DE102006053706B4 - Floor construction system for raised floor coverings and method for assembling the system - Google Patents
Floor construction system for raised floor coverings and method for assembling the system Download PDFInfo
- Publication number
- DE102006053706B4 DE102006053706B4 DE102006053706A DE102006053706A DE102006053706B4 DE 102006053706 B4 DE102006053706 B4 DE 102006053706B4 DE 102006053706 A DE102006053706 A DE 102006053706A DE 102006053706 A DE102006053706 A DE 102006053706A DE 102006053706 B4 DE102006053706 B4 DE 102006053706B4
- Authority
- DE
- Germany
- Prior art keywords
- guide rails
- construction system
- floor construction
- alignment
- elements
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F15/00—Flooring
- E04F15/02—Flooring or floor layers composed of a number of similar elements
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04D—ROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
- E04D11/00—Roof covering, as far as not restricted to features covered by only one of groups E04D1/00 - E04D9/00; Roof covering in ways not provided for by groups E04D1/00 - E04D9/00, e.g. built-up roofs, elevated load-supporting roof coverings
- E04D11/005—Supports for elevated load-supporting roof coverings
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F15/00—Flooring
- E04F15/02—Flooring or floor layers composed of a number of similar elements
- E04F15/02005—Construction of joints, e.g. dividing strips
- E04F15/02022—Construction of joints, e.g. dividing strips with means for aligning the outer surfaces of the flooring elements
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F15/00—Flooring
- E04F15/02—Flooring or floor layers composed of a number of similar elements
- E04F15/04—Flooring or floor layers composed of a number of similar elements only of wood or with a top layer of wood, e.g. with wooden or metal connecting members
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F15/00—Flooring
- E04F15/02—Flooring or floor layers composed of a number of similar elements
- E04F15/02044—Separate elements for fastening to an underlayer
- E04F2015/0205—Separate elements for fastening to an underlayer with load-supporting elongated furring elements between the flooring elements and the underlayer
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F15/00—Flooring
- E04F15/02—Flooring or floor layers composed of a number of similar elements
- E04F15/02044—Separate elements for fastening to an underlayer
- E04F2015/0205—Separate elements for fastening to an underlayer with load-supporting elongated furring elements between the flooring elements and the underlayer
- E04F2015/02055—Separate elements for fastening to an underlayer with load-supporting elongated furring elements between the flooring elements and the underlayer with additional supporting elements between furring elements and underlayer
- E04F2015/02061—Separate elements for fastening to an underlayer with load-supporting elongated furring elements between the flooring elements and the underlayer with additional supporting elements between furring elements and underlayer adjustable perpendicular to the underlayer
Abstract
Bodenaufbausystem für einen zu belegenden Untergrund (U) mit platten- und/oder paneelförmigen Belagelementen (1) und zugeordneten Führungsschienen (2), wobei die Führungsschienen (2) eine Unterkonstruktion zum planebenen Auflegen der Belagelemente (1) bilden, die parallel und beabstandet zueinander auf dem Untergrund (U) ausgerichtet sind, und längliche Justierlehren (4) mit Unterfütterungen vorgesehen sind, die zur planebenen Ausrichtung der Führungsschienen (2) dienen und die senkrecht zu den Führungsschienen angeordnet sind, dadurch gekennzeichnet, dass die länglichen Justierlehren (4) auf den Führungsschienen (2) aufliegen und mit einem lösbaren Verbindungsmittel (42) an den Führungsschienen (2) befestigt angeordnet sind, wobei das Verbindungsmittel (42) ein an der Justierlehre (4) vorgesehener Dauermagnet ist.Floor structure system for one to be occupied underground (U) with plate and / or panel-shaped covering elements (1) and associated guide rails (2), with the guide rails (2) a substructure for flat laying of the covering elements (1) form, parallel and spaced from each other on the ground (U) are aligned, and elongated Adjustment gauges (4) with relines are provided for the planar alignment of the guide rails (2) serve and which are arranged perpendicular to the guide rails, characterized in that the elongate adjustment gauges (4) on the guide rails (2) rest and with a detachable Connecting means (42) on the guide rails (2) are fixedly mounted, wherein the connecting means (42) a permanent magnet provided on the adjusting gauge (4).
Description
Die Erfindung betrifft ein Bodenaufbausystem für einen zu belegenden Untergrund mit platten- und/oder paneelförmigen Belagelementen und zugeordneten Führungsschienen, wobei die Führungsschienen eine Unterkonstruktion zum planebenen Auflegen der Belagelemente bilden, die parallel und beabstandet zueinander auf dem Untergrund ausgerichtet sind, und längliche Justierlehren mit Unterfütterungen vorgesehen sind, die zur planebenen Ausrichtung der Führungsschienen dienen und die senkrecht zu den Führungsschienen angeordnet sind sowie ein Verfahren zur Montage dieses Bodenaufbausystems.The The invention relates to a floor construction system for a surface to be occupied with plate and / or panel-shaped Covering elements and associated guide rails, wherein the guide rails a substructure for level application of the covering elements form, parallel and spaced from each other on the ground are aligned, and elongated Alignment gauges with relines are provided for the planar alignment of the guide rails serve and which are arranged perpendicular to the guide rails and a method of assembling this floor construction system.
Ein
derartiges Bodenaufbausystem ist aus der
In
der
Bei diesem bekannten Bodenaufbausystem werden die Führungsschienen ebenfalls planeben durch entsprechende Unterfütterung mittels aushärtenden Kunstharzmörtelhäufchen auf dem zu belegenden Untergrund ausgerichtet und fixiert. Nachteilig ist jedoch, dass die Ausrichtung, insbesondere die Höhenausrichtung der Führungsschienen zeit- und damit kostenaufwendig ist.at This known floor construction system, the guide rails are also level by appropriate relining by means of hardening Resin mortar pile on aligned and fixed to the underlying surface. adversely However, that is the orientation, especially the height orientation the guide rails time and thus costly.
Aus
der
Die
Aus
der
Ferner
ist aus der
Ausgehend vom eingangs genannten Stand der Technik ist es Aufgabe der Erfindung, ein Bodenaufbausystem anzugeben, bei dem die die Unterkonstruktion bildenden Führungsschienen mit geringem Arbeitsaufwand planeben ausgerichtet werden können.Starting from the aforementioned state The object of the invention is to specify a floor construction system in which the guide rails forming the substructure can be leveled with little effort.
Gelöst wird diese Aufgabe mit einem Bodenaufbausystem gemäß Anspruch 1 bzw. mit einem Verfahren gemäß Anspruch 16.Is solved This object with a floor construction system according to claim 1 or with a method according to claim 16th
Dadurch, dass längliche Justierlehren vorgesehen sind, die zur planebenen Ausrichtung der Führungsschienen senkrecht zu diesen, auf diesen aufliegend und mit einem lösbaren Verbindungsmittel an diesen befestigt angeordnet sind, wird eine Hilfskonstruktion zur planebenen Ausrichtung der Führungsschienen angegeben. Die Justierlehren werden auf den lose auf den Untergrund aufgelegten Führungsschienen aufgesetzt und mit dem lösbaren Verbindungsmittel im gewünschten parallelen Abstand verbunden. Durch Unterfüttern der Justierlehren kann eine geeignete planebene Ausrichtung erfolgen. Beispielsweise kann für Balkone, Laubengänge oder dergleichen eine im wesentlichen horizontale, jedoch mit einem kleinen nach außen gerichteten Gefälle justierte Fläche mit Hilfe der Justierlehren definiert werden. Anschließend werden die Führungsschienen in der so höhen- und lagerichtig definierten Position mit geeigneten Mitteln festgelegt.Thereby, that elongated Justierlehren are provided for the plane alignment of the guide rails perpendicular to these, resting on these and with a releasable connection means Are arranged attached to this, an auxiliary structure for plane alignment of the guide rails specified. The alignment gauges are loosely placed on the ground placed guide rails put on and with the detachable Lanyard in the desired connected parallel distance. By relining the Justierlehren can a appropriate plane alignment done. For example, for balconies, pergolas or the like, a substantially horizontal, but with a small to the outside adjusted slope area be defined with the aid of the alignment gauges. Then be the guide rails in such high altitude and correctly defined position determined by suitable means.
Das Verbindungsmittel ist ein an der Justierlehre vorgesehener Dauermagnet, womit die für das Justieren erforderliche Verbindung zwischen Justierlehre und Führungsschiene magnetisch erzeugt wird. Im Gegensatz zu mechanischen Verbindungen, beispielsweise durch Verschraubung, Klemmung oder dergleichen, ist die Verbindung gegen die magnetische Kraft des Dauermagneten jederzeit lösbar und Verformungen aufgrund von Verspannungen treten bei dieser magnetischen Verbindung nicht auf. Bevorzugt weist die Justierlehre ein Strangprofil auf.The Connecting means is provided on the Justierlehre permanent magnet, with which for the adjustment required connection between calibration gauge and guide rail is generated magnetically. Unlike mechanical connections, for example, by screwing, clamping or the like the connection against the magnetic force of the permanent magnet at any time solvable and deformations due to tension occur in this magnetic Do not connect. Preferably, the Justierlehre an extruded profile on.
Um eine horizontale Ausrichtung bzw. eine definierte Neigung der planebenen Unterkonstruktionsebene der Führungsschienen einstellen zu können, weist die Justierlehre eine in Längsrichtung orientierte Wasserwaagenlibelle auf.Around a horizontal orientation or a defined inclination of the flat plane Substructure level of the guide rails to be able to adjust the adjustment gauge has a longitudinal direction oriented bubble level.
Um einen flächigen, in sich steifen Verbund der zunächst lose auf den Untergrund aufgelegten Führungsschienen zu erreichen, sind wenigstens zwei Justierlehren beabstandet und parallel zueinander auf den Führungsschienen angeordnet. Der Verbund aus Führungsschienen und Justierlehren wird dann in geeigneter Weise durch Unterfütterungen planeben ausgerichtet.Around a flat, in itself rigid composite of the first to reach loosely laid on the ground guide rails, At least two Justierlehren are spaced and parallel to each other on the guide rails arranged. The composite of guide rails and gauges will then properly level by relinings aligned.
Um die so horizontal bzw. mit einer definierten Neigung ausgerichtete Unterkonstruktion bestehend aus den Führungsschienen und den daran oder darauf befestigten Justierlehren auf dem Untergrund festzulegen, sind höhenvariable Befestigungsmittel zur Fixierung und Höhenausrichtung der Führungsschienen auf dem Untergrund vorgesehen. Bevorzugt ist das höhenvariable Befestigungsmittel ein druckfest aushärtender PU-Schaum, ein Kunstharzmörtel oder ein hydraulisch härtender Mörtel. Nach Aushärtung des Befestigungsmittels wird die Hilfskonstruktion bestehend aus den Justierlehren abgenommen und anschließend der flächige Belag bestehend aus platten- und oder paneelförmigen Belagelementen auf der aus den Führungsschienen gebildeten Unterkonstruktion aufgelegt.Around the so horizontally or with a defined slope aligned Substructure consisting of the guide rails and the thereto or on the alignment jigs attached to the ground, are height-variable Fastening means for fixing and height alignment of the guide rails provided on the ground. Preferably, the height variable Fasteners a pressure-resistant curing PU foam, a synthetic resin mortar or a hydraulically hardening Mortar. After curing of the fastener is the auxiliary construction consisting of removed from the adjusting gauges and then the surface covering consisting of plate and or panel-shaped Covering elements on the out of the guide rails formed substructure laid on.
Wenn die Führungsschiene m-förmigen Querschnitt hat, wobei alle drei vertikalen Schenkel gleiche Länge haben, der mittlere Schenkel eine oben offene Nut aufweist und Verbindungen der Schenkel als Auflagefläche für die Belagelemente ausgebildet sind, wird eine hohe Steifigkeit der Führungsschiene und eine flächige Verteilung der Vertikallasten vom Belagelement über die Führungsschiene auf den Untergrund erreicht. Die ausgebildete nach oben offene Nut in mittiger Längsachse der Führungsschiene kann als Verankerung und/oder Fugenführung für die Belagelemente dienen.If the guide rail M-shaped cross-section has, with all three vertical legs have the same length, the middle leg has an open-topped groove and connections the leg as a support surface for the Covering elements are formed, a high rigidity of the guide rail and a plane Distribution of vertical loads from the covering element via the guide rail to the ground reached. The trained upwardly open groove in the central longitudinal axis the guide rail can serve as anchoring and / or joint guide for the covering elements.
Um eine genaue Parallelbeabstandung in einem vorgesehenen Abstand der Führungsschienen zueinander zu vereinfachen, weist die Justierlehre mehrere Lehreneinschubelemente auf, die in Längsrichtung der Justierlehre verschiebbar und festsetzbar ausgebildet sind und jeweils ein für einen Eingriff in die Nut einer Führungsschiene nach unten vorstehendes Schwert aufweisen.Around a precise parallel spacing at a designated distance of Guide rails to each other To simplify, the Justierlehre several teaching insertion on, in the longitudinal direction the Justierlehre are designed to be displaceable and fixable and one for each an engagement in the groove of a guide rail projecting downwards Sword have.
Wenn am unteren Ende der äußeren Schenkel der Führungsschienen je ein nach außen gerichteter Randstreifen vorgesehen ist, wird die Aufstandsfläche und damit die Lastverteilung der auf dem Belag wirkenden Verkehrslasten großflächiger auf den Untergrund übertragen. Somit werden Punktlasten bewusst vollkommen ausgeschlossen.If at the lower end of the outer thighs the guide rails one to the outside directed edge strip is provided, the footprint and so that the load distribution of the traffic loads acting on the pavement on a larger scale transfer the underground. Thus, point loads are consciously completely excluded.
Um eine innige Verbindung des aushärtbaren Befestigungsmittels mit der Führungsschiene zu unterstützen, sind wenigstens die Randstreifen gelocht.Around an intimate connection of the hardenable Fastener with the guide rail to support, At least the edge strips are perforated.
Wenn die Führungsschiene aus gefalztem, bevorzugt verzinktem, Stahlblech besteht, wird eine kostengünstige und gleichzeitig magnetisierbare Führungsschiene angegeben.If the guide rail made of folded, preferably galvanized, sheet steel, is a cost-effective and simultaneously magnetizable guide rail specified.
Dadurch, dass Distanzelemente vorgesehen sind, die teilweise in die Nut der Führungsschienen eingreifen und die Belagelemente auf den Führungs schienen zueinander beabstandet halten, wird eine Lagefixierung der auf den Führungsschienen aufgelegten Belagelemente sicher erreicht.Thereby, that spacer elements are provided which partially into the groove of Engage guide rails and the covering elements appeared on the guide keep spaced apart, is a positional fixation on the guide rails safely reached applied covering elements.
In einer bevorzugten ersten Ausgestaltungsform ist das Distanzelement ein Streifen mit einer Stärke kleiner gleich der lichten Weite der Nut und einer Höhe kleiner gleich der Stärke der Belagelemente zuzüglich der Tiefe der Nut. Der Distanzstreifen bildet somit eine Fuge zwischen zwei aneinander grenzenden Belagelementen aus.In A preferred first embodiment is the spacer element a strip with a thickness smaller than the clear width of the groove and one height smaller equal to the strength the covering elements plus the depth of the groove. The spacer strip thus forms a gap between two adjoining flooring elements.
Alternativ ist das Distanzelement ein in Aufsicht kreuzförmiges Element mit einer Höhe kleiner gleich der Stärke der Belagelemente, wobei an der Unterseite des kreuzförmigen Elements ein geradliniger, vorstehender Abschnitt für einen Eingriff in die Nut vorgesehen ist. Das kreuzförmige Element bildet quasi ein „Fliesenkreuz" von vier an einem Punkt mit ihren rechtwinkligen Ecken zusammenstoßenden plattenförmigen Belagelementen aus und fixiert die Fugenbreite sowohl parallel wie auch senkrecht zu den Führungsschienen. Das kreuzförmige Element definiert nämlich zusätzlich zum Distanzstreifen gemäß der ersten Ausführungsform noch die senkrecht zur Führungsschiene ausgebildete Fuge zwischen aneinander grenzenden plattenförmigen Belagelementen. Der nach unten vorstehende Abschnitt greift in die in der Führungsschiene vorgesehene Nut, um insgesamt eine Lagefixierung des auf der Führungsschienen aufliegenden Belagelementes zu erreichen.alternative is the spacer element in a cross-shaped cross-sectional element with a height equal to or less the strength the covering elements, being at the bottom of the cross-shaped element a rectilinear protruding portion for engaging the groove is provided. The cruciform Element forms a kind of "tile cross" of four at one Point with their right-angled corners collapsing plate-shaped covering elements out and fixed the joint width both parallel and vertical to the guide rails. The cruciform Element defines namely additionally to the spacer strip according to the first embodiment still perpendicular to the guide rail trained joint between adjacent plate-shaped covering elements. The downwardly protruding section engages with those in the guide rail provided groove to a total of a positional fixation of the guide rails To reach resting covering element.
Bevorzugt sind die Belagelemente Bodenplatten oder Fliesen aus Beton, Keramik oder Naturstein oder Paneelen aus Holz in Form von flächigen Elementen oder Dielenbrettern.Prefers the covering elements are floor slabs or tiles made of concrete, ceramics or natural stone or wood panels in the form of flat elements or plank boards.
Dadurch, dass das aushärtbare Befestigungsmittel in Form von ggf. unterbrochenen Streifen oder Klebehäufchen annähernd äquidistant auf dem Untergrund entlang der Führungsschienen aufgebracht wird, wird eine regelmäßige Abstützung der Führungsschiene auf dem Untergrund zum Lasteintrag bereitgestellt. Gleichwohl kann zwischen den unterbrochenen Streifen und/oder Klebehäufchen noch Oberflächenwasser auf dem abgedichteten Untergrund abfließen.Thereby, that the curable Fasteners in the form of possibly interrupted strips or adhesive heap almost equidistant on the ground along the guide rails is applied, a regular support of the guide rail on the ground provided for load entry. However, between the interrupted Stripes and / or adhesive patches still surface water drain on the sealed underground.
Nachfolgend wird ein Ausführungsbeispiel der Erfindung anhand der beiliegenden Zeichnung detailliert beschrieben.following is an embodiment of Invention described in detail with reference to the accompanying drawings.
Darin zeigt:In this shows:
In
Diese
Anordnung ist in der Draufsicht in
Um
die Justierung weiter zu vereinfachen, sind an dem Strangprofil
Wie
in
Wie
ferner in der Detailansicht der
In
die Nut
An
den äußeren Schenkeln
Mit
dem erfindungsgemäßen Bodenaufbausystem
kann somit der Montageaufwand zur Verlegung einer neuen Belagoberfläche für zu sanierende Balkone,
Laubengänge,
Loggien oder dergleichen erheblich verringert werden. Der zu sanierende
Untergrund U muss lediglich ausreichende Tragkraft aufweisen und
vor Verlegung der Führungsschienen zur
Abführung
von Oberflächenwasser
wasserdicht versiegeln werden. Dies kann mit in der Bautechnik üblichen
Mitteln erreicht werden. Anschließend wird das erfindungsgemäße Bodenaufbausystem
mit Hilfe der länglichen
Justierlehren
Nach
dem Aushärten
des Befestigungsmittels
- 11
- Belagelementcovering element
- 1111
- Kanteedge
- 22
- Führungsschieneguide rail
- 2121
- mittlerer Schenkelmiddle leg
- 2222
- äußerer Schenkelouter thigh
- 2323
- Nutgroove
- 2424
- Auflagefläche, VerbindungBearing surface, connection
- 2525
- Randstreifenedge strips
- 2626
- höhenvariables Befestigungsmittelheight variable fastener
- 2727
- Lochhole
- 33
- Distanzelementspacer
- 3131
- Distanzstreifenspacer strips
- 44
- Justierlehreadjustment gauge
- 4141
- Strangprofilextruded profile
- 4242
- Verbindungsmittel, DauermagnetConnecting means permanent magnet
- 4343
- Führungguide
- 4444
- LehreneinschubelementTeaching insert element
- 4545
- Schwertsword
- 4646
- Arretierungsmittellocking
- UU
- Untergrundunderground
Claims (18)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE102006053706A DE102006053706B4 (en) | 2006-11-15 | 2006-11-15 | Floor construction system for raised floor coverings and method for assembling the system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE102006053706A DE102006053706B4 (en) | 2006-11-15 | 2006-11-15 | Floor construction system for raised floor coverings and method for assembling the system |
Publications (2)
Publication Number | Publication Date |
---|---|
DE102006053706A1 DE102006053706A1 (en) | 2008-05-29 |
DE102006053706B4 true DE102006053706B4 (en) | 2009-04-09 |
Family
ID=39326083
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE102006053706A Expired - Fee Related DE102006053706B4 (en) | 2006-11-15 | 2006-11-15 | Floor construction system for raised floor coverings and method for assembling the system |
Country Status (1)
Country | Link |
---|---|
DE (1) | DE102006053706B4 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE202011051440U1 (en) | 2011-09-26 | 2011-11-09 | Joachim Klug | A fixture |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE1659617A1 (en) * | 1968-02-20 | 1971-02-11 | Barth Kg | Method of laying floor coverings |
DE1954155A1 (en) * | 1969-10-28 | 1971-05-06 | Parkett Zentrale Barth Kg | Method of laying floor coverings |
DE4233175A1 (en) * | 1992-10-02 | 1994-04-07 | Kreusel Magda | Slab laying system with supports and lower drainage - uses slab support rails, contg. duct for liq. collecting and drainage |
DE19901316A1 (en) * | 1999-01-15 | 2000-07-20 | Joachim Rottschy | To lay a level floor support structure the upper surfaces of the lateral profiles are aligned on a nominal level plane by limit bars to be fixed in the alignment on their lower support profiles |
DE20110359U1 (en) * | 2001-06-20 | 2001-12-20 | Niggeloh Frank | Assembly aid |
DE10249493A1 (en) * | 2002-10-24 | 2004-05-13 | Brüggemann, Manfred | Floor construction system has webs provided on tile-form elements on at least two opposite edges and orientated towards foundation, and support elements are constructed as guide rails with top open, relatively parallel double flanks |
DE102004037777B3 (en) * | 2004-08-03 | 2006-02-16 | Steinwerk Köstner OHG | Jig frame for placement of rectangular paving stones have short and long interlocking notches |
-
2006
- 2006-11-15 DE DE102006053706A patent/DE102006053706B4/en not_active Expired - Fee Related
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE1659617A1 (en) * | 1968-02-20 | 1971-02-11 | Barth Kg | Method of laying floor coverings |
DE1954155A1 (en) * | 1969-10-28 | 1971-05-06 | Parkett Zentrale Barth Kg | Method of laying floor coverings |
DE4233175A1 (en) * | 1992-10-02 | 1994-04-07 | Kreusel Magda | Slab laying system with supports and lower drainage - uses slab support rails, contg. duct for liq. collecting and drainage |
DE19901316A1 (en) * | 1999-01-15 | 2000-07-20 | Joachim Rottschy | To lay a level floor support structure the upper surfaces of the lateral profiles are aligned on a nominal level plane by limit bars to be fixed in the alignment on their lower support profiles |
DE20110359U1 (en) * | 2001-06-20 | 2001-12-20 | Niggeloh Frank | Assembly aid |
DE10249493A1 (en) * | 2002-10-24 | 2004-05-13 | Brüggemann, Manfred | Floor construction system has webs provided on tile-form elements on at least two opposite edges and orientated towards foundation, and support elements are constructed as guide rails with top open, relatively parallel double flanks |
DE102004037777B3 (en) * | 2004-08-03 | 2006-02-16 | Steinwerk Köstner OHG | Jig frame for placement of rectangular paving stones have short and long interlocking notches |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE202011051440U1 (en) | 2011-09-26 | 2011-11-09 | Joachim Klug | A fixture |
DE102012109090A1 (en) | 2011-09-26 | 2013-03-28 | Joachim Klug | A fixture |
Also Published As
Publication number | Publication date |
---|---|
DE102006053706A1 (en) | 2008-05-29 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP1490565A1 (en) | Laying system for floor tiles | |
DE10158215B4 (en) | Laying system for floor slabs | |
DE10249493B4 (en) | Floor construction system for ceramic, tile and slab coverings | |
EP1083269B1 (en) | Aid for laying covering plates in a raised or ventilated position | |
WO2020169151A2 (en) | Floor panel having magnetic adhesion, and floor covering | |
DE102006053706B4 (en) | Floor construction system for raised floor coverings and method for assembling the system | |
DE102008053230B4 (en) | Device for connecting structural panels, in particular floor panels | |
DE3918240A1 (en) | Floor for indoor sports stadium - is supported on struts and beams with intervening layers of damping material | |
DE202012102579U1 (en) | Connecting arrangement of laterally grooved floor or wall boards | |
EP1293606B1 (en) | Daywork shuttering device | |
EP3246488B1 (en) | Floor, in particular terrace or balcony floor, and use of it | |
DE10347199A1 (en) | Element for floors comprises a thin pressure and wear resistant plate consisting, in particular, of natural stone, and a layer of light material consisting of expanded polypropylene foam | |
EP1911882A2 (en) | System for manufacturing a paving for walkable and/or drivable roof areas, ground covers or similar | |
DE10007101A1 (en) | Levelling device for flat surfaces consists of battens held together by height adjustable fish plates | |
EP1760219B1 (en) | Mounting system for floor with tiles | |
EP3215688B1 (en) | Substructure plate for repairing floor surfaces | |
DE202013103285U1 (en) | Dilatation and contraction joints in concrete traffic areas | |
DE19810773A1 (en) | Method for laying floor panels onto rough base | |
DE102018103287A1 (en) | Device and system for laying boards on a base | |
DE3842558A1 (en) | Sealing flat support for terrace or balcony - consists of raster of longitudinal and transverse components set on sealing web of insulating material | |
EP1516976B1 (en) | Multilayered floor covering element with grooves for connecting profiles | |
DE202014105259U1 (en) | Base plate for floor surface restoration | |
EP4015735A1 (en) | Bearing device for plate elements, plate assembly comprising at least one plate element and at least four bearing devices for plate elements, kit comprising at least four bearing devices for plate elements and a bonding agent, and method for laying a plate assembly | |
DE202014103456U1 (en) | Device for receiving a terrace covering | |
DE202011109402U1 (en) | Floor structure system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
OP8 | Request for examination as to paragraph 44 patent law | ||
8364 | No opposition during term of opposition | ||
8327 | Change in the person/name/address of the patent owner |
Owner name: BRUEGGEMANN, FOLKERT, 12489 BERLIN, DE |
|
R119 | Application deemed withdrawn, or ip right lapsed, due to non-payment of renewal fee |