CN109941900A - A kind of sound barrier plate simply installs equipment - Google Patents

A kind of sound barrier plate simply installs equipment Download PDF

Info

Publication number
CN109941900A
CN109941900A CN201910308614.9A CN201910308614A CN109941900A CN 109941900 A CN109941900 A CN 109941900A CN 201910308614 A CN201910308614 A CN 201910308614A CN 109941900 A CN109941900 A CN 109941900A
Authority
CN
China
Prior art keywords
sound barrier
cable
barrier plate
hanging apparatus
brackets
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910308614.9A
Other languages
Chinese (zh)
Inventor
卢磊
卢敏兵
杨连琪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 11th Bureau Group Co Ltd
Third Engineering Co Ltd of China Railway 11th Bureau Group Co Ltd
Original Assignee
China Railway 11th Bureau Group Co Ltd
Third Engineering Co Ltd of China Railway 11th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 11th Bureau Group Co Ltd, Third Engineering Co Ltd of China Railway 11th Bureau Group Co Ltd filed Critical China Railway 11th Bureau Group Co Ltd
Priority to CN201910308614.9A priority Critical patent/CN109941900A/en
Publication of CN109941900A publication Critical patent/CN109941900A/en
Pending legal-status Critical Current

Links

Abstract

The invention discloses a kind of sound barrier plates simply to install equipment, include: two to be respectively used to that the bracket on the outside of sound barrier bar is arranged in, it is equipped with support portion on two brackets, the cable for installing hanging apparatus is equipped between each support portion, hanging apparatus is for lifting sound barrier panel.Two brackets can be respectively arranged on the outside of the sound barrier bar at column both ends arranged side by side by devices such as ropes when installation, in view of the factors such as portable, bracket can be the easy devices such as rod-shaped scaffold, due to being equipped with cable between two support portions being set on two brackets, the hanging apparatus for being used to lift sound barrier panel can be installed on to cable, operation hanging apparatus lifts sound barrier panel between two adjacent sound barrier bars.This sound barrier plate simply installs that device structure is simple, easy to carry, can complete the installation to sound barrier panel by manual operation in the case where existing hoisting technology is not available.

Description

A kind of sound barrier plate simply installs equipment
Technical field
The present invention relates to technical fields, simply install equipment more specifically to a kind of sound barrier plate.
Background technique
Existing board plug type sound barrier is installed most of engineering and is installed using truck crane, track crane, crane, truck crane according to Bad bridge has transport execution conditions, and crane, which relies on, has the vertical crane condition of branch under bridge, and track crane needs reasonable transport group It knits and relies on track formation condition, and influenced to need the feelings in high pier, being laid with track circuit, duration epitonos by the duration It is big using existing hoisting technology construction cost, Hoisting Security risk is bigger under condition, or even existing hoisting technology can not be used It constructs, can only be by the way of manually installed, but manually installed it will take a lot of manpower and time.
In conclusion how to provide a kind of time saving and energy saving manual operation equipment, pacify board plug type sound barrier normally Dress, is a problem to be solved by those skilled in the art.
Summary of the invention
It, can be with using the equipment in view of this, the object of the present invention is to provide a kind of sound barrier plates simply to install equipment It saves hand labor and completes the installation to board plug type sound barrier.
To achieve the goals above, the invention provides the following technical scheme:
A kind of sound barrier plate simply installs equipment, comprising: and two are respectively used to that the bracket on the outside of sound barrier bar is arranged in, It is equipped with support portion on two brackets, the cable for installing hanging apparatus is equipped between two support portions, it is described Hanging apparatus is for lifting sound barrier panel.
Preferably, the hanging apparatus is removable and the fixable cable being set between two brackets On.
Preferably, the hanging apparatus includes the tube body being slidably set on the cable, is installed on the tube body There are the jack or hoist engine for lifting sound barrier panel.
Preferably, the tube body is equipped with the hanging ring for installing jack or hoist engine.
Preferably, the top of two brackets is equipped with fixed part, and the both ends of the tube body are equipped with positioning rope, described Positioning rope is connected on its closer fixed part.
Preferably, the body of rod that two brackets are vertically arranged, two fixed parts include laterally opposed difference The first cantilever being set on two bodies of rod, the end of two first cantilevers, which is equipped with, is respectively used to fix two institutes State the second pulley of positioning rope.
It preferably, further include the second cantilever being horizontally set on two bodies of rod respectively, the end of second cantilever Portion top surface is equipped with the guiding device for guide cords, is installed on second cantilever on the same body of rod and described the One cantilever is mutually perpendicular to.
Preferably, the lower end of second cantilever is equipped with the link for suspension cord.
Preferably, the both ends of the cable are for being fixedly installed on ground, two be arranged on the bracket it is described Support portion is used to support the cable.
Preferably, the support portion is first pulley, and the axis of two first pulleys is perpendicular to the cable Direction is simultaneously respectively arranged on two brackets.
A kind of sound barrier plate provided by the invention simply installs equipment, comprising: two are respectively used to be arranged in sound barrier Bracket on the outside of bar is equipped with support portion on two brackets, the cable for installing hanging apparatus is equipped between each support portion, Hanging apparatus is for lifting sound barrier panel.
Two brackets can be respectively arranged in positioned at column both ends arranged side by side by devices such as ropes when installation On the outside of sound barrier bar, it is contemplated that the factors such as portable, bracket can be the easy devices such as rod-shaped scaffold, due to being set to two brackets On two support portions between be equipped with cable, the hanging apparatus for being used to lift sound barrier panel can be installed on cable, operate Hanging apparatus lifts sound barrier panel between two adjacent sound barrier bars.
This sound barrier plate simply installs that device structure is simple, easy to carry, dismounting is quick, can be in existing hoisting technology The installation to sound barrier panel is completed by manual operation in the case where not being available.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this The embodiment of invention for those of ordinary skill in the art without creative efforts, can also basis The attached drawing of offer obtains other attached drawings.
Fig. 1 is the schematic diagram that sound barrier plate provided by the present invention simply installs equipment;
Fig. 2 is the schematic diagram of the single body of rod provided by the present invention;
Fig. 3 is the top view of the single body of rod provided by the present invention;
Fig. 4 is that sound barrier plate provided by the present invention simply installs equipment for lifting the sound barrier in the different paths of two column The installation top view of plate;
The installation that sound barrier plate simply installs equipment when Fig. 5 is installation secondary series sound barrier panel provided by the present invention is shown It is intended to;
Fig. 6 is the schematic diagram that the present invention installs connecting plate by link.
In Fig. 1-6:
The 1- body of rod, 2- first pulley, the second cantilever of 3-, 4- link, 5- handrail, 6- reinforcing bar, the first cantilever of 7-, 8- second are sliding Wheel, 9- guiding device, 10- first row sound barrier, 11- secondary series sound barrier, 12- connecting plate, 13- hoist engine, 14- cabinet, 15- Tube body, 16- positioning rope, 17- hanging ring.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
Core of the invention is to provide a kind of sound barrier plate and simply installs equipment, can save artificial labor using the equipment It moves and completes the installation to board plug type sound barrier.
Fig. 1~6 is please referred to, Fig. 1 is the schematic diagram that sound barrier plate provided by the present invention simply installs equipment;Fig. 2 is The schematic diagram of the single body of rod provided by the present invention;Fig. 3 is the top view of the single body of rod provided by the present invention;Fig. 4 is this hair Sound barrier plate provided by bright simply installs the installation top view of sound barrier panel of the equipment for lifting the different paths of two column;Figure 5 for installation secondary series sound barrier panel provided by the present invention when sound barrier plate the scheme of installation of equipment is simply installed;Fig. 6 is The present invention installs the schematic diagram of connecting plate by link.
A kind of sound barrier plate simply installs equipment, comprising: and two are respectively used to that the bracket on the outside of sound barrier bar is arranged in, It is equipped with support portion on two brackets, the cable for installing hanging apparatus is equipped between two support portions, hanging apparatus is used for Lift sound barrier panel.
It should be noted that the quantity for the sound barrier bar that a column are arranged side by side is two or more, when the quantity of sound barrier bar When being two, it is both provided with bracket on every sound barrier bar, when sound barrier bar is more than two, in the sound of two or more arrangement A bracket is respectively provided on the sound barrier bar at barrier bar both ends, since sound barrier panel is to be plugged between two sound barrier bars, institute To need for bracket to be set to the outside of sound barrier bar.
Specifically, the outside due to sound barrier bar has groove, bracket can be placed in groove, then set on groove There is limiting device, bracket is made not fall out groove, limiting device can be wirerope or bolt.
Bracket can be rod-shaped or other shapes, and support portion can be set in any position on support portion, but need It should be noted that being equipped with hanging apparatus due to being equipped with cable between support portion on cable, slinging sound barrier panel in hanging apparatus The maximum height of sound barrier bar, inserts sound barrier panel into two when the maximum height reached later needs to be greater than actual installation Between root sound barrier bar.
The both ends that the cable being arranged between support portion is arranged on two brackets can be fixed on ground by fixed device, Perhaps the device such as the clump weight of concreting or cabinet 14, Huo Zheke are fixed on the device with constant weight To be fixed on bracket, it is however noted that, when the weight of cable lifting is excessive, fixed part may be will drive to drive Bracket falls down, and needs bracket that can balance this pulling force at this time, for example the upper end of bracket can be fixedly connected by wirerope In on the ground in outside.
Hanging apparatus can be simple operations and easy to carry device, and this hanging apparatus is being installed on rope Sound barrier panel can be lifted in the case where upper, for example the devices such as hoist engine 13 or jack, specific hanging apparatus can bases The sound barrier panel and operating condition that lifting is actually needed are determined, it is not limited to apparatus above.
Two brackets can be respectively arranged in positioned at column both ends arranged side by side by devices such as ropes when installation On the outside of sound barrier bar, it is contemplated that the factors such as portable, bracket can be the easy devices such as rod-shaped scaffold, due to being set to two brackets On two support portions between be equipped with cable, the hanging apparatus for being used to lift sound barrier panel can be installed on cable, operate Hanging apparatus lifts sound barrier panel between two adjacent sound barrier bars.
This sound barrier plate simply installs that device structure is simple, easy to carry, dismounting is quick, can be in existing hoisting technology The installation to sound barrier panel is completed by manual operation in the case where not being available.
In view of lifting being filled according to mode fixed after being detachably connected and installing when sound barrier bar is multiple It sets and is installed on cable, be then required to dismount hanging apparatus when each sound barrier panel is lifted, will increase artificial Labour reduces working efficiency, is generally the column sound barrier being made of more than two sound barrier panels, institute when installing sound barrier Hanging apparatus can be moved and on the fixable cable being set between two brackets to promote working efficiency.
It should be noted that being arranged at this time removable since sound barrier panel may be deposited in a certain place by construction site Moving and being securable to the hanging apparatus on cable can be convenient the transport of sound barrier panel, when needs insert the sound barrier panel of stacking When between sound barrier bar, first sound barrier panel can be lifted on hanging apparatus, operation hanging apparatus is moved on cable, When being moved to the space of top between two sound barrier bars for needing to insert, hanging apparatus is fixed on cable, by sound-screen Groove between two sound barriers of two sides alignment of baffle, slowly inserting downwards releases sound-screen when predeterminated position is arrived in inserting Connection between baffle and hanging apparatus, it should be noted that predeterminated position and non-specific location, this position is understood that For sound barrier panel and sound barrier bar will not be damaged, and the position of personal safety will not be injured.
Hanging apparatus is removable and fixable mode there are many, it is preferred that hanging apparatus includes slidably being set in Tube body 15 on cable is equipped with jack or hoist engine 13 for lifting sound barrier panel on tube body 15.It should be noted that Jack perhaps can be moved or be pulled the sound barrier panel of lifting to tube body 15 after hoist engine 13 lifts sound barrier panel, make pipe Body 15 can be slided along cable, when being moved to corresponding position, stop the movement to tube body 15, specifically, tube body 15 can be used steel pipe.
It can be used in the way of the installation hanging apparatus of tube body 15 a variety of, it is preferred that tube body 15 is equipped with for installing The hanging ring 17 of jack or hoist engine 13.Hanging ring 17 is set as semi-annular shape herein, or can be set to other shapes, in order to Guarantee being stably connected between hanging ring 17 and tube body 15, hanging ring 17 can be welded on tube body 15, and by hanging ring 17 and manages The diameter of body 15 is in same plane.
Optionally, coaster can be set on cable, and hanging apparatus is installed on to the bottom of coaster, but need to infuse Meaning, coaster must be equipped with brake gear, that is, any position of the coaster on cable can be made to be stagnated.
On the basis of the above embodiments, it can be equipped with fixed part on the top of two brackets, the both ends of tube body 15 are set There is positioning rope 16, positioning rope 16 is connected on its closer fixed part.
It should be noted that fixed part can be set in any position on bracket, as long as not Chong Die with support portion, Rope can be pulled in the purpose of the both ends of tube body 15 setting positioning rope 16 to position tube body 15 on rope The length of position, positioning rope 16 can be configured according to actual condition, should be noted that when positioning rope 16 is generally arranged The length of unilateral positioning rope 16 will meet tube body 15 and may be at any position on rope.
Specifically, the body of rod 1 that two brackets are vertically arranged, two fixed parts include laterally opposed being respectively arranged at two The first cantilever 7 on a body of rod 1, the end of two the first cantilevers 7, which is equipped with, is respectively used to fix the of two positioning ropes 16 Two pulleys 8.
It should be noted that the first cantilever 7 is horizontally set on the body of rod 1 to be rod-shaped, it specifically can be using the form of welding The two is connected, bolted form can also be selected to connect the two when necessary certainly, what the end of the first cantilever 7 was equipped with The direction of the central axis of second pulley 8 and the direction of cable are vertical or in other certain angles, and specific angle can be according to reality Border demand is configured.Bracket and 7 structure of the first cantilever that the above form is arranged are simple, easy to carry, and are easily worked.If It needs to adjust the direction or position of the body of rod 1, handrail 5 can be equipped in 1 two sides of the body of rod.
It on the basis of the above embodiments, further include the second cantilever 3 being horizontally set on two bodies of rod 1 respectively, second The end top surface of cantilever 3 is equipped with the guiding device 9 for guide cords, the second cantilever 3 being installed on the same body of rod 1 and the One cantilever 7 is mutually perpendicular to.
It should be noted that can be potentially encountered on the sound barrier path of plan setting when sound barrier is arranged in roadside There are barriers, such as line bar, railing for setting up in advance etc., sound barrier of the path for needing for sound barrier to be arranged to plan setting The outside in path or inside extend, and can have more than two sound barrier paths, at this time in order not to be installed on sound to original The body of rod 1 of barrier bar is dismantled, and the second lateral cantilever 3, the sound barrier plate letter of original setting can be arranged on the body of rod 1 Equipment easy to install is to insert sound barrier panel between two bodies of rod 1, and the second cantilever 3 equipped with guiding device 9 is to be oriented to rope It is used to install the opposite direction of former directive 10 plate of first row sound barrier with this body of rod 1, secondary series sound barrier is set as with this body of rod 1 The end body of rod 1 of 11 bars, then the identical body of rod 1 is set on the other end body of rod 1 of 11 plate of secondary series sound barrier, rope is bypassed The guiding device 9 on the identical body of rod 1 that is arranged on the other end body of rod 1 is simultaneously fixed, and reaches secondary series sound barrier 11 with this Plate continues to install.
Guiding device 9 is the device for guide cords, and the rod of 3 top surface of the second cantilever can be arranged in parallel in for two Body.90 ° of angle can be usually equipped between second cantilever 3 and the first cantilever 7, in order to be installed and connected in the different paths of two column Sound barrier panel connecting plate 12.Preferably, the lower end of the second cantilever 3 is equipped with the link 4 for suspension cord, passes through this link 4 can make easy mounting device, rope be passed through link 4, one end is fixedly connected on bottom by hoist engine 13 or jack Face or clump weight, the other end is for lifting connecting plate 12.This device is simply reliable, and can carry out to connecting plate 12 quickly Installation, without dismantling to original bracket, can promote working efficiency.
Certainly, the angle between the first cantilever 7 and the second cantilever 3 can be also configured according to the actual situation.
It, can will be on the first cantilever 7 and/or the second cantilever 3 in order to reinforce the stability of the first cantilever 7 and the second cantilever 3 Equipped with reinforcing bar 6, the other end of reinforcing bar 6 is connect with the top of the body of rod 1.
On the basis of the above embodiments, for being fixedly installed on ground, two are set on bracket at the both ends of cable Support portion be used to support cable.
It should be noted that the cable that two support portions support need to guarantee as far as possible it is tight, in order to mobile lifting dress It sets, such structure, which is arranged, can save the utilization of cable, can also reduce the binding number of cable.
Optionally, the end of cable is installed on two support portions, and the outside along two brackets in cable direction is set respectively There is the safe cable for holding bracket, safe cable is connected to the top of two brackets.
Preferably, support portion is first pulley 2, direction and difference of the axis of two first pulleys 2 perpendicular to cable It is set on two brackets.The friction between support portion and cable can be reduced by pulley support cable, and is tied in cable It ties up and facilitates adjustment when something goes wrong, for example the cable tight degree propped up between two brackets is inadequate, can pull at one end easily ?.
Each embodiment in this specification is described in a progressive manner, the highlights of each of the examples are with other The difference of embodiment, the same or similar parts in each embodiment may refer to each other.
Equipment is simply installed to sound barrier plate provided by the present invention above to be described in detail.It is used herein A specific example illustrates the principle and implementation of the invention, and the above embodiments are only used to help understand originally The method and its core concept of invention.It should be pointed out that for those skilled in the art, not departing from this hair , can be with several improvements and modifications are made to the present invention under the premise of bright principle, these improvement and modification also fall into power of the present invention In the protection scope that benefit requires.

Claims (10)

1. a kind of sound barrier plate simply installs equipment characterized by comprising two are respectively used to be arranged outside sound barrier bar The bracket of side is equipped with support portion on two brackets, is equipped between two support portions for installing hanging apparatus Cable, the hanging apparatus is for lifting sound barrier panel.
2. sound barrier plate according to claim 1 simply installs equipment, which is characterized in that the hanging apparatus is removable And on the fixable cable being set between two brackets.
3. sound barrier plate according to claim 2 simply installs equipment, which is characterized in that the hanging apparatus includes can The tube body (15) of sliding being set on the cable, be equipped on the tube body (15) jack for lifting sound barrier panel or Hoist engine (13).
4. sound barrier plate according to claim 3 simply installs equipment, which is characterized in that the tube body (15) is equipped with For installing the hanging ring (17) of jack or hoist engine (13).
5. sound barrier plate according to claim 4 simply installs equipment, which is characterized in that the top of two brackets Be equipped with fixed part, the both ends of the tube body (15) are equipped with positioning rope (16), the positioning rope (16) be connected to away from From on its closer described fixed part.
6. sound barrier plate according to claim 5 simply installs equipment, which is characterized in that two brackets are perpendicular The body of rod (1) being directly arranged, two fixed parts include that laterally opposed first be respectively arranged on two bodies of rod (1) is outstanding Arm (7), the end of two first cantilevers (7) are equipped with the second cunning for being respectively used to fix two positioning ropes (16) It takes turns (8).
7. sound barrier plate according to claim 6 simply installs equipment, which is characterized in that further include laterally setting respectively The second cantilever (3) on two bodies of rod (1), the end top surface of second cantilever (3), which is equipped with, is used for guide cords Guiding device (9), be installed on second cantilever (3) on the same body of rod (1) and first cantilever (7) mutually hung down Directly.
8. sound barrier plate according to claim 7 simply installs equipment, which is characterized in that second cantilever (3) Lower end is equipped with the link (4) for suspension cord.
9. simply installing equipment to sound barrier plate described in 8 any one according to claim 1, which is characterized in that the line For being fixedly installed on ground, two support portions being arranged on the bracket are used to support the line at the both ends of cable Cable.
10. sound barrier plate according to claim 9 simply installs equipment, which is characterized in that the support portion is One pulley (2), the axis of two first pulleys (2) perpendicular to the cable direction and be respectively arranged at two branch On frame.
CN201910308614.9A 2019-04-17 2019-04-17 A kind of sound barrier plate simply installs equipment Pending CN109941900A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910308614.9A CN109941900A (en) 2019-04-17 2019-04-17 A kind of sound barrier plate simply installs equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910308614.9A CN109941900A (en) 2019-04-17 2019-04-17 A kind of sound barrier plate simply installs equipment

Publications (1)

Publication Number Publication Date
CN109941900A true CN109941900A (en) 2019-06-28

Family

ID=67015507

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910308614.9A Pending CN109941900A (en) 2019-04-17 2019-04-17 A kind of sound barrier plate simply installs equipment

Country Status (1)

Country Link
CN (1) CN109941900A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114878456A (en) * 2022-04-15 2022-08-09 广东省医疗器械质量监督检验所 Hundred check testing arrangement

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114878456A (en) * 2022-04-15 2022-08-09 广东省医疗器械质量监督检验所 Hundred check testing arrangement

Similar Documents

Publication Publication Date Title
CN105858435A (en) Technology for hoisting strip-shaped inclined steel structures in place through single crane
CN105129602B (en) Grow up vertical reinforcement monoblock type raising suspender
CN101177959A (en) Curtain wall unit hanging equipment and construction method thereof
CN205387439U (en) Mast hoisting accessory
CN109941900A (en) A kind of sound barrier plate simply installs equipment
CN209702166U (en) A kind of sound barrier plate simply installs equipment
CN204983692U (en) Concrete panel's hoist device
CN112252589A (en) Steel reinforcement cage structure and installation method thereof
CN216739582U (en) Multifunctional auxiliary device for binding reinforcing steel bars of slide-resistant piles
CN104030176B (en) The equalizer bar of hoisting platform truss and hanging method thereof
CN116573545A (en) Simple lifting frame for pipe jacking working well soil outlet
CN215854817U (en) Lifting device for pipeline installation
CN214301281U (en) Construction platform for connecting steel truss girder and bridge deck slab
CN213596814U (en) Movable three-dimensional crossing type multipurpose suspension bridge construction platform
CN108483212A (en) Cladding glass installation self-control electric hoist hanger system and its hanging method
CN210342619U (en) Connecting piece of integral lifting scaffold
CN101768925B (en) Mounting equipment of beam falling prevention stopping block and construction method thereof
CN110171766B (en) Steel bar transportation lifting appliance
JPH11147690A (en) Low head space reinforcing bar building-in device
CN211691536U (en) Simple lifting mechanism for bare concrete exterior wall cladding
CN209957241U (en) Steel hanger
CN209686833U (en) Operating platform support frame and operating platform
CN103015323B (en) Beam body hoisting device
CN205087793U (en) Integral of vertical reinforcement of growing up rises hoist
CN216339062U (en) Auxiliary assembly for mounting bridge diaphragm beam template

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination