CN111236613A - Protection platform for building construction and use method thereof - Google Patents

Protection platform for building construction and use method thereof Download PDF

Info

Publication number
CN111236613A
CN111236613A CN202010096549.0A CN202010096549A CN111236613A CN 111236613 A CN111236613 A CN 111236613A CN 202010096549 A CN202010096549 A CN 202010096549A CN 111236613 A CN111236613 A CN 111236613A
Authority
CN
China
Prior art keywords
construction
aluminum alloy
guide rail
wall
layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010096549.0A
Other languages
Chinese (zh)
Inventor
高空亮
曹珍珠
高湛
吴云飞
武鑫鑫
王辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Zhongzhizheng Engineering Technology Research Institute Co ltd
Original Assignee
Henan Zhongzhizheng Engineering Technology Research Institute Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Zhongzhizheng Engineering Technology Research Institute Co ltd filed Critical Henan Zhongzhizheng Engineering Technology Research Institute Co ltd
Priority to CN202010096549.0A priority Critical patent/CN111236613A/en
Publication of CN111236613A publication Critical patent/CN111236613A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G3/30Mobile scaffolds; Scaffolds with mobile platforms suspended by flexible supporting elements, e.g. cables
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G3/30Mobile scaffolds; Scaffolds with mobile platforms suspended by flexible supporting elements, e.g. cables
    • E04G3/32Hoisting devices; Safety devices
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/001Safety or protective measures against falling down relating to scaffoldings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/04Means for fastening, supporting, or bracing scaffolds on or against building constructions
    • E04G5/046Means for fastening, supporting, or bracing scaffolds on or against building constructions for fastening scaffoldings on walls

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The invention provides a protective platform for building construction and a using method thereof, and the protective platform comprises a steel main frame and an aluminum alloy construction platform, wherein the steel main frame comprises a plurality of lifting guide rails which are vertically arranged at intervals, one side of each lifting guide rail is provided with a wall-attached unloading anti-tilting anti-falling mechanism at intervals along the vertical direction, the other side of each lifting guide rail is vertically fixed with a guide rail column, the aluminum alloy construction platform is fixed on the guide rail column, the guide rail column is connected with a driving mechanism and drives the guide rail column to vertically move through the driving mechanism, the guide rail column comprises vertical inner row upright posts and outer row upright posts which are parallel to the inner row upright posts, a steel protective net is arranged on the outer sides of the outer row upright posts, the aluminum alloy construction platform comprises two aluminum alloy walkways, and the. The invention is connected with the construction layer stably, can adjust the heights of the main frame and the construction platform and the arrangement of the walkway plates according to the change of the construction layer height, saves a large amount of materials compared with the existing protection platform, and prevents inclination and falling.

Description

Protection platform for building construction and use method thereof
Technical Field
The invention relates to the technical field of building construction, in particular to a protective platform for building construction and a using method thereof.
Background
In assembly type structure or cast-in-place outer wall project work progress, need protect, current inserted scaffold includes seven steps or more and walks the guidance tape, and several layers of guidance tape do not have the effect below, only when in order to carry, satisfies the cantilever height and is not beyond the standard, just so has the material extravagant big, and whole scaffold frame quality is heavier, is not convenient for climb or make construction wall bear great.
CN209637192U discloses a novel building outer wall protection platform, mainly used low-rise building, if be used for high-rise building, construction is once a construction one deck at present, need protect the height of 1.5m, and the protection frame is 4.5m high at least that is, and this 4.5m does not have the outer wall can install attachment device, and this protection platform does not consider that the construction layer can not do to attach the wall pre-buried, takes place to tumble easily during the use, appears unstably. In addition, high-rise buildings have higher requirements on the combination stability of the protective platform and the wall body of the building due to larger wind power.
Disclosure of Invention
The invention provides a protective platform for building construction and a using method thereof, which are connected with a construction layer stably, can adjust the heights of a main frame and the construction platform and the arrangement of walkway plates according to the change of the height of the construction layer, save a large amount of materials compared with the prior scaffold or protective platform, and have the anti-tilting and anti-falling functions.
The technical scheme of the invention is realized as follows: the utility model provides a protection platform for construction, including steel main frame and aluminum alloy construction platform, the steel main frame includes the promotion guide rail that the vertical interval of a plurality of set up, one side of promotion guide rail is provided with along vertical interval and attaches the wall off-load and prevent inclining and prevent weighing down the mechanism, the opposite side is along vertical being fixed with the guide rail post, aluminum alloy construction platform is fixed in the upper end of guide rail post, the guide rail post links to each other with actuating mechanism, drive guide rail post vertical migration through actuating mechanism, the guide rail post includes vertical interior pole setting and the outer pole setting of arranging parallel with interior row of stand, the upper end in outer row pole setting outside is provided with the steel protection network, aluminum alloy construction platform includes two aluminum alloy walkways boards, two aluminum alloy walkways boards set up the upside between interior.
Further, actuating mechanism includes the hydraulic cylinder of vertical setting, and the lower extreme of hydraulic cylinder can be dismantled continuously through the construction completion layer that attaches wall spare and building wall, and the upper end of hydraulic cylinder is provided with jacking bearing tray, is provided with jacking bolt on the guide rail post of jacking bearing tray top, and jacking bolt is located aluminum alloy construction platform's below.
Further, the driving mechanism comprises a lower lifting point, an upper lifting point and an electric hoist, the lower lifting point, the electric hoist and the upper lifting point are sequentially arranged on the guide rail column from bottom to top, a detachable hanger is arranged on the construction completion layer corresponding to the upper lifting point, the electric hoist is connected with the lower lifting point, and a traction chain of the electric hoist is connected with the hanger.
Furthermore, attach wall off-load and prevent inclining and prevent weighing down mechanism including attaching wall guide holder, shore, leading wheel and safety hook, attach wall guide holder one end and pass through the construction completion layer that the wall bolt was fixed in building wall, the other end is provided with the leading wheel with promote guide rail complex, shore and safety hook set up respectively in the upper and lower both sides that attach the wall guide holder, and with promote the guide rail complex.
Furthermore, a horizontal inner cantilever plate is arranged between the aluminum alloy walkway plate and the building wall body, one end of the inner cantilever plate extends out of the aluminum alloy walkway plate, and a turnover plate used for preventing materials from falling is hinged to the inner cantilever plate.
Further, the bolt holes with the interval of 100mm are vertically and uniformly distributed in the inner sides of the outer row of upright rods, the aluminum alloy walkway plates and the lifting guide rail.
The using method of the protective platform for building construction comprises the following steps:
(1) the steel main frame is installed on a building wall body through an attached wall unloading anti-tilting and anti-falling mechanism, the attached wall unloading anti-tilting and anti-falling mechanism is installed on a construction completion layer of the building wall body, an aluminum alloy walkway plate on the lower layer corresponds to a just completed construction layer, an aluminum alloy walkway plate on the upper layer corresponds to a to-be-constructed layer, and the free end of a turning plate is arranged on the construction completion layer adjacent to the to-be-constructed layer.
(2) And (3) after the layer to be constructed in the step (1) is constructed, starting the driving mechanism to drive the steel main frame to move upwards, and driving the aluminum alloy construction platform to move upwards to the next layer to be constructed by the steel main frame.
Further, in the step (2), if the driving mechanism adopts a hydraulic oil cylinder, the lowest wall-attached unloading anti-tilting and anti-falling mechanism is taken down and installed on the layer to be constructed in the step (1), the hydraulic oil cylinder extends, the jacking bearing tray pushes the steel main frame to ascend through the jacking bolt, and the steel main frame drives the aluminum alloy construction platform to move upwards to the next layer to be constructed; and then the hydraulic oil cylinder is contracted, the wall attaching piece is moved upwards to the next construction completion layer, and simultaneously the hydraulic oil cylinder is driven to move upwards.
Further, in the step (2), if the driving mechanism adopts an electric hoist, the lowest wall-attached unloading, anti-tilting and anti-falling mechanism is taken down and installed on the layer to be constructed in the step (1), the electric hoist is started, the steel main frame is driven to ascend through transmission of a traction chain, and the steel main frame drives the aluminum alloy construction platform to move upwards to the next layer to be constructed; then the electric hoist rotates reversely, and the hanger is moved upwards to the next layer after construction.
The invention has the beneficial effects that:
1. the invention is mainly applied to fabricated buildings, can also be used for construction protection of full cast-in-place outer wall projects, is connected with a construction layer stably, can be suitable for construction of layers with different heights, and can adjust the heights of a main frame and a construction platform and the arrangement of a walkway plate according to the change of the height of the construction layer; the driving mechanism is an electric hoist, a hydraulic oil cylinder can be adopted, and a motor and a reduction gearbox can also be adopted; compared with the traditional scaffold, the traditional attached lifting scaffold and the traditional all-steel attached lifting scaffold, a large amount of materials are saved;
2. a plurality of wall-attached structures are adopted, so that the anti-tilting and anti-falling effects can be achieved in the lifting process;
3. the construction platform adopts aluminum alloy and a light frame body, the aluminum alloy is enough to bear construction live load and wind load, the main stress structure is a guide rail column, and the guide rail column is made of steel, so that the strength of the protection platform can be ensured, the weight of the protection platform can be reduced, and the protection platform is free of fire hazard;
4. all connections of the protection platform can adopt bolt connection, torsion checking is carried out, no steel pipe fastener is used, and the connection is very reliable;
5. the installation is swift simple, does not need too high installation technique, and ordinary workman can, can satisfy assembly type structure's high construction demand.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to the drawings without creative efforts.
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic structural diagram of a guide rail column according to an embodiment;
FIG. 3 is an enlarged view of a portion of FIG. 2;
FIG. 4 is a schematic diagram of the elevated rail columns according to one embodiment;
FIG. 5 is a schematic structural view of a second guide rail column according to an embodiment;
FIG. 6 is a partial enlarged view of B in FIG. 5;
fig. 7 is a schematic structural view of the second guide rail column after being lifted according to the embodiment.
The construction method comprises the following steps of lifting a guide rail 1, attaching a wall guide seat 2, a top support 3, a falling protector 4, a guide rail column 5, an inner row of upright rods 6, an outer row of upright rods 7, a steel protective net 8, an aluminum alloy walkway plate 9, a hydraulic oil cylinder 10, a jacking bearing tray 11, an inner cantilever plate 13, a turning plate 14, a lower lifting point 15, an upper lifting point 16, an electric hoist 17, a traction chain 18, a hanger 19, a construction completion layer 20, a to-be-constructed layer 21 and an attached wall part 22.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be obtained by a person skilled in the art without inventive effort based on the embodiments of the present invention, are within the scope of the present invention.
Example one
As shown in fig. 1-3, a protection platform for building construction, including steel main frame and aluminum alloy construction platform, the steel main frame includes a plurality of lifting guide rail 1 that the interval set up, like 2 lifting guide rail 1, specifically set up according to building wall body demand, one side of lifting guide rail 1 is provided with along vertical interval and attaches wall off-load anti-tilt-prevent and prevent weighing down mechanism, it includes attaching wall off-load anti-tilt-prevent and prevent weighing down mechanism 2, the shore 3, leading wheel and safety hook 4, it is made for shaped steel and steel sheet welding to attach wall guide rail 2, it is fixed in building wall body's construction completion layer 20 through the wall bolt to attach wall guide rail 2 one end, the other end is fixed with the leading wheel with lifting guide rail 1 complex, shore 3 and safety hook 4 are installed respectively in the upper and lower both sides that attach wall guide rail 2, and with lifting guide rail 1 complex.
A guide rail column 5 is vertically fixed on the other side of the lifting guide rail 1, the guide rail column 5 is formed by welding profile steel into a standard part and installing the standard part by using bolts, the height of the guide rail column 5 is 7m, the height of the covering layer is 2+1m, the aluminum alloy construction platform is fixed at the upper ends of two guide rail columns 5, the guide rail columns 5 are connected with a driving mechanism, the driving mechanism drives the guide rail column 5 to vertically move, the guide rail column 5 comprises vertical inner row upright posts 6 and outer row upright posts 7 parallel to the inner row upright posts, the width between the outer row upright posts 7 and the inner row upright posts is 600-1200mm, can hold alone get into can, arrange in succession through the connecting piece between pole setting 7 and the interior pole setting of arranging, the connecting piece adopts shaped steel welding preparation to form, highly be 400 between the sand-baked 700mm, the bolt hole of vertical equipartition interval 100mm is followed to the inboard of arranging pole setting and lifting guide outward.
The upper end of the outer side of the outer row of upright posts 7 is fixed with a steel protective net 8, the steel protective net 8 is formed by connecting a net frame and a net piece together by using self-tapping screws, the net frame is formed by welding 2.0 x 2.0 square tubes, the net piece is made of 0.4-1.0mm thick punching steel plates, each steel protective net 8 is 2.5 x 1.5m, and other specifications can be adopted as required. Adopt steel protection network 8 to protect, also can adopt to block the waist pole and protect, aluminum alloy construction platform includes two aluminum alloy walkways boards 9, and two aluminum alloy walkways boards 9 are fixed in the upside between interior row pole setting 6 and the outer row pole setting 7 along vertical interval. The aluminum alloy walkway plate 9 is made of 6061-T6 aluminum alloy, is formed by extrusion at one time and is a standard structural member, and bolt holes with the interval of 100mm are uniformly distributed on the side wall of the aluminum alloy walkway plate 9.
Actuating mechanism includes the hydraulic cylinder 10 of vertical setting, hydraulic cylinder 10 is vertical to be arranged in between outer pole setting 7 and the interior pole setting 6 of arranging, hydraulic cylinder 10's lower extreme with attach the wall spare fixed linking to each other, it can dismantle with construction completion layer 20 of building wall body through wearing the wall bolt to attach wall spare 22 and link to each other, hydraulic cylinder 10's upper end is fixed with jacking bearing tray 11, be fixed with the jacking bolt on the guide rail post 5 of jacking bearing tray 11 top, the jacking bolt is located aluminum alloy construction platform's below. A horizontal inner cantilever plate 13 is fixed between the aluminum alloy walkway plate 9 and the building wall, one end of the inner cantilever plate 13 extends out of the aluminum alloy walkway plate 9, and a turnover plate 14 for preventing materials from falling is hinged to the inner cantilever plate.
As shown in fig. 2 and 4, the using method of the present embodiment includes the following steps:
(1) the steel main frame is installed on a building wall body through an attached wall unloading, anti-tilting and anti-falling mechanism, the attached wall unloading, anti-tilting and anti-falling mechanism is installed on a construction completion layer 20 of the building wall body, an attached wall unloading, anti-tilting and anti-falling mechanism on a lifting guide rail 1 corresponds to the construction completion layer 20, an aluminum alloy walkway plate 9 on the lower layer corresponds to a construction layer which is just completed, an aluminum alloy walkway plate 9 on the upper layer corresponds to a layer 21 to be constructed, and the free end of a turning plate 14 is arranged on the construction completion layer 20 adjacent to the layer 21 to be constructed.
(2) After the layer to be constructed 21 in the step (1) is constructed, taking down the wall-attached unloading anti-tilting and anti-falling mechanism at the lowest end, installing the wall-attached unloading anti-tilting and anti-falling mechanism on the layer to be constructed 21 in the step (1), extending the hydraulic oil cylinder 10, pushing the steel main frame to rise by the jacking bearing tray 11 through the jacking bolt, and driving the aluminum alloy construction platform to move upwards to the next layer to be constructed 21 by the steel main frame; the hydraulic ram 10 is then retracted, moving the wall attachment up to the next completion layer 20, and simultaneously moving the hydraulic ram 10 up.
Example two
This embodiment is substantially the same as the first embodiment, except that: as shown in fig. 5 and 6, the driving mechanism includes a lower hanging point 15, an upper hanging point 16 and an electric hoist 17, the lower hanging point 15, the electric hoist 17 and the upper hanging point 16 are sequentially fixed on the outward-discharging upright post 7 by bolts from bottom to top, the lower end of the electric hoist 17 is connected with the lower hanging point 15, a detachable hanger 19 is fixed on a construction completion layer 20 corresponding to the upper hanging point 16, the hanger 19 is fixedly connected with the construction completion layer 20 by a wall-penetrating bolt, and a traction chain 18 of the electric hoist 17 is connected with the hanger 19.
As shown in fig. 5 and 7, when the present embodiment is used, step (1) is the same as that of the first embodiment; in the step (2), the lowest wall-attached unloading anti-tilting and anti-falling mechanism is taken down and installed on the layer to be constructed 21 in the step (1), the electric hoist 17 is started, the steel main frame is driven to ascend by the transmission of the traction chain 18, and the steel main frame drives the aluminum alloy construction platform to move upwards to the next layer to be constructed 21; then, the electric block 17 is rotated in the reverse direction, and the hanger 19 is moved up to the next construction completion layer 20.
The above description is only for the purpose of illustrating the preferred embodiments of the present invention and is not to be construed as limiting the invention, and any modifications, equivalents, improvements and the like that fall within the spirit and principle of the present invention are intended to be included therein.

Claims (9)

1. The utility model provides a construction is with protection platform which characterized in that: including steel main frame and aluminum alloy construction platform, the steel main frame includes the promotion guide rail that the vertical interval of a plurality of set up, one side of promotion guide rail is provided with along vertical interval and attaches the wall off-load and prevent inclining and prevent weighing down the mechanism, the opposite side is along vertical being fixed with the guide rail post, aluminum alloy construction platform is fixed in the upper end of guide rail post, the guide rail post links to each other with actuating mechanism, drive the vertical removal of guide rail post through actuating mechanism, the guide rail post includes vertical interior row pole setting and the outer pole setting of arranging parallel with interior row stand, the upper end in outer row pole setting outside is provided with the steel protection network, aluminum alloy construction platform includes two aluminum alloy guidance tape, two aluminum alloy guidance tape set up the upside between interior row pole.
2. The protection platform for building construction according to claim 1, characterized in that: the actuating mechanism comprises a vertically arranged hydraulic oil cylinder, the lower end of the hydraulic oil cylinder is detachably connected with a construction completion layer of the building wall through a wall attachment piece, the upper end of the hydraulic oil cylinder is provided with a jacking bearing tray, a jacking bolt is arranged on a guide rail column above the jacking bearing tray, and the jacking bolt is located below the aluminum alloy construction platform.
3. The protection platform for building construction according to claim 1, characterized in that: the driving mechanism comprises a lower lifting point, an upper lifting point and an electric hoist, the lower lifting point, the electric hoist and the upper lifting point are sequentially arranged on the guide rail column from bottom to top, a detachable hanger is arranged on a construction completion layer corresponding to the upper lifting point, the electric hoist is connected with the lower lifting point, and a traction chain of the electric hoist is connected with the hanger.
4. A protective platform for use in construction according to any one of claims 1 to 3 wherein: attach wall off-load and prevent inclining anti-falling mechanism including attaching wall guide holder, shore, leading wheel and safety hook, attach wall guide holder one end and pass through the construction completion layer that the wall bolt was fixed in building wall, the other end is provided with and promotes guide rail complex leading wheel, shore and safety hook set up respectively in attaching the upper and lower both sides of wall guide holder, and with promote the guide rail cooperation.
5. The protection platform for building construction according to claim 1, characterized in that: the aluminum alloy walkway plate is characterized in that a horizontal inner cantilever plate is arranged between the aluminum alloy walkway plate and the building wall, one end of the inner cantilever plate extends out of the aluminum alloy walkway plate, and a turnover plate used for preventing materials from falling is hinged to the inner cantilever plate.
6. The protection platform for building construction according to claim 1, characterized in that: bolt holes with the interval of 100mm are vertically and uniformly distributed in the inner sides of the outer row vertical rods, the aluminum alloy walkway plates and the lifting guide rails.
7. Use of the protective platform for construction according to any one of claims 1 to 6, comprising the following steps:
(1) the steel main frame is installed on a building wall body through an attached wall unloading anti-tilting and anti-falling mechanism, the attached wall unloading anti-tilting and anti-falling mechanism is installed on a construction completion layer of the building wall body, an aluminum alloy walkway plate on the lower layer corresponds to a just completed construction layer, an aluminum alloy walkway plate on the upper layer corresponds to a to-be-constructed layer, and the free end of a turning plate is arranged on the construction completion layer adjacent to the to-be-constructed layer.
(2) And (3) after the layer to be constructed in the step (1) is constructed, starting the driving mechanism to drive the steel main frame to move upwards, and driving the aluminum alloy construction platform to move upwards to the next layer to be constructed by the steel main frame.
8. Use according to claim 7, characterized in that: in the step (2), if the driving mechanism adopts a hydraulic oil cylinder, the wall-attached unloading anti-tilting and anti-falling mechanism at the lowest end is taken down and installed on the layer to be constructed in the step (1), the hydraulic oil cylinder extends, the jacking bearing tray pushes the steel main frame to ascend through the jacking bolt, and the steel main frame drives the aluminum alloy construction platform to move upwards to the next layer to be constructed; and then the hydraulic oil cylinder is contracted, the wall attaching piece is moved upwards to the next construction completion layer, and simultaneously the hydraulic oil cylinder is driven to move upwards.
9. Use according to claim 7, characterized in that: in the step (2), if the driving mechanism adopts an electric hoist, the lowest wall-attached unloading anti-tilting and anti-falling mechanism is taken down and installed on the layer to be constructed in the step (1), the electric hoist is started, the transmission of a traction chain drives a steel main frame to ascend, and the steel main frame drives an aluminum alloy construction platform to move upwards to the next layer to be constructed; then the electric hoist rotates reversely, and the hanger is moved upwards to the next layer after construction.
CN202010096549.0A 2020-02-16 2020-02-16 Protection platform for building construction and use method thereof Pending CN111236613A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010096549.0A CN111236613A (en) 2020-02-16 2020-02-16 Protection platform for building construction and use method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010096549.0A CN111236613A (en) 2020-02-16 2020-02-16 Protection platform for building construction and use method thereof

Publications (1)

Publication Number Publication Date
CN111236613A true CN111236613A (en) 2020-06-05

Family

ID=70874972

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010096549.0A Pending CN111236613A (en) 2020-02-16 2020-02-16 Protection platform for building construction and use method thereof

Country Status (1)

Country Link
CN (1) CN111236613A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112523520A (en) * 2020-12-12 2021-03-19 河南中之正工程技术研究院有限公司 Construction method of lifting protection platform for prefabricated building
CN112727048A (en) * 2020-12-26 2021-04-30 郭娇龙 Aluminum alloy climbing frame with guide rail guide wheel
CN113235906A (en) * 2021-06-01 2021-08-10 中国建筑第四工程局有限公司 Integrally-lifted peripheral protection hanging frame and lifting method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103422664A (en) * 2013-09-02 2013-12-04 河南天立建筑工程技术有限公司 Attached lifting scaffold
CN107419894A (en) * 2017-06-21 2017-12-01 河北盛卓建筑设备制造有限公司 Adhesion type lifting type aluminium alloy scaffold
CN109537866A (en) * 2018-12-12 2019-03-29 北京千引力科技发展有限公司 A kind of attachment type raise scaffold and its hanging method
CN209799334U (en) * 2019-03-12 2019-12-17 湖南万力工程科技有限公司 lifting device for lifting scaffold

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103422664A (en) * 2013-09-02 2013-12-04 河南天立建筑工程技术有限公司 Attached lifting scaffold
CN107419894A (en) * 2017-06-21 2017-12-01 河北盛卓建筑设备制造有限公司 Adhesion type lifting type aluminium alloy scaffold
CN109537866A (en) * 2018-12-12 2019-03-29 北京千引力科技发展有限公司 A kind of attachment type raise scaffold and its hanging method
CN209799334U (en) * 2019-03-12 2019-12-17 湖南万力工程科技有限公司 lifting device for lifting scaffold

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112523520A (en) * 2020-12-12 2021-03-19 河南中之正工程技术研究院有限公司 Construction method of lifting protection platform for prefabricated building
CN112727048A (en) * 2020-12-26 2021-04-30 郭娇龙 Aluminum alloy climbing frame with guide rail guide wheel
CN113235906A (en) * 2021-06-01 2021-08-10 中国建筑第四工程局有限公司 Integrally-lifted peripheral protection hanging frame and lifting method

Similar Documents

Publication Publication Date Title
CN111236613A (en) Protection platform for building construction and use method thereof
CN112942790A (en) Cantilever climbing device and construction method of cantilever structure
CN211923476U (en) Electric hoist lifting system attached to lifting scaffold
CN116136122A (en) Integrated attached type inclined lifting climbing frame system and use method thereof
CN217028004U (en) Annular hanging basket suspension device for curtain wall construction of super high-rise building
CN210460016U (en) Integrated form single power lift material platform
CN212103679U (en) A construction platform for installation of assembled tower
CN106703509B (en) Suspension type fence hoisting equipment and hoisting method thereof
CN202990389U (en) Vertical double-frame guide rail attaching lift scaffold
CN216810895U (en) Elevator shaft operation platform
CN110886225A (en) Construction method of cable tower stay cable installation system
CN216662305U (en) Super high-rise tower crane bottom attached hydraulic self-climbing hard protection platform
CN215407312U (en) Overhanging climbing device
CN214575825U (en) Attached lifting unloading platform
CN211499699U (en) Ladder-climbing type operation rack for hanging cage
CN113494127A (en) Construction method for layered lifting of large-span open-web corridor steel platform
CN210886924U (en) Maintenance platform in retractable double-cable-plane cable-stayed bridge tower stay cable area
CN113323368A (en) Lifting construction method for external protection hanging frame of assembled building
CN217418002U (en) Self-elevating lifting tower crane safety channel device
CN209778232U (en) Self-elevating gantry lifter
CN212406056U (en) Attached lifting scaffold
CN219260998U (en) Anchor cable stretching device
CN218881540U (en) Construction protection frame
CN215564411U (en) Sliding construction device for high-rise cylindrical building
CN116181041B (en) Building machine of multilayer quick construction

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20200605