German Patent Specifications Nos. 284 006, 327143, German Auslegeschriften Nos. 1119 479, 1057 764; French Patent Nos. 1094 784, 1192 705; Textbook "Kran- und Transportanlagen" by Michenfelder, 1912, pages 35 and 36.
DER32525A 1962-04-19 1962-04-19 Tower crane Pending DE1180104B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DER32525A DE1180104B (en) 1962-04-19 1962-04-19 Tower crane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DER32525A DE1180104B (en) 1962-04-19 1962-04-19 Tower crane

Publications (1)

Publication Number Publication Date
DE1180104B true DE1180104B (en) 1964-10-22

Family

ID=7403842

Family Applications (1)

Application Number Title Priority Date Filing Date
DER32525A Pending DE1180104B (en) 1962-04-19 1962-04-19 Tower crane

Country Status (1)

Country Link
DE (1) DE1180104B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE284006C (en) *
DE327143C (en) * 1920-10-12 Wilhelm Prollius Procedure for converting fixed cranes into mobile ones and for moving fixed cranes locally
FR1094784A (en) * 1955-05-24
DE1057764B (en) * 1954-12-16 1959-05-21 Boilot Petolat Ets A mast consisting of several standard elements with a supporting or conveying element arranged on it
FR1192705A (en) * 1957-03-06 1959-10-28 Center Column Tower Crane with Unlimited Rotation Boom
DE1119479B (en) * 1958-06-27 1961-12-14 Boilot Petolat Sa Ets Swiveling construction crane mast consisting of standard elements standing on top of one another

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE284006C (en) *
DE327143C (en) * 1920-10-12 Wilhelm Prollius Procedure for converting fixed cranes into mobile ones and for moving fixed cranes locally
FR1094784A (en) * 1955-05-24
DE1057764B (en) * 1954-12-16 1959-05-21 Boilot Petolat Ets A mast consisting of several standard elements with a supporting or conveying element arranged on it
FR1192705A (en) * 1957-03-06 1959-10-28 Center Column Tower Crane with Unlimited Rotation Boom
DE1119479B (en) * 1958-06-27 1961-12-14 Boilot Petolat Sa Ets Swiveling construction crane mast consisting of standard elements standing on top of one another

Similar Documents

Publication Publication Date Title
DE1603179C3 (en) Ferris wheel
DE3136102C2 (en) Small crane for laying in layers, especially large-format bricks
CH662333A5 (en) TOWER TURNING CRANE WITH EXTENSION AND JUMPER.
DE826341C (en) Movable construction crane
DE1180104B (en) Tower crane
DE2451673A1 (en) Rescuing appliance for use at great heights - comprises rotary crane with lift coupled to load absorber
DE1126093B (en) Mobile crane, especially construction crane
AT140282B (en) Tower car with telescopic mast and work platform.
DE2930161C2 (en)
DE3633582A1 (en) Articulated crane with self-erecting tower and telescoping jib
DE759687C (en) For the heaviest loads, it can be dismantled and easily erected
AT215631B (en) Tower crane
DE3024286A1 (en) Rotary tower crane for cooling tower construction - has mast carried by carriages travelling on circular track concentric with tower axis
DE950881C (en) Method for lengthening rigid, non-rotating building crane masts by installing intermediate pieces
DE202009002519U1 (en) hoist
DE1481797A1 (en) Construction crane
DE915498C (en) Method for erecting a high-rise mast, in particular a tower crane mast, which consists of parts that are articulated to one another and can be connected to form a non-articulated piece
DE2931422A1 (en) TURNING TOWER CRANE
DE2064511C3 (en) Arrangement for erecting a mast construction
DE1756481A1 (en) Method for topping up a mobile tower crane
DE1506543A1 (en) Tower crane
DE1159607B (en) Tower crane
AT289340B (en) MOBILE LIFTING FRAME
CH125056A (en) Tower crane.
DE1957714A1 (en) Umlegarer tower crane