CN221001896U - Bracket - Google Patents

Bracket Download PDF

Info

Publication number
CN221001896U
CN221001896U CN202322814182.3U CN202322814182U CN221001896U CN 221001896 U CN221001896 U CN 221001896U CN 202322814182 U CN202322814182 U CN 202322814182U CN 221001896 U CN221001896 U CN 221001896U
Authority
CN
China
Prior art keywords
heating surface
rod
rods
bracket
hanging
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202322814182.3U
Other languages
Chinese (zh)
Inventor
邹海越
孙超
张磊
王治坤
张自成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SEPCO3 Electric Power Construction Co Ltd
Original Assignee
SEPCO3 Electric Power Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SEPCO3 Electric Power Construction Co Ltd filed Critical SEPCO3 Electric Power Construction Co Ltd
Priority to CN202322814182.3U priority Critical patent/CN221001896U/en
Application granted granted Critical
Publication of CN221001896U publication Critical patent/CN221001896U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Ladders (AREA)

Abstract

The utility model relates to the technical field of power station construction equipment, in particular to a bracket which is used for construction operations such as high-place unhooking and the like and comprises two symmetrical hanging rods arranged above a heating surface collecting box, wherein two sides of the bottom end surface of each hanging rod are respectively provided with a vertical rod and a stop rod, and the heating surface collecting box is positioned between the vertical rod and the stop rod. The design can well and firmly hang the disengaging bracket on the heating surface header, and the supporting plate is conveniently built on the supporting rod, so that not only is the worker conveniently walk on the supporting plate, but also a construction operation space is provided for the construction of the worker, and the worker conveniently carries out construction operations such as unhooking, aligning and the like on the heating surface; the grab rail and the scaffold tube arranged in the design have the effects of intercepting and protecting workers on the supporting plate, and are convenient for the workers to hang the hooks of the safety belt on the scaffold tube and the grab rail, so that the safety protection effect is achieved for the workers.

Description

Bracket
Technical Field
The utility model relates to the technical field of power station construction equipment, in particular to a bracket.
Background
In various power stations, when other high-altitude equipment such as a heating surface, a collecting box and the like are required to be unhooked and other construction operations are performed, as the steel frame structure rises step by step, a worker working layer platform is higher and higher, workers are required to walk on a hoisting layer steel beam, the risk of falling hidden danger is high, and the working efficiency is inconvenient to influence when the construction operation is performed;
The traditional method is that a scaffold is erected on a nearby steel frame platform of a header in-situ layer to approach a channel, so that the erection time is long and the danger is high; on the one hand, because high-altitude equipment is complex in structure, available walking and construction operation space are very limited, and in addition, the traditional method also has great potential safety hazards, and workers lack of safety guarantee in construction and are prone to high falling.
Disclosure of utility model
The utility model aims to provide a hook and an opposite bracket at the high position of a heating surface so as to solve the problems in the prior art.
In order to achieve the above purpose, the present utility model provides the following technical solutions:
The bracket comprises a heating surface header and a plurality of tube panels arranged below the heating surface header, wherein the heating surface header is provided with the bracket;
The bracket is used for construction operations such as high-place unhooking and the like and comprises two symmetrical hanging rods arranged above a heating surface collecting box, wherein two sides of the bottom end surface of each hanging rod are respectively provided with a vertical rod and a stop rod, and the heating surface collecting box is positioned between the vertical rods and the stop rods;
the front sides of the upright posts are respectively provided with a grab bar, and a plurality of scaffold tubes for hanging safety belts are arranged between the two grab bars; a supporting rod is arranged between the bottom end of the vertical rod and the bottom end of the grab rail, and a limiting rod for propping against the tube panel is arranged at the rear end of the supporting rod; a supporting plate for workers to walk is arranged above the two supporting rods.
As a preferable technical scheme of the utility model, the grab rail is provided with a plurality of fixing buckles for fixing the scaffold tube, and two ends of the scaffold tube penetrate through the fixing buckles on two sides and are fixedly connected with the fixing buckles.
As a preferable technical scheme of the utility model, the width of the supporting plate is 50-60cm.
As a preferable technical scheme of the utility model, the linear distance between two adjacent support rods is smaller than 200cm.
As a preferable technical scheme of the utility model, the diameter of the heating surface header is b, the length of the baffle rod is a, and a relation of a=b+19.5cm exists between the length a of the baffle rod and the diameter b of the heating surface header.
As a preferable technical scheme of the utility model, the length of the suspension rod is c, and a relation of c=b+10.5cm exists between the length c of the suspension rod and the diameter b of the heating surface header.
As a preferable technical scheme of the utility model, the linear distance between two adjacent scaffold tubes is 40-60cm.
Compared with the prior art, the utility model has the beneficial effects that:
1. In the design, the vertical rod, the hanging rod and the stop rod are mutually matched with the lower limiting rod, so that the disengaging bracket can be well and firmly hung on the heating surface collecting box, the support plate is conveniently built on the support rod, a worker can walk on the support plate conveniently, a construction operation space is provided for the construction of the worker, and the worker can conveniently perform construction operations such as unhooking, aligning and the like on the heating surface;
2. The grab rail and the scaffold tube arranged in the design play a role in interception and protection for workers on the supporting plate, and are convenient for the workers to hang the hooks of the safety belt on the scaffold tube and the grab rail, so that the safety protection effect is played for the workers, the conditions of high falling and the like of the workers are avoided, and the construction safety is improved.
Drawings
FIG. 1 is a schematic diagram of the overall structure of the present utility model;
FIG. 2 is a second schematic diagram of the overall structure of the present utility model;
FIG. 3 is a schematic view of a bracket according to the present utility model;
FIG. 4 is a schematic view of a portion of a bracket according to the present utility model;
FIG. 5 is a second schematic view of a portion of a bracket according to the present utility model.
In the figure:
1. A heating surface header;
2. A tube panel;
3. A bracket; 31. a hanging rod; 32. a stop lever; 33. a vertical rod; 34. a grab rail; 341. a fixing buckle; 35. a supporting rod; 36. a limit rod; 37. a supporting plate; 38. and (5) a scaffold tube.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
The embodiment provides a technical scheme:
Referring to fig. 1-5, a hook and an opposite bracket at the high position of a heating surface comprises a heating surface header 1 and a plurality of tube panels 2 arranged below the heating surface header 1, wherein the heating surface header 1 is provided with a bracket 3; the bracket 3 is used for construction operations such as high-place unhooking and the like and comprises two symmetrical hanging rods 31 arranged above the heating surface header 1, wherein two sides of the bottom end surface of the hanging rods 31 are respectively provided with a vertical rod 33 and a stop rod 32, the vertical rods 33 and the stop rods 32 are tightly welded with the hanging rods 31, and the heating surface header 1 is positioned between the vertical rods 33 and the stop rods 32; the front sides of the upright rods 33 are respectively provided with a grab bar 34, and a plurality of scaffold tubes 38 for hanging safety belts are arranged between the two grab bars 34; through the grab bar 34 and the grab bar 38, the safety belt has the functions of intercepting and protecting workers on the supporting plate 37, and is convenient for the workers to hang the hooks of the safety belt on the grab bar 38 and the grab bar 34, thereby playing the role of safety protection for the workers.
Specifically, a supporting rod 35 is arranged between the bottom end of the vertical rod 33 and the bottom end of the grab rail 34, the vertical rod 33 and the grab rail 34 are tightly welded with the supporting rod 35, a limiting rod 36 which is tightly abutted against the tube panel 2 is arranged at the rear end of the supporting rod 35, and the limiting rod 36 is tightly welded with the supporting rod 35; a supporting plate 37 for workers to walk is arranged above the space between the two supporting rods 35, and the supporting plate 37 is bound and fixed with the supporting rods 35 through iron wires; the supporting rods 35 facilitate the construction of the supporting plates 37, not only facilitate the workers to walk on the supporting plates 37, but also provide construction operation space for the construction of the workers, and facilitate the construction operations of unhooking, aligning and the like of the workers at the heated surface.
In this embodiment, a plurality of fixing buckles 341 for fixing the scaffold tube 38 are installed on the grab bar 34, the fixing buckles 341 are tightly welded with the grab bar 34, two ends of the scaffold tube 38 pass through the fixing buckles 341 on two sides and are fixedly connected with the fixing buckles 341, the scaffold tube 38 and the fixing buckles 341 are bound and fixed through iron wires, the fixing buckles 341 are used for stably installing the scaffold tube 38, and the scaffold tube 38 is convenient to protect workers from construction.
In this embodiment, the pallet 37 has a width of 50-60cm, and the pallet 37 preferably has a width of 52cm, which provides a sufficient construction operation space for a worker.
In this embodiment, the linear distance between two adjacent support rods 35 is smaller than 200cm, and the design is convenient to build the support plate 37 on the support rods 35 stably, so that the stability of the support plate 37 is improved.
In this embodiment, the diameter of the heating surface header 1 is b, the length of the stop lever 32 is a, a relation of a=b+19.5cm exists between the length a of the stop lever 32 and the diameter b of the heating surface header 1, the upright rod 33, the hanging rod 31 and the stop lever 32 are fixed with the heating surface header 1 in cooperation with the bottom limiting rod 36, so that when the bracket 3 is manufactured, the length of the stop lever 32 should be adjusted according to the size (b in fig. 1) of the heating surface header 1, the size (a in fig. 1) of the stop lever 32 should be 19.5cm more on the basis of the diameter b of the heating surface header 1, thereby avoiding the shaking of the whole device during construction of workers and falling off from the heating surface header 1, and the excessive part of the stop lever 32 can well avoid the problem.
In the present embodiment, the length of the hanging rod 31 is c, and there is a relationship of c=b+10.5cm between the length c of the hanging rod 31 and the diameter b of the heating surface header 1, so as to avoid that the hanging rod 31 portion hanging on the upper portion cannot be hung on the heating surface header 1, but the stability in hanging is affected by the excessive spare size, so that 10.5cm is preferable.
In this embodiment, the linear distance between two adjacent scaffolds 38 is 40-60cm, and the linear distance between two adjacent scaffolds 38 is preferably 50cm, and the designed scaffolds 38 can provide better protection for workers on the pallet 37, and facilitate hanging of the safety belt.
It should be noted that, when the bracket 3 in this embodiment is used, a safety net may be installed at the front side of the scaffold tube 38 between the two grab bars 34, the safety net may be bound and fixed with the scaffold tube 38 through an iron wire, and the safety net may further protect workers.
When the scaffold is specifically used, a user firstly places two support rods 35 on the ground, then passes through the fixing buckles 341 on the grab bars 34 on the two sides through the two ends of the scaffold tube 38, and binds and fixes the scaffold tube 38 and the fixing buckles 341 through iron wires, the scaffold tube 38 is installed, then the user installs the support plate 37 at the position above the space between the two support rods 35, binds and fixes the support rods 35 and the support plate 37 through the iron wires, the support plate 37 is installed, then the user hangs the bracket 3 on the heating surface header 1 by using a crane or the like, the bracket 3 is installed with the heating surface header 1, and finally the user stands on the support plate 37, so that construction operations such as unhooking, butt joint and the like can be performed.
The foregoing has shown and described the basic principles, principal features and advantages of the utility model. It will be understood by those skilled in the art that the present utility model is not limited to the above-described embodiments, and that the above-described embodiments and descriptions are only preferred embodiments of the present utility model, and are not intended to limit the utility model, and that various changes and modifications may be made therein without departing from the spirit and scope of the utility model as claimed. The scope of the utility model is defined by the appended claims and equivalents thereof.

Claims (7)

1. The utility model provides a bracket, includes heating surface collection case (1) and a plurality of tube panels (2) that set up below heating surface collection case (1), its characterized in that: a bracket (3) is arranged on the heating surface header (1);
The bracket (3) comprises two symmetrical hanging rods (31) arranged above the heating surface header (1), two sides of the bottom end surface of each hanging rod (31) are respectively provided with a vertical rod (33) and a stop rod (32), and the heating surface header (1) is positioned between the vertical rods (33) and the stop rods (32);
The front sides of the upright rods (33) are respectively provided with a grab bar (34), and a plurality of scaffold tubes (38) for hanging safety belts are arranged between the two grab bars (34); a supporting rod (35) is arranged between the bottom end of the vertical rod (33) and the bottom end of the grab rail (34), and a limiting rod (36) for propping against the pipe screen (2) is arranged at the rear end of the supporting rod (35); a supporting plate (37) for workers to walk is arranged above the two supporting rods (35).
2. A carrier as in claim 1 wherein: the grab bar (34) is provided with a plurality of fixing buckles (341) for fixing the scaffold tube (38), and two ends of the scaffold tube (38) penetrate through the fixing buckles (341) on two sides and are fixedly connected with the fixing buckles (341).
3. A carrier as in claim 1 wherein: the width of the supporting plate (37) is 50-60cm.
4. A carrier as in claim 1 wherein: the straight line distance between two adjacent support rods (35) is smaller than 200cm.
5. A carrier as in claim 1 wherein: the diameter of the heating surface header (1) is b, the length of the stop lever (32) is a, and a relation of a=b+19.5cm exists between the length a of the stop lever (32) and the diameter b of the heating surface header (1).
6. A carrier as in claim 1 wherein: the length of the hanging rod (31) is c, and a relation of c=b+10.5cm exists between the length c of the hanging rod (31) and the diameter b of the heating surface header (1).
7. A carrier as in claim 1 wherein: the linear distance between two adjacent scaffolds (38) is 40-60cm.
CN202322814182.3U 2023-10-20 2023-10-20 Bracket Active CN221001896U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202322814182.3U CN221001896U (en) 2023-10-20 2023-10-20 Bracket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202322814182.3U CN221001896U (en) 2023-10-20 2023-10-20 Bracket

Publications (1)

Publication Number Publication Date
CN221001896U true CN221001896U (en) 2024-05-24

Family

ID=91120095

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202322814182.3U Active CN221001896U (en) 2023-10-20 2023-10-20 Bracket

Country Status (1)

Country Link
CN (1) CN221001896U (en)

Similar Documents

Publication Publication Date Title
CN221001896U (en) Bracket
CN214658667U (en) Construction accessory installation operation frame
CN111764658B (en) Construction method of continuous hanging net rack platform for hyperbolic reticulated shell venue
CN209702166U (en) A kind of sound barrier plate simply installs equipment
CN209227564U (en) A kind of slope surface prefabricated section placing device
CN207749810U (en) A kind of Novel moveable scaffold
CN210508494U (en) Combined fairway
CN208023418U (en) A kind of bridge construction anti-drop device
CN208215308U (en) Suspension type station
CN215670912U (en) Construction scaffold convenient to disassemble and assemble
CN208123629U (en) Outdoor overhead lifting pipeline equipment
CN217840808U (en) High-altitude construction platform
CN220058983U (en) Quick-dismantling horizontal safety protection device
CN109941900A (en) A kind of sound barrier plate simply installs equipment
CN213115463U (en) Reinforcing device of hanging basket suspension mechanism
CN212671122U (en) Scaffold for building construction
CN211572507U (en) Rack operation platform is used at hyperbolic net shell formula venue top
CN211083109U (en) Mobile support for communication engineering
CN221073640U (en) Support that high altitude construction constructor was prevented falling
CN109958272A (en) High altitude operation operating platform bracket and its hooking method for being articulated on girder steel
CN205259558U (en) Novel scaffold for fitment
CN219906796U (en) Tower crane overhanging attachment device
CN209620540U (en) A kind of decoration steel structure scaffold
CN217652295U (en) Steel movable cantilever operation platform
CN218507434U (en) Assembled component hoisting device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant