CN2558687Y - Semi-sink four-decking bedding overpass - Google Patents

Semi-sink four-decking bedding overpass Download PDF

Info

Publication number
CN2558687Y
CN2558687Y CN 02222131 CN02222131U CN2558687Y CN 2558687 Y CN2558687 Y CN 2558687Y CN 02222131 CN02222131 CN 02222131 CN 02222131 U CN02222131 U CN 02222131U CN 2558687 Y CN2558687 Y CN 2558687Y
Authority
CN
China
Prior art keywords
track
semi
overpass
underground
ground line
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 02222131
Other languages
Chinese (zh)
Inventor
李华绪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 02222131 priority Critical patent/CN2558687Y/en
Application granted granted Critical
Publication of CN2558687Y publication Critical patent/CN2558687Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model discloses an overpass, which is especially suitable for urban roads. In order to solve the technical problem the utility model aiming to settle, the technical scheme is that: a semi-sunk four-level overpass comprises a non-motor lane on the ground, an annular driveway overhead the ground, a vertical driveway which is a channel lower than the ground and a lateral driveway which is a high cross bridge over the annular driveway. For adopting the four-level overpass, the utility model occupies less area and saves land; especially in the road construction and reconstruction in old city or old city area, the utility model can reduce demolition of building and house around and save lots of demolition cost. Meanwhile, due to compact structure and low engineering cost, the overpass can save engineering investment for a country and a construction unit.

Description

Semi-underground four aspect overpass bridges
Affiliated technical field
The utility model relates to a kind of overpass bridge, particularly is applicable to the overpass bridge of urban road.
Background technology
Along with the development of urban construction,, in urban road, adopt overpass bridge more and more in order to save the soil of an inch of land is an inch of gold.And the floor space of existing overpass bridge is very big, and it is built needs to remove and move a large amount of buildings, has therefore increased the cost and the infusion of financial resources of building.
December in 1999 notice of authorization on the 22nd the patent (patent No.: 92112156), disclose a kind of road of grade-separated junction with three diverging interconnections, but that its defective is a floor space is big, the construction costs height.
The utility model content
Technical problem to be solved in the utility model provide a kind of floor space little have an overpass bridge of four layers.
In order to realize that the technical scheme that technical problem to be solved in the utility model adopts is: semi-underground four aspect overpass bridges comprise the nonmotorized vehicle lane on the ground line, overhead annular track on ground line, vertically the track is the tunnel that is lower than ground line, and laterally the track is to make somebody a mere figurehead high overbridge above annular track.
Because the utility model has adopted the overpass bridge of four levels, so floor space is little, has saved the soil, particularly in the road construction and transformation of old city and old town, a large amount of removal expenses is saved in the building around reducing and the removal in house.Owing to the compact conformation of this overpass bridge, construction costs is low simultaneously, also can be that country and Construction unit save construction investment.
Laterally adopt through hole in the track, and on the gap bridge of nonmotorized vehicle lane, adopting half formula railing can effectively improve therebetween daylighting, reducing illumination, not only can save construction cost, can also reduce consequent maintenance cost and labour cost.
Description of drawings
Below in conjunction with drawings and Examples the utility model is elaborated.
Fig. 1 is the vertical view of semi-underground four aspect overpass bridges of the present utility model;
Fig. 2 is the A-A view of Fig. 1;
Fig. 3 is the B-B view of Fig. 1;
The user mode design sketch of Fig. 4 semi-underground four aspect overpass bridges.
The specific embodiment
Semi-underground four aspect overpass bridges of the present utility model comprise the nonmotorized vehicle lane 1 on the ground line, overhead annular track 2 on ground line, and vertically track 3 is for being lower than the tunnel of ground line, and laterally track 4 is for making somebody a mere figurehead high overbridge above annular track 2.
Last track 6 that annular track 2 and ground line intersect and following track 9 are separately positioned on the both sides in vertical track 3 and horizontal track 4.Have a vertical through hole 5 in the center in annular track 2, through hole 5 passes the top that ground line penetrates into vertical track 3.The diameter of this through hole 5 is equal to or less than the width in vertical track 3.
Nonmotorized vehicle lane 1 adopts the following bridge opening 7 in annular track 2 and the gap bridges 8 above vertical track 3 to be interconnected.Adopt half formula railing 11 in the outside in gap bridge 8 and bridge opening 7.
Embodiment:
As shown in Figure 1, any direction road in the same way of semi-underground four aspect overpass bridges all adopts two tracks, so whole road is very spacious, each track is 3 meters, and then the road overall width of the four direction of overpass bridge is 24 meters.At the four direction of overpass bridge, the up gradient 6 in annular track 2 and gug 9 all are separately positioned on the both sides in horizontal track 4 and vertical track 3.Nonmotorized vehicle lane 1 is arranged outside around overpass bridge.When automobile need be turned right when travelling, the gug 9 that the kerb lane of the up gradient 6 by annular track 2 directly changes the right side over to travels.When automobile need turn left to travel, drive to the platform 10 in annular track 2 after, the 90 ° of gugs 9 by the left side that detour left travel.
As shown in Figures 2 and 3, nonmotorized vehicle lane 1 and the same level of ground line.Annular track 2 makes overhead on ground line about 3 meters of platform 10 by up gradient 6 and gug 9.Vertically track 3 is for being lower than the tunnel of ground line, and it is 5 meters that minimum point is lower than ground line.Laterally track 4 is for making somebody a mere figurehead high overbridge above annular track 2, and it is 5 meters that the below of the highest point in horizontal track 4 is higher than annular track 2.So laterally track 4 is sunken to the underground whole height that has reduced on the overpass bridge ground line, the height on the ground line is about 8--9 rice, can not cause big influence to the road and the environment in city.
As shown in Figures 2 and 3, for the ease of the connection around the nonmotorized vehicle lane 1, adopt the following bridge opening 7 in annular track 2 and the gap bridges 8 above vertical track 3 that nonmotorized vehicle lane 1 is interconnected.
As Fig. 3 and shown in Figure 2, have a vertical through hole 5 in the center in annular track 2, through hole 5 passes ground line and penetrates into 3 tops, vertical track, so increased the middle daylighting in tunnel in vertical track 3, and the diameter of through hole is less than or equal to the width in vertical track 3, thereby the turning radius of automobile on annular track 2 reduces, and reaches the angle of 90 ° of turnings.As shown in Figure 3, adopt half formula railing 11 in the outside of the gap bridge 8 of nonmotorized vehicle lane 4 and the outside in bridge opening 7, increased pass a bridge 8 around daylighting.
Under the influence that is subjected to urban road and surrounding enviroment, change the track into the bicycle road, the structure of whole overpass bridge is compact more.In like manner, at the crossing that main line and branch line cross, vertically track 3 or laterally track 4 change the bicycle road into, also belong to protection domain of the present utility model.

Claims (7)

1, semi-underground four aspect overpass bridges, comprise the nonmotorized vehicle lane (1) on the ground line, overhead annular track (2) on ground line, it is characterized in that: vertically track (3) is for being lower than the tunnel of ground line, and laterally track (4) is for making somebody a mere figurehead the top high overbridge in annular track (2).
2, semi-underground four aspect overpass bridges as claimed in claim 1 is characterized in that: up gradient (6) that described annular track (2) and ground line intersect and gug (9) are separately positioned on the both sides in vertical track (3) and horizontal track (4).
3, semi-underground four aspect overpass bridges as claimed in claim 1 is characterized in that: have a vertical through hole (5) in the center of annular track (2), above-mentioned through hole (5) passes ground line and penetrates into top, vertical track (3).
4, semi-underground four aspect overpass bridges as claimed in claim 3, it is characterized in that: the diameter of through hole (5) is less than or equal to the width of vertical track (3),
5, semi-underground four aspect overpass bridges as claimed in claim 1 is characterized in that: described nonmotorized vehicle lane (1) adopts the following bridge opening (7) in annular track (2) and the gap bridge (8) above vertical track (3) to be interconnected.
6, semi-underground four aspect overpass bridges as claimed in claim 5 is characterized in that: half formula railing (11) is adopted in the outside in the outside of above-mentioned gap bridge (8) and bridge opening (7).
7, semi-underground four aspect overpass bridges as claimed in claim 1, it is characterized in that: the platform (10) in described annular track (2) below is 2.5 meters on plane above Ground, the lowest part in described vertical track (3) is lower than 5 meters of ground lines, and laterally the below of the highest point in track (4) is higher than (10) 5 meters on the platform in annular track (2).
CN 02222131 2002-04-05 2002-04-05 Semi-sink four-decking bedding overpass Expired - Fee Related CN2558687Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 02222131 CN2558687Y (en) 2002-04-05 2002-04-05 Semi-sink four-decking bedding overpass

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 02222131 CN2558687Y (en) 2002-04-05 2002-04-05 Semi-sink four-decking bedding overpass

Publications (1)

Publication Number Publication Date
CN2558687Y true CN2558687Y (en) 2003-07-02

Family

ID=33700107

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 02222131 Expired - Fee Related CN2558687Y (en) 2002-04-05 2002-04-05 Semi-sink four-decking bedding overpass

Country Status (1)

Country Link
CN (1) CN2558687Y (en)

Cited By (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101113582A (en) * 2006-09-11 2008-01-30 张凤珠 Multiple pass-way weight reducing viaduct
CN101338541B (en) * 2008-08-18 2010-06-16 福建省中福工程建设监理有限公司 Crossing elevated passage for relaxing traffic jam
CN101792994A (en) * 2010-03-05 2010-08-04 王营杰 Multifunctional tunnel grade separation hub bridge
CN102127886A (en) * 2011-02-17 2011-07-20 王营杰 Multifunctional tunnel and road parking area
CN101781874B (en) * 2009-08-06 2011-08-17 欧煜新 Crossroad single-deck viaduct system and vehicle passing method
CN102322005A (en) * 2011-06-30 2012-01-18 逄承麟 Flyover
CN102535284A (en) * 2011-01-04 2012-07-04 缪龙琯 Urban arterial road smoothing technical scheme
CN102605692A (en) * 2012-03-14 2012-07-25 贾德玉 Unobstructed flyover
CN102733279A (en) * 2012-07-18 2012-10-17 李力 Comprehensive transportation hub applied to crossroad
WO2013170634A1 (en) * 2012-05-18 2013-11-21 Zhao Shufeng Crossroad pedestrian and vehicle accessible bridge-and-tunnel-combined interchange
CN103711052A (en) * 2012-10-08 2014-04-09 黎香贵 City expressway
CN103821056A (en) * 2012-10-22 2014-05-28 彭高培 Multi-dimensional traffic road network
CN103898819A (en) * 2012-12-31 2014-07-02 都快通(北京)交通疏导设备有限公司 Fishtail flyover for unblocking urban traffic
CN105155375A (en) * 2015-09-25 2015-12-16 孙振国 Fast-slow separation interchange system
CN105256678A (en) * 2015-10-23 2016-01-20 李益安 Crossroad four-plane flyover
CN105648864A (en) * 2016-03-21 2016-06-08 吕雅南 Cross ring-type full-function interchange
CN106192642A (en) * 2016-07-12 2016-12-07 吕雅南 A kind of multi-functional cross overpass
CN106256958A (en) * 2016-06-24 2016-12-28 肖云山 A kind of traffic system not stopped by crossroad
CN111779351A (en) * 2019-12-11 2020-10-16 董国良 Old city reconstruction method

Cited By (25)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101113582B (en) * 2006-09-11 2015-04-08 张凤珠 Multiple pass-way weight reducing overpass
CN101113582A (en) * 2006-09-11 2008-01-30 张凤珠 Multiple pass-way weight reducing viaduct
CN101338541B (en) * 2008-08-18 2010-06-16 福建省中福工程建设监理有限公司 Crossing elevated passage for relaxing traffic jam
CN101781874B (en) * 2009-08-06 2011-08-17 欧煜新 Crossroad single-deck viaduct system and vehicle passing method
CN101792994A (en) * 2010-03-05 2010-08-04 王营杰 Multifunctional tunnel grade separation hub bridge
CN102535284A (en) * 2011-01-04 2012-07-04 缪龙琯 Urban arterial road smoothing technical scheme
CN102127886A (en) * 2011-02-17 2011-07-20 王营杰 Multifunctional tunnel and road parking area
CN102322005A (en) * 2011-06-30 2012-01-18 逄承麟 Flyover
CN102605692A (en) * 2012-03-14 2012-07-25 贾德玉 Unobstructed flyover
CN102605692B (en) * 2012-03-14 2015-02-25 贾德玉 Unobstructed flyover
WO2013170634A1 (en) * 2012-05-18 2013-11-21 Zhao Shufeng Crossroad pedestrian and vehicle accessible bridge-and-tunnel-combined interchange
CN102733279A (en) * 2012-07-18 2012-10-17 李力 Comprehensive transportation hub applied to crossroad
CN102733279B (en) * 2012-07-18 2016-02-24 李力 Be applied in crossroad comprehensive transportation hub
CN103711052A (en) * 2012-10-08 2014-04-09 黎香贵 City expressway
CN103821056A (en) * 2012-10-22 2014-05-28 彭高培 Multi-dimensional traffic road network
CN103898819A (en) * 2012-12-31 2014-07-02 都快通(北京)交通疏导设备有限公司 Fishtail flyover for unblocking urban traffic
CN103898819B (en) * 2012-12-31 2016-05-11 都快通(北京)交通疏导设备有限公司 A kind of urban transportation is dredged the stifled fish tail viaduct of using
CN105155375A (en) * 2015-09-25 2015-12-16 孙振国 Fast-slow separation interchange system
CN105155375B (en) * 2015-09-25 2017-08-29 孙振国 A kind of speed separated interchange system
CN105256678A (en) * 2015-10-23 2016-01-20 李益安 Crossroad four-plane flyover
CN105648864A (en) * 2016-03-21 2016-06-08 吕雅南 Cross ring-type full-function interchange
CN106256958A (en) * 2016-06-24 2016-12-28 肖云山 A kind of traffic system not stopped by crossroad
CN106192642A (en) * 2016-07-12 2016-12-07 吕雅南 A kind of multi-functional cross overpass
CN111779351A (en) * 2019-12-11 2020-10-16 董国良 Old city reconstruction method
CN111779351B (en) * 2019-12-11 2021-10-26 董国良 Old city reconstruction method

Similar Documents

Publication Publication Date Title
CN2558687Y (en) Semi-sink four-decking bedding overpass
CN1249302C (en) Full spatial urban road system and traffic method using same
CN201634979U (en) Multilevel intersection system of crossroad
CN202194041U (en) Flyover
US20080152426A1 (en) Single Layer Overhead Full Interchange Flyover
CN102322005A (en) Flyover
CN100351468C (en) Full stereoscopic city road system and traffic method using said system
CN1552997A (en) Cross three-dimensional taffic apparatus
CN101067295A (en) Method for utilizing underground souterrain combined with ground road to be as trolley bus passageway
CN102912701B (en) Multi-functional left-turn directional interchange overpass
CN2851332Y (en) Flyover bridge
CN1242119C (en) Overpass system for realizing crossroad T road mutual passing
CN2535437Y (en) Semi-sink internal circuit type overpass
CN201395755Y (en) Cross road unclogged road structure and traffic route thereof
CN2692196Y (en) Semi automatic overpass structure
CN2921083Y (en) High-speed single-layer full interchange bridge
CN102900000B (en) Comprehensive complete straight-through direct left-hand rotation right lateral viaduct
CN1379156A (en) Overhead cross of road
CN1834352A (en) City system having man and vehicles fully separated
CN200964557Y (en) Four-way overbridge
CN202181491U (en) U-shaped combined passage of crossroad
CN200943171Y (en) Full-route beading type totally-enclosed ultramicroscopic high-speed single-layer overpass
CN200981964Y (en) Viaduct
CN206635581U (en) The building in three-dimensional city and traffic integrated system
CN2931557Y (en) Traffic lights free viaduct for automotive vehicles and non-automotive vehicles roadway crossing

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee