CN207739656U - A kind of hanging dry wall scene supporting apparatus in hole side - Google Patents
A kind of hanging dry wall scene supporting apparatus in hole side Download PDFInfo
- Publication number
- CN207739656U CN207739656U CN201820055803.0U CN201820055803U CN207739656U CN 207739656 U CN207739656 U CN 207739656U CN 201820055803 U CN201820055803 U CN 201820055803U CN 207739656 U CN207739656 U CN 207739656U
- Authority
- CN
- China
- Prior art keywords
- dry wall
- hanging
- hanging dry
- fitting
- rod piece
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000009434 installation Methods 0.000 abstract description 9
- 238000000034 method Methods 0.000 abstract description 6
- 230000009286 beneficial effect Effects 0.000 abstract description 2
- 238000010276 construction Methods 0.000 description 7
- 238000012937 correction Methods 0.000 description 3
- 238000007689 inspection Methods 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 2
- 238000013461 design Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000011017 operating method Methods 0.000 description 1
- 238000009417 prefabrication Methods 0.000 description 1
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model is related to a kind of hanging dry wall scene supporting apparatus in hole side, belong to building field.It includes hanging dry wall, non-hanging dry wall, parallel support rod piece, interim diagonal brace rod piece, floor, the temporary support built-in fitting on hanging dry wall, the temporary support built-in fitting on non-hanging dry wall, the temporary support built-in fitting in floor plates, hanging dry wall and non-hanging dry wall are arranged in parallel, the hanging dry wall of parallel support rod piece vertical connection and non-hanging dry wall, interim diagonal brace rod piece connects non-hanging dry wall and floor, and the temporary support built-in fitting in floor plates is arranged on floor.After adopting the above technical scheme, the utility model has the beneficial effect that:Its operability is strong, relative to traditional method, is only slightly adjusted to the setting of support fulcrum and working procedure, by way of " borrowing power ", the installation for realizing the hanging wall in hole side is fixed, while reducing material, labor and time cost.
Description
Technical field
The utility model is related to building fields, and in particular to a kind of hanging dry wall scene supporting apparatus in hole side.
Background technology
Requirement with various regions place relevant policies to building concentration prefabrication and assembly construction rate is higher and higher, in order to reach prefabricated dress
Requirement with rate is arranged hanging dry wall on hole side and is inevitable.And the setting of dry wall scene temporary support, not only
It is only for live interim installation to fix, while the inspection and correction of the position and its verticality of completing dry wall must be coordinated, therefore
Dry wall temporary support is quite important, can not ignore.
At present when the temporary support of the hanging dry wall in hole side is arranged in prefabricated components Deepen Design, do not consider at hole
The situation of supporting point difficulty is arranged in construction site, and then causes construction site when installing dry wall, by being set up at hole
Full hall scaffold is realized as the fulcrum of live temporary support.It, must in order to ensure dry wall in-site installation and its precise positioning
It must must ensure that scaffolding structure will have enough rigidity to avoid horizontal and vertical deformation at fulcrum.Apparent this operating method
It is relatively difficult to achieve, it is also required to spend larger material, labor and time cost even if realizing, operability is not strong, cannot embody dress
With formula building industrialization high-quality, high efficiency, few artificial feature.
Utility model content
The purpose of this utility model is that it is in view of the drawbacks of the prior art and insufficient, a kind of hanging dry wall in hole side is provided
Live supporting apparatus.Its operability is strong, relative to traditional method, is only slightly adjusted to the setting of support fulcrum and working procedure
Whole, by way of " borrow power ", the installation for realizing the hanging wall in hole side is fixed, at the same reduce material, labor and time at
This.
To achieve the above object, the utility model is using following technical scheme:It includes hanging dry wall 1, non-hanging
It is dry wall 2, parallel support rod piece 3, interim diagonal brace rod piece 4, floor 5, the temporary support built-in fitting 6 on hanging dry wall, non-outstanding
The temporary support built-in fitting 8 on temporary support built-in fitting 7, floor plates on empty dry wall, hanging dry wall 1 and non-hanging prefabricated
Wall 2 is arranged in parallel, the hanging dry wall 1 of 3 vertical connection of parallel support rod piece and non-hanging dry wall 2, and interim diagonal brace rod piece 4 connects
Non- hanging dry wall 2 and floor 5, the temporary support built-in fitting 6 on hanging dry wall are arranged in hanging dry wall 1 and parallel support
The junction of rod piece 3, the temporary support built-in fitting 7 on non-hanging dry wall are arranged in non-hanging dry wall 2 and interim hound
The junction of part 3, the temporary support built-in fitting 8 in floor plates are arranged on floor 5.
The operation principle of the utility model:After non-2 construction site of hanging dry wall lifting is in place, pass through interim diagonal brace rod piece
The installation of temporary support built-in fitting 7 on temporary support built-in fitting 8 and non-hanging dry wall in 4 connection floor plates is fixed, then is hung
The hanging dry wall 1 in hole side is filled, the temporary support installed on fixed non-hanging dry wall is connected by parallel support rod piece 3
Temporary support built-in fitting 6 on built-in fitting 7 and hanging dry wall 1 is secured in position.
The hanging dry wall in hole side 1 is to have installed the temporary support built-in fitting 7 on fixed non-hanging dry wall as facing
When the fulcrum that supports, after installation is in place, in order successively to non-hanging dry wall 2, the hanging dry wall 1 in hole side carry out position and
The inspection and correction of its verticality meet《Job specfication》Requirement to construction error limitation.
After adopting the above technical scheme, the utility model has the beneficial effect that:Its operability is strong, relative to traditional method,
Only the setting of support fulcrum and working procedure are slightly adjusted, by way of " borrowing power ", realize the installation of the hanging wall in hole side
It is fixed, while reducing material, labor and time cost.
Description of the drawings
In order to illustrate the embodiment of the utility model or the technical proposal in the existing technology more clearly, below will be to embodiment
Or attached drawing needed to be used in the description of the prior art is briefly described, it should be apparent that, the accompanying drawings in the following description is only
It is some embodiments of the utility model, for those of ordinary skill in the art, before not making the creative labor property
It puts, other drawings may also be obtained based on these drawings.
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is the sectional view along A-A of Fig. 1.
Reference sign:Hanging dry wall 1, non-hanging dry wall 2, parallel support rod piece 3, interim diagonal brace rod piece 4, building
Temporary support built-in fitting 6 on plate 5, hanging dry wall, the temporary support built-in fitting 7 on non-hanging dry wall, in floor plates
Temporary support built-in fitting 8.
Specific implementation mode
Shown in Fig. 1-Fig. 2, present embodiment the technical solution adopted is that:It includes hanging dry wall 1, non-outstanding
It is empty dry wall 2, parallel support rod piece 3, interim diagonal brace rod piece 4, floor 5, the temporary support built-in fitting 6 on hanging dry wall, non-
Temporary support built-in fitting 7 on hanging dry wall, the temporary support built-in fitting 8 in floor plates, hanging dry wall 1 and non-hanging pre-
Wall 2 processed is arranged in parallel, the hanging dry wall 1 of 3 vertical connection of parallel support rod piece and non-hanging dry wall 2, and interim diagonal brace rod piece 4 connects
Non- hanging dry wall 2 and floor 5 are connect, the temporary support built-in fitting 6 on hanging dry wall is arranged in hanging dry wall 1 and parallel branch
The junction of strut member 3, the temporary support built-in fitting 7 on non-hanging dry wall are arranged in non-hanging dry wall 2 and interim diagonal brace
The junction of rod piece 3, the temporary support built-in fitting 8 in floor plates are arranged on floor 5.
The operation principle of the utility model:After non-2 construction site of hanging dry wall lifting is in place, pass through interim diagonal brace rod piece
The installation of temporary support built-in fitting 7 on temporary support built-in fitting 8 and non-hanging dry wall in 4 connection floor plates is fixed, then is hung
The hanging dry wall 1 in hole side is filled, the temporary support installed on fixed non-hanging dry wall is connected by parallel support rod piece 3
Temporary support built-in fitting 6 on built-in fitting 7 and hanging dry wall 1 is secured in position.
The hanging dry wall in hole side 1 is to have installed the temporary support built-in fitting 7 on fixed non-hanging dry wall as facing
When the fulcrum that supports, after installation is in place, in order successively to non-hanging dry wall 2, the hanging dry wall 1 in hole side carry out position and
The inspection and correction of its verticality meet《Job specfication》Requirement to construction error limitation.
The above is merely intended for describing the technical solutions of the present application, but not for limiting the present application, those of ordinary skill in the art couple
The other modifications or equivalent replacement that the technical solution of the utility model is made, without departing from technical solutions of the utility model
Spirit and scope should all cover in the right of the utility model.
Claims (1)
1. a kind of hanging dry wall scene supporting apparatus in hole side, it is characterised in that:It includes hanging dry wall (1), non-
Hanging dry wall (2), parallel support rod piece (3), interim diagonal brace rod piece (4), floor (5), the temporary support on hanging dry wall
The temporary support built-in fitting (8) on temporary support built-in fitting (7), floor plates on built-in fitting (6), non-hanging dry wall, vacantly
Dry wall (1) and non-hanging dry wall (2) are arranged in parallel, the hanging dry wall of parallel support rod piece (3) vertical connection (1) and non-outstanding
Empty dry wall (2), interim diagonal brace rod piece (4) connect non-hanging dry wall (2) and floor (5), the interim branch on hanging dry wall
It is interim on the junction of hanging dry wall (1) and parallel supporting bar (3), non-hanging dry wall to support built-in fitting (6) setting
The interim branch that supporting embedded part (7) is arranged on the junction of non-hanging dry wall (2) and interim diagonal brace rod piece (4), floor plates
Built-in fitting (8) is supportted to be arranged on floor (5).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820055803.0U CN207739656U (en) | 2018-01-12 | 2018-01-12 | A kind of hanging dry wall scene supporting apparatus in hole side |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820055803.0U CN207739656U (en) | 2018-01-12 | 2018-01-12 | A kind of hanging dry wall scene supporting apparatus in hole side |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207739656U true CN207739656U (en) | 2018-08-17 |
Family
ID=63123073
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820055803.0U Expired - Fee Related CN207739656U (en) | 2018-01-12 | 2018-01-12 | A kind of hanging dry wall scene supporting apparatus in hole side |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207739656U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110700609A (en) * | 2019-08-30 | 2020-01-17 | 中国十七冶集团有限公司 | Peripheral empty prefabricated wall installation support fixing device that faces of assembly type structure |
-
2018
- 2018-01-12 CN CN201820055803.0U patent/CN207739656U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110700609A (en) * | 2019-08-30 | 2020-01-17 | 中国十七冶集团有限公司 | Peripheral empty prefabricated wall installation support fixing device that faces of assembly type structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109577534A (en) | Tool-based hanging die assembly type composite floor slab and construction method | |
CN106065681A (en) | Superimposed sheet hoard strip construction method in a kind of overall assembled architecture based on BIM technology | |
CN107476583A (en) | A kind of concrete assembled building builds construction method | |
CN104746862A (en) | Temporary installation operating platform on overhead equipment foundation and erecting method thereof | |
CN207739656U (en) | A kind of hanging dry wall scene supporting apparatus in hole side | |
CN108130950A (en) | A kind of component component of assembled arthitecutral structure and include its building | |
CN209413294U (en) | A kind of beam form board mount for saving construction space | |
CN102251679B (en) | Construction method | |
CN208650446U (en) | A kind of two layers of plug-in wall of clear-water concrete and the plug-in wall connecting node of standard construct | |
CN206267520U (en) | A kind of self-supporting post-cast strip is poured with hanging mould | |
CN208152585U (en) | A kind of simple high-rise pump pipe fixing device | |
CN206352397U (en) | A kind of auxiliary mould for being used to connect pillar and take over a business | |
CN205077756U (en) | Angle sign indicating number connection mode PC stair | |
CN205000467U (en) | Building body and outer wall connection subassembly thereof | |
CN209323952U (en) | Overhanging scaffold | |
CN207892083U (en) | Fabricated shear wall board bottom has height difference junction support system | |
CN210263989U (en) | Wall body bearing structure is built in room | |
CN210194965U (en) | Connecting device of precast concrete externally-hung wallboard | |
CN104088453B (en) | A kind of scaffold edge support structure and using method thereof | |
CN208748845U (en) | A kind of assembled architecture auxiliary connecting device | |
CN207244960U (en) | A kind of Prefabricated stacking floor with tool-typed formwork for being used to drop plate region | |
CN105756323A (en) | Civil building kitchen and toilet-based construction method for sunk suspended form mold | |
CN205329908U (en) | External mounting structure of big board and external erection joint spare | |
CN212359092U (en) | Building templates fixing device | |
CN216475738U (en) | Assembled exterior wall cladding |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180817 |
|
CF01 | Termination of patent right due to non-payment of annual fee |