CN209323952U - Overhanging scaffold - Google Patents
Overhanging scaffold Download PDFInfo
- Publication number
- CN209323952U CN209323952U CN201821555829.8U CN201821555829U CN209323952U CN 209323952 U CN209323952 U CN 209323952U CN 201821555829 U CN201821555829 U CN 201821555829U CN 209323952 U CN209323952 U CN 209323952U
- Authority
- CN
- China
- Prior art keywords
- plate
- ontology
- fixed
- suspension pieces
- socket
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Movable Scaffolding (AREA)
Abstract
The utility model relates to scaffold fields, more particularly to overhanging scaffold, it includes suspension pieces ontology (1), bottom is mounted on the scaffold ontology (22) on suspension pieces ontology (1) and the supporting beam (23) for installing suspension pieces ontology (1), scaffold ontology (22) includes vertical pipe fitting (231), lateral pipe fitting (232), socket (2) are provided on suspension pieces ontology (1), first fixing piece (3), first supporting element (4), limited mouth (5) are provided on first supporting element (4), lateral pipe fitting (232) is plugged in limited mouth (5), suspension pieces ontology (1) is arranged by socket (2) and is fixed on supporting beam (23), vertical pipe fitting (231) is fixed on suspension pieces ontology (1) by the first fixing piece (3).Suspension pieces provided by the utility model have many advantages, such as that structure is simple, and intensity is reliable.The overhanging measurer has the advantages that easy to assembly, stable structure is reliable.
Description
Technical field
The utility model relates to scaffold field, more particularly to overhanging scaffold.
Background technique
With the development of Architectural Equipment, the research and application of scaffold are improved rapidly, and various scaffolds set up form
It emerges in multitude, but these scaffolds are from ground to high-altitude integral erection mostly, scaffolding work amount is larger, for highly higher
Local construction area, it is high integrally to set up scaffold expense, therefore, the overhanging scaffold for skyscraper occurs.
Overhanging scaffold refers to scaffold of the frame structure off-load on the rigid Cantilever Beams (frame) for being attached to building structure, for building
Build operation and its security protection needs of the main body or fitting-out work in construction.Traditional overhanging scaffold is installed as, and is first poured
Concrete is built, when then concrete reaches intensity, carries out placing installation I-steel, then just can be carried out and set up scaffold, in this way
Construction procedure it is longer there are the duration, the disadvantages of lost labor.And shadow of such process mode by outside environmental elements
It rings, expends working hour, influence the progress of engineering
Utility model content
The utility model is directed in the prior art since specific pipe fitting mounting means bring builds scaffold mode list
The disadvantages of one property, project progress is slower, provide overhanging scaffold.
In order to solve the above technical problems, the utility model is addressed by following technical proposals:
Overhanging scaffold, the scaffold ontology being mounted on suspension pieces ontology including suspension pieces ontology, bottom and is used for
The supporting beam of suspension pieces ontology is installed, scaffold ontology includes vertical pipe fitting, lateral pipe fitting, is provided with socket on suspension pieces ontology
Mouthful, the first fixing piece, the first supporting element are provided with limited mouth on the first supporting element, and lateral pipe fitting is plugged in limited mouth, vacantly
Part is arranged by socket and is fixed in supporting beam, and vertical pipe is fixed on suspension pieces ontology by the first fixing piece.Suspension pieces
It can be in the case where being fitted without horizontal shore, using building for the steel pipe advanced hand cradle of traveling far and wide of combination suspension pieces, to save
The about working hour of certain time.
Preferably, further including pre-installation frame, the second fixing piece is additionally provided on suspension pieces ontology, suspension pieces pass through second
Fixing piece is fixedly mounted on pre-installation frame.
Preferably, socket is " C " type bayonet, offer on the upper side wall and lower wall of " C " type bayonet for grafting
The first through hole of turnbuckle;Further include turnbuckle, turnbuckle pass through upper side wall first through hole and lower wall first
Suspension pieces ontology is fixed in supporting beam by through-hole by nut.So that socket can more match different supports
Beam, and it is easily installed fixation.
Preferably, ontology includes vertical the first plate and the second plate for being vertically fixed on the first plate side, the
Two plates include upper second plate and lower second plate, surround socket between upper second plate, lower second plate and the first plate, first is solid
Determine the side far from upper second plate that part is arranged on upper second plate or is fixed on the first plate.Space is saved, total is made
It is relatively reliable and compact.
Preferably, the upside of socket is arranged in the first supporting element, promising opening upwards are set on the first supporting element
Bayonet surrounds the limited mouth of support transverse pipe between bayonet and suspension pieces ontology.
Preferably, further including pull rod, it is additionally provided on suspension pieces ontology for the connector of steady brace and for adjusting
The operation port of whole pull rod offers the socket passed through for pull rod on connector;One end of pull rod is fixed on scaffold ontology,
The other end passes through socket and is fixed by nut.To save the uses of components, and easy to adjust, whole occupied space compared with
It is small.
Preferably, suspension pieces ontology further includes the first support plate, be arranged in parallel in the first support plate the first fixed ear,
The second through-hole of coaxial line is offered in second fixed ear, the first fixed ear and the second fixed ear, the first fixed ear, second are fixed
Operation port is surrounded between ear and the first support plate, connector is plugged in the second through-hole of the first fixed ear and the second fixed ear.
This kind of structure has many advantages, such as easy to disassemble, assembles reliable.
Preferably, the edge of the second through-hole is provided with gap, claw is provided on the lateral surface of connector, claw passes through
Gap is fastened on the first fixed ear or the second fixed ear far from the lateral surface of operation port.
Preferably, being also connected with the second support of parallel first support plate between the first fixed ear and the second fixed ear
Plate, the first fixing piece are fixed in the second support plate.
Preferably, suspension pieces ontology includes vertical the first plate and the second plate for being vertically fixed on the first plate side
Part, the second plate include upper second plate and lower second plate, surround socket between upper second plate, lower second plate and the first plate,
Upper second plate and lower second plate offer the first through hole for grafting turnbuckle, the first support far from one end of the first plate
Plate is upper second plate, and the first fixing piece is arranged in the first support plate.
The utility model by adopting the above technical scheme, has the advantages that
Suspension pieces provided by the utility model have many advantages, such as that structure is simple, and intensity is reliable.The suspension pieces are in level
In the case that supporting beam has completed, it can be directly installed on horizontal shore.When horizontal shore due to extraneous factor not
In the case where capable of completing in time, engineering staff, which can be, first installs scaffold, when after the installation is completed, then covering and propping up again
It supports on beam, is tensed with bolt.It can certainly construct simultaneously, so as to shorten working hour.The suspension pieces are able to carry out pair
Horizontal transverse-pipe, vertical pipe are supported, and are supported reliable.
And scaffold installation form multiplicity provided by the utility model, it can satisfy the different demands of engineering staff, foot
Assembly can be separated and independently performed in the fixation of hand cradle ontology built with supporting beam, substantially reduce engineering scaffold installation when
Between, and scaffold installation and adjustment are convenient, and it is fixed.
The device can shorten the construction period, and save manually, improve the performance of enterprises, saved cost and material.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of suspension pieces in embodiment 1 and embodiment 2;
Fig. 2 is the schematic perspective view of suspension pieces in embodiment 3;
Fig. 3 is the structural schematic diagram of suspension pieces in embodiment 4;
Fig. 4 is that the pre- of overhanging scaffold builds schematic diagram;
Fig. 5 is the partial enlarged view of Fig. 4;
Fig. 6 is the scheme of installation of suspension pieces and supporting beam.
Technical name corresponding to appended drawing reference in figure are as follows: 1- ontology, 2- socket, the first fixing piece of 3-, 4-the first
Second plate, 11- under supporting element, 5- limited mouth, the second fixing piece of 6-, 7- first through hole, the first plate of 8-, upper second plate of 9-, 10-
Bayonet, 12- connector, 13- operation port, the first fixed ear of 14-, the second fixed ear of 15-, the second through-hole of 16-, 17- gap, 18-
Socket, 19- claw, the 20 one the first support plates, the 21 one the second support plates.
Specific embodiment
The utility model is described in further detail with embodiment with reference to the accompanying drawing.
Embodiment 1
As shown in Fig. 1 and Fig. 4, Fig. 5, Fig. 6, overhanging scaffold, including suspension pieces ontology 1, bottom are mounted on suspension pieces
Scaffold ontology 22 on ontology 1 and the supporting beam 23 for installing suspension pieces ontology 1, scaffold ontology 22 include vertical pipe fitting
231, lateral pipe fitting 232 is provided with socket 2, the first fixing piece 3, the first supporting element 4, the first supporting element on suspension pieces ontology 1
Limited mouth 5 is provided on 4, lateral pipe fitting 232 is plugged in limited mouth 5, and suspension pieces ontology 1 is arranged by socket 2 and is fixed on
In supporting beam 23, vertical pipe fitting 231 is fixed on suspension pieces ontology 1 by the first fixing piece 3.Wherein suspension pieces ontology 1 is steel
Structural member.Socket 2 is " C " type bayonet, is offered on the upper side wall and lower wall of " C " type bayonet for grafting turnbuckle 25
First through hole 7;It further include turnbuckle 25, turnbuckle 25 passes through the first through hole 7 of upper side wall and the first of lower wall is led to
Suspension pieces ontology 1 is fixed in supporting beam 23 by hole 7 by nut.In the present embodiment, suspension pieces ontology 1 includes vertical
First plate 8 and the second plate for being vertically fixed on 8 side of the first plate, the second plate includes upper second plate 9 and lower second plate
10, socket 2, upper second plate 9 and lower second plate 10 are surrounded between upper second plate 9, lower second plate 10 and the first plate 8 far from the
One end of one plate 8 offers the first through hole 7 for grafting turnbuckle 25, and in the present embodiment, the first fixing piece 3 is welded on
On upper second plate 9.
The upside of socket 2 is arranged in first supporting element 4, and the purpose that upside is arranged in is not influence 2 grafting of socket
In supporting beam.In the present embodiment, the edge of upper second plate 9 is arranged in the first supporting element 4.It is provided on first supporting element 4
For the bayonet 11 of opening upwards, the limited mouth 5 of support transverse pipe is surrounded between bayonet 11 and suspension pieces ontology 1.In the present embodiment
In, the first supporting element 4 is the plate of arc, so bayonet 11 is arc port, ensure that limited mouth 5 supports stablizing for cross bar.
During installation, socket 2 is socketed in supporting beam 23, then adjusts behind position that (and cushion block has using bolt
If needing) first through hole 7 is passed through, suspension pieces ontology 1 is fixedly mounted in supporting beam.Wherein it is arranged in every supporting beam 23
There are two suspension pieces ontology 1, transversely 232 length direction of pipe fitting is distributed supporting beam 23, and adjacent lateral pipe fitting 232 passes through longitudinal direction
Pipe fitting 233 is connected and fixed, to build one layer of scaffold.Wherein, the limit of two suspension pieces ontologies 1 in every supporting beam 23
Mouth 23 is oppositely arranged.
Embodiment 2
Such as Fig. 1 and Fig. 4, Fig. 5, Fig. 6, it is in place of the present embodiment and the difference of embodiment 1, is also set on suspension pieces ontology 1
The second fixing piece 6 of suspension pieces is supported when being equipped with pre-installation.Second fixing piece 6 is the pipe fitting of upper end sealing.Second fixing piece 6 peace
Mounted in the side of the first plate 8.Wherein, when the effect of the second fixing piece 6 is to pre-install scaffold, make entire hanging
Part ontology 1 has a brace foundation, enables suspension pieces ontology 1 is reliable and stable to be mounted on pre-installation frame 24, and specific second
Fixing piece 6 is plugged on pre-installation frame 24, and the lower end surface of lower second plate 10 is contradicted in the upside of scaffold transverse direction pipe fitting 232.Its
It in middle the present embodiment, pre-installs and is provided with support column on frame 24, the second fixing piece 6 on the support columns, then leads to for pipe fitting grafting
Crossing bolt is tightly fastened the second fixing piece 6 and support column.Wherein support column with suspension pieces ontology 1 correspond.
Embodiment 3
As shown in Fig. 2 and Fig. 4, Fig. 5, Fig. 6, overhanging scaffold, including suspension pieces ontology 1, bottom are mounted on suspension pieces
Scaffold ontology 22 on ontology 1 and the supporting beam 23 for installing suspension pieces ontology 1, scaffold ontology 22 include vertical pipe fitting
231, lateral pipe fitting 232 is provided with socket 2, the first fixing piece 3, the first supporting element 4, the first supporting element on suspension pieces ontology 1
Limited mouth 5 is provided on 4, lateral pipe fitting 232 is plugged in limited mouth 5, and suspension pieces are arranged by socket and are fixed on supporting beam
On, vertical pipe fitting 231 is fixed on suspension pieces ontology 1 by the first fixing piece 3.Wherein suspension pieces ontology 1 is steel construction piece.Set
Interface 2 is " C " type bayonet, is offered on the upper side wall and lower wall of " C " type bayonet logical for the first of grafting turnbuckle 25
Hole 7;It further include turnbuckle 25, turnbuckle 25 passes through the first through hole 7 of upper side wall and the first through hole 7 of lower wall, passes through
Suspension pieces ontology 1 is fixed in supporting beam 23 by nut.In the present embodiment, suspension pieces ontology 1 includes the first vertical plate 8
With the second plate for being vertically fixed on 8 side of the first plate, the second plate includes upper second plate 9 and lower second plate 10, and upper second
Socket 2 is surrounded between plate 9, lower second plate 10 and the first plate 8, upper second plate 9 and lower second plate 10 are far from the first plate 8
One end offers the first through hole 7 for grafting turnbuckle 25, and in the present embodiment, the first fixing piece 3 is welded on the second plate 9
On.
The upside of socket 2 is arranged in first supporting element 4, and the purpose that upside is arranged in is not influence 2 grafting of socket
In supporting beam.In the present embodiment, the edge of upper second plate 9 is arranged in the first supporting element 4.It is provided on first supporting element 4
For the bayonet 11 of opening upwards, the limited mouth 5 of support transverse pipe is surrounded between bayonet 11 and suspension pieces ontology 1.In the present embodiment
In, the first supporting element 4 is the plate of arc, so bayonet 11 is arc port, ensure that limited mouth 5 supports stablizing for cross bar.
During installation, socket 2 is socketed in supporting beam 23, then being had behind adjustment position using bolt and cushion block is needed
First through hole 7 is passed through if wanting, and suspension pieces ontology 1 is fixedly mounted in supporting beam.Wherein it is provided in every supporting beam 23
Two suspension pieces ontologies 1, transversely 232 length direction of pipe fitting is distributed supporting beam 23, and adjacent lateral pipe fitting 232 passes through longitudinal pipe
Part 233 is connected and fixed, to build one layer of scaffold.Wherein, the limited mouth of two suspension pieces ontologies 1 in every supporting beam 23
23 are oppositely arranged.
The second fixing piece 6 of suspension pieces is supported when being additionally provided with pre-installation on suspension pieces ontology 1.Second fixing piece 6 is upper
Hold the pipe fitting of sealing.Second fixing piece 6 is mounted on the side of the first plate 8.Wherein, the effect of the second fixing piece 6 is to foot
When hand cradle is pre-installed, entire suspension pieces ontology 1 is set to have a brace foundation, the peace for keeping suspension pieces ontology 1 reliable and stable
On pre-installation frame 24, specific second fixing piece 6 is plugged on pre-installation frame 24, and the lower end surface of lower second plate 10 contradicts
The upside of scaffold transverse direction pipe fitting 232.Wherein in the present embodiment, pre-installs and be provided with support column 241, the second fixing piece on frame 24
6 are plugged on support column 241 for pipe fitting, are then tightly fastened the second fixing piece 6 and support column by bolt.Wherein support column
With suspension pieces ontology 1 correspond.
Further include pull rod 26, is additionally provided on suspension pieces ontology 1 for the connector 12 of steady brace 26 and for adjusting
The operation port 13 of pull rod 26 offers the socket 18 passed through for pull rod 26 on connector 12;One end of pull rod 26 is fixed on foot
On hand cradle ontology 22, the other end passes through socket 18 and is fixed by nut, and after wherein pull rod 26 passes through operation port 13, engineering staff is logical
It crosses and pull rod 26 is adjusted in the bolt that the adjusting of operation port 13 is mounted on pull rod 26.Suspension pieces ontology 1 further includes first
Fagging 20, the first fixed ear 14, the second fixed ear 15 are arranged in parallel in the first support plate 20, and the first fixed ear 14 and second is solid
The second through-hole 16 that coaxial line is offered on ear 15 is determined, between the first fixed ear 14, the second fixed ear 15 and the first support plate 20
Operation port 13 is surrounded, connector 12 is plugged in the second through-hole 16 of the first fixed ear 14 and the second fixed ear 15.In this implementation
In example, the first fixed ear 14 and the second fixed ear 15 are independent two plates, and the first support plate 20 is upper second plate 9, and first
Fixed ear 14 and the second fixed ear 15 are fixed on the second plate 9, and the edge of the second through-hole 16 is provided with gap 17, connection
Claw 19 is provided on the lateral surface of part 12, claw 19 passes through gap 17 and is fastened on the first fixed ear 14 or the second fixed ear 15 far
On lateral surface from operation port 13, the connector 12 is the bolt of steel material, and the both ends of connector 12 are arranged in clamping jaw, wherein
The shape of claw 19 can be the plate of side outstanding, as long as guaranteeing that clamping jaw can be pierced by from gap 17, energy after then rotating
Enough it is stuck in the edge of the second through-hole 16.The both ends of connector 12 can be respectively provided with identical claw 19, be not required to during installation in this way
Distinguish insertion end, can also one end claw 19 is set, the limited block of other shapes is arranged in the other end, guarantees connector 12 not
It can be extracted from the second through-hole 16.
Wherein, the first fixing piece of the present embodiment 3 is fixed on the top of the second plate 9, and is located at the first fixed ear 14 and the
It between two fixed ears 15, should know the program not and be unique, the advantages of such set-up mode is, saves accounting for for suspension pieces
With space, keep total more compact.
Embodiment 4
As shown in Fig. 3, Fig. 4, Fig. 5, Fig. 6, it is in place of the present embodiment and the difference of embodiment 3,14 He of the first fixed ear
The second support plate 21 of parallel first support plate 20 is also connected between second fixed ear 15, the first fixing piece 3 is fixed on second
In support plate 21.
Embodiment 5
It is in place of the present embodiment and the difference of embodiment 3, connector 12 and the first fixed ear 14, the second fixed ear 15 are
Fixed non-dismountable connection.Only need to guarantee that connecting rod can there are operation ports 13 on socket 18 and suspension pieces ontology 1
?.
Embodiment 6
Be in place of the present embodiment and the difference of embodiment 3: connector 12 can be in such a way that bolt and nut be fixed
It is designed, can also be designed by the way of bolt and lock, guarantee that connector 12 has certain activity space.
Embodiment 7
It is in place of the difference of the present embodiment and embodiment 2~6, the second fixing piece 6 is support plate, is made described hanging
Part does not need pre-installation frame 24 in pre-installation.
Embodiment 8
The characteristics of the present embodiment is, two suspension pieces in the present embodiment in each supporting beam, one for embodiment 3 or
4 suspension pieces ontology 1, another is the suspension pieces ontology 1 of embodiment 2.
In short, the above is only the preferred embodiment of the present invention, it is all according to present utility model application the scope of the patents institute
The equivalent changes and modifications of work should all belong to the covering scope of the utility model patent.
Claims (10)
1. overhanging scaffold, it is characterised in that: be mounted on the foot on suspension pieces ontology (1) including suspension pieces ontology (1), bottom
Hand cradle ontology (22) and supporting beam (23) for installing suspension pieces ontology (1), scaffold ontology (22) includes vertical pipe fitting
(231), lateral pipe fitting (232) is provided with socket (2) on suspension pieces ontology (1), the first fixing piece (3), the first supporting element
(4), it is provided with limited mouth (5) on the first supporting element (4), lateral pipe fitting (232) is plugged in limited mouth (5), suspension pieces ontology
(1) it is arranged and is fixed on supporting beam (23) by socket (2), vertical pipe fitting (231) is fixed on outstanding by the first fixing piece (3)
On empty part ontology (1).
2. overhanging scaffold according to claim 1, it is characterised in that: further include pre-installation frame (30), suspension pieces sheet
It is additionally provided on body (1) the second fixing piece (6), suspension pieces ontology (1) is fixedly mounted on pre-installation frame by the second fixing piece (6)
(30) on.
3. overhanging scaffold according to claim 1, it is characterised in that: socket (2) is " C " type bayonet, " C " type card
First through hole (7) are offered on the upper side wall and lower wall of mouth;It further include turnbuckle (25), turnbuckle (25) passes through upside
Suspension pieces ontology (1) is fixed on supporting beam (23) by nut by the first through hole (7) of wall and the first through hole (7) of lower wall
On.
4. overhanging scaffold according to claim 1, it is characterised in that: ontology (1) includes vertical the first plate (8)
With the second plate for being vertically fixed on the first plate (8) side, the second plate includes upper second plate (9) and lower second plate (10),
Socket (2) are surrounded between upper second plate (9), lower second plate (10) and the first plate (8), the first fixing piece (3) is arranged upper
On second plate (9) or be fixed on the first plate (8) far from upper second plate (9) side.
5. overhanging scaffold according to claim 1, it is characterised in that: the first supporting element (4) is arranged in socket (2)
Upside, the bayonet (11) of promising opening upwards is set on the first supporting element (4), between bayonet (11) and suspension pieces ontology (1)
Surround the limited mouth (5) of support transverse pipe.
6. overhanging scaffold according to claim 1 or 2 or 3 or 4, it is characterised in that: further include pull rod (26), vacantly
It is additionally provided on part ontology (1) for the connector (12) of steady brace (26) and the operation port for adjusting pull rod (26)
(13), the socket (18) passed through for pull rod (26) is offered on connector (12);One end of pull rod (26) is fixed on scaffold
On ontology (22), the other end passes through socket (18) and is fixed by nut.
7. overhanging scaffold according to claim 5, it is characterised in that: suspension pieces ontology (1) further includes the first support
Plate (20) is arranged in parallel with the first fixed ear (14), the second fixed ear (15), the first fixed ear (14) in the first support plate (20)
With the second through-hole (16) that coaxial line is offered on the second fixed ear (15), the first fixed ear (14), the second fixed ear (15) and
It is surrounded between first support plate (20) operation port (13), connector (12) is plugged on the first fixed ear (14) and the second fixed ear
(15) in the second through-hole (16).
8. overhanging scaffold according to claim 6, it is characterised in that: the edge of the second through-hole (16) is provided with gap
(17), it is provided with claw (19) on the lateral surface of connector (12), claw (19) passes through gap (17) and is fastened on the first fixed ear
(14) or the second fixed ear (15) is far from the lateral surface of operation port (13).
9. overhanging scaffold according to claim 7, it is characterised in that: the first fixed ear (14) and the second fixed ear
(15) the second support plate (21) of parallel first support plate (20) is also connected between, the first fixing piece (3) is fixed on second
On fagging (21).
10. overhanging scaffold according to claim 6, it is characterised in that: suspension pieces ontology (1) includes vertical first
Plate (8) and the second plate for being vertically fixed on the first plate (8) side, upper second plate (9) and lower second plate (10) are far from the
One end of one plate (8) offers the first through hole (7) for grafting turnbuckle, and the first support plate (20) is upper second plate
(9), the first fixing piece (3) is arranged on the first support plate (20).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821555829.8U CN209323952U (en) | 2018-09-21 | 2018-09-21 | Overhanging scaffold |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821555829.8U CN209323952U (en) | 2018-09-21 | 2018-09-21 | Overhanging scaffold |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209323952U true CN209323952U (en) | 2019-08-30 |
Family
ID=67707285
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821555829.8U Active CN209323952U (en) | 2018-09-21 | 2018-09-21 | Overhanging scaffold |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209323952U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113235898A (en) * | 2021-06-04 | 2021-08-10 | 中铁大桥局上海工程有限公司 | Overhanging scaffold and construction process thereof |
-
2018
- 2018-09-21 CN CN201821555829.8U patent/CN209323952U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113235898A (en) * | 2021-06-04 | 2021-08-10 | 中铁大桥局上海工程有限公司 | Overhanging scaffold and construction process thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107355037A (en) | Assembling type steel structure builds self-bearing type steel truss form bracing system and construction method | |
CN209323952U (en) | Overhanging scaffold | |
CN204920178U (en) | Attaching scaffold main part | |
CN206530078U (en) | A kind of support meanss | |
CN211470603U (en) | Telescopic tower crane passageway | |
CN209323953U (en) | Suspension pieces for scaffold | |
CN214835056U (en) | Supporting device for bearing plate of sawtooth-shaped steel bar truss floor | |
CN109296194A (en) | Suspension pieces and overhanging scaffold for scaffold | |
CN212223933U (en) | Assembly type building foundation brick moulding bed capable of being used circularly | |
CN211143695U (en) | Operating platform for assisting assembly type tower crane in dismounting | |
CN211691235U (en) | Stone wall hanging framework | |
CN211114837U (en) | Earthwork supporting template | |
CN211597710U (en) | A adjustable shore structure of complete set for post-cast strip construction | |
CN207739656U (en) | A kind of hanging dry wall scene supporting apparatus in hole side | |
CN215107165U (en) | Be used for steel construction welded operation platform | |
CN206677863U (en) | The quick assembly tool of photo-thermal sulculus | |
CN212773377U (en) | High-rise suspended component pouring support system | |
CN219045297U (en) | Scaffold upright rod supporting and fixing device for stair template inclined plane | |
CN211201306U (en) | Steel construction that transformer substation used | |
CN208456103U (en) | It is a kind of to increase overhanging type attachment support for climbing frame | |
CN211545645U (en) | Box roof beam installation lug | |
CN109994941A (en) | A kind of quick installing mechanism of outdoor box | |
CN215484534U (en) | Window platform erects strutting arrangement for construction | |
CN213418450U (en) | Hanging flower basket mounting on roof pergola roof beam | |
CN215564421U (en) | Y-shaped jacking for bottom die support |