CN210918070U - Assembled frame leveling structure - Google Patents
Assembled frame leveling structure Download PDFInfo
- Publication number
- CN210918070U CN210918070U CN201921415003.6U CN201921415003U CN210918070U CN 210918070 U CN210918070 U CN 210918070U CN 201921415003 U CN201921415003 U CN 201921415003U CN 210918070 U CN210918070 U CN 210918070U
- Authority
- CN
- China
- Prior art keywords
- frame
- leveling
- piece
- fixing
- connecting piece
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Floor Finish (AREA)
Abstract
本实用新型提供了一种装配式框架调平结构,其包括:调平框架,其设置于侧墙上;连接垫架,其设置于侧墙和地面的阴角位置,调平框架的底部与连接垫架的顶部相连接;固定连接件,其包括第一固定件和第一连接件,第一连接件设置于调平框架上,第一固定件穿过第一连接件并固定于侧墙内;固定连接件设置为两组,分别位于调平框架的上下两端;加强连接件,其包括第二固定件、第二连接件以及角件,角件分别连接第二固定件和第二连接件;调平框架和连接垫架均为方钢。本实用新型相较于现有技术具有以下优点:组件由工厂预制,在装修现场进行组装拼接即可,且组装便捷易拆卸,不仅节省装修材料,便于后期的维修,同时绿色环保、无污染。
The utility model provides an assembled frame leveling structure, which comprises: a leveling frame, which is arranged on a side wall; a connecting pad frame, which is arranged at an inner corner position of the side wall and the ground; The tops of the connection pads are connected; the fixed connecting piece includes a first fixing piece and a first connecting piece, the first connecting piece is arranged on the leveling frame, and the first fixing piece passes through the first connecting piece and is fixed to the side wall inside; the fixed connecting pieces are arranged in two groups, which are located at the upper and lower ends of the leveling frame respectively; the reinforcing connecting piece includes a second fixing piece, a second connecting piece and a corner piece, and the corner pieces are respectively connected with the second fixing piece and the second fixing piece. Connector; leveling frame and connecting pad are square steel. Compared with the prior art, the utility model has the following advantages: the components are prefabricated in the factory, and can be assembled and spliced at the decoration site, and the assembly is convenient and easy to disassemble, which not only saves decoration materials, but also facilitates later maintenance, and is environmentally friendly and pollution-free.
Description
技术领域technical field
本实用新型涉及一种框架调平结构,具体而言,涉及一种装配式框架调平结构。The utility model relates to a frame leveling structure, in particular to an assembled frame leveling structure.
背景技术Background technique
装配式装饰是近年新兴的一种装饰施工形式。装配式装饰顾名思义,即是将装饰所需要使用的各个部品部件在工厂内实现生产完成,然后运输到装饰现场进行组合安装,免去了传统的装饰现场对各部品部件的测量、切割等作业,施工更为简单方便,可以极大地提高装饰现场的施工效率,并且施工现场更为整洁和美观,不会产生过多的装饰材料垃圾,是一种更为绿色环保的装饰施工形式。Prefabricated decoration is an emerging form of decoration construction in recent years. As the name implies, prefabricated decoration is to complete the production of various parts and components required for decoration in the factory, and then transport them to the decoration site for combined installation, eliminating the need for the traditional decoration site to measure and cut each part. The construction is simpler and more convenient, which can greatly improve the construction efficiency of the decoration site, and the construction site is more tidy and beautiful, and will not generate too much decoration material waste, which is a more green and environmentally friendly decoration construction form.
随着建筑装饰行业的发展,室内装饰行业取得了显著的成绩,但装饰工艺并没有得到整体改善,依旧停留在传统工艺上。传统的室内装饰体系主要使用石膏板、密度板、涂料油漆等材料,并由工人现场加工安装。大多存在以下问题:With the development of the building decoration industry, the interior decoration industry has made remarkable achievements, but the decoration technology has not been improved as a whole, and it still stays on the traditional technology. The traditional interior decoration system mainly uses gypsum board, MDF, paint and other materials, and is processed and installed by workers on site. Most have the following problems:
一、存在较大的浪费问题;1. There is a large waste problem;
二、工期长,工艺繁琐,工作量大,施工废料多;Second, the construction period is long, the process is cumbersome, the workload is large, and there are many construction wastes;
三、很难进行后期的保养与维修,不能满足客户需求;3. It is difficult to carry out maintenance and repair in the later period, and it cannot meet the needs of customers;
四、与现代都市人倡导的讲求实用、环保、节能观念不符。Fourth, it is inconsistent with the concept of practicality, environmental protection and energy saving advocated by modern urbanites.
实用新型内容Utility model content
鉴于此,本实用新型提供了一种装配式框架调平结构,组件由工厂预制,在装修现场进行组装拼接即可,且组装便捷易拆卸,不仅节省装修材料,便于后期的维修,同时绿色环保、无污染。In view of this, the present utility model provides a prefabricated frame leveling structure, the components are prefabricated in the factory, and can be assembled and spliced at the decoration site, and the assembly is convenient and easy to disassemble, which not only saves decoration materials, facilitates later maintenance, and is environmentally friendly. , No pollution.
为此,本实用新型提供了一种装配式框架调平结构,其包括:To this end, the present utility model provides an assembled frame leveling structure, which includes:
调平框架,其设置于侧墙上;leveling frame, which is arranged on the side wall;
连接垫架,其设置于侧墙和地面的阴角位置,调平框架的底部与连接垫架的顶部相连接;The connection pad frame is arranged at the inner corner of the side wall and the ground, and the bottom of the leveling frame is connected with the top of the connection pad frame;
固定连接件,其包括第一固定件和第一连接件,第一连接件设置于调平框架上,第一固定件穿过第一连接件并固定于侧墙内;固定连接件设置为两组,分别位于调平框架的上下两端;The fixed connecting piece includes a first fixing piece and a first connecting piece, the first connecting piece is arranged on the leveling frame, the first fixing piece passes through the first connecting piece and is fixed in the side wall; groups, located at the upper and lower ends of the leveling frame;
加强连接件,其包括第二固定件、第二连接件以及角件,角件分别连接第二固定件和第二连接件;加强连接件设置为两组,分别位于调平框架的顶部和连接垫架的侧面;调平框架和连接垫架均为方钢。The reinforcing connecting piece includes a second fixing piece, a second connecting piece and a corner piece, and the corner pieces are respectively connected with the second fixing piece and the second connecting piece; the reinforcing connecting piece is arranged in two groups, which are located at the top of the leveling frame and connect with each other respectively. The side of the pad; the leveling frame and the connecting pad are square steel.
进一步地,上述第一固定件和第二固定件均为膨胀螺栓。Further, the first fixing member and the second fixing member are both expansion bolts.
进一步地,上述第一连接件为连接方架,第二连接件为螺栓。Further, the first connecting member is a connecting square frame, and the second connecting member is a bolt.
进一步地,上述连接方架包括调节板和设置于调节板四周的支撑架。Further, the above-mentioned connecting frame includes an adjustment plate and a support frame arranged around the adjustment plate.
进一步地,上述调节板上设置有固定孔,固定孔沿其四角设置。Further, the above-mentioned adjusting plate is provided with fixing holes, and the fixing holes are arranged along the four corners thereof.
进一步地,上述第一固定件与固定孔一一对应设置。Further, the first fixing member and the fixing hole are arranged in a one-to-one correspondence.
进一步地,上述连接垫架上设置有连接槽。Further, the connection pad is provided with a connection groove.
进一步地,上述连接槽的槽口设置有向内弯折的连接钩。Further, the notch of the above-mentioned connecting groove is provided with a connecting hook bent inward.
本实用新型所提供的一种装配式框架调平结构,主要包括调平框架、连接垫架、固定连接件和加强连接件,调平框架和侧墙固定,连接垫架设置于调平框架的底部,且分别连接调平框架和地面,调平框架通过固定连接件进行固定,在固定的同时,对调平框架进行调平,通过第一固定件进入侧墙的深度不同,达到调整调平框架的平面度;调整完毕,利用加强连接件对调平框架的顶部、连接垫架的底部进行加固连接,提高调平框架的整体强度和承载力,之后再调平框架上安装装饰墙板即可。The prefabricated frame leveling structure provided by the utility model mainly includes a leveling frame, a connecting pad frame, a fixed connecting piece and a reinforcing connecting piece. The bottom is connected to the leveling frame and the ground respectively. The leveling frame is fixed by the fixed connector. While fixing, the leveling frame is leveled. The depth of entering the side wall through the first fixing piece is different, so as to adjust the leveling frame. After the adjustment, the top of the leveling frame and the bottom of the connection pad frame are reinforced and connected with the reinforcing connectors to improve the overall strength and bearing capacity of the leveling frame, and then the decorative wall panels can be installed on the leveling frame.
安装时,将连接垫架和调平框架的底部连接,之后将调平框架通过固定连接件固定于侧墙上,最后通过加强连接件将调平框架和连接垫架再次进行加固,分别与侧墙和地面进行连接。During installation, connect the connecting pad and the bottom of the leveling frame, then fix the leveling frame on the side wall through the fixing connector, and finally reinforce the leveling frame and the connecting Connect the wall to the ground.
通过上述结构,使得本实用新型所提供的一种装配式框架调平结构相较于现有技术主要具有以下优点:Through the above structure, the prefabricated frame leveling structure provided by the present invention mainly has the following advantages compared with the prior art:
一、由于内部钢架结构,实现了工厂预制,现场直接进行拼装的干作业施工方法,整个施工过程简单,可在工厂将损耗降到最低;1. Due to the internal steel frame structure, the dry work construction method of factory prefabrication and direct assembly on site is realized. The whole construction process is simple, and the loss can be minimized in the factory;
二、解决了材料浪费、工艺繁琐,施工废料多的问题;2. Solve the problems of material waste, cumbersome craftsmanship and many construction wastes;
三、减少了墙面厚度,整体构造易拼装,易拆卸,可重复利用,便于后期的维修和保养;3. The thickness of the wall is reduced, the overall structure is easy to assemble, easy to disassemble, and can be reused, which is convenient for later repair and maintenance;
四、利用该框架调平结构,可直接将装饰墙板插装于框架内,不需要胶水、钉子等进行固定,免除了甲醛的释放及对型材本身的破坏,节约资源,减少了建筑承重,减少装修成本,实现绿色环保的装修理念。Fourth, using the frame leveling structure, the decorative wall panels can be directly inserted into the frame, without glue, nails, etc. for fixing, eliminating the release of formaldehyde and the damage to the profile itself, saving resources and reducing building load-bearing, Reduce decoration costs and realize the concept of green and environmentally friendly decoration.
附图说明Description of drawings
通过阅读下文优选实施方式的详细描述,各种其他的优点和益处对于本领域普通技术人员将变得清楚明了。附图仅用于示出优选实施方式的目的,而并不认为是对本实用新型的限制。而且在整个附图中,用相同的参考符号表示相同的部件。在附图中:Various other advantages and benefits will become apparent to those of ordinary skill in the art upon reading the following detailed description of the preferred embodiments. The accompanying drawings are only for the purpose of illustrating the preferred embodiments, and are not considered to be a limitation of the present invention. Also, the same components are denoted by the same reference numerals throughout the drawings. In the attached image:
图1为本实用新型实施例提供的一种装配式框架调平结构的结构示意图;1 is a schematic structural diagram of a prefabricated frame leveling structure provided by an embodiment of the present utility model;
图2为图1中A处的放大图;Fig. 2 is the enlarged view of A place in Fig. 1;
图3为图1中B处的放大图;Fig. 3 is the enlarged view at B in Fig. 1;
图4为本实用新型实施例提供的一种装配式框架调平结构中第一连接件的侧视图;4 is a side view of a first connector in an assembled frame leveling structure provided by an embodiment of the present invention;
图5为本实用新型实施例提供的一种装配式框架调平结构中第一连接件的主视图;5 is a front view of a first connector in an assembled frame leveling structure provided by an embodiment of the present invention;
图6为本实用新型实施例提供的一种装配式框架调平结构中连接垫架的结构示意图。6 is a schematic structural diagram of a connection pad in an assembled frame leveling structure provided by an embodiment of the present invention.
具体实施方式Detailed ways
下面将参照附图更详细地描述本公开的示例性实施例。虽然附图中显示了本公开的示例性实施例,然而应当理解,可以以各种形式实现本公开而不应被这里阐述的实施例所限制。相反,提供这些实施例是为了能够更透彻地理解本公开,并且能够将本公开的范围完整的传达给本领域的技术人员。Exemplary embodiments of the present disclosure will be described in more detail below with reference to the accompanying drawings. While exemplary embodiments of the present disclosure are shown in the drawings, it should be understood that the present disclosure may be embodied in various forms and should not be limited by the embodiments set forth herein. Rather, these embodiments are provided so that the present disclosure will be more thoroughly understood, and will fully convey the scope of the present disclosure to those skilled in the art.
实施例一:Example 1:
参见图1至图3,图中示出了本实用新型实施例一提供的一种装配式框架调平结构,包括:调平框架1,其设置于侧墙2上;连接垫架3,其设置于侧墙2和地面4的阴角位置,调平框架1的底部与连接垫架3的顶部相连接;固定连接件,其包括第一固定件51和第一连接件52,第一连接件52设置于调平框架1上,第一固定件51穿过第一连接件52并固定于侧墙2内;固定连接件设置为两组,分别位于调平框架1的上下两端;加强连接件,其包括第二固定件61、第二连接件62以及角件63,角件63分别连接第二固定件61和第二连接件62;加强连接件设置为两组,分别位于调平框架1的顶部和连接垫架3的侧面;调平框架1和连接垫架3均为方钢。其中,第一固定件51和第二固定件61均为膨胀螺栓;第一连接件52为连接方架,第二连接件62为螺栓。Referring to FIGS. 1 to 3 , a prefabricated frame leveling structure provided by
本实施例所提供的一种装配式框架调平结构,主要包括调平框架1、连接垫架3、固定连接件和加强连接件,调平框架1和侧墙2固定,连接垫架3设置于调平框架1的底部,且分别连接调平框架1和地面4,调平框架1通过固定连接件进行固定,在固定的同时,对调平框架1进行调平,通过第一固定件51进入侧墙2的深度不同,达到调整调平框架1的平面度;调整完毕,利用加强连接件对调平框架1的顶部、连接垫架3的底部进行加固连接,提高调平框架1的整体强度和承载力,之后再调平框架1上安装装饰墙板即可。A prefabricated frame leveling structure provided in this embodiment mainly includes a
安装时,将连接垫架3和调平框架1的底部连接,之后将调平框架1通过固定连接件固定于侧墙2上,最后通过加强连接件将调平框架1和连接垫架3再次进行加固,分别与侧墙2和地面4进行连接。During installation, connect the connecting
通过上述结构,使得本实用新型所提供的一种装配式框架调平结构相较于现有技术主要具有以下优点:Through the above structure, the prefabricated frame leveling structure provided by the present invention mainly has the following advantages compared with the prior art:
一、由于内部钢架结构,实现了工厂预制,现场直接进行拼装的干作业施工方法,整个施工过程简单,可在工厂将损耗降到最低;1. Due to the internal steel frame structure, the dry work construction method of factory prefabrication and direct assembly on site is realized. The whole construction process is simple, and the loss can be minimized in the factory;
二、解决了材料浪费、工艺繁琐,施工废料多的问题;2. Solve the problems of material waste, cumbersome craftsmanship and many construction wastes;
三、减少了墙面厚度,整体构造易拼装,易拆卸,可重复利用,便于后期的维修和保养;3. The thickness of the wall is reduced, the overall structure is easy to assemble, easy to disassemble, and can be reused, which is convenient for later repair and maintenance;
四、利用该框架调平结构,可直接将装饰墙板插装于框架内,不需要胶水、钉子等进行固定,免除了甲醛的释放及对型材本身的破坏,节约资源,减少了建筑承重,减少装修成本,实现绿色环保的装修理念。Fourth, using the frame leveling structure, the decorative wall panels can be directly inserted into the frame, without glue, nails, etc. for fixing, eliminating the release of formaldehyde and the damage to the profile itself, saving resources and reducing building load-bearing, Reduce decoration costs and realize the concept of green and environmentally friendly decoration.
实施例二:Embodiment 2:
参见图4至图5,图中示出了本实用新型实施例二提供的一种装配式框架调平结构,本实施例在上述各实施例的基础上还进一步地做出了以下作为改进的技术方案:连接方架包括调节板521和设置于调节板521四周的支撑架522;调节板521上设置有固定孔523,固定孔523沿其四角设置;第一固定件51与固定孔523一一对应设置。通过上述结构的设置,由于连接方架设置于调平框架1上,调节板521的四角设置有固定孔523,类似法兰盘的结构,第一固定件51,即膨胀螺栓与固定孔523个数对应,通过改变调节板521四角的位置,来改变调平框架1的平面度,不仅调平方便,而且提高施工效率。Referring to FIGS. 4 to 5 , the figures show a prefabricated frame leveling structure provided by the second embodiment of the present invention. This embodiment further makes the following improvements on the basis of the above-mentioned embodiments. Technical scheme: the connecting square frame includes an
实施例三:Embodiment three:
参见图1、图6,图中示出了本实用新型实施例三提供的一种装配式框架调平结构,本实施例在上述各实施例的基础上还进一步地做出了以下作为改进的技术方案:连接垫架3上设置有连接槽31;连接槽31的槽口设置有向内弯折的连接钩32。通过上述结构的设置,能够提高连接垫架3和调平框架1、地面之间的连接力度,提高承重能力和安装效果。Referring to FIG. 1 and FIG. 6 , a prefabricated frame leveling structure provided by
显然,本领域的技术人员可以对本实用新型进行各种改动和变型而不脱离本实用新型的精神和范围。这样,倘若本实用新型的这些修改和变型属于本实用新型权利要求及其等同技术的范围之内,则本实用新型也意图包含这些改动和变型在内。Obviously, those skilled in the art can make various changes and modifications to the present invention without departing from the spirit and scope of the present invention. Thus, if these modifications and variations of the present utility model fall within the scope of the claims of the present utility model and their equivalents, the present utility model is also intended to include these modifications and variations.
Claims (8)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201921415003.6U CN210918070U (en) | 2019-08-28 | 2019-08-28 | Assembled frame leveling structure |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201921415003.6U CN210918070U (en) | 2019-08-28 | 2019-08-28 | Assembled frame leveling structure |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN210918070U true CN210918070U (en) | 2020-07-03 |
Family
ID=71361854
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201921415003.6U Expired - Fee Related CN210918070U (en) | 2019-08-28 | 2019-08-28 | Assembled frame leveling structure |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN210918070U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110453873A (en) * | 2019-08-28 | 2019-11-15 | 金螳螂精装科技(苏州)有限公司 | An assembled frame leveling structure |
-
2019
- 2019-08-28 CN CN201921415003.6U patent/CN210918070U/en not_active Expired - Fee Related
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110453873A (en) * | 2019-08-28 | 2019-11-15 | 金螳螂精装科技(苏州)有限公司 | An assembled frame leveling structure |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN110453825B (en) | Installation structure of assembled frame partition wall | |
| CN207260319U (en) | Integrated module assembled arthitecutral structure | |
| CN207749908U (en) | A kind of enclosure wall of full assembly lightweight steel construction | |
| CN210918070U (en) | Assembled frame leveling structure | |
| CN210658835U (en) | Mounting structure of assembled frame partition wall | |
| CN105155836A (en) | Aluminum alloy formwork for buildings and method for applying aluminum alloy formwork | |
| CN204590326U (en) | A kind of wallboard erects dress syndeton and uses the house of this structure | |
| CN216041945U (en) | Detachable design mounting structure of assembled composite light wallboard | |
| CN107989224B (en) | Connecting mechanism for wall corner of assembled house and construction process of connecting mechanism | |
| CN207332369U (en) | A kind of assembled integral vacuum toilet | |
| CN201738538U (en) | Wall connecting piece of plug-in type low-carbon heat-insulation energy-saving plate | |
| CN210947527U (en) | A prefabricated frame wall mounting structure | |
| CN205604546U (en) | Link plate system is gone along with sb. to guard him to iteration environmental protection assembled outer wall | |
| CN108360785A (en) | Concealed frame type wall brick system and its construction method in a kind of assembled room | |
| CN210659086U (en) | Assembled floor | |
| CN207513060U (en) | A kind of cylinder stone material dry suspending wall construction | |
| CN207260501U (en) | A kind of L-type thermal insulating composite panel installs supporting item | |
| CN110359655A (en) | A stone dry-hanging modular installation structure | |
| CN110453873A (en) | An assembled frame leveling structure | |
| CN210947287U (en) | Installation structure of a prefabricated frame partition wall | |
| CN212656419U (en) | Novel peripheral revetment structure of assembled | |
| CN214462574U (en) | Step-type low-plastic concrete formwork that can be quickly assembled and disassembled | |
| CN211369170U (en) | Mounting structure of assembled frame | |
| CN111535581A (en) | Convenient and fast mounting and dismounting type combined prefabricated formwork applicable to building floor lowering position | |
| CN110629958A (en) | A prefabricated frame wall mounting structure |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200703 |
