CN207032601U - A kind of two-way close spelling laminated floor slab connecting joint structure - Google Patents
A kind of two-way close spelling laminated floor slab connecting joint structure Download PDFInfo
- Publication number
- CN207032601U CN207032601U CN201720798986.0U CN201720798986U CN207032601U CN 207032601 U CN207032601 U CN 207032601U CN 201720798986 U CN201720798986 U CN 201720798986U CN 207032601 U CN207032601 U CN 207032601U
- Authority
- CN
- China
- Prior art keywords
- floor slab
- steel bar
- laminated floor
- stress
- bar ring
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
It the utility model is related to a kind of two-way close spelling laminated floor slab connecting joint structure, including two-way laminated floor slab, bottom steel bar stress, additional bar ring;Piece contacts between two-way laminated floor slab;Bottom steel bar stress is anchored into the region in cast-in-place layer concrete in the bending of floor tip inside, forms the portion that bends inwards;Bending inwards for additional bar ring and both sides while is fixedly connected portion;Additional bar ring across piece and with the portion's part superposition that bends inwards of bottom steel bar stress;The portion of bending inwards of additional bar ring and steel bar stress is below truss bars.The utility model does not need special tooth mould, and bottom reinforcement bars can make bar-mat reinforcement and directly integrally be positioned in mould during production;It need not be stayed during site operation and set post-cast strip, reduced live post-cast strip formwork and set up the work of support, lift site operation efficiency;The concrete belts and engaged of three constraints are formed after casting concrete, ensure that the good globality of piece both sides concrete and stress performance.
Description
Technical field
It the utility model is related to a kind of laminated floor slab connecting joint structure, and in particular to a kind of two-way close spelling laminated floor slab connects
Node structure is connect, belongs to laminated floor slab connecting node technical field.
Background technology
With the continuous enlargement deepened constantly with construction scope of construction industry system reform, building industrialization is constantly by political affairs
Mansion and the concern of society, already as the developing direction of Building Trade in China.
The connected mode on two-way laminated floor slab uses the wide cast-in-place band forms of reserved 200-300mm in the prior art,
Engineering site need to install alter-pouring strips mould plate and support, low construction efficiency;The prefabricated layer side of laminated floor slab stretches out bending reinforcing steel bar, factory
Muscle spacing need to be gone out according to difference during production and process different fixing tooth moulds, need to placed when reinforcing bar is put by root, low production efficiency;And
And largely go out personal safety of the muscle in lifting component and installation to worker and certain hidden danger be present.
For example, respectively referring to Fig. 1,2 and Fig. 3,4, bottom steel bar stress 1 stretches out the side of Prefabricated stacking floor 3, during production
Need to formulate special tooth mould, to fix steel bar stress 1, need to be placed in the tooth mould of side, greatly reduce by root when reinforcing bar is put
Production efficiency;Need to install the template that 200mm is wide or 300mm is wide at post-cast strip during site operation, and set up template and vertically prop up
Support, add the workload at scene.Meanwhile surface perception is not after construction for concrete bottom and precast floor slab bottom surface at post-cast strip
Unanimously, surface is also difficult to ensure that and flushed, a large amount of artificial floating workloads of later stage increase.
To sum up, it is low and related to there is production and construction efficiency in laminated floor slab connecting node design construction of the prior art
The problem of construction safety.
The content of the invention
The utility model technical issues that need to address are:Connected mode in the prior art on two-way laminated floor slab is equal
Wide cast-in-site stripe is reserved, engineering site need to install alter-pouring strips mould plate and support, low construction efficiency;The prefabricated layer side of laminated floor slab stretches out
Bending reinforcing steel bar, during plant produced need to according to it is different go out muscle spacing process different fixing tooth moulds, need to be placed when reinforcing bar is put by root,
Low production efficiency;And largely go out personal safety of the muscle in lifting component and installation to worker and certain hidden danger be present.
The utility model takes following technical scheme:
A kind of two-way close spelling laminated floor slab connecting joint structure, including it is two-way laminated floor slab 3, bottom steel bar stress 1, additional
Reinforced steel bar ring 2;Piece contacts between the two-way laminated floor slab 3;Bottom steel bar stress 1 anchors into cast-in-place in the bending of floor tip inside
In layer concrete in 4 region, the portion that bends inwards is formed;The additional bar ring 2 and bend inwards portion while the fixation of both sides
Connection;The additional bar ring 2 across piece and with the portion's part superposition that bends inwards of bottom steel bar stress 1;Additional bar ring
2 and the portion of bending inwards of steel bar stress 1 be below truss bars, so as to ensure that both do not expose concrete surface.
Further, the additional bar ring 2 is using the structure type for closing reinforcing bar.
Further, the termination of bottom steel bar stress 1 uses the structure type with closing reinforced steel bar ring.
Further, the reinforced steel bar ring that additional bar ring 2 is formed with the bottom steel bar stress of piece both sides simultaneously across piece
Overlap joint, increase the anchoring property of edge joint position additional bar ring.
Further, the additional bar ring 2 and the portion of bending inwards are in rectangular configuration.
The beneficial effects of the utility model are:
1) bottom steel bar stress 1 does not stretch out the side of Prefabricated stacking floor 3, it is not necessary to special tooth mould, bottom reinforcement bars during production
Bar-mat reinforcement can be made directly integrally to be positioned in mould, great improving production efficiency;
2) during site operation, Prefabricated stacking floor is directly close to be stitched together, and sets post-cast strip without staying, is poured after reducing scene
With formwork and the work supported is set up, lifts site operation efficiency;
3) one closing reinforced steel bar ring of the top surface of Prefabricated stacking floor 3 formation is stretched out in the bending of bottom steel bar stress 1, meanwhile, close
Edge joint position additional rectangular closing reinforced steel bar ring is spelled, and is overlapped with the reinforced steel bar ring of both sides Prefabricated stacking floor, is formed after casting concrete
The concrete belts and engaged of three constraints, ensure that the good globality of piece both sides concrete and stress performance.
Brief description of the drawings
Fig. 1 is a kind of schematic diagram of laminated floor slab connecting joint structure of prior art.
Fig. 2 is the structural representation of bottom steel bar stress in Fig. 1.
Fig. 3 is the schematic diagram of second of laminated floor slab connecting joint structure of prior art.
Fig. 4 is the structural representation of bottom steel bar stress in Fig. 3.
Fig. 5 is the two-way close structural representation for spelling laminated floor slab connecting joint structure of the utility model.
Fig. 6 is the structural representation of bottom steel bar stress 1 and additional bar ring 2 in Fig. 5.
In figure, 1, bottom steel bar stress, 2. additional bar rings, 3. Prefabricated stacking floors, 4. cast-in-place concrete layers, 6. tops
Steel bar stress, 7. top distribution bars.
Embodiment
The utility model is further illustrated with reference to specific the drawings and specific embodiments.
Referring to Fig. 5-6, a kind of two-way close spelling laminated floor slab connecting joint structure, including two-way laminated floor slab 3, bottom stress
Reinforcing bar 1, additional bar ring 2;Piece contacts between the two-way laminated floor slab 3;Bottom steel bar stress 1 is curved in floor tip inside
Folding is anchored into cast-in-place layer concrete in 4 region, forms the portion that bends inwards;The additional bar ring 2 bends inwards with both sides
Portion is fixedly connected simultaneously;The additional bar ring 2 across piece and with the portion's part superposition that bends inwards of bottom steel bar stress 1;
The portion of bending inwards of additional bar ring 2 and steel bar stress 1 is below truss bars, so as to ensure that both do not expose concrete table
Face.
In this embodiment, referring to Fig. 6, the additional bar ring 2 is using the structure type for closing reinforcing bar.
In this embodiment, the structure type with closing reinforced steel bar ring is used referring to Fig. 6, the termination of bottom steel bar stress 1.
In this embodiment, referring to Fig. 5, bottom steel bar stress of the additional bar ring 2 across piece while with piece both sides
The reinforced steel bar ring overlap joint of formation, increase the anchoring property of edge joint position additional bar ring.
In this embodiment, it is in rectangular configuration referring to Fig. 6, the additional bar ring 2 and the portion of bending inwards.
When it is implemented, the reinforced steel bar ring that reinforced steel bar ring 2 is formed with the bottom steel bar stress of piece both sides simultaneously across piece is taken
After the completion of connecing, casting concrete, it is fixed together two-way laminated floor slab.
The utility model bottom steel bar stress 1 does not stretch out the side of Prefabricated stacking floor 3, it is not necessary to special tooth mould, during production
Bottom reinforcement bars can make bar-mat reinforcement and directly integrally be positioned in mould, great improving production efficiency;It is prefabricated during site operation
Laminated floor slab is directly close to be stitched together, and post-cast strip is set without staying, and is reduced live post-cast strip formwork and is set up the work of support, carries
Rise site operation efficiency;The bending of bottom steel bar stress 1 stretches out the top surface of Prefabricated stacking floor 3 and forms a closing reinforced steel bar ring, meanwhile,
In close spelling edge joint position additional rectangular closing reinforced steel bar ring, and overlapped with the reinforced steel bar ring of both sides Prefabricated stacking floor, after casting concrete
The concrete belts and engaged of three constraints are formed, ensure that piece both sides concrete good globality and stress
Energy.
Above is preferred embodiment of the present utility model, those of ordinary skill in the art can also be carried out respectively on this basis
Kind conversion improves, and on the premise of the total design of the utility model is not departed from, these conversion or improvement should all belong to this reality
Within the scope of new be claimed.
Claims (5)
- A kind of 1. two-way close spelling laminated floor slab connecting joint structure, it is characterised in that:Including two-way laminated floor slab (3), bottom steel bar stress (1), additional bar ring (2);Piece contacts between the two-way laminated floor slab (3);Bottom steel bar stress (1) is anchored into cast-in-place layer concrete in the region of (4) in the bending of floor tip inside, is formed inwardly curved Folding part;Bending inwards for the additional bar ring (2) and both sides while is fixedly connected portion;The additional bar ring (2) across piece and with the portion's part superposition that bends inwards of bottom steel bar stress (1);The portion of bending inwards of additional bar ring (2) and steel bar stress (1) is below truss bars.
- 2. two-way close spelling laminated floor slab connecting joint structure as claimed in claim 1, it is characterised in that:The additional bar ring (2) using the structure type of closing reinforcing bar.
- 3. two-way close spelling laminated floor slab connecting joint structure as claimed in claim 1, it is characterised in that:The bottom stress steel Muscle (1) termination uses the structure type with closing reinforced steel bar ring.
- 4. two-way close spelling laminated floor slab connecting joint structure as claimed in claim 1, it is characterised in that:Additional bar ring (2) The reinforced steel bar ring formed simultaneously with the bottom steel bar stress of piece both sides across piece overlaps, and increases the anchor of edge joint position additional bar ring Solidity energy.
- 5. two-way close spelling laminated floor slab connecting joint structure as claimed in claim 1, it is characterised in that:The additional bar ring (2) and the portion of bending inwards is in rectangular configuration.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720798986.0U CN207032601U (en) | 2017-07-04 | 2017-07-04 | A kind of two-way close spelling laminated floor slab connecting joint structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720798986.0U CN207032601U (en) | 2017-07-04 | 2017-07-04 | A kind of two-way close spelling laminated floor slab connecting joint structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207032601U true CN207032601U (en) | 2018-02-23 |
Family
ID=61466462
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720798986.0U Active CN207032601U (en) | 2017-07-04 | 2017-07-04 | A kind of two-way close spelling laminated floor slab connecting joint structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207032601U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109898714A (en) * | 2019-04-02 | 2019-06-18 | 上海应用技术大学 | The close spelling connection structure of fibre sheet material concrete bidirectional laminated slab and implementation method |
CN110565863A (en) * | 2019-09-27 | 2019-12-13 | 华东建筑设计研究院有限公司 | Composite floor slab, building and frame for preparing composite floor slab |
CN114457948A (en) * | 2020-11-10 | 2022-05-10 | 内蒙古中朵远大建筑工业有限公司 | Splicing seam structure of prefabricated bottom plate of bidirectional laminated slab and construction method of splicing seam structure |
CN115262831A (en) * | 2022-08-09 | 2022-11-01 | 筑邦绿建科技(重庆)有限公司 | Integral type splicing seam construction method for fabricated floor and floor |
-
2017
- 2017-07-04 CN CN201720798986.0U patent/CN207032601U/en active Active
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109898714A (en) * | 2019-04-02 | 2019-06-18 | 上海应用技术大学 | The close spelling connection structure of fibre sheet material concrete bidirectional laminated slab and implementation method |
CN110565863A (en) * | 2019-09-27 | 2019-12-13 | 华东建筑设计研究院有限公司 | Composite floor slab, building and frame for preparing composite floor slab |
CN114457948A (en) * | 2020-11-10 | 2022-05-10 | 内蒙古中朵远大建筑工业有限公司 | Splicing seam structure of prefabricated bottom plate of bidirectional laminated slab and construction method of splicing seam structure |
CN115262831A (en) * | 2022-08-09 | 2022-11-01 | 筑邦绿建科技(重庆)有限公司 | Integral type splicing seam construction method for fabricated floor and floor |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207032601U (en) | A kind of two-way close spelling laminated floor slab connecting joint structure | |
CN104775553B (en) | Novel L-shaped edge member for superimposed slab shear walls and connecting method for novel L-shaped edge member | |
CN107542196A (en) | Prestressed concrete bidirectional laminated slab and preparation method | |
CN113202219B (en) | Fully prefabricated assembled steel-concrete composite floor system and design calculation method | |
CN207582764U (en) | A kind of close spelling laminated floor slab connecting joint structure of end fluting | |
CN106638304A (en) | UHPC-common-concrete-lamination composite bridge-deck-slab construction and constructing method thereof | |
CN207863256U (en) | A kind of close spelling precast floor slab connection structure with tongue and groove | |
CN206859479U (en) | A kind of steel bar girder laminated floor slab | |
CN212026779U (en) | Building node structure of assembled full-prefabricated floor slab and supporting member | |
CN105113717B (en) | Interior truss type steel tube concrete L-shaped post and its construction method | |
CN107090908B (en) | A kind of vertical prefabricated components joint connecting method | |
CN107130715A (en) | Teeth groove is poured after a kind of to be linked and packed the construction method of formula building roof system | |
CN110318490A (en) | A kind of construction method that superimposed sheet is connect with secondary beam and node connecting structure | |
CN110029836A (en) | A kind of concrete structure reinforcing bars template integrative installation technology dwelling house system | |
CN108316466A (en) | A kind of prefabricated window member that floats, assembled float window joint structure and its construction method | |
CN105839784B (en) | Assembled jacking type construction techniques | |
CN105297893A (en) | Tenon-and-mortise type concrete superposed beam cross connection structure and construction method thereof | |
CN108978967A (en) | A kind of method of the prefabricated part overlapping connection concrete floor of total cross-section | |
CN107130716A (en) | After pour teeth groove and be linked and packed formula building roof system | |
CN105220792A (en) | A kind of prefabricated concealed bracings energy-consuming shear wall and assemble method thereof | |
CN109184030A (en) | A kind of assembly concrete shear wall Type Composite Structure System and installation method | |
CN108775084A (en) | Steel-concrete combines precast beam and prefabricated post connection structure and construction method | |
CN107268417A (en) | A kind of highway steel reinforced concrete combined beam structure based on assembling | |
CN208039577U (en) | Half prefabricated prestressed concrete floor slab of figure of eight steel bar girder | |
CN108412099A (en) | Bar connecting formula concrete prefabricated board and connection method are buried after through thickness |