DE102004005916A1 - Mounting part e.g. for concrete for increasing load under pressure, has special fitting for concrete to be applied with tubular pipe arranged between load introduction surfaces - Google Patents
Mounting part e.g. for concrete for increasing load under pressure, has special fitting for concrete to be applied with tubular pipe arranged between load introduction surfaces Download PDFInfo
- Publication number
- DE102004005916A1 DE102004005916A1 DE200410005916 DE102004005916A DE102004005916A1 DE 102004005916 A1 DE102004005916 A1 DE 102004005916A1 DE 200410005916 DE200410005916 DE 200410005916 DE 102004005916 A DE102004005916 A DE 102004005916A DE 102004005916 A1 DE102004005916 A1 DE 102004005916A1
- Authority
- DE
- Germany
- Prior art keywords
- fitting according
- built
- concrete
- load introduction
- ring
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C5/00—Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
- E04C5/01—Reinforcing elements of metal, e.g. with non-structural coatings
- E04C5/06—Reinforcing elements of metal, e.g. with non-structural coatings of high bending resistance, i.e. of essentially three-dimensional extent, e.g. lattice girders
- E04C5/0645—Shear reinforcements, e.g. shearheads for floor slabs
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B5/00—Floors; Floor construction with regard to insulation; Connections specially adapted therefor
- E04B5/43—Floor structures of extraordinary design; Features relating to the elastic stability; Floor structures specially designed for resting on columns only, e.g. mushroom floors
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C5/00—Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
- E04C5/07—Reinforcing elements of material other than metal, e.g. of glass, of plastics, or not exclusively made of metal
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
Description
Anwendungsgebietfield of use
Die Erfindung betrifft eine Vorrichtung entsprechend dem Oberbegriff des Anspruchs 1, die dazu dient, die Durchleitung von großen Druckkräften durch Beton niedriger Festigkeit zu ermöglichen.The The invention relates to a device according to the preamble of claim 1, which serves the passage of large pressure forces through To allow concrete of low strength.
Ein beispielhafter, typischer Anwendungsfall für die Durchleitung von Druckkräften findet sich bei Decken in Massiv- bzw. Verbundbauweise im Bereich von Stützendurchführungen. Wenn die Stütze zur Maximierung der Tragfähigkeit aus hochfestem Beton (z.B. Druckfestigkeit fc ≈ 100 MPa) hergestellt und entsprechend belastet wird, muss die Tragfähigkeit des Deckenbetons (einachsige Druckfestigkeit fc ≈ 35 MPa) durch geeignete Mittel, z.B. das hier beschriebene Einbauteil, erhöht werden.An exemplary, typical application for the transmission of compressive forces found in ceilings in solid or composite construction in the range of support passages. If the support is made of high-strength concrete (eg compressive strength f c ≈ 100 MPa) and maximized load bearing capacity, the load-bearing capacity of the concrete (uniaxial compressive strength f c ≈ 35 MPa) must be increased by suitable means, eg the installation component described here become.
Zur Zeit übliche Lösungen des Problems der Kraftdurchleitung durch Decken sind:
- – Herabsetzen der Stützenlast, um die Druckfestigkeit der Decke nicht zu überschreiten. Wird diese Lösung gewählt, können die Stützen nicht wirtschaftlich ausgenutzt werden.
- – Betonieren der Decke im Bereich der Stützen mit Beton einer höheren Festigkeit als die der restlichen Decke. Bei dieser Variante ist der Ablauf der Deckenbetonage erschwert, da im Bereich der Stützen Deckenbereiche von der Betonage ausgespart werden müssen, z.B. durch Streckmetall oder (profilierte) Schalungselemente. Diese Arbeit ist manuell aufwändig, da üblicherweise Längsbewehrung in zwei Lagen (oben und unten) eingebaut wird, die durch die temporäre Schalung durchgeführt werden muss, ohne dass später nennenswerte Mengen Deckenbeton durch diese Öffnungen in den Deckenbereich rund um die Stützen gelangt. Außerdem muss der Stützbereich später separat mit Beton höherer Festigkeit betoniert werden, was einen zusätzlichen Arbeitsschritt mit entsprechendem Überwachungsaufwand verursacht. Weiterhin kann mit dieser Vorgehensweise keine Sichtbetonqualität erreicht werden.
- – Einbau eines massiven Stahleinbauteils, das die Lastdurchleitung übernimmt. Diese Methode wird hauptsächlich für Verbundstützen mit Stahlkern genutzt. Bei Stützen mit großem Durchmesser (>1 m) und großen Deckendicken wird das Gewicht des Stahlkerns sehr groß, z.B. bei einem Durchmesser von 0,80 m und einer Höhe von 40 cm ergibt sich ein Gewicht von 78,5·3,14/4·1,22 = 39,5 t.
- - Reduce the column load, so as not to exceed the compressive strength of the ceiling. If this solution is chosen, the supports can not be exploited economically.
- - Concreting the ceiling in the area of the columns with concrete of a higher strength than that of the rest of the ceiling. In this variant, the expiration of the ceiling concrete layer is difficult because in the area of the columns ceiling areas must be recessed from the concreting, eg by expanded metal or (profiled) formwork elements. This work is manually laborious because usually longitudinal reinforcement in two layers (top and bottom) is installed, which must be carried out by the temporary formwork, without later significant amounts of concrete ceiling passes through these openings in the ceiling area around the columns. In addition, the support area must later be separately concreted with concrete of higher strength, which causes an additional step with a corresponding monitoring effort. Furthermore, no fair-quality concrete can be achieved with this procedure.
- - Installation of a massive steel component, which takes over the load transmission. This method is mainly used for composite columns with steel core. For supports with a large diameter (> 1 m) and large ceiling thickness, the weight of the steel core is very large, for example, with a diameter of 0.80 m and a height of 40 cm results in a weight of 78.5 · 3.14 / 4 · 1.2 2 = 39.5 t.
Aufgabe der ErfindungTask of invention
Durch die Erfindung soll die Durchleitung von großen Druckkräften durch Beton niedriger Festigkeit ermöglicht werden (wie z.B. bei der Stütze-Decke-Verbindung), wobei eine einfache Handhabung auf der Baustelle und eine wirtschaftliche technische Ausführung erreicht werden soll.By the invention is intended to lower the passage of high pressure forces through concrete Strength allows be used (as in the column-ceiling connection), being an easy handling on site and an economical technical design should be achieved.
Diese Aufgabe wird durch ein Einbauteil gelöst, das die beiden Lasteinleitungsflächen rohrförmig verbindet. Dabei wird durch das Rohr während der Belastung ein Umschnürungsdruck aufgebaut, der die Druckfestigkeit des Betons im Inneren des Rohres auf ein Mehrfaches seiner normalen Festigkeit erhöht. Das Einbauteil trägt also nicht primär die Lasten aus den Stützen, sondern trägt diese Lasten als Verbundsystem mit dem inneren Beton ab.These Task is solved by a built-in part, which connects the two load introduction surfaces tubular. It is through the pipe during the Strain a strapping pressure built, the compressive strength of the concrete inside the pipe increased to a multiple of its normal strength. The Built-in unit wears not primary the loads from the supports, but carries these loads as a composite system with the inner concrete.
Vorteile der ErfindungAdvantages of invention
Durch die Erfindung ist es einfach möglich, hohe Lasten durch Beton normaler Festigkeit zu leiten. Dabei ist der Arbeitsablauf einfach und leicht auszuführen.
- – Nach dem Stellen der unteren Schalung und dem Verlegen der unteren Bewehrungslagen wird das Einbauteil auf der unteren Lasteinleitungsfläche platziert.
- – Dabei kann z.B. nach Anspruch 8 die Bewehrung einfach durch die Schlitze geführt werden.
- – Nun wird die obere Bewehrungslage verlegt,
- – dabei können die Bewehrungseisen z.B. wieder direkt in die Schlitze gelegt werden (Anspruch 8)
- – Danach wird die Decke einschließlich des Einbauteils mit dem normalfesten Beton betoniert, d.h. das Einbauteil ist vollständig in den Deckenbeton eingebettet und auch damit gefüllt.
- – Die nächste Stütze kann nun im Mörtelbett auf die Lasteinleitungsstelle gesetzt werden, oder es kann genauso gut die nächste Stütze monolithisch aufbetoniert werden.
- - After placing the lower formwork and laying the lower reinforcement layers, the installation part is placed on the lower load introduction surface.
- - Here, for example, according to claim 8, the reinforcement can be easily guided through the slots.
- - Now the upper reinforcement layer is moved,
- - In this case, the rebar can eg be placed directly in the slots again (claim 8)
- - Then the ceiling including the built-in part is concreted with the normal strength concrete, ie the built-in part is completely embedded in the concrete ceiling and also filled with it.
- - The next support can now be placed in the mortar bed on the load introduction point, or it can just as well be concreted on the next support monolithic.
Sind die Schlitze lang, kann zur Reduzierung der Verformung ein Haltering vorgesehen werden (Ansprüche 11 – 13). Dadurch wird auch der geschlitzten Rand des Rohres verstärkt.are the slots long, can be a retaining ring to reduce the deformation be provided (claims 11-13). As a result, the slotted edge of the tube is reinforced.
Die Anordnung von Anschlussbewehrung und von unten durchgeführter Bewehrung stellt aufgrund der Ausführung als Rohr kein Problem dar oder kann über Muffen oder Schweißstäbe leicht integriert werden.The Arrangement of connection reinforcement and reinforcement made from below poses due to the execution as a pipe is no problem or can easily over muffs or welding rods to get integrated.
Die volle Tragfähigkeit der angeschlossenen Stützen kann wirtschaftlich ausgenutzt werden, dabei ist das Einbauteil deutlich leichter und mit weniger Fertigungsproblemen behaftet als ein vergleichbares massives.The full load capacity of the connected supports can be used economically, while the built-in part is significantly lighter and with fewer manufacturing problems afflicted than a comparable massive.
Durch den Einbau von Ringen an den Enden lässt sich auch problemlos ein Toleranzausgleich für Einbauungenauigkeiten realisieren, indem man Ringe mit unterschiedlicher Höhe vorhält.By The installation of rings at the ends can also be easily Tolerance compensation for installation inaccuracies realize by holding rings of different heights.
Im Bereich der Lasteinleitung entstehen über dem Rohr lokal hohe Pressungen. Um die Längsverformung des Einbauteils zu verringern und somit die Kapazität zur Erhöhung der Betobdruckfestigkeit (Umschnürungseffekt) zu erhöhen, kann nach Anspruch 15 auf dem Ring eine Weichschicht angeordnet werden, die eine direkte Lastübertragung von Längskräften auf das Rohr reduziert.in the In the load transfer area, locally high pressures are created above the pipe. To the longitudinal deformation reduce the built-in part and thus the capacity to increase the Impact strength (banding effect) to increase, may according to claim 15 arranged on the ring a soft layer Be that a direct load transfer of longitudinal forces the tube is reduced.
Nach bisherigen Versuchen beeinträchtigt auch die Anordnung des Einbauteils mit Abstand zu Betonoberfläche direkt unter der Lasteinleitung nicht die Gesamttragfähigkeit (Ansprüche 16 – 18).To previous attempts also affected the arrangement of the built-in part with distance to the concrete surface directly under the load introduction not the total carrying capacity (claims 16 - 18).
Werden nach Anspruch 19 Führungsstifte integriert, so kann damit auf einfache Weise sichergestellt werden, dass es in der Lasteinleitung und Übertragung nur minimale Exzentrizitäten auftreten und es dadurch keinen Verlust der Tragfähigkeit gibt. Die Montage auf der Baustelle wird außerdem stark vereinfacht.Become according to claim 19 guide pins integrated, so it can be easily ensured that there are only minimal eccentricities in the load introduction and transmission and thereby there is no loss of viability. The assembly on the construction site is going as well greatly simplified.
Zur Rationalisierung des Bauablaufes ist es nach den Ansprüchen 20 und 21 möglich, das Einbauteil bereits auf die untere, vorgefertigte Stütze montiert auf die Baustelle zu liefern, um den Bauablauf weiter zu rationalisieren.to Rationalization of the construction process is it according to claims 20 and 21 possible, the installation part already mounted on the lower, prefabricated support to deliver to the construction site to further streamline the construction process.
Es ist möglich, die Außenseite des Rohres senkrecht zur Richtung der äußeren Last so zu profilieren, dass auch die Querkrafttragfähigkeit gesichert wird (Abstützung der Betondruckstrebe).It is possible, the outside of the tube perpendicular to the direction of the external load so profiling that also the lateral force carrying capacity is secured (support the concrete pressure strut).
Falls das Einbauteil in Verbindung mit Fertigteilen eingesetzt wird, kann es auch sinnvoll sein, das Rohr schon im Fertigteilwerk mit dem höherfesten Stützenbeton zu füllen (Anspruch 24).If the built-in part is used in conjunction with finished parts can It also makes sense, the pipe already in the precast plant with the higher strength column concrete to fill (Claim 24).
Claims (28)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE200410005916 DE102004005916A1 (en) | 2004-02-06 | 2004-02-06 | Mounting part e.g. for concrete for increasing load under pressure, has special fitting for concrete to be applied with tubular pipe arranged between load introduction surfaces |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE200410005916 DE102004005916A1 (en) | 2004-02-06 | 2004-02-06 | Mounting part e.g. for concrete for increasing load under pressure, has special fitting for concrete to be applied with tubular pipe arranged between load introduction surfaces |
Publications (1)
Publication Number | Publication Date |
---|---|
DE102004005916A1 true DE102004005916A1 (en) | 2005-09-01 |
Family
ID=34813168
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE200410005916 Withdrawn DE102004005916A1 (en) | 2004-02-06 | 2004-02-06 | Mounting part e.g. for concrete for increasing load under pressure, has special fitting for concrete to be applied with tubular pipe arranged between load introduction surfaces |
Country Status (1)
Country | Link |
---|---|
DE (1) | DE102004005916A1 (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2011030178A1 (en) * | 2009-09-08 | 2011-03-17 | Gutzwiller Holding Ag | Reinforcing element for recessed parts in concrete structures |
DE202010005965U1 (en) * | 2010-04-21 | 2011-08-29 | Rosen Swiss Ag | Sleeve, foundation and wind turbine |
DE202016103203U1 (en) * | 2016-06-16 | 2017-09-19 | Thomas Mösch | Designed as a thrust element device for reinforcing a concrete pavement |
Citations (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3110982A (en) * | 1960-06-15 | 1963-11-19 | Ollie L Besinger | Precast, reinforced concrete column construction |
DE1484329A1 (en) * | 1964-01-29 | 1969-04-10 | Mannesmann Ag | Connection for reinforced concrete members |
DE7006581U (en) * | 1970-02-24 | 1970-07-02 | Haeussler Ernst | CONNECTOR ANCHORS. |
WO1987007318A1 (en) * | 1986-05-22 | 1987-12-03 | Culica, Jacqueline | Rigid metal connection between raised slab-floors and prefabricated pillars of reinforced concrete for autostable paraseismic constructions |
EP0318712A1 (en) * | 1987-11-30 | 1989-06-07 | Riss AG | Connection device for coupling between a concrete floor and a column, and building |
EP0557731A1 (en) * | 1992-01-28 | 1993-09-01 | Fundia Betoniteräkset Oy Ab | Reinforcement for a concrete slab |
US5291715A (en) * | 1991-01-25 | 1994-03-08 | Basile Frank M | Suspension device for concrete reinforcements |
DE9401717U1 (en) * | 1993-03-26 | 1994-03-31 | Tobler Stahlbau AG, St Gallen | Prop head reinforcement |
DE29708234U1 (en) * | 1997-03-24 | 1997-08-07 | Max Bögl Stahl- und Anlagenbau GmbH & Co., 92369 Sengenthal | Steel cap for reinforcing flat slabs in the area of a column |
WO1999028562A1 (en) * | 1997-11-26 | 1999-06-10 | Bernard Douet | Columnar foundation for buildings, structures or the like |
DE19937414A1 (en) * | 1999-08-07 | 2001-03-15 | Heinz Pape | Construction component for producing recesses in support area of flat ceilings of reinforced- and stressed concrete involves stresses taken up and dissipated by round tube with all-round torus at each end |
DE20120678U1 (en) * | 2001-12-20 | 2002-03-14 | WALTER BAU-AKTIENGESELLSCHAFT, 85609 Aschheim | Formation of a node between a reinforced concrete column and a flat ceiling made of reinforced concrete in a multi-storey building |
EP1223259A1 (en) * | 2001-01-12 | 2002-07-17 | Ancotech Ag | Reinforcement for columns supported slab floors, shear-reinforcing element as well as a method for manufacturing a reinforcement |
-
2004
- 2004-02-06 DE DE200410005916 patent/DE102004005916A1/en not_active Withdrawn
Patent Citations (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3110982A (en) * | 1960-06-15 | 1963-11-19 | Ollie L Besinger | Precast, reinforced concrete column construction |
DE1484329A1 (en) * | 1964-01-29 | 1969-04-10 | Mannesmann Ag | Connection for reinforced concrete members |
DE7006581U (en) * | 1970-02-24 | 1970-07-02 | Haeussler Ernst | CONNECTOR ANCHORS. |
WO1987007318A1 (en) * | 1986-05-22 | 1987-12-03 | Culica, Jacqueline | Rigid metal connection between raised slab-floors and prefabricated pillars of reinforced concrete for autostable paraseismic constructions |
EP0318712A1 (en) * | 1987-11-30 | 1989-06-07 | Riss AG | Connection device for coupling between a concrete floor and a column, and building |
US5291715A (en) * | 1991-01-25 | 1994-03-08 | Basile Frank M | Suspension device for concrete reinforcements |
EP0557731A1 (en) * | 1992-01-28 | 1993-09-01 | Fundia Betoniteräkset Oy Ab | Reinforcement for a concrete slab |
DE9401717U1 (en) * | 1993-03-26 | 1994-03-31 | Tobler Stahlbau AG, St Gallen | Prop head reinforcement |
DE29708234U1 (en) * | 1997-03-24 | 1997-08-07 | Max Bögl Stahl- und Anlagenbau GmbH & Co., 92369 Sengenthal | Steel cap for reinforcing flat slabs in the area of a column |
WO1999028562A1 (en) * | 1997-11-26 | 1999-06-10 | Bernard Douet | Columnar foundation for buildings, structures or the like |
DE19937414A1 (en) * | 1999-08-07 | 2001-03-15 | Heinz Pape | Construction component for producing recesses in support area of flat ceilings of reinforced- and stressed concrete involves stresses taken up and dissipated by round tube with all-round torus at each end |
EP1223259A1 (en) * | 2001-01-12 | 2002-07-17 | Ancotech Ag | Reinforcement for columns supported slab floors, shear-reinforcing element as well as a method for manufacturing a reinforcement |
DE20120678U1 (en) * | 2001-12-20 | 2002-03-14 | WALTER BAU-AKTIENGESELLSCHAFT, 85609 Aschheim | Formation of a node between a reinforced concrete column and a flat ceiling made of reinforced concrete in a multi-storey building |
Non-Patent Citations (5)
Title |
---|
Fertigteilstützen aus Hochleistungsbeton B 125 für das Hochhaus HERRIOT`s in Frankfurt am Main. In: Betonwerk + Fertigteil-Tech nik,3,2003,S.46-56 * |
Fertigteilstützen aus Hochleistungsbeton B 125 für das Hochhaus HERRIOT`s in Frankfurt am Main. In: Betonwerk + Fertigteil-Tech nik,3,2003,S.46-56; |
JP 03156048 A., In: Patent Abstracts of Japan * |
JP 03156048 A.,In: Patent Abstracts of Japan; |
JP 3-156048 A., In: Patent Abstracts of Japan; |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2011030178A1 (en) * | 2009-09-08 | 2011-03-17 | Gutzwiller Holding Ag | Reinforcing element for recessed parts in concrete structures |
WO2011030270A1 (en) * | 2009-09-08 | 2011-03-17 | Gutzwiller Holding Ag | Reinforcing element for recessed parts in concrete structures |
EP3181772A1 (en) * | 2009-09-08 | 2017-06-21 | acG Holding AG | Reinforcing element for installations in concrete structures |
EP3181772B1 (en) | 2009-09-08 | 2023-10-18 | acG Holding AG | Use of a reinforcing element for installations in concrete structures |
DE202010005965U1 (en) * | 2010-04-21 | 2011-08-29 | Rosen Swiss Ag | Sleeve, foundation and wind turbine |
DE202016103203U1 (en) * | 2016-06-16 | 2017-09-19 | Thomas Mösch | Designed as a thrust element device for reinforcing a concrete pavement |
EP3258028A1 (en) * | 2016-06-16 | 2017-12-20 | Thomas Mösch | Device in the form of a shear element for reinforcing a concrete floor |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP2914790B1 (en) | Method for producing a tower construction from reinforced concrete | |
EP3662122A1 (en) | Foundation for a structure | |
EP1032737B1 (en) | Shear-load chuck holder | |
EP1252403B1 (en) | Honeycomb-structured hollow-block concrete floor | |
DE102017118375A1 (en) | Offshore construction | |
EP1248889A2 (en) | Reinforced or pre-stressed concrete part which is subjected to a transverse force | |
EP2410097A2 (en) | Butt joints of highly stressed prefabricated columns | |
DE102004005916A1 (en) | Mounting part e.g. for concrete for increasing load under pressure, has special fitting for concrete to be applied with tubular pipe arranged between load introduction surfaces | |
EP3225758A1 (en) | Connection component for thermal isolation between a vertical and horizontal building part | |
EP0875635B1 (en) | Composite element primarily designed for vertically supporting constructive elements of buildings | |
DE102007037436A1 (en) | Fire wall or complex separation wall e.g. for building made from pre-fabricated concrete elements, has several similar panels which are made from concrete precast and have horizontal part | |
EP2450497B1 (en) | Reinforced concrete plug and method for producing a concrete-wood compound element | |
DE19629029A1 (en) | Manufacturing method for bridge support and traffic structure | |
DE102012110184A1 (en) | Centrifugal concrete column for use with ceiling connector for structure of building, is made of ultra high performance concrete, where cylinder compressive strength of ultra high performance concrete is thundered mega Pascal | |
DE202004018655U1 (en) | Steel composite beam with fire-protected support for ceiling elements | |
DE9314567U1 (en) | Prefabricated module | |
AT413403B (en) | PREPARED ELEMENT OF HIGH STRENGTH CONCRETE FOR SUPPORT CEILING NOTES | |
WO2004059216A1 (en) | Prefabricated structural element, especially ceiling or wall element from a solidified material and method for producing such a structural element | |
KR20210068678A (en) | Punching shear reinforcing-bar and foundation structure construction method therewith | |
EP3728756B1 (en) | Column-ceiling node for a reinforced concrete ceiling and two concrete columns in storey construction | |
DE202017107261U1 (en) | Prefabricated concrete element with at least one load-bearing component | |
DE202006019905U1 (en) | Composite structural component for use as e.g. concrete column, has concrete body, and inner reinforcement that is placed in concrete body, where reinforcement is designed by prefabricated profiles of predetermined length and contour | |
AT520519B1 (en) | Support ceiling node for a reinforced concrete floor and two concrete columns in the storey | |
DE2105432C3 (en) | Process for the production of a longitudinally prestressed composite pile | |
AT520529B1 (en) | Support ceiling node for a reinforced concrete floor and two concrete columns in the storey |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
OM8 | Search report available as to paragraph 43 lit. 1 sentence 1 patent law | ||
ON | Later submitted papers | ||
8127 | New person/name/address of the applicant |
Owner name: NGUYEN, VIET TUE, PROF. DR.-ING. HABIL., 04416 MAR |
|
8110 | Request for examination paragraph 44 | ||
8127 | New person/name/address of the applicant |
Owner name: BILFINGER BERGER AG, 68165 MANNHEIM, DE Owner name: NGUYEN, VIET TUE, PROF. DR.-ING. HABIL., 04416, DE |
|
8181 | Inventor (new situation) |
Inventor name: INVENTOR IS APPLICANT |
|
R119 | Application deemed withdrawn, or ip right lapsed, due to non-payment of renewal fee |
Effective date: 20120901 |