CN102912701B - Multi-functional left-turn directional interchange overpass - Google Patents
Multi-functional left-turn directional interchange overpass Download PDFInfo
- Publication number
- CN102912701B CN102912701B CN201210179417.XA CN201210179417A CN102912701B CN 102912701 B CN102912701 B CN 102912701B CN 201210179417 A CN201210179417 A CN 201210179417A CN 102912701 B CN102912701 B CN 102912701B
- Authority
- CN
- China
- Prior art keywords
- viaduct
- bridge
- road
- tracks
- longitudinal
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Bridges Or Land Bridges (AREA)
- Road Paving Structures (AREA)
Abstract
A kind of multi-functional left-turn directional interchange overpass, it includes grillage foundation road surface, there is the road of four corners of the world four direction, vertical and horizontal viaduct is had in crossing intersection part erection, wherein horizontal viaduct is on longitudinal viaduct, form two-layer Viaduct Structure, it is characterized in that: be provided with right-hand bend arch bridge on the right of every bar road, described vertical and horizontal viaduct is respectively provided with four tracks, between track, jube is installed between two, and the left turn lane that on every viaduct, middle two tracks are reverse each other, gap bridge one end that two left turn lanes are positioned at viaduct has set up 90 ° of left-hand bend downward bridges respectively, ground level road under connecting bridge, and on the ground, below of longitudinal viaduct, the tune track of People's Bank of China passageway, nonmotorized vehicle lane and four direction is arranged with by line, the invention solves existing overpass bridge can not directly turn left, construction cost is high, affects the problem such as traffic speed and order, and the crossroad being particularly suitable for highway is built.
Description
Technical field
The present invention relates to traffic highway, especially a kind of multi-functional left-turn directional interchange overpass.
Background technology
In traffic highway, the crossroad place that amount of flow is larger, usually need to set up overpass bridge, existing overpass bridge form of structure is multiple, but does not have a kind ofly can directly to turn left, the left-hand bend of vehicle can only be realized by the right-hand bend road of 270 °, this bridge construction cost is high, and floor space is large, the land resources that waste is valuable, and have cross interleave road conditions, affect traffic speed and order and security.
Summary of the invention
Object of the present invention will solve existing overpass bridge exactly and can not directly turn left, and the above-mentioned series of problems brought provides a kind of multi-functional left-turn directional interchange overpass.
Concrete scheme of the present invention is: multi-functional left-turn directional interchange overpass, include grillage foundation road surface, there is the road of four corners of the world four direction, vertical and horizontal viaduct is had in crossing intersection part erection, wherein horizontal viaduct is on longitudinal viaduct, form two-layer Viaduct Structure, it is characterized in that: be provided with right-hand bend arch bridge on the right of every bar road, described horizontal viaduct is provided with four tracks, between track, jube is installed between two, the left turn lane that wherein, two tracks are reverse each other, gap bridge one end that two left turn lanes are positioned at viaduct has set up 90 ° of left-hand bend downward bridges respectively, ground level road under connecting bridge, longitudinal viaduct is provided with four tracks, the left turn lane that wherein, two tracks are reverse each other, gap bridge one end that two left turn lanes are positioned at viaduct has set up 90 ° of left-hand bend downward bridges respectively, wherein every bar left-turning pathways, all goes up a slope with the craspedodrome road gone in the same direction after by overpass bridge simultaneously and crosses over, and is arranged with the tune track of People's Bank of China passageway, nonmotorized vehicle lane and four direction by line on the ground, below of longitudinal viaduct.
In the present invention, the vehicle of four direction all can directly turn left, current easy, do not interweave mutually, have complete directed intercommunication, vehicle is in the process of traveling whole crossroad, its road voluntarily, easy, quick, safety, adds the traffic capacity of overpass bridge, ensure that vehicle travels in way and does not block up, improve passage rate, ensure that traffic safety.On the ground, below of longitudinal viaduct, be provided with sidewalk, nonmotorized vehicle lane, tune track simultaneously, greatly facilitate pedestrian and non motorized vehicle passageway, and motor vehicle tune.And construction cost of the present invention is low, and floor space is little, save valuable land resources.
Accompanying drawing explanation
Fig. 1 is perspective view of the present invention.
In figure: 1-north orientation road, 2-south orientation road, 3-east orientation road, 4-is western to road, 5-right-hand bend arch bridge, 6-90 ° of left-hand bend downward bridge, the horizontal viaduct of 7-, the longitudinal viaduct of 8-, 9-jube.
Detailed description of the invention
See Fig. 1, the present invention includes grillage foundation road surface, there is the road 1 of four corners of the world four direction, 2, 3, 4, vertical and horizontal viaduct 8 is had in crossing intersection part erection, 7, wherein horizontal viaduct 7 is on longitudinal viaduct 8, form two-layer Viaduct Structure, particularly: be provided with right-hand bend arch bridge 5 on the right of every bar road, described horizontal viaduct 7 is provided with four tracks, between two jube 9 is installed between track, the left turn lane that wherein, two tracks are reverse each other, gap bridge one end that two left turn lanes are positioned at viaduct has set up 90 ° of left-hand bend downward bridges 6 respectively, ground level road under connecting bridge, longitudinal viaduct 8 is provided with four tracks, the left turn lane that wherein, two tracks are reverse each other, gap bridge one end that two left turn lanes are positioned at viaduct has set up 90 ° of left-hand bend downward bridges 6 respectively, wherein every bar left-turning pathways, all goes up a slope with the craspedodrome road gone in the same direction after by overpass bridge simultaneously and crosses over, and is arranged with the tune track of People's Bank of China passageway, nonmotorized vehicle lane and four direction by line on the ground, below of longitudinal viaduct 8.
Claims (1)
1. multi-functional left-turn directional interchange overpass, include grillage foundation road surface, there is the road of four corners of the world four direction, vertical and horizontal viaduct is had in crossing intersection part erection, wherein horizontal viaduct is on longitudinal viaduct, form two-layer Viaduct Structure, it is characterized in that: be provided with right-hand bend arch bridge on the right of every bar road, described horizontal viaduct is provided with four tracks, between track, jube is installed between two, the left turn lane that wherein, two tracks are reverse each other, gap bridge one end that two left turn lanes are positioned at viaduct has set up 90 ° of left-hand bend downward bridges respectively, ground level road under connecting bridge, longitudinal viaduct is provided with four tracks, the left turn lane that wherein, two tracks are reverse each other, gap bridge one end that two left turn lanes are positioned at viaduct has set up 90 ° of left-hand bend downward bridges respectively, wherein every bar left turn lane, all by crossing over side by side with the direct lane that goes in the same direction during overpass bridge, the then descending that turns left after upward slope enters ground level road, and is arranged with the tune track of People's Bank of China passageway, nonmotorized vehicle lane and four direction by line on the ground, below of longitudinal viaduct.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210179417.XA CN102912701B (en) | 2011-08-05 | 2012-06-04 | Multi-functional left-turn directional interchange overpass |
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011102239653A CN102337713A (en) | 2011-08-05 | 2011-08-05 | Left-turn directional interchange overpass |
CN201110223965.3 | 2011-08-05 | ||
CN201210179417.XA CN102912701B (en) | 2011-08-05 | 2012-06-04 | Multi-functional left-turn directional interchange overpass |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102912701A CN102912701A (en) | 2013-02-06 |
CN102912701B true CN102912701B (en) | 2015-11-04 |
Family
ID=45513642
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011102239653A Pending CN102337713A (en) | 2011-08-05 | 2011-08-05 | Left-turn directional interchange overpass |
CN201210179417.XA Expired - Fee Related CN102912701B (en) | 2011-08-05 | 2012-06-04 | Multi-functional left-turn directional interchange overpass |
Family Applications Before (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011102239653A Pending CN102337713A (en) | 2011-08-05 | 2011-08-05 | Left-turn directional interchange overpass |
Country Status (1)
Country | Link |
---|---|
CN (2) | CN102337713A (en) |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106284009A (en) * | 2016-10-18 | 2017-01-04 | 冯阳 | Cross interchange overpass |
CN107476154A (en) * | 2017-09-20 | 2017-12-15 | 湖南省格知科技有限公司 | Viaduct |
CN112900172A (en) * | 2021-03-30 | 2021-06-04 | 张吉祥 | Small double-layer overpass for city |
CN113152183A (en) * | 2021-04-13 | 2021-07-23 | 李益安 | Five-fork road two-layer overpass |
CN113089400A (en) * | 2021-05-19 | 2021-07-09 | 李金胜 | Two-layer overpass with staggered cross-shaped crossroad |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1344838A (en) * | 2001-08-18 | 2002-04-17 | 杨子荣 | Two-layer intercommunicated overpass with separated traffic lanes and pavements |
CN2672150Y (en) * | 2004-01-12 | 2005-01-19 | 肖为民 | Overpass |
CN2736411Y (en) * | 2004-05-31 | 2005-10-26 | 朱宁 | Topology type natural special-line overpass |
CN200946229Y (en) * | 2004-08-16 | 2007-09-12 | 张航 | Super minisize crossroads |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
LT5330B (en) * | 2004-07-02 | 2006-03-27 | Stanislovas Buteliauskas | Junction of roads |
-
2011
- 2011-08-05 CN CN2011102239653A patent/CN102337713A/en active Pending
-
2012
- 2012-06-04 CN CN201210179417.XA patent/CN102912701B/en not_active Expired - Fee Related
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1344838A (en) * | 2001-08-18 | 2002-04-17 | 杨子荣 | Two-layer intercommunicated overpass with separated traffic lanes and pavements |
CN2672150Y (en) * | 2004-01-12 | 2005-01-19 | 肖为民 | Overpass |
CN2736411Y (en) * | 2004-05-31 | 2005-10-26 | 朱宁 | Topology type natural special-line overpass |
CN200946229Y (en) * | 2004-08-16 | 2007-09-12 | 张航 | Super minisize crossroads |
Also Published As
Publication number | Publication date |
---|---|
CN102912701A (en) | 2013-02-06 |
CN102337713A (en) | 2012-02-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202194041U (en) | Flyover | |
CN102912701B (en) | Multi-functional left-turn directional interchange overpass | |
CN103161105A (en) | Crossroad unblocked bridge | |
CN102322005A (en) | Flyover | |
CN202017171U (en) | Three-layer flyover for urban roads | |
CN201080585Y (en) | Unidirectional straight-through crossroad for crossroad | |
CN104963252A (en) | Urban multilayer roundabout viaduct | |
CN105350416A (en) | Method for solving urban road traffic jam | |
CN201738207U (en) | High through capacity crossroad full intercommunication fly-over bridge | |
CN101792994A (en) | Multifunctional tunnel grade separation hub bridge | |
WO2014071540A1 (en) | Crossroads structure to facilitate re-modelling of established crossroads | |
CN202139520U (en) | Flyover without left turn | |
CN202519557U (en) | Unimpeded flyover | |
CN203807903U (en) | Three-layer flyover | |
CN202416105U (en) | Unblocked bridge for crossroad | |
CN202220318U (en) | Left turning type directional interchange overpass | |
CN202671991U (en) | Small universal unblocked overpass | |
CN201648900U (en) | Multifunctional tunnel interchange hinge bridge | |
CN201809718U (en) | Baseless ground anchoring overpass bridge | |
CN201024365Y (en) | Crossroads | |
CN102605692A (en) | Unobstructed flyover | |
CN202519556U (en) | Unimpeded flyover | |
CN103452021A (en) | Universal unblocked small overpass | |
CN202969184U (en) | Unimpeded flyover | |
CN202519551U (en) | Multifunctional room-type free passage interchange bridge |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |