CN207244960U - A kind of Prefabricated stacking floor with tool-typed formwork for being used to drop plate region - Google Patents
A kind of Prefabricated stacking floor with tool-typed formwork for being used to drop plate region Download PDFInfo
- Publication number
- CN207244960U CN207244960U CN201720799200.7U CN201720799200U CN207244960U CN 207244960 U CN207244960 U CN 207244960U CN 201720799200 U CN201720799200 U CN 201720799200U CN 207244960 U CN207244960 U CN 207244960U
- Authority
- CN
- China
- Prior art keywords
- laminated floor
- prefabricated laminated
- formwork
- slab
- lowering
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
本实用新型涉及一种用于降板区域的带工具式模板的预制叠合楼板,包括上部预制叠合楼板、下部预制叠合楼板、钢筋骨架、第一侧模板、第二侧模板;上部预制叠合楼板和下部预制叠合楼板各自近降板区域的位置预埋模板螺栓;第一侧模板呈直角Z字形,其上端面通过预埋螺栓与上部预制叠合楼板固定,其下端面通过预埋螺栓与下部预制叠合楼板固定;第二侧模板侧面与上部预制叠合楼板贴合,下部抵住下部预制叠合楼板。本实用新型将上、下预制叠合楼板底部预留第一侧模板用固定螺栓孔,将第一侧模板以成品件的形式直接安装在楼板上,减少了现场支设模板的工作量,极大的提高了现场的施工效率。
The utility model relates to a prefabricated laminated floor slab with a tool-type formwork used in the lowering area, comprising an upper prefabricated laminated floor, a lower prefabricated laminated floor, a steel bar skeleton, a first side formwork, a second side formwork; an upper prefabricated laminated floor The composite floor and the lower prefabricated laminated floor are pre-embedded with formwork bolts near the lowering slab area; the first side formwork is in a right-angled Z shape, and its upper end is fixed to the upper prefabricated laminated floor by embedded bolts, and its lower end is pre-embedded by embedded bolts It is fixed with the lower prefabricated laminated floor; the side of the second side formwork is attached to the upper prefabricated laminated floor, and the lower part is against the lower prefabricated laminated floor. In the utility model, fixing bolt holes for the first side formwork are reserved at the bottom of the upper and lower prefabricated laminated slabs, and the first side formwork is directly installed on the floor in the form of a finished product, which reduces the workload of on-site supporting formwork and greatly Greatly improved the construction efficiency on site.
Description
技术领域technical field
本实用新型涉及一种预制叠合楼板,具体来说,是一种用于降板区域的带工具式模板的预制叠合楼板,属于预制叠合楼板技术领域。The utility model relates to a prefabricated laminated floor slab, specifically, a prefabricated laminated floor slab with a tool formwork used in a lowering area, and belongs to the technical field of prefabricated laminated floor slabs.
背景技术Background technique
随着建筑行业的迅猛发展,建筑工程质量标准、节能环保要求也越来越高,针对卫生间降板处传统的木方支模不能达到节能、环保和效益要求,卫生间降板处支模如何才能既符合国家绿色节能环保,又能装配化施工,提高施工效率,因而此方法必须有新的突破和创新。With the rapid development of the construction industry, the quality standards of construction projects and the requirements for energy conservation and environmental protection are getting higher and higher. The traditional wooden formwork at the lower board of the bathroom cannot meet the requirements of energy saving, environmental protection and efficiency. How can the formwork at the lower board of the bathroom meet both requirements? The country is green, energy-saving and environmentally friendly, and it can be assembled and constructed to improve construction efficiency. Therefore, this method must have new breakthroughs and innovations.
卫生间降板砼的浇筑质量直接影响到后续卫生间工程做法及卫生间内外地面高差。几乎所有的卫生间降板施工都存在着降板吊模胀模、缺棱掉角、漏浆孔洞、模板偏位、降板高度不足等缺陷。为有效地降低上述问题产生的概率,分析其产生原因、主要影响因素并且根据具体情况采取改进措施是非常有必要的。The pouring quality of the toilet lowering board concrete directly affects the follow-up toilet engineering practice and the height difference between the inside and outside of the toilet. Almost all toilet lowering constructions have defects such as swelling of lowering boards, missing edges and corners, holes for grout leakage, formwork deviation, and insufficient height of lowering boards. In order to effectively reduce the probability of the above problems, it is necessary to analyze the causes, main influencing factors and take improvement measures according to specific conditions.
发明内容Contents of the invention
本实用新型需要解决的技术问题是:现有的降板区域的楼板,降板施工往往存在着降板吊模胀模、缺棱掉角、漏浆孔洞、模板偏位、降板高度不足、施工难度大、施工效率低等缺陷。The technical problem to be solved by the utility model is: in the existing floor slab in the lowering slab area, the construction of the lowering slab often has the problems of expansion of the lowering slab hanging mold, missing edges and corners, leakage holes, formwork deviation, insufficient height of the lowering slab, high construction difficulty, Defects such as low construction efficiency.
本实用新型采取以下技术方案:The utility model takes the following technical solutions:
一种用于降板区域的带工具式模板的预制叠合楼板,包括上部预制叠合楼板10、下部预制叠合楼板15、钢筋骨架、第一侧模板12、第二侧模板14;所述上部预制叠合楼板10和下部预制叠合楼板15各自近降板区域的位置预埋模板螺栓13;所述第一侧模板12呈直角Z字形,其上端面通过所述预埋螺栓13与上部预制叠合楼板10固定,其下端面通过所述预埋螺栓13与下部预制叠合楼板10固定;所述第二侧模板14侧面与上部预制叠合楼板10贴合,下部抵住下部预制叠合楼板12。A prefabricated laminated floor slab with a tool-type formwork for the lowering area, including an upper prefabricated laminated floor 10, a lower prefabricated laminated floor 15, a steel bar skeleton, a first side formwork 12, and a second side formwork 14; The prefabricated laminated floor 10 and the lower prefabricated laminated floor 15 are pre-embedded with formwork bolts 13 near the lowering slab area; the first side formwork 12 is in a right-angled Z shape, and its upper end surface is connected with the upper prefabricated laminated plate through the prefabricated bolts 13. The composite floor 10 is fixed, and its lower end surface is fixed to the lower prefabricated laminated floor 10 through the embedded bolts 13; the side of the second side formwork 14 is attached to the upper prefabricated laminated floor 10, and the lower part is against the lower prefabricated laminated floor 12.
进一步的,钢筋骨架包括梁上部纵筋4、梁中部腰筋5、梁箍筋6、梁下部纵筋11。Further, the reinforcement skeleton includes the longitudinal reinforcement 4 at the upper part of the beam, the waist reinforcement 5 at the middle part of the beam, the stirrup reinforcement 6 and the longitudinal reinforcement 11 at the lower part of the beam.
进一步的,所述上部预制叠合楼板10和下部预制叠合楼板12安装时呈升降板形式。Further, the upper prefabricated laminated floor 10 and the lower prefabricated laminated floor 12 are in the form of lifting slabs when installed.
更进一步的,所述梁上部纵筋4、梁中部腰筋5、梁箍筋6、梁下部纵筋11预埋设置在所述下部预制叠合楼板15的近第一侧模板12的部位。Furthermore, the beam upper longitudinal reinforcement 4 , beam middle waist reinforcement 5 , beam stirrup 6 , and beam lower longitudinal reinforcement 11 are pre-embedded and arranged near the first side formwork 12 of the lower prefabricated laminated floor 15 .
进一步的,带工具式模板的预制叠合楼板用于卫生间内。Further, prefabricated laminated floor slabs with tool formwork are used in the bathroom.
进一步的,所述第一侧模板12为金属成品构件,对上部预制叠合楼板10起到支撑作用。Further, the first side formwork 12 is a finished metal component, which supports the upper prefabricated laminated floor 10 .
本实用新型的有益效果在于:The beneficial effects of the utility model are:
1)将钢筋骨架预埋在下部叠合楼板内,在工厂流水线上生产,现场无需板扎钢筋,减少了现场支设楼板模板和绑扎上翻梁钢筋的工作量;1) Pre-buried the steel bar skeleton in the lower laminated floor, and produced it on the factory assembly line. There is no need to tie the steel bar on site, which reduces the workload of supporting the floor formwork and binding the steel bar of the upper turning beam on site;
2)上、下预制叠合楼板底部预留第一侧模板用固定螺栓孔,将第一侧模板以成品件的形式直接安装在楼板上,减少了现场支设模板的工作量,极大的提高了现场的施工效率,同时解决了现浇支模带来的质量问题。2) Bolt holes for the first side formwork are reserved at the bottom of the upper and lower prefabricated laminated slabs, and the first side formwork is directly installed on the floor in the form of finished parts, which reduces the workload of on-site support formwork and greatly improves The construction efficiency on site is improved, and the quality problems caused by cast-in-place formwork are solved at the same time.
3)第一侧模板是工厂化生产的一体化构件,表观质量好,材料性能可靠,构件尺寸准确,能够解决降板施工出现的胀模、缺棱掉角等情况的发生。3) The first side formwork is an integrated component of factory production, with good appearance quality, reliable material performance, and accurate component size, which can solve the problems of mold expansion, missing edges and corners, etc. in the lowering construction.
4)第一侧模板结构可靠,刚性较强,对上预制模板还能起到支撑的作用。4) The first side formwork has a reliable structure and strong rigidity, and can also support the upper prefabricated formwork.
5)第二侧模板以成品件的形式安装于上、下部预制叠合楼板底部,同时第二侧模板还可以作为上部叠合楼板的竖向支撑。5) The second side formwork is installed on the bottom of the upper and lower prefabricated laminated floors in the form of a finished product, and the second side formwork can also be used as a vertical support for the upper laminated floor.
附图说明Description of drawings
图1是现有技术中用于降板区域预制叠合楼板的示意图。其中,上部预制叠合楼板是预制的,整个降板区域是通过支模浇筑的。Fig. 1 is a schematic diagram of prefabricated laminated floor slabs used in the lowering area in the prior art. Among them, the upper prefabricated laminated floor slab is prefabricated, and the entire descending slab area is poured through formwork.
图2是本实用新型用于降板区域的带工具式模板的预制叠合楼板的示意图。图中,仅第二侧模板14是通过支模设置的,上部预制叠合楼板和带钢筋骨架的下部预制叠合楼板均是在工厂完成预制的,第一侧模板12是现场安装固定的。Fig. 2 is a schematic diagram of the prefabricated laminated floor slab with tool formwork used in the lowering slab area of the present invention. In the figure, only the second side formwork 14 is set by supporting the formwork, the upper prefabricated laminated floor and the lower prefabricated laminated floor with steel skeleton are all prefabricated in the factory, and the first side formwork 12 is installed and fixed on site.
图中,1.桁架钢筋;2.上部受力钢筋;3.上部分布钢筋;4.梁上部纵筋;5.梁中部腰筋;6.梁箍筋;7.现浇混凝土;8.下部受力钢筋;9.底部分布钢筋;10.上部预制叠合楼板;11.梁下部纵筋;12.第二侧模板;13.模板螺栓;14.第二侧模板,15.下部预制叠合楼板。In the figure, 1. Truss reinforcement; 2. Upper stress reinforcement; 3. Upper distribution reinforcement; 4. Upper longitudinal reinforcement of beam; 5. Waist reinforcement in beam middle; 6. Beam stirrup; Stress reinforcement; 9. Bottom distribution reinforcement; 10. Upper prefabricated laminated floor; 11. Beam lower longitudinal reinforcement; 12. Second side formwork; 13. Formwork bolts; 14. Second side formwork, 15. Lower prefabricated laminated floor.
具体实施方式Detailed ways
下面结合附图和具体实施例对本实用新型进一步说明。Below in conjunction with accompanying drawing and specific embodiment the utility model is further described.
参见图2,一种用于降板区域的带工具式模板的预制叠合楼板,包括上部预制叠合楼板10、下部预制叠合楼板15、钢筋骨架、第一侧模板12、第二侧模板14;所述上部预制叠合楼板10和下部预制叠合楼板15各自近降板区域的位置预埋模板螺栓13;所述第一侧模板12呈直角Z字形,其上端面通过所述预埋螺栓13与上部预制叠合楼板10固定,其下端面通过所述预埋螺栓13与下部预制叠合楼板10固定;所述第二侧模板14侧面与上部预制叠合楼板10贴合,下部抵住下部预制叠合楼板12。Referring to Fig. 2, a prefabricated laminated floor slab with a tool-type formwork for the lowering area, including an upper prefabricated laminated floor 10, a lower prefabricated laminated floor 15, a steel skeleton, a first side formwork 12, and a second side formwork 14 ; The upper prefabricated laminated floor 10 and the lower prefabricated laminated floor 15 are pre-embedded formwork bolts 13 at the positions near the lowering plate area; the first side formwork 12 is in a right-angle Z shape, and its upper end surface passes through the embedded bolts 13 It is fixed with the upper prefabricated laminated floor 10, and its lower end surface is fixed with the lower prefabricated laminated floor 10 through the embedded bolts 13; the side of the second side formwork 14 is attached to the upper prefabricated laminated floor 10, and the lower part is against the lower part Prefabricated laminated floor 12.
参见图2,在此实施例中,钢筋骨架包括梁上部纵筋4、梁中部腰筋5、梁箍筋6、梁下部纵筋11。Referring to FIG. 2 , in this embodiment, the reinforcement skeleton includes the upper longitudinal reinforcement 4 of the beam, the waist reinforcement 5 in the middle of the beam, the stirrup 6 of the beam, and the longitudinal reinforcement 11 of the lower beam.
参见图2,在此实施例中,所述上部预制叠合楼板10和下部预制叠合楼板12安装时呈升降板形式。Referring to Fig. 2, in this embodiment, the upper prefabricated laminated floor 10 and the lower prefabricated laminated floor 12 are in the form of lifting slabs when installed.
参见图2,在此实施例中,所述梁上部纵筋4、梁中部腰筋5、梁箍筋6、梁下部纵筋11预埋设置在所述下部预制叠合楼板15的近第一侧模板12的部位。Referring to Fig. 2, in this embodiment, the beam upper longitudinal reinforcement 4, the beam middle waist reinforcement 5, the beam stirrup 6, and the beam lower longitudinal reinforcement 11 are pre-embedded and arranged near the first The position of the side formwork 12.
参见图2,在此实施例中,带工具式模板的预制叠合楼板用于卫生间内。Referring to Fig. 2, in this embodiment, the prefabricated laminated floor slab with tool formwork is used in the toilet.
参见图2,在此实施例中,所述第一侧模板12为金属成品构件,对上部预制叠合楼板10起到支撑作用。Referring to FIG. 2 , in this embodiment, the first side formwork 12 is a finished metal component, which supports the upper prefabricated laminated floor 10 .
具体施工时,先将第一侧模板12通过预埋螺栓13固定在下部预制叠合楼板15上,并将带钢筋骨架的下部预制叠合楼板15安装并做好竖向支撑后,吊装上部预制叠合楼板10,上部预制叠合楼板10底部搁置于第一侧模板12上端面,通过预埋螺栓13将上部预制叠合楼板10与第一侧模板12上端面固定;上、下部预制叠合楼板固定后,将第二侧模板14支模固定,然后浇筑混凝土,最后将第二侧模板14拆除。During specific construction, the first side formwork 12 is first fixed on the lower prefabricated laminated floor 15 through embedded bolts 13, and the lower prefabricated laminated floor 15 with steel skeleton is installed and vertically supported, then the upper prefabricated floor is hoisted. Laminated floor slab 10, the bottom of the upper prefabricated laminated floor slab 10 rests on the upper end surface of the first side formwork 12, and the upper prefabricated laminated floor slab 10 and the upper end surface of the first side formwork 12 are fixed by embedded bolts 13; After the floor slab is fixed, the second side formwork 14 is fixed, then concrete is poured, and finally the second side formwork 14 is removed.
以上是本实用新型的优选实施例,本领域普通技术人员还可以在此基础上进行各种变换或改进,在不脱离本实用新型总的构思的前提下,这些变换或改进都属于本实用新型要求保护的范围之内。Above is the preferred embodiment of the present utility model, those skilled in the art can also carry out various transformations or improvements on this basis, without departing from the general idea of the present utility model, these transformations or improvements all belong to the present utility model within the scope of protection.
Claims (5)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201720799200.7U CN207244960U (en) | 2017-07-04 | 2017-07-04 | A kind of Prefabricated stacking floor with tool-typed formwork for being used to drop plate region |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201720799200.7U CN207244960U (en) | 2017-07-04 | 2017-07-04 | A kind of Prefabricated stacking floor with tool-typed formwork for being used to drop plate region |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN207244960U true CN207244960U (en) | 2018-04-17 |
Family
ID=61877962
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201720799200.7U Expired - Fee Related CN207244960U (en) | 2017-07-04 | 2017-07-04 | A kind of Prefabricated stacking floor with tool-typed formwork for being used to drop plate region |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN207244960U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN113136968A (en) * | 2021-05-06 | 2021-07-20 | 太原市建筑设计研究院 | Assembled kitchen and bathroom laminated slab splicing structure and splicing method |
-
2017
- 2017-07-04 CN CN201720799200.7U patent/CN207244960U/en not_active Expired - Fee Related
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN113136968A (en) * | 2021-05-06 | 2021-07-20 | 太原市建筑设计研究院 | Assembled kitchen and bathroom laminated slab splicing structure and splicing method |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN106988525A (en) | A kind of skyscraper aluminum alloy mould plate construction method | |
| CN108005387A (en) | A kind of assembled wallboard and the cast-in-place main body method for synchronously constructing of shear wall with short piers | |
| CN106193589B (en) | Concrete superelevation heavy type beam and overlapping board combining structure method for supporting | |
| CN105804395B (en) | Stair continuously poured in one molding construction method based on monoblock type typified form | |
| CN105178604A (en) | Construction method of assembly type superimposed floor slab | |
| CN108104284A (en) | Shear wall steel arm is embedded in the wallboard connecting structure and assembly method of floor | |
| CN207660132U (en) | A kind of wallboard connecting structure of shear wall overhanging steel arm insertion floor end | |
| CN205330159U (en) | Fixing device for cast-in-place slab with bottom form for laminated floor slabs | |
| CN107143076A (en) | A kind of Prefabricated stacking floor with side flanging and its construction method for being used to drop plate region | |
| CN219080981U (en) | Non-support fixing device for post-pouring strip of superimposed sheet | |
| CN206681359U (en) | One kind cheats new formwork system in hole | |
| CN201991226U (en) | Flange template support structure | |
| CN205369286U (en) | A prefabricated independent foundation mold | |
| CN104675112A (en) | Steel stair formwork and constructing method for once pouring forming of building staircase | |
| CN204199687U (en) | A kind of bath is fallen plate-girder side shaping tool formula between defending and is hung die device | |
| CN207244961U (en) | A kind of Prefabricated stacking floor with side flanging for being used to drop plate region | |
| CN204626965U (en) | For the steel stair template of poured up at a time between architectural stair | |
| CN102011490B (en) | Template supporting construction process of wall after slab for high-rise shear wall structure system | |
| CN220828037U (en) | Truss floor carrier plate supporting structure | |
| CN107152112A (en) | A kind of modularization Prefabricated stacking floor and its construction method for being used to drop plate region | |
| CN206070570U (en) | A kind of building structure | |
| CN117027589A (en) | Prefabricated bay window design and construction process | |
| CN207244957U (en) | A kind of modularization Prefabricated stacking floor for being used to drop plate region | |
| CN209637242U (en) | A laminated slab positioning support and slab seam sealing device for prefabricated buildings | |
| CN202787992U (en) | Constructional column top concrete pouring structure |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180417 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |