CN213268983U - Self-climbing discharging platform - Google Patents

Self-climbing discharging platform Download PDF

Info

Publication number
CN213268983U
CN213268983U CN202021868677.4U CN202021868677U CN213268983U CN 213268983 U CN213268983 U CN 213268983U CN 202021868677 U CN202021868677 U CN 202021868677U CN 213268983 U CN213268983 U CN 213268983U
Authority
CN
China
Prior art keywords
platform
unloading
guide rail
steelframe
self
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202021868677.4U
Other languages
Chinese (zh)
Inventor
张强
张宏亮
刘涛
赵军
杨学力
魏洁
陈鑫
刘小飞
张建飞
冯博
裴世玉
宋伟红
王飞
张锋
杨少珍
赵炯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Urban Construction Sixth Group Co Ltd
Original Assignee
Beijing Urban Construction Sixth Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Urban Construction Sixth Group Co Ltd filed Critical Beijing Urban Construction Sixth Group Co Ltd
Priority to CN202021868677.4U priority Critical patent/CN213268983U/en
Application granted granted Critical
Publication of CN213268983U publication Critical patent/CN213268983U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model provides a platform of unloading of climbing certainly, upwards promote through intelligent lift system, intelligent lift system is including direct and the fixed electric block of platform of unloading, including the steelframe, attach to the material platform of carrying on the steelframe and locate the enhancement tripod between material platform bottom surface and the steelframe of carrying, be equipped with the guide rail on the steelframe, be equipped with anti-falling device between guide rail and the structure wall body, anti-falling device is including attaching the wall support, the adjustable off-load top lifter that pushes away on the guide rail horizontal pole and the interior wall seat gyro wheel that attaches who caves in the guide rail both sides, it still is equipped with the secondary safety hook to. Adopt the utility model discloses only prevent weighing down the device and attach the wall support through ann tears open, upwards promote the platform of unloading, the guide rail all transmits through the guide rail with the gravity of the platform of unloading and each accessory, utilizes assorted anti-falling device to eat power with it, and the make full use of system dead weight, frictional force is very big under the action of gravity, makes overall structure very stable.

