CN209323953U CN201821556469.3U CN201821556469U CN209323953U CN 209323953 U CN209323953 U CN 209323953U CN 201821556469 U CN201821556469 U CN 201821556469U CN 209323953 U CN209323953 U CN 209323953U
Authority
CN
China
Prior art keywords
plate
scaffold
ontology
suspension pieces
fixed ear
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821556469.3U
Other languages
Chinese (zh)
Inventor
邓伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201821556469.3U priority Critical patent/CN209323953U/en
Application granted granted Critical
Publication of CN209323953U publication Critical patent/CN209323953U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The utility model relates to scaffold fields, more particularly to suspension pieces for scaffold, the socket (2) for being socketed horizontal shore is provided on its ontology (1), the first fixing piece (3) of fixed vertical pipe is provided on ontology (1), it is used to support the first supporting element (4) of transverse pipe, the limited mouth (5) of grafting transverse pipe is provided on first supporting element (4), the second fixing piece of suspension pieces is supported when being additionally provided with pre-installation on ontology (1), socket is " C " type bayonet, the first through hole (7) for grafting turnbuckle is offered on the upper side wall and lower wall of " C " type bayonet.Suspension pieces provided by the utility model have many advantages, such as that structure is simple, and intensity is reliable.The suspension pieces can be directly installed on horizontal shore in the case where horizontal shore has completed.Engineering staff is also possible to first install scaffold, when after the installation is completed, then covering in supporting beam again, is tensed with bolt.

Description

Suspension pieces for scaffold
Technical field
The utility model relates to scaffold fields, more particularly to suspension pieces for scaffold.
Background technique
With the development of Architectural Equipment, the research and application of scaffold are improved rapidly, and various scaffolds set up form It emerges in multitude, but these scaffolds are from ground to high-altitude integral erection mostly, scaffolding work amount is larger, for highly higher Local construction area, it is high integrally to set up scaffold expense, therefore, the overhanging scaffold for skyscraper occurs. Overhanging scaffold refers to scaffold of the frame structure off-load on the rigid Cantilever Beams (frame) for being attached to building structure, for building Build operation and its security protection needs of the main body or fitting-out work in construction.Traditional overhanging scaffold is installed as, and is first poured Concrete is built, when then concrete reaches intensity, carries out placing installation I-steel, then just can be carried out and set up scaffold, in this way Construction procedure it is longer there are the duration, the disadvantages of lost labor.And shadow of such process mode by outside environmental elements It rings, expends working hour, influence the progress of engineering.
Utility model content
The utility model is directed in the prior art since specific pipe fitting mounting means bring builds scaffold mode list The disadvantages of one property, project progress is slower, provide the suspension pieces for scaffold.
In order to solve the above technical problems, the utility model is addressed by following technical proposals:
For the suspension pieces of scaffold, including ontology, the socket for being socketed horizontal shore is provided on ontology, this It is provided with the first fixing piece of fixed vertical pipe on body, is used to support the first supporting element of transverse pipe, is arranged on the first supporting element There is the limited mouth of grafting transverse pipe.Suspension pieces can be combined hanging in the case where being fitted without horizontal shore using steel pipe The advanced hand cradle of traveling far and wide of part is built, to save the working hour of certain time.
Preferably, supporting the second fixing piece of suspension pieces to realize pre-installation when being additionally provided with pre-installation on ontology.
Preferably, socket is " C " type bayonet, offer on the upper side wall and lower wall of " C " type bayonet for grafting The first through hole of turnbuckle.So that socket can more match different supporting beams, and it is easily installed.
Preferably, ontology includes vertical the first plate and the second plate for being vertically fixed on the first plate side, the Two plates include upper second plate and lower second plate, and upper second plate descends between the second plate and the first plate to surround socket, upper second Plate and lower second plate offer the first through hole for grafting turnbuckle far from one end of the first plate.
Preferably, the setting of the first fixing piece is on the second plate, space is saved, keeps total relatively reliable and compact.
Preferably, the top of socket is arranged in the first supporting element, promising opening upwards are set on the first supporting element Bayonet surrounds the limited mouth of support transverse pipe between bayonet and ontology.It is convenient that horizontal cross bar is limited, and limit jail It leans on, cross bar is convenient for adjusting and installation.
Preferably, being additionally provided on ontology for the connector of steady brace and the operation port for adjusting pull rod, even The socket passed through for pull rod is offered on fitting.To save the use of components, and it is easy to adjust, it is whole to occupy sky Between it is smaller.
Preferably, ontology further includes the first support plate, the first fixed ear, second solid is arranged in parallel in the first support plate Determine ear, the second through-hole of coaxial line, the first fixed ear, the second fixed ear and are offered in the first fixed ear and the second fixed ear Operation port is surrounded between one support plate, connector is plugged in the second through-hole of the first fixed ear and the second fixed ear.This kind knot Structure has many advantages, such as easy to disassemble, assembles reliable.
Preferably, the edge of the second through-hole is provided with gap, claw is provided on the lateral surface of connector, claw passes through Gap is fastened on the first fixed ear or the second fixed ear far from the lateral surface of operation port.
Preferably, being also connected with the second support of parallel first support plate between the first fixed ear and the second fixed ear Plate, the first fixing piece are fixed in the second support plate.
Preferably, ontology includes vertical the first plate and the second plate for being vertically fixed on the first plate side, the Two plates include upper second plate and lower second plate, and upper second plate descends between the second plate and the first plate to surround socket, upper second Plate and lower second plate offer the first through hole for grafting turnbuckle far from one end of the first plate, and the first support plate is upper Second plate, the first fixing piece are arranged in the first support plate.
The utility model by adopting the above technical scheme, has the advantages that
Suspension pieces provided by the utility model have many advantages, such as that structure is simple, and intensity is reliable.The suspension pieces are in level In the case that supporting beam has completed, it can be directly installed on horizontal shore.When horizontal shore due to extraneous factor not In the case where capable of completing in time, engineering staff, which can be, first installs scaffold, when after the installation is completed, then covering and propping up again It supports on beam, is tensed with bolt.It can certainly construct simultaneously, so as to shorten working hour.The suspension pieces are able to carry out pair Horizontal transverse-pipe, vertical pipe are supported, and are supported reliable.
The device can shorten the construction period, and save manually, improve the performance of enterprises, saved cost and material.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of embodiment 1 and embodiment 2;
Fig. 2 is the schematic perspective view of 3 suspension pieces of embodiment;
Fig. 3 is the structural schematic diagram of 4 suspension pieces of embodiment.
Technical name corresponding to appended drawing reference in figure are as follows: 1-ontology, 2-sockets, the 3-the first fixing piece, 4- Under first supporting element, 5-limited mouths, the 6-the second fixing piece, 7-first through hole, the 8-the first plate, 9-upper second plates, 10- Second plate, 11-bayonets, 12-connectors, 13-operation ports, the 14-the first fixed ear, the 15-the second fixed ear, 16-the second Through-hole, 17-gap, 18-sockets, 19-claws, the 20 one the first support plates, the 21 one the second support plates.
Specific embodiment
The utility model is described in further detail with embodiment with reference to the accompanying drawing.
Embodiment 1
As shown in Figure 1, being used for the suspension pieces of scaffold, including ontology 1, wherein ontology 1 is steel construction piece.It is set on ontology 1 Be equipped with the socket 2 for being socketed horizontal shore, the effect of socket 2 be to be socketed in supporting beam to entire suspension pieces into Row support.It is provided with the first fixing piece 3 of fixed vertical pipe on ontology 1, is used to support the first supporting element 4 of transverse pipe, first The limited mouth 5 of grafting transverse pipe is provided on supporting element 4.First fixing piece 3 and the first supporting element 4 weld with ontology 1 solid It is fixed.First fixing piece 3 is pipe fitting.The socket 2 is " C " type bayonet, is offered on the upper side wall and lower wall of " C " type bayonet First through hole 7 for grafting turnbuckle.In the present embodiment, ontology 1 includes the first vertical plate 8 and is vertically fixed on Second plate of 8 side of the first plate, the second plate include upper second plate 9 and lower second plate 10, upper second plate 9, lower second plate 10 and first surround between plate 8 socket 2, upper second plate 9 and lower second plate 10 opened up far from one end of the first plate 8 it is useful In the first through hole 7 of grafting turnbuckle, the present embodiment, the first fixing piece 3 is welded on the second plate 9.
The upside of socket 2 is arranged in first supporting element 4, and the purpose that upside is arranged in is not influence 2 grafting of socket In supporting beam.In the present embodiment, the edge of upper second plate 9 is arranged in the first supporting element 4.It is provided on first supporting element 4 For the bayonet 11 of opening upwards, the limited mouth 5 of support transverse pipe is surrounded between bayonet 11 and ontology 1.In the present embodiment, first Supporting element 4 is the plate of arc, so bayonet 11 is arc port, ensure that limited mouth 5 supports stablizing for cross bar.
During installation, socket 2 is socketed in supporting beam, uses bolt and cushion block in need after then adjusting position If pass through first through hole 7, suspension pieces are fixedly mounted in supporting beam.Then it carries out building scaffold.Vertical pipe is plugged on In the first vertical fixing piece 3.
Embodiment 2
As being in place of Fig. 1 the present embodiment and the difference of embodiment 1, support is hanging when being additionally provided with pre-installation on ontology 1 Second fixing piece 6 of part.Second fixing piece 6 is the pipe fitting of upper end sealing.Second fixing piece 6 is mounted on the side of the first plate 8. Wherein, when the effect of the second fixing piece 6 is to pre-install scaffold, entire suspension pieces is made to have a brace foundation, makes to hang Empty part can be reliable and stable be mounted on pre-installation bottom plate, specific second fixing piece 6 is plugged on pre-installation bottom plate, lower the The lower end surface of two plates 10 contradicts on the horizontal transverse-pipe of scaffold.
Embodiment 3
As shown in Fig. 2, being used for the suspension pieces of scaffold, including ontology 1, wherein ontology 1 is steel construction piece.It is set on ontology 1 Be equipped with the socket 2 for being socketed horizontal shore, the effect of socket 2 be to be socketed in supporting beam to entire suspension pieces into Row support.It is provided with the first fixing piece 3 of fixed vertical pipe on ontology 1, is used to support the first supporting element 4 of transverse pipe, first The limited mouth 5 of grafting transverse pipe is provided on supporting element 4.First fixing piece 3 and the first supporting element 4 weld with ontology 1 solid It is fixed.First fixing piece 3 is pipe fitting.The socket 2 is " C " type bayonet, is offered on the upper side wall and lower wall of " C " type bayonet First through hole 7 for grafting turnbuckle.In the present embodiment, ontology 1 includes the first vertical plate 8 and is vertically fixed on Second plate of 8 side of the first plate, the second plate include upper second plate 9 and lower second plate 10, upper second plate 9, lower second plate 10 and first surround between plate 8 socket 2, upper second plate 9 and lower second plate 10 opened up far from one end of the first plate 8 it is useful In the first through hole 7 of grafting turnbuckle, the present embodiment, the first fixing piece 3 is welded on the second plate 9.
The upside of socket 2 is arranged in first supporting element 4, and the purpose that upside is arranged in is not influence 2 grafting of socket In supporting beam.In the present embodiment, the edge of upper second plate 9 is arranged in the first supporting element 4.It is provided on first supporting element 4 For the bayonet 11 of opening upwards, the limited mouth 5 of support transverse pipe is surrounded between bayonet 11 and ontology 1.In the present embodiment, first Supporting element 4 is the plate of arc, so bayonet 11 is arc port, ensure that limited mouth 5 supports stablizing for cross bar.
The second fixing piece 6 of suspension pieces is supported when being additionally provided with pre-installation on ontology 1.Second fixing piece 6 is upper end sealing Pipe fitting.Second fixing piece 6 is mounted on the side of the first plate 8.Wherein, the effect of the second fixing piece 6 be to scaffold into When row pre-installation, entire suspension pieces is made to have a brace foundation, enables suspension pieces are reliable and stable to be mounted on pre-installation bottom plate, Specific second fixing piece 6 is plugged on pre-installation bottom plate, and the lower end surface of lower second plate 10 contradicts the horizontal transverse-pipe in scaffold On.
It is additionally provided on ontology 1 for the connector 12 of steady brace and the operation port 13 for adjusting pull rod, connector The socket 18 passed through for pull rod is offered on 12, after wherein pull rod passes through operation port 13, engineering staff passes through in operation port 13 The bolt being mounted on pull rod is adjusted pull rod is adjusted.Ontology 1 further includes the first support plate 20, is put down in the first support plate 20 Row is provided with the first fixed ear 14, the second fixed ear 15, offers coaxial line in the first fixed ear 14 and the second fixed ear 15 Second through-hole 16, surrounds operation port 13 between the first fixed ear 14, the second fixed ear 15 and the first support plate 20, connector 12 is inserted It connects in the second through-hole 16 of the first fixed ear 14 and the second fixed ear 15.In the present embodiment, the first fixed ear 14 and second Fixed ear 15 is independent two plates, and the first support plate 20 is upper second plate 9, and the first fixed ear 14 and the second fixed ear 15 are solid Fixed to be arranged on upper second plate 9, the edge of the second through-hole 16 is provided with gap 17, is provided with claw on the lateral surface of connector 12 19, claw 19 passes through gap 17 and is fastened on the first fixed ear 14 or the second lateral surface of the fixed ear 15 far from operation port 13, institute The bolt that connector 12 is steel material is stated, the both ends of connector 12 are arranged in clamping jaw, and wherein the shape of claw 19 can be protrusion The plate of side the edge of the second through-hole 16 can be stuck in after then rotating as long as guaranteeing that clamping jaw can be pierced by from gap 17. The both ends of connector 12 can be respectively provided with identical claw 19, need not distinguish between insertion end during installation in this way, can also only one The limited block of other shapes is arranged in end setting claw 19, the other end, guarantees that connector 12 will not be extracted from the second through-hole 16.
Wherein, the first fixing piece of the present embodiment 3 is fixed on the top of the second plate 9, and is located at the first fixed ear 14 and the It between two fixed ears 15, should know the program not and be unique, the advantages of such set-up mode is, saves accounting for for suspension pieces With space, keep total more compact.And to guarantee that the pull rod being pierced by is fixed with being plugged on first during conceptual design Vertical bar on part 3 is not in interference phenomenon.
Embodiment 4
As shown in figure 3, being in place of the present embodiment and the difference of embodiment 3, the first fixed ear 14 and the second fixed ear 15 Between be also connected with the second support plate 21 of parallel first support plate 20, the first fixing piece 3 is fixed in the second support plate 21.
Embodiment 5
It is in place of the present embodiment and the difference of embodiment 3, connector 12 and the first fixed ear 14, the second fixed ear 15 are Fixed non-dismountable connection.Only need to guarantee that connecting rod can there are operation ports 13 on socket 18 and ontology 1.
Embodiment 6
Be in place of the present embodiment and the difference of embodiment 3: connector 12 can be in such a way that bolt and nut be fixed It is designed, can also be designed by the way of bolt and lock, guarantee that connector 12 has certain activity space.
Embodiment 7
It is in place of the difference of the present embodiment and embodiment 2~6, the second fixing piece 6 is support plate, is made described hanging Part does not need pre-installation frame in pre-installation.
In short, the above is only the preferred embodiment of the present invention, it is all according to present utility model application the scope of the patents institute The equivalent changes and modifications of work should all belong to the covering scope of the utility model patent.

Claims (10)

1. being used for the suspension pieces of scaffold, including ontology (1), it is characterised in that: ontology is provided on (1) for being socketed horizontal branch The socket (2) of beam is supportted, the first fixing piece (3) of fixed vertical pipe is provided on ontology (1), is used to support the first of transverse pipe Supporting element (4) is provided with the limited mouth (5) of grafting transverse pipe on the first supporting element (4).
2. the suspension pieces according to claim 1 for scaffold, it is characterised in that: ontology is additionally provided with pre- peace on (1) The second fixing piece (6) of suspension pieces is supported when dress.
3. the suspension pieces according to claim 1 for scaffold, it is characterised in that: socket (2) is " C " type bayonet, The first through hole (7) for grafting turnbuckle is offered on the upper side wall and lower wall of " C " type bayonet.
4. the suspension pieces according to claim 3 for scaffold, it is characterised in that: the first fixing piece (3) is arranged upper On second plate (9).
5. the suspension pieces according to claim 1 for scaffold, it is characterised in that: the first supporting element (4) setting is covering The upside of interface (2) bayonet (11) of promising opening upwards is arranged on the first supporting element (4), between bayonet (11) and ontology (1) Surround the limited mouth (5) of support transverse pipe.
6. being used for the suspension pieces of scaffold described according to claim 1 or 2 or 3 or 5, it is characterised in that: ontology is also set on (1) It is equipped with for the connector (12) of steady brace and the operation port (13) for adjusting pull rod, offers and be used on connector (12) The socket (18) that pull rod passes through.
7. the suspension pieces according to claim 6 for scaffold, it is characterised in that: ontology (1) further includes the first support Plate (20) is arranged in parallel with the first fixed ear (14), the second fixed ear (15), the first fixed ear (14) in the first support plate (20) With the second through-hole (16) that coaxial line is offered on the second fixed ear (15), the first fixed ear (14), the second fixed ear (15) and It is surrounded between first support plate (20) operation port (13), connector (12) is plugged on the first fixed ear (14) and the second fixed ear (15) in the second through-hole (16).
8. the suspension pieces according to claim 6 for scaffold, it is characterised in that: the edge of the second through-hole (16) is arranged Have gap (17), be provided on the lateral surface of connector (12) claw (19), claw (19) passes through gap (17) and is fastened on first Fixed ear (14) or the second fixed ear (15) are far from the lateral surface of operation port (13).
9. the suspension pieces according to claim 7 for scaffold, it is characterised in that: the first fixed ear (14) and second is consolidated Determine the second support plate (21) that parallel first support plate (20) is also connected between ear (15), the first fixing piece (3) is fixed on In two support plates (21).
10. the suspension pieces according to claim 6 for scaffold, it is characterised in that: ontology (1) includes vertical first Plate (8) and the second plate for being vertically fixed on the first plate (8) side, the second plate include upper second plate (9) and lower second Plate (10) surrounds socket (2) between upper second plate (9), lower second plate (10) and the first plate (8), upper second plate (9) and under Second plate (10) offers the first through hole (7) for grafting turnbuckle, the first support plate far from the one end of the first plate (8) It (20) is upper second plate (9), the first fixing piece (3) is arranged on the first support plate (20).
CN201821556469.3U 2018-09-21 2018-09-21 Suspension pieces for scaffold Active CN209323953U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821556469.3U CN209323953U (en) 2018-09-21 2018-09-21 Suspension pieces for scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821556469.3U CN209323953U (en) 2018-09-21 2018-09-21 Suspension pieces for scaffold

Publications (1)

Publication Number Publication Date
CN209323953U true CN209323953U (en) 2019-08-30

Family

ID=67707252

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821556469.3U Active CN209323953U (en) 2018-09-21 2018-09-21 Suspension pieces for scaffold

Country Status (1)

Country Link
CN (1) CN209323953U (en)

Similar Documents

Publication Publication Date Title
CN107558723A (en) A kind of method that Sloping roof is made and installed with hanging basket suspension frame
CN207764096U (en) A kind of construction supervision external wall and window side water test device
CN205918078U (en) Can dismantle mobile scaffold
CN209323953U (en) Suspension pieces for scaffold
CN209323952U (en) Overhanging scaffold
CN207010043U (en) A kind of JP cabinets inspection platform
CN204920178U (en) Attaching scaffold main part
CN109296194A (en) Suspension pieces and overhanging scaffold for scaffold
CN208534069U (en) The assembled support device of steel bar truss floor support plate composite floor system
CN108979116A (en) A kind of reinforcing heightening type hanging basket connection system
CN211143695U (en) Operating platform for assisting assembly type tower crane in dismounting
CN201339311Y (en) Turning plate device of hanging rack
CN208749071U (en) A kind of reinforcing heightening type hanging basket connection system
CN208830765U (en) Prefabricated balcony supporting apparatus
CN208280562U (en) Discharging platform promotes connector
CN208996021U (en) A kind of building enclosure of groove Larsen steel sheet pile
CN215107165U (en) Be used for steel construction welded operation platform
CN213742169U (en) Fabricated scaffold device for constructional engineering
CN221001896U (en) Bracket
CN219045297U (en) Scaffold upright rod supporting and fixing device for stair template inclined plane
CN107780644B (en) Operation platform for elevator shaft construction and use method thereof
CN215631515U (en) Construction hanging basket supporting system
CN210976518U (en) Adjustable building frame for house construction project
CN217175622U (en) Protection integration elevartor shaft operation platform
CN216840508U (en) Portable combined type external wall construction operation platform

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant