CN109296194A - Suspension pieces and overhanging scaffold for scaffold - Google Patents
Suspension pieces and overhanging scaffold for scaffold Download PDFInfo
- Publication number
- CN109296194A CN109296194A CN201811109915.0A CN201811109915A CN109296194A CN 109296194 A CN109296194 A CN 109296194A CN 201811109915 A CN201811109915 A CN 201811109915A CN 109296194 A CN109296194 A CN 109296194A
- Authority
- CN
- China
- Prior art keywords
- plate
- ontology
- scaffold
- suspension pieces
- fixed ear
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G5/04—Means for fastening, supporting, or bracing scaffolds on or against building constructions
- E04G5/045—Means for fastening, supporting, or bracing scaffolds on or against building constructions for fastening scaffoldings on profiles, e.g. I or H profiles
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Movable Scaffolding (AREA)
Abstract
The present invention relates to scaffold fields, disclose the suspension pieces and overhanging scaffold for scaffold, the socket (2) for being socketed horizontal shore is provided on its metal body (1), the first fixing piece (3) of fixed vertical pipe is provided on metal body (1), it is used to support the first supporting element (4) of transverse pipe, the limited mouth (5) of grafting transverse pipe is provided on first supporting element (4), the second fixing piece of suspension pieces is supported when being additionally provided with pre-installation on metal body (1), socket is c-type bayonet, the first through hole (7) for grafting turnbuckle is offered on the upper side wall and lower wall of c-type bayonet.Suspension pieces provided by the present invention have many advantages, such as that structure is simple, and intensity is reliable.The suspension pieces can be directly installed on horizontal shore in the case where horizontal shore has completed.Engineering staff is also possible to first install scaffold, when after the installation is completed, then covering in supporting beam again, is tensed with bolt.
Description
Technical field
The present invention relates to scaffold fields, more particularly to suspension pieces for scaffold.
Background technique
With the development of Architectural Equipment, the research and application of scaffold are improved rapidly, and various scaffolds set up form
It emerges in multitude, but these scaffolds are from ground to high-altitude integral erection mostly, scaffolding work amount is larger, for highly higher
Local construction area, it is high integrally to set up scaffold expense, therefore, the overhanging scaffold for skyscraper occurs.
Overhanging scaffold refers to scaffold of the frame structure off-load on the rigid Cantilever Beams (frame) for being attached to building structure, for building
Build operation and its security protection needs of the main body or fitting-out work in construction.Traditional overhanging scaffold is installed as, and is first poured
Concrete is built, when then concrete reaches intensity, carries out placing installation I-steel, then just can be carried out and set up scaffold, in this way
Construction procedure it is longer there are the duration, the disadvantages of lost labor.And shadow of such process mode by outside environmental elements
It rings, expends working hour, influence the progress of engineering.
Summary of the invention
The present invention is directed in the prior art since specific pipe fitting mounting means bring builds scaffold mode unicity,
The disadvantages of project progress is slower provides the suspension pieces for scaffold.
In order to solve the above technical problems, the present invention is addressed by following technical proposals:
For the suspension pieces of scaffold, including ontology, ontology is metal body or plastic body or wooden ontology, sheet
It is provided with the socket for being socketed horizontal shore on body, the first fixing piece of fixed vertical pipe is provided on ontology, is used for
The first supporting element of transverse pipe is supported, the limited mouth of grafting transverse pipe is provided on the first supporting element.Suspension pieces can not have
In the case where installing horizontal shore, using building for the steel pipe advanced hand cradle of traveling far and wide of combination suspension pieces, to save certain time
Working hour.
Preferably, supporting the second fixing piece of suspension pieces to realize pre-installation when being additionally provided with pre-installation on ontology.
Preferably, socket is c-type bayonet, offers on the upper side wall and lower wall of c-type bayonet and tensed for grafting
The first through hole of bolt.So that socket can more match different supporting beams, and it is easily installed.
Preferably, ontology includes vertical the first plate and the second plate for being vertically fixed on the first plate side, the
Two plates include upper second plate and lower second plate, and upper second plate descends between the second plate and the first plate to surround socket, upper second
Plate and lower second plate offer the first through hole for grafting turnbuckle far from one end of the first plate.
Preferably, the setting of the first fixing piece is on the second plate, space is saved, keeps total relatively reliable and compact.
Preferably, the top of socket is arranged in the first supporting element, promising opening upwards are set on the first supporting element
Bayonet surrounds the limited mouth of support transverse pipe between bayonet and ontology.It is convenient that horizontal cross bar is limited, and limit jail
It leans on, cross bar is convenient for adjusting and installation.
Preferably, being additionally provided on ontology for the connector of steady brace and the operation port for adjusting pull rod, even
The socket passed through for pull rod is offered on fitting.To save the use of components, and it is easy to adjust, it is whole to occupy sky
Between it is smaller.
Preferably, ontology further includes the first support plate, the first fixed ear, second solid is arranged in parallel in the first support plate
Determine ear, the second through-hole of coaxial line, the first fixed ear, the second fixed ear and are offered in the first fixed ear and the second fixed ear
Operation port is surrounded between one support plate, connector is plugged in the second through-hole of the first fixed ear and the second fixed ear.This kind knot
Structure has many advantages, such as easy to disassemble, assembles reliable.
Preferably, the edge of the second through-hole is provided with gap, claw is provided on the lateral surface of connector, claw passes through
Gap is fastened on the first fixed ear or the second fixed ear far from the lateral surface of operation port.
Preferably, being also connected with the second support of parallel first support plate between the first fixed ear and the second fixed ear
Plate, the first fixing piece are fixed in the second support plate.
Preferably, ontology includes vertical the first plate and the second plate for being vertically fixed on the first plate side, the
Two plates include upper second plate and lower second plate, and upper second plate descends between the second plate and the first plate to surround socket, upper second
Plate and lower second plate offer the first through hole for grafting turnbuckle far from one end of the first plate, and the first support plate is upper
Second plate, the first fixing piece are arranged in the first support plate.
It further includes scaffold ontology and support leg hand that the present invention also provides a kind of scaffolds including above-mentioned suspension pieces
Several supporting beams of frame ontology, supporting beam are mounted on wall, and suspension pieces are sleeved and fixed by socket and are mounted in supporting beam.
The present invention by adopting the above technical scheme, has the advantages that
Suspension pieces provided by the present invention have many advantages, such as that structure is simple, and intensity is reliable.The suspension pieces are horizontally-supported
In the case that beam has completed, it can be directly installed on horizontal shore.When horizontal shore due to extraneous factor cannot and
When completion in the case where, engineering staff, which can be, first installs scaffold, when after the installation is completed, then being covered again in supporting beam
On, it is tensed with bolt.It can certainly construct simultaneously, so as to shorten working hour.The suspension pieces are able to carry out to level
Transverse tube, vertical pipe are supported, and are supported reliable.
And scaffold installation form multiplicity provided by the invention, it can satisfy the different demands of engineering staff, scaffold
Assembly can be separated and independently performed in the fixation of ontology built with supporting beam, substantially reduce the time of engineering scaffold installation,
And scaffold installation and adjustment are convenient, and it is fixed.
The device can shorten the construction period, and save manually, improve the performance of enterprises, saved cost and material.
Detailed description of the invention
Fig. 1 is the structural schematic diagram that embodiment 1 and embodiment 2 overhang part;
Fig. 2 is the schematic perspective view that embodiment 3 overhangs part;
Fig. 3 is the structural schematic diagram that embodiment 4 overhangs part;
Fig. 4 is that the pre- of overhanging scaffold builds schematic diagram;
Fig. 5 is the partial enlarged view of Fig. 4;
Fig. 6 is the scheme of installation for overhanging part and supporting beam.
Technical name corresponding to appended drawing reference in figure are as follows: 1-ontology, 2-sockets, the 3-the first fixing piece, 4-
Under first supporting element, 5-limited mouths, the 6-the second fixing piece, 7-first through hole, the 8-the first plate, 9-upper second plates, 10-
Second plate, 11-bayonets, 12-connectors, 13-operation ports, the 14-the first fixed ear, the 15-the second fixed ear, 16-the second
Through-hole, 17-gap, 18-sockets, 19-claws, the 20 one the first support plates, the 21 one the second support plates.
Specific embodiment
Present invention is further described in detail with embodiment with reference to the accompanying drawing.
Embodiment 1
As shown in Figure 1, being used for the suspension pieces of scaffold, including ontology 1, ontology 1 is metal body, wherein in the present embodiment
Ontology 1 is steel construction piece.The socket 2 for being socketed horizontal shore is provided on ontology 1, the effect of socket 2 is to cover
It connects and entire suspension pieces is supported in supporting beam.The first fixing piece 3 of fixed vertical pipe is provided on ontology 1, for branch
The first supporting element 4 of transverse pipe is supportted, the limited mouth 5 of grafting transverse pipe is provided on the first supporting element 4.First fixing piece 3 and
One supporting element 4 is welded and fixed with ontology 1.First fixing piece 3 is pipe fitting.The socket 2 is c-type bayonet, c-type bayonet
The first through hole 7 for grafting turnbuckle is offered on upper side wall and lower wall.In the present embodiment, ontology 1 includes vertical
The first plate 8 and be vertically fixed on the second plate of 8 side of the first plate, the second plate includes upper second plate 9 and lower second
Plate 10 surrounds socket 2 between upper second plate 9, lower second plate 10 and the first plate 8, and upper second plate 9 and lower second plate 10 are separate
One end of first plate 8 offers the first through hole 7 for grafting turnbuckle, and in the present embodiment, the first fixing piece 3 is welded on
On upper second plate 9.
The upside of socket 2 is arranged in first supporting element 4, and the purpose that upside is arranged in is not influence 2 grafting of socket
In supporting beam.In the present embodiment, the edge of upper second plate 9 is arranged in the first supporting element 4.It is provided on first supporting element 4
For the bayonet 11 of opening upwards, the limited mouth 5 of support transverse pipe is surrounded between bayonet 11 and ontology 1.In the present embodiment, first
Supporting element 4 is the plate of arc, so bayonet 11 is arc port, ensure that limited mouth 5 supports stablizing for cross bar.
During installation, socket 2 is socketed in supporting beam, uses bolt and cushion block in need after then adjusting position
If pass through first through hole 7, suspension pieces are fixedly mounted in supporting beam.Then it carries out building scaffold.Vertical pipe is plugged on
In the first vertical fixing piece 3.
Embodiment 2
As being in place of Fig. 1 the present embodiment and the difference of embodiment 1, support is hanging when being additionally provided with pre-installation on ontology 1
Second fixing piece 6 of part.Second fixing piece 6 is the pipe fitting of upper end sealing.Second fixing piece 6 is mounted on the side of the first plate 8.
Wherein, when the effect of the second fixing piece 6 is to pre-install scaffold, entire suspension pieces is made to have a brace foundation, makes to hang
Empty part can be reliable and stable be mounted on pre-installation bottom plate, specific second fixing piece 6 is plugged on pre-installation bottom plate, lower the
The lower end surface of two plates 10 contradicts on the horizontal transverse-pipe of scaffold.
Embodiment 3
As shown in Fig. 2, being used for the suspension pieces of scaffold, including ontology 1, wherein ontology 1 is steel construction piece.It is set on ontology 1
Be equipped with the socket 2 for being socketed horizontal shore, the effect of socket 2 be to be socketed in supporting beam to entire suspension pieces into
Row support.It is provided with the first fixing piece 3 of fixed vertical pipe on ontology 1, is used to support the first supporting element 4 of transverse pipe, first
The limited mouth 5 of grafting transverse pipe is provided on supporting element 4.First fixing piece 3 and the first supporting element 4 weld with ontology 1 solid
It is fixed.First fixing piece 3 is pipe fitting.The socket 2 is c-type bayonet, offers and is used on the upper side wall and lower wall of c-type bayonet
The first through hole 7 of grafting turnbuckle.In the present embodiment, ontology 1 includes the first vertical plate 8 and is vertically fixed on first
Second plate of 8 side of plate, the second plate include upper second plate 9 and lower second plate 10, upper second plate 9, lower second plate 10 with
Socket 2 is surrounded between first plate 8, upper second plate 9 and lower second plate 10 are offered far from one end of the first plate 8 for inserting
Connect the first through hole 7 of turnbuckle, in the present embodiment, the first fixing piece 3 is welded on the second plate 9.
The upside of socket 2 is arranged in first supporting element 4, and the purpose that upside is arranged in is not influence 2 grafting of socket
In supporting beam.In the present embodiment, the edge of upper second plate 9 is arranged in the first supporting element 4.It is provided on first supporting element 4
For the bayonet 11 of opening upwards, the limited mouth 5 of support transverse pipe is surrounded between bayonet 11 and ontology 1.In the present embodiment, first
Supporting element 4 is the plate of arc, so bayonet 11 is arc port, ensure that limited mouth 5 supports stablizing for cross bar.
The second fixing piece 6 of suspension pieces is supported when being additionally provided with pre-installation on ontology 1.Second fixing piece 6 is upper end sealing
Pipe fitting.Second fixing piece 6 is mounted on the side of the first plate 8.Wherein, the effect of the second fixing piece 6 be to scaffold into
When row pre-installation, entire suspension pieces is made to have a brace foundation, enables suspension pieces are reliable and stable to be mounted on pre-installation bottom plate,
Specific second fixing piece 6 is plugged on pre-installation bottom plate, and the lower end surface of lower second plate 10 contradicts the horizontal transverse-pipe in scaffold
On.
It is additionally provided on ontology 1 for the connector 12 of steady brace and the operation port 13 for adjusting pull rod, connector
The socket 18 passed through for pull rod is offered on 12, after wherein pull rod passes through operation port 13, engineering staff passes through in operation port 13
The bolt being mounted on pull rod is adjusted pull rod is adjusted.Ontology 1 further includes the first support plate 20, is put down in the first support plate 20
Row is provided with the first fixed ear 14, the second fixed ear 15, offers coaxial line in the first fixed ear 14 and the second fixed ear 15
Second through-hole 16, surrounds operation port 13 between the first fixed ear 14, the second fixed ear 15 and the first support plate 20, connector 12 is inserted
It connects in the second through-hole 16 of the first fixed ear 14 and the second fixed ear 15.In the present embodiment, the first fixed ear 14 and second
Fixed ear 15 is independent two plates, and the first support plate 20 is upper second plate 9, and the first fixed ear 14 and the second fixed ear 15 are solid
Fixed to be arranged on upper second plate 9, the edge of the second through-hole 16 is provided with gap 17, is provided with claw on the lateral surface of connector 12
19, claw 19 passes through gap 17 and is fastened on the first fixed ear 14 or the second lateral surface of the fixed ear 15 far from operation port 13, institute
The bolt that connector 12 is steel material is stated, the both ends of connector 12 are arranged in clamping jaw, and wherein the shape of claw 19 can be protrusion
The plate of side the edge of the second through-hole 16 can be stuck in after then rotating as long as guaranteeing that clamping jaw can be pierced by from gap 17.
The both ends of connector 12 can be respectively provided with identical claw 19, need not distinguish between insertion end during installation in this way, can also only one
The limited block of other shapes is arranged in end setting claw 19, the other end, guarantees that connector 12 will not be extracted from the second through-hole 16.
Wherein, the first fixing piece of the present embodiment 3 is fixed on the top of the second plate 9, and is located at the first fixed ear 14 and the
It between two fixed ears 15, should know the program not and be unique, the advantages of such set-up mode is, saves accounting for for suspension pieces
With space, keep total more compact.And to guarantee that the pull rod being pierced by is fixed with being plugged on first during conceptual design
Vertical bar on part 3 is not in interference phenomenon.
Embodiment 4
As shown in figure 3, being in place of the present embodiment and the difference of embodiment 3, the first fixed ear 14 and the second fixed ear 15
Between be also connected with the second support plate 21 of parallel first support plate 20, the first fixing piece 3 is fixed in the second support plate 21.
Embodiment 5
It is in place of the present embodiment and the difference of embodiment 3, connector 12 and the first fixed ear 14, the second fixed ear 15 are
Fixed non-dismountable connection.Only need to guarantee that connecting rod can there are operation ports 13 on socket 18 and ontology 1.
Embodiment 6
Be in place of the present embodiment and the difference of embodiment 3: connector 12 can be in such a way that bolt and nut be fixed
It is designed, can also be designed by the way of bolt and lock, guarantee that connector 12 has certain activity space.
Embodiment 7
It is in place of the difference of the present embodiment and embodiment 2~6, the second fixing piece 6 is support plate, is made described hanging
Part does not need pre-installation frame in pre-installation.
Embodiment 8
As shown in Fig. 1 and Fig. 4, Fig. 5, Fig. 6, overhanging scaffold, including suspension pieces ontology 1, bottom are mounted on suspension pieces
Scaffold ontology 22 on ontology 1 and the supporting beam 23 for installing suspension pieces ontology 1, scaffold ontology 22 include vertical pipe fitting
231, lateral pipe fitting 232 is provided with socket 2, the first fixing piece 3, the first supporting element 4, the first supporting element on suspension pieces ontology 1
Limited mouth 5 is provided on 4, lateral pipe fitting 232 is plugged in limited mouth 5, and suspension pieces ontology 1 is arranged by socket 2 and is fixed on
In supporting beam 23, vertical pipe fitting 231 is fixed on suspension pieces ontology 1 by the first fixing piece 3.Wherein suspension pieces ontology 1 is steel
Structural member.Socket 2 is c-type bayonet, and for grafting turnbuckle 25 is offered on the upper side wall and lower wall of c-type bayonet
One through-hole 7;It further include turnbuckle 25, turnbuckle 25 passes through the first through hole 7 of upper side wall and the first through hole 7 of lower wall,
Suspension pieces ontology 1 is fixed in supporting beam 23 by nut.In the present embodiment, suspension pieces ontology 1 includes vertical first
Plate 8 and the second plate for being vertically fixed on 8 side of the first plate, the second plate include upper second plate 9 and lower second plate 10, on
Socket 2 is surrounded between second plate 9, lower second plate 10 and the first plate 8, upper second plate 9 and lower second plate 10 are far from the first plate
One end of part 8 offers the first through hole 7 for grafting turnbuckle 25, and in the present embodiment, the first fixing piece 3 is welded on
On two plates 9.
The upside of socket 2 is arranged in first supporting element 4, and the purpose that upside is arranged in is not influence 2 grafting of socket
In supporting beam.In the present embodiment, the edge of upper second plate 9 is arranged in the first supporting element 4.It is provided on first supporting element 4
For the bayonet 11 of opening upwards, the limited mouth 5 of support transverse pipe is surrounded between bayonet 11 and suspension pieces ontology 1.In the present embodiment
In, the first supporting element 4 is the plate of arc, so bayonet 11 is arc port, ensure that limited mouth 5 supports stablizing for cross bar.
During installation, socket 2 is socketed in supporting beam 23, then adjusts behind position that (and cushion block has using bolt
If needing) first through hole 7 is passed through, suspension pieces ontology 1 is fixedly mounted in supporting beam.Wherein it is arranged in every supporting beam 23
There are two suspension pieces ontology 1, transversely 232 length direction of pipe fitting is distributed supporting beam 23, and adjacent lateral pipe fitting 232 passes through longitudinal direction
Pipe fitting 233 is connected and fixed, to build one layer of scaffold.Wherein, the limit of two suspension pieces ontologies 1 in every supporting beam 23
Mouth 23 is oppositely arranged.
Embodiment 9
Such as Fig. 1 and Fig. 4, Fig. 5, Fig. 6, it is in place of the present embodiment and the difference of embodiment 1, is also set on suspension pieces ontology 1
The second fixing piece 6 of suspension pieces is supported when being equipped with pre-installation.Second fixing piece 6 is the pipe fitting of upper end sealing.Second fixing piece 6 peace
Mounted in the side of the first plate 8.Wherein, when the effect of the second fixing piece 6 is to pre-install scaffold, make entire hanging
Part ontology 1 has a brace foundation, enables suspension pieces ontology 1 is reliable and stable to be mounted on pre-installation frame 24, and specific second
Fixing piece 6 is plugged on pre-installation frame 24, and the lower end surface of lower second plate 10 is contradicted in the upside of scaffold transverse direction pipe fitting 232.Its
It in middle the present embodiment, pre-installs and is provided with support column on frame 24, the second fixing piece 6 on the support columns, then leads to for pipe fitting grafting
Crossing bolt is tightly fastened the second fixing piece 6 and support column.Wherein support column with suspension pieces ontology 1 correspond.
Embodiment 10
As shown in Fig. 2 and Fig. 4, Fig. 5, Fig. 6, overhanging scaffold, including suspension pieces ontology 1, bottom are mounted on suspension pieces
Scaffold ontology 22 on ontology 1 and the supporting beam 23 for installing suspension pieces ontology 1, scaffold ontology 22 include vertical pipe fitting
231, lateral pipe fitting 232 is provided with socket 2, the first fixing piece 3, the first supporting element 4, the first supporting element on suspension pieces ontology 1
Limited mouth 5 is provided on 4, lateral pipe fitting 232 is plugged in limited mouth 5, and suspension pieces are arranged by socket and are fixed on supporting beam
On, vertical pipe fitting 231 is fixed on suspension pieces ontology 1 by the first fixing piece 3.Wherein suspension pieces ontology 1 is steel construction piece.Set
Interface 2 is c-type bayonet, and the first through hole 7 for grafting turnbuckle 25 is offered on the upper side wall and lower wall of c-type bayonet;
It further include turnbuckle 25, turnbuckle 25 passes through the first through hole 7 of upper side wall and the first through hole 7 of lower wall, passes through nut
Suspension pieces ontology 1 is fixed in supporting beam 23.In the present embodiment, suspension pieces ontology 1 includes the first vertical plate 8 and hangs down
Directly it is fixed on the second plate of 8 side of the first plate, the second plate includes upper second plate 9 and lower second plate 10, upper second plate 9,
Socket 2, the one end of upper second plate 9 and lower second plate 10 far from the first plate 8 are surrounded between lower second plate 10 and the first plate 8
Offer the first through hole 7 for grafting turnbuckle 25, in the present embodiment, the first fixing piece 3 is welded on the second plate 9.
The upside of socket 2 is arranged in first supporting element 4, and the purpose that upside is arranged in is not influence 2 grafting of socket
In supporting beam.In the present embodiment, the edge of upper second plate 9 is arranged in the first supporting element 4.It is provided on first supporting element 4
For the bayonet 11 of opening upwards, the limited mouth 5 of support transverse pipe is surrounded between bayonet 11 and suspension pieces ontology 1.In the present embodiment
In, the first supporting element 4 is the plate of arc, so bayonet 11 is arc port, ensure that limited mouth 5 supports stablizing for cross bar.
During installation, socket 2 is socketed in supporting beam 23, then being had behind adjustment position using bolt and cushion block is needed
First through hole 7 is passed through if wanting, and suspension pieces ontology 1 is fixedly mounted in supporting beam.Wherein it is provided in every supporting beam 23
Two suspension pieces ontologies 1, transversely 232 length direction of pipe fitting is distributed supporting beam 23, and adjacent lateral pipe fitting 232 passes through longitudinal pipe
Part 233 is connected and fixed, to build one layer of scaffold.Wherein, the limited mouth of two suspension pieces ontologies 1 in every supporting beam 23
23 are oppositely arranged.
The second fixing piece 6 of suspension pieces is supported when being additionally provided with pre-installation on suspension pieces ontology 1.Second fixing piece 6 is upper
Hold the pipe fitting of sealing.Second fixing piece 6 is mounted on the side of the first plate 8.Wherein, the effect of the second fixing piece 6 is to foot
When hand cradle is pre-installed, entire suspension pieces ontology 1 is set to have a brace foundation, the peace for keeping suspension pieces ontology 1 reliable and stable
On pre-installation frame 24, specific second fixing piece 6 is plugged on pre-installation frame 24, and the lower end surface of lower second plate 10 contradicts
The upside of scaffold transverse direction pipe fitting 232.Wherein in the present embodiment, pre-installs and be provided with support column 241, the second fixing piece on frame 24
6 are plugged on support column 241 for pipe fitting, are then tightly fastened the second fixing piece 6 and support column by bolt.Wherein support column
With suspension pieces ontology 1 correspond.
Further include pull rod 26, is additionally provided on suspension pieces ontology 1 for the connector 12 of steady brace 26 and for adjusting
The operation port 13 of pull rod 26 offers the socket 18 passed through for pull rod 26 on connector 12;One end of pull rod 26 is fixed on foot
On hand cradle ontology 22, the other end passes through socket 18 and is fixed by nut, and after wherein pull rod 26 passes through operation port 13, engineering staff is logical
It crosses and pull rod 26 is adjusted in the bolt that the adjusting of operation port 13 is mounted on pull rod 26.Suspension pieces ontology 1 further includes first
Fagging 20, the first fixed ear 14, the second fixed ear 15 are arranged in parallel in the first support plate 20, and the first fixed ear 14 and second is solid
The second through-hole 16 that coaxial line is offered on ear 15 is determined, between the first fixed ear 14, the second fixed ear 15 and the first support plate 20
Operation port 13 is surrounded, connector 12 is plugged in the second through-hole 16 of the first fixed ear 14 and the second fixed ear 15.In this implementation
In example, the first fixed ear 14 and the second fixed ear 15 are independent two plates, and the first support plate 20 is upper second plate 9, and first
Fixed ear 14 and the second fixed ear 15 are fixed on the second plate 9, and the edge of the second through-hole 16 is provided with gap 17, connection
Claw 19 is provided on the lateral surface of part 12, claw 19 passes through gap 17 and is fastened on the first fixed ear 14 or the second fixed ear 15 far
On lateral surface from operation port 13, the connector 12 is the bolt of steel material, and the both ends of connector 12 are arranged in clamping jaw, wherein
The shape of claw 19 can be the plate of side outstanding, as long as guaranteeing that clamping jaw can be pierced by from gap 17, energy after then rotating
Enough it is stuck in the edge of the second through-hole 16.The both ends of connector 12 can be respectively provided with identical claw 19, be not required to during installation in this way
Distinguish insertion end, can also one end claw 19 is set, the limited block of other shapes is arranged in the other end, guarantees connector 12 not
It can be extracted from the second through-hole 16.
Wherein, the first fixing piece of the present embodiment 3 is fixed on the top of the second plate 9, and is located at the first fixed ear 14 and the
It between two fixed ears 15, should know the program not and be unique, the advantages of such set-up mode is, saves accounting for for suspension pieces
With space, keep total more compact.
Embodiment 11
As shown in Fig. 3, Fig. 4, Fig. 5, Fig. 6, it is in place of the present embodiment and the difference of embodiment 3,14 He of the first fixed ear
The second support plate 21 of parallel first support plate 20 is also connected between second fixed ear 15, the first fixing piece 3 is fixed on second
In support plate 21.
Embodiment 12
It is in place of the present embodiment and the difference of all of above embodiment, ontology 1 is plastic body, and component is plastic part,
Intensity requirement is only needed to meet.
Embodiment 13
It is in place of the present embodiment and the difference of all of above embodiment, ontology 1 is wooden ontology, it is only necessary to intensity requirement
Satisfaction.
In short, the foregoing is merely presently preferred embodiments of the present invention, it is all according to equalization made by scope of the present invention patent
Variation and modification, shall all be covered by the patent of the invention.
Claims (10)
1. be used for the suspension pieces of scaffold, including ontology (1), ontology (1) is metal body or plastic body or wooden ontology,
It is characterized in that: being provided with the socket (2) for being socketed horizontal shore on ontology (1), ontology is provided on (1) for fixing
The first fixing piece (3) of vertical pipe, the first supporting element (4) for being used to support transverse pipe, the first supporting element are provided with grafting on (4)
The limited mouth (5) of transverse pipe.
2. the suspension pieces according to claim 1 for scaffold, it is characterised in that: ontology is additionally provided with pre- peace on (1)
The second fixing piece (6) of suspension pieces is supported when dress.
3. the suspension pieces according to claim 1 for scaffold, it is characterised in that: socket (2) is c-type bayonet, c-type
The first through hole (7) for grafting turnbuckle is offered on the upper side wall and lower wall of bayonet.
4. the suspension pieces according to claim 1 for scaffold, it is characterised in that: the first supporting element (4) setting is covering
The upside of interface (2) bayonet (11) of promising opening upwards is arranged on the first supporting element (4), between bayonet (11) and ontology (1)
Surround the limited mouth (5) of support transverse pipe.
5. any suspension pieces for scaffold according to claim 1, it is characterised in that: ontology is additionally provided on (1)
Operation port (13) for the connector (12) of steady brace and for adjusting pull rod, connector offer on (12) for pull rod
The socket (18) passed through.
6. the suspension pieces according to claim 6 for scaffold, it is characterised in that: ontology (1) further includes the first support
Plate (20) is arranged in parallel with the first fixed ear (14), the second fixed ear (15), the first fixed ear (14) in the first support plate (20)
With the second through-hole (16) that coaxial line is offered on the second fixed ear (15), the first fixed ear (14), the second fixed ear (15) and
It is surrounded between first support plate (20) operation port (13), connector (12) is plugged on the first fixed ear (14) and the second fixed ear
(15) in the second through-hole (16).
7. the suspension pieces according to claim 6 for scaffold, it is characterised in that: the edge of the second through-hole (16) is arranged
Have gap (17), be provided on the lateral surface of connector (12) claw (19), claw (19) passes through gap (17) and is fastened on first
Fixed ear (14) or the second fixed ear (15) are far from the lateral surface of operation port (13).
8. the suspension pieces according to claim 7 for scaffold, it is characterised in that: the first fixed ear (14) and second is consolidated
Determine the second support plate (21) that parallel first support plate (20) is also connected between ear (15), the first fixing piece (3) is fixed on
In two support plates (21).
9. the suspension pieces according to claim 6 for scaffold, it is characterised in that: ontology (1) includes vertical first
Plate (8) and the second plate for being vertically fixed on the first plate (8) side, the second plate include upper second plate (9) and lower second
Plate (10) surrounds socket (2) between upper second plate (9), lower second plate (10) and the first plate (8), upper second plate (9) and under
Second plate (10) offers the first through hole (7) for grafting turnbuckle, the first support plate far from the one end of the first plate (8)
It (20) is upper second plate (9), the first fixing piece (3) is arranged on the first support plate (20).
10. a kind of suspension pieces scaffold, it is characterised in that: any one suspension pieces including claim 1~9, further include foot
Several supporting beams (23) of hand cradle ontology (22) and support scaffolding ontology (22), supporting beam (23) are mounted on wall, vacantly
Part is sleeved and fixed by socket (2) and is mounted on supporting beam (23).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811109915.0A CN109296194B (en) | 2018-09-21 | 2018-09-21 | A unsettled piece and overhanging type scaffold for scaffold |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811109915.0A CN109296194B (en) | 2018-09-21 | 2018-09-21 | A unsettled piece and overhanging type scaffold for scaffold |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109296194A true CN109296194A (en) | 2019-02-01 |
CN109296194B CN109296194B (en) | 2020-12-08 |
Family
ID=65163822
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811109915.0A Active CN109296194B (en) | 2018-09-21 | 2018-09-21 | A unsettled piece and overhanging type scaffold for scaffold |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109296194B (en) |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6126127A (en) * | 1998-10-15 | 2000-10-03 | Redev Management Corporation | Bracket assembly |
JP2001323653A (en) * | 2000-05-16 | 2001-11-22 | Maeda Corp | Suspended scaffold for steel work |
JP2010185185A (en) * | 2009-02-10 | 2010-08-26 | Sekisui House Ltd | Temporary handrail and its construction method |
CN202000649U (en) * | 2011-01-12 | 2011-10-05 | 厦门源昌城建集团有限公司 | Movable strengthening device for bottom of upright stenshion of construction cantilevered frame |
CN203867159U (en) * | 2014-04-22 | 2014-10-08 | 西安工业大学 | Sleeve type cantilever scaffold structure |
CN104179341A (en) * | 2014-08-25 | 2014-12-03 | 中国十七冶集团有限公司 | Method for mounting combining and positioning devices of cantilever bearing frames |
JP2015148098A (en) * | 2014-02-06 | 2015-08-20 | 株式会社杉孝 | Beam frame receiving tool |
CN204645589U (en) * | 2015-05-05 | 2015-09-16 | 通州建总集团有限公司 | A kind of tool-type builder's jack bracing device |
-
2018
- 2018-09-21 CN CN201811109915.0A patent/CN109296194B/en active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6126127A (en) * | 1998-10-15 | 2000-10-03 | Redev Management Corporation | Bracket assembly |
JP2001323653A (en) * | 2000-05-16 | 2001-11-22 | Maeda Corp | Suspended scaffold for steel work |
JP2010185185A (en) * | 2009-02-10 | 2010-08-26 | Sekisui House Ltd | Temporary handrail and its construction method |
CN202000649U (en) * | 2011-01-12 | 2011-10-05 | 厦门源昌城建集团有限公司 | Movable strengthening device for bottom of upright stenshion of construction cantilevered frame |
JP2015148098A (en) * | 2014-02-06 | 2015-08-20 | 株式会社杉孝 | Beam frame receiving tool |
CN203867159U (en) * | 2014-04-22 | 2014-10-08 | 西安工业大学 | Sleeve type cantilever scaffold structure |
CN104179341A (en) * | 2014-08-25 | 2014-12-03 | 中国十七冶集团有限公司 | Method for mounting combining and positioning devices of cantilever bearing frames |
CN204645589U (en) * | 2015-05-05 | 2015-09-16 | 通州建总集团有限公司 | A kind of tool-type builder's jack bracing device |
Also Published As
Publication number | Publication date |
---|---|
CN109296194B (en) | 2020-12-08 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107558723A (en) | A kind of method that Sloping roof is made and installed with hanging basket suspension frame | |
CN209323952U (en) | Overhanging scaffold | |
CN109296194A (en) | Suspension pieces and overhanging scaffold for scaffold | |
CN209323953U (en) | Suspension pieces for scaffold | |
CN204920178U (en) | Attaching scaffold main part | |
CN108373106B (en) | Photovoltaic module integral hoisting method | |
CN108252447B (en) | Suspended ceiling base device and installation method | |
CN211447277U (en) | Constructional column reinforcing bar construction equipment under roof beam | |
CN217353535U (en) | Template reinforcing apparatus is hung to floor structure board position of falling | |
CN211143695U (en) | Operating platform for assisting assembly type tower crane in dismounting | |
CN213879155U (en) | Just, dismantlement formula cable erection crane span structure of electromechanical engineering installation usefulness | |
CN211114703U (en) | House building electromechanical engineering is with portable maintenance frame | |
CN211037509U (en) | Suspended ceiling mounting structure under steel construction with spherical node | |
CN210685332U (en) | Spraying device convenient to install on climbing frame | |
CN215564421U (en) | Y-shaped jacking for bottom die support | |
CN208280562U (en) | Discharging platform promotes connector | |
CN215107165U (en) | Be used for steel construction welded operation platform | |
CN207007022U (en) | For deep-foundation pit engineering support beam demolition blasting flyrock protection device | |
KR102398117B1 (en) | Assembling jig for assembling the framework | |
CN219045297U (en) | Scaffold upright rod supporting and fixing device for stair template inclined plane | |
CN216196535U (en) | Support diagonal rod convenient to disassemble and assemble and used for inner and outer vertical rods of climbing frame | |
CN217419584U (en) | U-shaped lower hanging Larsen steel sheet pile steel purlin bracket replacing device | |
CN221001896U (en) | Bracket | |
CN205530776U (en) | Removable formula damping device that trades of rubber support | |
CN220058983U (en) | Quick-dismantling horizontal safety protection device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |