CN105756323A - Civil building kitchen and toilet-based construction method for sunk suspended form mold - Google Patents

Civil building kitchen and toilet-based construction method for sunk suspended form mold Download PDF

Info

Publication number
CN105756323A
CN105756323A CN201610132157.9A CN201610132157A CN105756323A CN 105756323 A CN105756323 A CN 105756323A CN 201610132157 A CN201610132157 A CN 201610132157A CN 105756323 A CN105756323 A CN 105756323A
Authority
CN
China
Prior art keywords
mould
mold
construction method
toilet
kitchen
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610132157.9A
Other languages
Chinese (zh)
Inventor
李蓉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC5 Group Corp Ltd
Original Assignee
China MCC5 Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC5 Group Corp Ltd filed Critical China MCC5 Group Corp Ltd
Priority to CN201610132157.9A priority Critical patent/CN105756323A/en
Publication of CN105756323A publication Critical patent/CN105756323A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F15/00Flooring
    • E04F15/12Flooring or floor layers made of masses in situ, e.g. seamless magnesite floors, terrazzo gypsum floors
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F21/00Implements for finishing work on buildings
    • E04F21/02Implements for finishing work on buildings for applying plasticised masses to surfaces, e.g. plastering walls
    • E04F21/04Patterns or templates; Jointing rulers
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F21/00Implements for finishing work on buildings
    • E04F21/20Implements for finishing work on buildings for laying flooring
    • E04F21/24Implements for finishing work on buildings for laying flooring of masses made in situ, e.g. smoothing tools

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Foundations (AREA)

Abstract

The invention discloses a civil building kitchen and toilet-based construction method for a sunk suspended form mold, which aims at solving the problems that ground construction for kitchens and toilets of multilayer and high-rise civil buildings is troublesome to support, the stability is poor, the mold is repeatedly used and the turnover number is small in the prior art. The civil building kitchen and toilet-based construction method for the sunk suspended form mold comprises the following steps: (1) fabricating the modularized suspended form mold by a rectangular steel tube; (2) prefabricating a base for a mortar mold; (3) installing the sunk suspended form mold; (4) casting concrete; and (5) dismantling the suspended form mold. The civil building kitchen and toilet-based construction method is simple in structure and convenient to implement; and the consumption of the template material for kitchens and toilets and the construction cost are significantly reduced.

Description

The construction method of mould mould is hung based on the sunk type of civil buildings kitchen and toilet
Technical field
The present invention relates to the technical field of construction of a kind of civil buildings kitchen and toilet, specifically, relate to a kind of sunk type based on civil buildings kitchen and toilet and hang the construction method of mould mould.
Background technology
Multilamellar, the kitchen of high-rise civil building, accomodation ground, be desirable that its ground is than other house earth surface more than sinking 50mm, to install when this position concrete construction and hang mould.In prior art, conventional construction method is: adopting plank sheathing thick for δ=15-18mm to hang mould, the program exists following defect: installing trouble, steadiness is poor, reuses turnover number few.
Summary of the invention
It is an object of the invention to overcome drawbacks described above, it is provided that the construction method of mould mould is hung in a kind of simple in construction, realization easily based on the sunk type of civil buildings kitchen and toilet.
To achieve these goals, the present invention is by the following technical solutions:
A kind of sunk type based on civil buildings kitchen and toilet hangs the construction method of mould mould, comprises the following steps:
(1) rectangular steel pipe is adopted to make the modular step hanging mould mould;
(2) step of pre-cast concrete mortar mold base;
(3) sunk type hangs the step that mould mould is installed;
(4) concrete step is poured into a mould;
(5) step of mould mould form removal is hung.
Further, the rectangular steel pipe hanging mould mould in described step (1) is with bolts.
Further, in described step (2), the dimensions of the length, width and height of mold for cement mortar base is as follows: 50mm × 80mm × slab thickness.
Further, the concrete grammar of described step (3) is as follows:
(31) multiple mold for cement mortar bases are placed on template corresponding position, building according to spacing 1m-1.5m;
(32) mould mould will be hung to be arranged on mold for cement mortar base;
(33) according to mold for cement mortar base, the position in length and breadth hanging mould mould is corrected;
(34) fixing mould mould is hung.
Further, in described step (5), reach on energy after the intensity of people at the concrete strength built, just carry out form removal to hanging mould mould.
Compared with prior art, the method have the advantages that
(1) manufactured size precision of the present invention height, mould adopts light-walled rectangular pipe, and it is lightweight, makes to be connected with, and connects simplicity, use, installation, convenient disassembly.
(2) present invention adopts ad hoc mold for cement mortar base, controls mould setting height(from bottom) by mold for cement mortar base, controls plane position in length and breadth by the position line in length and breadth, and the accurate precision of installation site is high, is positioned on and firmly unshifts.
(3) present invention adopts rectangular steel pipe to make and modular hangs mould mould, and utilization rate height not only reused by this mould, but also can be new die in other project redjustment and modification, again reuses, significantly reduces kitchen and toilet mould material consumption and construction cost.
Accompanying drawing explanation
Fig. 1 is the construction schematic diagram of the present invention.
In accompanying drawing, the title corresponding to accompanying drawing labelling is as follows: 1-rectangular steel pipe, 2-mold for cement mortar base.
Detailed description of the invention
Below in conjunction with drawings and Examples, the invention will be further described, and embodiments of the present invention include but not limited to the following example.
Embodiment
The construction of civil buildings kitchen and toilet, in traditional construction method, is all adopt plank sheathing to hang mould, inconvenience of not only constructing, and poor stability, reuses that number of times is few, construction cost is high.In order to solve this technical problem, as it is shown in figure 1, present embodiments provide a kind of sunk type based on civil buildings kitchen and toilet to hang the construction method of mould mould, the method adopts light-walled rectangular pipe, is made as and hangs mould dedicated templates mould.Its peace tears that simple, quick, position is fixing accurately to be reused open, also can use in the repacking of other project, reduce kitchen and toilet significantly and hang template cost.This method adopts modular technology, use light-walled rectangular pipe to make and hang template mold, between rectangular steel pipe with bolts, it is achieved in the quick, convenient of mould installing/dismounting, simultaneously, number of times reused by mould to be significantly larger than plank sheathing, has not only saved resource, and has advantageously reduced construction cost.
So that the present invention is had apparent understanding and understanding by those skilled in the art, below in conjunction with illustrating:
This method mainly includes following steps:
One, rectangular steel pipe is adopted to make the modular step hanging mould mould
The making of mould adopts modular technology, uses light-walled rectangular pipe to make and hangs template mold, with bolts between rectangular steel pipe;Specifically, when practice of construction, the geomery according to kitchen, toilet, use 50 × more than 80mm rectangular steel pipe processing and fabricating kitchen, toilet hang module die, the rectangular steel pipe of mould connect use M8 × 70mm with bolt.
Two, the step of pre-cast concrete mortar mold base
According to the prefabricated cement special mortar base of the slab thickness of kitchen guarding, it is of a size of 50mm × 80mm × slab thickness.Mould is placed on prefabricated mold for cement mortar base, reaches and control to hang template mold requirement for height.
Three, sunk type hangs the step that mould mould is installed
First pre-cast concrete mortar base spacing is about 1m-1.5m and is placed on template corresponding position, building, the rectangular steel pipe hanging mould mould is assembled one by one, the mould mould that hangs assembled is arranged on mold for cement mortar base, carry out position correction in length and breadth to hanging mould mould, mould mould will be hung with φ 1-2mm iron wire spacing 1-2m and be fixed in kitchen and toilet bottom of the building template.Wherein, hang the position correction in length and breadth of mould mould, it may be achieved the plan-position of mould controls, according to the position line in length and breadth put on floor, beam bottom mother plate, be directed at the nations such as position line iron wire and prick on floor, beam bottom board, it is ensured that its plan-position unshifts.
Four, concrete step is poured into a mould
Conventionally concreting method carries out building, and in the art, belongs to routine techniques, and therefore not to repeat here.
Five, the step of mould mould form removal is hung
Reach on energy after the intensity of people at the concrete strength built, just carry out form removal to hanging mould mould, during form removal, the rectangular steel pipe in mould is removed one by one;After form removal, mould is cleared up, treat that construction next time repeats and use again.
According to above-described embodiment, the present invention just can be realized well.What deserves to be explained is; under premise based on above-mentioned design principle; for solving same technical problem; even if some making on architecture basics disclosed in this invention are without substantial change or polishing; the essence of the technical scheme adopted is still the same with the present invention, therefore it should also be as in protection scope of the present invention.

Claims (5)

1. the sunk type based on civil buildings kitchen and toilet hangs the construction method of mould mould, it is characterised in that comprise the following steps:
(1) rectangular steel pipe is adopted to make the modular step hanging mould mould;
(2) step of pre-cast concrete mortar mold base;
(3) sunk type hangs the step that mould mould is installed;
(4) concrete step is poured into a mould;
(5) step of mould mould form removal is hung.
2. the sunk type based on civil buildings kitchen and toilet according to claim 1 hangs the construction method of mould mould, it is characterised in that the rectangular steel pipe hanging mould mould in described step (1) is with bolts.
3. the sunk type based on civil buildings kitchen and toilet according to claim 1 hangs the construction method of mould mould, it is characterised in that in described step (2), the dimensions of the length, width and height of mold for cement mortar base is as follows: 50mm × 80mm × slab thickness.
4. the sunk type based on civil buildings kitchen and toilet according to claim 1 hangs the construction method of mould mould, it is characterised in that the concrete grammar of described step (3) is as follows:
(31) multiple mold for cement mortar bases are placed on template corresponding position, building according to spacing 1m-1.5m;
(32) mould mould will be hung to be arranged on mold for cement mortar base;
(33) according to mold for cement mortar base, the position in length and breadth hanging mould mould is corrected;
(34) fixing mould mould is hung.
5. the sunk type based on civil buildings kitchen and toilet according to claim 1 hangs the construction method of mould mould, it is characterised in that in described step (5), reaches on energy after the intensity of people at the concrete strength built, and just carries out form removal to hanging mould mould.
CN201610132157.9A 2016-03-09 2016-03-09 Civil building kitchen and toilet-based construction method for sunk suspended form mold Pending CN105756323A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610132157.9A CN105756323A (en) 2016-03-09 2016-03-09 Civil building kitchen and toilet-based construction method for sunk suspended form mold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610132157.9A CN105756323A (en) 2016-03-09 2016-03-09 Civil building kitchen and toilet-based construction method for sunk suspended form mold

Publications (1)

Publication Number Publication Date
CN105756323A true CN105756323A (en) 2016-07-13

Family

ID=56332932

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610132157.9A Pending CN105756323A (en) 2016-03-09 2016-03-09 Civil building kitchen and toilet-based construction method for sunk suspended form mold

Country Status (1)

Country Link
CN (1) CN105756323A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107891510A (en) * 2017-12-11 2018-04-10 安徽海龙建筑工业有限公司 A kind of split type prefabricated components toilet mould and its into mold technique
CN113027123A (en) * 2021-03-18 2021-06-25 山西四建集团有限公司 Suspended formwork construction method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001012077A (en) * 1999-06-28 2001-01-16 Tokuyuki Araki Form for staircase construction
CN102383593A (en) * 2011-08-29 2012-03-21 浙江城建建设集团有限公司 Support formwork device and construction method for one-step formed flange concrete in kitchens and toilets
CN202370179U (en) * 2011-12-29 2012-08-08 中建七局第三建筑有限公司 Waterproof cushion block for waterproof floor lifting mould support
CN202882415U (en) * 2012-11-12 2013-04-17 江苏省苏中建设集团股份有限公司 Kitchen and toilet drop plate template
CN203394030U (en) * 2013-07-23 2014-01-15 中建三局第一建设工程有限责任公司 Setting steel die for caisson hanging dies of bathrooms of building structures
CN205063333U (en) * 2015-10-13 2016-03-02 中国建筑第五工程局有限公司 Modular bathroom falls board and hangs mould device

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001012077A (en) * 1999-06-28 2001-01-16 Tokuyuki Araki Form for staircase construction
CN102383593A (en) * 2011-08-29 2012-03-21 浙江城建建设集团有限公司 Support formwork device and construction method for one-step formed flange concrete in kitchens and toilets
CN202370179U (en) * 2011-12-29 2012-08-08 中建七局第三建筑有限公司 Waterproof cushion block for waterproof floor lifting mould support
CN202882415U (en) * 2012-11-12 2013-04-17 江苏省苏中建设集团股份有限公司 Kitchen and toilet drop plate template
CN203394030U (en) * 2013-07-23 2014-01-15 中建三局第一建设工程有限责任公司 Setting steel die for caisson hanging dies of bathrooms of building structures
CN205063333U (en) * 2015-10-13 2016-03-02 中国建筑第五工程局有限公司 Modular bathroom falls board and hangs mould device

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
陈国清: "《铁路工程施工质量通病防治手册》", 30 April 1997 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107891510A (en) * 2017-12-11 2018-04-10 安徽海龙建筑工业有限公司 A kind of split type prefabricated components toilet mould and its into mold technique
CN113027123A (en) * 2021-03-18 2021-06-25 山西四建集团有限公司 Suspended formwork construction method

Similar Documents

Publication Publication Date Title
CN104631512B (en) Hang modulus method after-pouring band beam-slab construction method
CN201217898Y (en) Concrete prefabricated stairs
CN107035064B (en) Assembled prefabricated outer wall plate structure and construction method
CN104790676A (en) Rapid leveling and alignment device and method for installation of prefabricated wallboards
EP3670774A1 (en) Prefabricated bathroom and methods for constructing and installing the same
CN204126048U (en) Bracket steel bar concrete shear force wall connecting pin contact assembled architecture
CN104131704A (en) Steel pipe column concrete lateral pouring method and steel pipe column structure used in method
CN102535495B (en) U-shaped groove base for prefabricated building and construction method thereof
CN107476583A (en) A kind of concrete assembled building builds construction method
CN111734018A (en) Formwork structure, disassembly-free mold and concrete wall construction method
CN108708452B (en) U-shaped integral prefabricated bay window component, assembled bay window node structure and construction method thereof
CN104895221B (en) Assembled shaped steel confined concrete shear wall structure
CN105756323A (en) Civil building kitchen and toilet-based construction method for sunk suspended form mold
CN212224168U (en) Double-sided superposed flow guide wall
CN204753834U (en) Partition plate of scissors stair and connection structure of floor roof beam
CN101886470B (en) Construction method of exposed concrete ribbed beams
CN108204131A (en) A kind of prefabricated partition wall construction method
CN203834809U (en) Steel pipe column structure for steel pipe column concrete side pouring method
CN103334492A (en) Prefabricated assembled type framework structure
CN203361332U (en) Prefabricated assembly type frame structure
CN216075217U (en) Accurate pre-buried device of complicated basic column base bolt of steel construction
CN104047381A (en) Assembly integrated type lightly reinforced concrete shear wall structure
CN210685110U (en) Assembled novel bidirectional ribbed profiled steel sheet composite floor
CN205476453U (en) Mould mould is hung to formula of sinking between civil buildings kitchen guarding
CN109296111B (en) Large double-sided laminated wallboard node structure with integral convex window and construction method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20160713

RJ01 Rejection of invention patent application after publication