DE102016205946A1 - formwork device - Google Patents

formwork device Download PDF

Info

Publication number
DE102016205946A1
DE102016205946A1 DE102016205946.7A DE102016205946A DE102016205946A1 DE 102016205946 A1 DE102016205946 A1 DE 102016205946A1 DE 102016205946 A DE102016205946 A DE 102016205946A DE 102016205946 A1 DE102016205946 A1 DE 102016205946A1
Authority
DE
Germany
Prior art keywords
formwork
panels
shuttering
battery mold
support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
DE102016205946.7A
Other languages
German (de)
Inventor
Felix von Limburg
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Doka Newcon At GmbH
Original Assignee
BT Innovation GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BT Innovation GmbH filed Critical BT Innovation GmbH
Priority to DE102016205946.7A priority Critical patent/DE102016205946A1/en
Priority to PCT/EP2017/057537 priority patent/WO2017174432A1/en
Priority to BR112018070735-0A priority patent/BR112018070735B1/en
Priority to NZ747009A priority patent/NZ747009A/en
Priority to SI201730568T priority patent/SI3439840T1/en
Priority to EP17715657.7A priority patent/EP3439840B1/en
Publication of DE102016205946A1 publication Critical patent/DE102016205946A1/en
Priority to IL262085A priority patent/IL262085B/en
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B7/00Moulds; Cores; Mandrels
    • B28B7/08Moulds provided with means for tilting or inverting
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B7/00Moulds; Cores; Mandrels
    • B28B7/24Unitary mould structures with a plurality of moulding spaces, e.g. moulds divided into multiple moulding spaces by integratable partitions, mould part structures providing a number of moulding spaces in mutual co-operation
    • B28B7/241Detachable assemblies of mould parts providing only in mutual co-operation a number of complete moulding spaces
    • B28B7/243Detachable assemblies of mould parts providing only in mutual co-operation a number of complete moulding spaces for making plates, panels or similar sheet- or disc-shaped objects
    • B28B7/245Detachable assemblies of mould parts providing only in mutual co-operation a number of complete moulding spaces for making plates, panels or similar sheet- or disc-shaped objects using transportable mould batteries
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B7/00Moulds; Cores; Mandrels
    • B28B7/0002Auxiliary parts or elements of the mould
    • B28B7/0014Fastening means for mould parts, e.g. for attaching mould walls on mould tables; Mould clamps
    • B28B7/002Fastening means for mould parts, e.g. for attaching mould walls on mould tables; Mould clamps using magnets
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B7/00Moulds; Cores; Mandrels
    • B28B7/0029Moulds or moulding surfaces not covered by B28B7/0058 - B28B7/36 and B28B7/40 - B28B7/465, e.g. moulds assembled from several parts
    • B28B7/0035Moulds characterised by the way in which the sidewalls of the mould and the moulded article move with respect to each other during demoulding
    • B28B7/0041Moulds characterised by the way in which the sidewalls of the mould and the moulded article move with respect to each other during demoulding the sidewalls of the mould being moved only parallelly away from the sidewalls of the moulded article

Landscapes

  • Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Chemical & Material Sciences (AREA)
  • Ceramic Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Moulds, Cores, Or Mandrels (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

Die vorliegende Erfindung bezieht sich auf eine Schalungseinrichtung für eine Batterieschalung zum Herstellen von Bauelementen, insbesondere Betonfertigteilen, die zumindest zwei Schottwände aufweist und die Schalungseinrichtung zwei Schalungsplatten aufweist, die lösbar gelenkig miteinander verbindbar sind, um von einem aufgefalteten in einen gefalteten Zustand überführt zu werden, wobei jede Schalungsplatte eine Schalungsvorderseite zum Anbringen von Schalelementen und eine Schalungsrückseite aufweist, und die Schalungsrückseiten der beiden Schalungsplatten im gefalteten Zustand einander zugewandt sind, und die Schalungseinrichtung dafür vorgesehen ist zwischen den Schottwänden positioniert zu werden.
Außerdem bezieht sich die vorliegende Erfindung auf eine Batterieschalung mit zumindest einer erfindungsgemäßen Schalungseinrichtung, wobei die Schalungsplatten im verbundenen oder unverbundenen Zustand in die Batterieschalung eingesetzt werden können.
The present invention relates to a formwork device for a battery formwork for the manufacture of structural elements, in particular precast concrete elements, which has at least two bulkhead walls and the formwork device has two formwork panels which are detachably hinged together to be transferred from a folded to a folded state, wherein each formwork panel has a formwork front side for attaching formworks and a formwork backside, and the formwork backs of the two formwork panels in the folded state face each other, and the formwork means is intended to be positioned between the bulkheads.
In addition, the present invention relates to a battery mold with at least one formwork device according to the invention, wherein the formwork panels can be used in the connected or unconnected state in the battery mold.

Figure DE102016205946A1_0001
Figure DE102016205946A1_0001

Description

Die vorliegende Erfindung bezieht sich auf eine Schalungseinrichtung für eine Batterieschalung zum Herstellen von Bauelementen insbesondere Betonfertigteilen und auf eine Batterieschalung mit zumindest einer erfindungsgemäßen Schalungseinrichtung.The present invention relates to a formwork device for a battery formwork for the manufacture of components, in particular precast concrete elements, and to a battery mold with at least one formwork device according to the invention.

Bei der Serienfertigung von Betonfertigteilen kommen häufig Batterieschalungen zum Einsatz. Insbesondere bei der Herstellung von Gebäuden in Plattenbauweise werden häufig Betonfertigteile verwendet. Diese Betonfertigteile können schnell und günstig in Batterieschalungen hergestellt werden. Bei herkömmlichen Batterieschalungen werden als Schalungseinrichtungen sogenannte Schottwände verwendet, die nebeneinander angeordnet sind. Die Schottwände spannen jeweils vertikale Ebenen auf. Zwischen den Schottwänden sind Schalelemente zum Beispiel für Türen, Fenster und so weiter angebracht, die zusammen mit den beidseitig angeordneten Schottwänden jeweils mit Beton zu füllende Hohlräume begrenzen. Die Schottwände werden je nach Bedarf mit den entsprechenden Schalelementen bestückt. Dazu bringt ein Werker die Schalelemente zum Beispiel mit Magnethaltern an den aus Stahl bestehenden Schottwänden an. Während der Fertigung sind die Schottwände gegeneinander verspannt, um eine ausreichende Dichtheit der Hohlräume zu gewährleisten. Die Hohlräume sind nach oben hin offen und werden zum Herstellen der Betonfertigteile mit Beton gefüllt. Dabei werden die zwischen den Schottwänden angeordneten Hohlräume im Wesentlichen gleichzeitig mit Beton gefüllt. Nach dem Aushärten des Betons wird die Verspannung gelöst und die ausgehärteten Betonfertigteile können der Batterieschalung entnommen werden. Durch die gleichzeitige Fertigung mehrerer Betonfertigteile ist es mit der Batterieschalung möglich, Betonfertigteile schnell und kostengünstig zu produzieren. Andererseits ist die Handhabung der großen und vergleichsweise schweren Schottwände nicht ganz einfach. Auch ist das Bestücken der Schottwände mit Schalelementen recht mühsam.In the series production of precast concrete parts often battery molds are used. In particular, in the manufacture of prefabricated buildings are often precast concrete parts used. These precast concrete parts can be produced quickly and cheaply in battery molds. In conventional battery molds so-called shuttering walls are used as shuttering, which are arranged side by side. The bulkhead walls each span vertical planes. Between the bulkheads formwork elements are for example for doors, windows and so on attached, which limit together with the partition walls arranged on both sides with concrete to be filled cavities. The bulkheads are equipped as needed with the appropriate formwork elements. For this purpose, a worker attaches the formwork elements, for example with magnetic holders, to the steel bulkheads. During manufacture, the bulkheads are braced against each other to ensure sufficient tightness of the cavities. The cavities are open at the top and are filled with concrete for producing the precast concrete parts. The cavities arranged between the bulkheads are filled substantially simultaneously with concrete. After hardening of the concrete, the tension is released and the hardened precast concrete parts can be removed from the battery mold. By producing several precast concrete parts at the same time, battery molds make it possible to produce precast concrete parts quickly and inexpensively. On the other hand, the handling of the large and relatively heavy bulkheads is not easy. Also, the loading of the bulkhead walls with formwork elements is quite tedious.

Die DE 10 2015 209 157 beschreibt eine Schalungseinrichtung für eine Batterieschalung zum Herstellen von Bauelementen, die zwei Schalungsplatten aufweist. Eine solche Schalungseinrichtung wird auch als Schmetterlingsschalung bezeichnet. Diese Schalungseinrichtung ermöglicht bereits eine wesentliche Erleichterung bei der Produktion von Betonfertigteilen.The DE 10 2015 209 157 describes a formwork device for a battery mold for the manufacture of components, which has two formwork panels. Such a formwork device is also referred to as butterfly formwork. This formwork device already allows a substantial relief in the production of precast concrete parts.

Es ist jedoch wünschenswert und die Aufgabe der vorliegenden Erfindung den Fertigungsprozess noch flexibler zu gestalten, um eine leichtere Bestückung der Schalungsplatten durch Personen oder Maschinen zu ermöglichen.However, it is desirable and the object of the present invention to make the manufacturing process even more flexible in order to facilitate easier assembly of the shuttering panels by persons or machines.

Diese Aufgabe wird erfindungsgemäß gelöst durch eine Schalungseinrichtung für eine Batterieschalung zum Herstellen von Bauelementen, insbesondere Betonfertigteilen, die zumindest zwei Schottwände aufweist, und die Schalungseinrichtung zwei Schalungsplatten aufweist, die lösbar gelenkig miteinander verbindbar sind, um von einem aufgefalteten Zustand in einen gefalteten Zustand überführt zu werden, wobei jede Schalungsplatte eine Schalungsvorderseite zum Anbringen von Schalelementen und eine Schalungsrückseite aufweist, und die Schalungsrückseiten der beiden Schalungsplatten im gefalteten Zustand einander zugewandt sind, und die Schalungseinrichtung dafür vorgesehen ist, zwischen den Schottwänden positioniert zu werden.This object is achieved by a shuttering device for a battery mold for the manufacture of components, especially precast concrete parts, which has at least two bulkheads, and the formwork device has two formwork panels which are releasably articulated interconnected to transferred from a folded state into a folded state each formwork panel having a formwork front side for attaching formwork elements and a formwork back side, and the formwork backs of the two formwork panels in the folded state facing each other, and the formwork means is intended to be positioned between the bulkheads.

Diese Lösung hat den Vorteil, dass die Schalungsplatten im nicht verbundenen bzw. im getrennten Zustand unabhängig voneinander mit Schalelementen, zum Beispiel für Türen und Fenster für ein Betonfertigteil, von Personen oder Maschinen bestückt werden können. Auf diese Weise kommen Personen oder Maschinen leichter von allen Seiten an die Schalungsplatten heran. Auch kann durch die Bestückung im nicht verbundenen Zustand der Schalungsplatten der Platzbedarf zum Beispiel in Fertigungsstraßen gegenüber miteinander verbundenen Schalungsplatten wesentlich verringert werden. Durch die Möglichkeit einer Bestückung der Schalungsplatten mit Schalelementen in liegendem Zustand der Schalungsplatten wird die Automatisierung dieses Vorgangs erleichtert. Nach dem Bestücken können die Schalungsplatten wieder miteinander verbunden werden, und in einen gefalteten Zustand überführt werden. Danach kann die Schalungseinrichtung mit den beiden Schalungsplatten zwischen den Schottwänden positioniert werden. Auf diese Weise ist eine flexiblere und leichtere Handhabung der Schalungseinrichtung möglich. Gleichzeitig wird der Platzbedarf bei der Bestückung verringert. Somit können auch die Ausmaße einer Fertigungsstraße verringert werden.This solution has the advantage that the formwork panels in the unconnected or in the separated state independently of each other with scarf elements, for example, for doors and windows for a precast concrete part of people or machines can be fitted. In this way, persons or machines come easier from all sides of the formwork panels. Also can be significantly reduced by the assembly in the non-connected state of the formwork panels of space requirements, for example, in production lines opposite interconnected formwork panels. The possibility of equipping the shuttering panels with formwork elements in the lying state of the formwork panels, the automation of this process is facilitated. After loading, the formwork panels can be reconnected and transferred to a folded condition. Thereafter, the formwork device can be positioned with the two formwork panels between the bulkheads. In this way, a more flexible and easier handling of the formwork device is possible. At the same time, the space required for assembly is reduced. Thus, the dimensions of a production line can be reduced.

In einer vorteilhaften Weiterentwicklung der Erfindung können die Schalungsplatten im Wesentlichen rechteckig und vorzugsweise einseitig, bevorzugt an der längeren Längsseite, miteinander verbindbar sein. Die Form der Schalungsplatten entspricht dadurch im Wesentlichen der Form der Schottwände, so dass die Kompatibilität mit den Schottwänden gewährleistet ist. Insbesondere für eine mögliche Nachrüstung bestehender Batterieschalungen kann dieses vorteilhaft sein. Günstig kann es dabei sein, wenn die im Wesentlichen rechteckigen Schalungsplatten einseitig, vorzugsweise an der längeren Längsseite, miteinander verbindbar sind. Die Verbindung folgt dadurch einer während des Einsetzvorganges der gefalteten Schalungsplatten horizontal verlaufenden Linie. Die beiden Schalungsplatten erstrecken sich dadurch ausgehend von dieser Linie nach unten, hängen sozusagen von dieser Linie ausgehend nach unten. Auf diese Weise ist eine einfachere Handhabung der Schalungseinrichtung möglich.In an advantageous further development of the invention, the formwork panels can be connected to one another in a substantially rectangular manner and preferably on one side, preferably on the longer longitudinal side. The shape of the formwork panels thereby corresponds substantially to the shape of the bulkheads, so that the compatibility with the bulkheads is guaranteed. This can be advantageous in particular for a possible retrofitting of existing battery molds. It may be favorable if the substantially rectangular shuttering panels can be connected to one another on one side, preferably on the longer longitudinal side. The connection thus follows a line running horizontally during the insertion process of the folded shuttering panels. The two formwork panels thereby extend starting from this line down, hanging down from this line, so to speak. In this way, easier handling of the formwork device is possible.

Es kann auch von Vorteil sein, wenn die Schalungsplatten über wenigstens ein Scharniergelenk miteinander verbindbar sind. Auf diese Weise kann das Überführen der Schalungsplatten vom aufgefalteten in den gefalteten Zustand und somit auch deren Handhabung weiter vereinfacht werden.It can also be advantageous if the shuttering panels can be connected to one another via at least one hinge joint. In this way, the transfer of the shuttering panels from the folded in the folded state and thus also their handling can be further simplified.

Günstig kann es auch sein, wenn jede der Schalungsplatten zumindest eine Einhängerolle und/oder zumindest eine erste Stützrolle und/oder zumindest eine zweite Stützrolle aufweist. Durch die Einhängerolle können die Schalungsplatten in der Batterieschalung leichter verschoben werden. Während der Bestückung liegen die Schalungsplatten mit der ersten Stützrolle und/oder mit der zweiten Stützrolle auf einer Unterlage auf. Die Schalungsplatten können mit Hilfe der Stützrollen leichter auf der Unterlage bewegt werden. Weiterhin wird das Überführen der miteinander verbundenen Schalungsplatten von einem aufgefalteten Zustand in einen gefalteten Zustand beziehungsweise von einem gefalteten Zustand in einen aufgefalteten Zustand durch die erste Stützrolle unterstützt. Beim Überführen der verbundenen Schalungsplatten vom aufgefalteten in den gefalteten Zustand beziehungsweise von dem gefalteten in den aufgefalteten Zustand stützt sich die erste Stützrolle zumindest zeitweise an der Unterlage ab und rollt zumindest zeitweise an dieser entlang. Auf diese Weise kann die Handhabung der Schalungseinrichtung weiter vereinfacht werden.It may also be favorable if each of the shuttering panels has at least one suspension roller and / or at least one first support roller and / or at least one second support roller. The hanging roller makes it easier to move the shuttering panels in the battery mold. During assembly, the formwork panels with the first support roller and / or with the second support roller rest on a base. The shuttering panels can be moved more easily on the base with the help of the support rollers. Furthermore, the transfer of the interconnected formwork panels from a folded state to a folded state or from a folded state to a folded state is supported by the first support roller. When transferring the connected shuttering panels from the folded to the folded state or from the folded to the unfolded state, the first support roller is supported at least temporarily on the base and rolls at least temporarily along this. In this way, the handling of the formwork device can be further simplified.

Weiterhin kann es sich als vorteilhaft erweisen, wenn die Einhängerolle an einer Schmalseite der Schalungsplatte und vorzugsweise in dem Bereich, an dem die beiden Schalungsplatten aneinandergrenzen, vorgesehen ist. Mit einer derartigen Konstruktion kann das Einhängen der Schalungsplatte in die Batterieschalung weiter vereinfacht werden.Furthermore, it may prove to be advantageous if the Einhängerolle on a narrow side of the formwork panel and preferably in the region where the two formwork panels adjoin is provided. With such a construction, the hooking of the formwork panel in the battery mold can be further simplified.

Zudem kann es vorteilhaft sein, wenn die erste Stützrolle an der dem Scharniergelenk gegenüberliegenden Längsseite der Schalungsplatte angeordnet ist. Auf diese Weise kann das Überführen der Schalungsplatten von einem aufgefalteten Zustand in einen gefalteten Zustand beziehungsweise von einem gefalteten Zustand in einen aufgefalteten Zustand noch besser unterstützt und somit vereinfacht werden.In addition, it may be advantageous if the first support roller is arranged on the longitudinal side of the shuttering panel opposite the hinge joint. In this way, the transfer of the shuttering panels from a folded state to a folded state or from a folded state to a deployed state can be better supported and thus simplified.

In einer vorteilhaften Weiterbildung der Erfindung kann die zweite Stützrolle auf der Schalungsrückseite der Schalungsplatte angeordnet sein. Dadurch kann die Schalungsplatte noch leichter auf einer Unterlage bewegt werden, wodurch die Handhabung noch weiter erleichtert werden kann.In an advantageous embodiment of the invention, the second support roller may be arranged on the formwork back of the formwork panel. As a result, the shuttering panel can be moved even more easily on a base, whereby the handling can be further facilitated.

Günstig kann es auch sein, wenn die ersten Stützrollen und/oder die zweiten Stützrollen von den Schalungsplatten der Schalungseinrichtung entlang der Schwenkachse versetzt zueinander angeordnet sind. Im gefalteten Zustand sind die Schalungsrückseiten der Schalungsplatten, an denen die zweiten Stützrollen angebracht sind, einander zugewandt. Durch die versetzte Anordnung der Stützrollen kann der Abstand der beiden Schalungsplatten im gefalteten Zustand verringed werden. Auch die versetzte Anordnung der ersten Stützrollen ermöglicht einen geringeren Abstand der beiden Schalungsplatten im gefalteten Zustand.It may also be favorable if the first support rollers and / or the second support rollers are offset from one another by the formwork panels of the formwork device along the pivot axis. In the folded state, the formwork backs of the formwork panels, on which the second support rollers are mounted, facing each other. Due to the staggered arrangement of the support rollers, the distance between the two formwork panels in the folded state can be reduced. The staggered arrangement of the first support rollers allows a smaller distance of the two formwork panels in the folded state.

Außerdem kann es günstig sein, wenn die erste Stützrolle und/oder die zweite Stützrolle schwenkbar ist. Auf diese Weise kann die Schalungsplatte noch leichter auf der Unterlage bewegt werden.In addition, it may be favorable if the first support roller and / or the second support roller is pivotable. In this way, the formwork panel can be moved even easier on the pad.

Auch kann es sich als vorteilhaft erweisen, wenn die Einhängerolle zumindest abschnittsweise aus Stahl besteht und/oder die erste Stützrolle und/oder die zweite Stützrolle zumindest abschnittsweise aus Kunststoff besteht. Somit können die Schalungsplatten leichter bewegt werden bei gleichzeitiger hoher Stabilität der Einhängerolle beziehungsweise der Stützrollen.It may also prove advantageous if the suspension roller is at least partially made of steel and / or the first support roller and / or the second support roller is at least partially made of plastic. Thus, the formwork panels can be easily moved while high stability of the suspension role or the support rollers.

In einer vorteilhaften Weiterentwicklung der Erfindung kann die Schalungseinrichtung über die ersten Stützrollen zumindest zeitweilig während des Auffaltens und/oder Entfaltens und/oder Abheben von und/oder Ablegen auf einer Unterlage vorzugsweise beweglich abstützbar sein. Durch das Abstützen der Schalungseinrichtung kann die Handhabung der Schalungseinrichtung während des Auffaltens und/oder Entfaltens und/oder Abheben von und/oder Ablegen auf einer Unterlage weiter vereinfacht werden.In an advantageous further development of the invention, the formwork device can be supported, preferably at least temporarily, during the unfolding and / or unfolding and / or lifting off and / or depositing on a base via the first support rollers. By supporting the formwork device, the handling of the formwork device during the unfolding and / or unfolding and / or lifting off and / or depositing on a base can be further simplified.

Zudem wird die obige Aufgabe gelöst durch eine Batterieschalung mit zumindest einer erfindungsgemäßen Schalungseinrichtung, bei der die Schalungsplatten im verbundenen oder unverbundenen Zustand in die Batterieschalung eingesetzt werden können.In addition, the above object is achieved by a battery mold with at least one formwork device according to the invention, in which the formwork panels can be used in the connected or unconnected state in the battery mold.

Diese Lösung hat den Vorteil, dass der Fertigungsprozess noch flexibler gestaltet werden kann. Insbesondere können die Schalungsplatten im unverbundenen Zustand bestückt werden, und auch in diesem Zustand in die Batterieschalung eingesetzt werden. Die Ausmaße von unverbundenen Schalungsplatten sind wesentlich geringer als von verbundenen Schalungsplatten. Da auch unverbundene Schalungsplatten in die Batterieschalung eingesetzt werden können, ist eine Verbindung der Schalungsplatten vor dem Einsetzen in die Batterieschalung nicht mehr nötig. Somit kann die Handhabung weiter vereinfacht und der Platzbedarf weiter verringert werden.This solution has the advantage that the manufacturing process can be made even more flexible. In particular, the formwork panels can be fitted in the unconnected state, and be used in this condition in the battery mold. The dimensions of unconnected shuttering panels are much lower than of connected shuttering panels. Since unconnected shuttering panels can be used in the battery mold, a connection of the shuttering panels before insertion into the battery mold is no longer necessary. Thus, the handling can continue simplified and space requirements are further reduced.

Vorteilhaft kann es sein, wenn die im unverbundenen Zustand eingesetzten Schalungsplatten miteinander verbindbar sind. Auf diese Weise kann die Handhabung der Schalungsplatten in der Batterieschalung weiter vereinfacht werden.It may be advantageous if the formwork panels used in the unconnected state are connectable to each other. In this way, the handling of the shuttering panels in the battery mold can be further simplified.

Weiter hin kann es vorteilhaft sein, wenn die Schalungsplatten hängend in der Batterieschalung angeordnet sind, da dadurch der Platzbedarf weiter verringert werden kann.Farther, it may be advantageous if the formwork panels are arranged hanging in the battery mold, as this space requirements can be further reduced.

Auch kann es sich als günstig erweisen, wenn die Batterieschalung zumindest eine Trageinrichtung, vorzugsweise eine Schiene, zur Aufnahme der Einhängerolle der Schalungsplatte aufweist. Auf diese Weise kann die Handhabung noch weiter vereinfacht werden.It may also prove to be advantageous if the battery mold has at least one support device, preferably a rail, for receiving the engagement roller of the shuttering panel. In this way, the handling can be further simplified.

Die Erfindung wird nachstehend anhand eines Ausführungsbeispieles und zugehöriger Zeichnungen näher erläutert.The invention will be explained in more detail below with reference to an embodiment and associated drawings.

Diese Zeichnungen zeigen:These drawings show:

1 eine schematische Darstellung einer bekannten Batterieschalung mit Schalungseinrichtungen; 1 a schematic representation of a known battery formwork with formwork devices;

2 eine schematische Darstellung einer erfindungsgemäßen Schalungseinrichtung im aufgefalteten Zustand in einer Draufsicht; 2 a schematic representation of a formwork device according to the invention in the unfolded state in a plan view;

3 eine vergrößerte schematische Darstellung eines Scharniergelenks der Schalungseinrichtung aus der 2; 3 an enlarged schematic representation of a hinge joint of the formwork device of the 2 ;

4 eine schematische Darstellung der Schalungseinrichtung aus der 2 in einer Seitenansicht; 4 a schematic representation of the formwork device of the 2 in a side view;

5 eine schematische Darstellung der erfindungsgemäßen Schalungseinrichtung in einem angehobenen Zustand; und 5 a schematic representation of the formwork device according to the invention in a raised state; and

6 eine schematische Darstellung der erfindungsgemäßen Schalungseinrichtung im gefalteten Zustand in der Batterieschalung. 6 a schematic representation of the shuttering device according to the invention in the folded state in the battery mold.

1 zeigt eine schematische Darstellung einer Batterieschalung 1 mit Schalungseinrichtungen 5', wie sie aus der DE 10 2015 209 157 bekannt ist. Die Batterieschalung 1 wird zum Herstellen von nicht gezeigten Bauelementen und insbesondere von Betonfertigteilen für Gebäude verwendet. Die Batterieschalung 1 weist ein Tragegestell 2 auf mit voneinander beabstandeten Auflageabschnitten 3. Die Anzahl der Auflageabschnitte 3 in der 1 ist nur als beispielhaft anzusehen, und kann den Gegebenheiten angepasst werden. Weiterhin umfasst die Batterieschalung 1 zwei Trageinrichtungen 4, in der die Schottwände 6 und die Schalungseinrichtungen 5' hängend und beweglich, d. h. in der vorliegenden Ausführungsform verschiebbar, aufgenommen sind. Die Schalungseinrichtungen 5' befinden sich dabei zwischen den Schottwänden 6. Zwischen zumindest einer Schottwand 6 und einer Schalungseinrichtung 5' wird ein mit Beton zu befüllender Hohlraum ausgebildet, wobei bevorzugt die Schalungseinrichtung 5' nicht gezeigte Schalelemente trägt, welche die Kontur des Betonfertigteils bestimmen. Die Schalelemente können zum Beispiel Türen- oder Fensterausschnitte begrenzen und dichten zudem während des Betonierens den mit Beton gefüllten Hohlraum ab. Die Schalelemente können zum Beispiel mit Magnethaltern an der Schalungseinrichtung 5' befestigt sein. Ergänzend können zudem eine nicht gezeigte Heizeinrichtung und/oder ein nicht gezeigter Rüttler an der Schalungseinrichtung 5 montiert sein. Die in der 1 dargestellte Schalungseinrichtung 5' ist plattenförmig ausgebildet. Die Schalungseinrichtung 5' kann einseitig oder beidseitig mit entsprechenden Schalelementen versehen sein. Wenn die Schalungseinrichtung 5' beidseitig mit Schalelementen versehen ist, kann sie dazu dienen, auf jeder Seite unterschiedliche Betonfertigteile herzustellen. Die beidseitig mit Schalelementen bestückte Schalungseinrichtung 5' wie auch die einseitig mit Schalungseinrichtung 5' wird zwischen zwei Schottwänden 6 eingesetzt und während des Betonierens mit diesen verspannt. 1 shows a schematic representation of a battery mold 1 with formwork equipment 5 ' as they are from the DE 10 2015 209 157 is known. The battery mold 1 is used for the manufacture of components, not shown, and in particular of precast concrete parts for buildings. The battery mold 1 has a support frame 2 on with spaced support sections 3 , The number of support sections 3 in the 1 is to be regarded as exemplary only, and can be adapted to the circumstances. Furthermore, the battery mold includes 1 two carrying devices 4 in which the bulkheads 6 and the formwork equipment 5 ' hanging and movable, that are slidably received in the present embodiment, are added. The formwork equipment 5 ' are located between the bulkheads 6 , Between at least one bulkhead 6 and a formwork device 5 ' If a cavity to be filled with concrete is formed, wherein preferably the formwork device 5 ' not shown, which determine the contour of the precast concrete part. The formwork elements can, for example, limit door or window cutouts and also seal off the concrete-filled cavity during concreting. The formwork elements can, for example, with magnetic holders on the formwork device 5 ' be attached. In addition, a heating device (not shown) and / or a vibrator (not shown) may additionally be provided on the formwork device 5 be mounted. The in the 1 Shuttering device shown 5 ' is plate-shaped. The formwork device 5 ' can be provided on one side or on both sides with corresponding formwork elements. When the formwork device 5 ' On both sides is provided with formwork elements, it can serve to produce different precast concrete on each side. The shuttering elements fitted on both sides with formwork elements 5 ' as well as the one-sided with formwork device 5 ' is between two bulkheads 6 used and braced during concreting with these.

Die Anzahl der Trageinrichtungen 4 der Schottwände 6 und der Schalungseinrichtungen 5' ist als nur beispielhaft anzusehen und kann je nach den Gegebenheiten variiert werden. So können zum Beispiel Schalungseinrichtungen 5' für die Außenwände, Innenwände, den Boden sowie für das Dach eines Hauses vorgesehen sein, so dass mit der Batterieschalung 1 gleichzeitig die Bauelemente für ein ganzes Gebäude produziert werden können. Die Schottwände 6 und die Schalungseinrichtungen 5' sind zwischen zwei Abstützeinrichtungen 7 eingespannt. Die Anzahl der Abstützeinrichtungen 7 ist ebenfalls als nur beispielhaft anzusehen, und kann den Erfordernissen entsprechend variiert werden. Zumindest eine Abstützeinrichtung 7 ist beweglich, d. h. in der vorliegenden Ausführungsform verschieblich, in den Trageinrichtungen 4 aufgenommen. Zur Stabilisierung können die Schalungseinrichtungen 5' und die Abstützeinrichtungen 7 in der Betonierstellung durch eine oder mehrere stangenförmige Verbindungseinrichtungen 9 miteinander verbunden und verspannt werden. Die Anzahl der Verbindungseinrichtungen 9 kann den Verhältnissen angepasst werden. Anstelle von stangenförmigen Verbindungseinrichtungen 9 sind auch hydraulische Verbindungseinrichtungen möglich. Die stangenförmigen Verbindungseinrichtungen 9 sind jedoch besonders robust und einfach zu handhaben.The number of carrying devices 4 the bulkheads 6 and the formwork equipment 5 ' is to be regarded as only an example and can be varied depending on the circumstances. For example, formwork equipment 5 ' be provided for the outer walls, inner walls, the floor and for the roof of a house, so that with the battery mold 1 at the same time the components for an entire building can be produced. The bulkheads 6 and the formwork equipment 5 ' are between two support devices 7 clamped. The number of support devices 7 is also to be considered as exemplary only, and may be varied according to requirements. At least one support device 7 is movable, ie displaceable in the present embodiment, in the support means 4 added. To stabilize the formwork equipment 5 ' and the support devices 7 in the concreting position by one or more rod-shaped connecting devices 9 be connected and braced together. The number of connecting devices 9 can be adapted to the circumstances. Instead of rod-shaped connecting devices 9 Hydraulic connection devices are also possible. The rod-shaped connecting devices 9 However, they are particularly robust and easy to handle.

Weiterhin weist die Batterieschalung 1 eine Hebeeinrichtung 8 auf, mit der zumindest eine der Schalungseinrichtungen 5' von der abgesenkten Betonierstellung in eine angehobene Transportstellung überführbar ist, in welcher die Schalungseinrichtung 5' über eine in der Betonierstellung befindliche Schalungseinrichtung 5' in einer Richtung im Wesentlichen senkrecht zur Anheberichtung X förderbar ist. Bei der Batterieschalung 1 werden die Schalungseinrichtungen 5' von oben in die Trageinrichtungen 4 eingehängt, so dass sie im eingehängten Zustand in Betonierstellung zwischen den Auflageabschnitten 3 vom Boden beabstandet sind. Die Gestaltung der Hebeeinrichtung 8 kann den Erfordernissen angepasst werden. Falls nötig, können auch mehrere Hebeeinrichtungen 8 verwendet werden.Furthermore, the battery mold 1 a lifting device 8th on, with the at least one of the formwork devices 5 ' from the lowered concreting position in a raised transport position can be transferred, in which the formwork device 5 ' via a formwork device located in the concreting position 5 ' in a direction substantially perpendicular to the lifting direction X is conveyed. In the battery mold 1 become the formwork equipment 5 ' from above into the carrying devices 4 mounted so that they are in the suspended state in concreting position between the support sections 3 spaced from the ground. The design of the lifting device 8th can be adapted to the requirements. If necessary, several lifting devices can also be used 8th be used.

Die Hebeeinrichtung 8 ist auf zwei voneinander beabstandeten Führungseinrichtungen 25, die hier als Laufschienen 25 ausgebildet sind, in einer Spannrichtung der Schalungseinrichtungen 5 bewegbar. Weiterhin sind die Führungseinrichtungen 25 über den Trageinrichtungen 4 und parallel dazu angeordnet. Um die Batterieschalungen 1 kompakter zu gestalten, sind die Schalungseinrichtungen 5 an ihrem oberen Ende an den Trageinrichtungen 4 befestigt.The lifting device 8th is on two spaced guide means 25 that are here as rails 25 are formed, in a clamping direction of the formwork devices 5 movable. Furthermore, the management facilities 25 over the carrying devices 4 and arranged in parallel. To the battery molds 1 To make more compact, the formwork devices 5 at its upper end to the carrying devices 4 attached.

Die Batterieschalung 1 kann zumindest eine nicht dargestellte Beschwereinrichtung mit einem Hohlraum aufweisen, der vorzugsweise mit Sand, Wasser und/oder Beton befüllbar ist. Weiterhin kann die Beschwereinrichtung entleerbar und/oder entfernbar sein. Dadurch kann die Standfestigkeit und Stabilität der Batterieschalung erhöht werden.The battery mold 1 may comprise at least one, not shown Beschwereinrichtung with a cavity which is preferably filled with sand, water and / or concrete. Furthermore, the Beschwereinrichtung be emptied and / or removable. As a result, the stability and stability of the battery mold can be increased.

Die 2 zeigt eine schematische Darstellung einer erfindungsgemäßen Schalungseinrichtung 5 in einer Draufsicht, die zum Beispiel in der in 1 gezeigten Batterieschalung 1 anstatt der Schalungseinrichtung 5' verwendet werden kann. Die Schalungseinrichtung 5 weist zwei Schalungsplatten 10 auf, die lösbar gelenkig miteinander verbindbar sind, um von einem aufgefalteten Zustand in einen gefalteten Zustand überführt zu werden. In der 2 sind die Schalungsplatten 10 miteinander verbunden und in einem aufgefalteten Zustand. In der Draufsicht auf die 2 ist die Schalungsvorderseite 11 zum Anbringen von nicht dargestellten Schalelementen gezeigt. Weiterhin weist die Schalungsplatte 10 eine Schalungsrückseite 12 auf, die gegenüber der Schalungsvorderseite 11 angeordnet ist. Im gefalteten Zustand, der in der 6 dargestellt ist, sind die Schalungsrückseiten 12 der beiden Schalungsplatten 10 einander zugewandt. Die Schalungseinrichtung 5 ist dafür vorgesehen, zwischen den Schottwänden 6 positioniert zu werden. Die Schalungseinrichtung 5 bzw. die Schalungsplatte 10 kann liegend bestückt werden. Weiterhin kann die Schalungseinrichtung 5 bzw. die Schalungsplatte 10 in sogenannten Umlaufanlagen mit Fordereinrichtungen transportiert werden. In den Umlaufanlagen können sich verschiedene Bearbeitungsstationen befinden. Nach dem Entformen kann die Schalungseinrichtung 5 bzw. die Schalungsplatte 10 zum Beispiel an einer Arbeitsstation gereinigt und an einer anderen Arbeitsstation neu bestückt werden, bevor sie erneut in die Batterieschalung 1 eingehängt wird.The 2 shows a schematic representation of a formwork device according to the invention 5 in a plan view, for example in the in 1 shown battery mold 1 instead of the formwork device 5 ' can be used. The formwork device 5 has two formwork panels 10 which are releasably hingedly connected to each other to be transferred from a folded state to a folded state. In the 2 are the formwork panels 10 connected together and in a folded state. In the top view on the 2 is the formwork front 11 shown for attaching scarf elements, not shown. Furthermore, the formwork panel 10 a formwork backside 12 on, the opposite of the formwork front 11 is arranged. In the folded state, in the 6 is shown, are the formwork backs 12 the two formwork panels 10 facing each other. The formwork device 5 is intended to be between the bulkheads 6 to be positioned. The formwork device 5 or the formwork panel 10 can be equipped lying down. Furthermore, the formwork device 5 or the formwork panel 10 be transported in so-called circulation systems with Fordereinrichtungen. There may be various processing stations in the circulation systems. After demolding, the formwork device 5 or the formwork panel 10 for example, be cleaned at one workstation and repackaged at another workstation before returning to the battery mold 1 is hung.

Die Schalungsplatten 10 sind im Wesentlichen rechteckig und an der längeren Längsseite 13 über zwei Scharniergelenke 15 miteinander verbunden. Die Anordnung und Anzahl der Scharniergelenke 15 ist als nur beispielhaft anzusehen, und kann den Gegebenheiten angepasst werden. In der 3 ist ein Scharniergelenk 15 aus der 2 vergrößert dargestellt. Darauf wird später noch genauer eingegangen.The formwork panels 10 are essentially rectangular and on the longer longitudinal side 13 over two hinge joints 15 connected with each other. The arrangement and number of hinge joints 15 is to be regarded as exemplary only, and can be adapted to the circumstances. In the 3 is a hinge joint 15 from the 2 shown enlarged. This will be discussed in more detail later.

Jede der Schalungsplatten 10 weist zwei Einhängerollen 18, zwei erste Stützrollen 19 und zwei zweite Stützrollen 20 auf. Die Einhängerollen 18 sind jeweils an einer Schmalseite 14 der Schalungsplatten 10 und in dem Bereich, an dem die beiden Schalungsplatten 10 aneinander grenzen, angeordnet. Jede Schalungsplatte 10 weist zwei erste Stützrollen 19 an der den Scharniergelenken 15 gegenüberliegenden Längsseite 13 der Schalungsplatte 10 auf. Zwei zweite Stützrollen 20 sind jeweils auf der Schalungsrückseite 12 der Schalungsplatten 10 angeordnet. Die ersten Stützrollen 19 und die zweiten Stützrollen 20 von den Schalungsplatten 10 der Schalungseinrichtung 5 sind entlang der Schwenkachse 22 versetzt zueinander angeordnet. Durch diese Anordnung kann der Abstand der beiden Schalungsplatten 10 im gefalteten Zustand verringert werden.Each of the formwork panels 10 has two suspension rollers 18 , two first support rollers 19 and two second support rollers 20 on. The suspension rollers 18 are each on a narrow side 14 the formwork panels 10 and in the area where the two formwork panels 10 adjoin one another, arranged. Every formwork panel 10 has two first support rollers 19 at the hinge joints 15 opposite longitudinal side 13 the formwork panel 10 on. Two second support rollers 20 are each on the back of the formwork 12 the formwork panels 10 arranged. The first support rollers 19 and the second support rollers 20 from the formwork panels 10 the formwork device 5 are along the pivot axis 22 staggered to each other. By this arrangement, the distance between the two formwork panels 10 be reduced in the folded state.

In der 2 sind bei der oberen Schalungsplatte 10 die beiden ersten Stützrollen 19 jeweils am Rand der Schalungsplatte 10 angeordnet. Das ermöglicht eine leichte Handhabung der Schalungsplatte 10 beziehungsweise der Schalungseinrichtung 5. Jedoch sind die Anzahl und die Anordnung der Einhängerollen 18, der ersten Stützrollen 19 und der zweiten Stützrollen 20 als nur beispielhaft anzusehen und an die jeweiligen Erfordernisse anpassbar.In the 2 are at the upper formwork panel 10 the first two support rollers 19 each at the edge of the formwork panel 10 arranged. This allows easy handling of the formwork panel 10 or the formwork device 5 , However, the number and the arrangement of the suspension rollers are 18 , the first supporting rollers 19 and the second support rollers 20 as merely exemplary and adaptable to the respective requirements.

Die Einhängerollen 18 sind über Halter 21b an den Schmalseiten 14 der Schalungsplatten 10 derart befestigt, dass sie von den Schalungsplatten 10 hervorstehen.The suspension rollers 18 are about holders 21b on the narrow sides 14 the formwork panels 10 fixed so that they are from the shuttering panels 10 protrude.

Weiterhin sind die ersten Stützrollen 19 über Halter 21a derart an den Längsseiten 13 der Schalungsplatten 10 befestigt, dass sie davon hervorstehen.Furthermore, the first support rollers 19 over holder 21a so on the long sides 13 the formwork panels 10 attached that they protrude from it.

Es ist auch denkbar, dass die ersten Stützrollen 19 und/oder die zweiten Stützrollen 20 schwenkbar sind, wodurch die Bewegung der Schalungsplatten 10 auf einer Unterlage 23, wie sie in der 5 gezeigt ist, noch leichter ist. It is also conceivable that the first support rollers 19 and / or the second support rollers 20 are pivotable, causing the movement of shuttering panels 10 on a pad 23 as they are in the 5 shown is even easier.

Als besonders günstig hat es sich erwiesen, wenn die Einhängerolle 18 zumindest abschnittsweise aus Stahl und die ersten Stützrollen 19 und die zweite Stützrolle 20 zumindest abschnittsweise aus Kunststoff besteht. Jedoch kann auch jedes andere geeignete Material verwendet werden.It has proved to be particularly favorable when the suspension roller 18 at least in sections made of steel and the first support rollers 19 and the second support roller 20 at least partially made of plastic. However, any other suitable material may be used.

In der 2 sind weiterhin die Rollenachsen 24a für die ersten Stützrollen und 24b für die Einhängerollen 18 eingezeichnet.In the 2 are still the role axes 24a for the first support rollers and 24b for the suspension rollers 18 located.

Die 3 zeigt eine Vergrößerung eines Scharniergelenks 15, wie es in der 2 dargestellt ist. An den Schalungsplatten 10 sind jeweils Scharniergelenkteile 16 angeordnet, die durch einen Bolzen 17 miteinander verbunden werden. Im verbundenen Zustand liegt jeweils ein Scharnierteil 16 eines Schalungselements 10 einem Scharnierteil 16 eines anderen Schalungselements 10 gegenüber. Der Bolzen 17 wird auf geeignete Weise vor dem Herausfallen gesichert. Nach Entfernen der nicht gezeigten Sicherung kann der Bolzen 17 aus den Scharniergelenkteilen 16 entfernt werden, so dass die Schalungsplatten 10 voneinander getrennt werden können und getrennt voneinander bestückt werden können. Das Scharniergelenk 15 ist nur als beispielhaft anzusehen. Es können auch andere geeignete Scharniergelenke verwendet werden. Anstatt von Scharniergelenken sind auch andere geeignete gelenkige Verbindungsarten oder eine Mischung von verschiedenen gelenkigen Verbindungsarten denkbar.The 3 shows an enlargement of a hinge joint 15 as it is in the 2 is shown. On the formwork panels 10 are each hinged hinge parts 16 arranged by a bolt 17 be connected to each other. In the connected state is in each case a hinge part 16 a formwork element 10 a hinge part 16 another formwork element 10 across from. The bolt 17 is secured in a suitable manner from falling out. After removing the fuse, not shown, the bolt 17 from the hinge joint parts 16 be removed, leaving the formwork panels 10 can be separated from each other and can be equipped separately. The hinge joint 15 is to be considered as an example only. Other suitable hinges may be used. Instead of hinged joints, other suitable articulated types of connection or a mixture of different articulated types of connection are conceivable.

Die 4 zeigt eine erfindungsgemäße Schalungseinrichtung 5 im verbundenen und aufgefalteten Zustand in einer Seitenansicht. Die ersten Stützrollen 19 sowie die zweiten Stützrollen 20 sind auf der Unterlage 23 beweglich abgestützt. Auf der Schalungsvorderseite 11 der Schalungsplatte 10 können nicht dargestellte Schalelemente, die die Kontur des Betonfertigteils bestimmen, aufgebracht werden. Die Schalelemente können zum Beispiel Türen- oder Fensterausschnitte begrenzen und dichten zudem während des Betonierens den mit Beton gefüllten Hohlraum ab. Die Schalelemente können zum Beispiel mit Magnethaltern an den Schalungsplatten 10 befestigt werden. Es sind auch andere Befestigungsmethoden möglich. Die Schalungsplatten können gemäß der gewünschten Befestigungsmethode gestaltet werden.The 4 shows a formwork device according to the invention 5 in the connected and unfolded state in a side view. The first support rollers 19 and the second support rollers 20 are on the pad 23 movably supported. On the formwork front 11 the formwork panel 10 can not be shown formwork elements that determine the contour of the precast concrete part, are applied. The formwork elements can, for example, limit door or window cutouts and also seal off the concrete-filled cavity during concreting. The formwork elements can, for example, with magnetic holders on the formwork panels 10 be attached. There are also other attachment methods possible. The formwork panels can be designed according to the desired fastening method.

5 zeigt eine schematische Darstellung der erfindungsgemäßen Schalungseinrichtung 5 während der Überführung von einem aufgefalteten Zustand in einen gefalteten Zustand oder während der Überführung von einem gefalteten Zustand in einen aufgefalteten Zustand beziehungsweise während des Abhebens von der Unterlage 23 oder des Ablegens auf der Unterlage 23. Die beiden Schalungsplatten 10 sind über Scharniergelenke 15 miteinander verbunden. Die Schalungseinrichtung 5 wird über die ersten Stützrollen 19 zeitweilig während des Auffaltens und/oder Entfaltens und/oder Abheben von und/oder Ablegen auf der Unterlage 23 beweglich abgestützt. Dadurch kann die Handhabung der Schalungseinrichtung 5 wesentlich vereinfacht werden. 5 shows a schematic representation of the formwork device according to the invention 5 during transfer from a folded state to a folded state or during transfer from a folded state to a deployed state or during lift-off from the pad, respectively 23 or depositing on the pad 23 , The two formwork panels 10 are about hinge joints 15 connected with each other. The formwork device 5 is about the first support rollers 19 temporarily during unfolding and / or unfolding and / or lifting off and / or depositing on the support 23 movably supported. This allows the handling of the formwork device 5 be greatly simplified.

Die 6 zeigt eine schematische Darstellung der erfindungsgemäßen Schalungseinrichtung 5 im gefalteten Zustand beziehungsweise in einem Zustand, wenn sie in die Trageinrichtung 4 der Batterieschalung 1 eingehängt ist. In der 6 ist nur die Trageinrichtung 4 der Batterieschalung 1 dargestellt. Die Schalungsplatten 10 sind über die Scharniergelenke 15 gelenkig miteinander verbunden. Die Einhängerollen 18 sind in der Trageinrichtung 4 angeordnet. Die Schalungsrückseiten 12 der Schalungsplatten 10 sind benachbart zueinander angeordnet.The 6 shows a schematic representation of the formwork device according to the invention 5 in the folded state or in a state when in the carrying device 4 the battery mold 1 is mounted. In the 6 is only the carrying device 4 the battery mold 1 shown. The formwork panels 10 are over the hinge joints 15 hinged together. The suspension rollers 18 are in the carrying device 4 arranged. The formwork backs 12 the formwork panels 10 are arranged adjacent to each other.

Gemäß der vorliegenden Erfindung können jedoch die Schalungsplatten 10 nicht nur im verbundenen Zustand, sondern auch im unverbundenen Zustand in die Batterieschalung 1 eingehängt werden. Ein Einhängen mit Hilfe der Einhängerollen 18 ist nicht unbedingt erforderlich. Die Schalungsplatten 10 können beziehungsweise die Schalungseinrichtung 10 kann auch mit anderen geeigneten Methoden in die Batterieschalung 1 eingesetzt werden. Weiterhin sind die im unverbundenen Zustand eingesetzten Schalungsplatten 10 auch in der Batterieschalung 1 miteinander verbindbar. Auf diese Weise kann der Fertigungsprozess sehr flexibel gestaltet werden, und die Handhabung wird vereinfacht.According to the present invention, however, the formwork panels 10 not only in the connected state, but also in the unconnected state in the battery mold 1 be hung. An attachment using the suspension rollers 18 is not essential. The formwork panels 10 can or the formwork device 10 can also be used with other suitable methods in the battery mold 1 be used. Furthermore, the shuttering panels used in the unconnected state 10 also in the battery mold 1 connectable with each other. In this way, the manufacturing process can be made very flexible, and handling is simplified.

Durch die hängende Anordnung der Schalungsplatten 10 in der Batterieschalung 1 kann die Batterieschalung 1 kompakter gestaltet werden.Due to the hanging arrangement of the formwork panels 10 in the battery mold 1 can the battery mold 1 be made more compact.

Mit Hilfe der erfindungsgemäßen Schalungseinrichtung 5 für eine Batterieschalung 1 beziehungsweise der Batterieschalung 1 mit einer erfindungsgemäßen Schalungseinrichtung 5 ist eine leichtere Bestückung der Schalungsplatten 10 durch Personen oder Maschinen möglich. Somit kann der Fertigungsprozess noch flexibler gestaltet werden. Insbesondere ist bei einer getrennten Bestückung der Schalungsplatten 10 eine leichtere Handhabung derselben möglich. Eine Person oder eine Maschine kommt leichter von allen Seiten an die Schalungsplatte 10 zum Bestücken heran. Zudem wird in Fertigungsstraßen weniger Platz benötigt.With the aid of the formwork device according to the invention 5 for a battery mold 1 or the battery mold 1 with a formwork device according to the invention 5 is a lighter assembly of shuttering panels 10 by persons or machines possible. Thus, the manufacturing process can be made even more flexible. In particular, in a separate assembly of shuttering panels 10 easier handling of the same possible. A person or a machine is easier on all sides of the formwork panel 10 for loading. In addition, less space is needed in production lines.

ZITATE ENTHALTEN IN DER BESCHREIBUNG QUOTES INCLUDE IN THE DESCRIPTION

Diese Liste der vom Anmelder aufgeführten Dokumente wurde automatisiert erzeugt und ist ausschließlich zur besseren Information des Lesers aufgenommen. Die Liste ist nicht Bestandteil der deutschen Patent- bzw. Gebrauchsmusteranmeldung. Das DPMA übernimmt keinerlei Haftung für etwaige Fehler oder Auslassungen.This list of the documents listed by the applicant has been generated automatically and is included solely for the better information of the reader. The list is not part of the German patent or utility model application. The DPMA assumes no liability for any errors or omissions.

Zitierte PatentliteraturCited patent literature

  • DE 102015209157 [0003, 0030] DE 102015209157 [0003, 0030]

Claims (15)

Schalungseinrichtung für eine Batterieschalung (1) zum Herstellen von Bauelementen, insbesondere Betonfertigteilen, die zumindest zwei Schottwände (6) aufweist, und die Schalungseinrichtung (5) zwei Schalungsplatten (10) aufweist, die lösbar gelenkig miteinander verbindbar sind, um von einem aufgefalteten Zustand in einen gefalteten Zustand überführt zu werden, wobei jede Schalungsplatte (10) eine Schalungsvorderseite (11) zum Anbringen von Schalelementen und eine Schalungsrückseite (12) aufweist und die Schalungsrückseiten (12) der beiden Schalungsplatten (10) im gefalteten Zustand einander zugewandt sind und die Schalungseinrichtung (5) dafür vorgesehen ist zwischen den Schottwänden (6) positioniert zu werden.Formwork device for a battery mold ( 1 ) for the manufacture of structural elements, in particular precast concrete elements, comprising at least two bulkhead walls ( 6 ), and the formwork device ( 5 ) two formwork panels ( 10 ) which are releasably hinged together to be transferred from a folded state to a folded state, wherein each formwork panel ( 10 ) a formwork front side ( 11 ) for attaching formwork elements and a formwork backside ( 12 ) and the formwork backs ( 12 ) of the two formwork panels ( 10 ) are facing each other in the folded state and the formwork device ( 5 ) is provided between the bulkheads ( 6 ) to be positioned. Schalungseinrichtung nach Anspruch 1, dadurch gekennzeichnet, dass die Schalungsplatten (10) im Wesentlichen rechteckig und vorzugsweise einseitig, bevorzugt an der längeren Längsseite (13) miteinander verbindbar sind.Shuttering device according to claim 1, characterized in that the formwork panels ( 10 ) is substantially rectangular and preferably one-sided, preferably on the longer longitudinal side ( 13 ) are connectable to each other. Schalungseinrichtung nach Anspruch 1 oder 2, dadurch gekennzeichnet, dass die Schalungsplatten (10) über wenigstens ein Scharniergelenk (15) miteinander verbindbar sind.Shuttering device according to claim 1 or 2, characterized in that the formwork panels ( 10 ) via at least one hinge joint ( 15 ) are connectable to each other. Schalungseinrichtung nach zumindest einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, dass jede der Schalungsplatten (10) zumindest eine Einhängerolle (18) und/oder zumindest eine erste Stützrolle (19) und/oder zumindest eine zweite Stützrolle (20) aufweist.Formwork device according to at least one of the preceding claims, characterized in that each of the formwork panels ( 10 ) at least one suspension roller ( 18 ) and / or at least a first supporting role ( 19 ) and / or at least a second supporting role ( 20 ) having. Schalungseinrichtung nach zumindest einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, dass die Einhängerolle (18) an einer Schmalseite (14) der Schalungsplatte (10) und vorzugsweise in dem Bereich an dem die beiden Schalungsplatten (10) aneinandergrenzen vorgesehen ist.Shuttering device according to at least one of the preceding claims, characterized in that the suspension roller ( 18 ) on a narrow side ( 14 ) of the formwork panel ( 10 ) and preferably in the area where the two formwork panels ( 10 ) is provided adjacent to each other. Schalungseinrichtung nach zumindest einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, dass die erste Stützrolle (19) an der dem Scharniergelenk (15) gegenüberliegenden Längsseite (13) der Schalungsplatte (10) angeordnet ist.Shuttering device according to at least one of the preceding claims, characterized in that the first support roller ( 19 ) at the hinge joint ( 15 ) opposite longitudinal side ( 13 ) of the formwork panel ( 10 ) is arranged. Schalungseinrichtung nach zumindest einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, dass die zweite Stützrolle (20) auf der Schalungsrückseite (12) der Schalungsplatte (10) angeordnet ist.Shuttering device according to at least one of the preceding claims, characterized in that the second supporting roller ( 20 ) on the back of the formwork ( 12 ) of the formwork panel ( 10 ) is arranged. Schalungseinrichtung nach zumindest einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, dass die ersten Stützrollen (19) und/oder die zweiten Stützrollen (20) von den Schalungsplatten (10) der Schalungseinrichtung (5) entlang der Schwenkachse (22) versetzt zueinander angeordnet sind.Formwork device according to at least one of the preceding claims, characterized in that the first support rollers ( 19 ) and / or the second support rollers ( 20 ) from the formwork panels ( 10 ) of the formwork device ( 5 ) along the pivot axis ( 22 ) are offset from one another. Schalungseinrichtung nach zumindest einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, dass die erste Stützrolle (19) und/oder die zweite Stützrolle (20) schwenkbar ist.Shuttering device according to at least one of the preceding claims, characterized in that the first support roller ( 19 ) and / or the second support roller ( 20 ) is pivotable. Schalungseinrichtung nach zumindest einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, dass die Einhängerolle (18) zumindest abschnittsweise aus Stahl besteht und/oder die erste Stützrolle (19) und/oder die zweite Stützrolle (20) zumindest abschnittsweise aus Kunststoff besteht.Shuttering device according to at least one of the preceding claims, characterized in that the suspension roller ( 18 ) consists at least in sections of steel and / or the first supporting role ( 19 ) and / or the second support roller ( 20 ) consists at least partially of plastic. Schalungseinrichtung nach zumindest einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, dass die Schalungseinrichtung (5) über die ersten Stützrollen (19) zumindest zeitweilig während des Auffaltens und/oder Entfaltens und/oder Abheben von und/oder Ablegen auf einer Unterlage (23) vorzugsweise beweglich abstützbar sind.Formwork device according to at least one of the preceding claims, characterized in that the formwork device ( 5 ) over the first support rollers ( 19 ) at least temporarily during unfolding and / or unfolding and / or taking off and / or depositing on a support ( 23 ) are preferably movable supportable. Batterieschalung mit zumindest einer Schalungseinrichtung (5) nach zumindest einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, dass die Schalungsplatten (10) im verbundenen oder unverbundenen Zustand in die Batterieschalung (1) eingesetzt werden können.Battery mold with at least one formwork device ( 5 ) according to at least one of the preceding claims, characterized in that the shuttering panels ( 10 ) in the connected or unconnected state in the battery mold ( 1 ) can be used. Batterieschalung nach Anspruch 12, dadurch gekennzeichnet, dass die im unverbundenen Zustand eingesetzten Schalungsplatten (10) miteinander verbindbar sind.Battery mold according to claim 12, characterized in that the shuttering panels used in the unconnected state ( 10 ) are connectable to each other. Batterieschalung nach Anspruch 12 oder 13, dadurch gekennzeichnet, dass die Schalungsplatten (10) hängend in der Batterieschalung (1) angeordnet sind.Battery mold according to claim 12 or 13, characterized in that the formwork panels ( 10 ) hanging in the battery mold ( 1 ) are arranged. Batterieschalung nach zumindest einem der Ansprüche 12 bis 14, dadurch gekennzeichnet, dass die Batterieschalung (1) zumindest eine Trageinrichtung (4), vorzugsweise eine Schiene (4), zur Aufnahme der Einhängerolle (18) der Schalungsplatte (10) aufweist.Battery mold according to at least one of claims 12 to 14, characterized in that the battery mold ( 1 ) at least one carrying device ( 4 ), preferably a rail ( 4 ), for receiving the suspension roller ( 18 ) of the formwork panel ( 10 ) having.
DE102016205946.7A 2016-04-08 2016-04-08 formwork device Withdrawn DE102016205946A1 (en)

Priority Applications (7)

Application Number Priority Date Filing Date Title
DE102016205946.7A DE102016205946A1 (en) 2016-04-08 2016-04-08 formwork device
PCT/EP2017/057537 WO2017174432A1 (en) 2016-04-08 2017-03-30 Formwork device
BR112018070735-0A BR112018070735B1 (en) 2016-04-08 2017-03-30 FORMWORK AND BATTERY FORMWORK DEVICE
NZ747009A NZ747009A (en) 2016-04-08 2017-03-30 Formwork device
SI201730568T SI3439840T1 (en) 2016-04-08 2017-03-30 Formwork device
EP17715657.7A EP3439840B1 (en) 2016-04-08 2017-03-30 Formwork device
IL262085A IL262085B (en) 2016-04-08 2018-10-03 Formwork device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE102016205946.7A DE102016205946A1 (en) 2016-04-08 2016-04-08 formwork device

Publications (1)

Publication Number Publication Date
DE102016205946A1 true DE102016205946A1 (en) 2017-10-12

Family

ID=58489307

Family Applications (1)

Application Number Title Priority Date Filing Date
DE102016205946.7A Withdrawn DE102016205946A1 (en) 2016-04-08 2016-04-08 formwork device

Country Status (7)

Country Link
EP (1) EP3439840B1 (en)
BR (1) BR112018070735B1 (en)
DE (1) DE102016205946A1 (en)
IL (1) IL262085B (en)
NZ (1) NZ747009A (en)
SI (1) SI3439840T1 (en)
WO (1) WO2017174432A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102017200118A1 (en) * 2017-01-05 2018-07-05 Doka NewCon GmbH formwork device

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP3815865A1 (en) 2019-10-31 2021-05-05 Umdasch Group NewCon GmbH Formwork device
EP3815866A1 (en) 2019-10-31 2021-05-05 Umdasch Group NewCon GmbH Formwork device
EP3832052A1 (en) 2019-12-04 2021-06-09 Umdasch Group NewCon GmbH Shuttering for creating a door/window opening in a concrete wall or slab
CN117124461B (en) * 2023-08-02 2024-02-13 安徽金鹏绿色建筑产业集团有限公司 Production equipment for vertical mold of prestressed laminated slab

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102015209157A1 (en) 2015-05-19 2016-11-24 B.T. Innovation Gmbh formwork device

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1326902A (en) * 1919-03-15 1920-01-06 Atterbury Grosvenor Process of and apparatus for making concrete slabs
DE2418665A1 (en) * 1974-04-18 1975-11-06 Spannbetonwerk Koch Kg Shuttering core for concrete cavity wall elements - is designed for automatic non-manual removal and reduced assembly time
DD268190A1 (en) * 1988-01-08 1989-05-24 Ingenieurtief Und Verkehrsbauk BATTERY FORM, PREFERABLY FOR MANUFACTURING CONCRETE ELEMENTS
DE112004000547D2 (en) * 2003-01-20 2005-12-15 Roland Weber folding formwork

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102015209157A1 (en) 2015-05-19 2016-11-24 B.T. Innovation Gmbh formwork device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102017200118A1 (en) * 2017-01-05 2018-07-05 Doka NewCon GmbH formwork device

Also Published As

Publication number Publication date
IL262085B (en) 2020-05-31
SI3439840T1 (en) 2021-07-30
BR112018070735A2 (en) 2019-02-05
WO2017174432A1 (en) 2017-10-12
NZ747009A (en) 2020-03-27
EP3439840B1 (en) 2020-09-30
EP3439840A1 (en) 2019-02-13
BR112018070735B1 (en) 2023-01-17
IL262085A (en) 2018-12-02

Similar Documents

Publication Publication Date Title
DE102015209157B4 (en) Formwork device and battery formwork with this formwork device
EP3439840B1 (en) Formwork device
EP2083977B1 (en) Formwork system for concreting prefabricated parts, comprising a formwork shell and a formwork core
DE2229264C2 (en) Process for the factory production of the storeys of a building and apparatus for carrying out the process
EP3572198B1 (en) Formwork core for a formwork system for the concreting of a bell body
EP0239053B1 (en) Prefabricated roller shutter box composed of assembled brick elements, and method for producing it
EP3565692B1 (en) Formwork device
DE2400790C2 (en) Process and device for the production of room cells made of reinforced concrete, e.g. prefabricated garages
EP4051472B1 (en) Formwork device
DE3202336C2 (en)
EP3832052A1 (en) Shuttering for creating a door/window opening in a concrete wall or slab
DE2430009C2 (en) Method and device for demoulding large panels made of reinforced concrete
DE2032740A1 (en) Form for the production of a space cell
DE2033514A1 (en) Method and device for the construction of rooms, in particular for residential use
DE1684435A1 (en) Formwork panel, especially for reinforced concrete slabs
EP3815866A1 (en) Formwork device
DE2417805A1 (en) Removable formwork for concrete room unit - has formwork split to enable moulded shell to be removed on pallet
DE2100193A1 (en) Device for shuttering a prefabricated garage
DE2618735A1 (en) Structured surface reinforced concrete wall sliding formwork - has short rear sliding structured matrices between sliding form panels and wall
DE2157313A1 (en) Method and device for casting prefabricated components
DE102016120047A1 (en) Device and method for the integral production of a three side elements and a floor element and / or a ceiling element having room module
DE7737513U1 (en) CLAMP FOR CONCRETE COLUMN FORMWORK
DE8413214U1 (en) Plant for the production of large-scale building panels, in particular large concrete panels, in one or more battery molds operated in parallel
DE9107967U1 (en) Device for the production of reinforced concrete room cells
DE2139661A1 (en) Equipment for the production of concrete building panels by means of formwork

Legal Events

Date Code Title Description
R081 Change of applicant/patentee

Owner name: DOKA NEWCON GMBH, AT

Free format text: FORMER OWNER: B.T. INNOVATION GMBH, 39116 MAGDEBURG, DE

R082 Change of representative

Representative=s name: BREUER FRIEDRICH HAHNER PATENTANWAELTE PARTG M, DE

Representative=s name: GRUENECKER PATENT- UND RECHTSANWAELTE PARTG MB, DE

Representative=s name: WALLINGER RICKER SCHLOTTER TOSTMANN PATENT- UN, DE

R082 Change of representative

Representative=s name: BREUER FRIEDRICH HAHNER PATENTANWAELTE PARTG M, DE

Representative=s name: WALLINGER RICKER SCHLOTTER TOSTMANN PATENT- UN, DE

R082 Change of representative

Representative=s name: BREUER FRIEDRICH HAHNER PATENTANWAELTE PARTG M, DE

R119 Application deemed withdrawn, or ip right lapsed, due to non-payment of renewal fee