CN215291325U CN202121209640.5U CN202121209640U CN215291325U CN 215291325 U CN215291325 U CN 215291325U CN 202121209640 U CN202121209640 U CN 202121209640U CN 215291325 U CN215291325 U CN 215291325U
Authority
CN
China
Prior art keywords
building
stand
channel
protection frame
frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121209640.5U
Other languages
Chinese (zh)
Inventor
观开剑
潘正斌
孙清臣
叶文杰
李家盛
陈荣朗
胡俊
俞旺新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fourth Engineering Division Corp Ltd
Original Assignee
China Construction Fourth Engineering Division Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fourth Engineering Division Corp Ltd filed Critical China Construction Fourth Engineering Division Corp Ltd
Priority to CN202121209640.5U priority Critical patent/CN215291325U/en
Application granted granted Critical
Publication of CN215291325U publication Critical patent/CN215291325U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a peripheral protection stores pylon of whole promotion formula, include a set of stand that sets up around the facade outside the building, every stand attaches wall guide and building fixed connection through more than two, attaches the wall guide at the top that corresponds with every stand and installs electric block on, and electric block's lifting hook hangs the lower extreme of establishing at this stand, at the upper end fixedly connected with round channel-section steel of all stands, is provided with round protection frame in the periphery of channel-section steel, at a set of couple of inboard fixedly connected with in upper portion of protection frame, and the couple is hung and is established on the channel-section steel. The utility model discloses a protection frame carries out the integral erection on the ground, and workman high altitude construction is few, reduces the danger of protection frame installation. And only need through the tower crane with the well assembled protection frame on the ground hang in the well-installed channel-section steel in advance can, follow-up promotion process can be accomplished through electric block, can promote along with the construction floor successive layer, improved the efficiency of construction greatly.

Description

Whole promotion formula peripheral protection stores pylon
Technical Field
The utility model relates to an overall promotion formula peripheral protection stores pylon belongs to building peripheral protection technical field.
Background
The existing form that the peripheral protection frame of climbing frame combines with the frame stand of climbing carries out bolted connection through the pole setting of protection frame and the channel-section steel track of climbing the frame, and the installation order of its protection frame is that the workman connects the interior pole of protection earlier with the stand of fixing on the wall, and interior pole passes through the fixed outer pole of whippletree, installs the bottom guard plate after that, and other secondary rib, outer protection network and other spare parts are installed in proper order to the workman in the high altitude. The installation mode is finished in high altitude, workers work in high altitude, and the danger is great; and the installation period is long, which is not beneficial to the field period. In addition, the transportation of the protection frame member needs the tower crane to assist in hoisting to a construction surface layer, workers perform positioning and installation, and the time of occupying the tower crane is long.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a simple structure, simple to operate, safe and reliable's peripheral protection stores pylon of whole promotion formula to overcome not enough among the prior art.
In order to achieve the above purpose, the utility model adopts the following technical scheme: the utility model provides a peripheral protection stores pylon of whole promotion formula, include a set of stand that sets up around the facade outside along the building, every stand attaches wall guide holder and building fixed connection through more than two, install electric block on attaching the wall guide holder at the top that corresponds with every stand, and electric block's lifting hook hangs the lower extreme of establishing at this stand, at the upper end fixedly connected with round channel-section steel of all stands, be provided with round protection frame in the periphery of channel-section steel, at a set of couple of the inboard fixedly connected with in upper portion of protection frame, and the couple is hung and is established on the channel-section steel.
Furthermore, the protective frame comprises a circle of steel frame arranged around the outer vertical surface of the building, a protective net is hung on the outer side of the steel frame, and more than two layers of gangboards are arranged on the steel frame.
Furthermore, the inner side of the steel frame is provided with a roller which is contacted with the outer vertical surface of the building.
Furthermore, the inner side of the steel frame is provided with a slide rail which is in contact with the outer vertical surface of the building.
Furthermore, the wall-attached guide seat is fixed on a building through embedded bolts.
Since the technical scheme is used, the utility model discloses an advantage has below:
the danger of mounting the protective frame is reduced, the protective frame is integrally mounted on the ground, and workers do little overhead work.
Secondly, the protective frame is installed on the ground, so that flow construction can be formed, the field structure construction is not influenced, and the field construction period is facilitated.
And the occupied tower crane time is short, the protective frame assembled on the ground only needs to be hung on the channel steel installed in advance through the tower crane, the subsequent lifting process can be completed through the electric hoist, and the construction efficiency can be greatly improved along with the successive layer lifting of the construction floors.
Drawings
Fig. 1 is a front view of a schematic structural view of the present invention;
FIG. 2 is a plan view of a schematic layout of the channel;
FIG. 3 is a schematic view of the structure of the protective frame in example 1;
fig. 4 is a schematic structural view of a protective frame in embodiment 2.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Example 1
The embodiment of the utility model provides a: please refer to fig. 1-3, an integrally lifting type peripheral protection hanger comprises a set of upright posts 4 arranged around the outer vertical surface of a building 1, each upright post 4 is fixedly connected with the building 1 through more than two wall-attached guide seats 2, an electric hoist 6 is mounted on the top wall-attached guide seat 2 corresponding to each upright post 4, a lifting hook 3 of the electric hoist 6 is hung at the lower end of the upright post 4, a circle of channel steel 8 is fixedly connected at the upper end of all upright posts 4, a circle of protection frame 5 is arranged at the periphery of the channel steel 8, a set of hooks 7 is fixedly connected at the inner side of the upper part of the protection frame 5, and the hooks 7 are hung on the channel steel 8. The protective frame 5 comprises a steel frame 501 arranged along the periphery of the outer facade of the building 1, a protective net 502 is hung on the outer side of the steel frame 501, and more than two layers of gangboards 503 are arranged on the steel frame 501. The inside of the steel frame 501 is provided with rollers 504 which contact the facade of the building 1. The wall-attached guide seat 2 is fixed on the building 1 through embedded bolts.
During the construction, at first assemble protection frame 5 on ground, then through the tower crane with protection frame 5 handling to the construction layer to hang through couple 7 on protection frame 5 and establish on the channel-section steel 8 of stand 4 upper end, treat the construction layer and accomplish the construction back, start electric block 6, through electric block 6 with stand 4 upwards promote the one deck, then through attaching wall guide 2 with stand 4 and 1 fixed connection of building, like this alright reach the purpose that promotes protection frame 5 through promoting stand 4.
When the outer vertical surface of the building 1 is a plane structure, a group of rollers 504 is installed on the inner side of the protection frame 5, and the rollers 504 are in rolling contact with the outer vertical surface of the building 1 in the lifting process, so that the protection frame 5 can be stably lifted.
Example 2
The embodiment of the utility model provides a: please refer to fig. 1, 2 and 4, an integrally lifting type peripheral protection hanger comprises a set of upright posts 4 arranged around the outer vertical surface of a building 1, each upright post 4 is fixedly connected with the building 1 through more than two wall-attached guide seats 2, an electric hoist 6 is mounted on the wall-attached guide seat 2 at the top corresponding to each upright post 4, a lifting hook 3 of the electric hoist 6 is hung at the lower end of the upright post 4, a circle of channel steel 8 is fixedly connected at the upper end of all upright posts 4, a circle of protection frame 5 is arranged at the periphery of the channel steel 8, a set of hooks 7 is fixedly connected at the inner side of the upper part of the protection frame 5, and the hooks 7 are hung on the channel steel 8. The protective frame 5 comprises a steel frame 501 arranged along the periphery of the outer facade of the building 1, a protective net 502 is hung on the outer side of the steel frame 501, and more than two layers of gangboards 503 are arranged on the steel frame 501. The inner side of the steel frame 501 is provided with a slide rail 505 contacting with the outer facade of the building 1. The wall-attached guide seat 2 is fixed on the building 1 through embedded bolts.
During the construction, at first assemble protection frame 5 on ground, then through the tower crane with protection frame 5 handling to the construction layer to hang through couple 7 on protection frame 5 and establish on the channel-section steel 8 of stand 4 upper end, treat the construction layer and accomplish the construction back, start electric block 6, through electric block 6 with stand 4 upwards promote the one deck, then through attaching wall guide 2 with stand 4 and 1 fixed connection of building, like this alright reach the purpose that promotes protection frame 5 through promoting stand 4.
When the outer vertical surface of the building 1 is an uneven floating window structure, a group of sliding rails 505 are arranged on the inner side of the protection frame 5, and the sliding rails 505 are in sliding contact with the outer vertical surface of the building 1 in the lifting process, so that the protection frame 5 can be stably lifted.

Claims (5)

1. An integrally hoisted peripheral protective hanger comprising a set of uprights (4) arranged around the facade of a building (1), characterized in that: every stand (4) attach wall guide holder (2) and building (1) fixed connection through more than two, attach wall guide holder (2) at the top that corresponds with every stand (4) and install electric block (6), and lifting hook (3) of electric block (6) are hung and are established the lower extreme in this stand (4), upper end fixedly connected with round channel-section steel (8) at all stands (4), be provided with round protection frame (5) in the periphery of channel-section steel (8), at the inboard fixedly connected with in upper portion of protection frame (5) a set of couple (7), and couple (7) are hung and are established on channel-section steel (8).
2. The integrally lifted peripheral shielding hanger of claim 1 wherein: the protective frame (5) comprises a circle of steel frame (501) arranged around the outer facade of the building (1), a protective net (502) is hung on the outer side of the steel frame (501), and more than two layers of gangboards (503) are arranged on the steel frame (501).
3. The integrally lifted peripheral shielding hanger of claim 2 wherein: and rollers (504) which are in contact with the outer vertical surface of the building (1) are arranged on the inner side of the steel frame (501).
4. The integrally lifted peripheral shielding hanger of claim 2 wherein: and a sliding rail (505) which is in contact with the outer vertical surface of the building (1) is arranged on the inner side of the steel frame (501).
5. The integrally lifted peripheral shielding hanger of claim 1 wherein: the wall-attached guide seat (2) is fixed on the building (1) through embedded bolts.
CN202121209640.5U 2021-06-01 2021-06-01 Whole promotion formula peripheral protection stores pylon Active CN215291325U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121209640.5U CN215291325U (en) 2021-06-01 2021-06-01 Whole promotion formula peripheral protection stores pylon

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121209640.5U CN215291325U (en) 2021-06-01 2021-06-01 Whole promotion formula peripheral protection stores pylon

Publications (1)

Publication Number Publication Date
CN215291325U true CN215291325U (en) 2021-12-24

Family

ID=79543349

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121209640.5U Active CN215291325U (en) 2021-06-01 2021-06-01 Whole promotion formula peripheral protection stores pylon

Country Status (1)

Country Link
CN (1) CN215291325U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113235906A (en) * 2021-06-01 2021-08-10 中国建筑第四工程局有限公司 Integrally-lifted peripheral protection hanging frame and lifting method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113235906A (en) * 2021-06-01 2021-08-10 中国建筑第四工程局有限公司 Integrally-lifted peripheral protection hanging frame and lifting method

Similar Documents

Publication Publication Date Title
CN113235906A (en) Integrally-lifted peripheral protection hanging frame and lifting method
CN215291325U (en) Whole promotion formula peripheral protection stores pylon
CN213268983U (en) Self-climbing discharging platform
CN210460016U (en) Integrated form single power lift material platform
CN114150857B (en) Construction method of attached type automatic climbing elevator shaft safety protection platform
CN111236613A (en) Protection platform for building construction and use method thereof
CN112523520B (en) Construction method of lifting protection platform for prefabricated building
CN113062584A (en) Multipoint elevator shaft construction lifting platform and construction method
CN201460186U (en) Adhesive lifting scaffold
CN205000656U (en) From over -and -under type material cycling platform
CN208732486U (en) Roofing monorail crane
CN216616995U (en) Green lighting regularization cat ladder device
CN217054267U (en) Protection device construction structure
CN216549362U (en) Assembling and hoisting device for components above foundation pit
CN214114721U (en) Cantilever crane
CN210973660U (en) Temporary tower crane passageway of can overturning suitable for whole hoisting frame
CN209556401U (en) A kind of super high-rise building super large curtain wall unit hydraulic synchronizing lifting system
CN110748140A (en) Track beam hanging basket special for stepped curtain wall
CN221216935U (en) Assembled curtain wall unit body lifting device for super high-rise building reconstruction
CN217418002U (en) Self-elevating lifting tower crane safety channel device
CN205445448U (en) Climb construction ladder of transmission tower
CN215291319U (en) Multi-point elevator shaft construction lifting platform
CN202248827U (en) Single attached lifting scaffold
CN209924424U (en) Creeping formwork device with safety structure
CN219060835U (en) Self-elevating lighting well operation platform device

Legal Events

Date Code Title Description
GR01 Patent grant