CN212583162U - Assembled integral protection operation platform - Google Patents

Assembled integral protection operation platform Download PDF

Info

Publication number
CN212583162U
CN212583162U CN202020628178.1U CN202020628178U CN212583162U CN 212583162 U CN212583162 U CN 212583162U CN 202020628178 U CN202020628178 U CN 202020628178U CN 212583162 U CN212583162 U CN 212583162U
Authority
CN
China
Prior art keywords
climbing ladder
fixing
supporting plate
rod
dead lever
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020628178.1U
Other languages
Chinese (zh)
Inventor
何克扬
方兴
邱少冬
陈益平
王恺
韦志伟
吴耀东
岳林海
张伟锋
李宗彬
姜明志
黄海林
陈顺亚
盘云鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangxi Jiaojian Engineering Construction Group Co.,Ltd.
Original Assignee
Guangxi Changchang Road & Bridge Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangxi Changchang Road & Bridge Construction Co ltd filed Critical Guangxi Changchang Road & Bridge Construction Co ltd
Priority to CN202020628178.1U priority Critical patent/CN212583162U/en
Application granted granted Critical
Publication of CN212583162U publication Critical patent/CN212583162U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Ladders (AREA)

Abstract

The utility model discloses an integral protection work platform of pin-connected panel, including vertical support bar, the pot head is equipped with the connection mounting that the section is "L" shape about the vertical support bar, and the vertical support bar of below is fixed with the support base, it has horizontal dead lever to connect the inboard laminating of mounting, and vertical support bar, the bolt mounting hole that the position corresponds is seted up to the link of connecting mounting and horizontal dead lever to the inside fixing bolt that is equipped with of bolt mounting hole, the inboard of horizontal dead lever is equipped with the backup pad dead lever, and has set up the operation backup pad on the backup pad dead lever, and the operation backup pad outer wall has seted up climbing ladder fixed orifices and workpiece setting hole, the inside climbing ladder that has set up the slope form of climbing ladder fixed orifices. The assembly type integral protection operation platform is flexible to assemble and disassemble, is tightly matched, is not easy to loosen and swing, saves the assembling and disassembling time and labor on the premise of ensuring safety, has cyclic utilization, and improves the economical efficiency of the safety protection platform.

Description

Assembled integral protection operation platform
Technical Field
The utility model relates to a construction work platform technical field specifically is the whole protection work platform of pin-connected panel.
Background
The building need use work platform at the in-process of construction mostly, and work platform includes chassis, support, constitutes after support and the chassis cooperation, sets up work platform around the building, and the staff can process the building like this.
The in-process that current work platform used need set up extra climbing structure, can waste a large amount of manpowers and physics moreover in the dismouting, and the not hard up condition appears easily in the connection between each part moreover.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a whole protection operation platform of pin-connected panel to the industry platform that proposes in solving the background art needs to set up extra climbing structure at the in-process that uses, can waste a large amount of manpowers and physics in addition in the dismouting, and the not hard up problem appears easily in the connection between each part moreover.
In order to achieve the above object, the utility model provides a following technical scheme: pin-connected panel whole protection work platform, including vertical support bar, the pot head is equipped with the connection mounting that the section is "L" shape about the vertical support bar, and the vertical support bar of below is fixed with the support base, it has horizontal dead lever to connect the inboard laminating of mounting, and the link of vertical support bar, connection mounting and horizontal dead lever sets up the bolt mounting hole that the position corresponds to bolt mounting hole inside is equipped with fixing bolt, the inboard of horizontal dead lever is equipped with the backup pad dead lever, and has set up the operation backup pad on the backup pad dead lever to climbing ladder fixed orifices and workpiece setting hole have been seted up to operation backup pad outer wall, the inside climbing ladder that has set up the slope form of climbing ladder fixed orifices.
Preferably, the outer wall of the vertical supporting rod is provided with an annular groove, and the inner shape of the groove of the vertical supporting rod is matched with the bent inner shape of the connecting and fixing piece.
Preferably, a rectangular protective net rack is arranged above and below the transverse fixing rod.
Preferably, the operation supporting plate is a wood plate, and the workpiece mounting hole is located on a central line of the operation supporting plate.
Preferably, the two climbing ladder fixing holes are arranged, and the two climbing ladder fixing holes are symmetrically distributed about the central line of the workpiece mounting hole.
Preferably, threaded holes are formed in the two ends of the climbing ladder, screws are arranged in the threaded holes of the climbing ladder, and the climbing ladder is fixed on the operation supporting plate through the screws.
Compared with the prior art, the beneficial effects of the utility model are that: the assembly type integral protection operation platform is flexible to assemble and disassemble, is tightly matched, is not easy to loosen and swing, saves the assembling and disassembling time and labor on the premise of ensuring safety, has cyclic utilization, and improves the economical efficiency of the safety protection platform. The recess of the vertical support pole outer lane of the device can block connecting the mounting, improves the effect of connecting the fixed vertical support pole of mounting, and the protection rack can be plugged up below horizontal dead lever in addition, avoids the staff to drop from the clearance of horizontal dead lever, and the climbing ladder fixed orifices plays the effect of holding the climbing ladder, makes things convenient for the staff to scramble, and the operation backup pad adopts the plank, and weight ratio is lighter, the work of convenient transport.
Drawings
FIG. 1 is a schematic structural view of the assembly type integral protection operation platform of the present invention;
FIG. 2 is a top view of the vertical support rod of the assembled integral protection operation platform of the present invention;
FIG. 3 is an enlarged schematic structural view of the assembly type integral protection operation platform at A in FIG. 1;
fig. 4 is the enlarged schematic structural diagram of the B position in fig. 2 of the assembled integral protection operation platform of the present invention.
In the figure: 1. vertical bracing piece, 2, connection mounting, 3, fixing bolt, 4, horizontal dead lever, 5, protection rack, 6, support base, 7, operation backup pad, 8, climbing ladder fixed orifices, 9, backup pad dead lever, 10, climbing ladder, 11, workpiece setting hole, 12, bolt mounting hole.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, the present invention provides a technical solution: the assembled integral protection operation platform comprises a vertical supporting rod 1, wherein the upper end and the lower end of the vertical supporting rod 1 are sleeved with a connecting and fixing part 2 with an L-shaped section, a supporting base 6 is fixed on the vertical supporting rod 1 at the lowest part, an annular groove is formed in the outer wall of the vertical supporting rod 1, the inner shape of the groove of the vertical supporting rod 1 is matched with the bending inner shape of the connecting and fixing part 2, the groove in the outer wall of the vertical supporting rod 1 of the structure plays a role of accommodating the connecting and fixing part 2, the upper end and the lower end of the connecting and fixing part 2 are clamped, the effect of fixing the vertical supporting rod 1 by the connecting and fixing part 2 is improved, a transverse fixing rod 4 is attached to the inner side of the connecting and fixing part 2, a bolt mounting hole 12 with a corresponding position is formed at the connecting end of the vertical supporting rod 1, a fixing bolt 3 is arranged, and the working supporting plate 7 is set up on the supporting plate fixing rod 9, and the outer wall of the working supporting plate 7 is equipped with a climbing ladder fixing hole 8 and a workpiece mounting hole 11, the upper and lower parts of the transverse fixing rod 4 are equipped with a rectangular protective net rack 5, the protective net rack 5 of the structure can block the gap between the transverse fixing rods 4 to avoid the user from falling from the gap between the transverse fixing rods 4, the working supporting plate 7 is made of wood, and the workpiece mounting hole 11 is positioned on the central line of the working supporting plate 7, the working supporting plate 7 of the structure has light weight, which is convenient for the user to carry, and the working supporting plate 7 can form a working platform, the inner part of the climbing ladder fixing hole 8 is set up with an inclined climbing ladder 10, the climbing ladder fixing holes 8 are two, and the climbing ladder fixing holes 8 are symmetrically distributed about the central line of the workpiece mounting hole 11, the climbing ladder fixing hole 8 of the structure, be provided with two climbing ladder fixed orifices 8 so the device one deck can set up two climbing ladders 10, the user can be simultaneously from top to bottom, the both ends of climbing ladder 10 set up threaded hole, and the threaded hole of climbing ladder 10 is equipped with the screw, and climbing ladder 10 passes through the screw fixation on operation backup pad 7, the climbing ladder 10 of this structure passes through the screw fixation on operation backup pad 7, make things convenient for the dismouting work of climbing ladder 10, the user can enter into on the operation backup pad 7 of next floor or one deck through climbing ladder 10.
The working principle is as follows: when the assembled integral protection operation platform is used, firstly, the supporting base 6 of the device is arranged at a proper place, then the fixing bolt 3 is fixed in the bolt mounting holes 12 of the vertical supporting rod 1, the connecting and fixing part 2 and the transverse fixing rod 4, so that the connecting and fixing part 2 fixes different vertical supporting rods 1, the transverse fixing rod 4 is fixed on the connecting and fixing part 2, the connecting and fixing part 2 is transversely connected, then the protection net rack 5 is arranged at the position between the transverse fixing rods 4, finally, the operation supporting plate 7 can be laid on the supporting plate fixing rod 9, so that a building main body to be processed is positioned at the position of the workpiece mounting hole 11, finally, the climbing ladder 10 is fixed on the inner wall of the climbing ladder fixing hole 8 through a screw, thus, a user can enter the next layer of operation supporting plate 7 or the previous layer of supporting plate operation 7 through the climbing ladder 10, thereby completing a series of works.
Although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments or portions thereof without departing from the spirit and scope of the invention.

Claims (6)

1. Pin-connected panel whole protection work platform, including vertical support bar (1), its characterized in that: the upper end and the lower end of the vertical supporting rod (1) are sleeved with a connecting and fixing piece (2) with an L-shaped section, a supporting base (6) is fixed on the vertical supporting rod (1) at the lowest part, a transverse fixing rod (4) is attached to the inner side of the connecting and fixing piece (2), and the connecting ends of the vertical supporting rod (1), the connecting fixing piece (2) and the transverse fixing rod (4) are provided with bolt mounting holes (12) with corresponding positions, a fixing bolt (3) is arranged in the bolt mounting hole (12), a supporting plate fixing rod (9) is arranged on the inner side of the transverse fixing rod (4), an operation supporting plate (7) is arranged on the supporting plate fixing rod (9), and the outer wall of the operation supporting plate (7) is provided with a climbing ladder fixing hole (8) and a workpiece mounting hole (11), an inclined climbing ladder (10) is erected in the climbing ladder fixing hole (8).
2. The assembled integral protection work platform according to claim 1, characterized in that: the outer wall of the vertical supporting rod (1) is provided with an annular groove, and the inner shape of the groove of the vertical supporting rod (1) is matched with the bent inner shape of the connecting and fixing piece (2).
3. The assembled integral protection work platform according to claim 1, characterized in that: and a rectangular protective net rack (5) is arranged above and below the transverse fixing rod (4).
4. The assembled integral protection work platform according to claim 1, characterized in that: the operation supporting plate (7) is made of a wood plate, and the workpiece mounting hole (11) is located on the central line of the operation supporting plate (7).
5. The assembled integral protection work platform according to claim 1, characterized in that: the two climbing ladder fixing holes (8) are arranged, and the two climbing ladder fixing holes (8) are symmetrically distributed about the center line of the workpiece mounting hole (11).
6. The assembled integral protection work platform according to claim 1, characterized in that: threaded holes are formed in two ends of the climbing ladder (10), screws are arranged in the threaded holes of the climbing ladder (10), and the climbing ladder (10) is fixed on the operation supporting plate (7) through the screws.
CN202020628178.1U 2020-04-23 2020-04-23 Assembled integral protection operation platform Active CN212583162U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020628178.1U CN212583162U (en) 2020-04-23 2020-04-23 Assembled integral protection operation platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020628178.1U CN212583162U (en) 2020-04-23 2020-04-23 Assembled integral protection operation platform

Publications (1)

Publication Number Publication Date
CN212583162U true CN212583162U (en) 2021-02-23

Family

ID=74649469

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020628178.1U Active CN212583162U (en) 2020-04-23 2020-04-23 Assembled integral protection operation platform

Country Status (1)

Country Link
CN (1) CN212583162U (en)

Similar Documents

Publication Publication Date Title
CN205822747U (en) Architectural engineering scaffold
CN212583162U (en) Assembled integral protection operation platform
CN219528334U (en) Scaffold for building construction
CN211313306U (en) Movable scaffold for constructional engineering
CN111350337A (en) Bearing frame for building construction
CN215331393U (en) Protection device on scaffold
CN214785757U (en) Scaffold frame that building engineering used
CN214462346U (en) Assembled scaffold for housing construction engineering
CN214170118U (en) Electric power iron tower convenient to maintenance
CN211873780U (en) Attached safety operation protection platform for building construction
CN209129335U (en) A kind of construction carrier
CN204876579U (en) Building construction system
CN209538625U (en) A kind of scaffold
CN215055104U (en) Multifunctional scaffold for construction engineering
CN201245965Y (en) Hanging scaffold
CN206198634U (en) A kind of sand hill frame
CN213204897U (en) Scaffold for building construction
CN216196420U (en) Interior decoration auxiliary equipment
CN217782775U (en) Scaffold for civil engineering construction
CN220247534U (en) Scaffold with auxiliary inclined supporting structure
CN219365350U (en) Movable scaffold tower
CN203654706U (en) Movable operation platform for pot top
CN219548303U (en) Scaffold for civil engineering construction
CN215760321U (en) Cantilever device for building engineering construction
CN215803136U (en) Portable scaffold ladder

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: Building F3, Group F, Nanning ASEAN Enterprise Headquarters Port, No. 10, Xinji Road, Gaoxin District, Nanning City, Guangxi Zhuang Autonomous Region, 530000

Patentee after: Guangxi Jiaojian Engineering Construction Group Co.,Ltd.

Address before: 530000 15, West Guangxi building, 4 Kok Road, Nanning, the Guangxi Zhuang Autonomous Region

Patentee before: GUANGXI CHANGCHANG ROAD & BRIDGE CONSTRUCTION Co.,Ltd.