Description

Self-climbing discharging platform
Technical Field
The utility model relates to a construction field specifically belongs to a platform of unloading from climbing.
Background
The unloading platform is various temporary operation platforms and operation frames which are usually erected on a construction site and is generally used for material turnover. The discharging platform is divided into a floor type discharging platform, an overhanging type discharging platform and the like. The existing unloading platform is generally made of channel steel, a wood plate is paved on the channel steel, and a steel wire rope is adopted to anchor the channel steel at the joint of the structure. The structure is simple, the connection between the structure and the structural member is very simple, no protective measures are taken, and the potential safety hazard is very large. Self-elevating discharging platforms also appear in the prior art, however, the lifting structure is complex, a large amount of manpower is needed for every lifting adjustment, a large amount of operations are carried out in the dismounting process, the lifting construction period is long in time consumption, the efficiency is low, and the existing discharging platform cannot meet the requirements of high-rise building construction on high safety, low labor intensity, low use cost, high construction efficiency, large bearing capacity, simple and easy operation and the like.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a from platform of unloading of climbing solves prior art platform of unloading and installs and tear complicacy open, leads to the technical problem that the efficiency of construction is low.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a from platform of unloading of climbing upwards promotes through intelligent hoist system, and intelligent hoist system includes direct and the fixed electric block of platform of unloading, its characterized in that: the anti-falling device comprises a steel frame, a material carrying platform attached to the steel frame and a reinforcing tripod arranged between the bottom surface of the material carrying platform and the steel frame, wherein a guide rail is arranged on the steel frame, an anti-falling device is arranged between the guide rail and a structural wall body, the anti-falling device comprises a wall attaching support, an adjustable unloading supporting ejector pushed on a guide rail cross rod and wall attaching seat rollers sunken in two sides of the guide rail, and a secondary anti-falling device is further arranged between the bottom surface of the wall attaching support and the guide rail.
Further preferably, the adjustable unloading supporting device comprises a supporting head, a supporting device and a spring, wherein the spring is connected between cross rods on two sides of the supporting device and the wall-attached support.
Furthermore, the steel frame is a rectangular steel frame consisting of transverse keels and vertical keels, and a plurality of sections of guide rails of the guide rails are formed by splicing connecting channel steel.
Furthermore, a person standing platform for unloading the anti-falling device is arranged below the lower portion of the steel frame and the reinforcing triangular frame, and the height of the person standing platform is 1-1.2 m.
Furthermore, a heightening seat is connected between the wall attaching support and the structural wall body.
Further, the material loading platform comprises a bottom plate, a protective guard and steel frames located on the bottom surface of the bottom plate and the outer side surface of the protective guard, and the steel frames comprise rectangular frames and reinforcing supports located in the rectangular frames.
Furthermore, the reinforcing triangular supports comprise horizontal rods positioned on the bottom surface of the material loading platform, two inclined support rods arranged between the horizontal rods and the steel frame in parallel and shear supports arranged between the two inclined support rods.
More preferably, the short channel steel is all located to the tip that diagonal bracing piece and horizon bar and steelframe are connected, the short channel steel is detained and is fixed through the screw rod after on steelframe vertical joist.
In addition, still including locating the wall support that attaches on the structure wall body, be fixed with wire rope on attaching the wall support on the bearing bolt, wire rope passes behind the wire rope idle pulley and fixes with electric block's lifting hook.
More preferably, a diagonal draw bar is further arranged between the material loading platform and the guide rail above the material loading platform.
Compared with the prior art the utility model has the following characteristics and beneficial effect:
adopt the utility model discloses only prevent weighing down the device and attach the wall support through ann tears open, upwards promote the platform of unloading, the guide rail all transmits through the guide rail with the gravity of platform and each accessory of unloading, utilize assorted anti-falling device to eat power with it, make full use of system dead weight, frictional force is very big under the action of gravity, make whole structure very stable, can fully ensure safe in utilization, the setting of standing people's platform, can accelerate anti-falling device and attach the ann of wall support and tear open, the reuse of being convenient for, and easy operation has fine popularization and practical value, can produce good economic benefits after extensive popularization and application.
Drawings
Fig. 1 is a schematic structural view of a self-climbing discharging platform of the present invention;
FIG. 2 is a first schematic view of the fall preventing device according to the present invention;
fig. 3 is a schematic view of the fall preventing device according to the present invention.
Reference numerals: 1-anti-falling device; 11-a wall-attached support; 12-an adjustable unloading jack; 13-attaching wall seat rollers; 14-a secondary safety catch; 15-a plug; 16-a jack; 17-a spring; 2-a vertical keel; 3-a loading platform; 4-reinforcing the tripod; 5-a guide rail; 6-standing human platform.
Detailed Description
In order to make the technical means, innovative features, objectives and functions realized by the present invention easy to understand, the present invention will be further described below.
The embodiments described herein are specific embodiments of the present invention, and are intended to be illustrative of the concepts of the present invention, which are intended to be illustrative and exemplary, and should not be construed as limiting the scope of the embodiments of the present invention. In addition to the embodiments described herein, those skilled in the art will be able to employ other technical solutions which are obvious based on the disclosure of the claims and the specification of the present application, and these technical solutions include technical solutions which make any obvious replacement or modification for the embodiments described herein.
A self-climbing unloading platform is shown in figure 1 and comprises a steel frame, a material carrying platform 3 attached to the steel frame and a reinforcing tripod arranged between the bottom surface of the material carrying platform 3 and the steel frame, wherein a guide rail 5 is arranged on the steel frame, an anti-falling device 1 is arranged between the guide rail 5 and a structural wall body, as shown in figures 2 and 3, the anti-falling device 1 comprises a wall attaching support 11, an adjustable unloading support 12 pushed on a guide rail cross rod and wall attaching support rollers 13 sunken in two sides of the guide rail 5, a secondary anti-falling device 14 is arranged between the bottom surface of the wall attaching support 11 and the guide rail 5 as required, the material carrying platform 3 is lighter in weight compared with the whole climbing frame, and the anti-falling device 1 can generally meet production requirements.
5 a plurality of sections guide rails of guide rail form through connecting the channel-section steel concatenation, guide rail concatenation department also has connecting bolt to connect fixedly simultaneously, the steelframe lower part, it is equipped with the people platform 6 of standing who is used for uninstalling anti-falling device to strengthen tripod below, the people platform 6 of standing highly is 1~1.2m, it still is connected with the seat of increaseing to attach between wall support 11 and the structure wall body, it includes the bottom plate to carry material platform 3, rail guard and the steel framework that is located bottom plate bottom surface and rail guard lateral surface, steel framework all includes rectangular frame and the enhancement support that is located rectangular frame, that is, including bottom rectangular frame, side rectangular frame and the steel mesh board or the steel sheet of paving on the inboard and bottom rectangular frame of side rectangular frame, bottom plate and rail guard are constituteed by steel mesh board or steel sheet.
The reinforcing triangular supports comprise horizontal rods 41 positioned on the bottom surface of the material carrying platform 3, two oblique supporting rods 42 arranged between the horizontal rods 41 and the steel frame in parallel and shear supporting rods 43 arranged between the two oblique supporting rods 42, the end parts of the oblique supporting rods 42 and the horizontal rods 41 connected with the steel frame are respectively arranged on short channel steel 44, the short channel steel 44 is buckled on a vertical keel of the steel frame and then fixed through a screw rod, and an inclined pull rod (not shown in the figure) is further arranged between the material carrying platform 3 and a guide rail 5 above the material carrying platform.
The adjustable unloading jacking device 12 comprises a jacking head 15, a jacking device 16 and springs 17, the springs 17 are connected between cross rods on two sides of the jacking device and the wall-attached support 11, and the steel frame is a rectangular steel frame consisting of cross keels (not marked in the figure) and vertical keels 2. The anti-falling system of the unloading platform (DM300 type) consists of an adjustable anti-falling unloading limiting jacking device, a track anti-falling stop rod, a wall-attached support and a wall-through bolt.
Specifically, the adjustable anti-falling unloading limiting jacking device comprises a jacking head, a screw rod, a threaded sleeve and the like. The V-shaped fork head of the top is supported on the anti-falling stop lever of the guide rail, the top support comprises an adjusting screw rod and a threaded sleeve, the top is connected with the adjusting screw rod, the adjusting screw rod is connected with the threaded sleeve, the lower end of the threaded sleeve is fixed on the wall-attached support through a connecting bolt, the load is transmitted to the wall-attached support through the adjustable anti-falling unloading limiting top support and the connecting bolt, and then the load is transmitted to the building through the wall-attached support through the wall-penetrating bolt. In the stage of lifting the unloading platform, the adjustable anti-falling unloading limiting jacking device always leans against the guide rail anti-falling stop lever under the action of spring force, is opened along with the linear motion of the guide rail and is not restrained; once the attached lifting scaffold falls down due to abnormity, the supporting device can immediately support the rail anti-falling stop lever, and the anti-falling wheel frame is connected with the structure through the wall-attached support and the wall-penetrating bolt to transfer force, so that the anti-falling effect is achieved. Multiple tests prove that the average braking and anti-falling distance is between 20 and 60mm, and the requirement is met.
The utility model discloses an intelligence hoisting system upwards promotes, intelligence hoisting system is by gravity sensor (be used for being connected with electric block), intelligence divides quick-witted case and by electric block with last, lower spandrel girder (can fix according to the design), wire rope, the wire rope third wheel, it constitutes to promote the seat of hanging, promote to hang the seat and be fixed in the architectural structure respectively alone with anti-falling device on, form independent promotion system, wire rope hangs the seat with promoting (not drawn in the picture) and goes up bearing bolt and fix, the lower part is passed behind the wire rope third wheel and is connected with the lifting hook on electric block's the chain sling, it is generally connected through the fixed electric block of gravity sensor to go up the spandrel girder, lower spandrel girder is used for fixed wire.
The JSJ-GL type control system adopted by the safe intelligent control system has an advanced computer-aided cluster control technology and has the following advantages:
a. the safety intelligent monitoring system fully embodies the principle that safety is first and prevention is the main principle, adopts a computer to automatically carry out real-time safety monitoring on the lifting process, finds abnormal automatic shutdown and alarms, and greatly improves the safety degree of the attached lifting scaffold.
b. The signal acquisition adopts single two twisted shield wires to connect a plurality of monitoring points in parallel to be connected with the main controller and the PC, the anti-jamming capability of long-distance transmission is strong, the multi-point and multi-wire connection on a construction site is avoided, and the device is more suitable for complex working conditions.
c. The control circuits of the control system are connected in a parallel mode, and the problem that the whole control signal cannot be transmitted to the master control due to the fact that the branch control circuit fails in the past is solved. And meanwhile, all the sub-controllers have independent control actions, and when the single-chip microcomputer of the sub-controllers detects that the current machine position is abnormal, the single-chip microcomputer of the sub-controllers can automatically send out corresponding actions and transmit signals to the master controller. The control method can be used for controlling a single (group) or a plurality of (group) machine position clusters, and has the advantages of flexible control mode, high intelligence degree, high control precision and real-time control.
d. The wiring is all plug connectors, and system wiring does not need professionals, prevents reverse plug design, and is very simple, swift.
The basic principles and the main features of the invention and the advantages of the invention have been shown and described above, it will be evident to those skilled in the art that the invention is not limited to the details of the foregoing illustrative embodiments, but that the invention may be embodied in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Furthermore, it should be understood that although the present description refers to embodiments, not every embodiment may contain only a single embodiment, and such description is for clarity only, and those skilled in the art should integrate the description, and the embodiments may be combined as appropriate to form other embodiments understood by those skilled in the art.

Claims (10)

1. The utility model provides a from platform of unloading of climbing upwards promotes through intelligent hoist system, and intelligent hoist system includes direct and the fixed electric block of platform of unloading, its characterized in that: including the steelframe, attach to year material platform (3) on the steelframe and locate the enhancement tripod of carrying between material platform (3) bottom surface and the steelframe, be equipped with guide rail (5) on the steelframe, be equipped with anti-falling device (1) between guide rail (5) and the structural wall body, anti-falling device (1) is including attaching wall support (11), top pushes up adjustable off-load on the guide rail horizontal pole and fall in attaching wall seat gyro wheel (13) of guide rail (5) both sides, it still is equipped with secondary safety hook (14) to attach between wall support (11) bottom surface and guide rail (5), steelframe lower part, enhancement tripod below are equipped with station people platform (6) that are used for anti-falling device.
2. The self-climbing platform of unloading of claim 1, wherein: the adjustable unloading supporting device (12) comprises a supporting head (15), a supporting device (16) and a spring (17), wherein the spring (17) is connected between cross bars on two sides of the supporting device and the wall-attached support (11).
3. The self-climbing platform of unloading of claim 1, wherein: the steel frame is a rectangular steel frame consisting of a transverse keel and a vertical keel (2), and a plurality of guide rails of the guide rail (5) are formed by splicing connecting channel steel.
4. The self-climbing platform of unloading of claim 1, wherein: the height of the people standing platform (6) is 1-1.2 m.
5. The self-climbing platform of unloading of claim 1, wherein: and a heightening seat is also connected between the wall attaching support (11) and the structural wall body.
6. The self-climbing platform of unloading of claim 1, wherein: the material carrying platform (3) comprises a bottom plate, a protective guard and steel frames located on the bottom surface of the bottom plate and the outer side surface of the protective guard, and the steel frames comprise rectangular frames and reinforcing supports located in the rectangular frames.
7. The self-climbing platform of unloading of claim 1, wherein: the reinforcing tripods comprise horizontal rods (41) positioned on the bottom surface of the material loading platform (3), two oblique supporting rods (42) arranged between the horizontal rods (41) and the steel frame in parallel and shear supporting rods (43) arranged between the two oblique supporting rods (42).
8. The self-climbing platform of unloading of claim 7, wherein: short channel steel (44) are all located to tip that diagonal bracing pole (42) and horizon bar (41) and steelframe are connected, it is fixed through the screw rod after short channel steel (44) are detained on steelframe mullion the keel.
9. The self-climbing platform of unloading of claim 1, wherein: the wall-attached support is arranged on the structural wall body, a steel wire rope is fixed on a bearing bolt on the wall-attached support, and the steel wire rope penetrates through a steel wire rope pulley and then is fixed with a lifting hook of the electric hoist.
10. A self-climbing platform according to any one of claims 1 to 9, wherein: and an inclined pull rod is also arranged between the material loading platform (3) and the guide rail (5) above the material loading platform.
CN202021868677.4U 2020-09-01 2020-09-01 Self-climbing discharging platform Expired - Fee Related CN213268983U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021868677.4U CN213268983U (en) 2020-09-01 2020-09-01 Self-climbing discharging platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021868677.4U CN213268983U (en) 2020-09-01 2020-09-01 Self-climbing discharging platform

Publications (1)

Publication Number Publication Date
CN213268983U true CN213268983U (en) 2021-05-25

Family

ID=75979549

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021868677.4U Expired - Fee Related CN213268983U (en) 2020-09-01 2020-09-01 Self-climbing discharging platform

Country Status (1)

Country Link
CN (1) CN213268983U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114961228A (en) * 2022-05-05 2022-08-30 中交第三航务工程局有限公司 Wall-attached device of external climbing frame
CN115788073A (en) * 2022-11-29 2023-03-14 中国十七冶集团有限公司 Climbing method for attached discharging platform
CN116201348A (en) * 2023-01-04 2023-06-02 中煤地建设工程有限公司 Frame structure is climbed in outer wall construction and health safety monitoring system thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114961228A (en) * 2022-05-05 2022-08-30 中交第三航务工程局有限公司 Wall-attached device of external climbing frame
CN115788073A (en) * 2022-11-29 2023-03-14 中国十七冶集团有限公司 Climbing method for attached discharging platform
CN116201348A (en) * 2023-01-04 2023-06-02 中煤地建设工程有限公司 Frame structure is climbed in outer wall construction and health safety monitoring system thereof

Similar Documents

Publication Publication Date Title
CN213268983U (en) Self-climbing discharging platform
CN101672102B (en) Steel structural overhead ceiling construction platform
CN202882378U (en) Attached type lifting scaffold
CN201679220U (en) Single mast climbing working platform
CN202000646U (en) Self-lifting construction platform integrating vertical transportation device and mould frame
CN201598820U (en) Single point suspension external hanging bracket
CN101892736A (en) High altitude moving hanging basket construction method
CN111236613A (en) Protection platform for building construction and use method thereof
CN111075182A (en) Attached lifting scaffold hangs hoist system upside down
CN202214974U (en) 5.8 m ultrahigh external lifting scaffold
CN220376298U (en) Hanging basket lifting device
CN212271570U (en) Elevator shaft adhesion lifting protection platform
CN204024013U (en) A kind of self-climbing lifting material platform
CN108946542A (en) A kind of small gun carriage and its construction method
CN202441045U (en) Rail-type electric attached lifting scaffold
CN211736309U (en) Building climbing frame lifting device
CN101701492A (en) Guide rail frame type adhering lifting scaffold
CN216007754U (en) All-steel attached lifting scaffold
CN208732495U (en) A kind of small gun carriage
CN214424055U (en) Attached lifting scaffold platform of unloading
CN103225390B (en) Hollow facade pulley guide attached-type lifting scaffold
CN2209702Y (en) Saffold
CN203499232U (en) Attached lifting scaffold
CN206784960U (en) Lower supporting type overhanging unloading platform
CN202899720U (en) Steel pole provided with foot treadles and used for high-tension transmission line iron tower

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210525