CN215107165U - Be used for steel construction welded operation platform - Google Patents

Be used for steel construction welded operation platform Download PDF

Info

Publication number
CN215107165U
CN215107165U CN202120801847.5U CN202120801847U CN215107165U CN 215107165 U CN215107165 U CN 215107165U CN 202120801847 U CN202120801847 U CN 202120801847U CN 215107165 U CN215107165 U CN 215107165U
Authority
CN
China
Prior art keywords
platform
board
diaphragm
steel
steel structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120801847.5U
Other languages
Chinese (zh)
Inventor
王吉河
董福国
王忠云
冯琳
王祥宝
王振宇
许晓煌
刘成
赵哲
赵文明
何薇
孙自彬
徐传良
宋子浩
李文治
姚义强
韩存金
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing International Construction Group Co ltd
Beijing Construction Engineering Group Co Ltd
Original Assignee
Beijing International Construction Group Co ltd
Beijing Construction Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing International Construction Group Co ltd, Beijing Construction Engineering Group Co Ltd filed Critical Beijing International Construction Group Co ltd
Priority to CN202120801847.5U priority Critical patent/CN215107165U/en
Application granted granted Critical
Publication of CN215107165U publication Critical patent/CN215107165U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model relates to an operation platform for steel construction welding belongs to the technical field of steel construction, and it includes the platform frame, the platform frame includes two platform boards that set up relatively, two many platform poles of fixedly connected with between the platform board, two fixedly connected with diaphragm between the platform board, just the diaphragm sets up the one end of platform board, the diaphragm is kept away from a plurality of installation cards have set firmly in the one side of platform board. This application has the effect that improves steel construction welding operation efficiency of construction.

Description

Be used for steel construction welded operation platform
Technical Field
The application relates to the field of steel structure construction, in particular to an operating platform for steel structure welding.
Background
At present, in the steel structure building engineering work process, there is more girder steel welding, and the girder steel generally is the I-shaped roof beam, and the general construction steel platform that uses carries out welding operation during the construction, but when using construction steel platform, need set up the scaffold on ground, then install steel platform on scaffold, this kind of steel platform needs a large amount of steel pipe scaffold, sets up for a long time to the efficiency of construction has been influenced.
SUMMERY OF THE UTILITY MODEL
In order to improve steel construction welding operation's efficiency of construction, this application provides an operation platform for steel construction welding.
The application provides a be used for steel construction welded operation platform adopts following technical scheme:
the utility model provides an operation platform for steel construction welding, includes the platform frame, the platform frame includes two platform boards of relative setting, two many platform poles of fixedly connected with between the platform board, two fixedly connected with diaphragm between the platform board, just the diaphragm sets up the one end of platform board, the diaphragm is kept away from a plurality of installation cards have set firmly in the one side of platform board.
Through adopting above-mentioned technical scheme, set firmly the installation card on the platform frame to install the platform frame on the girder steel through the installation card, make operating personnel can stand and carry out welding operation on the platform frame, avoided setting up the scaffold frame and carried out welding operation again, shortened construction cycle, improved the efficiency of construction, and platform frame simple structure is convenient for process at the job site.
Optionally, the installation card includes the mounting panel, the mounting panel is the rectangle steel sheet, the mounting panel is kept away from the draw-in groove has been seted up to the one end of diaphragm, the draw-in groove card is gone into on the flange board of girder steel.
Through adopting above-mentioned technical scheme, installation card simple structure, the preparation of being convenient for to installation card that the card can stabilize is on the flange board of girder steel.
Optionally, the installation card is close to the installation of diaphragm top, the diaphragm is kept away from the one side bottom of landing slab has set firmly many spinal branchs vaulting pole, bracing piece one end with diaphragm fixed connection, other end butt is in the flange board bottom surface of girder steel.
Through adopting above-mentioned technical scheme, when operating personnel stood on the platform frame, the platform frame received decurrent pressure, and an effort is applyed to the platform frame in the flange board bottom surface of girder steel to the bracing piece can be contradicted, offsets the platform frame and received decurrent pressure to make the bracing piece can play the supporting role to the platform frame, make the installation of platform frame more firm.
Optionally, the bracing piece is kept away from the one end of diaphragm has set firmly the backup pad, the backup pad with the flange board bottom surface laminating of girder steel.
Through adopting above-mentioned technical scheme, the backup pad can increase the area of contact of the flange board bottom surface of bracing piece and girder steel, makes the bracing piece more stable to make the bracing piece can effectually play the supporting role to the platform frame.
Optionally, two the landing slab top is provided with the breast board respectively.
Through adopting above-mentioned technical scheme, the breast board can block platform frame both sides, avoids operating personnel to fall platform frame, guarantees construction safety.
Optionally, the breast board with the landing slab passes through the hinge articulated, the hinge sets up two the one side that the landing slab was kept away from each other, two one side that the landing slab is relative still is provided with and is used for fixing the couple of breast board, two the one side that the landing slab was kept away from each other has set firmly the fixed plate respectively, the fixed plate is the right angle triangle-shaped board, a right angle limit of fixed plate with landing slab fixed connection, another right angle limit with breast board bottom parallel and level.
Through adopting above-mentioned technical scheme, make breast board and platform board articulated through the hinge to set up the fixed plate, opening the platform board, can make being in the horizontality that the platform board is firm, the breast board can increase the area of platform frame, enlarges operating personnel's working range, is convenient for more construct.
Optionally, a plurality of connecting plates are fixedly connected between the two platform plates.
Through adopting above-mentioned technical scheme, the connecting plate links together two landing slabs, has improved the stability of platform frame.
Optionally, the platform rod is made of round steel with a diameter of phi 25.
Through adopting above-mentioned technical scheme, phi 25's round steel intensity is high to be convenient for draw materials at the building site.
In summary, the present application includes at least one of the following beneficial technical effects:
1. the installation clamp is fixedly arranged on the platform frame, and the platform frame is installed on the steel beam through the installation clamp, so that an operator can stand on the platform frame to perform welding operation, the scaffold is prevented from being erected and then the welding operation is performed, the construction period is shortened, the construction efficiency is improved, and the platform frame is simple in structure and convenient to process on a construction site;
2. when an operator stands on the platform frame, the platform frame is pressed downwards, the support rods can be abutted against the bottom surface of the flange plate of the steel beam, an acting force is applied to the platform frame to offset the downward pressure applied to the platform frame, so that the support rods can support the platform frame, and the platform frame is more stably installed;
3. make breast board and platform board articulated through the hinge to set up the fixed plate, opening the platform board, can make the firm level state that is in of platform board, the breast board can increase the area of platform frame, enlarges operating personnel's operation scope, is convenient for more construct.
Drawings
Fig. 1 is a schematic perspective view of the present application.
FIG. 2 is a perspective view of the present application with the gate open.
Fig. 3 is a perspective view of the present application highlighting the support bar.
Description of reference numerals: 1. a platform frame; 11. a platform plate; 12. a platform bar; 13. a transverse plate; 14. a connecting plate; 2. installing a card; 21. mounting a plate; 22. a card slot; 3. a breast board; 31. a fixing plate; 32. hooking; 33. a shackle; 4. a support bar; 41. a support plate; 5. a steel beam.
Detailed Description
The present application is described in further detail below with reference to figures 1-3.
The embodiment of the application discloses an operation platform for steel structure welding. Referring to fig. 1, an operation platform for welding a steel structure includes a platform frame 1 and an installation card 2 for installing the platform frame 1.
Install installation card 2 on platform frame 1, install platform frame 1 on the flange board of girder steel 5 through installation card 2, make operating personnel can stand and carry out welding jobs on platform frame 1, avoided setting up the scaffold frame and carried out welding jobs, improved the efficiency of construction.
Referring to fig. 1 and 2, the platform frame 1 comprises two platform plates 11 which are arranged oppositely, a plurality of platform rods 12 are fixedly connected between the two platform plates 11 at uniform intervals, the platform rods 12 are made of round steel with phi 25, and the highest points of the platform rods 12 are flush with the top ends of the platform plates 11, so that an operator can stand on the platform frame 1 to perform welding operation conveniently; still fixedly connected with polylith connecting plate 14 between two landing slab 11, polylith connecting plate 14 interval evenly sets up, and connecting plate 14 sets up the position in 11 bottoms of landing slab, and connecting plate 14 connects into two landing slab 11 into wholly, has strengthened the intensity of landing shelf 1.
Be connected with diaphragm 13 between two relative landing slabs 11, diaphragm 13 sets up on the terminal surface of two landing slabs 11 one ends, and the vertical setting of diaphragm 13. Installation card 2 sets firmly in diaphragm 13 keep away from the one side of landing slab 11, installation card 2 is close to diaphragm 13 top and sets up, and 2 tops of installation card and the parallel and level of diaphragm 13 top, installation card 2 is provided with two, installation card 2 includes mounting panel 21, the one end and the diaphragm 13 fixed connection of mounting panel 21, and the vertical setting of mounting panel 21, the draw-in groove 22 has been seted up to the one end of keeping away from diaphragm 13 at mounting panel 21, draw-in groove 22 can be blocked on the flange board of girder steel 5, thereby install platform frame 1 on girder steel 5.
Referring to fig. 3, it is provided with many spinal branchs vaulting pole 4 still to be evenly spaced on diaphragm 13, bracing piece 4 sets up the bottom at diaphragm 13, 4 one end of bracing piece are fixed on diaphragm 13, the other end extends to girder steel 5's flange board bottom surface, and the butt in girder steel 5's flange board bottom surface, when operating personnel stands on platform frame 1, platform frame 1 receives decurrent pressure, bracing piece 4 can contradict in girder steel 5's flange board bottom surface, an effort is applyed to platform frame 1, offset platform frame 1 and received decurrent pressure, therefore, bracing piece 4 can play the supporting role to platform frame 1, make platform frame 1 installation more firm. One end of keeping away from diaphragm 13 at bracing piece 4 has set firmly backup pad 41, and backup pad 41 is the rectangle steel sheet, and backup pad 41 sets up with the flange board bottom surface laminating of girder steel 5, and backup pad 41 can increase the area of contact of bracing piece 4 with the flange board bottom surface of girder steel 5, makes bracing piece 4 more firm, can effectually play the supporting role to platform frame 1.
Referring to fig. 1 and 2, the top ends of two platform boards 11 are respectively provided with a baffle plate 3, the baffle plates 3 are hinged with the platform boards 11 through hinges, and the hinges are arranged on the sides of the two platform boards 11 far away from each other; still set firmly couple 32 on two platform boards 11 relative one sides, still set firmly respectively on two relative sides of breast board 3 and couple 32 relative shackle 33, establish couple 32 hook on shackle 33, can be fixed breast board 3, and breast board 3 can be with 1 both sides of platform frame block, and is safer when making operating personnel carry out welding operation.
Still set firmly fixed plate 31 in the one side of keeping away from each other of two landing slabs 11 respectively, fixed plate 31 is the right angle triangle-shaped board, a right angle limit and breast board 3 fixed connection of fixed plate 31, another right angle limit and 3 bottom parallel and level of breast board, take out couple 32 from shackle 33, open breast board 3, make breast board 3 be in the horizontality, a right angle limit of fixed plate 31 is contradicted and is kept away from one side of another landing slab 11 at landing slab 11, thereby make breast board 3 fixed, open back with breast board 3, platform frame 1's area has been increased, operating personnel's operation range has been enlarged, the operating personnel of being convenient for more carry out the operation.
The implementation principle of the operation platform for welding the steel structure is as follows: install platform frame 1 on the flange board of girder steel 5 through installation card 2, can make operating personnel stand and carry out welding jobs on platform frame 1, avoided setting up the scaffold frame and carried out welding jobs, improved the efficiency of construction to this application simple structure is convenient for process at the job site, and is convenient for ann tears open.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (8)

1. The utility model provides an operation platform for steel construction welding which characterized in that: including platform frame (1), platform frame (1) includes two platform boards (11) of relative setting, two many platform poles of fixedly connected with (12), two between platform board (11) fixedly connected with diaphragm (13) between platform board (11), just diaphragm (13) set up the one end of platform board (11), diaphragm (13) are kept away from set firmly a plurality of installation cards (2) in the one side of platform board (11).
2. The operation platform for steel structure welding of claim 1, characterized in that: installation card (2) include mounting panel (21), mounting panel (21) are the rectangle steel sheet, mounting panel (21) are kept away from draw-in groove (22) have been seted up to the one end of diaphragm (13), draw-in groove (22) card is gone into on the flange board of girder steel (5).
3. The operation platform for steel structure welding of claim 2, characterized in that: installation card (2) are close to diaphragm (13) top installation, diaphragm (13) are kept away from the one side bottom of landing slab (11) has set firmly many spinal branch vaulting poles (4), bracing piece (4) one end with diaphragm (13) fixed connection, the other end butt is in the flange board bottom surface of girder steel (5).
4. The operation platform for steel structure welding of claim 3, characterized in that: one end of the transverse plate (13) far away from the support rod (4) is fixedly provided with a support plate (41), and the support plate (41) is attached to the bottom surface of the flange plate of the steel beam (5).
5. The operation platform for steel structure welding of claim 1, characterized in that: and the top ends of the two platform boards (11) are respectively provided with a sideboard (3).
6. The operation platform for steel structure welding of claim 5, characterized in that: sideboard (3) with it is articulated that platform board (11) pass through the hinge, the hinge sets up two the one side of keeping away from each other of platform board (11), two one side that platform board (11) is relative still is provided with and is used for fixing couple (32) of sideboard (3), two the one side that platform board (11) kept away from each other has set firmly fixed plate (31) respectively, fixed plate (31) are the right angle triangle-shaped board, a right angle limit of fixed plate (31) with platform board (11) fixed connection, another right angle limit with sideboard (3) bottom parallel and level.
7. The operation platform for steel structure welding of claim 1, characterized in that: a plurality of connecting plates (14) are fixedly connected between the two platform plates (11).
8. The operation platform for steel structure welding of claim 1, characterized in that: the platform rod (12) is made of round steel with the diameter phi of 25.
CN202120801847.5U 2021-04-19 2021-04-19 Be used for steel construction welded operation platform Active CN215107165U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120801847.5U CN215107165U (en) 2021-04-19 2021-04-19 Be used for steel construction welded operation platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120801847.5U CN215107165U (en) 2021-04-19 2021-04-19 Be used for steel construction welded operation platform

Publications (1)

Publication Number Publication Date
CN215107165U true CN215107165U (en) 2021-12-10

Family

ID=79267165

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120801847.5U Active CN215107165U (en) 2021-04-19 2021-04-19 Be used for steel construction welded operation platform

Country Status (1)

Country Link
CN (1) CN215107165U (en)

Similar Documents

Publication Publication Date Title
CN212773624U (en) Hanging, hanging and pulling supporting device suitable for steel bar truss floor bearing plate
CN208734109U (en) A kind of steel roof joist safety rope hanging apparatus
CN215107165U (en) Be used for steel construction welded operation platform
CN211470603U (en) Telescopic tower crane passageway
CN211815611U (en) Detachable bracket
CN210659407U (en) Tool type protective shed for machining of reinforcing steel bars
CN213484787U (en) Photovoltaic power generation board mounting and supporting structure with suspended steel beam foundation
CN110778009A (en) Suspended ceiling structure
CN214656433U (en) Connecting buckle type scaffold
CN209323952U (en) Overhanging scaffold
CN214835056U (en) Supporting device for bearing plate of sawtooth-shaped steel bar truss floor
CN212477442U (en) Steel box girder mounting bracket
CN213418450U (en) Hanging flower basket mounting on roof pergola roof beam
CN212897468U (en) Detachable scaffold for building site
CN213742169U (en) Fabricated scaffold device for constructional engineering
CN218541439U (en) Suspension type operation platform
CN215107513U (en) Adjustable tripod for supporting overhanging floor bearing plate
CN218405090U (en) Overline bridge operation platform
CN216446025U (en) Asymmetric tower crane foundation structure
CN219909961U (en) Cantilever frame supporting structure of roof cornice
CN211923449U (en) Tool type overhanging protective frame
CN215925721U (en) Cantilever hanging rack for steel box girder
CN213449414U (en) Top support cantilever hanging basket hanger in limited space under archaize building slope roof
CN209760444U (en) Firm type support that slides
CN211689941U (en) Hanging type construction platform for splicing steel box girder support method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant