DE102008032217A1 - Basement for signal mast for railway track, has tie bar downwardly extending from support head into receiving space, and filling body filling receiving space for stationarly supporting tie bar in receiving space - Google Patents
Basement for signal mast for railway track, has tie bar downwardly extending from support head into receiving space, and filling body filling receiving space for stationarly supporting tie bar in receiving space Download PDFInfo
- Publication number
- DE102008032217A1 DE102008032217A1 DE102008032217A DE102008032217A DE102008032217A1 DE 102008032217 A1 DE102008032217 A1 DE 102008032217A1 DE 102008032217 A DE102008032217 A DE 102008032217A DE 102008032217 A DE102008032217 A DE 102008032217A DE 102008032217 A1 DE102008032217 A1 DE 102008032217A1
- Authority
- DE
- Germany
- Prior art keywords
- receiving space
- anchor
- foundation according
- pile
- carrier
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/32—Foundations for special purposes
- E02D27/42—Foundations for poles, masts or chimneys
Abstract
Description
Die Erfindung betrifft eine Fundamentanordnung, insbesondere für Maste, beispielsweise Signalmaste für Gleisanlagen, oder sonstige Bauwerke.The The invention relates to a foundation arrangement, in particular for Masts, such as signal masts for track systems, or other structures.
Gleisanlagen für den Schienenverkehr umfassen Maste, beispielsweise für Signaleinrichtungen. Die Signale werden in an den Gleisen aufgestellt. Weder darf die Festigkeit des Gleisbetts beeinträchtigt werden, noch dürfen etwaige Kabelkanäle oder andere in der Nähe des Gleisbetts befindliche Einrichtungen beschädigt werden. Weiter stellt sich als Anforderung an entsprechende Fundamente, dass sie auf einfacher Weise schnell und kostenggünstig zu errichten sind.railway tracks for railways include masts, for example for signaling devices. The signals are in on the tracks established. The strength of the track bed must not be impaired are still allowed, any cable channels or others Facilities located near the track bed are damaged become. Next arises as a requirement for appropriate foundations that easy to set up quickly and inexpensively are.
Dazu
ist sowohl aus der
Die Kopfplatte trägt an ihren vier Ecken Befestigungsbolzen, auf denen Distanzklötze angeordnet sind. Der Mast wird mit seinem Mastfuß auf die Distanzklötze aufgesetzt und dort durch die Befestigungsbolzen gesichert.The Top plate carries at its four corners fastening bolts, on which spacer blocks are arranged. The mast will with his mast foot placed on the spacer blocks and secured there by the fastening bolts.
Bei diesen Befestigungsvorrichtungen erfolgt die Lastübertragung zwischen der Muffe und dem oberen Ende des Rammrohrs punktweise durch die radialen Justierschrauben.at These fastening devices are the load transfer between the sleeve and the upper end of the ram tube pointwise through the radial adjustment screws.
Es ist Aufgabe der Erfindung eine verbesserte Fundamentanordnung anzugeben.It The object of the invention is to provide an improved foundation arrangement.
Diese Aufgabe wird mit dem Fundament nach Anspruch 1 gelöst. Außerdem gibt Anspruch 15 ein vorteilhaftes Verfahren zur Errichtung von Fundamenten an.These Task is solved with the foundation of claim 1. In addition, claim 15 gives an advantageous method for Construction of foundations.
Das erfindungsgemäße Fundament umfasst einen Pfahl, der beispielsweise durch ein im Wesentlichen vertikal in den Boden einzurammendes oder anderweitig in den Boden einzubringendes Rohr gebildet wird. Vorzugsweise ist das Rohr innen und außen glattwandig sowie sowohl an seinem oberen wie auch an seinem unteren Ende offen. Auf diese oder eine geeignete andere Weise wird in einem oberen Ende des Pfahls oberhalb des beim Einrammen in den Boden eingedrungenen Bodenmaterials ein Aufnahmeraum ausgebildet, in dem ein Mastträger gehalten ist. Der Mastträger umfasst einen Trägerkopf als Aufnahme zur Befestigung der Last, d. h. beispielsweise des Signalmastes, sowie einen Anker, der sich von dem Trägerkopf nach unten in den Aufnahmeraum hinein erstreckt. Der Anker ist in einen Füllkörper eingelassen, der den Aufnahmeraum ausfüllt, um den Anker und mit diesem den Trägerkopf an dem Pfahl ortsfest zu sichern. Anstelle eines rohrförmigen Rammpfahls kann auch ein außen mit Gewinde versehenes unten offen oder geschlossen ausgebildetes Rohr genutzt werden, dass einen Erdbohrer bildet.The foundation according to the invention comprises a pile, for example, by a substantially vertical in the ground to be hammered or otherwise introduced into the soil pipe is formed. Preferably, the tube is inside and outside smooth-walled as well as at its upper as well as at its lower Open end. In this or another suitable way is in a upper end of the pile above when driving into the ground penetrated soil material formed a receiving space in the a mast carrier is held. The mast carrier comprises a carrier head as a receptacle for attaching the load, d. H. for example, the signal mast, as well as an anchor, the from the carrier head down into the receiving space inside extends. The anchor is embedded in a filler, which fills the receiving space around the anchor and with this to secure the carrier head to the pile stationary. Instead of a tubular pile can also be an outside threaded bottom open or closed trained Pipe that forms an auger.
Der Pfahl und der Mastträger können beide aus Stahl ausgebildet sein. Die beiden Teile sind untereinander ohne direkte Stahl-Stahl-Verbindung verbunden. Vielmehr besteht, wenn der Füllkörper aus Beton ausgebildet ist, ein form-, kraft- und stoffschlüssiger Stahl-Beton-Stahl-Verbund. Der Formkörper ist bei der Errichtung des Fundaments durch Einfüllen eines aushärtbaren oder aushärtenden vorzugsweise mineralisch gebundenen Materials in den Aufnahmeraum gebildet. Als Material für den Füllkörper können z. B. unterschiedliche Betonarten, insbesondere zementreiche Betonarten ohne Grobkorn zur Anwendung kommen. Alternativ können Polymerbeton oder andere fließfähige oder durch geeignete Maßnahmen (z. B. durch Erwärmung) plastifizierbare Massen Verwendung finden, die nach dem Einfüllen aushärten oder erstarren.Of the Pile and the mast carrier can both be made of steel be educated. The two parts are with each other without direct Steel-steel connection connected. Rather, if the filler body is made of concrete, a positive, cohesive and material Steel-concrete composite steel. The molded body is at the erection of the foundation by filling a curable or hardening, preferably mineral bonded material formed in the recording room. As material for the filler can z. B. different types of concrete, in particular cement-rich concrete types without coarse grain are used. alternative can be polymer concrete or other flowable or by appropriate measures (eg by heating) plasticizable masses find use after filling harden or solidify.
Vorzugsweise weist der Aufnahmeraum eine Weite auf, die erheblich größer ist als ein Außendurchmesser des Ankers. Damit hat der Anker vor Einbringen des Füllmaterials in den Aufnahmeraum erhebliches seitliches Spiel. Er kann vorzugsweise um mehrere Zentimeter seitlich bewegt werden. Beispielsweise wird der Anker durch ein Rohr mit durchgehend geschlossener oder auch gelochter Rohrwand gebildet, deren Außendurchmesser etwa ein halb bis dreiviertel so groß ist wie der Innendurchmesser des Aufnahmeraums. Damit kann beim Setzen der Rammpfähle mit großen Toleranzen gearbeitet werden. Auch sind leichte Deformationen des oberen Pfahlendes unbeachtlich. Die gewünschte Mastposition des Signalmasts oder sonstigen Bauwerks kann durch Ausrichtung des Mastträgers an dem Pfahl vor Ausgießen des Aufnahmeraums erreicht werden.Preferably the recording room has a width that is considerably larger is as an outer diameter of the anchor. This has the Anchor before introducing the filling material into the receiving space considerable lateral play. He can preferably by several centimeters laterally to be moved. For example, the anchor is through a pipe with formed continuously closed or perforated pipe wall, whose outer diameter is about one-half to three quarters like that big is like the inside diameter of the receiving space. In order to can when setting the driven piles with large tolerances to be worked. There are also slight deformations of the upper end of the pile irrelevant. The desired mast position of the signal tower or other structure may be due to alignment of the girder be reached on the pile before pouring the receiving space.
Ist der Anker, wie erwähnt, durch einen Rohrfortsatz gebildet, wird es bevorzugt diesen an seinem unteren Ende offen auszubilden. Der Füllkörper kann dann erzeugt werden, indem fließfähige Vergussmasse, wie beispielsweise der genannte Beton, durch eine zentrale Öffnung in der Kopfplatte in den Mastträger eingefüllt wird. Der Aufnahmeraum des Pfahls wird dadurch von unten nach oben ansteigend weitgehend lunkerfrei bis zu dem oberen Rand des Pfahls gefüllt. Der Anker aber, falls gewünscht, auch anderweitig als Profilstab oder dergleichen ausgebildet sein.is the anchor, as mentioned, formed by a tubular extension, It is preferred to form this open at its lower end. The filler can then be produced by flowable potting compound, such as the called concrete, through a central opening in the top plate is filled in the mast carrier. The recording room of the pile is thereby increasing largely from bottom to top void-free filled to the top of the pile. Of the Anchor but, if desired, otherwise as a profile bar or the like may be formed.
Sowohl an dem Anker wie auch in dem Innenraum sind vorzugsweise sich in Querrichtung erstreckende Elemente, wie beispielsweise Flossen, Zapfen, sich quer durch den Aufnahmeraum erstreckende Stangen oder dergleichen vorgesehen. Diese sich in Querrichtung erstreckenden Elemente oder Strukturen bilden eine Verdrehsicherung gegen Verdrehung des Füllkörpers gegen den Pfahl und gegen Verdrehung des Mastträgers gegen den Füllkörper. Damit ist eine Drehmomentübertragung von dem Mast auf den Pfahl sichergestellt. Signalmaste mit seitlichen Auslegern und asymmetrischen Windangriff können auf diese Weise sicher fundamentiert werden.Either at the anchor as well as in the interior are preferably in Transversely extending elements, such as fins, cones, extending transversely through the receiving space extending rods or the like intended. These transversely extending elements or structures form a rotation against rotation of the packing against the pole and against twisting of the pole carrier against the filler. This is a torque transmission ensured by the mast on the pole. Signal masts with lateral Cantilevers and asymmetric wind attack can on this Be safely grounded.
Vorzugsweise weist der Mastträger einen Trägerkopf in Gestalt einer vorzugsweise ebenen Platte auf. Diese Platte ist wiederum vorzugsweise exzentrisch zu dem Anker angeordnet. Zusätzlich zu der durch das Spiel zwischen dem Anker und dem Pfahl gegebenen Justagemöglichkeit ergibt sich dadurch eine weitere Justagemöglichkeit durch Verdrehen der Platte. Die Platte kann als Quadrat- oder Rechteckplatte ausgebildet sein. Sie ist dann in 90°-Schritten drehbar, um einen gewünschten Achsversatz zwischen dem Pfahl und dem Trägerkopf bzw. dem Mast zu erzielen.Preferably the mast carrier has a carrier head in shape a preferably flat plate. This plate is in turn preferably arranged eccentrically to the armature. additionally to the given by the game between the anchor and the stake Adjustment option results in a further adjustment option by twisting the plate. The plate can be a square or rectangular plate be educated. It is then rotatable in 90 ° increments, to a desired axial offset between the pile and to achieve the carrier head or the mast.
Unterhalb des Trägerkopfs sind vorzugsweise mehrere (zum Beispiel drei oder vier) Radialstege vorgesehen, die sich über den Außenumfang des Pfahls hinaus erstrecken. Die Stege gestatten einerseits eine gute Biegemomentübertragung zwischen dem Trägerkopf und dem Anker und andererseits können sie einen Abstandshalter bilden, der einen Mindestabstand zwischen der Trägerplatte des Mastträgers und dem oberen Rand des Pfahls sicherstellt. Dies erleichtert die Montage des Masts an der Trägerplatte und die Entwässerung des Mastfußes.Below the carrier head are preferably several (for example three or four) radial webs provided over the Extend the outer circumference of the post addition. The bridges allow on the one hand a good bending moment transmission between the Carrier head and the anchor and on the other hand can they form a spacer that has a minimum distance between the carrier plate of the pole carrier and the upper Edge of the pole ensures. This facilitates the mounting of the mast on the support plate and the drainage of the mast base.
Die Errichtung des genannten Fundaments ist denkbar einfach. An einer geeigneten Stelle, beispielsweise an dem Boden einer Grube, deren Tiefe etwa der Höhe des in dem Rammpfahl gewünschten Aufnahmeraums entspricht, wird ein unten offenes Rohr platziert und mittels einer Ramme in den Boden getrieben. Bei ausreichender Rammtiefe steht der obere Rand des Pfahls bzw. Rohrs etwa auf Höhe des oberen Rands der genannten kleinen Grube. Es wird nun der Mastträger mit seinem Anker in den Aufnahmeraum eingeführt und der Trägerkopf ausgerichtet. Die Ausrichtung desselben umfasst beispielsweise die Einstellung einer gewünschten Höhe. Diese kann eingestellt werden, indem eine die äußere Mantelfläche des oberen Pfahlendes umgreifende und sich dabei fest klemmende Justagevorrichtung vorgesehen wird, die mit höhenverstellbaren Elementen von unten her auf den Trägerkopf einwirkt. Außerdem kann eine seitliche Ausrichtung des Mastträgers durch seitliches Verschieben desselben vorgenommen werden. Die Vertikalaus richtung kann ebenfalls im Rahmen des sehr reichlich bemessenen Spiels zwischen dem Anker und dem Pfahl bewirkt werden. Somit ist der Fundamentkopf nicht nur auf einfache Weise stufenlos höhenverstellbar, sondern es können auch Toleranzen zwischen dem Rammpfahl und dem Mastträger ausgeglichen werden. Dies gilt insbesondere bei exzentrischer Kopfanordnung.The Construction of the mentioned foundation is very simple. At a suitable location, for example at the bottom of a pit whose Depth about the height of the desired in the pile pile receiving space is a bottom open tube is placed and by means of a Rammer driven into the ground. With sufficient ramming depth is the upper edge of the pile or pipe at about the height of upper edge of said small pit. It is now the mast carrier with its anchor introduced into the receiving space and the Carrier head aligned. The orientation of the same includes For example, the setting of a desired height. This can be adjusted by a the outer lateral surface the upper end of the pile encompassing and thereby firmly clamped Adjustment device is provided, with height-adjustable Elements acts from below on the carrier head. Furthermore can a lateral alignment of the pole carrier by lateral Move it to be made. The vertical direction can also be part of the very abundant game between the anchor and the pile are effected. Thus, the foundation head not only infinitely height-adjustable in a simple way, but it can also tolerances between the pile and the mast carrier be compensated. This is especially true with eccentric head assembly.
Weil der Mastträger in den vorzugsweise elektrisch isolierend ausgebildeten Füllkörper eingelassen ist, werden Fehlerströme von dem Mast ferngehalten, die sonst zu einer erheblich beschleunigten Korrosion von Stahlmasten führen können. Solche Fehlerströme können insbesondere dann entstehen, wenn auf ein und demselben Gleisabschnitt sowohl mit Gleichstrom wie auch mit Wechselstrom betriebene Triebfahrzeuge fahren.Because the mast carrier in the preferably electrically insulating trained filler is embedded Fault currents kept away from the mast, the otherwise to one significantly accelerated corrosion of steel pylons can. Such fault currents can in particular then arise when on the same track section both with DC as well as AC powered locomotives drive.
Außerdem zeigt sich, das erfindungsgemäße Fundamentierungssystem als äußerst handlingfreundlich. Es ist eine schnelle Montage vor Ort, ohne Schleifen, Bohren und Schweißen möglich bzw. vorgesehen.Furthermore shows, the foundation system according to the invention as extremely easy to handle. It's a fast one Assembly on site, without grinding, drilling and welding possible or provided.
Weitere Einzelheiten vorteilhafter Ausführungsformen der Erfindung ergeben sich aus der Zeichnung, der Beschreibung oder Ansprüchen. Die Beschreibung beschränkt sich auf wesentliche Aspekte der Erfindung und sonstige Gegebenheiten. Die Zeichnung offenbart weitere Details und ist ergänzend heranzuziehen. Es zeigen:Further Details of advantageous embodiments of the invention result from the drawing, the description or claims. The description is limited to essential aspects the invention and other conditions. The drawing reveals further details and should be consulted. Show it:
In
Zu
dem Fundament
Der
Füllkörper
An
dem oberen Ende des unten offenen Ankers
Der
Trägerkopf
Der
Anker
Außerdem
ist in dem Innenraum
Wie
außerdem aus den
Zur
Errichtung des Fundaments
Prinzipiell
kann die Richtung auf ebenem Grund erfolgen. Vorzugsweise wird jedoch
wie
In principle, the direction can be on a level ground. Preferably, however, it is like
Im
Weiteren wird nun der Mastträger
Ist
der Mastträger
Der
Pfahl
Das
erfindungsgemäße Fundament
Das
erfindungsgemäße Fundament
- 11
- Gleiskörpertrack body
- 22
- Gleistrack
- 33
- KabelkanalCabel Canal
- 44
- Signalmastsignal mast
- 55
- Fundamentfoundation
- 66
- Pfahlstake
- 77
- unteres Endelower The End
- 88th
- oberes Endeupper The End
- 99
- Linieline
- 1010
- Teilpart
- 1111
- Aufnahmeraumaccommodation space
- 1212
- Füllkörperpacking
- 1313
- Mastträgerpole support
- 1414
- Trägerkopfcarrier head
- 1515
- Ankeranchor
- 16–1916-19
- Stützblechegussets
- 20–2220-22
- Kantenedge
- 2323
- Randedge
- 24–2724-27
- Befestigungsbohrungenmounting holes
- 2828
- Mastfußmast
- 2929
- Platteplate
- 30, 3130 31
- Flügelwing
- 3232
- StabRod
- 33, 3433 34
- Öffnungenopenings
- 3535
- Grubepit
- 3636
- Bodenground
- 3737
- Justiervorrichtungadjusting
- 38, 3938 39
- Stellelementeactuators
ZITATE ENTHALTEN IN DER BESCHREIBUNGQUOTES INCLUDE IN THE DESCRIPTION
Diese Liste der vom Anmelder aufgeführten Dokumente wurde automatisiert erzeugt und ist ausschließlich zur besseren Information des Lesers aufgenommen. Die Liste ist nicht Bestandteil der deutschen Patent- bzw. Gebrauchsmusteranmeldung. Das DPMA übernimmt keinerlei Haftung für etwaige Fehler oder Auslassungen.This list The documents listed by the applicant have been automated generated and is solely for better information recorded by the reader. The list is not part of the German Patent or utility model application. The DPMA takes over no liability for any errors or omissions.
Zitierte PatentliteraturCited patent literature
- - DE 202006018112 U1 [0003] - DE 202006018112 U1 [0003]
- - DE 202004015733 U1 [0003] - DE 202004015733 U1 [0003]
Claims (15)
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE102008032217A DE102008032217A1 (en) | 2008-07-09 | 2008-07-09 | Basement for signal mast for railway track, has tie bar downwardly extending from support head into receiving space, and filling body filling receiving space for stationarly supporting tie bar in receiving space |
DE202008017902U DE202008017902U1 (en) | 2008-07-09 | 2008-07-09 | mast foundations |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE102008032217A DE102008032217A1 (en) | 2008-07-09 | 2008-07-09 | Basement for signal mast for railway track, has tie bar downwardly extending from support head into receiving space, and filling body filling receiving space for stationarly supporting tie bar in receiving space |
Publications (1)
Publication Number | Publication Date |
---|---|
DE102008032217A1 true DE102008032217A1 (en) | 2010-02-11 |
Family
ID=41501014
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE102008032217A Ceased DE102008032217A1 (en) | 2008-07-09 | 2008-07-09 | Basement for signal mast for railway track, has tie bar downwardly extending from support head into receiving space, and filling body filling receiving space for stationarly supporting tie bar in receiving space |
DE202008017902U Expired - Lifetime DE202008017902U1 (en) | 2008-07-09 | 2008-07-09 | mast foundations |
Family Applications After (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE202008017902U Expired - Lifetime DE202008017902U1 (en) | 2008-07-09 | 2008-07-09 | mast foundations |
Country Status (1)
Country | Link |
---|---|
DE (2) | DE102008032217A1 (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102012019368A1 (en) * | 2012-10-02 | 2014-04-03 | Strabag Offshore Wind Gmbh | Correction element for the establishment of an offshore foundation and founding system and method of establishing such a foundation |
DE202016005974U1 (en) | 2016-06-17 | 2016-10-24 | Heicon Service GmbH | Device for connecting a pile pile foundation with a supporting structure |
CN111894031A (en) * | 2020-08-10 | 2020-11-06 | 中国建筑第八工程局有限公司 | Tower crane foundation and construction method thereof |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102014006581A1 (en) | 2014-05-02 | 2015-11-05 | Beate Diehl | Device, method and system for vibration-free and settlement-free foundation and attachment of components in the ground |
DE102020113356A1 (en) | 2020-05-18 | 2021-11-18 | Menz Industriedienstleistungs-GmbH | Floor panel assembly and process for its manufacture |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE19648299A1 (en) * | 1996-11-21 | 1997-11-20 | Siemens Ag | Mast construction for overhead line |
DE202004015733U1 (en) | 2004-10-02 | 2004-12-23 | BBL Bahnbau Lüneburg GmbH | Foundation fitting for railway signal mast has sleeve placed over a post and a head plate attached to mast |
DE202006018112U1 (en) | 2006-11-29 | 2007-02-08 | BBL Bahnbau Lüneburg GmbH | Fixing device for signal post, has fastening bolts that are fixed in fastening base, and spacer blocks, where each spacer block comprises supporting surface for foot of signal post, and surface is supported on base |
-
2008
- 2008-07-09 DE DE102008032217A patent/DE102008032217A1/en not_active Ceased
- 2008-07-09 DE DE202008017902U patent/DE202008017902U1/en not_active Expired - Lifetime
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE19648299A1 (en) * | 1996-11-21 | 1997-11-20 | Siemens Ag | Mast construction for overhead line |
DE202004015733U1 (en) | 2004-10-02 | 2004-12-23 | BBL Bahnbau Lüneburg GmbH | Foundation fitting for railway signal mast has sleeve placed over a post and a head plate attached to mast |
DE202006018112U1 (en) | 2006-11-29 | 2007-02-08 | BBL Bahnbau Lüneburg GmbH | Fixing device for signal post, has fastening bolts that are fixed in fastening base, and spacer blocks, where each spacer block comprises supporting surface for foot of signal post, and surface is supported on base |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102012019368A1 (en) * | 2012-10-02 | 2014-04-03 | Strabag Offshore Wind Gmbh | Correction element for the establishment of an offshore foundation and founding system and method of establishing such a foundation |
DE202016005974U1 (en) | 2016-06-17 | 2016-10-24 | Heicon Service GmbH | Device for connecting a pile pile foundation with a supporting structure |
DE102016217793A1 (en) | 2016-06-17 | 2017-12-21 | Heicon Service Gesellschaft mbH | Device for connecting a pile pile foundation with a supporting structure and method for producing such a connection |
DE102016217793B4 (en) * | 2016-06-17 | 2019-11-14 | Heicon Service Gesellschaft mbH | Device for connecting a pile pile foundation with a supporting structure and method for producing such a connection |
CN111894031A (en) * | 2020-08-10 | 2020-11-06 | 中国建筑第八工程局有限公司 | Tower crane foundation and construction method thereof |
Also Published As
Publication number | Publication date |
---|---|
DE202008017902U1 (en) | 2011-02-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE3936705C2 (en) | ||
EP3441527B1 (en) | Shut-off device for preventing the passage of land vehicles | |
DE1684211A1 (en) | Building skeleton and method and device for erecting a building skeleton | |
DE102018107421A1 (en) | Foundation for a structure prestressed by means of a plurality of tendons and structure prestressed by means of a plurality of prestressed tendons | |
EP2698476B1 (en) | Method for the construction of an offshore structure and foundation for an offshore structure | |
CH707671B1 (en) | Supporting masonry element and retaining wall made of supporting masonry elements. | |
DE102008032217A1 (en) | Basement for signal mast for railway track, has tie bar downwardly extending from support head into receiving space, and filling body filling receiving space for stationarly supporting tie bar in receiving space | |
EP3303711B1 (en) | Method for constructing a foundation for a tower structure, and onshore tower structure | |
DE102010022661A1 (en) | Methods for soil compaction of sands and gravels, involves generating vertical vibration movements of compression tool by vibration device which is fitted on upper end of compression tool | |
EP1927698A2 (en) | Mounting device for signal posts | |
EP2977529A1 (en) | Single foundation | |
AT412658B (en) | PILLAR FOUNDATION IN BUILDINGS, CONSTRUCTION WORKS OD. DGL. | |
EP3228757B1 (en) | Reinforcement device | |
DE102007018335B4 (en) | Foundation for a mast | |
AT385553B (en) | Foundation which is anchored in the ground and is intended for fastening structural parts, in particular uprights, masts or the like | |
EP2511223B1 (en) | Method for producing a lifting device in the ground and use of same | |
DE2236377A1 (en) | PROCESS FOR PRODUCING GROUND ANCHORING, IN PARTICULAR FOR BUILDING CONSTRUCTIONS, PILLARS, MASTS AND POST, AND GROUND ANCHORING PRODUCED ACCORDING TO THE PROCESS | |
AT387256B (en) | Arrangement for providing a foundation for a pole | |
DE102014006581A1 (en) | Device, method and system for vibration-free and settlement-free foundation and attachment of components in the ground | |
DE3703200C2 (en) | Foundation device for a mast | |
DE3941641C1 (en) | Drive unit for foundation I beams - has ground drills within beams, retrieved after beams are properly installed | |
DE102004013017A1 (en) | Device for manufacture of in-situ concrete foundations for overhead line masts, for example, comprises prefabricated shuttering component with outer walls or at least one outer wall having circular openings | |
DE102005025049B3 (en) | Manufacture of foundation fixture for posts for receiving road crash-barrier, by forming strip footing, inserting anchors in opening, casting in concrete and attaching posts to anchors | |
DE102004057508A1 (en) | Frame coupling for steel building construction has integral connector with receiver for frame sections and ball joint to allow different orientations of receiver | |
DE1220879B (en) | Underpass structure and procedure for its subsequent installation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
OP8 | Request for examination as to paragraph 44 patent law | ||
R138 | Derivation of utility model |
Ref document number: 202008017902 Country of ref document: DE |
|
R002 | Refusal decision in examination/registration proceedings | ||
R003 | Refusal decision now final |