CN218881744U - Novel integrated bathroom of modularization suitable for quick construction - Google Patents

Novel integrated bathroom of modularization suitable for quick construction Download PDF

Info

Publication number
CN218881744U
CN218881744U CN202223224183.4U CN202223224183U CN218881744U CN 218881744 U CN218881744 U CN 218881744U CN 202223224183 U CN202223224183 U CN 202223224183U CN 218881744 U CN218881744 U CN 218881744U
Authority
CN
China
Prior art keywords
smc
bathroom
wallboard
novel integrated
plates
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202223224183.4U
Other languages
Chinese (zh)
Inventor
李文龙
翁羽
吴东昌
石奇林
陈贤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Seventh Engineering Division Corp Ltd
Original Assignee
China Construction Seventh Engineering Division Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Seventh Engineering Division Corp Ltd filed Critical China Construction Seventh Engineering Division Corp Ltd
Priority to CN202223224183.4U priority Critical patent/CN218881744U/en
Application granted granted Critical
Publication of CN218881744U publication Critical patent/CN218881744U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/60Planning or developing urban green infrastructure

Abstract

The utility model provides a novel integrated bathroom of modularization suitable for quick construction belongs to assembly type structure technical field. The utility model provides a novel integrated bathroom of modularization suitable for quick construction, includes flexible base, the SMC chassis that sets up on the flexible base, SMC chassis edge sets up the SMC wallboard of hugging closely in the bathroom lateral wall, the SMC roof that the bathroom top hung in midair, with the SMC chassis the adjustable glass door of door frame that the SMC wallboard was laminated mutually, set up the location couple that is used for installing bathroom cleaners and polishes on the SMC wallboard. Adopt the mode of standard component prefabrication, design a novel integrated bathroom who is applicable to quick laying, installation, based on the frame construction mode, optimize the building theory of traditional wet operation, reduce construction cycle in the at utmost.

Description

Novel integrated bathroom of modularization suitable for quick construction
Technical Field
The utility model relates to an assembly type structure technical field, concretely relates to novel integrated bathroom of modularization suitable for quick construction.
Background
With the increase of the room price and the improvement of the living standard, for ten thousand yuan/flat hardback rooms, owners hardly accept the plastic experience of SMC integrated bathrooms. With the development of new materials in new technologies, existing integrated bathroom suppliers develop integrated bathrooms with ceramic tiles from 2018, but the integrated bathrooms are not applied to a large number of hardbound residences due to immature technologies or high cost; for example, the base plate and the main wall plate of the integrated bathroom of the current ceramic tile series are made of aluminum alloy honeycomb materials, the main material cost is high, obvious hollowing and vibration are sensed when the wall plate is knocked, meanwhile, the wall plate needs to be thickened due to self-forming of the structure, the occupied indoor space is more, the living comfort is reduced, and the overall structure strength and the flatness of the integrated bathroom are poor.
With the development of modern society industrial technology and the acceleration of life rhythm, the living standard of people is continuously improved, the requirement on spiritual civilization is higher and higher, and higher requirements are put forward on the efficiency, construction quality and construction production cost of house construction. In order to realize efficient utilization of space, it is increasingly important to exert more functional demands of space in a limited space.
For example, in patent CN215716835U, the components are various, the installation process is complicated, and the method is not suitable for large-scale rapid construction. Patent CN213282669U, adopt the wet operation method of pouring formula to install, the laying cycle is long, and the operation degree of difficulty is higher, is not suitable for the temporary personnel's of the batch operation of emergency construction.
SUMMERY OF THE UTILITY MODEL
To the prior art, the utility model provides a novel integrated bathroom of modularization suitable for quick construction suitable for interim quick tear open build.
In order to solve the technical problem, the utility model discloses the technical scheme who takes is:
the utility model provides a novel integrated bathroom of modularization suitable for quick construction, includes flexible base, the SMC chassis that sets up on the flexible base, SMC chassis edge sets up the SMC wallboard of hugging closely in the bathroom lateral wall, the SMC roof that the bathroom top hung in midair, with the SMC chassis the adjustable glass door of door frame that the SMC wallboard was laminated mutually, set up the location couple that is used for installing bathroom cleaners and polishes on the SMC wallboard.
The utility model discloses a bathroom, including the expansion screw, telescopic base is fixed and is the scalable landing leg of matrix distribution, installs including using the expansion screw structure frame on the telescopic landing leg, structure frame include vertically and horizontally staggered's spandrel girder net fixed support boundary beam in spandrel girder net edge, the last setting of structure frame is used for placing the location baffle of SMC chassis, special floor drain, flange, set up expansion bolts on the support boundary beam and fix on the lateral wall between the bathroom, telescopic landing leg is last set up connecting bolt with structure frame's vertically and horizontally staggered node fixed connection, the location baffle be with the same net type structure of structure frame.
SMC chassis includes prefabricated member plane check board, the plane check board size with the mesh size of spandrel girder net is the same, the plane check board back sets up the brace rod that is central radiation structure, the upper surface of plane check board sets up prevents drawing the line.
The special floor drain and the flange comprise hardware plates and floor drains or flanges arranged in the hardware plates, the hardware plates and the plane grating plates are identical in horizontal section size, the upper surfaces of the hardware plates are of concave structures, the plane grating plates and the hardware plates are arranged in the positioning partition plates in the telescopic base, and waterproof glue which is evenly smeared is arranged among the hardware plates, the plane grating plates and the positioning partition plates.
The SMC wallboard with it is sealed to set up the waterproof glue between the SMC chassis, set up between SMC wallboard and the bathroom lateral wall and be used for connecting solid, the neutral silicone structure of fixed wall and glue, the built-in supporting steel plate structure intermediate layer of SMC wallboard, the location couple is fixed on the supporting steel plate structure intermediate layer.
And a polyurethane foaming agent is filled between the SMC top plate and the SMC wallboard.
The utility model has the advantages as follows:
the modular assembly mode is adopted, the rapid construction of the integrated bathroom can be realized, the traditional wet operation mode is optimized, and the necessary shade drying interval link for winter operation is greatly reduced.
The mode of prefab is adopted, based on two segmentation subregion manufacturing concepts, promotes the operating speed, realizes standardized, the batch operation of basic component, improves product quality.
The design of the telescopic base adopts a suspended construction method, and the telescopic base is more suitable for areas with wet ground.
SMC chassis, SMC wallboard, SMC roof adopt the standard component to lay, reduce the activity duration.
Drawings
FIG. 1: the structure of the utility model is shown schematically;
FIG. 2: the utility model discloses a structure schematic diagram of local enlargement of the connection part of an SMC chassis and an SMC wallboard;
the system comprises a telescopic base-1, an SMC chassis-2, an SMC wallboard-3, an SMC top plate-4, a telescopic supporting leg-5, a spandrel girder grid-6, a supporting side beam-7 and an expansion bolt-8.
Detailed Description
For better understanding of the objects, technical solutions and advantages of the present invention, it will be further clear that the technical solutions of the present invention are described clearly and completely in conjunction with the embodiments, but the protection content of the present invention is not limited to the following embodiments. In the following description, numerous specific details are set forth in order to provide a more thorough understanding of the present invention. It is to be understood that the embodiments described are only some of the embodiments of the present invention, and not all of them. All other embodiments, which can be derived from the description of the embodiments of the present invention by a person skilled in the art, are within the scope of the present invention.
Examples
As shown in fig. 1-2, the present embodiment provides a novel integrated bathroom of modularization suitable for quick construction, including flexible base 1, the SMC chassis 2 that sets up on the flexible base 1, the edge setting of SMC chassis 2 hugs closely the SMC wallboard 3 of bathroom lateral wall, and the SMC roof 4 that suspends in midair at bathroom top, with SMC chassis 2 the adjustable glass door of door frame that SMC wallboard 3 laminated mutually, set up the location couple that is used for installing bathroom cleaners and polishes on the SMC wallboard 3.
The utility model discloses a bathroom, including the telescopic base 1 use the inflation screw to fix telescopic leg 5 that is matrix distribution on bathroom ground, install structural framework on telescopic leg 5, structural framework includes vertically and horizontally staggered spandrel girder net 6 the 6 fixed edge-supported roof beams 7 in edge of spandrel girder net, the last setting of structural framework is used for placing the location baffle of SMC chassis 2, special floor drain, flange, set up expansion bolts 8 on the support roof beams 7 and fix on the lateral wall of bathroom, telescopic leg 5 go up set up connecting bolts with structural framework's vertically and horizontally staggered node fixed connection, the location baffle be with the same latticed structure of structural framework.
SMC chassis 2 includes prefab plane check board, the plane check board size with spandrel girder net 6's mesh size is the same, the plane check board back sets up the brace rod that is central radiation structure, the upper surface of plane check board sets up prevents drawing the line.
The special floor drain and the flange comprise hardware plates and floor drains or flanges arranged in the hardware plates, the hardware plates and the plane grating plates are identical in horizontal section size, the upper surfaces of the hardware plates are of a concave structure, the plane grating plates and the hardware plates are arranged in the positioning partition plates in the telescopic base 1, and waterproof glue which is evenly smeared is arranged among the hardware plates, the plane grating plates and the positioning partition plates.
SMC wallboard 3 with it is sealed to set up the waterproof glue between SMC chassis 2, set up between SMC wallboard 3 and the bathroom lateral wall and be used for being connected fixed wall solid, neutral silicone structure and glue, SMC wallboard 3 embeds supporting steel plate structure intermediate layer, the location couple is fixed on the supporting steel plate structure intermediate layer.
The space between the SMC top plate 4 and the SMC wall plate 3 is filled with a polyurethane foaming agent.
The SMC chassis 2, SMC wall panels 3, SMC ceiling panels 4 are customizable SMC panels.
The SMC wallboard 3 and the SMC top board 4 are formed by splicing and fixing a plurality of standard boards.
The special floor drain and the flange are connected with a drainage pipeline of the bathroom.
The SMC wallboard 3 is provided with a through hole connected with a water inlet pipeline and a power supply line.
The adjustable glass door of door frame is push-pull type glass door.
The telescopic supporting legs 5 are adjustable supporting columns. The bearing beam grids 6 and the supporting edge beams 7 are made of metal flat iron.
The installation process comprises the following steps:
firstly, rechecking the space size of the bathroom building to see whether the overall installation requirement is met, and secondly, establishing a BIM (building information modeling) model according to the bathroom size and guiding in a through hole coordinate point. Building corresponding standard parts of the SMC chassis 2, the SMC wall plate 3 and the SMC top plate 4, and manufacturing the standard parts outside the field.
The telescopic base 1 is installed. Need fix scalable landing leg 5 to former structure floor earlier on, scalable landing leg 5 adopts the matrix to arrange, should avoid former building to reserve drainage pipe entrance to a cave when scalable landing leg 5 installs, sets up the structural framework on scalable landing leg 5.
And connecting the special floor drain and the flange of the integrated bathroom with the water outlet. The SMC chassis 2 is then placed on the telescopic base 1.
Then SMC wallboard 3 is installed. And a constructor assembles the wall boards on the same side according to the wall board installation drawing, reinforces the back by using wall fixing and neutral silicone structural adhesive, and then bonds the wall boards with the corresponding wall boards according to the positions of the coordinate points of the through holes.
Followed by the ceiling installation. Before the top plate is installed, the top water supply and drainage pipeline and the strong and weak current pipeline are installed. Then the top plates are arranged and placed flatly according to the drawing sequence, the top plates are connected into a whole by adopting U-shaped sectional materials and bolts, and the top plates are reinforced by adopting wall plate reinforcing ribs. And then placing the connected top plate at the upper end of the wall plate, adjusting the edges of the periphery to be aligned with the wall plate, aligning the middle abutted seam with the abutted seam of the wall plate, and fixing the top plate to the upper part of the wall plate by adopting screws.
Followed by a glass door installation. The glass door pocket adopts a telescopic device, and the width of the door pocket is adjusted according to the thickness of the wall body and the thickness of the assembled wall panel, so that the titanium-magnesium alloy door is tightly and firmly fixed on the wallboard.
And finally, installing the hardware sanitary appliance, wherein the hardware sanitary appliance can be directly hung and fixed on the positioning hook.
Finally, the above embodiments are only used for illustrating the technical solutions of the present invention and not for limiting, and other modifications or equivalent replacements made by the technical solutions of the present invention by those of ordinary skill in the art should be covered within the scope of the claims of the present invention as long as they do not depart from the spirit and scope of the technical solutions of the present invention.

Claims (6)

1. The utility model provides a novel integrated bathroom of modularization suitable for quick construction which characterized in that: including flexible base, the SMC chassis that sets up on the flexible base, SMC chassis edge sets up the SMC wallboard of hugging closely in the bathroom lateral wall, the SMC roof that the bathroom top hung in midair, with the SMC chassis the adjustable glass door of door frame that the SMC wallboard laminated mutually, set up the location couple that is used for installing bathroom cleaners and polishes on the SMC wallboard.
2. The novel integrated bathroom of modularization suitable for quick construction of claim 1, characterized by: the utility model discloses a bathroom, including the expansion screw, telescopic base is fixed and is the scalable landing leg of matrix distribution, installs including using the expansion screw structure frame on the telescopic landing leg, structure frame include vertically and horizontally staggered's spandrel girder net fixed support boundary beam in spandrel girder net edge, the last setting of structure frame is used for placing the location baffle of SMC chassis, special floor drain, flange, set up expansion bolts on the support boundary beam and fix on the lateral wall between the bathroom, telescopic landing leg is last set up connecting bolt with structure frame's vertically and horizontally staggered node fixed connection, the location baffle be with the same net type structure of structure frame.
3. The novel integrated bathroom of claim 2, characterized in that: the SMC chassis includes prefab plane check board, the plane check board size with the mesh size of spandrel girder net is the same, the plane check board back sets up the brace rod that is central radiation structure, the upper surface of plane check board sets up prevents drawing the line.
4. The novel integrated bathroom of claim 3, characterized in that: the special floor drain and the flange comprise hardware plates and floor drains or flanges arranged in the hardware plates, the hardware plates are the same as the plane grid plates in horizontal cross section size, the upper surfaces of the hardware plates are of concave structures, the plane grid plates and the hardware plates are arranged in the positioning partition plates in the telescopic base, and waterproof glue which is evenly smeared is arranged among the hardware plates, the plane grid plates and the positioning partition plates.
5. The novel integrated bathroom of claim 1, characterized in that: the SMC wallboard with it is sealed to set up the waterproof glue between the SMC chassis, set up between SMC wallboard and the bathroom lateral wall and be used for connecting solid, the neutral silicone structure of fixed wall and glue, the built-in supporting steel plate structure intermediate layer of SMC wallboard, the location couple is fixed on the supporting steel plate structure intermediate layer.
6. The novel integrated bathroom of modularization suitable for quick construction of claim 1, characterized by: and a polyurethane foaming agent is filled between the SMC top plate and the SMC wallboard.
CN202223224183.4U 2022-12-01 2022-12-01 Novel integrated bathroom of modularization suitable for quick construction Active CN218881744U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202223224183.4U CN218881744U (en) 2022-12-01 2022-12-01 Novel integrated bathroom of modularization suitable for quick construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202223224183.4U CN218881744U (en) 2022-12-01 2022-12-01 Novel integrated bathroom of modularization suitable for quick construction

Publications (1)

Publication Number Publication Date
CN218881744U true CN218881744U (en) 2023-04-18

Family

ID=85943900

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202223224183.4U Active CN218881744U (en) 2022-12-01 2022-12-01 Novel integrated bathroom of modularization suitable for quick construction

Country Status (1)

Country Link
CN (1) CN218881744U (en)

Similar Documents

Publication Publication Date Title
CN106013454B (en) Building and method of construction based on large spatial structure body and free-standing peripheral structure
JP3218530U (en) Central assembly steel structure
CN106869489A (en) Super High Core Walls Structure level and vertical synchronous construction top module system and construction method
CN218881744U (en) Novel integrated bathroom of modularization suitable for quick construction
CN201089977Y (en) Prefabricated steel construction house
CN101285324A (en) New framed building and construction procedure thereof
CN206859404U (en) A kind of connecting node applied to modularization steel building
CN109505225B (en) Safe and stable suspension bridge and construction process thereof
CN110725412A (en) Integrated house system with embedded steel structure
CN210918070U (en) Assembled frame leveling structure
CN216042867U (en) Modular container civilian accommodation
CN207739656U (en) A kind of hanging dry wall scene supporting apparatus in hole side
CN219732308U (en) Building module of modularization concatenation
CN105756323A (en) Civil building kitchen and toilet-based construction method for sunk suspended form mold
CN212026607U (en) Assembled steel structure house that can build additional
CN217734353U (en) Self-adaptive leveling overhead floor support
CN217679661U (en) Self-adaptive leveling overhead floor system
CN211572308U (en) Assembled modularization canopy
CN220133373U (en) Modular overhead bearing base layer
CN219622033U (en) I-steel rib steel plate composite shear wall
CN213359247U (en) Toilet overhead layer structure used in temporary building
CN115897849B (en) Ventilated solar energy Fu Zibao temperature outer wall system and construction method thereof
CN217517797U (en) Fully-assembled multi-layer bent frame building
CN217808502U (en) Lifting frame for lifting integrated structure
CN217232914U (en) Assembled integrated bathroom