CN105129602B - Grow up vertical reinforcement monoblock type raising suspender - Google Patents
Grow up vertical reinforcement monoblock type raising suspender Download PDFInfo
- Publication number
- CN105129602B CN105129602B CN201510616835.4A CN201510616835A CN105129602B CN 105129602 B CN105129602 B CN 105129602B CN 201510616835 A CN201510616835 A CN 201510616835A CN 105129602 B CN105129602 B CN 105129602B
- Authority
- CN
- China
- Prior art keywords
- reinforcing bar
- socket
- steel bar
- spigot
- limit base
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
- Load-Engaging Elements For Cranes (AREA)
Abstract
本发明公开了一种长大竖向钢筋整体式起升吊具,用于一次起吊多根钢筋,其特征在于包括藉由钢丝绳相连的上部吊装横梁和下部承插式钢筋防摆限位装置,所述吊装横梁包括藉由螺栓锁紧以夹持钢筋的两侧夹板;所述承插式钢筋防摆限位装置包括承插式钢筋限位座,该承插式钢筋限位座上横向并排间隔设有供各所吊钢筋对应插入的限位承口,还包括用于将钢筋锁于所述限位承口内的锁板,该锁板与所述承插式钢筋限位座通过螺栓固定。该吊具能够对多根超长、大直径钢筋一次性实施同排竖向起吊,不仅操作简单,大大提高了钢筋吊装效率,而且对于钢筋的定位较为稳固,能够解决钢筋底部在风荷载或局部偏载影响下的摆动问题。
The invention discloses an integral hoisting sling for long vertical steel bars, which is used for lifting multiple steel bars at one time, and is characterized in that it includes an upper hoisting beam connected by a steel wire rope and a lower socket-type steel bar swing-proof limiting device, The hoisting crossbeam includes splints on both sides to clamp the steel bars by bolt locking; the socket-type steel bar anti-sway limit device includes a socket-type steel bar limit seat, and the socket-type steel bar limit seat is horizontally side by side Intervals are provided with limit sockets for the corresponding insertion of each hanging steel bar, and a lock plate for locking the steel bars in the limit sockets is also included, and the lock plate is fixed with the socket-type steel bar limit seat by bolts. The spreader can vertically lift multiple super-long and large-diameter steel bars in the same row at one time. Swing problems under the influence of eccentric loads.
Description
技术领域technical field
本发明涉及竖向钢筋的吊具结构技术领域,具体涉及一种长大竖向钢筋整体式起升吊具。The invention relates to the technical field of a vertical steel bar hanger structure, in particular to an integral hoisting hanger for a long vertical steel bar.
背景技术Background technique
随着现代桥梁建设事业的发展,桥梁跨度及承载能力不断增加,墩柱、塔柱等下部结构尺寸越来越大,钢筋骨架的规模和重量也显著增大。同时,部分复杂混凝土构件对钢筋接头位置有明确要求,导致大直径(28~32mm),超长(未加工截断时达到12m)钢筋频繁应用,钢筋安装难度加大、效率低下。传统的钢筋安装施工技术方案大致有两种:一种方法是将半成品钢筋捆绑好后用吊机吊装至高空作业施工平台,再由人工配合吊机逐根安装定位,该方法的缺点是工序占用时间较长,吊车作业效率较低,单根大直径超长钢筋人工安装极为困难,安装精度难以保证;另一种方法是将钢筋骨架整体绑扎完成后用吊车进行安装,该方法缺点是:吊装过程中,钢筋骨架容易变形,需投入大量辅助装置进行加固,上下两节钢筋骨架对接时难度较大,精度难以控制。With the development of modern bridge construction, the span and bearing capacity of bridges continue to increase, the size of substructures such as pier columns and tower columns is getting larger and larger, and the scale and weight of steel skeletons are also significantly increasing. At the same time, some complex concrete components have clear requirements for the location of steel bar joints, resulting in the frequent use of large-diameter (28-32mm) and super-long (up to 12m when unprocessed and cut off) steel bars, making the installation of steel bars more difficult and inefficient. There are roughly two traditional steel bar installation and construction technical solutions: one method is to tie the semi-finished steel bars and hoist them to the high-altitude construction platform with a crane, and then install and position them one by one manually with the crane. The disadvantage of this method is that the process takes up It takes a long time and the efficiency of the crane operation is low. It is extremely difficult to manually install a single large-diameter super-long steel bar, and the installation accuracy is difficult to guarantee; another method is to install it with a crane after the overall binding of the steel frame is completed. During the process, the steel skeleton is easily deformed, and a large number of auxiliary devices need to be invested for reinforcement. It is difficult to connect the upper and lower steel skeletons, and the precision is difficult to control.
在现有公开技术中,如公开号:CN 204434056 U《钢筋吊具》,介绍了一种由两根横梁组成的钢筋吊装装置,横梁上设有圆孔用于固定钢筋。该装置仅对钢筋上部进行固定,如所吊为大直径超长钢筋,起吊后底部未采取任何限位措施,在风荷载及局部偏载影响下,长大钢筋底部做无规则摆动,极易造成整体稳定性不足,存在一定的安全风险,同时可能造成钢筋变形及损伤,因此该装置存在一定的局限性,适用范围较小。In the prior open technology, such as Publication No.: CN 204434056 U "Steel Bar Hanger", a steel bar hoisting device consisting of two crossbeams is introduced, and the crossbeam is provided with round holes for fixing the steel bars. This device only fixes the upper part of the steel bar. If the hoisted steel bar is large-diameter and super-long, no limit measures are taken at the bottom after hoisting. Under the influence of wind load and partial partial load, the bottom of the long steel bar swings randomly, which is very easy Insufficient overall stability results in a certain safety risk, and at the same time may cause deformation and damage to the steel bar. Therefore, the device has certain limitations and the scope of application is small.
发明内容Contents of the invention
本发明目的是:提供一种长大竖向钢筋整体式起升吊具,该吊具能够对多根超长、大直径钢筋一次性实施同排竖向起吊,不仅操作简单,能够提高钢筋吊装效率,而且对于钢筋的定位稳固,能够解决钢筋底部在风荷载或局部偏载影响下的摆动问题。The purpose of the present invention is to provide an integral hoisting sling for long vertical steel bars, which can vertically lift multiple super long and large-diameter steel bars in the same row at one time. Efficiency, and the positioning of the steel bar is stable, which can solve the swing problem of the bottom of the steel bar under the influence of wind load or local partial load.
本发明的技术方案是:一种长大竖向钢筋整体式起升吊具,用于一次起吊多根钢筋,其特征在于包括藉由钢丝绳相连的上部吊装横梁和下部承插式钢筋防摆限位装置,所述吊装横梁包括藉由螺栓锁紧以夹持钢筋的两侧夹板;所述承插式钢筋防摆限位装置包括承插式钢筋限位座,该承插式钢筋限位座上横向并排间隔设有供各所吊钢筋对应插入的限位承口,还包括用于将钢筋锁于所述限位承口内的锁板,该锁板与所述承插式钢筋限位座通过螺栓固定。The technical solution of the present invention is: an integral hoisting sling for long vertical steel bars, which is used for lifting multiple steel bars at one time, and is characterized in that it includes an upper hoisting beam connected by a wire rope and a lower socket-type steel bar anti-swing limiter. position device, the hoisting beam includes splints on both sides to clamp the steel bar by bolt locking; the socket-type steel bar anti-sway limit device includes a socket-type steel bar limit seat, The upper horizontal space is provided with limit sockets for the corresponding insertion of each hanging steel bar, and also includes a locking plate for locking the steel bars in the limit sockets, and the lock plate passes through the socket type steel bar limit seat Bolt on.
进一步的,本发明中所述锁板上开有与所述限位承口一一对应以供所述钢筋插入的限位孔,并且该锁板位于所述承插式钢筋限位座的底部,并与所述承载式钢筋限位座之间通过竖向螺栓固定。Further, in the present invention, the lock plate is provided with a limit hole that corresponds to the limit socket one by one for the insertion of the steel bar, and the lock plate is located at the bottom of the socket-type steel bar limit seat , and is fixed with the load-bearing steel bar limit seat by vertical bolts.
更进一步的,本发明中所述承插式钢筋限位座上的所述限位承口均匀间隔分布。Furthermore, in the present invention, the limit sockets on the socket-type steel bar limit seat are evenly spaced.
进一步的,本发明中所述吊装横梁还包括与所述两侧夹板之一固定或一体设计的钢筋定位卡板,所述钢筋定位卡板上间隔设有供各所吊钢筋对应插入的定位开槽或孔。Further, the hoisting beam in the present invention also includes a steel bar positioning clamp that is fixed or integrally designed with one of the two side splints, and the positioning slots for the corresponding insertion of each suspended steel bar are arranged on the steel bar positioning clamps at intervals. or hole.
更进一步的,本发明中所述钢筋定位卡板固定或一体设于所述夹板顶部。Furthermore, in the present invention, the reinforcing bar positioning clamping plate is fixed or integrated on the top of the clamping plate.
更进一步的,本发明中所述钢筋定位卡板上的所述定位开槽或孔均匀间隔分布。Furthermore, in the present invention, the positioning slots or holes on the reinforcing bar positioning clamps are evenly spaced.
进一步的,本发明中所述吊装横梁中的至少一块所述夹板的两端顶部一体设有起升吊耳。Further, lifting lugs are integrally provided on the tops of at least one of the two ends of the splint in the lifting beam in the present invention.
进一步的,本发明中所述吊装横梁中的至少一块所述夹板的两端底部一体设有夹板连接吊耳,而所述承插式钢筋限位座的两端顶部设有与夹板连接吊耳对应的限位座连接吊耳,所述夹板连接吊耳与所述限位座连接吊耳之间通过所述钢丝绳连接。Further, in the present invention, at least one of the splints in the hoisting beam is provided with plywood connecting lugs at the bottom of both ends, and the tops of both ends of the socket-type steel bar limit seat are provided with plywood connecting lugs The corresponding limit seat is connected to the lifting lug, and the connecting lug of the splint and the limit seat are connected by the wire rope.
本发明在实际制造时,所述夹板,承插式钢筋限位座均采用槽钢,锁板和钢筋定位卡板则采用钢板。When the present invention is actually manufactured, the clamping plate and the socket-type reinforcing bar spacer are all made of channel steel, and the locking plate and the reinforcing bar positioning clamping plate are made of steel plates.
需要说明,本案中的“长大竖向钢筋”即指行业内所认知的长度(未加工截断时的钢筋原材)达到12m,直径达28~32mm的钢筋。It should be noted that the "long vertical steel bar" in this case refers to the steel bar known in the industry to be 12m in length (the raw material of the steel bar when it is unprocessed and cut) and 28~32mm in diameter.
本发明的具体使用方法如下:Concrete method of use of the present invention is as follows:
1、松开吊装横梁的两侧夹板,将所吊钢筋上端卡在其中一块夹板顶部的钢筋定位卡板内,合上另一侧夹板,将两块夹板用螺栓连接固定以夹紧钢筋;1. Loosen the splints on both sides of the hoisting beam, clamp the upper end of the hoisted steel bar into the steel bar positioning clamp on the top of one of the splints, close the other splint, and connect the two splints with bolts to clamp the steel bar;
2、将所吊钢筋下端置于下部承插式钢筋限位座的限位承口内,再通过竖向螺栓从底部固定锁板,并确保所吊钢筋的下部均穿过锁板上的限位孔;2. Place the lower end of the suspended steel bar in the limit socket of the lower socket-type steel bar limit seat, and then fix the lock plate from the bottom through the vertical bolt, and ensure that the lower part of the suspended steel bar passes through the limit on the lock plate hole;
3、通过钢丝绳将夹板上的夹板连接吊耳和承插式钢筋限位座上的限位座连接吊耳连接,从而使得上部吊装横梁和下部承插式钢筋防摆限位装置相连。3. Connect the splint connection lugs on the splint to the limit seat connection lugs on the socket-type steel bar limit seat through the wire rope, so that the upper lifting beam is connected to the lower socket-type steel bar anti-swing limit device.
、采用吊装设备将钢筋和吊具整体起升至安装位置,稳定后解除吊装横梁和承插式钢筋防摆限位装置间的钢丝绳连接,卸掉底部锁板上的竖向螺栓,从两个方向分别取下锁板和承插式钢筋限位座。1. Use hoisting equipment to lift the steel bar and the spreader to the installation position as a whole. After stabilization, release the wire rope connection between the hoisting beam and the socket-type steel bar anti-swing limit device, and remove the vertical bolts on the bottom locking plate. Remove the lock plate and the socket-type steel bar limit seat respectively.
、逐根安装起升的竖向钢筋,安装到位后,松开上部吊装横梁的螺栓,将两侧夹板拆开,用吊装设备吊离后继续进行下一次吊装。1. Install the lifted vertical steel bars one by one. After the installation is in place, loosen the bolts of the upper hoisting beam, disassemble the splints on both sides, lift them away with hoisting equipment, and proceed to the next hoisting.
本发明的优点是:The advantages of the present invention are:
1. 本发明提供的这种吊具能够对多根超长、大直径钢筋一次性实施同排竖向起吊,操作简单,拆装方便,安全可靠,整体稳定性高,同时能保证钢筋的安装精度,有效提高了钢筋吊装及安装效率,充分利用吊车吊装能力,减少了资源浪费,同时也加快了施工进度。1. The spreader provided by the present invention can vertically lift multiple super-long and large-diameter steel bars in the same row at one time. It is easy to operate, easy to disassemble, safe and reliable, and has high overall stability. At the same time, it can ensure the installation of steel bars The accuracy effectively improves the hoisting and installation efficiency of steel bars, makes full use of the hoisting capacity of the crane, reduces the waste of resources, and speeds up the construction progress.
本发明中在吊装横梁的夹板上部增设钢筋定位卡板,其根据钢筋设计间距对应开槽或孔,不仅能有效控制钢筋安装间距,同时可以防止钢筋吊装过程中产生滑移,提高吊装稳定性和安全性。In the present invention, a reinforcing bar positioning clamp is added on the top of the splint for hoisting the beam, which corresponds to slots or holes according to the design spacing of the reinforcing bars, which can not only effectively control the installation spacing of the reinforcing bars, but also prevent slippage during the hoisting process of the reinforcing bars, and improve the stability and stability of the hoisting. safety.
本发明中的承插式钢筋防摆限位装置,其承插式钢筋限位座和锁板上根据钢筋设计间距对应开承口和设孔,将钢筋底部卡固,解决了钢筋底部在风荷载或局部偏载影响下的摆动问题,大大增加了钢筋起吊后的整体稳定性。且承插式钢筋限位座和锁板之间采用竖向螺栓固定,便于拆卸,能够加快施工进度。In the socket-type reinforcing bar anti-swing limiting device in the present invention, the socket-type reinforcing bar limiting seat and the locking plate correspondingly open the socket and set holes according to the design spacing of the reinforcing bars, and fix the bottom of the reinforcing bar, which solves the problem of the wind at the bottom of the reinforcing bar. The swing problem under the influence of load or local partial load greatly increases the overall stability of the steel bar after lifting. In addition, vertical bolts are used to fix the socket-type steel bar limit seat and the lock plate, which is convenient for disassembly and can speed up the construction progress.
附图说明Description of drawings
下面结合附图及实施例对本发明作进一步描述:The present invention will be further described below in conjunction with accompanying drawing and embodiment:
图1为本发明整体结构立体示意图;1 is a three-dimensional schematic view of the overall structure of the present invention;
图2为图1中单独的吊装横梁俯视图;Fig. 2 is a top view of a separate hoisting beam in Fig. 1;
图3为图1中单独承插式钢筋防摆限位装置俯视图。Fig. 3 is a top view of the single socket anti-swing limiting device in Fig. 1 .
其中:1、吊装横梁;2、夹板;2a、起升吊耳;2b、夹板连接吊耳;3、承插式钢筋防摆限位装置;4、承插式钢筋限位座;4a、限位承口;4b、限位座连接吊耳;5、锁板;5a、限位孔;6、钢筋定位卡板;6a、定位开槽;7、钢丝绳;8、螺栓;9、钢筋。Among them: 1. Hoisting beam; 2. Plywood; 2a. Lifting lug; 2b. Plywood connecting lug; 3. Socket-type steel bar anti-swing limit device; 4. Socket-type steel bar limit seat; 4a. Bit socket; 4b, limit seat connecting lug; 5, lock plate; 5a, limit hole; 6, steel bar positioning clip; 6a, positioning slot; 7, steel wire rope; 8, bolt;
具体实施方式detailed description
实施例:结合图1~图3所示为本发明长大竖向钢筋整体式起升吊具的一种具体实施方式,其由藉由钢丝绳7相连的上部吊装横梁1和下部承插式钢筋防摆限位装置3,用于一次起吊多根钢筋9。Embodiment: In combination with Fig. 1 to Fig. 3, it is a specific embodiment of the long vertical steel bar integral hoisting sling of the present invention, which consists of an upper hoisting beam 1 connected by a wire rope 7 and a lower socket type steel bar The anti-swing limiting device 3 is used for hoisting multiple steel bars 9 at one time.
具体结合图1和图2所示,本实施例中所述吊装横梁1的构成包含藉由横向螺栓8锁紧以夹持钢筋9的两侧夹板2;所述两侧夹板2之一的顶部焊接固定有钢筋定位卡板6,所述钢筋定位卡板6上间隔设有供各所吊钢筋9对应插入的定位开槽6a。本实施例中所述定位开槽6a的数量是11个,且均匀间隔分布。并且本实施例中所述两块夹板2的两端顶部均一体设有起升吊耳2a,用于起吊设备起吊。As shown in Figure 1 and Figure 2, the composition of the lifting beam 1 in this embodiment includes two side splints 2 clamped by transverse bolts 8 to clamp the steel bars 9; the top of one of the two side splints 2 Welding is fixed with reinforcing bar positioning clamping plate 6, and described reinforcing bar positioning clamping plate 6 is provided with the positioning slot 6a for corresponding insertion of each suspended reinforcing bar 9 at intervals. In this embodiment, the number of positioning slots 6a is 11, and they are evenly spaced. And in this embodiment, the tops of both ends of the two splints 2 are uniformly provided with lifting lugs 2a, which are used for lifting by lifting equipment.
结合图1和图3所示,本实施例中所述承插式钢筋防摆限位装置3由承插式钢筋限位座4和锁板5构成,所述承插式钢筋限位座4上横向并排间隔设有供各所吊钢筋9对应插入的限位承口4a,数量也为11个,且均匀间隔分布。所述锁板5上开有与所述限位承口4a一一对应以供所述钢筋9插入的限位孔5a,并且该锁板5位于所述承插式钢筋限位座4的底部,并与所述承载式钢筋限位座4之间通过竖向螺栓8固定,从而能够将钢筋9锁于限位承口4a内。As shown in Figure 1 and Figure 3, the socket-type steel bar anti-swing limiter 3 in this embodiment is composed of a socket-type steel bar limit seat 4 and a lock plate 5, and the socket-type steel bar limit seat 4 There are 11 limit sockets 4a for the corresponding insertion of the hanging steel bars 9 arranged side by side in the upper horizontal direction at intervals, and the number is evenly spaced. The lock plate 5 is provided with a limit hole 5a corresponding to the limit socket 4a for the insertion of the steel bar 9, and the lock plate 5 is located at the bottom of the socket-type steel bar limit seat 4 , and is fixed with the load-bearing steel bar limit seat 4 by a vertical bolt 8, so that the steel bar 9 can be locked in the limit socket 4a.
本实施例中所述吊装横梁1中的两块所述夹板2的两端底部均一体设有夹板连接吊耳2b,而所述承插式钢筋限位座4的两端顶部设有与夹板连接吊耳2b对应的限位座连接吊耳4b,所述夹板连接吊耳2b与所述限位座连接吊耳4b之间通过所述钢丝绳7连接。In this embodiment, the bottoms of the two ends of the two splints 2 in the hoisting beam 1 are uniformly provided with splint connection lugs 2b, and the tops of the two ends of the socket-type steel bar limit seat 4 are provided with splints. The limit seat connection lug 4b corresponding to the connection lug 2b is connected to the splint connection lug 2b and the limit seat connection lug 4b through the steel wire rope 7 .
本实施例在实际制造时,所述夹板2,承插式钢筋限位座4均采用槽钢,锁板5和钢筋定位卡板6则采用钢板。In the actual manufacture of the present embodiment, the splint 2 and the socket-type reinforcing bar limiting seat 4 are all made of channel steel, and the locking plate 5 and the reinforcing bar positioning clamping plate 6 are made of steel plates.
本发明的具体使用方法如下:Concrete method of use of the present invention is as follows:
1、松开吊装横梁1的两侧夹板2,将所吊钢筋9上端卡在其中一块夹板2顶部的钢筋定位卡板6内,合上另一侧夹板2,将两块夹板2用螺栓8连接固定以夹紧钢筋9;1. Loosen the splints 2 on both sides of the hoisting beam 1, clamp the upper end of the suspended steel bar 9 in the steel bar positioning clamp 6 on the top of one of the splints 2, close the splint 2 on the other side, and fasten the two splints 2 with bolts 8 Connect and fix to clamp the reinforcing bar 9;
2、将所吊钢筋9下端置于下部承插式钢筋限位座4的限位承口4a内,再通过竖向螺栓8从底部固定锁板5,并确保所吊钢筋9的下部均穿过锁板5上的限位孔5a;2. Place the lower end of the suspended steel bar 9 in the limit socket 4a of the lower socket-type steel bar limit seat 4, and then fix the locking plate 5 from the bottom through the vertical bolt 8, and ensure that the lower part of the suspended steel bar 9 is completely worn. Pass the limit hole 5a on the lock plate 5;
3、通过钢丝绳7将夹板2上的夹板连接吊耳2b和承插式钢筋限位座4上的限位座连接吊耳4b连接,从而使得上部吊装横梁1和下部承插式钢筋防摆限位装置3相连。3. Connect the splint connection lug 2b on the splint 2 with the limit seat connection lug 4b on the socket-type steel bar limit seat 4 through the wire rope 7, so that the upper hoisting beam 1 and the lower socket-type steel bar anti-swing limit Bit device 3 is connected.
、采用吊装设备将钢筋9和吊具整体起升至安装位置,稳定后解除吊装横梁1和承插式钢筋防摆限位装置3间的钢丝绳7连接,卸掉底部锁板5上的竖向螺栓8,从两个方向分别取下锁板5和承插式钢筋限位座4。1. Use hoisting equipment to hoist the steel bar 9 and the sling as a whole to the installation position, release the wire rope 7 connection between the hoisting beam 1 and the socket-type steel bar anti-swing limit device 3 after stabilization, and remove the vertical lock on the bottom lock plate 5. Bolt 8, remove the lock plate 5 and the socket-type steel bar limit seat 4 from two directions respectively.
、逐根安装起升的竖向钢筋9,安装到位后,松开上部吊装横梁1的螺栓8,将两侧夹板2拆开,用吊装设备吊离后继续进行下一次吊装。1. Install the vertical reinforcing bars 9 that are lifted one by one. After installing them in place, unclamp the bolts 8 of the upper lifting crossbeam 1, disassemble the two side splints 2, and continue the next lifting after lifting with the lifting equipment.
当然上述实施例只为说明本发明的技术构思及特点,其目的在于让熟悉此项技术的人能够了解本发明的内容并据以实施,并不能以此限制本发明的保护范围。凡根据本发明主要技术方案的精神实质所做的修饰,都应涵盖在本发明的保护范围之内。Of course, the above-mentioned embodiments are only to illustrate the technical conception and characteristics of the present invention, and its purpose is to enable those skilled in the art to understand the content of the present invention and implement it accordingly, and not to limit the protection scope of the present invention. All modifications made according to the spirit of the main technical solutions of the present invention shall fall within the protection scope of the present invention.
Claims (7)
- The vertical reinforcement monoblock type raising suspender 1. one kind is grown up, for once lifting by crane many reinforcing bars (9), it is characterised in that including by The top lifting cross beam (1) and the anti-sway stopping means of bottom spigot-and-socket reinforcing bar (3) being connected by steel wire rope (7), the lifting cross beam (1) include by bolt (8) locking with the both sides clamping plate (2) of clamping reinforcing bar (9);The anti-sway stopping means of spigot-and-socket reinforcing bar (3) include being interval with laterally side by side on spigot-and-socket reinforcing bar limit base (4), the spigot-and-socket reinforcing bar limit base (4) for each hung steel The spacing bellmouth (4a) of muscle (9) correspondence insertion, in addition to the jam plate for reinforcing bar (9) to be locked in the spacing bellmouth (4a) (5), the jam plate (5) and the spigot-and-socket reinforcing bar limit base (4) are fixed by bolt (8), be provided with the jam plate (5) with it is described Spacing bellmouth (4a) corresponds the spacing hole (5a) inserted for the reinforcing bar (9), and the jam plate (5) is located at the socket joint The bottom of formula reinforcing bar limit base (4), and it is fixed by vertical bolt (8) between the spigot-and-socket reinforcing bar limit base (4), it is described Spigot-and-socket reinforcing bar limit base (4) with jam plate (5) all in accordance with reinforcing bar (9) design spacing it is corresponding open up the spacing bellmouth (4a) and Corresponding spacing hole (5a), for reinforcing bar (9) bottom to be fixed, prevents reinforcing bar (9) bottom in wind load or local unbalance loading influence Lower swing, the resistance to overturning after increase reinforcing bar (9) lifting.
- 2. vertical reinforcement monoblock type raising suspender according to claim 1 of growing up, it is characterised in that the spigot-and-socket reinforcing bar Spacing bellmouth (4a) the uniform intervals distribution on limit base (4).
- 3. vertical reinforcement monoblock type raising suspender according to claim 1 of growing up, it is characterised in that the lifting cross beam (1) Also include and one of the both sides clamping plate (2) is fixed or bar spacer plate (6) of Integral design, the bar spacer plate (6) the positioning fluting (6a) for each hung reinforcing bar (9) correspondence insertion or hole are interval with.
- 4. vertical reinforcement monoblock type raising suspender according to claim 3 of growing up, it is characterised in that the bar spacer Plate (6) is fixed or is integrally provided at the top of the clamping plate (2).
- 5. vertical reinforcement monoblock type raising suspender according to claim 3 of growing up, it is characterised in that the bar spacer Positioning fluting (6a) or the distribution of hole uniform intervals on plate (6).
- 6. vertical reinforcement monoblock type raising suspender according to claim 1 of growing up, it is characterised in that the lifting cross beam (1) In at least one piece clamping plate (2) two ends at the top of be integrally formed with raising hanger (2a).
- 7. vertical reinforcement monoblock type raising suspender according to claim 1 of growing up, it is characterised in that the lifting cross beam (1) In at least one piece clamping plate (2) two ends bottom be integrally formed with clamping plate connection hanger (2b), and the spigot-and-socket reinforcing bar limit Limit base connection hanger (4b) corresponding with clamping plate connection hanger (2b), the clamping plate connection are provided with the top of the two ends of position seat (4) Hanger (2b) is connected between hanger (4b) is connected with the limit base by the steel wire rope (7).
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201510616835.4A CN105129602B (en) | 2015-09-24 | 2015-09-24 | Grow up vertical reinforcement monoblock type raising suspender |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201510616835.4A CN105129602B (en) | 2015-09-24 | 2015-09-24 | Grow up vertical reinforcement monoblock type raising suspender |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN105129602A CN105129602A (en) | 2015-12-09 |
| CN105129602B true CN105129602B (en) | 2017-09-29 |
Family
ID=54715267
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201510616835.4A Expired - Fee Related CN105129602B (en) | 2015-09-24 | 2015-09-24 | Grow up vertical reinforcement monoblock type raising suspender |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN105129602B (en) |
Families Citing this family (13)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106223625B (en) * | 2016-07-25 | 2018-12-18 | 中国建筑第八工程局有限公司 | The upright handling method of reinforcing bar in small space based on integral platform |
| CN107100651B (en) * | 2017-05-13 | 2023-05-26 | 山东佳信机械设备有限公司 | Tunnel lining seamless connection reinforcing steel bar positioning and waterproof board laying trolley |
| CN107215769B (en) * | 2017-07-31 | 2019-02-01 | 建宇(上海)石油科技有限公司 | A kind of highly effective petroleum pipeline swing pipe device |
| CN108178058B (en) * | 2017-12-27 | 2019-04-26 | 湖北神东建设有限公司 | A kind of release binding of building iron structure lifting |
| CN108643456B (en) * | 2018-05-21 | 2020-04-24 | 江苏省交通工程集团有限公司 | Mounting fixture of main rib of flanging die |
| CN108756960A (en) * | 2018-07-30 | 2018-11-06 | 洛阳高飞桥隧机械有限公司 | A kind of application method of anchor bar of waterproof plate in tunnels laying and reinforcing bar positioning lifting device |
| CN109368507B (en) * | 2018-11-29 | 2024-04-12 | 安徽科达机电股份有限公司 | Aerated concrete plug drill rod loop wheel machine and remove commentaries on classics borer device thereof |
| CN111532963B (en) * | 2020-05-29 | 2025-01-17 | 中铁大桥局第七工程有限公司 | Adjustable lifting appliance applicable to vertical unstable truss sheet type structure |
| CN112211099A (en) * | 2020-09-10 | 2021-01-12 | 湖南联智智能科技有限公司 | A appurtenance that is used for anchor head installation on bridge jib |
| CN112158711B (en) * | 2020-09-29 | 2022-08-12 | 义乌工商职业技术学院 | A kind of inclined steel bar integral lifting spreader for slope roof construction |
| CN113235826B (en) * | 2021-05-19 | 2022-10-28 | 中建桥梁有限公司 | Steel bar wire connection installation positioning method |
| CN114541768B (en) * | 2022-02-14 | 2024-07-09 | 中铁十一局集团第一工程有限公司 | Hoisting, positioning and installing method and device for vertical prestress steel strand of large-span continuous beam |
| CN115417289B (en) * | 2022-08-30 | 2025-10-03 | 中国建筑第八工程局有限公司 | A lifting device for efficiently lifting large vertical steel bars |
Family Cites Families (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US7444730B1 (en) * | 2005-06-29 | 2008-11-04 | Laurence Lee Beatty | Reinforcing bar lifter and method of reinforcing |
| CN203229310U (en) * | 2013-04-07 | 2013-10-09 | 中天建设集团浙江钢构有限公司 | Loading and transporting lifting appliance for steel truss floor bearing plate |
| CN104058329A (en) * | 2014-03-28 | 2014-09-24 | 中交第一航务工程局有限公司 | Lifting appliance for binding vertical reinforcement |
| CN203998604U (en) * | 2014-07-09 | 2014-12-10 | 中铁大桥局集团第五工程有限公司 | The be threaded vertical reinforcement erecting equipment of form of employing |
| CN204434056U (en) * | 2015-02-05 | 2015-07-01 | 葛洲坝集团第五工程有限公司 | Steel bar hanger |
| CN205087793U (en) * | 2015-09-24 | 2016-03-16 | 中铁四局集团第二工程有限公司 | Integral of vertical reinforcement of growing up rises hoist |
-
2015
- 2015-09-24 CN CN201510616835.4A patent/CN105129602B/en not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| CN105129602A (en) | 2015-12-09 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN105129602B (en) | Grow up vertical reinforcement monoblock type raising suspender | |
| CN102070071B (en) | Steel reinforcement cage hoisting method | |
| CN106276577B (en) | A kind of suspension bracket and operating method of framework isolated footing | |
| CN207878295U (en) | Suspension bridge cable changing device | |
| CN102674136A (en) | Lifting method for large-scale tower equipment | |
| CN205296844U (en) | Precast box girder steel strand wires hoisting point | |
| CN201151613Y (en) | Hoisting device at bottom of large-scale case roof beam pocket | |
| CN204324684U (en) | For the lifting tooling of nuclear power plant's fuel screen work | |
| CN203998604U (en) | The be threaded vertical reinforcement erecting equipment of form of employing | |
| CN206720558U (en) | A kind of adjustable steel-reinforcement cage hanger | |
| CN108862081A (en) | A kind of chain block crane boom and the application in the adjusting of beam steel protective layer thickness | |
| CN205442393U (en) | Posture that falls suspension system | |
| CN206665952U (en) | A kind of novel hanging tool | |
| CN203199883U (en) | Scissor type lifting tool for steel rail lifting | |
| CN105780659A (en) | Lifting appliance special for erection of large-tonnage steel box beam segment in non-stayed cable area of cable-stayed bridge | |
| CN207404705U (en) | A kind of lifting assembled architecture prefabricated components suspension hook | |
| CN214399489U (en) | Four-point hoisting eight-point hoisting beam | |
| CN210505201U (en) | A kind of equipment for hoisting steel bars in batches | |
| CN205087793U (en) | Integral of vertical reinforcement of growing up rises hoist | |
| CN210103281U (en) | Concrete sleeper gang hoisting device | |
| CN204265229U (en) | A kind of pin type slipping tail sling system | |
| CN217211450U (en) | A large bridge crane load test device | |
| CN118498232A (en) | A structural system and construction method suitable for hoisting steel bar components of main tower crossbeam | |
| CN209778062U (en) | An extension spreader for hoisting steel pipe arch bridge lattice girders | |
| CN217972205U (en) | A kind of balance hanger for box girder |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170929 |