CN218881540U - Construction protection frame - Google Patents
Construction protection frame Download PDFInfo
- Publication number
- CN218881540U CN218881540U CN202223213364.7U CN202223213364U CN218881540U CN 218881540 U CN218881540 U CN 218881540U CN 202223213364 U CN202223213364 U CN 202223213364U CN 218881540 U CN218881540 U CN 218881540U
- Authority
- CN
- China
- Prior art keywords
- footboard
- support body
- cage support
- cage
- pull ring
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000010276 construction Methods 0.000 title claims abstract description 19
- 239000000725 suspension Substances 0.000 claims description 9
- 238000004804 winding Methods 0.000 claims description 9
- 229910000831 Steel Inorganic materials 0.000 claims description 8
- 239000010959 steel Substances 0.000 claims description 8
- 239000002184 metal Substances 0.000 claims description 3
- 230000001681 protective effect Effects 0.000 description 8
- 238000009434 installation Methods 0.000 description 5
- 230000006978 adaptation Effects 0.000 description 4
- 230000000694 effects Effects 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 230000000712 assembly Effects 0.000 description 1
- 238000000429 assembly Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000003780 insertion Methods 0.000 description 1
- 230000037431 insertion Effects 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000001737 promoting effect Effects 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 230000001360 synchronised effect Effects 0.000 description 1
Images
Landscapes
- Types And Forms Of Lifts (AREA)
Abstract
The utility model discloses a construction protection frame, hang cage frame body including first cage frame body and second, wherein be equipped with the footboard on the first cage frame body of hanging, the surface at footboard both ends all is equipped with a pair of pull ring, it is provided with two sets of lifting unit to correspond on the cage frame body to hang, and is two sets of lifting unit correspond respectively connect in a pair of one of them one end of footboard the pull ring, the other one end of footboard a pair of the pull ring pass through the stay cable with cage frame body is hung to the second is connected, all be equipped with a plurality of transverse bars on first cage frame body of hanging and the second cage frame body of hanging, the both ends of footboard are equipped with from the hasp, from the hasp with transverse bar detachable connections, this application is simple structure not only, builds fastly, and is higher moreover, and it is very convenient to use.
Description
Technical Field
The utility model relates to a protection frame technical field, concretely relates to construction protection frame.
Background
At present, buildings on floors of cities are higher and higher, a protective frame is required to be built on the outer side for safety during construction, single steel pipes and pipe joints are connected through bolts in the conventional protective frame, then a protective net is arranged on the inner side of the protective frame, but the number of bolts required to be screwed is huge and the building efficiency is low in the conventional protective frame installation mode formed by connecting a plurality of single steel pipes and pipe joints through bolts; in addition, the protecting frame built by a plurality of single steel pipes has larger clearance between the steel pipes and lower safety factor.
Disclosure of Invention
For overcoming the not enough of above-mentioned prior art, the utility model provides a construction protection frame, not only simple structure builds fastly, and factor of safety is higher moreover.
The utility model discloses a realize through following technical scheme:
the utility model provides a construction protection frame, includes that first string cage support body and second hang the cage support body, first string cage support body with the second is hung and is equipped with the footboard between the cage support body, the surface at footboard both ends all is equipped with a pair of pull ring, it is provided with two sets of lifting unit to hang to correspond on the cage support body, and is two sets of lifting unit connect respectively in a pair of one end wherein of footboard the pull ring, a pair of the other one end of footboard the pull ring pass through the suspension cable with the second is hung the cage support body and is connected, all be equipped with a plurality of transverse bars on first string cage support body and the second string cage support body, the both ends of footboard are equipped with from the hasp, from the hasp with transverse bar detachable connection.
This application not only can be through lifting unit with the footboard hang and deliver to arbitrary height, but also can cooperate constructor to set up, can also play further fixed to the footboard through the pull ring on surface simultaneously, and then promote the security performance.
Furthermore, the lifting assembly comprises a winding lifting device and a pulley which are detachably mounted on the first hanging cage body, the winding lifting device and the pulley are arranged at the same horizontal height, the pulley is arranged on the outer side wall of the first hanging cage body, and a steel wire rope wound on the winding lifting device penetrates through the pulley to be connected to the pull ring.
When carrying out hoist and mount transportation, the cooperation pulley is raised to the book and is made the vertical transportation that makes progress of footboard, carries to appointed floor after, and the staff transfers the footboard through the one end of fixed footboard again, makes another cage body of hanging of the slow tendency of the other end of footboard and connects, simple structure, sets up the convenience.
Furthermore, a pair of pull rings are respectively arranged on two sides of the surface of the pedal, and the steel wire rope which is rolled and lifted is connected with the pull rings.
Furthermore, a plurality of mounting holes are formed in two sides of the surface of the pedal, stand columns are detachably mounted in the mounting holes, and a protective net is arranged between every two adjacent stand columns.
Furthermore, the mounting hole is the screw hole, be equipped with the threaded rod in the stand, the bottom of threaded rod with mounting hole looks adaptation, the top of threaded rod extends to the stand top.
Constructors can quickly fix the upright post and the pedal by rotating the threaded rod, and the detachable connection is very convenient for transportation and simple in fixing mode,
further, the protective net is a metal folding net.
The folding net can install the stand according to the interval of mounting hole on the footboard, and the adaptation scope is big, excellent in use effect.
The beneficial effects of the utility model reside in that:
1. the pedal can be lifted to any height through the lifting assembly, so that the pedal can be conveniently erected by matching with constructors, construction is more convenient, construction efficiency is improved, the upgrading assembly is detachably mounted, and the pedal is convenient to transport and use after subsequent construction is finished;
2. after the footboard was set up and is accomplished, can also pull to one side supplementary fixed to the footboard through two lifting unit who hang on the cage support body, promote the stability of footboard, make the security obtain further promotion, and do not need extra auxiliary assembly, with low costs, convenient to use.
Drawings
FIG. 1 is a schematic view of the pedal of the present application in its installed configuration;
FIG. 2 is a schematic view of the pedal of the present application after installation;
FIG. 3 is a schematic view of the construction of a transverse bar in the present application;
FIG. 4 is a schematic view of the pedal of the present application;
fig. 5 is a schematic structural view of a protection net in the present application;
wherein: 1. a first suspension cage body; 2. a second suspension cage body; 3. a pedal; 4. lifting the roll; 5. a pulley; 6. a transverse bar; 7. self-locking; 8. a pull ring; 9. a stay cable; 10. a column; 11. a protective net; 12. a threaded rod; 13. and (7) installing holes.
Detailed Description
The technical solutions of the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings, and it is to be understood that the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by a person skilled in the art without creative efforts belong to the protection scope of the present invention.
As shown in fig. 1-5, a construction protection frame, including first string of cage support body 1 and second string of cage support body 1, be equipped with footboard 3 between first string of cage support body 1 and the second string of cage support body 1, the surface at footboard 3 both ends all is equipped with a pair of pull ring 8, it is provided with two sets of lifting unit to correspond on the first string of cage support body 1, two sets of lifting unit connect respectively in a pair of pull ring 8 of one end wherein, lifting unit rises 4 and pulley 5 including the removable volume of installing on hanging the cage support body, and rise 4 and pulley 5 and be located same level and arrange, wherein pulley 5 is located the lateral wall of first string of cage support body 1, the wire rope that rises 4 and passes pulley 5 and connect in pull ring 8, still be equipped with a plurality of transverse rods 6 on first string of cage support body 1 and the second string of cage support body 1, the both ends of footboard 3 all are equipped with from hasp 7, articulate with transverse rod 6 from 7.
This application not only can be through lifting unit with footboard 3 hang and deliver to arbitrary height, when hoist and mount transportation, it rises 4 cooperation pulleys 5 and makes the vertical upwards transportation of footboard 3 to roll up, carry to appointed floor after, the staff passes through the one end of fixed footboard 3, lower footboard 3 again, make another string of cage support body of the slow tendency of the other end of footboard 3 and connect, set up the back that finishes, it continuously pulls footboard 3 to roll up the wire rope that rises 4, simultaneously hang cage support body 1 with the second on footboard 3 the other end and use oblique stay cable 9 to be connected fixedly, make two string of cage support bodies all pull pedal 3 to one side through wire rope, very big promotion footboard 3's stability, the security obtains promoting, and overall structure does not need extra auxiliary device, it is very convenient to install and dismantle the transportation.
Still should be equipped with the motor on the first cage support body 1 of hanging, and the output shaft of this motor connects two curls simultaneously and rises 4, and then realizes synchronous drive, makes footboard 3 hang and send and draw when inclining more stably.
3 surperficial both sides of footboard all are equipped with a plurality of mounting holes 13, removable the installing of mounting hole 13 is equipped with stand 10, be equipped with protection network 11 between two adjacent stands 10, mounting hole 13 is the screw hole, be equipped with threaded rod 12 in the stand 10, the bottom and the 13 looks adaptations of mounting hole of threaded rod 12, the top of threaded rod 12 extends to stand 10 top and is connected with the nut, constructor can pass through rotatory nut, make stand 10 and footboard 3 carry out quick fixation, and fixed mode is simple, the convenient transportation of dismantling.
The protection network 11 is the metal folding net, and the stand 10 can be installed according to the interval of mounting hole 13 on the footboard 3 to the folding net, and the adaptation scope is big, excellent in use effect.
The implementation mode of the application is as follows: the method comprises the following steps that constructors firstly build two cage hanging frame bodies, two groups of lifting assemblies are installed on a first cage hanging frame body 1 which is higher than a construction floor, the spacing distance between two winding lifting lifters 4 is equal to the distance between lifting rings at one end of a pedal 3, after installation is finished, steel wire ropes of the two winding lifting lifters 4 are respectively connected with the two lifting rings at one end of the pedal 3, then the two winding lifting lifters 4 are synchronously driven to enable the pedal 3 to be conveyed upwards, and after the pedal is conveyed to a specified height, workers connect a self-locking buckle 7 at the other end of the pedal 3 with a transverse rod 6 on the first cage hanging frame body 1; at the moment, the motor is reversely driven to enable the pedal 3 to slowly move downwards, and because the bottom end of the pedal 3 is hinged with the transverse rod 6, the pedal 3 can incline towards the second suspension cage body 1 by taking the transverse rod 6 as a circle center until the pedal is close to the second suspension cage body 1, and a worker is connected and fixed through the self-locking fastener 7 at the other end of the pedal 3, and the pre-fixing installation is finished; constructor connects rings and the second cage body on with footboard 3 through suspension cable 9 and fixes, and then strengthens footboard 3's stability, and the back of finishing the installation installs folding protection network 11 and footboard 3, expandes according to the mounting hole 13 interval on the footboard 3, then with stand 10 disect insertion mounting hole 13 in to the nut at rotatory stand 10 top makes whole protection network 11 and footboard 3 link into wholly.
Constructor is after finishing using, at first demolish protection network 11, then hang the suspension cable 9 and the auto-lock of cage support body 1 connection with footboard 3 and second and detain 7 and demolish in proper order, demolish the back that finishes, pioneer moves the book and rises 4, make footboard 3 vertical, then demolish 3 bottoms of footboard and the auto-lock between the first cage support body 1 and detain 7, demolish the back that finishes, slowly transfer footboard 3 to ground, then demolish upgrading subassembly and first cage support body 1 and the second cage support body 1 of hanging, transport the use.
The whole device does not need to be provided with an additional auxiliary device, is very convenient to use, has a simple structure, is high in building speed and is high in safety factor.
In the description herein, references to the description of the terms "one embodiment," "certain embodiments," "an illustrative embodiment," "an example," "a specific example," or "some examples," etc., mean that a particular feature, structure, material, or characteristic described in connection with the embodiment or example is included in at least one embodiment or example of the invention. In this specification, schematic representations of the above terms do not necessarily refer to the same embodiment or example. Furthermore, the particular features, structures, materials, or characteristics described may be combined in any suitable manner in any one or more embodiments or examples.
Finally, it should be noted that: the above embodiments are only used to illustrate the technical solution of the present invention, and not to limit it; although the present invention has been described in detail with reference to the foregoing embodiments, those skilled in the art will understand that: the technical solutions described in the foregoing embodiments may still be modified, or some or all of the technical features may be equivalently replaced; these modifications and substitutions do not depart from the essence of the corresponding technical solutions of the embodiments of the present invention.
Claims (6)
1. The utility model provides a construction protection frame, its characterized in that hangs cage support body (2) including first cage support body (1) and second, first hang and be equipped with footboard (3) between cage support body (2) with the second, the surface at footboard (3) both ends all is equipped with a pair of pull ring (8), it is provided with two sets of lifting unit, two sets of to hang the correspondence on the cage support body the lifting unit respectively correspond connect in footboard (3) one of them one end pull ring (8), a pair of footboard (3) other one end pull ring (8) through oblique guy cable (9) with cage support body (2) are hung to the second are connected, all be equipped with a plurality of transverse bars (6) on first cage support body (1) and the second cage support body (2) of hanging, the both ends of footboard (3) are equipped with from hasp (7), from hasp (7) with transverse bar (6) are connected.
2. A construction protection frame according to claim 1, wherein the lifting assembly comprises a winding lifting winch (4) and a pulley (5) detachably mounted on the first suspension cage body (1), and the winding lifting winch (4) and the pulley (5) are arranged at the same level, wherein the pulley (5) is arranged on the outer side wall of the first suspension cage body (1), and the steel wire rope on the winding lifting winch (4) passes through the pulley (5) to be connected to the pull ring (8).
3. A construction guard according to claim 2, characterised in that a pair of said pull rings (8) are arranged on each side of the surface of said footplate (3), the wire ropes of said hoisting winch (4) being connected to said pull rings (8).
4. The construction protection frame according to claim 1, wherein a plurality of mounting holes (13) are formed in two sides of the surface of the pedal (3), the upright posts (10) are detachably mounted in the mounting holes (13), and a protection net (11) is arranged between two adjacent upright posts (10).
5. A construction protection frame according to claim 4, characterized in that the mounting holes (13) are threaded holes, a threaded rod (12) is arranged in the upright (10), the bottom end of the threaded rod (12) is matched with the mounting holes (13), and the top end of the threaded rod (12) extends to the upper part of the upright (10).
6. A construction protection frame according to claim 4, characterized in that said protection net (11) is a metal folded net.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202223213364.7U CN218881540U (en) | 2022-12-01 | 2022-12-01 | Construction protection frame |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202223213364.7U CN218881540U (en) | 2022-12-01 | 2022-12-01 | Construction protection frame |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN218881540U true CN218881540U (en) | 2023-04-18 |
Family
ID=85978409
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202223213364.7U Active CN218881540U (en) | 2022-12-01 | 2022-12-01 | Construction protection frame |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN218881540U (en) |
-
2022
- 2022-12-01 CN CN202223213364.7U patent/CN218881540U/en active Active
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN218058252U (en) | Light partition plate mounting tool suitable for different floor height conveniently remove | |
| CN114753611A (en) | Curtain wall construction platform | |
| CN111236613A (en) | Protection platform for building construction and use method thereof | |
| CN218881540U (en) | Construction protection frame | |
| CN111648585A (en) | Construction method and device of suspended support type steel truss platform | |
| CN213596814U (en) | Movable three-dimensional spanning multi-purpose suspension bridge construction platform | |
| CN112647406B (en) | Arch rib lateral rotation tension erection device and construction method | |
| CN201330506Y (en) | Spreader climbing mechanism | |
| CN201635390U (en) | Automatic formwork supporting machine for high-rise building elevator shaft construction | |
| CN214989797U (en) | Safety passageway attached to tower crane climbing frame for people to climb | |
| CN219952606U (en) | Safety platform for beam slab prefabricated field | |
| CN208856718U (en) | A kind of saddle climbing type workbench | |
| CN119122250A (en) | A hanging basket device and construction method for large-area inclined glass curtain wall | |
| CN105152052A (en) | Glass curtain wall component lifting device and glass curtain wall component installing method | |
| CN219031629U (en) | Lifting equipment for indoor plate installation | |
| CN210973666U (en) | Simple lifting device for upright post construction cylinder of antiaircraft gun billboard | |
| CN118145476A (en) | Box transformer substation lifting sling for wind power operation and maintenance and box changing method | |
| CN213927771U (en) | Control pole setting convenient to hoist and mount | |
| CN117027352A (en) | Large-span high altitude vestibule curtain wall construction operation platform | |
| CN117800266A (en) | Photovoltaic panel auxiliary installation device for photovoltaic bracket and installation method thereof | |
| CN215564411U (en) | Sliding construction device for high-rise cylindrical building | |
| CN212613654U (en) | Curtain wall construction system suitable for high-rise building with special-shaped giant columns | |
| CN212581394U (en) | Portable small-size material transport device | |
| CN115215208A (en) | Detachable and telescopic ALC board mounting tool | |
| CN218623527U (en) | Self-elevating reinforcing steel bar house |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant |