CN217808502U - Lifting frame for lifting integrated structure - Google Patents
Lifting frame for lifting integrated structure Download PDFInfo
- Publication number
- CN217808502U CN217808502U CN202221300321.XU CN202221300321U CN217808502U CN 217808502 U CN217808502 U CN 217808502U CN 202221300321 U CN202221300321 U CN 202221300321U CN 217808502 U CN217808502 U CN 217808502U
- Authority
- CN
- China
- Prior art keywords
- frame
- hoisting frame
- lifting
- steelframe
- fixed mounting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model belongs to building construction field especially a hoisting frame for integral structure promotes, including the unit hoisting frame, the unit hoisting frame includes hoisting frame and lower hoisting frame, go up the hoisting frame and include two parallel arrangement and go up the steelframe, two equal fixed mounting in bottom of going up the steelframe have two perpendicular framves, and two top one side fixed mounting that go up the steelframe have same mounting bracket, the top fixed mounting of mounting bracket has the pneumatic cylinder, and the output of pneumatic cylinder is connected with the steel cable, and the bottom of steel cable extends to the below of supreme hoisting frame to be connected with lower hoisting frame, the hoisting frame includes two parallel arrangement lower steelframe down. The utility model is suitable for an integrated structure changeable structure edge, nimble lifting point that sets up has reached the effect of perfect promotion, simultaneously, is applicable to and not only is applicable to the integrated structure and promotes, also can be used to other structures or single component, covers the society trade.
Description
Technical Field
The utility model relates to a construction technical field especially relates to a hoisting frame for integrated configuration promotes.
Background
With the continuous development of the science and technology level of human society and economy, more and more high and large space buildings are presented to the public, and the buildings not only are ambitious and magnificent, but also have strong modern feelings and are often used as city business cards. High big space building adopts the form of large-span steel construction usually, adopts traditional high altitude to piece together scattered, and not only component installation and welded engineering volume are huge, and quality and safety are difficult to guarantee moreover. Therefore, the construction mode of the integral lifting of the structural ground assembly gradually enters the visual field of people.
The development of the process technology in recent years is provided on the basis of a pure integral lifting steel structure construction method, an electric pipeline and other building structures can be simultaneously installed in the process of assembling a ground steel structure, and after all the installation is completed, the comprehensive structure is integrally and comprehensively lifted, so that the purposes of improving the forming quality, shortening the construction period and reducing the safety risk are achieved.
Because the integrated structure is more complicated than a pure steel structure, the lifting of the group tower of the existing main line or the design of the lug plate of the lifting point does not meet the lifting requirement of the integrated structure, the integrated structure usually comprises a multi-professional structure, such as a concrete structure, a steel structure, a hydroelectric air pipe line structure, a curtain wall structure, a metal floor structure and the like, the lifting point of the main line is generally arranged on the steel structure in the form of the lug plate, and the complex shape finding of the integrated structure and the huge self weight can cause the failure of the lifting mode to a great extent; to this situation, this patent proposes a general and convenient hoisting frame.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the defects existing in the prior art and providing a lifting frame for lifting an integrated structure.
In order to realize the purpose, the utility model adopts the following technical scheme:
the utility model provides a hoisting frame for integral structure promotes, includes the unit hoisting frame, the unit hoisting frame includes hoisting frame and lower hoisting frame, go up the hoisting frame and include two parallel arrangement and go up the steelframe, two equal fixed mounting in bottom of going up the steelframe have two to erect the frame, two top one side fixed mounting that go up the steelframe have same mounting bracket, the top fixed mounting of mounting bracket has the pneumatic cylinder, and the quantity of pneumatic cylinder sets up according to actual requirement, sets up the pneumatic cylinder more than two best, and the output of pneumatic cylinder is connected with the steel cable, and the bottom of steel cable extends to the below of supreme hoisting frame to be connected with lower hoisting frame, the hoisting frame includes two parallel arrangement down the steelframe down, and two fixed mounting have same frame on top one side of steelframe down, the bottom fixed mounting of steel cable is on the top of steelframe down.
Preferably, the same upper reinforcing frame is fixedly installed between the vertical frame and the upper steel frame, and the upper reinforcing frame is obliquely arranged.
Preferably, the same lower reinforcing frame is fixedly installed between the lower steel frame and the frame, and the lower reinforcing frame is obliquely arranged.
Preferably, the upper steel frame and the mounting frame are both provided with through holes, and the steel rope penetrates through the through holes.
Preferably, all fixed mounting has anchor clamps and gasket structure on the inner wall all around of frame, and the component that will promote is fixed through anchor clamps and gasket structure.
The utility model discloses in, a hoisting frame for integral structure promotes is applicable to the changeable structure edge of integral structure, and nimble lifting point that sets up has reached perfect effect that promotes, simultaneously, is applicable to and not only is applicable to the integral structure and promotes, also can be used to other structures or single component, covers the whole trade of society.
Drawings
Fig. 1 is a schematic structural view of a lifting frame for lifting an integrated structure according to the present invention;
fig. 2 is a schematic view of a frame structure of a lifting frame for lifting an integrated structure.
In the figure: the steel frame is gone up to 1, 2 erect the frame, 3 go up the strengthening frame, 4 mounting brackets, 5 pneumatic cylinders, 6 steel cables, 7 lower steelframes, 8 lower strengthening frames, 9 frames, 10 anchor clamps and gasket structures.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1-2, a hoisting frame for integrated structure lifting, including the unit hoisting frame, the unit hoisting frame includes hoisting frame and lower hoisting frame, do benefit to installation and dismantlement, it includes two parallel arrangement to go up steelframe 1 to go up the hoisting frame, two equal fixed mounting in bottom of going up steelframe 1 have two perpendicular framves 2, two top one side fixed mounting of going up steelframe 1 have same mounting bracket 4, the top fixed mounting of mounting bracket 4 has pneumatic cylinder 5, the quantity of pneumatic cylinder 5 sets up according to actual requirement, preferably set up more than two pneumatic cylinders 5, the output of pneumatic cylinder 5 is connected with steel cable 6, and the bottom of steel cable 6 extends to the below of hoisting frame, and be connected with lower hoisting frame, lower hoisting frame includes two parallel arrangement lower steelframe 7, fixed mounting has same frame 9 on top one side of two lower steelframe 7, the shape phase-match of frame 9 according to the component shape that the actual need promoted, the bottom fixed mounting of steel cable 6 is on the top of lower steelframe 7, according to the integrated comprehensive hoisting steel structure distribution, set up a plurality of unit hoisting frames in a flexible way, constitute the whole hoisting frame, and install the computer synchronous control system, make the hoisting frame possess the wrong leveling of the automatic lifting in the lifting process, the alarm of the lifting in the same step, the alarm.
The utility model discloses in, erect that fixed mounting has same last strengthening frame 3 between frame 2 and the last steel frame 1, and go up the 3 slope settings of strengthening frame.
The utility model discloses in, fixed mounting has same lower reinforcement 8 between lower steelframe 7 and the frame 9, and 8 slopes to set up of lower reinforcement.
The utility model discloses in, go up and all seted up the through-hole on steelframe 1 and the mounting bracket 4, and steel cable 6 runs through the through-hole.
The utility model discloses in, equal fixed mounting has anchor clamps and gasket construction 10 on the inner wall all around of frame 9, and the component that will promote through anchor clamps and gasket construction 10 is fixed.
The utility model discloses implement the step as follows:
1. calculating the total load according to the weight of the structure to be lifted and the characteristics of the surrounding building environment, and arranging the integral lifting frames, particularly the number and the positions of the unit lifting frames;
2. determining the lifting force required to be distributed by the unit lifting frames and each resistance required by the unit lifting frames according to the calculation structure;
3. the quantity and the specification of hydraulic pump sources are configured according to the lifting force, and the resistance force required by each area of the upper structure of the lifting frame of the unit is calculated;
4. setting the number and the positions of the gaskets and the clamps arranged on the shapes and the inner edges of the penetrating openings of the lifting frames of the units according to the shapes of the penetrating objects, and calculating the structural resistance required by each area of the lower structures of the lifting frames of the units;
5. selecting proper section steel and a steel rope according to various resistance forces required by the unit hoisting frame and resistance forces required by various areas of the upper structure and the lower structure of the unit hoisting frame, and assembling the steel structure of the combined hoisting frame, the hydraulic pump source and the steel rope;
6. configuring a computer synchronous control system for the integral hoisting frame;
7. and (5) field installation and test are carried out, and the construction operation is carried out after all the components are finished.
The above, only be the embodiment of the preferred of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, which are designed to be replaced or changed equally, all should be covered within the protection scope of the present invention.
Claims (5)
1. The utility model provides a hoisting frame for integral structure promotes, a serial communication port, including the unit hoisting frame, the unit hoisting frame includes hoisting frame and lower hoisting frame, go up the hoisting frame and include two parallel arrangement and go up steelframe (1), two equal fixed mounting in bottom of going up steelframe (1) have two to erect frame (2), two top one side fixed mounting that go up steelframe (1) have same mounting bracket (4), the top fixed mounting of mounting bracket (4) has pneumatic cylinder (5), and the output of pneumatic cylinder (5) is connected with steel cable (6), and the bottom of steel cable (6) extends the below of supreme hoisting frame to be connected with lower hoisting frame, the hoisting frame includes two parallel arrangement down steelframe (7), and fixed mounting has same frame (9) on top one side of two lower steelframe (7), the bottom fixed mounting of steel cable (6) is under on the top of steelframe (7).
2. A lifting frame for lifting of integrated structure according to claim 1, characterized in that the same upper reinforcing frame (3) is fixedly installed between the vertical frame (2) and the upper steel frame (1), and the upper reinforcing frame (3) is obliquely arranged.
3. A lifting frame for lifting of integrated structures according to claim 1, characterized in that the same lower reinforcement frame (8) is fixedly mounted between the lower steel frame (7) and the frame (9), and the lower reinforcement frame (8) is arranged obliquely.
4. A lifting frame for lifting integrated structures according to claim 1, characterized in that the upper steel frame (1) and the mounting frame (4) are provided with through holes, and the steel cable (6) passes through the through holes.
5. A lifting frame for lifting of integrated structures according to claim 1, characterized in that the frame (9) is fixed with clamp and gasket structures (10) on all around inner walls.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202221300321.XU CN217808502U (en) | 2022-05-27 | 2022-05-27 | Lifting frame for lifting integrated structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202221300321.XU CN217808502U (en) | 2022-05-27 | 2022-05-27 | Lifting frame for lifting integrated structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN217808502U true CN217808502U (en) | 2022-11-15 |
Family
ID=83986335
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202221300321.XU Active CN217808502U (en) | 2022-05-27 | 2022-05-27 | Lifting frame for lifting integrated structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN217808502U (en) |
-
2022
- 2022-05-27 CN CN202221300321.XU patent/CN217808502U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101672102B (en) | Steel structural overhead ceiling construction platform | |
CN106869368A (en) | A kind of assembling type steel structure external hanging type wallboard base-supporting attachment structure | |
CN111395532B (en) | Installation and construction method for large-span half-opening elliptical spherical reticulated shell | |
CN109138452A (en) | Heavy construction bolt sphere steel pipe rack entirety fast lifting construction technology | |
CN106812328A (en) | The overall two step lifting construction methods of a string prestressed steel structure rack with hanging layer | |
CN109208915A (en) | A kind of cooling tower systems and steel vestibule construction method for lifting whole | |
CN104878867A (en) | Integrated structure of ceiling keel and double-layer construction platform and manufacturing method thereof | |
CN204715722U (en) | A kind of all steel attachment type raise scaffold | |
CN217808502U (en) | Lifting frame for lifting integrated structure | |
CN102888894A (en) | Structure and construction method for steel frame building with inner cylinder, outer frame and shape like Chinese character 'hui' | |
CN204728554U (en) | Integral structure of ceiling keel and double-layer construction platform | |
CN211200882U (en) | Steel construction conversion layer furred ceiling | |
CN208518234U (en) | A kind of prefabricated step plate and steel structure connection construct | |
CN114837483B (en) | High-low span portal steel frame building structure and construction process thereof | |
CN208310204U (en) | Base for supporting and arranging elevator shaft coupling beam template | |
CN209837287U (en) | Steel beam and steel plate shear wall, otic placode, angle steel stud welding connection structure | |
CN108412101B (en) | Steel structure integrated floor slab and construction method thereof | |
CN106764075A (en) | For the shaped steel Two bors d's oeuveres combined bracket that electrical and mechanical comprehensive pipeline is installed | |
CN218117146U (en) | Assembled building outer wall protection frame | |
CN216109627U (en) | External hanging operation platform for patio area of outer vertical surface of fabricated building | |
CN214399661U (en) | Supporting structure for secondary jacking of large-tonnage synchronous jacking system | |
CN213597264U (en) | Steel construction assembled wallboard | |
CN208473335U (en) | A kind of building synchronous jacking device | |
CN210659366U (en) | Old building outer wall reinforced structure | |
CN213143566U (en) | Walkway ceiling conversion layer structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |