Integrally-lifted peripheral protection hanging frame and lifting method
Technical Field
The invention relates to an integral lifting type peripheral protection hanging frame and a lifting method, and belongs to the technical field of building peripheral protection.
Background
The existing form that the peripheral protection frame of climbing frame combines with the frame stand of climbing carries out bolted connection through the pole setting of protection frame and the channel-section steel track of climbing the frame, and the installation order of its protection frame is that the workman connects the interior pole of protection earlier with the stand of fixing on the wall, and interior pole passes through the fixed outer pole of whippletree, installs the bottom guard plate after that, and other secondary rib, outer protection network and other spare parts are installed in proper order to the workman in the high altitude. The installation mode is finished in high altitude, workers work in high altitude, and the danger is great; and the installation period is long, which is not beneficial to the field period. In addition, the transportation of the protection frame member needs the tower crane to assist in hoisting to a construction surface layer, workers perform positioning and installation, and the time of occupying the tower crane is long.
Disclosure of Invention
The invention aims to provide an integral lifting type peripheral protection hanging frame and a lifting method, which are simple in structure, convenient to install, safe and reliable, and overcome the defects in the prior art.
In order to achieve the purpose, the invention adopts the following technical scheme: the utility model provides a peripheral protection stores pylon of whole promotion formula, include a set of stand that sets up around the facade outside along the building, every stand attaches wall guide holder and building fixed connection through more than two, install electric block on attaching the wall guide holder at the top that corresponds with every stand, and electric block's lifting hook hangs the lower extreme of establishing at this stand, at the upper end fixedly connected with round channel-section steel of all stands, be provided with round protection frame in the periphery of channel-section steel, at a set of couple of the inboard fixedly connected with in upper portion of protection frame, and the couple is hung and is established on the channel-section steel.
Furthermore, the protective frame comprises a circle of steel frame arranged around the outer vertical surface of the building, a protective net is hung on the outer side of the steel frame, and more than two layers of gangboards are arranged on the steel frame.
Furthermore, the inner side of the steel frame is provided with a roller which is contacted with the outer vertical surface of the building.
Furthermore, the inner side of the steel frame is provided with a slide rail which is in contact with the outer vertical surface of the building.
Furthermore, the wall-attached guide seat is fixed on a building through embedded bolts.
Meanwhile, the invention also provides a lifting method for the integral lifting type peripheral protection hanging frame, which comprises the steps of firstly assembling the protection frame on the ground, then hoisting the protection frame to a construction layer through a tower crane, hanging the protection frame on channel steel at the upper end of the upright column through a hook on the protection frame, starting an electric hoist after the construction layer is constructed, lifting the upright column upwards by one layer through the electric hoist, and then fixedly connecting the upright column with a building through a wall-attached guide seat, so that the aim of lifting the protection frame can be achieved through lifting the upright column.
In the method, if the outer vertical surface of the building is of a plane structure, a group of rollers are arranged on the inner side of the protection frame, and the rollers are in rolling contact with the outer vertical surface of the building in the lifting process, so that the protection frame can be stably lifted.
In the method, if the outer vertical surface of the building is of an uneven floating window structure, a group of sliding rails are arranged on the inner side of the protection frame, and the sliding rails are in sliding contact with the outer vertical surface of the building in the lifting process, so that the protection frame can be stably lifted.
Due to the adoption of the technical scheme, the invention has the following advantages:
the danger of mounting the protective frame is reduced, the protective frame is integrally mounted on the ground, and workers do little overhead work.
Secondly, the protective frame is installed on the ground, so that flow construction can be formed, the field structure construction is not influenced, and the field construction period is facilitated.
And the occupied tower crane time is short, the protective frame assembled on the ground only needs to be hung on the channel steel installed in advance through the tower crane, the subsequent lifting process can be completed through the electric hoist, and the construction efficiency can be greatly improved along with the successive layer lifting of the construction floors.
Drawings
FIG. 1 is a front view of a schematic of the structure of the present invention;
FIG. 2 is a plan view of a schematic layout of the channel;
FIG. 3 is a schematic view of the structure of the protective frame in example 1;
fig. 4 is a schematic structural view of a protective frame in embodiment 2.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Example 1
The embodiment of the invention comprises the following steps: please refer to fig. 1-3, an integrally lifting type peripheral protection hanger comprises a set of upright posts 4 arranged around the outer vertical surface of a building 1, each upright post 4 is fixedly connected with the building 1 through more than two wall-attached guide seats 2, an electric hoist 6 is mounted on the top wall-attached guide seat 2 corresponding to each upright post 4, a lifting hook 3 of the electric hoist 6 is hung at the lower end of the upright post 4, a circle of channel steel 8 is fixedly connected at the upper end of all upright posts 4, a circle of protection frame 5 is arranged at the periphery of the channel steel 8, a set of hooks 7 is fixedly connected at the inner side of the upper part of the protection frame 5, and the hooks 7 are hung on the channel steel 8. The protective frame 5 comprises a steel frame 501 arranged along the periphery of the outer facade of the building 1, a protective net 502 is hung on the outer side of the steel frame 501, and more than two layers of gangboards 503 are arranged on the steel frame 501. The inside of the steel frame 501 is provided with rollers 504 which contact the facade of the building 1. The wall-attached guide seat 2 is fixed on the building 1 through embedded bolts.
During the construction, at first assemble protection frame 5 on ground, then through the tower crane with protection frame 5 handling to the construction layer to hang through couple 7 on protection frame 5 and establish on the channel-section steel 8 of stand 4 upper end, treat the construction layer and accomplish the construction back, start electric block 6, through electric block 6 with stand 4 upwards promote the one deck, then through attaching wall guide 2 with stand 4 and 1 fixed connection of building, like this alright reach the purpose that promotes protection frame 5 through promoting stand 4.
When the outer vertical surface of the building 1 is a plane structure, a group of rollers 504 is installed on the inner side of the protection frame 5, and the rollers 504 are in rolling contact with the outer vertical surface of the building 1 in the lifting process, so that the protection frame 5 can be stably lifted.
Example 2
The embodiment of the invention comprises the following steps: please refer to fig. 1, 2 and 4, an integrally lifting type peripheral protection hanger comprises a set of upright posts 4 arranged around the outer vertical surface of a building 1, each upright post 4 is fixedly connected with the building 1 through more than two wall-attached guide seats 2, an electric hoist 6 is mounted on the wall-attached guide seat 2 at the top corresponding to each upright post 4, a lifting hook 3 of the electric hoist 6 is hung at the lower end of the upright post 4, a circle of channel steel 8 is fixedly connected at the upper ends of all the upright posts 4, a circle of protection frame 5 is arranged at the periphery of the channel steel 8, a set of hooks 7 is fixedly connected at the inner side of the upper part of the protection frame 5, and the hooks 7 are hung on the channel steel 8. The protective frame 5 comprises a steel frame 501 arranged along the periphery of the outer facade of the building 1, a protective net 502 is hung on the outer side of the steel frame 501, and more than two layers of gangboards 503 are arranged on the steel frame 501. The inner side of the steel frame 501 is provided with a slide rail 505 contacting with the outer facade of the building 1. The wall-attached guide seat 2 is fixed on the building 1 through embedded bolts.
During the construction, at first assemble protection frame 5 on ground, then through the tower crane with protection frame 5 handling to the construction layer to hang through couple 7 on protection frame 5 and establish on the channel-section steel 8 of stand 4 upper end, treat the construction layer and accomplish the construction back, start electric block 6, through electric block 6 with stand 4 upwards promote the one deck, then through attaching wall guide 2 with stand 4 and 1 fixed connection of building, like this alright reach the purpose that promotes protection frame 5 through promoting stand 4.
When the outer vertical surface of the building 1 is an uneven floating window structure, a group of sliding rails 505 are arranged on the inner side of the protection frame 5, and the sliding rails 505 are in sliding contact with the outer vertical surface of the building 1 in the lifting process, so that the protection frame 5 can be stably lifted.