DE202008017902U1 - mast foundations - Google Patents

mast foundations Download PDF

Info

Publication number
DE202008017902U1
DE202008017902U1 DE202008017902U DE202008017902U DE202008017902U1 DE 202008017902 U1 DE202008017902 U1 DE 202008017902U1 DE 202008017902 U DE202008017902 U DE 202008017902U DE 202008017902 U DE202008017902 U DE 202008017902U DE 202008017902 U1 DE202008017902 U1 DE 202008017902U1
Authority
DE
Germany
Prior art keywords
anchor
foundation according
receiving space
pile
carrier
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
DE202008017902U
Other languages
German (de)
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Leonhard Weiss & Co KG GmbH
Original Assignee
Leonhard Weiss & Co KG GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Leonhard Weiss & Co KG GmbH filed Critical Leonhard Weiss & Co KG GmbH
Priority to DE202008017902U priority Critical patent/DE202008017902U1/en
Publication of DE202008017902U1 publication Critical patent/DE202008017902U1/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/42Foundations for poles, masts or chimneys

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Foundations (AREA)

Abstract

Fundament (5), insbesondere für Maste, insbesondere für Signalmaste (4), oder sonstige Lasten,
mit einem Pfahl (6), der in den Boden einzubringen ist und an seinem oberen Ende (8.) einen Aufnahmeraum (11) aufweist,
mit einem Trägerkopf (14) als Aufnahme und zur Befestigung der Last,
mit einem Anker (15), der sich von dem Trägerkopf (14) nach unten in den Aufnahmeraum (11) hinein erstreckt, und
mit einem Füllköper (12), der den Aufnahmeraum (11) ausfüllt, um den Anker (15) in dem Aufnahmeraum (11) ortsfest zu sichern.
Foundation (5), in particular for masts, in particular for signal masts (4), or other loads,
with a pile (6), which is to be introduced into the ground and at its upper end (8) has a receiving space (11),
with a carrier head (14) as a receptacle and for fastening the load,
with an armature (15) extending downwardly from the carrier head (14) into the receiving space (11), and
with a Füllköper (12), which fills the receiving space (11) to secure the anchor (15) in the receiving space (11) stationary.

Figure 00000001
Figure 00000001

Description

Die Erfindung betrifft eine Fundamentanordnung, insbesondere für Maste, beispielsweise Signalmaste für Gleisanlagen, oder sonstige Bauwerke.The invention relates to a foundation arrangement, in particular for masts, for example, signal masts for track systems, or other structures.

Gleisanlagen für den Schienenverkehr umfassen Maste, beispielsweise für Signaleinrichtungen. Die Signale werden in an den Gleisen aufgestellt. Weder darf die Festigkeit des Gleisbetts beeinträchtigt werden, noch dürfen etwaige Kabelkanäle oder andere in der Nähe des Gleisbetts befindliche Einrichtungen beschädigt werden. Weiter stellt sich als Anforderung an entsprechende Fundamente, dass sie auf einfacher Weise schnell und kostenggünstig zu errichten sind.Rail track systems include masts, for example for signaling equipment. The signals are placed in on the tracks. Neither shall the strength of the track bed be impaired nor shall it damage any cable ducts or other facilities located near the track bed. Furthermore, as a requirement for corresponding foundations, they are easy to set up quickly and inexpensively.

Dazu ist sowohl aus der DE 20 2006 018 112 U1 wie auch aus der DE 20 2004 015 733 U1 Rammrohr-Fundamente für Signalmaste bekannt. Es wird ein Rohr in den Boden gerammt bis lediglich auch ein kurzer oberer Abschnitt aus dem Boden ragt. Auf diesen Abschnitt wird dann eine Muffe aufgesetzt, die oben eine Abschlussplatte trägt. Die Wandung der Muffe ist von mehreren Justierschrauben durchsetzt, die sich in Radialrichtung an dem oberen Ende des in der Muffe steckenden Rammrohrs abstützen.This is from both the DE 20 2006 018 112 U1 as well as from the DE 20 2004 015 733 U1 Pipe foundations for signal masts known. A pipe is rammed into the ground until only a short upper section protrudes from the ground. On this section then a sleeve is placed, the top carries a cover plate. The wall of the sleeve is penetrated by a plurality of adjusting screws, which are supported in the radial direction at the upper end of the sleeve in the sleeve.

Die Kopfplatte trägt an ihren vier Ecken Befestigungsbolzen, auf denen Distanzklötze angeordnet sind. Der Mast wird mit seinem Mastfuß auf die Distanzklötze aufgesetzt und dort durch die Befestigungsbolzen gesichert.The top plate carries at its four corners fastening bolts on which spacer blocks are arranged. The mast is placed with its mast base on the spacer blocks and secured there by the fastening bolts.

Bei diesen Befestigungsvorrichtungen erfolgt die Lastübertragung zwischen der Muffe und dem oberen Ende des Rammrohrs punktweise durch die radialen Justierschrauben.In these fastening devices, the load transfer between the sleeve and the upper end of the Rammrohrs pointwise by the radial adjustment screws.

Es ist Aufgabe der Erfindung eine verbesserte Fundamentanordnung anzugeben.It is an object of the invention to provide an improved foundation arrangement.

Diese Aufgabe wird mit dem Fundament nach Anspruch 1 gelöst. Außerdem gibt Anspruch 15 ein vorteilhaftes Verfahren zur Errichtung von Fundamenten an.This object is achieved with the foundation according to claim 1. In addition, claim 15 provides an advantageous method for the construction of foundations.

Das erfindungsgemäße Fundament umfasst einen Pfahl, der beispielsweise durch ein im Wesentlichen vertikal in den Boden einzurammendes oder anderweitig in den Boden einzubringendes Rohr gebildet wird. Vorzugsweise ist das Rohr innen und außen glattwandig sowie sowohl an seinem oberen wie auch an seinem unteren Ende offen. Auf diese oder eine geeignete andere Weise wird in einem oberen Ende des Pfahls oberhalb des beim Einrammen in den Boden eingedrungenen Bodenmaterials ein Aufnahmeraum ausgebildet, in dem ein Mastträger gehalten ist. Der Mastträger umfasst einen Trägerkopf als Aufnahme zur Befestigung der Last, d. h. beispielsweise des Signalmastes, sowie einen Anker, der sich von dem Trägerkopf nach unten in den Aufnahmeraum hinein erstreckt. Der Anker ist in einen Füllkörper eingelassen, der den Aufnahmeraum ausfüllt, um den Anker und mit diesem den Trägerkopf an dem Pfahl ortsfest zu sichern. Anstelle eines rohrförmigen Rammpfahls kann auch ein außen mit Gewinde versehenes unten offen oder geschlossen ausgebildetes Rohr genutzt werden, dass einen Erdbohrer bildet.The foundation according to the invention comprises a pile, which is formed, for example, by a tube which is to be substantially vertically wedged into the soil or otherwise introduced into the soil. Preferably, the tube is smooth-walled inside and outside and open at both its upper and lower ends. In this or a suitable other way, a receiving space is formed in an upper end of the pile above the bottom material which has penetrated into the ground during ramming, in which a mast support is held. The mast carrier comprises a carrier head as a receptacle for attaching the load, d. H. for example, the signal mast, and an armature which extends from the carrier head down into the receiving space. The anchor is embedded in a filler which fills the receiving space to secure the anchor and with this the carrier head to the pile stationary. Instead of a tubular driven pile, it is also possible to use an externally threaded, downwardly open or closed pipe, which forms an auger.

Der Pfahl und der Mastträger können beide aus Stahl ausgebildet sein. Die beiden Teile sind untereinander ohne direkte Stahl-Stahl-Verbindung verbunden. Vielmehr besteht, wenn der Füllkörper aus Beton ausgebildet ist, ein form-, kraft- und stoffschlüssiger Stahl-Beton-Stahl-Verbund. Der Formkörper ist bei der Errichtung des Fundaments durch Einfüllen eines aushärtbaren oder aushärtenden vorzugsweise mineralisch gebundenen Materials in den Aufnahmeraum gebildet. Als Material für den Füllkörper können z. B. unterschiedliche Betonarten, insbesondere zementreiche Betonarten ohne Grobkorn zur Anwendung kommen. Alternativ können Polymerbeton oder andere fließfähige oder durch geeignete Maßnahmen (z. B. durch Erwärmung) plastifizierbare Massen Verwendung finden, die nach dem Einfüllen aushärten oder erstarren.The pile and the mast support can both be made of steel. The two parts are connected to each other without direct steel-steel connection. Rather, when the filler is made of concrete, a positive, cohesive and cohesive steel-concrete-steel composite. The shaped body is formed in the construction of the foundation by filling a curable or thermosetting preferably mineral bonded material into the receiving space. As a material for the filler z. B. different types of concrete, especially cement-rich types of concrete without coarse grain are used. Alternatively, polymer concrete or other flowable or by suitable measures (eg by heating) plastifiable masses can be used, which harden or solidify after filling.

Vorzugsweise weist der Aufnahmeraum eine Weite auf, die erheblich größer ist als ein Außendurchmesser des Ankers. Damit hat der Anker vor Einbringen des Füllmaterials in den Aufnahmeraum erhebliches seitliches Spiel. Er kann vorzugsweise um mehrere Zentimeter seitlich bewegt werden. Beispielsweise wird der Anker durch ein Rohr mit durchgehend geschlossener oder auch gelochter Rohrwand gebildet, deren Außendurchmesser etwa ein halb bis dreiviertel so groß ist wie der Innendurchmesser des Aufnahmeraums. Damit kann beim Setzen der Rammpfähle mit großen Toleranzen gearbeitet werden. Auch sind leichte Deformationen des oberen Pfahlendes unbeachtlich. Die gewünschte Mastposition des Signalmasts oder sonstigen Bauwerks kann durch Ausrichtung des Mastträgers an dem Pfahl vor Ausgießen des Aufnahmeraums erreicht werden.Preferably, the receiving space has a width which is considerably larger than an outer diameter of the armature. Thus, the anchor before introducing the filling material in the receiving space considerable lateral play. It can preferably be moved laterally by several centimeters. For example, the anchor is formed by a tube with a continuous closed or perforated pipe wall whose outer diameter is about one-half to three-quarters as large as the inner diameter of the receiving space. This can be used when setting the piles with large tolerances. Also slight deformations of the upper pile end are irrelevant. The desired mast position of the signal tower or other structure can be achieved by aligning the mast carrier to the pile before pouring the receiving space.

Ist der Anker, wie erwähnt, durch einen Rohrfortsatz gebildet, wird es bevorzugt diesen an seinem unteren Ende offen auszubilden. Der Füllkörper kann dann erzeugt werden, indem fließfähige Vergussmasse, wie beispielsweise der genannte Beton, durch eine zentrale Öffnung in der Kopfplatte in den Mastträger eingefüllt wird. Der Aufnahmeraum des Pfahls wird dadurch von unten nach oben ansteigend weitgehend lunkerfrei bis zu dem oberen Rand des Pfahls gefüllt. Der Anker aber, falls gewünscht, auch anderweitig als Profilstab oder dergleichen ausgebildet sein.If the anchor, as mentioned, formed by a tubular extension, it is preferred to form this open at its lower end. The filler can then be produced by pouring flowable potting compound, such as said concrete, through a central opening in the top plate into the mast carrier. The receiving space of the pile is thus filled from bottom to top largely free of voids up to the top of the pile. The anchor but, if desired, too otherwise be designed as a profile bar or the like.

Sowohl an dem Anker wie auch in dem Innenraum sind vorzugsweise sich in Querrichtung erstreckende Elemente, wie beispielsweise Flossen, Zapfen, sich quer durch den Aufnahmeraum erstreckende Stangen oder dergleichen vorgesehen. Diese sich in Querrichtung erstreckenden Elemente oder Strukturen bilden eine Verdrehsicherung gegen Verdrehung des Füllkörpers gegen den Pfahl und gegen Verdrehung des Mastträgers gegen den Füllkörper. Damit ist eine Drehmomentübertragung von dem Mast auf den Pfahl sichergestellt. Signalmaste mit seitlichen Auslegern und asymmetrischen Windangriff können auf diese Weise sicher fundamentiert werden.Both the armature and the interior are preferably provided with transversely extending members, such as fins, tenons, rods or rods extending transversely through the receiving space. These transversely extending elements or structures form a rotation against rotation of the packing against the pile and against rotation of the mast carrier against the packing. This ensures torque transmission from the mast to the pile. Signal masts with lateral outriggers and asymmetrical wind attack can be safely grounded in this way.

Vorzugsweise weist der Mastträger einen Trägerkopf in Gestalt einer vorzugsweise ebenen Platte auf. Diese Platte ist wiederum vorzugsweise exzentrisch zu dem Anker angeordnet. Zusätzlich zu der durch das Spiel zwischen dem Anker und dem Pfahl gegebenen Justagemöglichkeit ergibt sich dadurch eine weitere Justagemöglichkeit durch Verdrehen der Platte Die Platte kann als Quadrat- oder Rechteckplatte ausgebildet sein. Sie ist dann in 90°-Schritten drehbar, um einen gewünschten Achsversatz zwischen dem Pfahl und dem Trägerkopf bzw. dem Mast zu erzielen.The mast carrier preferably has a carrier head in the form of a preferably flat plate. This plate is in turn preferably arranged eccentrically to the anchor. In addition to the given by the game between the anchor and the post adjustment option, this results in a further adjustment option by turning the plate The plate may be formed as a square or rectangular plate. It is then rotatable in 90 ° increments in order to achieve a desired axial offset between the pile and the carrier head or the mast.

Unterhalb des Trägerkopfs sind vorzugsweise mehrere (zum Beispiel drei oder vier) Radialstege vorgesehen, die sich über den Außenumfang des Pfahls hinaus erstrecken. Die Stege gestatten einerseits eine gute Biegemomentübertragung zwischen dem Trägerkopf und dem Anker und andererseits können sie einen Abstandshalter bilden, der einen Mindestabstand zwischen der Trägerplatte des Mastträgers und dem oberen Rand des Pfahls sicherstellt. Dies erleichtert die Montage des Masts an der Trägerplatte und die Entwässerung des Mastfußes.Below the carrier head, a plurality of (for example three or four) radial webs are preferably provided, which extend beyond the outer circumference of the post. The webs allow on the one hand a good bending moment transfer between the carrier head and the armature and on the other hand they can form a spacer which ensures a minimum distance between the support plate of the mast carrier and the upper edge of the pile. This facilitates the mounting of the mast on the carrier plate and the drainage of the mast base.

Die Errichtung des genannten Fundaments ist denkbar einfach. An einer geeigneten Stelle, beispielsweise an dem Boden einer Grube, deren Tiefe etwa der Höhe des in dem Rammpfahl gewünschten Aufnahmeraums entspricht, wird ein unten offenes Rohr platziert und mittels einer Ramme in den Boden getrieben. Bei ausreichender Rammtiefe steht der obere Rand des Pfahls bzw. Rohrs etwa auf Höhe des oberen Rands der genannten kleinen Grube. Es wird nun der Mastträger mit seinem Anker in den Aufnahmeraum eingeführt und der Trägerkopf ausgerichtet. Die Ausrichtung desselben umfasst beispielsweise die Einstellung einer gewünschten Höhe. Diese kann eingestellt werden, indem eine die äußere Mantelfläche des oberen Pfahlendes umgreifende und sich dabei fest klemmende Justagevorrichtung vorgesehen wird, die mit höhenverstellbaren Elementen von unten her auf den Trägerkopf einwirkt. Außerdem kann eine seitliche Ausrichtung des Mastträgers durch seitliches Verschieben desselben vorgenommen werden. Die Vertikalausrichtung kann ebenfalls im Rahmen des sehr reichlich bemessenen Spiels zwischen dem Anker und dem Pfahl bewirkt werden. Somit ist der Fundamentkopf nicht nur auf einfache Weise stufenlos höhenverstellbar, sondern es können auch Toleranzen zwischen dem Rammpfahl und dem Mastträger ausgeglichen werden. Dies gilt insbesondere bei exzentrischer Kopfanordnung.The construction of the mentioned foundation is very simple. At a suitable location, for example at the bottom of a pit, the depth of which corresponds approximately to the height of the receiving space desired in the pile, an open-bottom pipe is placed and driven by a ram into the ground. With sufficient ramming depth of the upper edge of the pile or pipe is approximately at the level of the upper edge of said small pit. It is now introduced the mast carrier with its anchor in the receiving space and aligned the carrier head. The orientation thereof includes, for example, setting a desired height. This can be adjusted by an outer peripheral surface of the upper pile end encompassing and thereby firmly clamping adjustment device is provided, which acts with height-adjustable elements from below onto the carrier head. In addition, a lateral alignment of the mast carrier by lateral displacement of the same can be made. The vertical alignment can also be effected in the context of the very ample clearance between the anchor and the pole. Thus, the foundation head is not only height adjustable in a simple way, but it can also tolerances between the driven pile and the mast support can be compensated. This is especially true with eccentric head assembly.

Weil der Mastträger in den vorzugsweise elektrisch isolierend ausgebildeten Füllkörper eingelassen ist, werden Fehlerströme von dem Mast ferngehalten, die sonst zu einer erheblich beschleunigten Korrosion von Stahlmasten führen können. Solche Fehlerströme können insbesondere dann entstehen, wenn auf ein und demselben Gleisabschnitt sowohl mit Gleichstrom wie auch mit Wechselstrom betriebene Triebfahrzeuge fahren.Because the mast support is embedded in the preferably electrically insulating filler, fault currents are kept away from the mast, which can otherwise lead to a significantly accelerated corrosion of steel pylons. Such fault currents can arise, in particular, when driving on the same track section both with direct current as well as with AC powered traction vehicles.

Außerdem zeigt sich, das erfindungsgemäße Fundamentierungssystem als äußerst handlingfreundlich. Es ist eine schnelle Montage vor Ort, ohne Schleifen, Bohren und Schweißen möglich bzw. vorgesehen.In addition, the foundation system according to the invention is extremely hassle-friendly. It is a fast assembly on site, without grinding, drilling and welding possible or intended.

Weitere Einzelheiten vorteilhafter Ausführungsformen der Erfindung ergeben sich aus der Zeichnung, der Beschreibung oder Ansprüchen. Die Beschreibung beschränkt sich auf wesentliche Aspekte der Erfindung und sonstige Gegebenheiten. Die Zeichnung offenbart weitere Details und ist ergänzend heranzuziehen. Es zeigen:Further details of advantageous embodiments of the invention will become apparent from the drawings, the description or claims. The description is limited to essential aspects of the invention and other conditions. The drawing reveals more details and is complementary. Show it:

1 einen Gleiskörper mit Signalmast in schematisierter Vertikalschnittdarstellung. 1 a track with signal mast in a schematic vertical section.

2 das obere Ende des Mastfundaments und das untere Ende des Masts in schematisierter Vertikalschnittansicht. 2 the upper end of the mast foundation and the lower end of the mast in a schematic vertical sectional view.

3 einen Mastträger in perspektivischer Darstellung. 3 a mast carrier in perspective view.

4 den Mastträger nach 3 in einer Ansicht auf die Unterseite. 4 after the mast carrier 3 in a view on the bottom.

57 verschiedene Stadien der Errichtung des Mastfundaments. 5 - 7 various stages of construction of the foundation of the mast.

8 das Mastfundament vor dem Einfüllen einer Vergussmasse im vorjustierten Zustand. 8th the mast foundation before filling a potting compound in pre-adjusted condition.

In 1 ist ein Gleiskörper 1 für nicht weiter dargestellte Schienenfahrzeuge veranschaulicht. Der Gleiskörper 1 umfasst ein Gleis 2, auf dem Schienenfahrzeuge fahren. In unmittelbarer Nachbarschaft des Gleises 2 sind weitere zur Gleisanlage gehörige Elemente, wie beispielsweise ein Kabelkanal 3 sowie ein oder mehrere Signalmaste 4 angeordnet. 1 veranschaulicht einen solchen Signalmast 4 beispielhaft. Er wird von einem Fundament 5 getragen, das neben dem Gleis 2 errichtet ist.In 1 is a track body 1 illustrated for rail vehicles not shown. The track body 1 includes a track 2 driving on the rail vehicles. In the immediate vicinity of the track 2 are other belonging to the track system Elements, such as a cable channel 3 and one or more signal masts 4 arranged. 1 illustrates such a signal mast 4 exemplary. He is from a foundation 5 worn, next to the track 2 is erected.

Zu dem Fundament 5 gehört ein Pfahl 6, der vorzugsweise im Wesentlichen vertikal in den Boden eingerammt ist. Der Pfahl 6 ist vorzugsweise als Rohr ausgebildet und weist ein unteres Ende 7 sowie ein oberes Ende 8 auf. Während der größere untere, sich von dem unteren Ende 7 bis zu der gestrichelten Linie 9 in 1 erstreckende Teil des Pfahls 6 innen mit Erdreich gefüllt ist, umschließt der oberhalb der Linie 9 befindliche Teil 10 des Pfahls 6 einen mit einer geeigneten Füllmasse wie bspw. Beton gefüllten Innenraum 11. Die Füllmasse bildet einen Füllkörper 12, der den Aufnahmeraum 11 vorzugsweise lückenlos ausfüllt.To the foundation 5 heard a stake 6 which is preferably substantially vertically rammed into the ground. The stake 6 is preferably formed as a tube and has a lower end 7 as well as an upper end 8th on. While the larger lower, from the lower end 7 up to the dashed line 9 in 1 extending part of the pole 6 inside is filled with soil, which encloses above the line 9 located part 10 of the stake 6 a filled with a suitable filling compound such as concrete interior 11 , The filling compound forms a packing 12 that the recording room 11 preferably completely filled.

Der Füllkörper 12 dient zur Lagerung eines Mastträgers 13, zu dem ein Trägerkopf 14 beispielsweise in Gestalt einer in Draufsicht quadratischen (4) ebenen Platte und einen Anker 15 aufweist. Der Anker 15 wird beispielsweise durch ein an seinem oberen Rand mit dem Trägerkopf 14 verschweißtes Rohrstück gebildet, das sich von dem im Gebrauch horizontal orientierten Träger 14 im Wesentlichen vertikal nach unten erstreckt. Der Anker 15 ist, wie insbesondere aus 4 hervorgeht, an dem Trägerkopf 14 vorzugsweise exzentrisch gehalten, um die Position des Trägerkopfs 14 in weiten Grenzen variieren zu können. Zu diesem Zweck wird auch bevorzugt den Durchmesser des Aufnahmeraums 11 wesentlich größer festzulegen als den Außendurchmesser des Ankers 15. Vorzugsweise ist der Ankerdurchmesser geringe als drei Viertel des Durchmessers des Aufnahmeraums.The filler 12 serves for the storage of a mast carrier 13 to which a carrier head 14 for example in the form of a square (in plan view) 4 ) flat plate and an anchor 15 having. The anchor 15 is for example by a at its upper edge with the carrier head 14 welded pipe piece, which differs from the horizontally oriented in use carrier 14 extends substantially vertically downwards. The anchor 15 is how particular out 4 appears on the carrier head 14 preferably held eccentrically to the position of the carrier head 14 to be able to vary within wide limits. For this purpose, the diameter of the receiving space is also preferred 11 set much larger than the outer diameter of the armature 15 , Preferably, the anchor diameter is less than three quarters of the diameter of the receiving space.

An dem oberen Ende des unten offenen Ankers 15 sind Stützbleche 16, 17, 18, 19 vorgesehen, die sich über den Umfang des Pfahls hinaus in Radialrichtung erstrecken. Diese Stützbleche 16 bis 19 dienen als Knotenbleche und Abstandshalter. Sie weisen an ihren unteren Enden vorzugsweise gerade Kanten 20, 21, 22 (2 und 3), die in einer gemeinsamen zu den plattenförmigen Trägerkopf 14 parallelen Ebene liegen. Die Stützbleche 16 bis 19 bewirken eine Aussteifung der Verbindung zwischen dem Anker 15 und dem Trägerkopf 14 sowie die Einstellung eines festen Mindestabstands zwischen dem oberen Rand 23 des Pfahls 6.At the upper end of the lower open anchor 15 are support plates 16 . 17 . 18 . 19 provided which extend beyond the circumference of the post in the radial direction. These support plates 16 to 19 serve as gusset plates and spacers. They have at their lower ends preferably straight edges 20 . 21 . 22 ( 2 and 3 ), which in a common to the plate-shaped carrier head 14 lie parallel plane. The support plates 16 to 19 cause a stiffening of the connection between the anchor 15 and the carrier head 14 and the setting of a fixed minimum distance between the upper edge 23 of the stake 6 ,

Der Trägerkopf 14 ist, wie die 3 und 4 veranschaulichen, an seinen Ecken mit Befestigungsbohrungen 24, 25, 26, 27 versehen, die zur Befestigung des Mastfußes 28 des Signalmasts 4 mittels Bolzen dienen. Der Signalmast 4 ist vorzugsweise ein Stahlmast mit einer Fußplatte 29, die über geschweißte Knotenbleche mit dem Signalmast verbunden ist. Die Befestigung des Signalmasts 4 an dem Fundament 5 erfolgt, wie ersichtlich durch eine reine Stahl-zu-Stahl-Verbindung. Falls eine elektrische Isolation des Signalmasts 4 gegen den Trägerkopf 14 gewünscht ist, kann zwischen dem Trägerkopf und der Fußplatte 29 ein Isolator, z. B. in Form einer Kunststoffplatte angeordnet werden. Zusätzlich können die Befestigungsbolzen mit einer Isolierung versehen sein.The carrier head 14 is how the 3 and 4 illustrate, at its corners with mounting holes 24 . 25 . 26 . 27 provided for fixing the mast base 28 the signal tower 4 serve by means of bolts. The signal mast 4 is preferably a steel mast with a foot plate 29 , which is connected via welded gusset plates to the signal mast. The attachment of the signal mast 4 on the foundation 5 takes place, as can be seen by a pure steel-to-steel connection. If electrical isolation of the signal tower 4 against the carrier head 14 is desired, can between the carrier head and the base plate 29 an insulator, e.g. B. be arranged in the form of a plastic plate. In addition, the fastening bolts can be provided with insulation.

Der Anker 15 ist vorzugsweise an seinem unteren Ende mit wenigstens einem vorzugsweise mehren sich quer zur Längsachse erstreckenden Elementen beispielsweise in Gestalt kleiner Flügel 30, 31 versehen, die als Verdrehsicherung dienen, um zu verhindern, dass sich der ansonsten rotationssymmetrische Anker 15 in dem Füllkörper 12 dreht.The anchor 15 is preferably at its lower end with at least one preferably more transverse to the longitudinal axis extending elements, for example in the form of small wings 30 . 31 provided to serve as anti-rotation, to prevent the otherwise rotationally symmetric armature 15 in the packing 12 rotates.

Außerdem ist in dem Innenraum 11 mindestens eine weitere mit dem Pfahl 6 verbundene Struktur zur Verdrehsicherung des Füllkörpers 12 vorgesehen. Eine solche Struktur kann beispielsweise durch einen oder mehrere sich quer durch den Innenraum 11 erstreckenden Stäbe 32 gebildet sein (2).It is also in the interior 11 at least one more with the stake 6 Connected structure to prevent rotation of the packing 12 intended. Such a structure may be, for example, through one or more transverse to the interior 11 extending rods 32 be formed ( 2 ).

Wie außerdem aus den 3 und 4 ersichtlich ist, kann der Trägerkopf 14 mit einer Öffnung 33 versehen sein, die in den Innenraum des Ankers 15 führt. Aus 2 ersichtliche Öffnungen 34 in der Mantelfläche des Ankers 15 sind vorzugsweise auf Höhe der unteren Kanten 20, 21, 22 der Stützbleche 16 bis 19 angeordnet.As well as from the 3 and 4 can be seen, the carrier head 14 with an opening 33 Be provided in the interior of the anchor 15 leads. Out 2 apparent openings 34 in the lateral surface of the anchor 15 are preferably at the level of the lower edges 20 . 21 . 22 the support plates 16 to 19 arranged.

Zur Errichtung des Fundaments 5 wird wie folgt vorgegangen:
Prinzipiell kann die Richtung auf ebenem Grund erfolgen. Vorzugsweise wird jedoch wie 5 andeutet zunächst eine kleine Grube oder Vertiefung 35 ausgehoben, auf deren Boden der Pfahl 6 aufgesetzt wird. Mittels einer nicht weiter veranschaulichten Ramme wird der hohle Pfahl 6 dann in das Erdreich eingetrieben bis sein oberer Rand 23 etwa auf Höhe des die Grube 35 umgebenden Bodens steht. Dabei ist auch der Innenraum des Pfahls 6 etwa bis auf die Höhe des Bodens 36 mit Bodenmaterial gefüllt. Dies entspricht etwa der Höhe der Bodenmaterial gefüllt. Dies entspricht etwa der Höhe der Linie 9 in 1.
For the construction of the foundation 5 the procedure is as follows:
In principle, the direction can be on a level ground. Preferably, however, it is like 5 indicates first a small pit or depression 35 dug on the bottom of the pile 6 is put on. By means of a not further illustrated ram is the hollow pile 6 then driven into the ground until its upper edge 23 at about the height of the pit 35 surrounding soil. It is also the interior of the post 6 about to the height of the ground 36 filled with soil material. This corresponds to about the height of the soil material filled. This corresponds approximately to the height of the line 9 in 1 ,

Im Weiteren wird nun der Mastträger 13, wie er in 3 gesondert dargestellt ist, in dem leeren Aufnahmeraum 11 des oberen Teils 10 des Pfahls 6 eingesetzt. Im Weiteren wird der Mastträger 13 in dem Pfahl 6 gesichert. Dazu wird er zunächst justiert wie aus 8 ersichtlich ist, Beispielsweise kann dazu eine Justiervorrichtung 37 an das obere Ende des Pfahls 6 angesetzt werden. An der Justiervorrichtung 37 können zwei, drei oder mehreren Stellglieder 38, 39 vorgesehen sein, die eine vertikal verstellbare Auflagefläche aufweisen. Diese vertikal verstellbaren Auflageflächen können die Stirnseiten höhenverstellbarer Stifte, Stößel, Bolzen, Kolbenstangen von Hydraulikzylindern oder dergleichen sein. Auf ihnen liegt der Trägerkopf 14 auf. Durch entsprechende Einstellung der Elemente 38, 39 wird der Trägerkopf 14 in die gewünschte Höhenposition und in die gewünschte Ausrichtung (zum Beispiel exakt horizontal oder auch leicht gegen die Horizontale geneigt) gebracht.In addition, now the mast carrier 13 as he is in 3 is shown separately, in the empty recording room 11 of the upper part 10 of the stake 6 used. Furthermore, the mast carrier 13 in the stake 6 secured. For this he is first adjusted as from 8th For example, an adjusting device can be used for this purpose 37 to the top of the post 6 be set. At the adjusting device 37 can have two, three or more actuators 38 . 39 be provided, which have a vertically adjustable support surface. This vertically adjustable Support surfaces may be the faces of height-adjustable pins, plungers, bolts, piston rods of hydraulic cylinders or the like. On them lies the carrier head 14 on. By appropriate adjustment of the elements 38 . 39 becomes the carrier head 14 in the desired height position and in the desired orientation (for example, exactly horizontal or slightly inclined to the horizontal) brought.

Ist der Mastträger 13 justiert, wird Vergussmasse, beispielsweise entsprechender Feinbeton in das obere Ende des Pfahls 6 eingefüllt. Dies kann durch die Öffnung 33 hindurch geschehen. Damit wird der Aufnahmeraum bis zur Höhe des oberen Rands 23 des Pfahls 6 gefüllt. Nachdem die Füllmasse wenigstens teilweise erstarrt ist, kann die Justiervorrichtung 37 entfernt und die Grube 35 verfüllt werden.Is the mast carrier 13 adjusted, potting compound, for example, corresponding fine concrete in the upper end of the pile 6 filled. This can be through the opening 33 happen through. Thus, the receiving space is up to the height of the upper edge 23 of the stake 6 filled. After the filling material is at least partially solidified, the adjusting device 37 removed and the pit 35 be filled.

Der Pfahl 6 kann an seinem Abschnitt 10 an geeigneter Stelle mit einer oder mehreren Öffnungen versehen sein, die in 8 und auch sonst nicht weiter dargestellt sind. Diese Öffnungen sind vorzugsweise unterhalb des unteren Endes des Ankers 15 angeordnet und dienen beispielsweise der Einleitung von Kabeln oder Leerrohren für Kabel, die sich durch den Füllkörper und den Anker 15 hindurch durch die Öffnung 33 des Trägerkopfs 14 oder durch andere Öffnungen hindurch erstrecken.The stake 6 can at his section 10 be provided at a suitable location with one or more openings in 8th and otherwise not shown. These openings are preferably below the lower end of the anchor 15 arranged and serve, for example, the introduction of cables or conduits for cables, passing through the filler and the anchor 15 through the opening 33 of the carrier head 14 or extend through other openings.

Das erfindungsgemäße Fundament 5 weist einen Rammpfahl 6 auf, der zumindest an seinem oberen Ende hohl ist und somit einen Aufnahmeraum 11 bildet. In diesem ist ein Mastträger 13 einbetoniert, der vorzugsweise als geschweißtes Stahlteilausgebildet ist. Vorzugsweise besteht keine elektrisch leitende Verbindung zwischen dem Mastträger 13 und dem Pfahl 6. Durch das große Spiel zwischen dem Anker 15 des Mastträgers 13 und der Wandung des Pfahls 6. Sowie gegebenenfalls durch exzentrische Anordnung eine Kopfplatte des Mastträgers 13 an dem Anker 15 ist eine Justage des Mastträgers in weiten Grenzen möglich. Die Verbindung zwischen dem Mastträger und dem Rammpfahl 6 erfolgt durch einen Betonkörper 15.The foundation according to the invention 5 has a pile 6 on, which is hollow at least at its upper end and thus a receiving space 11 forms. This is a mast carrier 13 cast in concrete, which is preferably formed as a welded steel part. Preferably, there is no electrically conductive connection between the mast carrier 13 and the pole 6 , Through the big game between the anchor 15 of the fattening carrier 13 and the wall of the pole 6 , As well as possibly by eccentric arrangement a top plate of the mast carrier 13 at the anchor 15 An adjustment of the pole carrier is possible within wide limits. The connection between the mast carrier and the driven pile 6 takes place through a concrete body 15 ,

Das erfindungsgemäße Fundament 5 ist mit einfachen Mitteln kostengünstig zu errichten, wobei eine hohe Produktionssicherheit bei geringem Montageaufwand erreicht wird.The foundation according to the invention 5 is inexpensive to build with simple means, with a high production reliability is achieved with low installation costs.

BezugszeichenlisteLIST OF REFERENCE NUMBERS

11
Gleiskörpertrack body
22
Gleistrack
33
KabelkanalCabel Canal
44
Signalmastsignal mast
55
Fundamentfoundation
66
Pfahlstake
77
unteres Endelower end
88th
oberes Endetop end
99
Linieline
1010
Teilpart
1111
Aufnahmeraumaccommodation space
1212
Füllkörperpacking
1313
Mastträgerpole support
1414
Trägerkopfcarrier head
1515
Ankeranchor
16–1916-19
Stützblechegussets
20–2220-22
Kantenedge
2323
Randedge
24–2724-27
Befestigungsbohrungenmounting holes
2828
Mastfußmast
2929
Platteplate
30, 3130, 31
Flügelwing
3232
StabRod
33, 3433, 34
Öffnungenopenings
3535
Grubepit
3636
Bodenground
3737
Justiervorrichtungadjusting
38, 3938, 39
Stellelementeactuators

ZITATE ENTHALTEN IN DER BESCHREIBUNG QUOTES INCLUDE IN THE DESCRIPTION

Diese Liste der vom Anmelder aufgeführten Dokumente wurde automatisiert erzeugt und ist ausschließlich zur besseren Information des Lesers aufgenommen. Die Liste ist nicht Bestandteil der deutschen Patent- bzw. Gebrauchsmusteranmeldung. Das DPMA übernimmt keinerlei Haftung für etwaige Fehler oder Auslassungen.This list of the documents listed by the applicant has been generated automatically and is included solely for the better information of the reader. The list is not part of the German patent or utility model application. The DPMA assumes no liability for any errors or omissions.

Zitierte PatentliteraturCited patent literature

  • DE 202006018112 U1 [0003] DE 202006018112 U1 [0003]
  • DE 202004015733 U1 [0003] DE 202004015733 U1 [0003]

Claims (15)

Fundament (5), insbesondere für Maste, insbesondere für Signalmaste (4), oder sonstige Lasten, mit einem Pfahl (6), der in den Boden einzubringen ist und an seinem oberen Ende (8.) einen Aufnahmeraum (11) aufweist, mit einem Trägerkopf (14) als Aufnahme und zur Befestigung der Last, mit einem Anker (15), der sich von dem Trägerkopf (14) nach unten in den Aufnahmeraum (11) hinein erstreckt, und mit einem Füllköper (12), der den Aufnahmeraum (11) ausfüllt, um den Anker (15) in dem Aufnahmeraum (11) ortsfest zu sichern.Foundation ( 5 ), in particular for masts, in particular for signal masts ( 4 ), or other loads, with a pile ( 6 ), which is to be introduced into the ground and at its upper end ( 8th .) a receiving space ( 11 ), with a carrier head ( 14 ) as a receptacle and for fastening the load, with an anchor ( 15 ) extending from the carrier head ( 14 ) down into the receiving room ( 11 ) and with a filling body ( 12 ), the receiving space ( 11 ) to fill the anchor ( 15 ) in the recording room ( 11 ) secure. Fundament nach Anspruch 1, dadurch gekennzeichnet, dass der Pfahl (6) durch ein Rohr gebildet ist.Foundation according to claim 1, characterized in that the pile ( 6 ) is formed by a tube. Fundament nach Anspruch 2, dadurch gekennzeichnet, dass das Rohr ein offenes oberes Ende (8) und ein offenes unteres Ende (7) aufweist.Foundation according to claim 2, characterized in that the tube has an open upper end ( 8th ) and an open lower end ( 7 ) having. Fundament nach Anspruch 1, dadurch gekennzeichnet, dass der Aufnahmeraum (11) eine Weite aufweist, die erheblich größer ist als ein an dem Anker (15) festzustellender Außendurchmesser, so dass der Anker (15) vor Einbringen des Füllkörpers (12) in dem Aufnahmeraum (11) bezogen auf die Vertikalrichtung ausrichtbar ist.Foundation according to claim 1, characterized in that the receiving space ( 11 ) has a width that is considerably larger than one at the anchor ( 15 ) outer diameter, so that the armature ( 15 ) before introducing the filler ( 12 ) in the recording room ( 11 ) is aligned with respect to the vertical direction. Fundament nach Anspruch 1, dadurch gekennzeichnet, dass der Anker (15) durch einen sich von dem Kopfträger (14) weg erstreckenden Rohrfortsatz gebildet ist.Foundation according to claim 1, characterized in that the anchor ( 15 ) by a from the head carrier ( 14 ) is formed away extending tubular extension. Fundament nach Anspruch 5, dadurch gekennzeichnet, dass der Rohrfortsatz ein unteres offenes Ende aufweist.Foundation according to claim 5, characterized in that the tube extension has a lower open end. Fundament nach Anspruch 1, dadurch gekennzeichnet, dass der Anker (15) wenigstens eine sich in Querrichtung erstreckende Struktur (30, 31) aufweist.Foundation according to claim 1, characterized in that the anchor ( 15 ) at least one transversely extending structure ( 30 . 31 ) having. Fundament nach Anspruch 1, dadurch gekennzeichnet, dass in dem Aufnahmeraum (11) des Pfahls (6) wenigstens ein sich in Querrichtung erstreckendes Element (32) angeordnet ist.Foundation according to claim 1, characterized in that in the receiving space ( 11 ) of the pile ( 6 ) at least one transversely extending element ( 32 ) is arranged. Fundament nach Anspruch 8, dadurch gekennzeichnet, dass das Element (32) ein Stab ist.Foundation according to claim 8, characterized in that the element ( 32 ) is a rod. Fundament nach Anspruch 1, dadurch gekennzeichnet, dass der Trägerkopf (14) als Platte ausgebildet ist.Foundation according to claim 1, characterized in that the carrier head ( 14 ) is formed as a plate. Fundament nach Anspruch 1, dadurch gekennzeichnet, dass der Anker (15) an dem Kopfträger (14) exzentrisch angeordnet ist.Foundation according to claim 1, characterized in that the anchor ( 15 ) on the head carrier ( 14 ) is arranged eccentrically. Fundament nach Anspruch 1, dadurch gekennzeichnet, dass zwischen dem Anker (15) und dem Kopfträger (14) Radialstege (1619) angeordnet sind.Foundation according to claim 1, characterized in that between the anchor ( 15 ) and the head carrier ( 14 ) Radial webs ( 16 - 19 ) are arranged. Fundament nach Anspruch 12, dadurch gekennzeichnet, dass sich die Radialstege (1619) über den Pfahl (6) hinaus nach außen erstrecken.Foundation according to claim 12, characterized in that the radial webs ( 16 - 19 ) over the pile ( 6 ) extend outwards. Fundament nach Anspruch 1, dadurch gekennzeichnet, dass der Füllkörper (12) ein mineralisch gebundener ausgehärteter, in fließfähigem Zustand in den Aufnahmeraum (11) eingebrachter Körper ist.Foundation according to claim 1, characterized in that the filling body ( 12 ) a mineral bound hardened, in a flowable state in the receiving space ( 11 ) is introduced body. Fundament, errichtet mit einem Verfahren mit folgenden Schritten: Rammen eines Pfahls (6), der einen Aufnahmeraum (11) aufweist, in den Boden, bis der Pfahl (6) in ausreichender Länge in dem Boden steckt und aus dem Boden ein Abschnitt (10) ragt, der einen Aufnahmeraum (11) umschließt, Einsetzen eines einen Trägerkopf (14) tragenden Ankers (15) in den Aufnahmeraum (11), Positionieren des Trägerkopfs (14), Einfüllen einer aushärtbaren Masse in den Aufnahmeraum (11), Aushärten der Masse unter Ausbildung eines starren Füllkörpers (12).Foundation, built by a method with the following steps: Ramming a pile ( 6 ), which has a receiving space ( 11 ) into the ground until the pile ( 6 ) in sufficient length in the ground and from the ground a section ( 10 ), which has a receiving space ( 11 ), inserting a carrier head ( 14 ) carrying anchor ( 15 ) in the reception room ( 11 ), Positioning the carrier head ( 14 ), Pouring a hardenable mass into the receiving space ( 11 ), Hardening the mass to form a rigid packing ( 12 ).
DE202008017902U 2008-07-09 2008-07-09 mast foundations Expired - Lifetime DE202008017902U1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE202008017902U DE202008017902U1 (en) 2008-07-09 2008-07-09 mast foundations

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
DE102008032217A DE102008032217A1 (en) 2008-07-09 2008-07-09 Basement for signal mast for railway track, has tie bar downwardly extending from support head into receiving space, and filling body filling receiving space for stationarly supporting tie bar in receiving space
DE202008017902U DE202008017902U1 (en) 2008-07-09 2008-07-09 mast foundations

Publications (1)

Publication Number Publication Date
DE202008017902U1 true DE202008017902U1 (en) 2011-02-10

Family

ID=41501014

Family Applications (2)

Application Number Title Priority Date Filing Date
DE102008032217A Ceased DE102008032217A1 (en) 2008-07-09 2008-07-09 Basement for signal mast for railway track, has tie bar downwardly extending from support head into receiving space, and filling body filling receiving space for stationarly supporting tie bar in receiving space
DE202008017902U Expired - Lifetime DE202008017902U1 (en) 2008-07-09 2008-07-09 mast foundations

Family Applications Before (1)

Application Number Title Priority Date Filing Date
DE102008032217A Ceased DE102008032217A1 (en) 2008-07-09 2008-07-09 Basement for signal mast for railway track, has tie bar downwardly extending from support head into receiving space, and filling body filling receiving space for stationarly supporting tie bar in receiving space

Country Status (1)

Country Link
DE (2) DE102008032217A1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102014006581A1 (en) 2014-05-02 2015-11-05 Beate Diehl Device, method and system for vibration-free and settlement-free foundation and attachment of components in the ground
DE102020113356A1 (en) 2020-05-18 2021-11-18 Menz Industriedienstleistungs-GmbH Floor panel assembly and process for its manufacture

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102012019368A1 (en) * 2012-10-02 2014-04-03 Strabag Offshore Wind Gmbh Correction element for the establishment of an offshore foundation and founding system and method of establishing such a foundation
DE202016005974U1 (en) 2016-06-17 2016-10-24 Heicon Service GmbH Device for connecting a pile pile foundation with a supporting structure
CN111894031B (en) * 2020-08-10 2021-08-10 中国建筑第八工程局有限公司 Tower crane foundation and construction method thereof

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE202004015733U1 (en) 2004-10-02 2004-12-23 BBL Bahnbau Lüneburg GmbH Foundation fitting for railway signal mast has sleeve placed over a post and a head plate attached to mast
DE202006018112U1 (en) 2006-11-29 2007-02-08 BBL Bahnbau Lüneburg GmbH Fixing device for signal post, has fastening bolts that are fixed in fastening base, and spacer blocks, where each spacer block comprises supporting surface for foot of signal post, and surface is supported on base

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19648299A1 (en) * 1996-11-21 1997-11-20 Siemens Ag Mast construction for overhead line

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE202004015733U1 (en) 2004-10-02 2004-12-23 BBL Bahnbau Lüneburg GmbH Foundation fitting for railway signal mast has sleeve placed over a post and a head plate attached to mast
DE202006018112U1 (en) 2006-11-29 2007-02-08 BBL Bahnbau Lüneburg GmbH Fixing device for signal post, has fastening bolts that are fixed in fastening base, and spacer blocks, where each spacer block comprises supporting surface for foot of signal post, and surface is supported on base

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102014006581A1 (en) 2014-05-02 2015-11-05 Beate Diehl Device, method and system for vibration-free and settlement-free foundation and attachment of components in the ground
DE102020113356A1 (en) 2020-05-18 2021-11-18 Menz Industriedienstleistungs-GmbH Floor panel assembly and process for its manufacture

Also Published As

Publication number Publication date
DE102008032217A1 (en) 2010-02-11

Similar Documents

Publication Publication Date Title
DE3936705C2 (en)
DE69532510T2 (en) TENSION-FREE PILLAR FOUNDATION
EP3441527B1 (en) Shut-off device for preventing the passage of land vehicles
EP2931977B1 (en) Method for anchoring a foundation structure, and foundation structure
DE1684211A1 (en) Building skeleton and method and device for erecting a building skeleton
DE102018107421A1 (en) Foundation for a structure prestressed by means of a plurality of tendons and structure prestressed by means of a plurality of prestressed tendons
EP2698476B1 (en) Method for the construction of an offshore structure and foundation for an offshore structure
DE202008017902U1 (en) mast foundations
CH707671B1 (en) Supporting masonry element and retaining wall made of supporting masonry elements.
EP3303711B1 (en) Method for constructing a foundation for a tower structure, and onshore tower structure
AT391506B (en) DEVICE FOR EXHAUSTING HEAT IN THE GROUND FLOOR OR TO RECOVER HEAT FROM THE GROUND FLOOR
DE19716472C2 (en) Component, heavy weight wall made therefrom and method for manufacturing the heavy weight wall
EP1927698A2 (en) Mounting device for signal posts
EP2447420B1 (en) Mast
EP3112537B1 (en) Water-permeable support structure
AT412658B (en) PILLAR FOUNDATION IN BUILDINGS, CONSTRUCTION WORKS OD. DGL.
EP3228757B1 (en) Reinforcement device
DE102007018335B4 (en) Foundation for a mast
AT385553B (en) Foundation which is anchored in the ground and is intended for fastening structural parts, in particular uprights, masts or the like
DE2236377A1 (en) PROCESS FOR PRODUCING GROUND ANCHORING, IN PARTICULAR FOR BUILDING CONSTRUCTIONS, PILLARS, MASTS AND POST, AND GROUND ANCHORING PRODUCED ACCORDING TO THE PROCESS
DE102014006581A1 (en) Device, method and system for vibration-free and settlement-free foundation and attachment of components in the ground
WO2013189659A2 (en) Method for anchoring a structure in a bed of a body of water and underwater foundation
AT387256B (en) Arrangement for providing a foundation for a pole
DE102004013017B4 (en) Device for manufacture of in-situ concrete foundations for overhead line masts, for example, comprises prefabricated shuttering component with outer walls or at least one outer wall having circular openings
DE202021003193U1 (en) Modular, partially mobile crash barrier / crash barrier "system" made of prefabricated, reinforced concrete parts with integrated two-stage, horizontal buffer elements with strong anchoring in the ground / ground by means of reinforced concrete "anchors" and an additional concrete casing

Legal Events

Date Code Title Description
R207 Utility model specification

Effective date: 20110317

R150 Utility model maintained after payment of first maintenance fee after three years
R150 Utility model maintained after payment of first maintenance fee after three years

Effective date: 20111130

R151 Utility model maintained after payment of second maintenance fee after six years
R151 Utility model maintained after payment of second maintenance fee after six years

Effective date: 20140620

R152 Utility model maintained after payment of third maintenance fee after eight years
R071 Expiry of right